1
Human Resource Management – An Introduction
Dr. Smita Choudhary
Faculty HR & OB
SMU Learning Centre, Alwar LC Code
03034
2
Contents
•Introduction to Human Resource Management
•Concept of Human Resource Management
•Scope of Human Resource Management
•History of Human Resource Management
•Function of Human Resource Management
•Role of HR Executives
•Summary
•Check Your Learning
•Activity
SMU Learning Centre, Alwar LC Code 03034
3
Objectives
After studying this chapter, you will be
able to------
• Describe the concept of HRM
• Define the scope of HRM
• Describe the history of HRM
• Explain the functions of human resource
• Recognize the role of HR executives
SMU Learning Centre, Alwar LC Code
03034
4
Introduction
• Every organization is essentially a blend of material and Human Resource
(HR).
• Human Resource refers to the knowledge, education, skills, training and
ability of the members of the organization. Human resources are the most
valuable and unique assets of an organization.
• Even though specific human resource functions/activities are the
responsibility of the human resource department, the actual management of
human resources is the responsibility of all the managers in an organization.
• The scarcity of talented resources and the growing expectations of the
modern day worker have further increased the complexity of the human
resource function.
SMU Learning Centre, Alwar LC Code
03034
5
Concept of Human Resource Management
• Today’s organizations constantly mould itself to meet the
business challenges despite economic, political and social
patterns in which it exists.
• The efforts made by organizations to sustain business metrics
like revenue, profits and growth, market share is possible only
through the people in the organization who work towards
making this happen within the enterprise.
• According to Fisher, Schoendfelt and Shaw in their book “Human
Resources Management,“ HRM involves all management
decisions and practices that directly affect or influence the
people or Human resources who work for the organisation”.
SMU Learning Centre, Alwar LC Code
03034
6
Concept of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
7
A human resource manager has to build an
effective workforce, handle the
expectations of the employees and ensure
that they perform at their best.
Some of the Objectives of HRM
The objectives of HRM can be classified into
the following:
•To act as a link between the top
management and the employees.
•To arrange and maintain adequate
manpower inventory, which in turn,
ensures the smooth working of the
organisation.
•To help keep up ethical values and
behaviour amongst employees both within
and outside the organisation.
A human resource manager has to build an
effective workforce, handle the
expectations of the employees and ensure
that they perform at their best.
Some of the Objectives of HRM
The objectives of HRM can be classified into
the following:
•To act as a link between the top
management and the employees.
•To arrange and maintain adequate
manpower inventory, which in turn,
ensures the smooth working of the
organisation.
•To help keep up ethical values and
behaviour amongst employees both within
and outside the organisation.
Concept of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
8
• The scope of HRM is wide and far-reaching.
• An understanding of HRM is important to anyone who is employed in an
organisation.
• HR issues become important wherever there is a group of workers. Staffing is
performed by all the managers as a managerial function, either directly or
indirectly through HR department.
• All managers are, in this way, HR managers, since they get involved in HR
activities such as selecting, training, inducting, compensating and motivating
the employees along with industrial relations activities.
• Scope of HRM can be classified under the following heads:
 HRM in personnel management
 HRM in employee welfare
 HRM in industrial relations
• The scope of HRM is wide and far-reaching.
• An understanding of HRM is important to anyone who is employed in an
organisation.
• HR issues become important wherever there is a group of workers. Staffing is
performed by all the managers as a managerial function, either directly or
indirectly through HR department.
• All managers are, in this way, HR managers, since they get involved in HR
activities such as selecting, training, inducting, compensating and motivating
the employees along with industrial relations activities.
• Scope of HRM can be classified under the following heads:
 HRM in personnel management
 HRM in employee welfare
 HRM in industrial relations
Scope of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
9
Scope of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
10
History of Human Resource Management
• There is a vast difference between modern HRM and the personnel management
that was prevalent decades ago.
• By the end of the twentieth century, the managerial philosophy that had defined
the personnel function had undergone radical changes.
• There are various approaches:
 Scientific management approach: Fredrick Taylor, who is widely
considered to be the father of scientific management, focused on motions that
were required for each job, the tools used and the time needed to accomplish
each task.
 Human relations approach: The Hawthorne studies conducted during the
1930 and 1940s, forced organizations to shift their attention from scientific
management approach to human relations approach.
