What Langley Has to Say About Project Teams
                      That is New
♦ Langley experience is being adapted to working in a new project
  environment—subprojects in support of the Constellation Program
  and its major projects, Orion and Ares
   • Experience with projects where Langley had primary responsibility
   • Experience supporting other Centers’ projects
♦ Langley’s new approach is based on our support for the Shuttle
  Return to Flight effort
   • Projectize Langley’s support
   • Langley projects then integrate with their customers and partners in teams
     that include other Centers and their contractors
♦ The benefits have included
   • Application of disciplined project management and engineering to meet the
     needs of our customers
   • Continual improvement in a system of project management, engineering, and
     safety and mission assurance
   • Systematic adaptation to the management, engineering, and safety and
     mission assurance requirements of the Centers


                                                                                  2
New Horizons at Langley
♦ Center commitment to strengthen flight project teams has been
  underway for 3 years
♦ Original plan was based on robotic missions with some support to
  the Space Shuttle program and other possible future human space
  flight projects




CALIPSO          STS 114           STS 121        Planetary Aircraft
                                                                     3
New Horizons at Langley
♦ Things changed dramatically in FY 2006 when Langley became
  responsible for several large activities in the Constellation Program

                                                          Launch
                                                          Abort
    Ares I-1                                              System
     Vehicle
 Integration
                                                          Orion
                                                          Advanced
                                                          Technology
     Ares I
Engineering                                               Flight Test
   Support                                                Crew
                                                          Modules

                      Support for Constellation
                         Level I and Level II
                                                                        4
New Horizons at Langley
♦ The Exploration projects brought challenges for project teams
   • Langley has had to quickly staff up 6 project teams for human space flight
     projects over the last 9 months
      − Langley project teams cannot be fully staffed with people having human spaceflight
        experience
      − Langley project teams cannot deplete on-going support for the Space Shuttle and
        the Space Station
   • Langley Exploration projects do not stand alone but are integral parts of the
     Constellation Program or one of its major projects
      − Langley project team performance is tied to their Constellation, Ares, and Orion
        customers
      − Langley project team performance also depends on success from around NASA
        and from NASA’s contactors
   • A project management system suitable for Exploration projects was urgently
     needed
      − Adapted from experience of projectizing Langley support for the Shuttle’s Return to
        Flight



                                                                                           5
Staffing the Project Teams
♦ What Langley had for its Exploration projects
   • Technically excellent workforce, with experts in many disciplines and
     experience in flight, robotic space flight, and human space flight
   • Cadre of experienced project management staff that had grown with recent
     successes
      − Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO)
      − Geosynchronous Imaging Fourier Transform Spectrometer (GIFTS) Engineering
        Demonstration Unit
      − Planetary Aircraft Risk Reduction
      − X43-A
      − Shuttle Return to Flight
   • Langley’s Shuttle Return to Flight project had project management staff with
     recent human spaceflight project experience
   • NASA Engineering and Safety Center (NESC) also has in-depth technical
     and management experience in the Shuttle Return to Flight




                                                                                       6
Projectizing Support for Shuttle Return-to-Flight




                              External Tanks

Wing Leading Edge Sensors

                                                      Exposed Gap-filler
                                                 Aerothermodynamic Modeling




                                 STS-121
EVA Infrared Camera System       Discovery
                             Launched July 4th   Testing in 20” Mach 6 Tunnel
                                                                                7
Integrating Langley Project Teams with
        Teams in the Rest of the Constellation Program
♦ Langley has a long tradition of working with other NASA Centers
  and with contractors for mission success


 ’01 Odyssey                                            ’05 Huygens
                        ’03 MER

                                             ’05
                                         Genesis

                      Planetary Atmospheric Flight
               Aerobraking and Entry, Descent, and Landing
’06 Stardust          ’06 MRO                                ’09 MSL



                                      ’07 Phoenix


                                                                       8
Integrating Langley Project Teams with
      Teams in the Rest of the Constellation Program
♦ Customer-Focused Teams
  • Each Langley project is part of a Langley team focused on the needs of one
    of our major customers
     −   Constellation Level 1 and 2
     −   Orion Project
     −   Ares Project
     −   Space Operations
     −   Space Missions
  • Each customer-focused team includes
     − Leaders responsible for ensuring that Langley responds effectively to the
       customer’s needs
     − A representative at JSC or MSFC to provide quick interactions between Langley
       and the customers




