The document appears to be a map of an existing water system with labels for various water infrastructure assets such as water mains, distribution lines, and services. It includes labels for the diameter, material, joint type, and installation year of various water lines. It also outlines parcel boundaries and building outlines overlaid on a map grid. No other contextual information is provided in the document.
1. The document provides steps to start up a new gas turbine compressor (GTC) system, including pressurizing the system, starting up two GTC trains, and shifting process gas flow from the bypass line into the GTC system.
2. It outlines pressing the inlet separator and delivering gas to perform testing on the inlet cooler.
3. The steps also include depressurizing the suction header and opening/closing various valves to start up the two GTC trains and deliver a total gas flowrate of 170 MMSCFD through the system.
This document provides a digital supplement to the maintenance logbook and records for a Hawker BAe125-800SP aircraft (NXXGS). It contains details of maintenance actions performed on the airframe, engines, and avionics since 2/21/1989. The document is a work in progress with incomplete history prior to April 2007. It is intended to provide quick electronic access to pertinent maintenance data and serve as a backup to the paper log records.
The document outlines a methodology for installing a generator by lifting it into an engine room using a gantry system, sliding it into place on rails, jacking and aligning it, and then lowering it into its final position. Key steps include assembling the gantry, attaching lifting gear to lift the generator, positioning slide rails to move it, using jacks and an alignment system, and then removing the lifting and sliding equipment. Diagrams show the layout of the engine room and placement of the generator.
This document contains a map showing drainage, sanitary sewer, and water quality assets within Discovery Park that are currently owned and maintained by Seattle Public Utilities, King County, the US Government, and Discovery Park. The map legend indicates which entities own different types of assets such as mainlines, laterals, culverts, outfalls, and more. An upcoming walk through will transfer ownership and maintenance responsibilities of some assets from SPU to Discovery Park.
Klaus Deininger of the World Bank confirms in a letter that Nawaf Alfaouri participated in the Annual World Bank Conference on Land and Poverty held in Washington DC. The letter is addressed from the World Bank headquarters in Washington DC and is signed by Klaus Deininger as the confirming participation.
This presentation was given at the EPA’s National Water Event 2019, which took place on 29 and 30 May 2019 in Galway. This presentation by Michael Goss from Irish Water is on addressing the challenges related to wastewater networks.
This document lists item listings from an online auction site. It includes over 100 listings of various industrial, electrical, IT, and office equipment and parts. The listings provide details on the item description, selling price, number of bids, page views, and other metrics. Locations of buyers span various cities and states across the United States. Items range from water treatment plant spare parts and pallets to computers, servers, printers, and various machinery.
Project #1 - Water Pumping Station - Switchboard UpgradeDavid List
This is my first full drawing set. It was a project eventually ended in a complete upgrade of the pumping station.
See my LinkedIn post for more info;
https://www.linkedin.com/today/post/article/wps090-switchboard-upgrage-david-list?trk=prof-post
1. The document provides steps to start up a new gas turbine compressor (GTC) system, including pressurizing the system, starting up two GTC trains, and shifting process gas flow from the bypass line into the GTC system.
2. It outlines pressing the inlet separator and delivering gas to perform testing on the inlet cooler.
3. The steps also include depressurizing the suction header and opening/closing various valves to start up the two GTC trains and deliver a total gas flowrate of 170 MMSCFD through the system.
This document provides a digital supplement to the maintenance logbook and records for a Hawker BAe125-800SP aircraft (NXXGS). It contains details of maintenance actions performed on the airframe, engines, and avionics since 2/21/1989. The document is a work in progress with incomplete history prior to April 2007. It is intended to provide quick electronic access to pertinent maintenance data and serve as a backup to the paper log records.
The document outlines a methodology for installing a generator by lifting it into an engine room using a gantry system, sliding it into place on rails, jacking and aligning it, and then lowering it into its final position. Key steps include assembling the gantry, attaching lifting gear to lift the generator, positioning slide rails to move it, using jacks and an alignment system, and then removing the lifting and sliding equipment. Diagrams show the layout of the engine room and placement of the generator.
