SlideShare a Scribd company logo
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
ELECTRICAL CABINET DRAWINGS
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
1
15
REV
A
System : 3 Phase 4 Wire
Supply Frequency : 50Hz
Panel Name : Panel No. 1
Panel Type : Power Control Center
Incomer Amps : 100A
Power Line Voltage : 415V
Control Voltage : 240V
30 60 90
29 59 89
28 58 88
27 57 87
26 56 86
25 55 85
24 54 84
23 53 83
22 52 82
21 51 81
20 50 80
19 49 79
18 48 78
17 47 77
16 46 76
15 45 75
14 44 74
13 43 73
12 42 72
11 41 71
10 40 70
9 39 69
8 38 68
7 37 67
6 36 66
5 35 65
4 34 64
3 33 63
2 32 62
1 31 61
S.No. S.No. S.No.Sheet Title Sheet Title Sheet TitleRevision Revision Revision
Cabinet System Details
List of Drawings
Control Elements Detail
Single Line Diagram
Incomer #1 Metering
Feeder No. 1, 0.01A FDR.
Feeder No. 2, 0.01A FDR.
Feeder No. 3, 0.01A FDR.
Feeder No. 4, 0.01A FDR.
Feeder No. 5, 0.01A FDR.
Feeder No. 6, 0.01A FDR.
Termination Dwg
General Arrangement - External
General Arrangement - Internal
Bill of Quantity
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
LIST OF ALL DRAWINGS
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
2
15
REV
A
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
ELEMENTS SYMBOLS
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
3
15
REV
A
Contactor
NO Contact
Contactor
NC Contact
Contactor
Coil
Wire/Cable
Termination
Power/Control
Earth
Push Button
NO Contact
Push Button
NC Contact
Indicating Light
ON: Green, Trip: Red
Fwd: Green, Rev: Blue
Current
Transformer
Control
Transformer
Timer On-Delay
NO Contact
Timer On-Delay
NC Contact
Timer
Coil
10
Selector Switch
NO Contact
Thermostat
NC Contact
Neutral Link
MCB/MCCB/ACB
Single Line Dwg
Switch Fuse Unit
Single Line Dwg
MPCB
Single Line Dwg
Contactor
Single Line Dwg
A
Meters
I>> I>> I>>
MCCB/ACB
SFU
I>> I>> I>>
MPCB
MCB TP
Power Contactor
Overload Relay
X22
1 2 3
M
Motor
Capacitor
Single Line Dwg
Heater
Single Line Dwg
Sheet Number Reference: XX/YY
XX: Sheet No, YY: Column No.
Ferrul Number Reference: XXYY
XX: Sheet No, YY: Ferrul Number
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
SINGLE LINE DIAGRAM
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
4
15
REV
A
Incoming Cable
(50sqmm Cu)
100A,3P
MCCB
2A
3P MCB
1sqmm Cu
Cable
F1
0.01A Feeder for
Feeder No. 1
2A
3P MCB
1sqmm Cu
Cable
F2
0.01A Feeder for
Feeder No. 2
2A
3P MCB
1sqmm Cu
Cable
F3
0.01A Feeder for
Feeder No. 3
2A
3P MCB
1sqmm Cu
Cable
F4
0.01A Feeder for
Feeder No. 4
2A
3P MCB
1sqmm Cu
Cable
F5
0.01A Feeder for
Feeder No. 5
2A
3P MCB
1sqmm Cu
Cable
F6
0.01A Feeder for
Feeder No. 6
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Incomer #1 Metering
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
5
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Incoming Cable
(50sqmm Cu)
R
R1
Y
Y1
B
B1
R1
Y1
B1
N
N1
N1I>> I>> I>>
Q5.1
100A,3P
MCCB
2A Fuse
0501
0502
0503
R
Y
B
Y1 R1
Q5.2
2A MCB
0504 0505
TX5.1
415V/240V
0506 0507
1 2
Q5.3
4A MCB
1
2
06/02
06/02
06/02
06/02
06/14
06/14
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Feeder No. 1
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
6
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
05/39 R1
05/39 Y1
05/39 B1
07/02
07/02
07/02
07/0205/39 N1
05/39
05/39
2
1
07/13
07/13
Q6.1
I>> I>> I>>
2A
3P MCB
1A01
1A02
1A03
1A04
To Feeder No. 1
2A
X6 1 2 3 4
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Feeder No. 2
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
7
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
06/09 R1
06/09 Y1
06/09 B1
08/02
08/02
08/02
08/0206/09 N1
06/25
06/25
2
1
08/13
08/13
Q7.1
I>> I>> I>>
2A
3P MCB
1B01
1B02
1B03
1B04
To Feeder No. 2
2A
X7 1 2 3 4
