Agenda
• Case study of CSR 3658463
• Customer configuration
• Issue with GPS-Out
• Solution for customer issue.
• Limitations with GPS-Out Solution
• New improvements in SYNC area
Customer Configuration:
RNC
(NTP
Source)
DUW DUS
RRU-1
RRU-2
RRU-3
NTP Sync
GPS-Out
GPS-Out solution is not applicable for BB nodes.
GOG GOS
With the fluctuation in transmission DUS (L21)
sites goes down. DUW (U21) sites remain un-
impacted.
Customer set timeAndPhaseSynchCritical to false
on L21 sites. However, it doesn’t make any
difference.
For DUW (U21) sync source is NTP which have
precision in milliseconds.
DUW (U21) sites does sync adjustments to
compensate frequency drifting from external
reference source and sync remained in Locked
mode on DUW (U21). This is probably due to
freqDeviationThreshold is set to 5000 (max).
DUS (L21) node receiving GPS signal over the
GPS-Out. DUS cannot follow rate of the
frequency drifting from DUW node which is
providing GPS signal with precision of 1 PPS.
So DUS node enters FREE RUNNING MODE.
Problem Description & Observation
LOCKED
MODE
HOLDOVER
MODE
FREE
RUNNING
MODE
External reference lost Holdover timer expired
External reference regained
Radio Clock State Machine
FREQUENCY_LOCKED_MODE
TIME_LOCKED_MODE
TIME_OFFSET_LOCKED_MODE
FREQ_HOLDOVER_MODE
TIME_HOLDOVER_MODE
FREERUNNING_MODE
Investigation at DUW Side
• Below events seen in the DUW node.
<<nssinfo all>>
[2020-02-03 07:21:37] NORMAL -> MONITORING due to REFERENCE_UNSTABLE
[2020-02-03 07:26:42] MONITORING -> ADJUSTING due to SLOPE_OK event
[2020-02-03 07:45:40] ADJUSTING -> NORMAL due to FREQ_LOCKING_EVENT
[2020-02-03 08:39:09] NORMAL -> MONITORING due to REFERENCE_UNSTABLE
[2020-02-03 08:44:14] MONITORING -> ADJUSTING due to SLOPE_OK event
[2020-02-03 08:44:20] ADJUSTING -> NORMAL due to FREQ_LOCKING_EVENT
• Fluctuation in transport lead to deviation in NTP sync reference at DUW which further impact to DUS.
• DUS is not able to follow the frequency drifts due to GPS out solution.
• Whereas, when there is no deviation in NTP sync reference then DUS is not impacted.
• We can notice unstable reference events on the IpSyncRef at the observed time period on the DUW node.
• Due to instability system perform ADJUSTING frequency to compensate frequency drifting from external
reference source.
DUW (U21)
DUS (L21)
Proposal to mitigate the outages
• Node Group Synchronization (NGS) was recommended
instead of GPS-Out for improved flexibility and
stability.
RNC
(NTP
Source)
DUW (SP) DUS (SR)
RRU-1
RRU-2
RRU-3
NTP Sync
NGS
Issue seen after NGS implementation
• After implementing NGS there was no
issue see on the DUS (L21) nodes. As
it can keep the system clock in
HOLDOVER MODE. Even during the fiber
cut or fluctuations the L21 cells
remain up. Although there is cell
outage for few seconds due to BFN
JUMP. However, they are very short
as compared to previous outages.
• However, now the issue shifted to
DUW (U21) side. As during the fiber
cut the U21 cells were going down.
This was due to DUW entering FREE
RUNNING MODE.
Now the customer wants to know how to mitigate this problem completely, so
that there is no outage on the DUW side and avoid BFN jump on the DUS side.
Further analysis
• Collected traces for 24 hours to capture the scenario when the DUW
transitions from FREQUENCY LOCKED to FREE RUNNING MODE.
• From graph of “Time residual variance”
extracted from traces collected on SP
DUW node it can be observed that Sync
reference on SP node is unstable.