This document contains a map showing drainage, sanitary sewer, and water quality assets within Discovery Park that are currently owned and maintained by Seattle Public Utilities, King County, the US Government, and Discovery Park. The map legend indicates which entities own different types of assets such as mainlines, laterals, culverts, outfalls, and more. An upcoming walk through will transfer ownership and maintenance responsibilities of some assets from SPU to Discovery Park.
Klaus Deininger of the World Bank confirms in a letter that Nawaf Alfaouri participated in the Annual World Bank Conference on Land and Poverty held in Washington DC. The letter is addressed from the World Bank headquarters in Washington DC and is signed by Klaus Deininger as the confirming participation.
This presentation was given at the EPA’s National Water Event 2019, which took place on 29 and 30 May 2019 in Galway. This presentation by Michael Goss from Irish Water is on addressing the challenges related to wastewater networks.
This document lists item listings from an online auction site. It includes over 100 listings of various industrial, electrical, IT, and office equipment and parts. The listings provide details on the item description, selling price, number of bids, page views, and other metrics. Locations of buyers span various cities and states across the United States. Items range from water treatment plant spare parts and pallets to computers, servers, printers, and various machinery.
Project #1 - Water Pumping Station - Switchboard UpgradeDavid List
This is my first full drawing set. It was a project eventually ended in a complete upgrade of the pumping station.
See my LinkedIn post for more info;
https://www.linkedin.com/today/post/article/wps090-switchboard-upgrage-david-list?trk=prof-post
This engineering drawing shows details for a reclaim tunnel vault including elevations, sections, and specifications for six apron feeders. Key details include dimensions and material callouts for conveyor monorails, discharge chutes, head chutes, and dribble chutes. Lubrication and manufacturer specifications are provided for bearings on each of the six apron feeders.
The document appears to be a listing of items for sale on an online marketplace. It includes over 100 listings of various industrial, electrical, IT, and office equipment and parts. The listings provide details on the item description, seller location, buyer location, sale price, number of bids, page views, and other metrics. The items for sale include things like water treatment plant spare parts, pumps, laptops, servers, printers, lighting fixtures, and various machinery. Locations of buyers and sellers span various cities and states across the US.
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
This document is a pile layout drawing showing the foundation plan for a construction project. It includes details like pile locations, pile caps, ground beams, wall locations, and load information. The piles range in diameter from 600mm to 1200mm. Reinforced concrete walls are 200mm thick generally. The drawing provides guidance for the foundation design and establishes the load transfer structure below ground level.
The document provides details of three projects being undertaken by S. Mark Engineering including timelines, call out numbers and dates. It also includes the agenda for a weekly review meeting covering project details, safety, progress, documentation, procurement and next week's plan. HSE statistics for the current week are presented. Construction status and progress curves are shown for the IW tank modification and IW/PF pump installation projects. Documentation status lists the number of open, closed and resubmitted documents for each discipline across the projects.
The document provides a progress update on valve chamber and thrust block construction for water pipeline projects. As of the date, 1307 of 2818 valve chambers are completed for rural water supply projects, with 872 remaining. For urban projects, 876 of 2021 valve chambers are completed, with 1145 remaining. A total of 2183 thrust blocks are scoped, with 475 completed and 51 remaining.
The document contains plans and specifications for the construction of a residential building including:
- A site plan showing the layout of the building structures and surrounding areas.
- Floor plans showing the layout and dimensions of rooms.
- Elevations depicting the exterior views of the building.
- Sections through the building illustrating structural details.
- Schedules with information like material specifications and dimensions of building components.
This document contains a structural foundation layout and details for a building project including:
- A schedule listing 55 foundations and their dimensions
- A schedule listing 48 reinforced concrete columns and their dimensions
- Sections and details of the foundations, retaining walls, basement slabs, and waterproofing specifications.
