1. Always incorporate a D.P.C. tray in locations where any part of a building
projects. e.g. Porch roofs, Bay Windows, changes in Roof Level, all Extensions
whether Pitched or Flat roofs
2. Always incorporate a D.P.C. tray over a Lintel
Always install a Vertical D.P.C. at open reveals
4. Always provide a D.P.C. to bottom, back and
ends of Brick Cills
5. Always fix window and door frames behind
outer leaf
6. Always install a full metal tray D.P.C. in a
Brick Built chimney
7. Always maintain the cavity.
Never use an insulation that bridges the cavity
8. Always keep cavity clean.
Never allow mortar droppings to bridge cavity.
9. Always install the D.P.C. a min. of 150 mm
above finished ground level.
10. Always fill cavity to a level between 150 and 225 mm
below D.P.C.

Good Brickwork advice for Facing brickwork,

  • 1.
    Good Brickwork -Advice For Facing Brickwork, Ten Points To Remember 1. Always incorporate a D.P.C. tray in locations where any part of a building projects. e.g. Porch roofs, Bay Windows, changes in Roof Level, all Extensions whether Pitched or Flat roofs
  • 2.
    2. Always incorporatea D.P.C. tray over a Lintel
  • 3.
    Always install aVertical D.P.C. at open reveals
  • 4.
    4. Always providea D.P.C. to bottom, back and ends of Brick Cills
  • 5.
    5. Always fixwindow and door frames behind outer leaf
  • 6.
    6. Always installa full metal tray D.P.C. in a Brick Built chimney
  • 7.
    7. Always maintainthe cavity. Never use an insulation that bridges the cavity
  • 8.
    8. Always keepcavity clean. Never allow mortar droppings to bridge cavity.
  • 9.
    9. Always installthe D.P.C. a min. of 150 mm above finished ground level.
  • 10.
    10. Always fillcavity to a level between 150 and 225 mm below D.P.C.