SlideShare a Scribd company logo
1 of 2
Hope A. LaVare
Phone: 315-5221-1697 email: hlavare@gmail.com
Professional Summary:
Leader with experience working for Global Corporation and extensive experience with smaller private companies who
responds to shifting business needs and priorities in a systematic and effective way. Strengths reside in; removing waste
and improving and documenting processes, broadening capabilities in self and others and increasing profitability. Driven
to improve results and exceed goals.
Major Accomplishments Summary:
IEC Electronics Inc. May 2014 - Present
Manufactuer for Advanced Technology Companies
Quote Program Manager July 2014 – Present
 Improved Quote turn-time from 4 to 2 days. 83% completed early and zero late. Increased Same-Day turns from
5% to 36%.
 Developed Work Instruction document for step by step quote process for the Wire and Cable division
Jr. Quote Program Manager May 2014 – June 2014
 Prep customer Bill of Materials to load into central computer system for printed circuit board division
 Compare customer documentation to identify revisions not clearly communicated or missing required data
Electromark Co. November 1991 – April 2014
Manufacturer of Signs, Lables and Tags for Utility and Safety Industries
Pricing & Product Manager September 2011 – April 2014
 Spearheaded a Pricing Review Project, resulting in realignment of all Electromark product lines both standard and
customer specific (10,500 sku). This included meeting margin improvement for fiscal year targets, and outlines
for future fiscal year(s)
 Established and improved a proactive review process for all pricing agreements
 Co-Hosted a strategy summit with sales and marketing teams to prospect and qualify potential customers within
assigned electric utility and adjacent market opportunities and business plan development
 Responsibilities also included: Mentoring coworkers, monthly and year end margin and sales performance,
maintaining product hierarchies, customer part number links, product description formats, and oversee requests
for Add-Change-Obsolete process
SAP Variant Configuration Coord. April 2009 – August 2011
 Independently analyzed all products to determine what type(s) of VC materials would support business needs,
prioritized development stages, Organize data collection and Creation, Learned programming language to create
SAP user interface(s), in conjunction with creating and maintaining 100+ data tables in Excel & SAP required to
create custom pricing, the bill of materials and routing for the customized product
Product Estimating October 2005 – March 2009
 Estimating for all engineer to order as well as standard for which competitive list prices had not yet been
established
 Drove turn-around time from 24 hours to 2 hours though developing a more streamlined process and creation of
a standard price list, which also supported the customer service team goals
 Analysis of existing along with creation of new price deals with distributors / end users
Production Planning Supervisor September 2002 – September 2005
 Analyzed “actual run data”, and worked with Manager and Team to review and improve processes leading to
manufacturing cost and quality improvements
 Created standard operating documents for multiple production departments involved in Graphics, Printing,
Manufacturing, Sheet Metal and Inspection
 Supervised and led three employees to achieve continuous process improvements of order engineering resulting
in less than 24 hour turn-around from time of order receipt to production documentation complete
 Introduced, and implemented cross training of planning team with various production departments
 Responsibilities also included: developed inventory set points along with Minimum production run levels to
support both costing and order demand, completing corrective action reports, and material weather testing
samples and data collection among others
Production Planning April 1996 – August 2002
 Created production detail for each product to meet customer specifications including materials, manufacturing
process/routing steps, and tooling. Also Maintained/updated records as requested due to process improvement
Porcelain Department Lead February 1992 – March 1996
 Performed all process steps from raw material to screen printed end product (sand blasting, coating, imaging,
printing, kiln firing) along with managing a tight schedule to allow various operations to flow and make efficient
use of energy consumption and other resources
 Held to a high level of quality through product testing of both base materials and finished goods
 Tracked stocking levels and WIP in order to meet and maintain a delivery level of zero late orders for over three
years
Production Employee November 1991 – January 1992
 Worked with peers involved in manufacturing processes of Printing, Laminating and Die cutting
Education
North Rose-Wolcott High School Graduated: 1991

More Related Content

What's hot

Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's ResumeLori Green
 
Paul M. Fitzpatrick_Resume_2017(r)
Paul M. Fitzpatrick_Resume_2017(r)Paul M. Fitzpatrick_Resume_2017(r)
Paul M. Fitzpatrick_Resume_2017(r)Paul Fitzpatrick
 
Sterling Anderson Accomplishments
Sterling Anderson AccomplishmentsSterling Anderson Accomplishments
Sterling Anderson AccomplishmentsSterling Anderson
 
Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15Michael Baker
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_ResumeHuy Pham
 
C.V. Gabby Perez Aug-2016
C.V. Gabby Perez Aug-2016C.V. Gabby Perez Aug-2016
C.V. Gabby Perez Aug-2016Gabby Perez
 
Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds
 
VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Managerjiwri79
 
Amber Edwards resume 2016
Amber Edwards resume 2016Amber Edwards resume 2016
Amber Edwards resume 2016Amber Edwards
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015Yuret Sena
 
