3. Outline
3
ADPI-DSC
Reviewing the design drawings and
tender documents
Attending the progress meetings
Monitoring the condition on site
(Package 1A )
Preparation of cooling system
presentation
BAC FM
Monitoring the progress of AC
installation project at level 2.8 arrivals
Performing Planned Preventive
Maintenance (PPM) and corrective
maintenance
Research
7. Learning Outcomes
Gaining on-hand experience
Enhancing technical knowledge
Extending professional network
Interacting with colleague from different backgrounds