Georgia Strategic Prevention System (GASPS)
Office of Prevention Services and Programs (OPSP)
Division of Addictive Diseases
Department of Behavioral Health and Development Disabilities
Statewide Alcohol Initiative
Orientation
December 2, 2011
Travis Fretwell
Division of Addictive Diseases,
Office of Prevention Services & Programs
Assistant Executive Director, Division of Addictive Diseases,
Director, Office of Prevention Services and Programs
Welcome!
41
SAPTBG
Funded
Organization
s
Introduction of State Staff
Christopher Wood
Prevention Team Lead
Margie Irizarry
Epidemiologist
Tanisha Grimes
State Evaluator
Barbara Dorman
Executive Secretary
Kristie Burchett,
State Prevention Specialist Supervisor
Tamika Jonas,
Regional Specialist (Region 6)
Deanne Bergen,
Regional Specialist (Region 5)
Kim Fluellen,
Regional Specialist (Region 3)
Becky Croft,
Regional Specialist (Region 1)
Vacant (Region 2 & 6)
Statewide Contractors
 Georgia State University
 University of Georgia, Carl Vinson
Institute of Government
Vision & Mission Statement
Vision
Healthy fully realized Georgians living in
communities free of the debilitating effects of
substance use & abuse
Mission
To systematically implement a statewide multi-level
strategy that assists communities in developing and
implementing prevention programs and policies in
anticipation of and in response to its citizens
GA Prevention System
 Background
 New Direction
 Funded by the Office of Prevention Services and
Programs (OPSP), DAD, DBHDD
 Umbrella that provides centralized organization
to OPSP projects & initiatives
GASPS
/ 
Alcohol Initiative Other Substances
SPF SIG Prescription Drugs
SPF SPE
What is GA Strategic
Prevention System (GASPS)?
 A multilevel network-based system aimed to
prevent substance use and abuse and
promote healthy choices and lifestyle among
Georgians by implementing sustainable
evidence-based strategies (programs,
policies, and practices or EBPPP)
OVERVIEW
 Objectives of SAPTBG FY2011-12
 State selected goals
 Why focus solely on Alcohol
 GASPS initiative
 Strategic Prevention Framework (SPF) Model
 Public Health Model
 GASPS Design
 SPF SIG community (CPACS)
OVERVIEW
 Contract Overview
 SPF SIG community (Macon Safe Decisions)
 Georgia State University (GSU)
 TA & Support Services
 Evaluation
 SPF SIG community (Early Choices)
 Next Steps
 Closing Remarks
Objectives of SAPTBG
FY2011-12
 Objectives
 Statewide Alcohol Initiative
 Implement sustainable Evidence-based prevention
strategies (programs/practices/policies)
 Findings epidemiological/needs assessment data
 Research-based
 Align with state selected goals
 Target high need communities / high risk population
 Utilize SPF & Public Health Model
 Foster collaboration / build capacity & infrastructure
 Cultivate cultural competency
State Selected Goals
 Reduce the early onset of alcohol use
among 9-20 year olds
 Reduce access to alcohol and binge
drinking among 9-20 year olds
 Reduce binge & heavy drinking among
18-25 year olds.
Why Focus Solely on Alcohol?
 Most widely substance use among youth1
 Health Consequences (2001-2005)
 157 youth <21 died each year from alcohol-
related illness/injury
 46% of youth alcohol-attributable deaths were
due to motor-vehicle crashes
 34% of youth alcohol-attributable deaths were
due to homicide or suicide2
Sources:
1.U.S. Department of Health and Human Services. The Surgeon General's Call to Action to Prevent and Reduce Underage Drinking. Rockville, MD: U.S.
Department of Health and Human Services; 2007.
2.2001-2005 Alcohol-Related Disease Impact (ARDI) Software, Centers for Disease Control and Prevention (http://www.cdc.gov/alcohol/ardi.htm).
 Youth ages 9-20 use it more than any other
substance
 Average of 2,375 people in GA die from
alcohol-related injuries or illness each year
 3rd leading cause of death in GA
Source: 1. Youth Alcohol Use 2009 Georgia Data Summary. http://health.state.ga.us/pdfs/epi/cdiee/CDIEE%20Data%20Summaries%202009
/2009%20Alcohol%20Data%20Summary.pdf
Why Focus Solely on Alcohol?