• It was recognized that treating employees with respect would improve employee
satisfaction and help in achieving higher productivity.
• Human resources approach: Human resources treat people as resources, rather than
factors of production, or as human beings who act on the basis of emotions alone.
SMU Learning Centre, Alwar LC Code
03034
11
Some of the principles of human resource approach are:
•Employees are assets to an organisation.
•Policies, programmes and practices must cater to the needs
of employees and should help them in their work and in their
personal development.
•Employee rewards may be monetary such as hike in salary or
increments or it may be non-monetary such as change in
designation, status, fringe benefits, etc.
History of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
12
Function of Human Resource Management
•Human resource management involves blending the traditional
administrative functions along with the changing concepts of employee
welfare in the organisation.
•The retention of employees is dependent on how they are perceived and
treated in the organisation based on their performance, abilities and skills.
•The extent of activities carried out by the HR is dependent on the size and
scope of the organisation, the nature of operations and the attitude of
management towards the employees.
•HRM functions can be broadly classified into the following two
categories:
• Managerial functions
• Operative functions
SMU Learning Centre, Alwar LC Code
03034
13
Function of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
14
Function of Human Resource Management
Managerial functions of HR department
•Planning – Future course of action; it also includes identifying human resource
requirements and forecasting personnel needs.
•Organizing – Division of labor; assignment of responsibility is part of the
organization's functions.
•Staffing – It is the process of obtaining and maintaining capable and competent
personnel in various positions at all levels, i.e., manpower planning, recruitment,
selection, placement and induction.
•Directing – It is the process of directing all the available resources towards the
common organizational goals.
•Controlling – It is the measurement and rectification of activities to ensure that the
events conform to plans.
SMU Learning Centre, Alwar LC Code
03034
15
Function of Human Resource Management
Operative functions of HR department: Operative functions of HR
department are those core functions that only the HR department is assigned
to perform. These functions are:
Employment
Employment is the first operative function of HRM. This involves procuring and
employing individuals with suitable knowledge, skills, experience and aptitude
necessary to perform various jobs.
The various functions of employment are:
•Job analysis
•HR planning
•Recruitment
•Selection
•Placement
•Induction
SMU Learning Centre, Alwar LC Code
03034
16
Function of Human Resource Management
HR development
•HR development concentrates on developing the workforce so that both the
employees and the organisation in turn can achieve their goals.
•This includes functions starting with evaluating the performance of the employees,
providing necessary training and development programmes to fill the gaps between
current performances to the optimum performance of employees.
HR development involves functions such as:
•Performance appraisal – This is the process of evaluating the performance of an
employee on the job and developing a plan for the employee’s improvement.
•Training – Training is the systematic development of knowledge, skills and attitudes
required to perform a given task or job successfully, in an individual.
•Management development – It is the concept of developing the employees of an
organisation to meet future changes and challenges.
•Career planning and development – Career planning and development refers to
identifying one’s career goals and formulating plans for achieving them through
various means such as education and work experience.
SMU Learning Centre, Alwar LC Code
03034
17
Function of Human Resource Management
Compensation
•It includes all the rewards that an employee receives during the course of his
or her job–for his or her contributions to the organisation. It includes:
Job evaluation – It is a systematic determination of the value of each
job in relation to other jobs in the organisation, in the industry and in
the market.
Wage and salary administration – It is the process of formulating
and operating a suitable wage and salary programme.
Incentives – These are the rewards that an employee earns in addition
to regular wages or salary based on the performance of the individual,
the team or the organisation.
Fringe benefits – These are monetary and non-monetary benefits
given to employees during their employment and sometimes, also in
the post-employment period.
SMU Learning Centre, Alwar LC Code
03034
18
Employee relations
•It deals with the employees, in the organisational context, as a social
group that contributes to the organisation. It includes:
Increasing employee productivity.
Keeping the employees satisfied and motivated.
Developing team building, team management, leadership skills in
employees.
Function of Human Resource Management
SMU Learning Centre, Alwar LC Code
03034
19
Role of HR Executives
• Managing people is one of the biggest challenges for a manager. Few
of the reasons are:
Individuals differ from each other in terms of their values, attitudes,
beliefs and culture. This leads to a very complex situation.
The stimulating and motivational factors might not be the same for
all employees.
• It is important to understand the individual needs of the employees
and cater to those needs.