                                                                                       9
Integrating Langley Project Teams with
       Teams in the Rest of the Constellation Program
♦ Integrating Langley project teams with partners and contractors
   • Each project is responsible for a good, supportive, team relationship with
     the other NASA Centers and with the contractors who make up the
     Constellation program.
   • Launch Abort System
      − Langley Project Manager is LAS Control Account Manager in the Orion Project
      − Deputy Project Managers is at MSFC
      − The project has established a good working relationship with the Prime
        Contractor and with the Sub-Contractor for the Launch Abort System
   • Ares I-1 Vehicle Integration
      − While not directing the Ares I-1 Project, the Langley team leads the SE&I effort
        and coordinates all the activities leading to a successful test flight
      − Vehicle Integration representatives are on-site at MSFC, GRC, and the flight
        electronics contractor




                                                                                           10
Integrating Langley Project Teams with
      Teams in the Rest of the Constellation Program
♦ Integrating Langley project teams with partners and contractors
   • Orion TPS Advanced Technology
      − The Langley project reports to the TPS Advanced Technology Project Manager
        at ARC
   • Orion Crew Module Simulator
      − The Langley project reports to the Abort Flight Test Project in the Flight Test
        Office of the Orion Project
      − Other partners in the Abort Flight Test Project include GRC, Dryden, and the
        Orion Prime Contractor




                                                                                          11
Developing the Langley Project Management
                           System
♦ With the increased number of flight projects, we had a new urgency
  in developing a documented system of space flight project
  management and training people in it

♦ We have had help in the form of training and tools from many
  Centers and organizations
   •   NASA's Academy of Program/Project and Engineering Leadership program
   •   Goddard Space Flight Center
   •   Jet Propulsion Laboratory
   •   Johnson Space Center
   •   Marshall Space Flight Center




                                                                          12
Developing the Langley Project Management
                         System
♦ We have developed an Exploration Flight Project Practices
  handbook, based on the JPL Flight Project Practices handbook
   • The handbook is a central component of our project management system
♦ A number of modifications had to be made
   • Requirements for teamwork with customers and partners had to be modified
     significantly
      − Match the teaming arrangements within NASA’s Constellation Program
   • Requirements for applying NASA Procedural Requirements also had to be
     modified
   • The project life cycle had to be abstracted in order to apply both to
     technology development projects and to
   • A new section was added for the requirements applied to replanning a
     project
   • Links to JPL documents were replaced with links to NASA documents,
     Langley documents, and the Project Management Institute's Guide to the
     Project Management Body of Knowledge


                                                                              13
Developing the Langley Project Management
                          System
♦ As a result of all these changes, the handbook applies exclusively
  to Exploration projects at Langley and not to competitively won
  space science missions
   • It is also applicable to some directed space project work, like the Mars
     Science Laboratory Entry Descent and Landing Instrument project




                                                                                14
Future
♦ Langley has established a project performance guidance team to
  initiate and guide improvements in the project management
  system.
   • Deputy Directors from all organizations involved in Exploration projects
♦ The guidance team has commissioned two improvement teams to
  help the projects in FY 2007
   • Project planning improvement team
   • Project controls improvement team
♦ Langley has a strong lessons-learned activity that each project
  supports
   • Capture lessons learned at major milestones
   • Review accumulated lessons learned annually for inclusion in the project
     management system
♦ Langley is developing a Mission Flight Project Practices handbook
  which will serve as the central component of the project
  management system for projects where Langley has mission
  responsibility

                                                                                15
Future
♦ Langley Exploration projects are also giving experience
  to managers and engineers at all levels in the Center
♦ We continue to be grateful to our counterparts around
  NASA for help in training our managers and engineers in
  the way you do space flight projects




                                                            16

More Related Content

What's hot

NASA Commercial Crew Program 2014_04_14
NASA Commercial Crew Program 2014_04_14 NASA Commercial Crew Program 2014_04_14
NASA Commercial Crew Program 2014_04_14 Dmitry Tseitlin
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouelletteNASAPMC
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13Dmitry Tseitlin
 
Mitchell.michael
Mitchell.michaelMitchell.michael
Mitchell.michaelNASAPMC
 
Davis.howard
Davis.howardDavis.howard
Davis.howardNASAPMC
 
Sean Blanchette Resume - Summary
Sean Blanchette Resume - SummarySean Blanchette Resume - Summary
Sean Blanchette Resume - Summarysean blanchette
 

What's hot (9)