• Time residual variance represents the
ratio between measurements predicted
by algorithm and the real measurements
obtained from external Sync references.
• The curve on that graph should be really
close to horizontal line in case of stable
external Sync reference, but as it could
be seen that is not the case in graph
shown below.
• Another graph extracted from the traces showing the deviation in ppb.
• Deviation has been seen in
the transport network around
17ppb which is higher than
the limit, is the main root
cause.
• The difference between the
frequency of the output of
the OCXO and the incoming
reference is continuously
monitored by SW.
• Every 2.1s the output is
adjusted, to match the
reference.
• At 2020-04-01, around 2020-
04-01 18:15 the incoming
frequency of the NTP had a
sudden disturbance.
• There is a limit for how fast
the SW can regulate the
output. In this case the
limit was exceeded.
Suggestion: upgrade the nodes to SW version C19.Q2 EP12 or C20.Q1 on which
MR5172 (SP8) is delivered.
Improvements introduced in MR5172
MR5172-SP1:
• Feature should supervise frequency deviation defects
(frequency jumps, drifts, frequency inaccuracy) on
Baseband nodes for active reference.
• Synchronization reference supervision will declare
defect and deselect active reference when calculated
frequency deviation is above freqDeviationThreshold MO
attribute value. Deselected reference will be
supervised for recovery (if defect is ceased, reference
will be considered for re-activation by sync SW).
• SoCPRI algorithm on Baseband will be more robust to
frequency change of SP.
• User has ability to decide threshold for frequency
defects on active external reference.
• Introduced in 18.Q2.
MR5172…
MR5172-SP2:
• Supervision of active references for frequency
jump and fast frequency drift artifacts for G1 and
new alarm introduction for G1 and G2.
• The purpose of this feature is to improve
supervision of active external synchronization
reference in DU Radio Node. Supervision should
detect defects with frequency jumps or drifts.
• New alarm "Sync Reference Deviation" is introduced
for these kinds of defects for both DU Radio Node
and Baseband Radio Node.
• Introduced in 18.Q4.
MR5172…
MR5172-SP8:
• Improved Robustness of the Supervision of active
frequency references (the SP2 feature) for DUW/DUS. SP8
can be considered as add-on to SP2 functionality.
• This system improvement makes synchronization reference
supervision more robust when working with lower quality
synchronization references and more tolerant to
unstable sources.
• Instead of immediate traffic degradation,
synchronization holdover capability is retained for a
longer time, increasing the chance that the node re-
aligns with the sync source. It is expected this
results in less impact on network traffic ability.
• DUW: RBS W19.Q2.9 (C19.Q2- EP12-1) and C19.Q2 EP13.
Traces used in this case:
SP (DUW):
========
te default *
te e trace5 trace6 trace7 trace9 NSS_CBM_TUM2_TUREG
te save *
mon mp
SR (DUS):
========
te default *
te e trace1 NSS_CBM_TUM2_PLL
te save *
mon mp
Counters
PM Counter Name Attribute Value
pmfreeRunningSec FREE_RUNNING
FAILED
pmfreqHoldOverSec FREQUENCY_HOLDOVER
pmtimeFreeRunningSec FREQUENCY_LOCKED
FREQUENCY_HOLDOVER
pmtimeHoldoverSec RNT_TIME_HOLDOVER
TIME_OFFSET_HOLDOVER
pmtimeAssistedHoldoverSec RNT_TIME_LOCKED
TIME_OFFSET_LOCKED
when RadioEquipmentClock.timeSyncAssistanceSt
ate is ASSISTANCE_ACTIVE
GPS-Out LIMITATIONS AND NGS IMPROVEMENTS.pptx