• This involves taking up different roles by the HR.
• The specialist role of HR manager includes:
SMU Learning Centre, Alwar LC Code
03034
20
Role of HR Executives
• Service provider – Management needs to gather information such as
market statistics, pay rates and labor laws and legislations from the market
as well as from their competitors before making decisions on various
employee related issues.
• Managing Administrative expert – The administrative role involves
record keeping and legal compliance.
• Facilitator – They act as a facilitator when training and development
actions are planned and conducted and when performance appraisals are
done.
• Consultant – While supervising the employees, managers face many
problems.
• Auditor – HR specialists are responsible for ensuring that all members of
the management perform their respective roles efficiently and also ensures
that there is effective use of the human resources of the organisation.
SMU Learning Centre, Alwar LC Code
03034
21
• Change agent – It is the HR that helps organisations to implement
changes and help employees adapt to changes.
• Employee advocate – HR employees are the link between the top
management and the employees. The concerns of the employees are
first reported to the HR personnel. They report these issues to the top
management and try to resolve the issues.
HR in any organisation has multiple roles to play. No HR can perform
just one role. They may have to perform all the mentioned roles at
different stages in their career as HR personnel.
Role of HR Executives
SMU Learning Centre, Alwar LC Code
03034
22
• Human resource management is one of the most complex and challenging
field of management study. It mainly deals with people dimension in
management.
• The primary objective of HRM is to take care of the work life of employees
even while ensuring their best possible cooperation for achieving the
organisational goals and objectives.
• The scope of HRM can be divided into HRM in personnel management, HR
in employee welfare, HR in industrial relations.
• Basically, HRM includes the four functions of acquiring, developing,
motivating and managing the human resources. HRM functions are broadly
classified into two categories – managerial and operative functions.
• Managerial functions include planning, organising, directing and controlling.
• The specialist role of the HR professional takes a number of roles, which is
that of an auditor, service provider, administrative expert, facilitator,
consultant, the change agent and employee advocate.
Summary
SMU Learning Centre, Alwar LC Code
03034
23
Thanks

HRM an introduction

  • 1.
    1 Human Resource Management– An Introduction Dr. Smita Choudhary Faculty HR & OB
  • 2.
    SMU Learning Centre,Alwar LC Code 03034 2 Contents •Introduction to Human Resource Management •Concept of Human Resource Management •Scope of Human Resource Management •History of Human Resource Management •Function of Human Resource Management •Role of HR Executives •Summary •Check Your Learning •Activity
  • 3.
    SMU Learning Centre,Alwar LC Code 03034 3 Objectives After studying this chapter, you will be able to------ • Describe the concept of HRM • Define the scope of HRM • Describe the history of HRM • Explain the functions of human resource • Recognize the role of HR executives
  • 4.
    SMU Learning Centre,Alwar LC Code 03034 4 Introduction • Every organization is essentially a blend of material and Human Resource (HR). • Human Resource refers to the knowledge, education, skills, training and ability of the members of the organization. Human resources are the most valuable and unique assets of an organization. • Even though specific human resource functions/activities are the responsibility of the human resource department, the actual management of human resources is the responsibility of all the managers in an organization. • The scarcity of talented resources and the growing expectations of the modern day worker have further increased the complexity of the human resource function.
  • 5.
    SMU Learning Centre,Alwar LC Code 03034 5 Concept of Human Resource Management • Today’s organizations constantly mould itself to meet the business challenges despite economic, political and social patterns in which it exists. • The efforts made by organizations to sustain business metrics like revenue, profits and growth, market share is possible only through the people in the organization who work towards making this happen within the enterprise. • According to Fisher, Schoendfelt and Shaw in their book “Human Resources Management,“ HRM involves all management decisions and practices that directly affect or influence the people or Human resources who work for the organisation”.
  • 6.
    SMU Learning Centre,Alwar LC Code 03034 6 Concept of Human Resource Management
  • 7.
