2. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
MPW has been part of adopting and
applying Green Building Concepts in its
construction projects.
The application of green and sustainable
design has been initiated on a group of
selected projects as a required objective.
MPW has emphasized in the contractual
documents –TOR and RFP- the importance
of implementing green and sustainable
criteria (i.e. LEED and QSAS).
3. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
MPW has been part of adopting and
applying Green Building Concepts in its
construction projects.
The application of green and sustainable
design has been initiated on a group of
selected projects as a required objective.
MPW has emphasized in the contractual
documents –TOR and RFP- the importance
of implementing green and sustainable
criteria (i.e. LEED and QSAS).
4. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
MPW will present three ongoing case studies, detailing information
related to green aspects from each case study, and explaining how
green design and technology were applied.
5. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
3 Terminal Two Kuwait International Airport
6. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
7. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
Jaber Al-Sabah
Hospital
AL-Shuhada
AL-Zahra
Ministries
Zone
Six Ring Road
Sahara Golf &
Country Club
8. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
Site Area 4,760 m2
The Public Services
Public Authority for
Built-up Area 33,000 housing Welfare m2 company
AL-Zahra Zakat House
AL-Shuhada
The Public
Authority for Civil
info.
Ministry of Ministry of
Electricity & Water Public Works
9. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
Site Area 4,760 m2
The Public Services
Public Authority for
Built-up Area 33,000 housing Welfare m2 company
Consultant: Alia Al-Sayegh Cons.
Stage: Design Phase.
AL-Zahra Construction Date: Aug. 2013
Zakat House
AL-Shuhada
The Public
Authority for Civil
info.
Ministry of Ministry of
Electricity & Water Public Works
10. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
Exportation for Public Welfare Dept.
BOT Department:
- Administration offices
Supporting facilities for the 2 Dept.
“3 Basements+ Ground+ 9 Floors”
11. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
12. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
Terms Of Reference Addendum
13. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
1 URBAN Connectivity “14%”
2 Site “9%”
3 Energy “18”
4 Water “16%”
5 Material“8%”
6 Indoor Environment “14%”
7 Cultural and Economic Value “13%”
8 Management and Operations “8%”
QSAS Certification: Suggestion from Alia Al-Sayegh Cons.
14. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
1 URBAN Connectivity “14%”
2 Site “9%”
3 Energy “18”
4 Water “16%”
5 Material“8%”
6 Indoor Environment “14%”
7 Cultural and Economic Value “13%”
8 Management and Operations “8%”
QSAS Certification: Suggestion from Alia Al-Sayegh Cons.
15. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
1 Using Solar Panels for :
External Lighting “Stand-Alone”
16. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
1 Using Solar Panels for :
External Lighting “Stand-Alone”
Supply Electricity “Saving 9%”
17. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
18. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
19. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
20. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
1 Using Solar Panels for :
External Lighting “Stand-Alone”
Supply Electricity “Saving 9%”
2 LED is used for complete lighting fixtures of the building
21. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
3
Energy “18%”
Energy Demand Performance
Electrical System
1 Using Solar Panels for :
External Lighting “Stand-Alone”
Supply Electricity “Saving 9%”
2 LED is used for complete lighting fixtures of the building
3 A full Building Management System (BMS) is applied.
22. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
3 Terminal Two Kuwait International Airport
23. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
Site Area 500,000 m2
“Each”
Abdally Road
West Abdally
Road Location
East Abdally
Road Location
Al-Salmy Road Al-Salmy Road
Location
24. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
West Abdally
R E
Road Location
enewable nergy East Abdally
Road Location Trucks parking (2000 parking spaces min.)
Service center (3000 m2) :
- R P
Administration offices
equest for roposal
Al-Salmy Road
Location Mechanical and Electrical workshop
Trucks Weight station
Truck-Wash facilities
Supportive facilities
Stage: Construction Phase
Type: Design / Build.
Construction Finish Date:
March 2014
25. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
26. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
27. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
1.2 Wind Turbines “backup electrical power”
28. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
1.2 Wind Turbines “backup electrical power”
1.3 LED Fixture
29. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
1.2 Wind Turbines “backup electrical power”
1.3 LED Fixture
1.4 Stand-Alone Street Light
30. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
1.2 Wind Turbines “backup electrical power”
1.3 LED Fixture
1.4 Stand-Alone Street Light
2 Energy Conservation
2.1 Power Sockets (15%)
“Trailer Refrigeration Unit”
31. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
1 Clean Green Energy System
1.1 Solar Panels and Shading
1.2 Wind Turbines “backup electrical power”
1.3 LED Fixture
1.4 Stand-Alone Street Light
2 Energy Conservation
2.1 Power Sockets (15%)
“Trailer Refrigeration Unit”
3 Treated Water for Irrigation “Storm Water Tank”
32. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
Exportation for Public Welfare (EPWD) and
1 Build Operate and Transfer Agency (BOT)
2 Trucks' Parking Lots in Al-Jahra'a
Governorate
3 Terminal Two Kuwait International Airport
33. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Capital City
Hwally
Government
Fourth Ring Road
Fifth Ring Road
AL-Farwaniyah South Surrah
Government
Six Ring Road
Abdullah
AL-Mubarak
Sabhan Mubarak
Industrial Area AL-Kabeer
New Terminal Government
34. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Site Area 6.8 km2 Capital City
Built up Area 670,000 m2
Hwally
Government
Fourth Ring Road
Fifth Ring Road
AL-Farwaniyah South Surrah
Government
Six Ring Road
Abdullah
AL-Mubarak
Sabhan Mubarak
Industrial Area AL-Kabeer
New Terminal Government
35. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
36. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Consultant: Foster + Partners in Association with Gulf Cons.
