CURRICULUM VITAE
Address: J-439, DarpanColony,
Thatipur, Gwalior (M.P)
Email : sharma10v.d@gmail.com
Er.V.D.Sharma Mob. : 09425770578
Position held : Asst.Highway Engineer
Name of the Firm : Artefact Projects Ltd.
Name : V.D. Sharma
Profession : Civil Engineer
Date of Birth : 08/08/1981
Nationality : Indian
Membership of Professional Societies : Nil
Qualification:
 High school, from MP-board.
 Intermediate, from MP-board.
 B.A. from Jiwaji University, Gwalior (M.P).
Tech.Qualifiaction:
 Diploma in Civil, from RGPV (Bhopal, M.P) in Year 2006.
 B.Tech. in Civil, from ICE in Year 2011.
Extra Qualification:
 Primavera.
 Diploma in Auto-Cad.
 Diploma in Computer application (DCA).
Total Expereince:
 10-years
(2)
EMPLOYMENT RECORD
1. From June.2014 to till Date
Employer Artefact Projects Ltd.
Position Held Asst.Highway Engineer
Project Name Construction Supervision Consultancy Services For
Construction Of 4-Lane Kota Bypass on NH-76 at Kota on East-
West Corridor in the state of Rajasthan under phase-II Program
of National Highways development Project.Pkg. No. CS-04 .
(Rajasthan under NHAI)
Project Cost 140.35 Crore
Total Length 66.00 Kms.
Location Kota(Rajasthan)
Client NHAI
2. From Oct.2011 to May-2014
Employer Shreeji Infrastructure India (P).Ltd.
Position Held Senior Engineer
Project Name Widening and Re-Construction of Amarpatan-
Gorsari-Badera, Package-11(Jabalpur/ADB funded)
Total Length 46.5 Kms.
Project Cost 51.2 Crores
Location Satna (M.P)
Client MPRDC & Montecarlo
3. From Aug.2009 to Sept.2011
Employer IJM Berhad
Position Held Highway Engineer
Project Name Widening & Strengthening of four lane of existing Road
From Ch-132+800 Km to 187+00 Km under ADB
funded loan Assistance ,Jhansi-Lakhnadon Section(Nh-26);
Package-C- 4.
Total Length 54.2 Kms.
Project Cost 210 Crore
Location Sagar (M.P)
Client NHAI
4. From Sept.2008 to July2009
Employer Himalaya Const. Company
Position Held Highway Engineer
Project Name Improvement and Routine Maintainance Contract of
Gwalior to Agra Four lane, section of NH-3.
Length 105 kms.
Location Dhoulpur (Raj.)
Client NHAI
(3)
5.From April 2004 To Aug 2008
Employer Data Technosys Engineering Pvt.Ltd.
Position Held Field Engineer
Project Name Reconstruction & Supervision for the Strengthening &
Widening. Length: 60 km;Funded by-ADB
Total Length 60 Kms.
Project Cost 210 Crore
Location Sheopur (M.P)
Client MPRRDA
Some of relevant projects are as follows
Construction Supervision Consultancy Services For Construction
Of 4-Lane Kota Bypass on NH-76 at Kota on East-West Corridor in
the state of Rajasthan under phase-II Program of National
Highways development Project.Pkg. No. CS-04 .
(Rajasthan under NHAI)
Length:66.00Km,Location-Kota(Rajasthan);Client : NHAI,
Main Project Features-
Responsible for Setting Out of works, levels & highway geometrics in
accordance with the approved drawings, Construction supervision of laying
operations of pavement layers like Sub-grade,GSB,WMM,DBM & BC using
electronic sensor paver,Checking of field density & test maintaining quality
assurance to obtain the desired standards and consistency in the qualities of
Work, Checking & review of construction Program & methodology, measure
and certify quantity as per standard methods of measurement
Widening and Re-Construction of Amarpatan-Gorsari-Badera,
Package-11(Jabalpur/ADB); LotalLength-46.8Km; Project Cost
51.2Crores;Client-MPRDCunder MPSRP-III & Montecarlo
Construction Ltd. Location: Satna(M.P);
(a) Responsible for Setting Out of works, levels & highway geometrics in
accordance with the approved drawings, Construction supervision of laying
operations of pavement layers like Sub-grade, GSB, WMM, DBM & BC using
electronic sensor paver, Checking of Field density Test & moisture content,