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Feeder No. 3
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
8
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
07/09 R1
07/09 Y1
07/09 B1
09/02
09/02
09/02
09/0207/09 N1
07/25
07/25
2
1
09/13
09/13
Q8.1
I>> I>> I>>
2A
3P MCB
1C01
1C02
1C03
1C04
To Feeder No. 3
2A
X8 1 2 3 4
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Feeder No. 4
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
9
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
08/09 R1
08/09 Y1
08/09 B1
10/02
10/02
10/02
10/0208/09 N1
08/25
08/25
2
1
10/13
10/13
Q9.1
I>> I>> I>>
2A
3P MCB
1D01
1D02
1D03
1D04
To Feeder No. 4
2A
X9 1 2 3 4
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Feeder No. 5
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
10
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
09/09 R1
09/09 Y1
09/09 B1
11/02
11/02
11/02
11/0209/09 N1
09/25
09/25
2
1
11/13
11/13
Q10.1
I>> I>> I>>
2A
3P MCB
1E01
1E02
1E03
1E04
To Feeder No. 5
2A
X10 1 2 3 4
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
Feeder No. 6
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
11
15
REV
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
10/09 R1
10/09 Y1
10/09 B1
10/09 N1
10/25
10/25
2
1
Q11.1
I>> I>> I>>
2A
3P MCB
1F01
1F02
1F03
1F04
To Feeder No. 6
2A
X11 1 2 3 4
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
TERMINATION DIAGRAM PART 1/1
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
12
15
REV
A
X6 1
1A01
2
1A02
3
1A03
4
1A04
X7 1
1B01
2
1B02
3
1B03
4
1B04
X8 1
1C01
2
1C02
3
1C03
4
1C04
X9 1
1D01
2
1D02
3
1D03
4
1D04
X10 1
1E01
2
1E02
3
1E03
4
1E04
X11 1
1F01
2
1F02
3
1F03
4
1F04
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
GENERAL ARRANGEMENT - EXTERNAL
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
13
15
REV
A
1750
1700
400
1775
75
E
300
Cable
Alley
500
575
1F1 YR B
Incomer No. 1
100A 3P MCCB
225
1F2(1A)
Feeder No. 1, 0.01A FDR.
with 2A 3P MCB
225
1F3(1B)
Feeder No. 2, 0.01A FDR.
with 2A 3P MCB
225
1F4(1C)
Feeder No. 3, 0.01A FDR.
with 2A 3P MCB
225
1F5(1D)
Feeder No. 4, 0.01A FDR.
with 2A 3P MCB
225
1F6(1E)
Feeder No. 5, 0.01A FDR.
with 2A 3P MCB
300
Bus Bar
Chamber
350
225
2F1(1F)
Feeder No. 6, 0.01A FDR.
with 2A 3P MCB
275
2F2
Space Only
275
2F3
Space Only
275
2F4
Space Only
275
2F5
Space Only
375
2F6
Space Only
300
Cable
Alley
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
GENERAL ARRANGEMENT - INTERNAL
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
14
15
REV
A
Panel Depth
400mm
All Dim. in mm
1750
1700
75
300
Cable
Alley
500
575
Q5.1
225 Q6.1
225 Q7.1
225 Q8.1
225 Q9.1
225 Q10.1
300
Bus Bar
Chamber
350
225 Q11.1
275
275
275
275
375
300
Cable
Alley
Your Company Name
This drawing is submitted only for confidential use. It may not be copied, printed
or submitted to third parties without prior permission of Your Company Name
TITLE
BILL OF QUANTITY
REV DATE MODIFICATION DRAWN CHECKED
A
B
C
D
11.07.16 DRAWINGS BUILT Author Name USER
DRG NO.
DWG/2013/01/REV1
CUSTOMER
Your Customer Name
SHEET
15
15
REV
A
30 60 90
29 59 89
28 58 88
27 57 87
26 56 86
25 55 85
24 54 84
23 53 83
22 52 82
21 51 81
20 50 80
19 49 79
18 48 78
17 47 77
16 46 76
15 45 75
14 44 74
13 43 73
12 42 72
11 41 71
10 40 70
9 39 69
8 38 68
7 37 67
6 36 66
5 35 65
4 34 64
3 33 63
2 32 62
1 31 61
S.No. S.No. S.No.Item Description Item Description Item DescriptionMake Make MakeQty Qty Qty
MCCB , 100A 3P Siemens 1 No
MCB , 2A 3P Siemens 6Nos
MCB, 2A DP Siemens 1 No
MCB, 4A DP Siemens 1 No
Neutral Link Reputed 7Nos
Fuse with Fuse Base 2A Siemens 3Nos
Control TX 415/240V Reputed 1 No
Ind Light Red, 240VAC Teknik 1 No
Ind Light Yellow, 240VAC Teknik 1 No
Ind Light Blue, 240VAC Teknik 1 No