    SMU Learning Centre,Alwar LC Code 03034 7 A human resource manager has to build an effective workforce, handle the expectations of the employees and ensure that they perform at their best. Some of the Objectives of HRM The objectives of HRM can be classified into the following: •To act as a link between the top management and the employees. •To arrange and maintain adequate manpower inventory, which in turn, ensures the smooth working of the organisation. •To help keep up ethical values and behaviour amongst employees both within and outside the organisation. A human resource manager has to build an effective workforce, handle the expectations of the employees and ensure that they perform at their best. Some of the Objectives of HRM The objectives of HRM can be classified into the following: •To act as a link between the top management and the employees. •To arrange and maintain adequate manpower inventory, which in turn, ensures the smooth working of the organisation. •To help keep up ethical values and behaviour amongst employees both within and outside the organisation. Concept of Human Resource Management
  • 8.
    SMU Learning Centre,Alwar LC Code 03034 8 • The scope of HRM is wide and far-reaching. • An understanding of HRM is important to anyone who is employed in an organisation. • HR issues become important wherever there is a group of workers. Staffing is performed by all the managers as a managerial function, either directly or indirectly through HR department. • All managers are, in this way, HR managers, since they get involved in HR activities such as selecting, training, inducting, compensating and motivating the employees along with industrial relations activities. • Scope of HRM can be classified under the following heads:  HRM in personnel management  HRM in employee welfare  HRM in industrial relations • The scope of HRM is wide and far-reaching. • An understanding of HRM is important to anyone who is employed in an organisation. • HR issues become important wherever there is a group of workers. Staffing is performed by all the managers as a managerial function, either directly or indirectly through HR department. • All managers are, in this way, HR managers, since they get involved in HR activities such as selecting, training, inducting, compensating and motivating the employees along with industrial relations activities. • Scope of HRM can be classified under the following heads:  HRM in personnel management  HRM in employee welfare  HRM in industrial relations Scope of Human Resource Management
  • 9.
    SMU Learning Centre,Alwar LC Code 03034 9 Scope of Human Resource Management
  • 10.
    SMU Learning Centre,Alwar LC Code 03034 10 History of Human Resource Management • There is a vast difference between modern HRM and the personnel management that was prevalent decades ago. • By the end of the twentieth century, the managerial philosophy that had defined the personnel function had undergone radical changes. • There are various approaches:  Scientific management approach: Fredrick Taylor, who is widely considered to be the father of scientific management, focused on motions that were required for each job, the tools used and the time needed to accomplish each task.  Human relations approach: The Hawthorne studies conducted during the 1930 and 1940s, forced organizations to shift their attention from scientific management approach to human relations approach. • It was recognized that treating employees with respect would improve employee satisfaction and help in achieving higher productivity. • Human resources approach: Human resources treat people as resources, rather than factors of production, or as human beings who act on the basis of emotions alone.
  • 11.
    SMU Learning Centre,Alwar LC Code 03034 11 Some of the principles of human resource approach are: •Employees are assets to an organisation. •Policies, programmes and practices must cater to the needs of employees and should help them in their work and in their personal development. •Employee rewards may be monetary such as hike in salary or increments or it may be non-monetary such as change in designation, status, fringe benefits, etc. History of Human Resource Management
  • 12.
    SMU Learning Centre,Alwar LC Code 03034 12 Function of Human Resource Management •Human resource management involves blending the traditional administrative functions along with the changing concepts of employee welfare in the organisation. •The retention of employees is dependent on how they are perceived and treated in the organisation based on their performance, abilities and skills. •The extent of activities carried out by the HR is dependent on the size and scope of the organisation, the nature of operations and the attitude of management towards the employees. •HRM functions can be broadly classified into the following two categories: • Managerial functions • Operative functions
  • 13.
    SMU Learning Centre,Alwar LC Code 03034 13 Function of Human Resource Management
  • 14.
    SMU Learning Centre,Alwar LC Code 03034 14 Function of Human Resource Management Managerial functions of HR department •Planning – Future course of action; it also includes identifying human resource requirements and forecasting personnel needs. •Organizing – Division of labor; assignment of responsibility is part of the organization's functions. •Staffing – It is the process of obtaining and maintaining capable and competent personnel in various positions at all levels, i.e., manpower planning, recruitment, selection, placement and induction. •Directing – It is the process of directing all the available resources towards the common organizational goals. •Controlling – It is the measurement and rectification of activities to ensure that the events conform to plans.
  • 15.
    SMU Learning Centre,Alwar LC Code 03034 15 Function of Human Resource Management Operative functions of HR department: Operative functions of HR department are those core functions that only the HR department is assigned to perform. These functions are: Employment Employment is the first operative function of HRM. This involves procuring and employing individuals with suitable knowledge, skills, experience and aptitude necessary to perform various jobs. The various functions of employment are: •Job analysis •HR planning •Recruitment •Selection •Placement •Induction
  • 16.