Why Focus Solely on Alcohol?
 Youth alcohol use is also associated with
increased risk for:
 Physical assault
 Sexual assault
 Academic problems
 Tobacco use
 Drug use
 Unplanned and unprotected sexual activity
Source: Youth Alcohol Use 2010 Georgia Data Summaryhttp://health.state.ga.us/pdfs/epi/cdiee/CDIEE%20Data%20Summaries
%202010/YouthAlcoholUse2010.pdf
Why Focus Solely on Alcohol?
 Youth who consume alcohol are 5 times more
likely to become dependent on or abuse
alcohol than those who wait until 211
 Excessive alcohol use among youth is
associated with brain damage, intellectual
impairment, and memory problems2,3
Sources:
1. Hingson RW, Heeren T, Winter MR. Age at drinking onset and alcohol dependence: age at onset, duration, and severity. Pediatrics 2006;160:739–746
2. U.S. Department of Health and Human Services. The Surgeon General's Call to Action to Prevent and Reduce Underage Drinking. Rockville, MD: U.S.
Department of Health and Human Services; 2007.
3. Zeigler DW, Wang CC, Yoast RA, Dickinson BD, McCaffree MA, Robinowitz CB, Sterling ML. The neurocognitive effects of alcohol on adolescents
and college students. Preventive Medicine 2005 40: 23-32.
Why Focus Solely on Alcohol?
 Drinking Behaviors
 21% of GA HS students had first drink before age 13
 32% of GA MS & 68% HS students had one or more
alcoholic drinks at least once in their lifetime
 Approx 331,386 (34%) HS students had at least one
drink in the last 30 days
 Approx 181,634 (19%) GA HS students binge drink
(consuming five or more drinks at one time)
 Among GA HS who consumed alcohol:
 41% drank liquor rather than malt beverages
 17% beer
 14% other types of beverages (e.g. wine and wine coolers)
Source: 2009 Georgia Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
Binge drinking by grade level/age,
Georgia 2009
18
14
22 23
11
0
25
50
9th Grade 10th Grade 11th Grade 12th Grade Adults 18+*
Percent
Usual beverage type consumed by high school students,
Georgia 2009
41
17 17
14 12
0
25
50
Liquor Beer Malt
Beverages
Other
Beverages**
No Usual
Type
Percent
Why Focus Solely on Alcohol?
*Binge drinking among adults is defined as five or more drinks per episode for men and four or more drinks
per episode for women**Other beverages include wine, wine coolers, and other types of alcoholic beverages.
Source: 2009 Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
2009 Georgia Behavioral Risk Factor Surveillance Survey (http://health.state.ga.us/epi/brfss/index.asp).
Why Focus Solely on Alcohol?
 Drinking & Driving
 ~ 66,953 (7%) HS reported driving & driving
 Among 12th graders, 12% reported driving after
consuming alcohol
 Youth Access to Alcohol
 36% of HS who reported alcohol use got it from
someone else
 Among HS who consumed alcohol, 82% did so at
their home or someone else’s home
Source: 2009 Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
Alcohol source for high school students,
Georgia 2009
36
24
9 9
22
0
25
50
Given to
Them
Gave
Someone
Money to
Buy
Took from
Store or
Family
Bought from
Store,
Restaurant,
or at Public
Event
Got Some
Other Way
Percent
*Other locations include public places, public events, in vehicles, and on school property.
Why Focus Solely on Alcohol?
Source: 2009 Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
Lifetime Prevalence of Substance Use,
GA High School Students (YRBS 2005-2009)
73.2 73.6
67.9
56.1 56.9
49.2
38.7 38.1 36.6
14.9
11.4 11.6
8.3
6 5.96.4 4.9 4.65.3
7.7 6.5
4.3 2.4 3.84 3.9 4.5
0
10
20
30
40
50
60
70
80
90
100
2005 2007 2009
Ever drank alcohol
Ever smoked cigarette
Ever smoked marijuana
Ever used glue, aerosol
spray cans, paints, or
sprays to get high
Ever used cocaine
Ever used
methamphetamine
Ever used ectasy
Ever used heroin
Why Focus Solely on Alcohol?