More Related Content

Similar to panel designing software

MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM Sample
Shashi Kant
 
Sample portofolio 1
Sample portofolio 1Sample portofolio 1
Sample portofolio 1
ciolea ovidiu
 
3D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 03D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 0Rochelle Abrie
 
RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable
RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable
RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable
Echo Dong
 
Double bolt pipe clamp
Double bolt pipe clampDouble bolt pipe clamp
Double bolt pipe clamp
Design HuB
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdf
Mian Majid
 
Sld for pmcc
Sld for pmccSld for pmcc
Sld for pmcc
Avneet Monga
 
ETP Drawing.pdf
ETP Drawing.pdfETP Drawing.pdf
ETP Drawing.pdf
SyedSalmanAhmed25
 
Galactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDFGalactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDFArlindo Bork
 
JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
jjsem ksjemf
 
JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
sjehfd ksejfm
 
Jcb 525 50 s telescopic handler service repair manual sn 1037581 onwards
Jcb 525 50 s telescopic handler service repair manual sn 1037581 onwardsJcb 525 50 s telescopic handler service repair manual sn 1037581 onwards
Jcb 525 50 s telescopic handler service repair manual sn 1037581 onwards
ufsikkdjskemds
 
Jcb 520 telescopic handler service repair manual
Jcb 520 telescopic handler service repair manualJcb 520 telescopic handler service repair manual
Jcb 520 telescopic handler service repair manual
ofpsdjksemmds
 

Similar to panel designing software (16)

MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM Sample
 
Design
DesignDesign
Design
 
Sample portofolio 1
Sample portofolio 1Sample portofolio 1
Sample portofolio 1
 
3D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 03D-GCT-2014-1376-02 REV 0
3D-GCT-2014-1376-02 REV 0
 
RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable
RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable
RP TNC Straight Male Connectors Crimp for LMR195/RG58 Cable
 
Double bolt pipe clamp
Double bolt pipe clampDouble bolt pipe clamp
Double bolt pipe clamp
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdf
 
IC3D example dwgs
IC3D example dwgsIC3D example dwgs
IC3D example dwgs
 
Masters s
Masters sMasters s
Masters s
 
Sld for pmcc
Sld for pmccSld for pmcc
Sld for pmcc
 
ETP Drawing.pdf
ETP Drawing.pdfETP Drawing.pdf
ETP Drawing.pdf
 
Galactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDFGalactic Aztec Airframe.PDF
Galactic Aztec Airframe.PDF
 
JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 208S BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
 
JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
JCB 1CX BACKHOE LOADER Service Repair Manual SN(806000 Onwards)
 
Jcb 525 50 s telescopic handler service repair manual sn 1037581 onwards
Jcb 525 50 s telescopic handler service repair manual sn 1037581 onwardsJcb 525 50 s telescopic handler service repair manual sn 1037581 onwards
Jcb 525 50 s telescopic handler service repair manual sn 1037581 onwards
 
Jcb 520 telescopic handler service repair manual
Jcb 520 telescopic handler service repair manualJcb 520 telescopic handler service repair manual
Jcb 520 telescopic handler service repair manual
 

Recently uploaded

RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
h7j5io0
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
asuzyq
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
farazahmadas6
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
fastfixgaragedoor
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
9a93xvy
 
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
smpc3nvg
 

Recently uploaded (20)

RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
 
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
 

panel designing software

  • 1. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE ELECTRICAL CABINET DRAWINGS REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 1 15 REV A System : 3 Phase 4 Wire Supply Frequency : 50Hz Panel Name : Panel No. 1 Panel Type : Power Control Center Incomer Amps : 100A Power Line Voltage : 415V Control Voltage : 240V
  • 2. 30 60 90 29 59 89 28 58 88 27 57 87 26 56 86 25 55 85 24 54 84 23 53 83 22 52 82 21 51 81 20 50 80 19 49 79 18 48 78 17 47 77 16 46 76 15 45 75 14 44 74 13 43 73 12 42 72 11 41 71 10 40 70 9 39 69 8 38 68 7 37 67 6 36 66 5 35 65 4 34 64 3 33 63 2 32 62 1 31 61 S.No. S.No. S.No.Sheet Title Sheet Title Sheet TitleRevision Revision Revision Cabinet System Details List of Drawings Control Elements Detail Single Line Diagram Incomer #1 Metering Feeder No. 1, 0.01A FDR. Feeder No. 2, 0.01A FDR. Feeder No. 3, 0.01A FDR. Feeder No. 4, 0.01A FDR. Feeder No. 5, 0.01A FDR. Feeder No. 6, 0.01A FDR. Termination Dwg General Arrangement - External General Arrangement - Internal Bill of Quantity Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE LIST OF ALL DRAWINGS REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 2 15 REV A
  • 3. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE ELEMENTS SYMBOLS REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 3 15 REV A Contactor NO Contact Contactor NC Contact Contactor Coil Wire/Cable Termination Power/Control Earth Push Button NO Contact Push Button NC Contact Indicating Light ON: Green, Trip: Red Fwd: Green, Rev: Blue Current Transformer Control Transformer Timer On-Delay NO Contact Timer On-Delay NC Contact Timer Coil 10 Selector Switch NO Contact Thermostat NC Contact Neutral Link MCB/MCCB/ACB Single Line Dwg Switch Fuse Unit Single Line Dwg MPCB Single Line Dwg Contactor Single Line Dwg A Meters I>> I>> I>> MCCB/ACB SFU I>> I>> I>> MPCB MCB TP Power Contactor Overload Relay X22 1 2 3 M Motor Capacitor Single Line Dwg Heater Single Line Dwg Sheet Number Reference: XX/YY XX: Sheet No, YY: Column No. Ferrul Number Reference: XXYY XX: Sheet No, YY: Ferrul Number
  • 4. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE SINGLE LINE DIAGRAM REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 4 15 REV A Incoming Cable (50sqmm Cu) 100A,3P MCCB 2A 3P MCB 1sqmm Cu Cable F1 0.01A Feeder for Feeder No. 1 2A 3P MCB 1sqmm Cu Cable F2 0.01A Feeder for Feeder No. 2 2A 3P MCB 1sqmm Cu Cable F3 0.01A Feeder for Feeder No. 3 2A 3P MCB 1sqmm Cu Cable F4 0.01A Feeder for Feeder No. 4 2A 3P MCB 1sqmm Cu Cable F5 0.01A Feeder for Feeder No. 5 2A 3P MCB 1sqmm Cu Cable F6 0.01A Feeder for Feeder No. 6
  • 5. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Incomer #1 Metering REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 5 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Incoming Cable (50sqmm Cu) R R1 Y Y1 B B1 R1 Y1 B1 N N1 N1I>> I>> I>> Q5.1 100A,3P MCCB 2A Fuse 0501 0502 0503 R Y B Y1 R1 Q5.2 2A MCB 0504 0505 TX5.1 415V/240V 0506 0507 1 2 Q5.3 4A MCB 1 2 06/02 06/02 06/02 06/02 06/14 06/14
  • 6. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Feeder No. 1 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 6 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 05/39 R1 05/39 Y1 05/39 B1 07/02 07/02 07/02 07/0205/39 N1 05/39 05/39 2 1 07/13 07/13 Q6.1 I>> I>> I>> 2A 3P MCB 1A01 1A02 1A03 1A04 To Feeder No. 1 2A X6 1 2 3 4
  • 7. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Feeder No. 2 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 7 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 06/09 R1 06/09 Y1 06/09 B1 08/02 08/02 08/02 08/0206/09 N1 06/25 06/25 2 1 08/13 08/13 Q7.1 I>> I>> I>> 2A 3P MCB 1B01 1B02 1B03 1B04 To Feeder No. 2 2A X7 1 2 3 4
