The document provides information about an engineering department, including the manager, design engineers, drafting staff, and document control clerks. It details the department's certifications to work on pressure vessels and piping. It outlines the department's values, capabilities, tools used for design including modeling software, and provides examples of projects involving tank design and lifting. The department is prepared to perform quality work, meet deadlines, and is looking to work with new clients.
Capital project EPC service in pressure vessels & heat exchangers.
Turn around EPC service in replacement of pressure vessels & heat exchangers.
Pressure vessels and heat exchangers design & engineering.
Pressure vessels & heat exchangers re-rating.
Stress analysis to pressure vessels and other equipment.
Fitness for Service Assessment (FFS) in level 1, 2, & 3 per API 579-1/ASME FFS-1.
Capital project EPC service in pressure vessels & heat exchangers.
Turn around EPC service in replacement of pressure vessels & heat exchangers.
Pressure vessels and heat exchangers design & engineering.
Pressure vessels & heat exchangers re-rating.
Stress analysis to pressure vessels and other equipment.
Fitness for Service Assessment (FFS) in level 1, 2, & 3 per API 579-1/ASME FFS-1.
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet
This presentation shows some of the interesting projects snapshots that were completed under my supervision during 2006-2013.
Email: bj@bikramjeet.com
Website: www.bikramjeet.com
Learn to managing stress, boost productivityNetZealous LLC
Stress is the number one killer of our times. It is an insidious emotion that eats up all the happiness we need in life and at work. Because of it, we are unable to perform at the levels we are supposed to. Our own career prospects suffer because of this, as does the organization. When a person is stressed, it is natural that the productivity levels start dipping. This calls for ways to tackle stress, because it is always better to find ways of dealing with it, rather than to let it overpower us and make us succumb to it.
This infographic highlights the five key factors that create a winning omni-channel experience, with the data to back it up:
-71 percent of customers expect to view in-store inventory online
-50 percent of shoppers expect in-store pick-up
-80 percent of consumers are more likely to consider purchasing from brands they follow on social media
What is lacking in your omni-channel strategy, or what is working? To learn more, download the hybris white paper: "Creating the Perfect Commerce Experience for the Omni-Channel Customer" here: http://bit.ly/OmniX
PAUT Inspection Simulation of Welds at NASAejnovick
Use of CIVA NDT simulation software to assist in planning a weld inspection. This article includes a comparison between simulated and experimental results.
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet
This presentation shows some of the interesting projects snapshots that were completed under my supervision during 2006-2013.
Email: bj@bikramjeet.com
Website: www.bikramjeet.com
Learn to managing stress, boost productivityNetZealous LLC
Stress is the number one killer of our times. It is an insidious emotion that eats up all the happiness we need in life and at work. Because of it, we are unable to perform at the levels we are supposed to. Our own career prospects suffer because of this, as does the organization. When a person is stressed, it is natural that the productivity levels start dipping. This calls for ways to tackle stress, because it is always better to find ways of dealing with it, rather than to let it overpower us and make us succumb to it.
This infographic highlights the five key factors that create a winning omni-channel experience, with the data to back it up:
-71 percent of customers expect to view in-store inventory online
-50 percent of shoppers expect in-store pick-up
-80 percent of consumers are more likely to consider purchasing from brands they follow on social media
What is lacking in your omni-channel strategy, or what is working? To learn more, download the hybris white paper: "Creating the Perfect Commerce Experience for the Omni-Channel Customer" here: http://bit.ly/OmniX
PAUT Inspection Simulation of Welds at NASAejnovick
Use of CIVA NDT simulation software to assist in planning a weld inspection. This article includes a comparison between simulated and experimental results.
A description of how homeostasis works and how it is the theory that links structure, function and control in physiological systems. The concept of negative (and positive) feedback is explained.
Getting More Precision in Videoscope Measurements While Taking Larger Measure...Olympus IMS
The challenges that go into providing accurate and precise measurements larger and from further away.Though well established, stereo measurement is often thought of as unchanging. With measurements such as distance from root, blending profiles, corrosion and area measurements requiring a greater range of measurement and precision, it is essential to understand the evolution of stereo measurement as well as other technologies available.
This presentation will focus on the basic types of measurement technologies for videoscopes, and their inherent strength and weaknesses. Reference, Shadow, Stereo, Pattern projection measurement will all be presented.
In reference to stereo measurement, recent advances and factors can improve the precision of stereo measurement compared to what existed a decade ago. What goes into the hardware and the software that translate into to a greater precision to perform greater and more reliable measurements during RVI.