drainage and protection works, assist the Material Engineer for checking of
Borrow areas, Quarries and Crusher Site for the materials, maintaining quality
assurance to obtain the desired standards and consistency in the qualities of
Work, Checking & review of construction Program & methodology, measure
and certify quantity as per standard methods of measurement, Checking of
L-Section & X-Section of Road profile, reporting for Progress and control,
Development of wayside amenities & improvement of Junctions.
Project also involved construction of following Structures:
(a) HP culvert – 37 nos.
From June
2014 to till
date
From Oct
2011 To June-
2014
(4)
(b) Minor Bridges- 04 nos.
Details of minor bridges :
(1) Ch-05+050 (Length:16.8 m) 2x8 Solid slab type(open foundation)
(2) Ch-07+145 (Length:10.4 m)1x9.4 Solid slab type(open foundation)
(3) Ch-23+700(Length: 16.8 m) 2x8 Solid slab type(open foundation)
(4) Ch-27+255(Length: 10.4m)1x 9.4 Solid slab type(open foundation)
Widening & Strengthening of four lane of existing Road
from Ch-132+800 Km to 187+00 Km under ADB funded loan
Assistance ,Jhansi-Lakhnadon Section(NH- 26);Package-C- 4.
Responsible for Setting Out of works, levels & highway geometrics in
accordance with the approved drawings, Construction supervision of laying
operations of pavement layers like Sub-grade, GSB, WMM, DBM & BC using
electronic sensor paver, Checking of Field density Test & moisture content,
drainage and protection works, assist the Material Engineer for checking of
Borrow areas, Quarries and Crusher Site for the materials, maintaining quality
assurance to obtain the desired standards and consistency in the qualities of
Work, Checking & review of construction .
From Aug
2009 To Sep
2011
Improvement and Routine Maintainance Contract of Gwalior to
Agra Four lane, section of NH-3. Length: 105 km, Location-
Dhoulpur (Raj.); Client: NHAI, Main Project features- Maintainance
Supervision
Responsible for Setting Out of works, levels & highway geometrics in
accordance with the approved drawings, Construction supervision of laying
operations of pavement layers like DBM & BC using electronic sensor paver,
maintaining quality assurance to obtain the desired standards and
consistency in the qualities of Work, Checking & review of construction
Program & methodology, measure and certify quantity as per standard
methods of measurement,
From Sep
2008 To July
2009
Construction & Supervision Of Rural Road Under PMGSY In
Sheopur (M.P) Project Cost: 48.60 Crores
Year: Jan 2008 – Aug 2009; Location: Madhya Pradesh; Client: MP Rural
Road Development Authority(MPRRDA)
Main Project features: Construction Supervision
Position Held: Field Engineer
Activities Performed:
Responsible for Maintaining quality of materials as per standard specification
and clauses. during all stages i.e. construction of embankment / sub grade,
GSB/ WBM and top layers, conducting field and laboratory tests , checking
and certification of testing, preparation of design mix of cement concrete
monitoring to maintain the frequency of test and documentation of test resul
From April
2005 To Aug
2008
(5)
.
Certification
I, the undersigned, (Name Er.V.D.Sharma and Address– J-439,Darpan colony,
Thatipur,Gwalior (M.P)undertake that this CV correctly describes myself, my qualifications
and my experience and MPRDC would be at liberty to debar me if any information given in the
CV, in particular the Summary of Qualification & Experience vis-à-vis the requirements as per
TOR is found incorrect. I further undertake that I have never been debarred by NHAI/MPRDC &
OTHERS.
Date _______________ (Day/ Month/ Year)
[Er.V.D.Sharma]
Address: - J-439, Darpan colony, Thatipur, Gwalior (M.P)
Mobile: - 09425770578