More Related Content

Similar to GPS-Out LIMITATIONS AND NGS IMPROVEMENTS.pptx

Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdfKey Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
ssuser3be61c1
 
Evaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs localEvaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs local
IAEME Publication
 
Evaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs localEvaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs local
IAEME Publication
 
Manage LTE RAN Synchronization.pdf
Manage LTE RAN Synchronization.pdfManage LTE RAN Synchronization.pdf
Manage LTE RAN Synchronization.pdf
leilaerman
 
Ofdm performance analysis
Ofdm performance analysisOfdm performance analysis
Ofdm performance analysis
Saroj Dhakal
 
3G Huawei RAN Resource Monitoring and management.ppt
3G Huawei RAN Resource Monitoring and management.ppt3G Huawei RAN Resource Monitoring and management.ppt
3G Huawei RAN Resource Monitoring and management.ppt
Nailat2
 
An_FPGA_Based_Passive_K_Delta_1_Sigma_Modulator
An_FPGA_Based_Passive_K_Delta_1_Sigma_ModulatorAn_FPGA_Based_Passive_K_Delta_1_Sigma_Modulator
An_FPGA_Based_Passive_K_Delta_1_Sigma_Modulator
Matthew Albert Meza
 

Similar to GPS-Out LIMITATIONS AND NGS IMPROVEMENTS.pptx (20)

Saturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy Logic
Saturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy LogicSaturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy Logic
Saturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy Logic
 
Saturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy Logic
Saturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy LogicSaturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy Logic
Saturation Throughput and Delay Aware Asynchronous Noc Using Fuzzy Logic
 
515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx515878259-Node-Group-Synch-Workshop.pptx
515878259-Node-Group-Synch-Workshop.pptx
 
In Service Monitoring and Assurance at ITSF 2014
In Service Monitoring and Assurance at ITSF 2014 In Service Monitoring and Assurance at ITSF 2014
In Service Monitoring and Assurance at ITSF 2014
 
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdfKey Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
Key Factors that affect 5G Throughput, Possible Causes and Ways to optimize.pdf
 
Deep Dive 5G NR-RAN Release 2018 Q4.pptx
Deep Dive 5G NR-RAN Release 2018 Q4.pptxDeep Dive 5G NR-RAN Release 2018 Q4.pptx
Deep Dive 5G NR-RAN Release 2018 Q4.pptx
 
Evaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs localEvaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs local
 
Evaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs localEvaluation of remote sensing satellite ground station performance in prbs local
Evaluation of remote sensing satellite ground station performance in prbs local
 
Csq 2 dg
Csq 2 dgCsq 2 dg
Csq 2 dg
 
Performance analysis of High Speed ADC using SR F/F
Performance analysis of High Speed ADC using SR F/FPerformance analysis of High Speed ADC using SR F/F
Performance analysis of High Speed ADC using SR F/F
 
Cross Phase Modulation (XPM) Reduction in Hybrid Systems with 100G QPSK and 1...
Cross Phase Modulation (XPM) Reduction in Hybrid Systems with 100G QPSK and 1...Cross Phase Modulation (XPM) Reduction in Hybrid Systems with 100G QPSK and 1...
Cross Phase Modulation (XPM) Reduction in Hybrid Systems with 100G QPSK and 1...
 
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-FlopIRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
 
Manage LTE RAN Synchronization.pdf
Manage LTE RAN Synchronization.pdfManage LTE RAN Synchronization.pdf
Manage LTE RAN Synchronization.pdf
 
Ofdm performance analysis
Ofdm performance analysisOfdm performance analysis
Ofdm performance analysis
 
3G Huawei RAN Resource Monitoring and management.ppt
3G Huawei RAN Resource Monitoring and management.ppt3G Huawei RAN Resource Monitoring and management.ppt
3G Huawei RAN Resource Monitoring and management.ppt
 
14 static timing_analysis_5_clock_domain_crossing
14 static timing_analysis_5_clock_domain_crossing14 static timing_analysis_5_clock_domain_crossing
14 static timing_analysis_5_clock_domain_crossing
 
IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...
IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...
IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...
 