- Notes specifying materials and construction requirements.
This document provides specifications for a series of inline direct driven fans called the CCE Series. It includes dimensions, weights, performance data, and technical specifications for 12 different fan models. The fans incorporate a direct driven centrifugal fan inside a galvanized steel cabinet with removable access panels and flanged duct connections.
The document contains contact information for P ESystems Engineering Consultants located in Granite Falls, WA. It includes their address, phone number and fax. The rest of the document contains technical drawings and diagrams related to electrical and engineering system designs and specifications.
This document provides an instrument index for a cooling system, listing over 200 instruments including flow elements, flow indicators, and flow indicating transmitters. It includes key details for each instrument such as tag number, loop number, description, I/O type, location, original equipment details, and installation and supplier details. The index categorizes instruments by their association with different pieces of equipment in the cooling system such as tundishes and coolers.
This document provides an overview and update on Cimarex Energy Co., including:
1) Cimarex focuses on growing through drilling in multiple basins, with a portfolio approach to gas, natural gas liquids, and oil. 2) Their core operating areas are the Permian Basin (62% of production) and Mid-Continent (31% of production), with $1.5 billion budgeted for capital expenditures in 2013. 3) In the Permian Basin, Cimarex has an active drilling program focused on the Bone Spring and Wolfcamp formations in the Delaware Basin, with an emphasis on their Culberson County acreage.
1. The document appears to be architectural plans and drawings for an office building project located at 12 Royal Vista Way NW in Calgary, Alberta.
2. The drawings include floor plans, elevations, sections, and details showing the layout of the building including units, stairs, storage areas, parking levels, and vertical elements.
3. Dimensioned drawings provide measurements and technical specifications for the building construction including heights of floors, roof, and other building elements.
Presentation for DHA on project progress(08-09-22).pptxFaisalGulzar19
The presentation summarizes the progress of the Infrastructure Development Works Package 2-B project in DHA Gujranwala. Key points include:
- Planned progress is 32.13% but achieved progress is 20% due to monsoon rains, design revisions causing delays, and increased scope of work.
- A look ahead plan outlines balancing the work schedule to meet planned progress targets over the coming months through deployment of equipment and manpower resources.
- Financial progress and a balance work schedule provide details on completion status and planned progress by item through October 2023 to complete the project.
This document provides specifications for various bolt-in and solder-in filters as well as tubular ceramic filters. It lists the model number, dimensions, capacitance range, withstand voltage, and circuit type for each item. Sizes range from 1.7mm to 10mm and capacitance values are between 5pF to 1uF. Withstand voltages are between 16VDC to 1500VDC. The document also provides contact information for the manufacturer.
Samsung gt s5570 galaxy mini 05 main electrical part listbizupa
This document lists the main electrical parts for a Samsung device, including ICs, diodes, transistors, resistors, capacitors, crystals, oscillators, filters, connectors, and other components. It provides the design, location, security code and description for over 200 individual parts. The list is proprietary and not to be used without Samsung's authorization.
This document contains a schedule of VAV boxes for the ground floor and first floors of a hospital project. It includes 44 VAV boxes for the ground floor and 190 VAV boxes for the first floor, organized by location, description, tag number and other identifying information. Mechanical, plumbing and other trades are listed as having been coordinated for the project.
Recycled water project draft plans and specificationskristinemassey
FINAL TOWN REVIEW NFC
100% SUBMITTAL
No
1/7/14
5/24/13
Revision
Plot Date:
Note: * indicates signatures on original issue of drawing or last revision of drawing
22 November 2013 - 2:41 PM
Plotted by: Ben Langston
Drawn
Job
Project
Manager Director
Cad File No:
Date
N:\US\Santa Rosa\Projects\12027 - The Town of Yountville\12027-11-001 Recycled Water Expansion Project\06-CAD\Sheets\1202711001 G-001.dw
This document is a letter from C.A.A.F Engineering to the City of Lowell regarding an analysis of flooding along Clay Pit Brook. It includes an introduction of the engineering team led by Onix Castro. Appendices provide analysis of the history of flooding, technical requirements, data collected using HEC-RAS modeling at 12 river stations, and proposed solutions and assumptions. River station profiles show water surface elevations and other hydraulic parameters under varying flow rates.
