This document provides information on several of Hina Gazi's design projects. It describes 3 projects in particular: an urban installation in Riyadh intended to engage viewers from a distance; an educational building at the University of Baha featuring folded volumes and event spaces; and a medical research center featuring controlled research spaces and social areas. The projects showcase Gazi's conceptual designs and skills in master planning, architecture, and landscape design across different types of projects.