4 g lte_drive_test_parameters
4 g lte_drive_test_parameters4 g lte_drive_test_parameters
4 g lte_drive_test_parameters
 
An_FPGA_Based_Passive_K_Delta_1_Sigma_Modulator
An_FPGA_Based_Passive_K_Delta_1_Sigma_ModulatorAn_FPGA_Based_Passive_K_Delta_1_Sigma_Modulator
An_FPGA_Based_Passive_K_Delta_1_Sigma_Modulator
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini link
 

Recently uploaded

Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 

Recently uploaded (20)

Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturing
 

GPS-Out LIMITATIONS AND NGS IMPROVEMENTS.pptx

  • 1. GPS-OUT LIMITATIONS AND NGS IMPROVEMENTS Understanding the basics of synchronization – Narendra Kumar Sahu, Tier-2
  • 2. Agenda • Case study of CSR 3658463 • Customer configuration • Issue with GPS-Out • Solution for customer issue. • Limitations with GPS-Out Solution • New improvements in SYNC area
  • 3. Customer Configuration: RNC (NTP Source) DUW DUS RRU-1 RRU-2 RRU-3 NTP Sync GPS-Out GPS-Out solution is not applicable for BB nodes. GOG GOS
  • 4. With the fluctuation in transmission DUS (L21) sites goes down. DUW (U21) sites remain un- impacted. Customer set timeAndPhaseSynchCritical to false on L21 sites. However, it doesn’t make any difference. For DUW (U21) sync source is NTP which have precision in milliseconds. DUW (U21) sites does sync adjustments to compensate frequency drifting from external reference source and sync remained in Locked mode on DUW (U21). This is probably due to freqDeviationThreshold is set to 5000 (max). DUS (L21) node receiving GPS signal over the GPS-Out. DUS cannot follow rate of the frequency drifting from DUW node which is providing GPS signal with precision of 1 PPS. So DUS node enters FREE RUNNING MODE. Problem Description & Observation
  • 5. LOCKED MODE HOLDOVER MODE FREE RUNNING MODE External reference lost Holdover timer expired External reference regained Radio Clock State Machine FREQUENCY_LOCKED_MODE TIME_LOCKED_MODE TIME_OFFSET_LOCKED_MODE FREQ_HOLDOVER_MODE TIME_HOLDOVER_MODE FREERUNNING_MODE
  • 6. Investigation at DUW Side • Below events seen in the DUW node. <<nssinfo all>> [2020-02-03 07:21:37] NORMAL -> MONITORING due to REFERENCE_UNSTABLE [2020-02-03 07:26:42] MONITORING -> ADJUSTING due to SLOPE_OK event [2020-02-03 07:45:40] ADJUSTING -> NORMAL due to FREQ_LOCKING_EVENT [2020-02-03 08:39:09] NORMAL -> MONITORING due to REFERENCE_UNSTABLE [2020-02-03 08:44:14] MONITORING -> ADJUSTING due to SLOPE_OK event [2020-02-03 08:44:20] ADJUSTING -> NORMAL due to FREQ_LOCKING_EVENT • Fluctuation in transport lead to deviation in NTP sync reference at DUW which further impact to DUS. • DUS is not able to follow the frequency drifts due to GPS out solution. • Whereas, when there is no deviation in NTP sync reference then DUS is not impacted. • We can notice unstable reference events on the IpSyncRef at the observed time period on the DUW node. • Due to instability system perform ADJUSTING frequency to compensate frequency drifting from external reference source.
  • 8. Proposal to mitigate the outages • Node Group Synchronization (NGS) was recommended instead of GPS-Out for improved flexibility and stability. RNC (NTP Source) DUW (SP) DUS (SR) RRU-1 RRU-2 RRU-3 NTP Sync NGS
  • 9. Issue seen after NGS implementation • After implementing NGS there was no issue see on the DUS (L21) nodes. As it can keep the system clock in HOLDOVER MODE. Even during the fiber cut or fluctuations the L21 cells remain up. Although there is cell outage for few seconds due to BFN JUMP. However, they are very short as compared to previous outages. • However, now the issue shifted to DUW (U21) side. As during the fiber cut the U21 cells were going down. This was due to DUW entering FREE RUNNING MODE. Now the customer wants to know how to mitigate this problem completely, so that there is no outage on the DUW side and avoid BFN jump on the DUS side.
