I. General Information 
II. Roof Structure 
o Material Choice 
o Bracing 
o Support Beams 
o The 4 Piers 
o Tensile Membrane 
TABLE OF CONTENTS 
III. Main Structure 
o Truss Spire 
o The 3 Cantilevered Galleries 
IV. Conclusion 
V. Bibliography
 Location: Metz, France 
 Area: 11,330 sqm 
 Year: 2010 
 The Centre Pompidou in Metz is a large hexagonal structure with 
three galleries running through the building. 
 The Interior atmosphere is light with a pale wood roof, white walls 
and a pearl-grey concrete floor. 
 The roof ties the interior and exterior and the three exhibition 
galleries make up highly innovative architectural choices. 
GENERAL INFO
ROOF STRUCTURE 
Material Choice 
Bracing 
Support Beams 
The 4 Piers 
Tensile Membrane
ROOF STRUCTURE 
TIMBER CANOPY & STEEL TRUSS 
 Meet At 405 Foundation Piles Through A Concrete Slab 
 Both Act Independently
 A timber hexagon roof structure hovers over all of the separate 
volumes in order to unify them into a cohesive whole. 
 Composed of a pattern of hexagons and equilateral triangles 
inspired by traditional woven bamboo hats. 
 Each member overlaps one another similar to bamboo 
wickerwork. 
 The intersections do not use mechanical metal joints.
ROOF STRUCTURE 
MATERIAL CHOICE 
Timber 
 30 kWh 
 450 kg/m3 
 Renewable 
 Easy Cheap 
 Malleable 
 Better 
 Economical 
Concrete 
 180 kWh 
 2500 kg/m3 
 Limited 
 Very Hard Expensive 
 Rigid 
 Less 
 Expensive 
STRUCTURE 
WEIGHT 
QUANTITY 
RESTORATION 
FLEXIBILITY 
DETAILED FINISHING 
EXPENDITURE
ROOF STRUCTURE 
BRACING 
 The Triangulation of Force is in The Shape It Self 
Normal Hexagon Bracing Pompidou Hexagon Bracing
ROOF STRUCTURE 
SUPPORT BEAMS 
 Support Beams Travel Along 5 Effective Spines 
 Each Are Individually Prefabricated 
 2 Beams Intersect At Each Node Of The Hexagonal Grid
ROOF STRUCTURE 
THE 4 PIERS 
 Evenly spaced from the center, supported at the foundation 
 Structured same way as the Canopy 
 Additionally reinforced by Pre-stressed bolts & Metal Rings
ROOF STRUCTURE 
TENSILE MEMBRANE 
 Stretched and secured over the EDGE OF THE CANOPY, within the 
SPIRE, within the PIERS, and with a 5MM STEEL PLATE at the top 
 Conceptual puncturing of the three program masses engaging 
the dynamic skin through structural complexity
MAIN STRUCTURE 
The Truss Spire 
The Three Cantilevered Galleries
MAIN STRUCTURE 
TRUSS SPIRE 
 Height 77m 
 The Spire Is The Central Mast 
 Partially Supports The Canopy 
 Virtually Supports The Circulation & The Exhibition 
 Which contains the stairs and elevators.
MAIN STRUCTURE 
3 CANTILEVERED GALLERIES 
 Built-in the Steel Truss Spire 
 The three tubes are stacked vertically and 
arranged around the Hexagonal Steel Frame 
Tower 
 Structurally enabled by 4 steel horizontal beams 
at each corner 
o Leaving the interior open for exhibition 
o Each Cantilevered opens to a view in Metz 
o The space created beneath make up the Grand 
Nef Gallery.
“ 
” 
I BELIEVE THAT THE MATERIAL DOESN'T NEED TO BE STRONG TO 
BE USED TO BUILD A STRONG STRUCTURE. THE STRENGTH OF THE 
STRUCTURE HAS NOTHING TO DO WITH STRENGTH OF THE 
MATERIAL. 
WHAT DETERMINES THE PERMANENCE OF A BUILDING IS NOT 
THE WEALTH OF THE DEVELOPER OR THE MATERIALS THAT ARE 
USED, BUT THE SIMPLE QUESTION OF WHETHER OR NOT THE 
RESULTING STRUCTURE IS SUPPORTED - LOVED - BY THE PEOPLE. 
CONCLUSION 
Shigeru Ban
 Bidaine, Philippe. Centre Pompidou-Metz. Paris: Nouv. Éd. Scala, 2010. 
 "The Building." Centre Pompidou-Metz. Web. 12 Mar. 2011. <http://www.centrepompidou-metz. 
fr/site/?-the-building->. 
 Chessa, Melina. "Centre Pompidou-Metz : Les Premières Poutres De La Charpente Bois Sont 
Posées." Lemoniteur.fr. Le Moniteur France, 1 Apr. 2009. Web. 13 Mar. 2011.Center Pompidou- 
Metz : The First Beams of the Wooden Frame are Positioned 
 "Centre Pompidou-Metz." Detail: Timber Construction (2010): 1040-045. 
 "Centre Pompidou Metz." Structurae. Nicolas Janberg's Structurae, 2011. Web. 12 Mar. 2011. 
<http://en.structurae.de/structures/data/index.cfm?id=s0012274>. 
 Centre Pompidou Metz : 2008." Design to Production. Design to Production: Zurich/Stuttgart, 
June 2008. Web. 11 Mar. 2011. <http://www.designtoproduction.ch/content/view/75/54/>. 
 "Centre Pompidou Metz - France, 2010." Shigeru Ban Architects. Web. 11 Mar. 2011. 
<http://www.shigerubanarchitects.com/SBA_WORKS/SBA_OTHERS/SBA_OTHERS_ 
30/SBA_others_30.html>. 
BIBLIOGRAPHY
 Contractor World, and Holzbau Amann. "France: Outstanding Architectural Design Is Challenge 
for Contractor." Contractors World 1.7 (2010): 21-25. Contractors World. Roger Lindley, May 
2010. Web. 12 Mar. 2011. 
 Harris, James B., and Kevin Pui-K. Li. Masted Structures in Architecture. Oxford: Butterworth 
Architecture, 1996. 
 Jodidio, Philip, and Bon Laurent. Le. Centre Pompidou - Metz. Paris: Centre Pompidou, 2008. 
 Jodidio, Philip, and Shigeru Ban. Shigeru Ban: Complete Works, 1985-2010. Köln: Taschen, 2010. 
 Lequeux, Emmanuelle. L'architecture Du Musée: Chefs-d'oeuvre Du XXe Siècle. Paris: Beaux 
Arts-TTM, 2010. 
 Moore, Rowan. "Under the Big Top." Architectural Record 198.7 (2010): 82-88. Print. 
 Scheurer, Fabian. "File-to-Factory Production and Expertise." Detail: Analogue and Digital 
(2010): 482-86. 
BIBLIOGRAPHY