NASA Commercial Crew Program 2014_04_14
NASA Commercial Crew Program 2014_04_14 NASA Commercial Crew Program 2014_04_14
NASA Commercial Crew Program 2014_04_14
 
Fred.ouellette
Fred.ouelletteFred.ouellette
Fred.ouellette
 
D Sloey Resume1
D  Sloey Resume1D  Sloey Resume1
D Sloey Resume1
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13
 
Mitchell.michael
Mitchell.michaelMitchell.michael
Mitchell.michael
 
Davis.howard
Davis.howardDavis.howard
Davis.howard
 
Upstream Advert
Upstream AdvertUpstream Advert
Upstream Advert
 
Shinn
ShinnShinn
Shinn
 
Sean Blanchette Resume - Summary
Sean Blanchette Resume - SummarySean Blanchette Resume - Summary
Sean Blanchette Resume - Summary
 

Viewers also liked

Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012NASAPMC
 
Carol.mullenax
Carol.mullenaxCarol.mullenax
Carol.mullenaxNASAPMC
 
Hoyt diana
Hoyt dianaHoyt diana
Hoyt dianaNASAPMC
 
Ray hines stegeman
Ray hines stegemanRay hines stegeman
Ray hines stegemanNASAPMC
 
Rodney rocha
Rodney rochaRodney rocha
Rodney rochaNASAPMC
 
Inter bounds
Inter boundsInter bounds
Inter boundsNASAPMC
 
C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyersNASAPMC
 
What are the odds of making that number risk analysis with crystal ball - O...
What are the odds of making that number   risk analysis with crystal ball - O...What are the odds of making that number   risk analysis with crystal ball - O...
What are the odds of making that number risk analysis with crystal ball - O...p6academy
 

Viewers also liked (10)

Bilardo2 15-2012
Bilardo2 15-2012Bilardo2 15-2012
Bilardo2 15-2012
 
Carol.mullenax
Carol.mullenaxCarol.mullenax
Carol.mullenax
 
Hoyt diana
Hoyt dianaHoyt diana
Hoyt diana
 
Ray hines stegeman
Ray hines stegemanRay hines stegeman
Ray hines stegeman
 
Rodney rocha
Rodney rochaRodney rocha
Rodney rocha
 
Inter bounds
Inter boundsInter bounds
Inter bounds
 
C armstrong tbyers
C armstrong tbyersC armstrong tbyers
C armstrong tbyers
 
What are the odds of making that number risk analysis with crystal ball - O...
What are the odds of making that number   risk analysis with crystal ball - O...What are the odds of making that number   risk analysis with crystal ball - O...
What are the odds of making that number risk analysis with crystal ball - O...
 
Cirugia menor
Cirugia menorCirugia menor
Cirugia menor
 
Hulett
HulettHulett
Hulett
 

Similar to Gilman david

NASA_CCO_status-2013 update
NASA_CCO_status-2013 updateNASA_CCO_status-2013 update
NASA_CCO_status-2013 updateDmitry Tseitlin
 
Albert sierra
Albert sierraAlbert sierra
Albert sierraNASAPMC
 
Doug.sander
Doug.sanderDoug.sander
Doug.sanderNASAPMC
 
Dumbacher daniel
Dumbacher danielDumbacher daniel
Dumbacher danielNASAPMC
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.updateNASAPMC
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.updateNASAPMC
 
R zieger jhunter
R zieger jhunterR zieger jhunter
R zieger jhunterNASAPMC
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.cNASAPMC
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNASAPMC
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNASAPMC
 
CCCProgram_TIMM-COMSTAC_ 5-16-07.ppt
CCCProgram_TIMM-COMSTAC_ 5-16-07.pptCCCProgram_TIMM-COMSTAC_ 5-16-07.ppt
CCCProgram_TIMM-COMSTAC_ 5-16-07.pptBUSTOSZUIGAMARLONGUS
 
Dickerson mark
Dickerson markDickerson mark
Dickerson markNASAPMC
 
Dickerson mark
Dickerson markDickerson mark
Dickerson markNASAPMC
 
Rust.randy
Rust.randyRust.randy
Rust.randyNASAPMC
 
Keer.beth
Keer.bethKeer.beth
Keer.bethNASAPMC
 
Keer.beth
Keer.bethKeer.beth
Keer.bethNASAPMC
 

Similar to Gilman david (20)

NASA_CCO_status-2013 update
NASA_CCO_status-2013 updateNASA_CCO_status-2013 update
NASA_CCO_status-2013 update
 
