Savings through technology
Hydronic Savings Summary
Balance your
hydronic system
and cut electricity
costs immediately
Many hydronic and booster pumps
are oversized and operate against
valves that restrict flow. They often
use 30% to 50% more electricity
than necessary.
Follow these four steps to optimize the efficiency of your hydronic system:
Take advantage of AUDIT FUNDING
incentives to uncover the energy
savings potential for your hydronic
systems with the help of a
balancing professional.
Apply for RETROFIT PROGRAM
incentives to implement the
recommended balancing
improvements to optimize your
hydronic system.
Reap the rewards with no impact
on your facility and paybacks as
short as four months.
Hydronic Systems
Balancing
1
2
3
4
The RETROFIT PROGRAM provides
financial incentives of up to 50 per cent
of project costs to replace or upgrade
existing inefficient equipment with
high-efficiency equipment.
How many pumps do you have?
Each could be delivering big savings.
If you own or manage a commercial, multi-residential or
public sector property you likely have numerous hydronic and
booster pumps for your hot and cold water systems. If they
are standard fixed-speed pumps, they could be consuming
30% to 50% more electricity than necessary.
Apply for the incentives available through both the AUDIT
FUNDING and RETROFIT PROGRAM to upgrade your pumps
and achieve a potential payback in as little as four months.
Start with a hydronic balancing
professional or energy auditor
A qualified, experienced hydronic balancing professional can
isolate the electricity used by the motors on your pumps and
identify the potential savings achievable by upgrading them
with Variable Frequency Drives.
Under the AUDIT FUNDING program, you can qualify for
incentives of up to 50% of the cost of the audit to a maximum
of $5,000. You will receive a comprehensive auditor’s report,
which identifies cost benefits and prioritizes the implementation
of the projects.
Assumptions: duty cycle
18 hrs./day, annual usage
365 days/year, energy
cost $.10/kWh
We’ll work with you to apply for the
RETROFIT PROGRAM
The hydronic balancing professional’s report will provide you
with all the details of your current pump systems, which can
be used in your application for the RETROFIT PROGRAM.
We’ll help you through the pre-approval process to get your
project moving as quickly as possible.
Incentives are available for these projects. Talk to your
Toronto Hydro representative – we can help you through
the application process and maximize your incentives.
Remember, to qualify for the RETROFIT PROGRAM, it’s
important that your application is approved before any
work has started.
See the following example for potential savings achieved by
upgrading a 25 HP motor.
Benefits of a 25 HP motor with a
variable frequency drive
Assume pump speed is reduced by 20%, reducing
energy consumption by 50%
Subject to additional terms and conditions found at torontohydro.com/technology. Subject to change
without notice. Funded by the Ontario Power Authority and offered by Toronto Hydro. A mark of the Province of
Ontario protected under Canadian trade-mark law. Used under sublicence. OM
Official Mark of the Ontario Power
Authority. Used under licence. The star design is a trade-mark of Toronto Hydro Corporation. Used under licence.
‘Toronto Hydro’ means Toronto Hydro-Electric System Limited.
Contact us today to start your savings
torontohydro.com/technology
T: 416.542.3388	E: cdm@torontohydro.com
Annual energy cost without VFD $12,250
Annual energy cost with VFD $6,125
Annual energy savings $6,125
Incentive for VFD $1,340
Cost of VFD $3,500
Financial Benefit (Incentive + Savings - Cost) $3,965
Payback 4 months
Ask us how our Qualified
Applicant Representatives
can help you complete
RETROFIT PROGRAM
applications at no charge.

More Related Content

What's hot

Renewables presentationv2
Renewables presentationv2Renewables presentationv2
Renewables presentationv2
edgeer
 
Energy optimization management for industry
Energy optimization management for industryEnergy optimization management for industry
Energy optimization management for industry
Avanceon
 
Venkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamVenkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kam
guest17a0764
 
NaviFleet Fleet Management System For Heavy Duty Applications
NaviFleet Fleet Management System For Heavy Duty ApplicationsNaviFleet Fleet Management System For Heavy Duty Applications
NaviFleet Fleet Management System For Heavy Duty Applications
EcoTelematics Sofjins
 

What's hot (19)

Enmat details of each chart
Enmat details of each chartEnmat details of each chart
Enmat details of each chart
 