    SMU Learning Centre,Alwar LC Code 03034 16 Function of Human Resource Management HR development •HR development concentrates on developing the workforce so that both the employees and the organisation in turn can achieve their goals. •This includes functions starting with evaluating the performance of the employees, providing necessary training and development programmes to fill the gaps between current performances to the optimum performance of employees. HR development involves functions such as: •Performance appraisal – This is the process of evaluating the performance of an employee on the job and developing a plan for the employee’s improvement. •Training – Training is the systematic development of knowledge, skills and attitudes required to perform a given task or job successfully, in an individual. •Management development – It is the concept of developing the employees of an organisation to meet future changes and challenges. •Career planning and development – Career planning and development refers to identifying one’s career goals and formulating plans for achieving them through various means such as education and work experience.
  • 17.
    SMU Learning Centre,Alwar LC Code 03034 17 Function of Human Resource Management Compensation •It includes all the rewards that an employee receives during the course of his or her job–for his or her contributions to the organisation. It includes: Job evaluation – It is a systematic determination of the value of each job in relation to other jobs in the organisation, in the industry and in the market. Wage and salary administration – It is the process of formulating and operating a suitable wage and salary programme. Incentives – These are the rewards that an employee earns in addition to regular wages or salary based on the performance of the individual, the team or the organisation. Fringe benefits – These are monetary and non-monetary benefits given to employees during their employment and sometimes, also in the post-employment period.
  • 18.
    SMU Learning Centre,Alwar LC Code 03034 18 Employee relations •It deals with the employees, in the organisational context, as a social group that contributes to the organisation. It includes: Increasing employee productivity. Keeping the employees satisfied and motivated. Developing team building, team management, leadership skills in employees. Function of Human Resource Management
  • 19.
    SMU Learning Centre,Alwar LC Code 03034 19 Role of HR Executives • Managing people is one of the biggest challenges for a manager. Few of the reasons are: Individuals differ from each other in terms of their values, attitudes, beliefs and culture. This leads to a very complex situation. The stimulating and motivational factors might not be the same for all employees. • It is important to understand the individual needs of the employees and cater to those needs. • This involves taking up different roles by the HR. • The specialist role of HR manager includes:
  • 20.
    SMU Learning Centre,Alwar LC Code 03034 20 Role of HR Executives • Service provider – Management needs to gather information such as market statistics, pay rates and labor laws and legislations from the market as well as from their competitors before making decisions on various employee related issues. • Managing Administrative expert – The administrative role involves record keeping and legal compliance. • Facilitator – They act as a facilitator when training and development actions are planned and conducted and when performance appraisals are done. • Consultant – While supervising the employees, managers face many problems. • Auditor – HR specialists are responsible for ensuring that all members of the management perform their respective roles efficiently and also ensures that there is effective use of the human resources of the organisation.
  • 21.
    SMU Learning Centre,Alwar LC Code 03034 21 • Change agent – It is the HR that helps organisations to implement changes and help employees adapt to changes. • Employee advocate – HR employees are the link between the top management and the employees. The concerns of the employees are first reported to the HR personnel. They report these issues to the top management and try to resolve the issues. HR in any organisation has multiple roles to play. No HR can perform just one role. They may have to perform all the mentioned roles at different stages in their career as HR personnel. Role of HR Executives
  • 22.
    SMU Learning Centre,Alwar LC Code 03034 22 • Human resource management is one of the most complex and challenging field of management study. It mainly deals with people dimension in management. • The primary objective of HRM is to take care of the work life of employees even while ensuring their best possible cooperation for achieving the organisational goals and objectives. • The scope of HRM can be divided into HRM in personnel management, HR in employee welfare, HR in industrial relations. • Basically, HRM includes the four functions of acquiring, developing, motivating and managing the human resources. HRM functions are broadly classified into two categories – managerial and operative functions. • Managerial functions include planning, organising, directing and controlling. • The specialist role of the HR professional takes a number of roles, which is that of an auditor, service provider, administrative expert, facilitator, consultant, the change agent and employee advocate. Summary
  • 23.
    SMU Learning Centre,Alwar LC Code 03034 23 Thanks