SlideShare a Scribd company logo
Well Testing
Global Hose Management
Introduction
• Establish a global standard for Identification, use and
management of hoses used by Expro in all maintenance
and operational activities within the Well Test product
line. This procedure shall also identify the dangers
associated with improper hose end connections, usage,
storage and transportation.
®Copyright Expro 201 WELL FLOW MANAGEMENT
Why Hose Management?
• Better way of doing things
• To Standardize Procedure
• Continuous Safety Improvement
• High potential near miss
3” Hose Connection Part Off. Alert ref
Asia/Alert/2007/002. April 2007
Hose rupture from flare boom, bulletin no: HSEB-09-21. Oct 2009
Hose burst while in used offshore, alert no: EPTI-11-006. July 2011
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Scope
The extent of this procedure is from procurement
of hoses to discard.
• Responsibilities
• Identification
• Hose Tracking
• Hose Inspection
• Rig Up
• Rig Down
• Maintenance
• Storage
• Transportation
• Discard
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Responsibilities
All Expro employees shall follow the procedure
outlined in this document.
• Line Managers and Supervisors
Are to ensure that all procedures are enforced and lead by example
• Technicians Operators Workshop Personnel
Are to follow the procedures outlined in this document.
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Procurement/Purchase
• Vendors
Vendors shall be approved by manufacturer to sell hoses.
• Purchaser
Ensure all specifications are given to the Vendor.
• Receiving
Cross check hose with specifications.
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Hose Identification
All hoses shall have the following identifying bands
on them.
• Manufactures Band
Band shall have Unique Asset Number, Manufacture Date (not to exceed
(3) years) and Max working pressure
• Expro Band
Band shall have last dated tested on it and should be within a year of
current date.
®Copyright Expro 2014 WELL FLOW MANAGEMENT
• Types of hoses Used
• Specification
Temperature and pressure ratings
Material design
End connections
Standard
®Copyright Expro 2010 WELL FLOW MANAGEMENT
Hose Selection
®Copyright Expro 2010 WELL FLOW MANAGEMENT
Type Common Sizes Pressure Range End Connection Application
Air ½”,3/4”,1” 0-290psi NPT, Crowfoot Air Supply
Water 1”,2”,3” 0-290psi Crowfoot,
Jubilee Clamp, Tecklok clamp
Water Supply
Hydraulic ¼”,3/8”,1/2”
3/4"
0-30000psi JIC, BSP, Autoclave Pressure Testing
Hydraulic Actuators
Steam 1”,2” 0-250psi
(-40 to 235 oC)
Clamps, plug and bush, Couplings,
Hammer union
Steam Conduit
Oil transfer 2”,3” 0-600 psi 206 union, Tecklok Clamp, Flanged end. Oil/diesel transfer
Black Eagle 1”,2”,3”,4”,5” 0-15000 psi 1502 union Chemical Injection
Liquid Transfer
Acidizing
Well stimulation
Hose Tracking
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Expro Hose Register
Hose Inspection
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Hose Inspection Checklist
Items checked Yes No NA Comments
Do hose have tags and unique I.D. number?
Is hose within valid test date?
Is the pressure rating of hose visible?
Are there signs of weakness or corrosion of end connection?
Are the end connection seals in place and in good condition?
Are there signs of cuts, cracks, abrasion or other damage in the hose
body?
Is any part of hose kinked?
Is hose suitable for its intended use?
Remarks
Inspected by…………....... Date
Supervisor ………………….. Date
Rig Up/Rig Down
• Pre-Rig Up Checks
• Rig up Guide
• Rig Down Guide
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Maintenance
• Post Job
• Annual Pressure Test
• Pressure Testing Parameters
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Storage
• Storage Specifications
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Transportation
• Proper Arrangement
No heavy objects placed on top
Hung on racks if provided
Loose items shall be restricted from movement
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Discard of Hoses
• Discard Criteria
• Discard Procedures
®Copyright Expro 2014 WELL FLOW MANAGEMENT
Hose_QMS_Presentation

More Related Content

What's hot

Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
YAWAR HASSAN
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 

What's hot (20)

Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
Rigging Presentation
Rigging PresentationRigging Presentation
Rigging Presentation
 
R002
R002R002
R002
 
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 
Chain sling
Chain slingChain sling
Chain sling
 
Flanged Joint Alignment
Flanged Joint AlignmentFlanged Joint Alignment
Flanged Joint Alignment
 