Day-3, Mr. Ajit M. Sharan
Day-3, Mr. Ajit M. SharanDay-3, Mr. Ajit M. Sharan
Day-3, Mr. Ajit M. Sharan
 
Enmat v2.2 presentation september 2014
Enmat v2.2 presentation september  2014Enmat v2.2 presentation september  2014
Enmat v2.2 presentation september 2014
 
Day-3, Mr. GC Dattaroy, Ippai, Goa
Day-3, Mr. GC Dattaroy, Ippai, GoaDay-3, Mr. GC Dattaroy, Ippai, Goa
Day-3, Mr. GC Dattaroy, Ippai, Goa
 
Anglian Water Trial – Cambridge
Anglian Water Trial – CambridgeAnglian Water Trial – Cambridge
Anglian Water Trial – Cambridge
 
Steve fraser managing director fbe presentation
Steve fraser managing director fbe presentationSteve fraser managing director fbe presentation
Steve fraser managing director fbe presentation
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
 
January 2016: Oregon Clean Fuels Program, Jordan Ramer of EV Connect
January 2016: Oregon Clean Fuels Program, Jordan Ramer of EV Connect January 2016: Oregon Clean Fuels Program, Jordan Ramer of EV Connect
January 2016: Oregon Clean Fuels Program, Jordan Ramer of EV Connect
 
How to Win an Investment Approval from your Board
How to Win an Investment Approval from your BoardHow to Win an Investment Approval from your Board
How to Win an Investment Approval from your Board
 
E waste
E wasteE waste
E waste
 
Pacific Airwell, Master Slidedeck
Pacific Airwell, Master SlidedeckPacific Airwell, Master Slidedeck
Pacific Airwell, Master Slidedeck
 
Renewables presentationv2
Renewables presentationv2Renewables presentationv2
Renewables presentationv2
 
January 2016: Oregon Clean Fuels Program, Cory-Ann Wind of DEQ
January 2016: Oregon Clean Fuels Program, Cory-Ann Wind of DEQJanuary 2016: Oregon Clean Fuels Program, Cory-Ann Wind of DEQ
January 2016: Oregon Clean Fuels Program, Cory-Ann Wind of DEQ
 
Wind Industry and Gear Boxes
Wind Industry and Gear BoxesWind Industry and Gear Boxes
Wind Industry and Gear Boxes
 
Distributing Reports via Email and Using Shared Report Groups in EnergyCAP
Distributing Reports via Email and Using Shared Report Groups in EnergyCAPDistributing Reports via Email and Using Shared Report Groups in EnergyCAP
Distributing Reports via Email and Using Shared Report Groups in EnergyCAP
 
Energy optimization management for industry
Energy optimization management for industryEnergy optimization management for industry
Energy optimization management for industry
 
Venkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamVenkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kam
 
NaviFleet Fleet Management System For Heavy Duty Applications
NaviFleet Fleet Management System For Heavy Duty ApplicationsNaviFleet Fleet Management System For Heavy Duty Applications
NaviFleet Fleet Management System For Heavy Duty Applications
 
Catalyst 2016: Introduction to Cenergistic
Catalyst 2016: Introduction to CenergisticCatalyst 2016: Introduction to Cenergistic
Catalyst 2016: Introduction to Cenergistic
 

Similar to Hydronic Balancing Incentives

Green business conf 041410
Green business conf 041410Green business conf 041410
Green business conf 041410
EllieNowels
 
Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014
Company Spotlight
 
Fuelcell investor presentation_14
Fuelcell investor presentation_14Fuelcell investor presentation_14
Fuelcell investor presentation_14
Company Spotlight
 
Case Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial CultureCase Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial Culture
Fermenta Biotech Ltd
 
Peachtree Rebate Report_January 2016
Peachtree Rebate Report_January 2016Peachtree Rebate Report_January 2016
Peachtree Rebate Report_January 2016
Dan O'Neal
 

Similar to Hydronic Balancing Incentives (20)

Cooling Efficiencies
Cooling EfficienciesCooling Efficiencies
Cooling Efficiencies
 
MURB Incentives
MURB IncentivesMURB Incentives
MURB Incentives
 
Commercial Case Studies
Commercial Case StudiesCommercial Case Studies
Commercial Case Studies
 
B2B Marketing Portfolio
B2B Marketing PortfolioB2B Marketing Portfolio
B2B Marketing Portfolio
 