More Related Content

What's hot (20)

Vishu resume new (1)
Vishu resume new (1)Vishu resume new (1)
Vishu resume new (1)
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
Highway Engineer
Highway EngineerHighway Engineer
Highway Engineer
 
Resume for Sr.Land Surveyor
Resume for Sr.Land SurveyorResume for Sr.Land Surveyor
Resume for Sr.Land Surveyor
 
CV Suresh44UIC
CV Suresh44UICCV Suresh44UIC
CV Suresh44UIC
 
C.V.
C.V.C.V.
C.V.
 
CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
CV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerCV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design Engineer
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
Ravi_Shenker2014
Ravi_Shenker2014Ravi_Shenker2014
Ravi_Shenker2014
 
LVS Varma
LVS VarmaLVS Varma
LVS Varma
 
CV
CVCV
CV
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
MUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For SurveyorMUHAMMAD BILAL CV For Surveyor
MUHAMMAD BILAL CV For Surveyor
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani Tyagi
 
CV -TBC (Rail Specialist) V5
CV -TBC (Rail Specialist) V5CV -TBC (Rail Specialist) V5
CV -TBC (Rail Specialist) V5
 
Chetan Arora CV
Chetan Arora CVChetan Arora CV
Chetan Arora CV
 
CV Dylan Tate 2015_Brief
CV Dylan Tate 2015_BriefCV Dylan Tate 2015_Brief
CV Dylan Tate 2015_Brief
 

Similar to highway main (20)

corrected Sept 30, C.V OF HK MISHRA- TL
corrected Sept 30, C.V OF HK MISHRA- TLcorrected Sept 30, C.V OF HK MISHRA- TL
corrected Sept 30, C.V OF HK MISHRA- TL
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
 
Jayasankar_CV_for QA Manager
Jayasankar_CV_for QA ManagerJayasankar_CV_for QA Manager
Jayasankar_CV_for QA Manager
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
CURRICULAM DKS1
CURRICULAM DKS1CURRICULAM DKS1
CURRICULAM DKS1
 
cv.dchand copy
cv.dchand copycv.dchand copy
cv.dchand copy
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
CURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latestCURRICULUM_VITAE__NHAI_latest
CURRICULUM_VITAE__NHAI_latest
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
CV Mr. Haribabu
CV Mr. HaribabuCV Mr. Haribabu
CV Mr. Haribabu
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
 
Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
GDRPL Company Profile - .pptx
GDRPL Company Profile - .pptxGDRPL Company Profile - .pptx
GDRPL Company Profile - .pptx
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 