Eddy Current Array Inspection of Carbon Steel Welds with Dynamic Lift-Off Com...Olympus IMS
The use of eddy current array (ECA) technology has already been shown to increase the speed of inspections and the reliability of the surface inspection process. However, surface inspection of carbon steel welds used in pipelines and pressure vessels represents many challenges for this technology. The geometric shape of the weld crown, the paint thickness, the presence of crest and crowns, and the ferromagnetism of the carbon steel are constraints.
New tools have recently been developed to help overcome these challenges. A new orthogonal-type ECA probe based on flexible printed circuit board (PCB) technology conforms to the shape of the weld to help ensure flaw detection. Dynamic lift-off compensation and depth sizing tools were then added to a modern flaw detector, resulting in a leading-edge solution that can potentially replace Magnetic Particle Inspection for carbon steel weld inspection. With these inspection tools, users can fully benefit from the portability, imaging, data archiving, and reporting capabilities of eddy current array instruments.
In this paper, we review this new carbon weld inspection solution and present results that demonstrate the solution’s effectiveness for inspecting carbon steel welds. This presentation is technically advanced and is addressed to NDT operators and engineers.
Recent Advances in Handheld X-Ray Fluorescence-Based Alloy PMI/Material TestingOlympus IMS
Recently, a number of improvements related to accuracy, ease of use, speed and durability have been instituted in Handheld (HH) X-ray fluorescence (XRF) instruments. These advances are explained in practical terms, and the impact that each advance will have on the end user. This presentation is intended for those responsible for plant piping system maintenance and safety, and reinforces the practical usage and value of nondestructive HH XRF analysis in positive material identification (PMI) of alloys. Applications of useful low-compositional level elemental results (parts per million in magnitude) in conjunction with API corrosion guidelines will be covered (i.e. API RP 578 and RP 939-C). Additional compositionally-derived preventative maintenance techniques will also be included. Supplementary to the API corrosion guidelines application, an outline of HH XRF technology, its traditional alloy analysis uses, and distinct relevance to metallurgical & maintenance engineers will further illustrate the significance of recent innovations.
A systematic and targeted approach in applying improvements to software, firmware and hardware functionalities of a HH XRF instrument have all blended into a new era for the technique. Throughput and duty-cycle achievements have allowed a greater user impact when utilizing HH XRF during both uptime and downtime maintenance activities. Connectivity improvements to the technology allow remotely generated data to have an immediate use for users. Most notably, this recent set of computational improvements positions HH XRF into an analytical range rivaling aspects of laboratory grade XRF analysis while maintaining portability.
Thank you for taking time to view my design portfolio. This file includes some of my major design experience during my academic and professional career. This portfolio can show you that I am a future engineer with comprehensive theoretical skill sets, and a designer with creation and innovation. I believe I will be a valuable member of your team. If you have more questions, please reach out with the contact information below.
This presentation will cover pipe support design, 3D modeling, Finite Element Analysis, special stress and thermal cases, along with the unique cases that brought on new pipe support designs. Increase your understanding of the value-added services that are offered by PT&P.
Civil engineering CDR Sample For EngineersNeha Bania
Since the economy of Australia is growing exponentially with the spectacular economic boom in Civil engineering sector, there is a greater need for Civil Engineers with relevant international experience. In order to eliminate the critical shortages of Civil engineering to overcome the delay in projects, the skilled migration visas are opened for Civil Engineers by the Australian Government. The required qualification for entering this occupation is a bachelor’s degree or higher, along with relevant experience in some cases.
CDR Sample for Civil Engineers includes all the required reports such as Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career Episodes (CE), and Summary Statement.
This presentation will cover pipe support design, 3D modeling, Finite Element Analysis, special stress and thermal cases, along with the unique cases that brought on new pipe support designs. Increase your understanding of the value-added services that are offered by PT&P, and rest assured that your Engineering and Design needs can be covered by our 24x7 web-based emergency services, providing field service, and quick-turn around time when you need it most.
2. Profile of Engineering Department
Engineering Manager:
M. Ashraf Hussain, P.Eng. PMP, SSBB
B.Sc. in Mechanical Engineering.
Post Graduate Diploma in Industrial Production Engineering.
Design Engineer:
Lee J. Crick, P.Eng.
B.Sc. in Mechanical Engineering.