Green business conf 041410
Green business conf 041410Green business conf 041410
Green business conf 041410
 
Global Renewable Energy ENgines presentation at LLNL
Global Renewable Energy ENgines presentation at LLNLGlobal Renewable Energy ENgines presentation at LLNL
Global Renewable Energy ENgines presentation at LLNL
 
New Edition Bridget Fundikwa - Green Cape
New Edition Bridget Fundikwa - Green CapeNew Edition Bridget Fundikwa - Green Cape
New Edition Bridget Fundikwa - Green Cape
 
Presentation
PresentationPresentation
Presentation
 
Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014
 
Fuelcell investor presentation_14
Fuelcell investor presentation_14Fuelcell investor presentation_14
Fuelcell investor presentation_14
 
PG&E Demand Response Programs
PG&E Demand Response ProgramsPG&E Demand Response Programs
PG&E Demand Response Programs
 
Scalable Hydrogen Energy Platform (SHEP).pdf
Scalable Hydrogen Energy Platform (SHEP).pdfScalable Hydrogen Energy Platform (SHEP).pdf
Scalable Hydrogen Energy Platform (SHEP).pdf
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Syn tawa pre development loan opportunity 12.16.15
Syn tawa pre development loan opportunity 12.16.15Syn tawa pre development loan opportunity 12.16.15
Syn tawa pre development loan opportunity 12.16.15
 
Four Steps to Qualifying for Power Rebates
Four Steps to Qualifying for Power RebatesFour Steps to Qualifying for Power Rebates
Four Steps to Qualifying for Power Rebates
 
PowEra Feasibility Analysis Pitch Book
PowEra Feasibility Analysis Pitch BookPowEra Feasibility Analysis Pitch Book
PowEra Feasibility Analysis Pitch Book
 
SESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for AngelsSESPco Presentation for Crowd for Angels
SESPco Presentation for Crowd for Angels
 
Case Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial CultureCase Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial Culture
 
Peachtree Rebate Report_January 2016
Peachtree Rebate Report_January 2016Peachtree Rebate Report_January 2016
Peachtree Rebate Report_January 2016
 

Recently uploaded

NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
Amil Baba Dawood bangali
 
Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024Monthly Economic Monitoring of Ukraine No. 232, May 2024
what is the future of Pi Network currency.
what is the future of Pi Network currency.what is the future of Pi Network currency.
what is the future of Pi Network currency.
DOT TECH
 
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
ydubwyt
 
一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理
一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理
一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理
zsewypy
 
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
yonemuk
 

Recently uploaded (20)

NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
 
Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024
 
what is the future of Pi Network currency.
what is the future of Pi Network currency.what is the future of Pi Network currency.
what is the future of Pi Network currency.
 
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
一比一原版BCU毕业证伯明翰城市大学毕业证成绩单如何办理
 
how can i trade pi coins for Bitcoin easily.
how can i trade pi coins for Bitcoin easily.how can i trade pi coins for Bitcoin easily.
how can i trade pi coins for Bitcoin easily.
 
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdfIsios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdf
 
how to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchangehow to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchange
 
Bitcoin Masterclass TechweekNZ v3.1.pptx
Bitcoin Masterclass TechweekNZ v3.1.pptxBitcoin Masterclass TechweekNZ v3.1.pptx
Bitcoin Masterclass TechweekNZ v3.1.pptx
 
一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理
一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理
一比一原版Adelaide毕业证阿德莱德大学毕业证成绩单如何办理
 
Can a Pi network coin ever be sold out: I am ready to sell mine.
Can a Pi network coin ever be sold out: I am ready to sell mine.Can a Pi network coin ever be sold out: I am ready to sell mine.
Can a Pi network coin ever be sold out: I am ready to sell mine.
 
How can I sell my Pi coins in Vietnam easily?
How can I sell my Pi coins in Vietnam easily?How can I sell my Pi coins in Vietnam easily?
How can I sell my Pi coins in Vietnam easily?
 
how can I transfer pi coins to someone in a different country.
how can I transfer pi coins to someone in a different country.how can I transfer pi coins to someone in a different country.
how can I transfer pi coins to someone in a different country.
 