This document provides a monthly report for July 2022. Key highlights include the lowest inventory level achieved, completion of 5 improvement projects, and safety improvements to turbine drain valves and raw water pond level displays. Notable were a faulty GPS clock and high numbers of open purchase requests and orders. Metrics on notifications, preventative maintenance, inventory, and Kaizen projects were also included.
This engineering drawing shows details for a reclaim tunnel vault including elevations, sections, and specifications for six apron feeders. Key details include dimensions and material callouts for conveyor monorails, discharge chutes, head chutes, and dribble chutes. Lubrication and manufacturer specifications are provided for bearings on each of the six apron feeders.
The document appears to be a listing of items for sale on an online marketplace. It includes over 100 listings of various industrial, electrical, IT, and office equipment and parts. The listings provide details on the item description, seller location, buyer location, sale price, number of bids, page views, and other metrics. The items for sale include things like water treatment plant spare parts, pumps, laptops, servers, printers, lighting fixtures, and various machinery. Locations of buyers and sellers span various cities and states across the US.
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
This document is a pile layout drawing showing the foundation plan for a construction project. It includes details like pile locations, pile caps, ground beams, wall locations, and load information. The piles range in diameter from 600mm to 1200mm. Reinforced concrete walls are 200mm thick generally. The drawing provides guidance for the foundation design and establishes the load transfer structure below ground level.
The document provides details of three projects being undertaken by S. Mark Engineering including timelines, call out numbers and dates. It also includes the agenda for a weekly review meeting covering project details, safety, progress, documentation, procurement and next week's plan. HSE statistics for the current week are presented. Construction status and progress curves are shown for the IW tank modification and IW/PF pump installation projects. Documentation status lists the number of open, closed and resubmitted documents for each discipline across the projects.
The document provides a progress update on valve chamber and thrust block construction for water pipeline projects. As of the date, 1307 of 2818 valve chambers are completed for rural water supply projects, with 872 remaining. For urban projects, 876 of 2021 valve chambers are completed, with 1145 remaining. A total of 2183 thrust blocks are scoped, with 475 completed and 51 remaining.
The document contains plans and specifications for the construction of a residential building including:
- A site plan showing the layout of the building structures and surrounding areas.
- Floor plans showing the layout and dimensions of rooms.
- Elevations depicting the exterior views of the building.
- Sections through the building illustrating structural details.
- Schedules with information like material specifications and dimensions of building components.
This document contains a structural foundation layout and details for a building project including:
- A schedule listing 55 foundations and their dimensions
- A schedule listing 48 reinforced concrete columns and their dimensions
- Sections and details of the foundations, retaining walls, basement slabs, and waterproofing specifications.
- Notes specifying materials and construction requirements.
This document provides specifications for a series of inline direct driven fans called the CCE Series. It includes dimensions, weights, performance data, and technical specifications for 12 different fan models. The fans incorporate a direct driven centrifugal fan inside a galvanized steel cabinet with removable access panels and flanged duct connections.
The document contains contact information for P ESystems Engineering Consultants located in Granite Falls, WA. It includes their address, phone number and fax. The rest of the document contains technical drawings and diagrams related to electrical and engineering system designs and specifications.
This document provides an instrument index for a cooling system, listing over 200 instruments including flow elements, flow indicators, and flow indicating transmitters. It includes key details for each instrument such as tag number, loop number, description, I/O type, location, original equipment details, and installation and supplier details. The index categorizes instruments by their association with different pieces of equipment in the cooling system such as tundishes and coolers.