  • 8. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Feeder No. 3 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 8 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 07/09 R1 07/09 Y1 07/09 B1 09/02 09/02 09/02 09/0207/09 N1 07/25 07/25 2 1 09/13 09/13 Q8.1 I>> I>> I>> 2A 3P MCB 1C01 1C02 1C03 1C04 To Feeder No. 3 2A X8 1 2 3 4
  • 9. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Feeder No. 4 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 9 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 08/09 R1 08/09 Y1 08/09 B1 10/02 10/02 10/02 10/0208/09 N1 08/25 08/25 2 1 10/13 10/13 Q9.1 I>> I>> I>> 2A 3P MCB 1D01 1D02 1D03 1D04 To Feeder No. 4 2A X9 1 2 3 4
  • 10. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Feeder No. 5 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 10 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 09/09 R1 09/09 Y1 09/09 B1 11/02 11/02 11/02 11/0209/09 N1 09/25 09/25 2 1 11/13 11/13 Q10.1 I>> I>> I>> 2A 3P MCB 1E01 1E02 1E03 1E04 To Feeder No. 5 2A X10 1 2 3 4
  • 11. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE Feeder No. 6 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 11 15 REV A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 10/09 R1 10/09 Y1 10/09 B1 10/09 N1 10/25 10/25 2 1 Q11.1 I>> I>> I>> 2A 3P MCB 1F01 1F02 1F03 1F04 To Feeder No. 6 2A X11 1 2 3 4
  • 12. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE TERMINATION DIAGRAM PART 1/1 REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 12 15 REV A X6 1 1A01 2 1A02 3 1A03 4 1A04 X7 1 1B01 2 1B02 3 1B03 4 1B04 X8 1 1C01 2 1C02 3 1C03 4 1C04 X9 1 1D01 2 1D02 3 1D03 4 1D04 X10 1 1E01 2 1E02 3 1E03 4 1E04 X11 1 1F01 2 1F02 3 1F03 4 1F04
  • 13. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE GENERAL ARRANGEMENT - EXTERNAL REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 13 15 REV A 1750 1700 400 1775 75 E 300 Cable Alley 500 575 1F1 YR B Incomer No. 1 100A 3P MCCB 225 1F2(1A) Feeder No. 1, 0.01A FDR. with 2A 3P MCB 225 1F3(1B) Feeder No. 2, 0.01A FDR. with 2A 3P MCB 225 1F4(1C) Feeder No. 3, 0.01A FDR. with 2A 3P MCB 225 1F5(1D) Feeder No. 4, 0.01A FDR. with 2A 3P MCB 225 1F6(1E) Feeder No. 5, 0.01A FDR. with 2A 3P MCB 300 Bus Bar Chamber 350 225 2F1(1F) Feeder No. 6, 0.01A FDR. with 2A 3P MCB 275 2F2 Space Only 275 2F3 Space Only 275 2F4 Space Only 275 2F5 Space Only 375 2F6 Space Only 300 Cable Alley
  • 14. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE GENERAL ARRANGEMENT - INTERNAL REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 14 15 REV A Panel Depth 400mm All Dim. in mm 1750 1700 75 300 Cable Alley 500 575 Q5.1 225 Q6.1 225 Q7.1 225 Q8.1 225 Q9.1 225 Q10.1 300 Bus Bar Chamber 350 225 Q11.1 275 275 275 275 375 300 Cable Alley
  • 15. Your Company Name This drawing is submitted only for confidential use. It may not be copied, printed or submitted to third parties without prior permission of Your Company Name TITLE BILL OF QUANTITY REV DATE MODIFICATION DRAWN CHECKED A B C D 11.07.16 DRAWINGS BUILT Author Name USER DRG NO. DWG/2013/01/REV1 CUSTOMER Your Customer Name SHEET 15 15 REV A 30 60 90 29 59 89 28 58 88 27 57 87 26 56 86 25 55 85 24 54 84 23 53 83 22 52 82 21 51 81 20 50 80 19 49 79 18 48 78 17 47 77 16 46 76 15 45 75 14 44 74 13 43 73 12 42 72 11 41 71 10 40 70 9 39 69 8 38 68 7 37 67 6 36 66 5 35 65 4 34 64 3 33 63 2 32 62 1 31 61 S.No. S.No. S.No.Item Description Item Description Item DescriptionMake Make MakeQty Qty Qty MCCB , 100A 3P Siemens 1 No MCB , 2A 3P Siemens 6Nos MCB, 2A DP Siemens 1 No MCB, 4A DP Siemens 1 No Neutral Link Reputed 7Nos Fuse with Fuse Base 2A Siemens 3Nos Control TX 415/240V Reputed 1 No Ind Light Red, 240VAC Teknik 1 No Ind Light Yellow, 240VAC Teknik 1 No Ind Light Blue, 240VAC Teknik 1 No