Crane Rigging Safety by HF & C
Crane Rigging Safety by HF & CCrane Rigging Safety by HF & C
Crane Rigging Safety by HF & C
 
Welding and cutting safety
Welding and cutting safetyWelding and cutting safety
Welding and cutting safety
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
 
Safety Inspections and Sample Safety Inspection.Health and safety training D...
Safety Inspections and Sample Safety Inspection.Health  and safety training D...Safety Inspections and Sample Safety Inspection.Health  and safety training D...
Safety Inspections and Sample Safety Inspection.Health and safety training D...
 
bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
 
Look Listen Feel (LLF) by Sougata Pal
Look Listen Feel (LLF) by Sougata PalLook Listen Feel (LLF) by Sougata Pal
Look Listen Feel (LLF) by Sougata Pal
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 

Similar to Hose_QMS_Presentation

Internship Report
Internship ReportInternship Report
Internship Report
Malik Ehsan
 
Balflex USA Catalog
Balflex USA CatalogBalflex USA Catalog
Balflex USA Catalog
Balflexusa
 
LOKRINGTECHNOLOGY
LOKRINGTECHNOLOGYLOKRINGTECHNOLOGY
LOKRINGTECHNOLOGY
Kjell Haga
 
Top quality brasil unaflex
Top quality brasil   unaflexTop quality brasil   unaflex
Top quality brasil unaflex
TopQuality
 
Critical_Service_Catalog_EN
Critical_Service_Catalog_ENCritical_Service_Catalog_EN
Critical_Service_Catalog_EN
Leser UK
 
Carten-Fujikin BNW Series Diaphragm Valves
Carten-Fujikin BNW Series Diaphragm ValvesCarten-Fujikin BNW Series Diaphragm Valves
Carten-Fujikin BNW Series Diaphragm Valves
Rebecca Caulfield
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
yudi05
 

Similar to Hose_QMS_Presentation (20)

Internship Report
Internship ReportInternship Report
Internship Report
 
What is lifeguard safety hose technology?
What is lifeguard safety hose technology?What is lifeguard safety hose technology?
What is lifeguard safety hose technology?
 
Swivel joints
Swivel jointsSwivel joints
Swivel joints
 
Balflex USA Catalog
Balflex USA CatalogBalflex USA Catalog
Balflex USA Catalog
 
Jindex Pinch Valve
Jindex Pinch ValveJindex Pinch Valve
Jindex Pinch Valve
 
Multi Service High Pressure Ball Valves : SERIES - BV105L
Multi Service High Pressure Ball Valves : SERIES - BV105LMulti Service High Pressure Ball Valves : SERIES - BV105L
Multi Service High Pressure Ball Valves : SERIES - BV105L
 
Well Integrity.pptx
Well Integrity.pptxWell Integrity.pptx
Well Integrity.pptx
 
Perfect Engineers, Mumbai, Camlock Coupler
Perfect Engineers, Mumbai, Camlock CouplerPerfect Engineers, Mumbai, Camlock Coupler
Perfect Engineers, Mumbai, Camlock Coupler
 
LOKRINGTECHNOLOGY
LOKRINGTECHNOLOGYLOKRINGTECHNOLOGY
LOKRINGTECHNOLOGY
 
Top quality brasil unaflex
Top quality brasil   unaflexTop quality brasil   unaflex
Top quality brasil unaflex
 
US Bellows 101
US Bellows 101US Bellows 101
US Bellows 101
 
Critical_Service_Catalog_EN
Critical_Service_Catalog_ENCritical_Service_Catalog_EN
Critical_Service_Catalog_EN
 
Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive Emissions
 
Engineered valves for plastics polymers-pe-pp industry-Guichon valves
Engineered valves for plastics polymers-pe-pp industry-Guichon valvesEngineered valves for plastics polymers-pe-pp industry-Guichon valves
Engineered valves for plastics polymers-pe-pp industry-Guichon valves
 
Vannes spéciales pour production plastiques polymers pe pp-Guichon valves
Vannes spéciales pour production plastiques polymers pe pp-Guichon valvesVannes spéciales pour production plastiques polymers pe pp-Guichon valves
Vannes spéciales pour production plastiques polymers pe pp-Guichon valves
 
EXP Series pumps are available with Electronic Interface capability
EXP Series pumps are available with Electronic Interface capabilityEXP Series pumps are available with Electronic Interface capability
EXP Series pumps are available with Electronic Interface capability
 