highway main

  • 1. (1) CURRICULUM VITAE Address: J-439, DarpanColony, Thatipur, Gwalior (M.P) Email : sharma10v.d@gmail.com Er.V.D.Sharma Mob. : 09425770578 Position held : Asst.Highway Engineer Name of the Firm : Artefact Projects Ltd. Name : V.D. Sharma Profession : Civil Engineer Date of Birth : 08/08/1981 Nationality : Indian Membership of Professional Societies : Nil Qualification:  High school, from MP-board.  Intermediate, from MP-board.  B.A. from Jiwaji University, Gwalior (M.P). Tech.Qualifiaction:  Diploma in Civil, from RGPV (Bhopal, M.P) in Year 2006.  B.Tech. in Civil, from ICE in Year 2011. Extra Qualification:  Primavera.  Diploma in Auto-Cad.  Diploma in Computer application (DCA). Total Expereince:  10-years
  • 2. (2) EMPLOYMENT RECORD 1. From June.2014 to till Date Employer Artefact Projects Ltd. Position Held Asst.Highway Engineer Project Name Construction Supervision Consultancy Services For Construction Of 4-Lane Kota Bypass on NH-76 at Kota on East- West Corridor in the state of Rajasthan under phase-II Program of National Highways development Project.Pkg. No. CS-04 . (Rajasthan under NHAI) Project Cost 140.35 Crore Total Length 66.00 Kms. Location Kota(Rajasthan) Client NHAI 2. From Oct.2011 to May-2014 Employer Shreeji Infrastructure India (P).Ltd. Position Held Senior Engineer Project Name Widening and Re-Construction of Amarpatan- Gorsari-Badera, Package-11(Jabalpur/ADB funded) Total Length 46.5 Kms. Project Cost 51.2 Crores Location Satna (M.P) Client MPRDC & Montecarlo 3. From Aug.2009 to Sept.2011 Employer IJM Berhad Position Held Highway Engineer Project Name Widening & Strengthening of four lane of existing Road From Ch-132+800 Km to 187+00 Km under ADB funded loan Assistance ,Jhansi-Lakhnadon Section(Nh-26); Package-C- 4. Total Length 54.2 Kms. Project Cost 210 Crore Location Sagar (M.P) Client NHAI 4. From Sept.2008 to July2009 Employer Himalaya Const. Company Position Held Highway Engineer Project Name Improvement and Routine Maintainance Contract of Gwalior to Agra Four lane, section of NH-3. Length 105 kms. Location Dhoulpur (Raj.) Client NHAI
  • 3. (3) 5.From April 2004 To Aug 2008 Employer Data Technosys Engineering Pvt.Ltd. Position Held Field Engineer Project Name Reconstruction & Supervision for the Strengthening & Widening. Length: 60 km;Funded by-ADB Total Length 60 Kms. Project Cost 210 Crore Location Sheopur (M.P) Client MPRRDA Some of relevant projects are as follows Construction Supervision Consultancy Services For Construction Of 4-Lane Kota Bypass on NH-76 at Kota on East-West Corridor in the state of Rajasthan under phase-II Program of National Highways development Project.Pkg. No. CS-04 . (Rajasthan under NHAI) Length:66.00Km,Location-Kota(Rajasthan);Client : NHAI, Main Project Features- Responsible for Setting Out of works, levels & highway geometrics in accordance with the approved drawings, Construction supervision of laying operations of pavement layers like Sub-grade,GSB,WMM,DBM & BC using electronic sensor paver,Checking of field density & test maintaining quality assurance to obtain the desired standards and consistency in the qualities of Work, Checking & review of construction Program & methodology, measure and certify quantity as per standard methods of measurement Widening and Re-Construction of Amarpatan-Gorsari-Badera, Package-11(Jabalpur/ADB); LotalLength-46.8Km; Project Cost 51.2Crores;Client-MPRDCunder MPSRP-III & Montecarlo Construction Ltd. Location: Satna(M.P); (a) Responsible for Setting Out of works, levels & highway geometrics in accordance with the approved drawings, Construction supervision of laying operations of pavement layers like Sub-grade, GSB, WMM, DBM & BC using electronic sensor paver, Checking of Field density Test & moisture content, drainage and protection works, assist the Material Engineer for checking of Borrow areas, Quarries and Crusher Site for the materials, maintaining quality assurance to obtain the desired standards and consistency in the qualities of Work, Checking & review of construction Program & methodology, measure and certify quantity as per standard methods of measurement, Checking of L-Section & X-Section of Road profile, reporting for Progress and control, Development of wayside amenities & improvement of Junctions. Project also involved construction of following Structures: (a) HP culvert – 37 nos. From June 2014 to till date From Oct 2011 To June- 2014
  • 4. (4) (b) Minor Bridges- 04 nos. Details of minor bridges : (1) Ch-05+050 (Length:16.8 m) 2x8 Solid slab type(open foundation) (2) Ch-07+145 (Length:10.4 m)1x9.4 Solid slab type(open foundation) (3) Ch-23+700(Length: 16.8 m) 2x8 Solid slab type(open foundation) (4) Ch-27+255(Length: 10.4m)1x 9.4 Solid slab type(open foundation) Widening & Strengthening of four lane of existing Road from Ch-132+800 Km to 187+00 Km under ADB funded loan Assistance ,Jhansi-Lakhnadon Section(NH- 26);Package-C- 4. Responsible for Setting Out of works, levels & highway geometrics in accordance with the approved drawings, Construction supervision of laying operations of pavement layers like Sub-grade, GSB, WMM, DBM & BC using electronic sensor paver, Checking of Field density Test & moisture content, drainage and protection works, assist the Material Engineer for checking of Borrow areas, Quarries and Crusher Site for the materials, maintaining quality assurance to obtain the desired standards and consistency in the qualities of Work, Checking & review of construction . From Aug 2009 To Sep 2011 Improvement and Routine Maintainance Contract of Gwalior to Agra Four lane, section of NH-3. Length: 105 km, Location- Dhoulpur (Raj.); Client: NHAI, Main Project features- Maintainance Supervision Responsible for Setting Out of works, levels & highway geometrics in accordance with the approved drawings, Construction supervision of laying operations of pavement layers like DBM & BC using electronic sensor paver, maintaining quality assurance to obtain the desired standards and consistency in the qualities of Work, Checking & review of construction Program & methodology, measure and certify quantity as per standard methods of measurement, From Sep 2008 To July 2009 Construction & Supervision Of Rural Road Under PMGSY In Sheopur (M.P) Project Cost: 48.60 Crores Year: Jan 2008 – Aug 2009; Location: Madhya Pradesh; Client: MP Rural Road Development Authority(MPRRDA) Main Project features: Construction Supervision Position Held: Field Engineer Activities Performed: Responsible for Maintaining quality of materials as per standard specification and clauses. during all stages i.e. construction of embankment / sub grade, GSB/ WBM and top layers, conducting field and laboratory tests , checking and certification of testing, preparation of design mix of cement concrete monitoring to maintain the frequency of test and documentation of test resul From April 2005 To Aug 2008
  • 5. (5) . Certification I, the undersigned, (Name Er.V.D.Sharma and Address– J-439,Darpan colony, Thatipur,Gwalior (M.P)undertake that this CV correctly describes myself, my qualifications and my experience and MPRDC would be at liberty to debar me if any information given in the CV, in particular the Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have never been debarred by NHAI/MPRDC & OTHERS. Date _______________ (Day/ Month/ Year) [Er.V.D.Sharma] Address: - J-439, Darpan colony, Thatipur, Gwalior (M.P) Mobile: - 09425770578