Design Engineer:
Muhammad Shoib
MEng. in Mechanical Engineering
B.Sc. in Mechanical Engineering
Design Engineer:
Souvenir Muhammad
B.Sc. And M.Sc. in Mechanical Engineering, PhD student
3. Profile of Engineering Department
Drafting Supervisor:
Kevin Sparrow, CET
Senior Drafting Technologist
Y. Lam .CET
Senior Drafting Technologist:
Yuri Bouldakov , CET
Senior Drafting Technologist:
Donna Fleming, CET
Drafting Technologist
Troy Burrows
Drafting Technologist
Judy Terry
Document control Clerk
Carine Assemien
Document control Clerk
Gael Chomik
4. Certificate of Authorization Permit:
APEGA, P03714
APEGS, 25806
ABSA
Construct, Repair/Alter ASME Section VIII-1 pressure vessels
Construct, Repair/Alter ASME B31.1 Power Piping and ASME B31.3
process piping
Conduct performance qualification testing of pressure welders and machine
welding operators
ASME
U –stamp for manufacture of pressure vessel
NBBI
ULC
Manufacture of vertical and horizontal tanks
CWB
Certified to CSA standard W 47.1 for Fusion welding of steel
5. Standards Compliant to:
API 650 11th Edition.
API 620
AWWA D100
GLM Standard (GOOD INDUSTRY PRACTICES)
ASME Section VIII and IX
ASME B31.3
NBC 2010
OH&S
FIRE CODE
6. Our values:
Safety first
Integrity of design and Perform Quality Work
Transparency of information
Commitment to satisfy Targets and Deadlines
Ethics
Professionalism
7. Our Capabilities:
Complete design of tanks and pressure vessels.
Heating calculations for Fire tubes, electric, steam and glycol
heating system.
Design of burner system as per CSA B149.3.
Maximum fluid in and out flow rate calculation.
Pressure safety valve and Pressure vacuum safety valve sizing
calculation.
Tank pressure de-rating calculation to increase the pressure or
flow rate.
Load cell and structure design if the fluid is measured by weight.
Laser scanning and sizing the tank if real state is an issue.
Forensic Engineering and under pining for foundation heaving.
Expansion joints with monitoring and secondary containment
design.
Lift design of roofs and tanks.
8. Our Tools:
AME Tank
AME Tank can produce both 2-
D & 3-D models.
It is capable of performing
calculation as per API 650
providing the opportunity to
double check design
calculations and
manufacturability (identifying
interference of parts) .
Models built in AME Tank can
be exported to Autodesk
Inventor and AutoCAD to speed
up the production of drawings.
9. Our Tools (continued…):
GLM Custom built Excel Program for
designing (including calculations)
Tanks and components.
Updated to comply with the latest
version of API 650.
Approved accuracy of Calculations.
10. Our Tools (continued…):
FEA Software.
GLM is utilizing Simulation Mechanical by Autodesk
Predict Product Performance
Optimize Product Designs
Validate Design Decisions
Build it, break it, and fix it prior to hitting the shop floor…
11. Our Tools (continued…):
Nozzle/PRO and FE/Pipe
Uses FEA for predicting allowable nozzle loads
Design Nozzles and Reinforcing Pads to support existing loads
provided by piping department.
12. Our Tools (continued…):
Compress
Uses FEA for predicting allowable thickness
Code calculation for pressure vessels
13. Example of some projects
Example of design of roof lift
Design stage:
Design implementation:
14. Example of some projects
Example of design of roof lift
Outcome:
15. Example of some projects
Example of lifting the tank
Loading (3 point air bag lift)
Due to symmetry tank was modelled as one half of the original.
16. Example of some projects
Example of lifting the tank (continued…)
Stresses at the lifting points:
Deflection of the bottom plate (with magnification 10)
17. Our Approach:
Prepare calculations, General Arrangement drawings for all the tanks,
Inspection Test Plan and Welding Procedures for Client’s approval.
Be proactive: starting detail design and make necessary changes as
client approval arrives.
Scheduling shop built parts for uninterrupted field erection.
Willing to work simultaneously on several tanks within our scope.
Our involvement will be spontaneous to all parts of all the tanks that
purchased from sub vendors.
Set target to achieve all deadlines.
18. Work progress:
Being proactive, we have prepared
calculations, 50 drawings as well as
part of the General Arrangement
(GA) drawings for designs for
tanks.
Hoping to have some clarification in
this meeting (thanks to the
organizers) so that we can produce
almost flawless design and Detail
drawings.
19. Summary:
We are prepared to:
Perform quality work
Hit all deadlines
We are looking forward to work with all our clients.