This document provides an overview and update on Cimarex Energy Co., including:
1) Cimarex focuses on growing through drilling in multiple basins, with a portfolio approach to gas, natural gas liquids, and oil. 2) Their core operating areas are the Permian Basin (62% of production) and Mid-Continent (31% of production), with $1.5 billion budgeted for capital expenditures in 2013. 3) In the Permian Basin, Cimarex has an active drilling program focused on the Bone Spring and Wolfcamp formations in the Delaware Basin, with an emphasis on their Culberson County acreage.
1. The document appears to be architectural plans and drawings for an office building project located at 12 Royal Vista Way NW in Calgary, Alberta.
2. The drawings include floor plans, elevations, sections, and details showing the layout of the building including units, stairs, storage areas, parking levels, and vertical elements.
3. Dimensioned drawings provide measurements and technical specifications for the building construction including heights of floors, roof, and other building elements.
Presentation for DHA on project progress(08-09-22).pptxFaisalGulzar19
The presentation summarizes the progress of the Infrastructure Development Works Package 2-B project in DHA Gujranwala. Key points include:
- Planned progress is 32.13% but achieved progress is 20% due to monsoon rains, design revisions causing delays, and increased scope of work.
- A look ahead plan outlines balancing the work schedule to meet planned progress targets over the coming months through deployment of equipment and manpower resources.
- Financial progress and a balance work schedule provide details on completion status and planned progress by item through October 2023 to complete the project.
This document provides specifications for various bolt-in and solder-in filters as well as tubular ceramic filters. It lists the model number, dimensions, capacitance range, withstand voltage, and circuit type for each item. Sizes range from 1.7mm to 10mm and capacitance values are between 5pF to 1uF. Withstand voltages are between 16VDC to 1500VDC. The document also provides contact information for the manufacturer.
Samsung gt s5570 galaxy mini 05 main electrical part listbizupa
This document lists the main electrical parts for a Samsung device, including ICs, diodes, transistors, resistors, capacitors, crystals, oscillators, filters, connectors, and other components. It provides the design, location, security code and description for over 200 individual parts. The list is proprietary and not to be used without Samsung's authorization.
This document contains a schedule of VAV boxes for the ground floor and first floors of a hospital project. It includes 44 VAV boxes for the ground floor and 190 VAV boxes for the first floor, organized by location, description, tag number and other identifying information. Mechanical, plumbing and other trades are listed as having been coordinated for the project.
Recycled water project draft plans and specificationskristinemassey
FINAL TOWN REVIEW NFC
100% SUBMITTAL
No
1/7/14
5/24/13
Revision
Plot Date:
Note: * indicates signatures on original issue of drawing or last revision of drawing
22 November 2013 - 2:41 PM
Plotted by: Ben Langston
Drawn
Job
Project
Manager Director
Cad File No:
Date
N:\US\Santa Rosa\Projects\12027 - The Town of Yountville\12027-11-001 Recycled Water Expansion Project\06-CAD\Sheets\1202711001 G-001.dw
This document is a letter from C.A.A.F Engineering to the City of Lowell regarding an analysis of flooding along Clay Pit Brook. It includes an introduction of the engineering team led by Onix Castro. Appendices provide analysis of the history of flooding, technical requirements, data collected using HEC-RAS modeling at 12 river stations, and proposed solutions and assumptions. River station profiles show water surface elevations and other hydraulic parameters under varying flow rates.
This document provides a monthly report for July 2022. Key highlights include the lowest inventory level achieved, completion of 5 improvement projects, and safety improvements to turbine drain valves and raw water pond level displays. Notable were a faulty GPS clock and high numbers of open purchase requests and orders. Metrics on notifications, preventative maintenance, inventory, and Kaizen projects were also included.
Similar to DENNY_NETWORK_WATERMAP_NAWAF_FINAL (20)