  • 10. Further analysis • Collected traces for 24 hours to capture the scenario when the DUW transitions from FREQUENCY LOCKED to FREE RUNNING MODE. • From graph of “Time residual variance” extracted from traces collected on SP DUW node it can be observed that Sync reference on SP node is unstable. • Time residual variance represents the ratio between measurements predicted by algorithm and the real measurements obtained from external Sync references. • The curve on that graph should be really close to horizontal line in case of stable external Sync reference, but as it could be seen that is not the case in graph shown below.
  • 11. • Another graph extracted from the traces showing the deviation in ppb. • Deviation has been seen in the transport network around 17ppb which is higher than the limit, is the main root cause. • The difference between the frequency of the output of the OCXO and the incoming reference is continuously monitored by SW. • Every 2.1s the output is adjusted, to match the reference. • At 2020-04-01, around 2020- 04-01 18:15 the incoming frequency of the NTP had a sudden disturbance. • There is a limit for how fast the SW can regulate the output. In this case the limit was exceeded.
  • 12. Suggestion: upgrade the nodes to SW version C19.Q2 EP12 or C20.Q1 on which MR5172 (SP8) is delivered.
  • 13. Improvements introduced in MR5172 MR5172-SP1: • Feature should supervise frequency deviation defects (frequency jumps, drifts, frequency inaccuracy) on Baseband nodes for active reference. • Synchronization reference supervision will declare defect and deselect active reference when calculated frequency deviation is above freqDeviationThreshold MO attribute value. Deselected reference will be supervised for recovery (if defect is ceased, reference will be considered for re-activation by sync SW). • SoCPRI algorithm on Baseband will be more robust to frequency change of SP. • User has ability to decide threshold for frequency defects on active external reference. • Introduced in 18.Q2.
  • 14. MR5172… MR5172-SP2: • Supervision of active references for frequency jump and fast frequency drift artifacts for G1 and new alarm introduction for G1 and G2. • The purpose of this feature is to improve supervision of active external synchronization reference in DU Radio Node. Supervision should detect defects with frequency jumps or drifts. • New alarm "Sync Reference Deviation" is introduced for these kinds of defects for both DU Radio Node and Baseband Radio Node. • Introduced in 18.Q4.
  • 15. MR5172… MR5172-SP8: • Improved Robustness of the Supervision of active frequency references (the SP2 feature) for DUW/DUS. SP8 can be considered as add-on to SP2 functionality. • This system improvement makes synchronization reference supervision more robust when working with lower quality synchronization references and more tolerant to unstable sources. • Instead of immediate traffic degradation, synchronization holdover capability is retained for a longer time, increasing the chance that the node re- aligns with the sync source. It is expected this results in less impact on network traffic ability. • DUW: RBS W19.Q2.9 (C19.Q2- EP12-1) and C19.Q2 EP13.
  • 16. Traces used in this case: SP (DUW): ======== te default * te e trace5 trace6 trace7 trace9 NSS_CBM_TUM2_TUREG te save * mon mp SR (DUS): ======== te default * te e trace1 NSS_CBM_TUM2_PLL te save * mon mp
  • 17. Counters PM Counter Name Attribute Value pmfreeRunningSec FREE_RUNNING FAILED pmfreqHoldOverSec FREQUENCY_HOLDOVER pmtimeFreeRunningSec FREQUENCY_LOCKED FREQUENCY_HOLDOVER pmtimeHoldoverSec RNT_TIME_HOLDOVER TIME_OFFSET_HOLDOVER pmtimeAssistedHoldoverSec RNT_TIME_LOCKED TIME_OFFSET_LOCKED when RadioEquipmentClock.timeSyncAssistanceSt ate is ASSISTANCE_ACTIVE