More Related Content

What's hot

What's hot (20)

art gallery case study
art gallery case studyart gallery case study
art gallery case study
 
Guggenheim museum in NYC
Guggenheim museum in NYCGuggenheim museum in NYC
Guggenheim museum in NYC
 
Crystal palace london
Crystal palace londonCrystal palace london
Crystal palace london
 
Daniel libeskind
Daniel libeskindDaniel libeskind
Daniel libeskind
 
Architect Louis i kahn
Architect Louis i kahnArchitect Louis i kahn
Architect Louis i kahn
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
Frank Owen Gehry (HOA)
Frank Owen Gehry (HOA)Frank Owen Gehry (HOA)
Frank Owen Gehry (HOA)
 
Frank gehry
Frank gehry Frank gehry
Frank gehry
 
Heydar aliyev cultural center, baku
Heydar aliyev cultural center, bakuHeydar aliyev cultural center, baku
Heydar aliyev cultural center, baku
 
The le corbusier
The le corbusierThe le corbusier
The le corbusier
 
Daniel Libeskind
Daniel LibeskindDaniel Libeskind
Daniel Libeskind
 
Villa savoye
Villa savoye Villa savoye
Villa savoye
 
Shell structure
Shell structureShell structure
Shell structure
 
Architect Santiago
Architect SantiagoArchitect Santiago
Architect Santiago
 
The Maxxi Museum
The Maxxi Museum The Maxxi Museum
The Maxxi Museum
 
Norman foster
Norman fosterNorman foster
Norman foster
 
GUGGENHEIM MUSEUM (BILBAO)
GUGGENHEIM MUSEUM (BILBAO)GUGGENHEIM MUSEUM (BILBAO)
GUGGENHEIM MUSEUM (BILBAO)
 
Kengo Kuma and some of his works
Kengo Kuma and some of his worksKengo Kuma and some of his works
Kengo Kuma and some of his works
 
Peckham Library Case Study
Peckham Library Case StudyPeckham Library Case Study
Peckham Library Case Study
 
maxxi construction
maxxi constructionmaxxi construction
maxxi construction
 

Similar to Centre Pompidou-Metz Timber Canopy Structure

Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02Jy Chong
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum buildingMehari Melaku
 