Sean Costin resume
Sean Costin resumeSean Costin resume
Sean Costin resumeSeanCostin2
 

What's hot (20)

Joe Bollig-Resume-E
Joe Bollig-Resume-EJoe Bollig-Resume-E
Joe Bollig-Resume-E
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Resume 2015 1
Resume 2015 1Resume 2015 1
Resume 2015 1
 
Lori Green's Resume
Lori Green's ResumeLori Green's Resume
Lori Green's Resume
 
Paul M. Fitzpatrick_Resume_2017(r)
Paul M. Fitzpatrick_Resume_2017(r)Paul M. Fitzpatrick_Resume_2017(r)
Paul M. Fitzpatrick_Resume_2017(r)
 
Elizabeth Rubio - CV-2
Elizabeth Rubio - CV-2Elizabeth Rubio - CV-2
Elizabeth Rubio - CV-2
 
Sterling Anderson Accomplishments
Sterling Anderson AccomplishmentsSterling Anderson Accomplishments
Sterling Anderson Accomplishments
 
Joe Bollig-Resume-E
Joe Bollig-Resume-EJoe Bollig-Resume-E
Joe Bollig-Resume-E
 
Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15Resume_for_Mike_Baker_05-31-15
Resume_for_Mike_Baker_05-31-15
 
MohamedSaleh_McMasterUniversity_Resume
MohamedSaleh_McMasterUniversity_ResumeMohamedSaleh_McMasterUniversity_Resume
MohamedSaleh_McMasterUniversity_Resume
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_Resume
 
C.V. Gabby Perez Aug-2016
C.V. Gabby Perez Aug-2016C.V. Gabby Perez Aug-2016
C.V. Gabby Perez Aug-2016
 
Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016
 
VP Operations / General Manager
VP Operations / General ManagerVP Operations / General Manager
VP Operations / General Manager
 
Amber Edwards resume 2016
Amber Edwards resume 2016Amber Edwards resume 2016
Amber Edwards resume 2016
 
Ajay_CV_SQA
Ajay_CV_SQAAjay_CV_SQA
Ajay_CV_SQA
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015
 
Nikhil Resume
Nikhil ResumeNikhil Resume
Nikhil Resume
 
Catherine Gibson Resume
Catherine Gibson ResumeCatherine Gibson Resume
Catherine Gibson Resume
 
Sean Costin resume
Sean Costin resumeSean Costin resume
Sean Costin resume
 

Similar to Hope LaVare Resume

Julie Laux PM 2015
Julie Laux PM 2015Julie Laux PM 2015
Julie Laux PM 2015Julie Laux
 
Anna Gude CV MAY 2016
Anna Gude CV MAY 2016Anna Gude CV MAY 2016
Anna Gude CV MAY 2016Anna Gude
 
Jackie Sutherlin_Resume 2016
Jackie Sutherlin_Resume 2016Jackie Sutherlin_Resume 2016
Jackie Sutherlin_Resume 2016Jackie Sutherlin
 
Snow Resume
Snow ResumeSnow Resume
Snow ResumeKim Snow
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow
 
Michael Williams Resume 2-2017
Michael Williams Resume 2-2017Michael Williams Resume 2-2017
Michael Williams Resume 2-2017Michael Williams
 
Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)Kelly Hysell
 
Ray Bullock Resume February 1, 2017
Ray Bullock Resume February 1, 2017Ray Bullock Resume February 1, 2017
Ray Bullock Resume February 1, 2017Lawton BULLOCK
 
Deb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeborah Keefe
 
Mark Temple resume
Mark Temple resumeMark Temple resume
Mark Temple resumeMark Temple
 
Production &Industrial Engineering3
Production &Industrial Engineering3Production &Industrial Engineering3
Production &Industrial Engineering3Rowyda Mohammad
 
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016Muhammad Noushad
 

Similar to Hope LaVare Resume (20)

Julie Laux PM 2015
Julie Laux PM 2015Julie Laux PM 2015
Julie Laux PM 2015
 
Anna Gude CV MAY 2016
Anna Gude CV MAY 2016Anna Gude CV MAY 2016
Anna Gude CV MAY 2016
 
Jackie Sutherlin_Resume 2016
Jackie Sutherlin_Resume 2016Jackie Sutherlin_Resume 2016
Jackie Sutherlin_Resume 2016
 
RHP resume
RHP resumeRHP resume
RHP resume
 
Cyndee_Blenkush_Resume
Cyndee_Blenkush_ResumeCyndee_Blenkush_Resume
Cyndee_Blenkush_Resume
 
Snow Resume
Snow ResumeSnow Resume
Snow Resume
 
Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015
 
Michael Williams Resume 2-2017
Michael Williams Resume 2-2017Michael Williams Resume 2-2017
Michael Williams Resume 2-2017
 
Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)Kelly Hysell (Director, HCM SAAS Product Management)
Kelly Hysell (Director, HCM SAAS Product Management)
 
SUE RICHARDSON
SUE RICHARDSONSUE RICHARDSON
SUE RICHARDSON
 
Ray Bullock Resume February 1, 2017
Ray Bullock Resume February 1, 2017Ray Bullock Resume February 1, 2017
Ray Bullock Resume February 1, 2017
 
DAS_Resume_2015
DAS_Resume_2015DAS_Resume_2015
DAS_Resume_2015
 
Deb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management Specialist
 
Stephens Christina
Stephens ChristinaStephens Christina
Stephens Christina
 
Mark Temple resume
Mark Temple resumeMark Temple resume
Mark Temple resume
 
Production &Industrial Engineering3
Production &Industrial Engineering3Production &Industrial Engineering3
Production &Industrial Engineering3
 
SJV Resume 2017
SJV Resume 2017SJV Resume 2017
SJV Resume 2017
 
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
 
Ed Resume 12-14
Ed Resume 12-14Ed Resume 12-14
Ed Resume 12-14
 

Hope LaVare Resume

  • 1. Hope A. LaVare Phone: 315-5221-1697 email: hlavare@gmail.com Professional Summary: Leader with experience working for Global Corporation and extensive experience with smaller private companies who responds to shifting business needs and priorities in a systematic and effective way. Strengths reside in; removing waste and improving and documenting processes, broadening capabilities in self and others and increasing profitability. Driven to improve results and exceed goals. Major Accomplishments Summary: IEC Electronics Inc. May 2014 - Present Manufactuer for Advanced Technology Companies Quote Program Manager July 2014 – Present  Improved Quote turn-time from 4 to 2 days. 83% completed early and zero late. Increased Same-Day turns from 5% to 36%.  Developed Work Instruction document for step by step quote process for the Wire and Cable division Jr. Quote Program Manager May 2014 – June 2014  Prep customer Bill of Materials to load into central computer system for printed circuit board division  Compare customer documentation to identify revisions not clearly communicated or missing required data Electromark Co. November 1991 – April 2014 Manufacturer of Signs, Lables and Tags for Utility and Safety Industries Pricing & Product Manager September 2011 – April 2014  Spearheaded a Pricing Review Project, resulting in realignment of all Electromark product lines both standard and customer specific (10,500 sku). This included meeting margin improvement for fiscal year targets, and outlines for future fiscal year(s)  Established and improved a proactive review process for all pricing agreements  Co-Hosted a strategy summit with sales and marketing teams to prospect and qualify potential customers within assigned electric utility and adjacent market opportunities and business plan development  Responsibilities also included: Mentoring coworkers, monthly and year end margin and sales performance, maintaining product hierarchies, customer part number links, product description formats, and oversee requests for Add-Change-Obsolete process SAP Variant Configuration Coord. April 2009 – August 2011  Independently analyzed all products to determine what type(s) of VC materials would support business needs, prioritized development stages, Organize data collection and Creation, Learned programming language to create SAP user interface(s), in conjunction with creating and maintaining 100+ data tables in Excel & SAP required to create custom pricing, the bill of materials and routing for the customized product Product Estimating October 2005 – March 2009  Estimating for all engineer to order as well as standard for which competitive list prices had not yet been established  Drove turn-around time from 24 hours to 2 hours though developing a more streamlined process and creation of a standard price list, which also supported the customer service team goals  Analysis of existing along with creation of new price deals with distributors / end users
  • 2. Production Planning Supervisor September 2002 – September 2005  Analyzed “actual run data”, and worked with Manager and Team to review and improve processes leading to manufacturing cost and quality improvements  Created standard operating documents for multiple production departments involved in Graphics, Printing, Manufacturing, Sheet Metal and Inspection  Supervised and led three employees to achieve continuous process improvements of order engineering resulting in less than 24 hour turn-around from time of order receipt to production documentation complete  Introduced, and implemented cross training of planning team with various production departments  Responsibilities also included: developed inventory set points along with Minimum production run levels to support both costing and order demand, completing corrective action reports, and material weather testing samples and data collection among others Production Planning April 1996 – August 2002  Created production detail for each product to meet customer specifications including materials, manufacturing process/routing steps, and tooling. Also Maintained/updated records as requested due to process improvement Porcelain Department Lead February 1992 – March 1996  Performed all process steps from raw material to screen printed end product (sand blasting, coating, imaging, printing, kiln firing) along with managing a tight schedule to allow various operations to flow and make efficient use of energy consumption and other resources  Held to a high level of quality through product testing of both base materials and finished goods  Tracked stocking levels and WIP in order to meet and maintain a delivery level of zero late orders for over three years Production Employee November 1991 – January 1992  Worked with peers involved in manufacturing processes of Printing, Laminating and Die cutting Education North Rose-Wolcott High School Graduated: 1991