How to Select the Right Valve for your Application
How to Select the Right Valve for your ApplicationHow to Select the Right Valve for your Application
How to Select the Right Valve for your Application
 
Carten-Fujikin BNW Series Diaphragm Valves
Carten-Fujikin BNW Series Diaphragm ValvesCarten-Fujikin BNW Series Diaphragm Valves
Carten-Fujikin BNW Series Diaphragm Valves
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
 

Hose_QMS_Presentation

  • 2. Introduction • Establish a global standard for Identification, use and management of hoses used by Expro in all maintenance and operational activities within the Well Test product line. This procedure shall also identify the dangers associated with improper hose end connections, usage, storage and transportation. ®Copyright Expro 201 WELL FLOW MANAGEMENT
  • 3. Why Hose Management? • Better way of doing things • To Standardize Procedure • Continuous Safety Improvement • High potential near miss 3” Hose Connection Part Off. Alert ref Asia/Alert/2007/002. April 2007 Hose rupture from flare boom, bulletin no: HSEB-09-21. Oct 2009 Hose burst while in used offshore, alert no: EPTI-11-006. July 2011 ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 4. Scope The extent of this procedure is from procurement of hoses to discard. • Responsibilities • Identification • Hose Tracking • Hose Inspection • Rig Up • Rig Down • Maintenance • Storage • Transportation • Discard ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 5. Responsibilities All Expro employees shall follow the procedure outlined in this document. • Line Managers and Supervisors Are to ensure that all procedures are enforced and lead by example • Technicians Operators Workshop Personnel Are to follow the procedures outlined in this document. ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 6. Procurement/Purchase • Vendors Vendors shall be approved by manufacturer to sell hoses. • Purchaser Ensure all specifications are given to the Vendor. • Receiving Cross check hose with specifications. ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 7. Hose Identification All hoses shall have the following identifying bands on them. • Manufactures Band Band shall have Unique Asset Number, Manufacture Date (not to exceed (3) years) and Max working pressure • Expro Band Band shall have last dated tested on it and should be within a year of current date. ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 8. • Types of hoses Used • Specification Temperature and pressure ratings Material design End connections Standard ®Copyright Expro 2010 WELL FLOW MANAGEMENT
  • 9. Hose Selection ®Copyright Expro 2010 WELL FLOW MANAGEMENT Type Common Sizes Pressure Range End Connection Application Air ½”,3/4”,1” 0-290psi NPT, Crowfoot Air Supply Water 1”,2”,3” 0-290psi Crowfoot, Jubilee Clamp, Tecklok clamp Water Supply Hydraulic ¼”,3/8”,1/2” 3/4" 0-30000psi JIC, BSP, Autoclave Pressure Testing Hydraulic Actuators Steam 1”,2” 0-250psi (-40 to 235 oC) Clamps, plug and bush, Couplings, Hammer union Steam Conduit Oil transfer 2”,3” 0-600 psi 206 union, Tecklok Clamp, Flanged end. Oil/diesel transfer Black Eagle 1”,2”,3”,4”,5” 0-15000 psi 1502 union Chemical Injection Liquid Transfer Acidizing Well stimulation
  • 10. Hose Tracking ®Copyright Expro 2014 WELL FLOW MANAGEMENT Expro Hose Register
  • 11. Hose Inspection ®Copyright Expro 2014 WELL FLOW MANAGEMENT Hose Inspection Checklist Items checked Yes No NA Comments Do hose have tags and unique I.D. number? Is hose within valid test date? Is the pressure rating of hose visible? Are there signs of weakness or corrosion of end connection? Are the end connection seals in place and in good condition? Are there signs of cuts, cracks, abrasion or other damage in the hose body? Is any part of hose kinked? Is hose suitable for its intended use? Remarks Inspected by…………....... Date Supervisor ………………….. Date
  • 12. Rig Up/Rig Down • Pre-Rig Up Checks • Rig up Guide • Rig Down Guide ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 13. Maintenance • Post Job • Annual Pressure Test • Pressure Testing Parameters ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 14. Storage • Storage Specifications ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 15. Transportation • Proper Arrangement No heavy objects placed on top Hung on racks if provided Loose items shall be restricted from movement ®Copyright Expro 2014 WELL FLOW MANAGEMENT
  • 16. Discard of Hoses • Discard Criteria • Discard Procedures ®Copyright Expro 2014 WELL FLOW MANAGEMENT