Stage: Design Phase.
Construction Date: Sept. 2013
37. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
The New Terminal will initially accommodate 13
MAP with the opportunity to increase it to 25 MAP.
The layout of the airport is generated to
accommodate 35 flexible contact stands.
- 4,500 min. car parking for arrivals and departure .
38. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
39. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
40. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
41. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
42. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
43. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
44. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
45. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
46. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
47. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
48. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
49. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
50. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
1 Sustainable Site
2 Water Efficiency
3 Energy and Atmosphere
4 Indoor Environment
5 Material and Resource
6 * Renovation Design and Regional Priority
51. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
1 Sustainable Site
2 Water Efficiency
3 Energy and Atmosphere
4 Indoor Environment
5 Material and Resource
6 * Renovation Design and Regional Priority
52. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
Site Development 1
1 Sustainable Site
53. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
1 3 Terminal Two Kuwait International Airport
Sustainable Site Bridge Gardens
Site Development 1 Terraced gardens
and water features
Oasis
100% coverage
Native Planting Zone
80% coverage
60% coverage
40% coverage
20% coverage
Native Planting Zone Oasis Bridge Gardens
54. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
1 3 Terminal Two Kuwait International Airport
Sustainable Site Alternative Transportation 2
Buses
Car Park Pedestrian Link
Metro
Buses
55. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
1 3 Terminal Two Kuwait International Airport
Sustainable Site
Heat Island Effect “Non-Roof” 3
100% Parking Covered
“Green Roof”
56. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
57. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
1 Sustainable Site
2 Water Efficiency
3 Energy and Atmosphere
4 Indoor Environment
5 Material and Resource
6 * Renovation Design and Regional Priority
58. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
2 3 Terminal Two Kuwait International Airport
Water Efficiency
Water Efficient Landscaping 1
3
18 Treatment plant
Distributed
Reused Processed Water
Used Processed Water
59. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 Terminal Two Kuwait International Airport
1 Sustainable Site
2 Water Efficiency
3 Energy and Atmosphere
4 Indoor Environment
5 Material and Resource
6 * Renovation Design and Regional Priority
60. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Optimize Energy Performance 1
1 Day Light
2 Photovoltaic System
3 Indoor Lighting
61. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
1 Day Light
62. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
1 Day Light
Increase glazing to
equivalent of LEED
requirements with
coordinate of
cooling system
63. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
1 Day Light
64. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
1 Day Light
65. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
2 Photovoltaic System
11% renewable energy from solar thermal and
Photovoltaic Panels. Approx. 25.3GWh per annum
generated from PV panels.
Substantial use of photo voltaic arrays (PV) to generate
electricity, thus reduce the demand for Grid power.
66. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
2 Photovoltaic System
Total PV Area
200,000 sqm
67. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
3 3 Terminal Two Kuwait International Airport
Energy and Atmosphere
Energy Performance 1
Lighting Solution
Reduce building energy consumption by at least
16% of energy needed for the light use
Baggage hall lighting mix
of fluorescent and LED
high bay luminaires.
68. Ministry of Public Works
Construction Project Sector “Green Building in Government Projects”
May 2012
From three presented case studies, State of Kuwait government
represented by MPW had the decision of implementing sustainable
and green energy criteria into governmental projects by using any
approved measuring system such as LEED or QSAS.
This is TOR for ministry of information (new headquarter)
Concentrate on energy aspects ( solar panels)و عالية الصايغ راح تتكلم بالتفصيل عن تطبيقات QSAS
High advance smart buildingLighting control is achieved throughout the building through motion sensors and dimming system.
We need 900KhW for building usage, and fence lighting with security
4 power socket : Keeping the environment clean by turning off the desiel engine also save the energy
Drop off curb departure
Chick in hall
Departure additional view
immigration
Premium Check-in Hall – additional departure view
Central space
Central space
Roof Canopy protecting Facades & Boarding Bridges- External view towards the Fixed Bridges-
Arrival and baggage reclaim hall
Arrivals Concourse
TOR
Different type of vegetation- leed required protect native vegitation or restore to min. 50%
Car, bus, train
LEED required at least 50% of car parking should be covered
Departure concurse
Reduce potable water consumption الماي العادي وليس الصليبية أو الحلو and use it for irregation by 50% from calculated (this LEED requirment)… we are using the whole consmption water then treated then we r using it a gain for irregation
LEED required to use on site renewable energy system to offset 11% of the building annual energy cost