Introduction to Indian Financial System ()
Introduction to Indian Financial System ()Introduction to Indian Financial System ()
Introduction to Indian Financial System ()
 
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
一比一原版UO毕业证渥太华大学毕业证成绩单如何办理
 
what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024
 
Summary of financial results for 1Q2024
Summary of financial  results for 1Q2024Summary of financial  results for 1Q2024
Summary of financial results for 1Q2024
 
how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.
 
how can I sell my locked pi coins safety.
how can I sell my locked pi coins safety.how can I sell my locked pi coins safety.
how can I sell my locked pi coins safety.
 
The new type of smart, sustainable entrepreneurship and the next day | Europe...
The new type of smart, sustainable entrepreneurship and the next day | Europe...The new type of smart, sustainable entrepreneurship and the next day | Europe...
The new type of smart, sustainable entrepreneurship and the next day | Europe...
 
how to sell pi coins in Canada, Uk and Australia
how to sell pi coins in Canada, Uk and Australiahow to sell pi coins in Canada, Uk and Australia
how to sell pi coins in Canada, Uk and Australia
 

Hydronic Balancing Incentives

  • 1. November 2012 Savings through technology Hydronic Savings Summary Balance your hydronic system and cut electricity costs immediately Many hydronic and booster pumps are oversized and operate against valves that restrict flow. They often use 30% to 50% more electricity than necessary. Follow these four steps to optimize the efficiency of your hydronic system: Take advantage of AUDIT FUNDING incentives to uncover the energy savings potential for your hydronic systems with the help of a balancing professional. Apply for RETROFIT PROGRAM incentives to implement the recommended balancing improvements to optimize your hydronic system. Reap the rewards with no impact on your facility and paybacks as short as four months. Hydronic Systems Balancing 1 2 3 4
  • 2. The RETROFIT PROGRAM provides financial incentives of up to 50 per cent of project costs to replace or upgrade existing inefficient equipment with high-efficiency equipment. How many pumps do you have? Each could be delivering big savings. If you own or manage a commercial, multi-residential or public sector property you likely have numerous hydronic and booster pumps for your hot and cold water systems. If they are standard fixed-speed pumps, they could be consuming 30% to 50% more electricity than necessary. Apply for the incentives available through both the AUDIT FUNDING and RETROFIT PROGRAM to upgrade your pumps and achieve a potential payback in as little as four months. Start with a hydronic balancing professional or energy auditor A qualified, experienced hydronic balancing professional can isolate the electricity used by the motors on your pumps and identify the potential savings achievable by upgrading them with Variable Frequency Drives. Under the AUDIT FUNDING program, you can qualify for incentives of up to 50% of the cost of the audit to a maximum of $5,000. You will receive a comprehensive auditor’s report, which identifies cost benefits and prioritizes the implementation of the projects. Assumptions: duty cycle 18 hrs./day, annual usage 365 days/year, energy cost $.10/kWh We’ll work with you to apply for the RETROFIT PROGRAM The hydronic balancing professional’s report will provide you with all the details of your current pump systems, which can be used in your application for the RETROFIT PROGRAM. We’ll help you through the pre-approval process to get your project moving as quickly as possible. Incentives are available for these projects. Talk to your Toronto Hydro representative – we can help you through the application process and maximize your incentives. Remember, to qualify for the RETROFIT PROGRAM, it’s important that your application is approved before any work has started. See the following example for potential savings achieved by upgrading a 25 HP motor. Benefits of a 25 HP motor with a variable frequency drive Assume pump speed is reduced by 20%, reducing energy consumption by 50% Subject to additional terms and conditions found at torontohydro.com/technology. Subject to change without notice. Funded by the Ontario Power Authority and offered by Toronto Hydro. A mark of the Province of Ontario protected under Canadian trade-mark law. Used under sublicence. OM Official Mark of the Ontario Power Authority. Used under licence. The star design is a trade-mark of Toronto Hydro Corporation. Used under licence. ‘Toronto Hydro’ means Toronto Hydro-Electric System Limited. Contact us today to start your savings torontohydro.com/technology T: 416.542.3388 E: cdm@torontohydro.com Annual energy cost without VFD $12,250 Annual energy cost with VFD $6,125 Annual energy savings $6,125 Incentive for VFD $1,340 Cost of VFD $3,500 Financial Benefit (Incentive + Savings - Cost) $3,965 Payback 4 months Ask us how our Qualified Applicant Representatives can help you complete RETROFIT PROGRAM applications at no charge.