Albert sierra
Albert sierraAlbert sierra
Albert sierra
 
Doug.sander
Doug.sanderDoug.sander
Doug.sander
 
Dumbacher daniel
Dumbacher danielDumbacher daniel
Dumbacher daniel
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
 
Patrick.guske.update
Patrick.guske.updatePatrick.guske.update
Patrick.guske.update
 
Mukai
MukaiMukai
Mukai
 
R zieger jhunter
R zieger jhunterR zieger jhunter
R zieger jhunter
 
Customer Success Story
Customer Success StoryCustomer Success Story
Customer Success Story
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.c
 
GarnerResume
GarnerResumeGarnerResume
GarnerResume
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
 
Newman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_caseNewman lengyel dartpm-chal_case
Newman lengyel dartpm-chal_case
 
Engineering Careers in Astronomy
Engineering Careers in AstronomyEngineering Careers in Astronomy
Engineering Careers in Astronomy
 
CCCProgram_TIMM-COMSTAC_ 5-16-07.ppt
CCCProgram_TIMM-COMSTAC_ 5-16-07.pptCCCProgram_TIMM-COMSTAC_ 5-16-07.ppt
CCCProgram_TIMM-COMSTAC_ 5-16-07.ppt
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 
Rust.randy
Rust.randyRust.randy
Rust.randy
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 
Keer.beth
Keer.bethKeer.beth
Keer.beth
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk boNASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Recently uploaded

Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 

Recently uploaded (20)

Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 

Gilman david

  • 1. New Horizons in Project Teams David Gilman Deputy Director for Project Execution Exploration and Flight Projects Directorate NASA Langley Research Center 1
  • 2. What Langley Has to Say About Project Teams That is New ♦ Langley experience is being adapted to working in a new project environment—subprojects in support of the Constellation Program and its major projects, Orion and Ares • Experience with projects where Langley had primary responsibility • Experience supporting other Centers’ projects ♦ Langley’s new approach is based on our support for the Shuttle Return to Flight effort • Projectize Langley’s support • Langley projects then integrate with their customers and partners in teams that include other Centers and their contractors ♦ The benefits have included • Application of disciplined project management and engineering to meet the needs of our customers • Continual improvement in a system of project management, engineering, and safety and mission assurance • Systematic adaptation to the management, engineering, and safety and mission assurance requirements of the Centers 2
  • 3. New Horizons at Langley ♦ Center commitment to strengthen flight project teams has been underway for 3 years ♦ Original plan was based on robotic missions with some support to the Space Shuttle program and other possible future human space flight projects CALIPSO STS 114 STS 121 Planetary Aircraft 3
  • 4. New Horizons at Langley ♦ Things changed dramatically in FY 2006 when Langley became responsible for several large activities in the Constellation Program Launch Abort Ares I-1 System Vehicle Integration Orion Advanced Technology Ares I Engineering Flight Test Support Crew Modules Support for Constellation Level I and Level II 4
  • 5. New Horizons at Langley ♦ The Exploration projects brought challenges for project teams • Langley has had to quickly staff up 6 project teams for human space flight projects over the last 9 months − Langley project teams cannot be fully staffed with people having human spaceflight experience − Langley project teams cannot deplete on-going support for the Space Shuttle and the Space Station • Langley Exploration projects do not stand alone but are integral parts of the Constellation Program or one of its major projects − Langley project team performance is tied to their Constellation, Ares, and Orion customers − Langley project team performance also depends on success from around NASA and from NASA’s contactors • A project management system suitable for Exploration projects was urgently needed − Adapted from experience of projectizing Langley support for the Shuttle’s Return to Flight 5
  • 6. Staffing the Project Teams ♦ What Langley had for its Exploration projects • Technically excellent workforce, with experts in many disciplines and experience in flight, robotic space flight, and human space flight • Cadre of experienced project management staff that had grown with recent successes − Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observations (CALIPSO) − Geosynchronous Imaging Fourier Transform Spectrometer (GIFTS) Engineering Demonstration Unit − Planetary Aircraft Risk Reduction − X43-A − Shuttle Return to Flight • Langley’s Shuttle Return to Flight project had project management staff with recent human spaceflight project experience • NASA Engineering and Safety Center (NESC) also has in-depth technical and management experience in the Shuttle Return to Flight 6
  • 7. Projectizing Support for Shuttle Return-to-Flight External Tanks Wing Leading Edge Sensors Exposed Gap-filler Aerothermodynamic Modeling STS-121 EVA Infrared Camera System Discovery Launched July 4th Testing in 20” Mach 6 Tunnel 7
  • 8. Integrating Langley Project Teams with Teams in the Rest of the Constellation Program ♦ Langley has a long tradition of working with other NASA Centers and with contractors for mission success ’01 Odyssey ’05 Huygens ’03 MER ’05 Genesis Planetary Atmospheric Flight Aerobraking and Entry, Descent, and Landing ’06 Stardust ’06 MRO ’09 MSL ’07 Phoenix 8
  • 9. Integrating Langley Project Teams with Teams in the Rest of the Constellation Program ♦ Customer-Focused Teams • Each Langley project is part of a Langley team focused on the needs of one of our major customers − Constellation Level 1 and 2 − Orion Project − Ares Project − Space Operations − Space Missions • Each customer-focused team includes − Leaders responsible for ensuring that Langley responds effectively to the customer’s needs − A representative at JSC or MSFC to provide quick interactions between Langley and the customers 9
  • 10. Integrating Langley Project Teams with Teams in the Rest of the Constellation Program ♦ Integrating Langley project teams with partners and contractors • Each project is responsible for a good, supportive, team relationship with the other NASA Centers and with the contractors who make up the Constellation program. • Launch Abort System − Langley Project Manager is LAS Control Account Manager in the Orion Project − Deputy Project Managers is at MSFC − The project has established a good working relationship with the Prime Contractor and with the Sub-Contractor for the Launch Abort System • Ares I-1 Vehicle Integration − While not directing the Ares I-1 Project, the Langley team leads the SE&I effort and coordinates all the activities leading to a successful test flight − Vehicle Integration representatives are on-site at MSFC, GRC, and the flight electronics contractor 10
  • 11. Integrating Langley Project Teams with Teams in the Rest of the Constellation Program ♦ Integrating Langley project teams with partners and contractors • Orion TPS Advanced Technology − The Langley project reports to the TPS Advanced Technology Project Manager at ARC • Orion Crew Module Simulator − The Langley project reports to the Abort Flight Test Project in the Flight Test Office of the Orion Project − Other partners in the Abort Flight Test Project include GRC, Dryden, and the Orion Prime Contractor 11
  • 12. Developing the Langley Project Management System ♦ With the increased number of flight projects, we had a new urgency in developing a documented system of space flight project management and training people in it ♦ We have had help in the form of training and tools from many Centers and organizations • NASA's Academy of Program/Project and Engineering Leadership program • Goddard Space Flight Center • Jet Propulsion Laboratory • Johnson Space Center • Marshall Space Flight Center 12
  • 13. Developing the Langley Project Management System ♦ We have developed an Exploration Flight Project Practices handbook, based on the JPL Flight Project Practices handbook • The handbook is a central component of our project management system ♦ A number of modifications had to be made • Requirements for teamwork with customers and partners had to be modified significantly − Match the teaming arrangements within NASA’s Constellation Program • Requirements for applying NASA Procedural Requirements also had to be modified • The project life cycle had to be abstracted in order to apply both to technology development projects and to • A new section was added for the requirements applied to replanning a project • Links to JPL documents were replaced with links to NASA documents, Langley documents, and the Project Management Institute's Guide to the Project Management Body of Knowledge 13
  • 14. Developing the Langley Project Management System ♦ As a result of all these changes, the handbook applies exclusively to Exploration projects at Langley and not to competitively won space science missions • It is also applicable to some directed space project work, like the Mars Science Laboratory Entry Descent and Landing Instrument project 14
  • 15. Future ♦ Langley has established a project performance guidance team to initiate and guide improvements in the project management system. • Deputy Directors from all organizations involved in Exploration projects ♦ The guidance team has commissioned two improvement teams to help the projects in FY 2007 • Project planning improvement team • Project controls improvement team ♦ Langley has a strong lessons-learned activity that each project supports • Capture lessons learned at major milestones • Review accumulated lessons learned annually for inclusion in the project management system ♦ Langley is developing a Mission Flight Project Practices handbook which will serve as the central component of the project management system for projects where Langley has mission responsibility 15
  • 16. Future ♦ Langley Exploration projects are also giving experience to managers and engineers at all levels in the Center ♦ We continue to be grateful to our counterparts around NASA for help in training our managers and engineers in the way you do space flight projects 16