Case Study: Catenary Structures
Case Study: Catenary StructuresCase Study: Catenary Structures
Case Study: Catenary StructuresPrasad Thanthratey
 
ADVANCED CONSTRUCTION SYSTEM
ADVANCED CONSTRUCTION SYSTEMADVANCED CONSTRUCTION SYSTEM
ADVANCED CONSTRUCTION SYSTEMSara Aburayya
 
A4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressedA4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressedIndraj Bhachu
 
SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE
SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE
SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE SuruchiSharma58
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTJoyeeLee0131
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreTanisha Agarwal
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptxPrituJadhav1
 
Building construction-ii
Building construction-iiBuilding construction-ii
Building construction-iijinlieww
 
The space frame structure
The space frame structureThe space frame structure
The space frame structurebadekarbhavana
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid ArchitectsDhanveersinh Chavda
 
Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...
Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...
Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...MorroZorro
 
Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN Devesh Anand Jha
 
Tensile structures for architects
Tensile structures for architectsTensile structures for architects
Tensile structures for architectsDeepak KUMAR
 

Similar to Centre Pompidou-Metz Timber Canopy Structure (20)

Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
 
Case Study: Catenary Structures
Case Study: Catenary StructuresCase Study: Catenary Structures
Case Study: Catenary Structures
 
ADVANCED CONSTRUCTION SYSTEM
ADVANCED CONSTRUCTION SYSTEMADVANCED CONSTRUCTION SYSTEM
ADVANCED CONSTRUCTION SYSTEM
 
A4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressedA4 Portfolio Sample edited 2 .compressed
A4 Portfolio Sample edited 2 .compressed
 
SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE
SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE
SECONDARY DATA CASE STUDY: SATOLAS STATION LYON ST. EXUPERY, FRANCE
 
Glass beams
Glass beamsGlass beams
Glass beams
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
Building construction-ii
Building construction-iiBuilding construction-ii
Building construction-ii
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Column
ColumnColumn
Column
 
NEUE PRESENTATION.pptx
NEUE PRESENTATION.pptxNEUE PRESENTATION.pptx
NEUE PRESENTATION.pptx
 
The space frame structure
The space frame structureThe space frame structure
The space frame structure
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
 
Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...
Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...
Modern Architecture ; Organic Architecture. Centre Pompidou-Metz & Kawatana C...
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN Norman foster CITY HALL LONDON AND GHERKIN
Norman foster CITY HALL LONDON AND GHERKIN
 
Tensile structures for architects
Tensile structures for architectsTensile structures for architects
Tensile structures for architects
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 

Centre Pompidou-Metz Timber Canopy Structure

  • 2. PRESENTED TO: PIERRE SFEIR BY Chantal Hajjar Farid Saaybi Ghady Khalil
  • 3. I. General Information II. Roof Structure o Material Choice o Bracing o Support Beams o The 4 Piers o Tensile Membrane TABLE OF CONTENTS III. Main Structure o Truss Spire o The 3 Cantilevered Galleries IV. Conclusion V. Bibliography
  • 4.  Location: Metz, France  Area: 11,330 sqm  Year: 2010  The Centre Pompidou in Metz is a large hexagonal structure with three galleries running through the building.  The Interior atmosphere is light with a pale wood roof, white walls and a pearl-grey concrete floor.  The roof ties the interior and exterior and the three exhibition galleries make up highly innovative architectural choices. GENERAL INFO
  • 5. ROOF STRUCTURE Material Choice Bracing Support Beams The 4 Piers Tensile Membrane
  • 6. ROOF STRUCTURE TIMBER CANOPY & STEEL TRUSS  Meet At 405 Foundation Piles Through A Concrete Slab  Both Act Independently
  • 7.  A timber hexagon roof structure hovers over all of the separate volumes in order to unify them into a cohesive whole.  Composed of a pattern of hexagons and equilateral triangles inspired by traditional woven bamboo hats.  Each member overlaps one another similar to bamboo wickerwork.  The intersections do not use mechanical metal joints.
  • 8. ROOF STRUCTURE MATERIAL CHOICE Timber  30 kWh  450 kg/m3  Renewable  Easy Cheap  Malleable  Better  Economical Concrete  180 kWh  2500 kg/m3  Limited  Very Hard Expensive  Rigid  Less  Expensive STRUCTURE WEIGHT QUANTITY RESTORATION FLEXIBILITY DETAILED FINISHING EXPENDITURE
  • 9. ROOF STRUCTURE BRACING  The Triangulation of Force is in The Shape It Self Normal Hexagon Bracing Pompidou Hexagon Bracing
  • 10. ROOF STRUCTURE SUPPORT BEAMS  Support Beams Travel Along 5 Effective Spines  Each Are Individually Prefabricated  2 Beams Intersect At Each Node Of The Hexagonal Grid
  • 11. ROOF STRUCTURE THE 4 PIERS  Evenly spaced from the center, supported at the foundation  Structured same way as the Canopy  Additionally reinforced by Pre-stressed bolts & Metal Rings
  • 12. ROOF STRUCTURE TENSILE MEMBRANE  Stretched and secured over the EDGE OF THE CANOPY, within the SPIRE, within the PIERS, and with a 5MM STEEL PLATE at the top  Conceptual puncturing of the three program masses engaging the dynamic skin through structural complexity
  • 13. MAIN STRUCTURE The Truss Spire The Three Cantilevered Galleries
  • 14. MAIN STRUCTURE TRUSS SPIRE  Height 77m  The Spire Is The Central Mast  Partially Supports The Canopy  Virtually Supports The Circulation & The Exhibition  Which contains the stairs and elevators.
  • 15. MAIN STRUCTURE 3 CANTILEVERED GALLERIES  Built-in the Steel Truss Spire  The three tubes are stacked vertically and arranged around the Hexagonal Steel Frame Tower  Structurally enabled by 4 steel horizontal beams at each corner o Leaving the interior open for exhibition o Each Cantilevered opens to a view in Metz o The space created beneath make up the Grand Nef Gallery.
  • 16. “ ” I BELIEVE THAT THE MATERIAL DOESN'T NEED TO BE STRONG TO BE USED TO BUILD A STRONG STRUCTURE. THE STRENGTH OF THE STRUCTURE HAS NOTHING TO DO WITH STRENGTH OF THE MATERIAL. WHAT DETERMINES THE PERMANENCE OF A BUILDING IS NOT THE WEALTH OF THE DEVELOPER OR THE MATERIALS THAT ARE USED, BUT THE SIMPLE QUESTION OF WHETHER OR NOT THE RESULTING STRUCTURE IS SUPPORTED - LOVED - BY THE PEOPLE. CONCLUSION Shigeru Ban
  • 17.
  • 18.  Bidaine, Philippe. Centre Pompidou-Metz. Paris: Nouv. Éd. Scala, 2010.  "The Building." Centre Pompidou-Metz. Web. 12 Mar. 2011. <http://www.centrepompidou-metz. fr/site/?-the-building->.  Chessa, Melina. "Centre Pompidou-Metz : Les Premières Poutres De La Charpente Bois Sont Posées." Lemoniteur.fr. Le Moniteur France, 1 Apr. 2009. Web. 13 Mar. 2011.Center Pompidou- Metz : The First Beams of the Wooden Frame are Positioned  "Centre Pompidou-Metz." Detail: Timber Construction (2010): 1040-045.  "Centre Pompidou Metz." Structurae. Nicolas Janberg's Structurae, 2011. Web. 12 Mar. 2011. <http://en.structurae.de/structures/data/index.cfm?id=s0012274>.  Centre Pompidou Metz : 2008." Design to Production. Design to Production: Zurich/Stuttgart, June 2008. Web. 11 Mar. 2011. <http://www.designtoproduction.ch/content/view/75/54/>.  "Centre Pompidou Metz - France, 2010." Shigeru Ban Architects. Web. 11 Mar. 2011. <http://www.shigerubanarchitects.com/SBA_WORKS/SBA_OTHERS/SBA_OTHERS_ 30/SBA_others_30.html>. BIBLIOGRAPHY
  • 19.  Contractor World, and Holzbau Amann. "France: Outstanding Architectural Design Is Challenge for Contractor." Contractors World 1.7 (2010): 21-25. Contractors World. Roger Lindley, May 2010. Web. 12 Mar. 2011.  Harris, James B., and Kevin Pui-K. Li. Masted Structures in Architecture. Oxford: Butterworth Architecture, 1996.  Jodidio, Philip, and Bon Laurent. Le. Centre Pompidou - Metz. Paris: Centre Pompidou, 2008.  Jodidio, Philip, and Shigeru Ban. Shigeru Ban: Complete Works, 1985-2010. Köln: Taschen, 2010.  Lequeux, Emmanuelle. L'architecture Du Musée: Chefs-d'oeuvre Du XXe Siècle. Paris: Beaux Arts-TTM, 2010.  Moore, Rowan. "Under the Big Top." Architectural Record 198.7 (2010): 82-88. Print.  Scheurer, Fabian. "File-to-Factory Production and Expertise." Detail: Analogue and Digital (2010): 482-86. BIBLIOGRAPHY