Current Use of Substance Use,
GA High School Students (YRBS 2005-2009)
39.9
37.7
34.3
20.8
19 18.818.9 19.6 18.317.2 18.6
16.9
3 2.6 2.5
0
10
20
30
40
50
2005 2007 2009
Drank alcohol during the past 30
days
Binge alcohol use (5 or more
drinks) in the last 30 days
Used marijuana during the past
30 days
Smoked cigarettes during the
past 30 days
Used cocaine during the past 30
days
Why Focus Solely on Alcohol?
Why Focus Solely on Alcohol?
First Time Substance Use,
GA High School Students (YRBS 2005-2009)
26.8
23.9
20.7
14.9 14.5
11.9
8.2 8.1 8
0
10
20
30
40
50
2005 2007 2009
Drank alcohol before age 13
Smoked before age 13
Tried Marijuana before age 13
Questions?
What is GA Strategic
Prevention System (GASPS)?
 Purpose
 Build capacity and infrastructure within:
 State
 Regions
 sub regions / communities
 By means of:
 key policy stakeholders and resources mobilization
 coalition and workforce development
 research infrastructure enhancement
 Purpose
 Systematically implement SPF model across the
state
 Implement strategies aimed at population level
change
 Comprehensive approach
 Inform policy development
 Increase funding opportunities
What is GA Strategic
Prevention System (GASPS)?
SAMHSA's/CSAP Strategic
Prevention Framework (SPF)
Profile population
needs, resources,
and readiness to
address needs and
gaps
Monitor, evaluate,
sustain, and improve
or replace those that
fail
Implement evidence-
based prevention
programs and
activities
Develop a
Comprehensive
Strategic Plan
Mobilize and/or build
capacity to address
needs
1.Assess
2.Build
Capacity
3.Plan4.Implement
5.Monitor,
Evaluate
SAMHSA's Strategic Prevention
Framework (SPF)
Public Health Model
 Population-based
 Focuses on preventing health problems and
promoting healthy living for whole groups of
people (e.g. age groups, communities)
 Multiple causal factors
or determinants that
influence problems
 Comprehensive
Action Plan
People
(Host)
Physical and
Social
Contexts
(Environment)
ATOD and
Related
Products
(Agent)
GASPS Design
 State
 Advisory Steering Committee (ASC)
 State Prevention Alliance Workgroup (SPAW)
 TA & Support Services
 Data Structure
 |
 Region*
 Regional Prevention Alliance Workgroup (RPAW)
 TA & Support Services
 Data Structure
 |
 Sub Region
 Community Prevention Alliance Workgroup (CPAW)
 TA & Support Services
 Data Structure
Purpose of CPAW
 The purpose of a local CPAW is to build
capacity and infrastructure within an
organization in a defined community as well
as work in partnership with other community
stakeholders to execute strategies to achieve
successful results through this grant program.
Establish Multidiscipline Workgroup
 Assemble Workgroup
Epi
Planning & Operation
Evaluation & Sustainability
Establish workgroup
procedures and operating
structure
Foster collaboration & active
communication to meet selected
goals & objectives
Epi Representative /Workgroup
 Purpose
 Participates in data collection, review, and analysis
 Assists with the development of a needs assessment report
 Gathers & analyzes data for decision making during the
implementation of the SPF model
 Reviews existing secondary or archival data sources
 Identifies gaps in existing data
 Membership
 Data-source representatives (e.g. university faculty) who are
knowledgeable in data collection, manipulation, and analysis.
34
Planning & Operation
Representative / Workgroup
35
Purpose
Assists with developing the action plan & other required reports
Helps to identify potential evidence-based strategies
Drives effective and efficient use of prevention resources
Develops and oversees operational procedures across system
Assists with resource planning & technical assistance needs
Look at community readiness
Membership
Programmatic staff, partners, other related field representatives
Evaluation & Sustainability
Representative / Workgroup
 Purpose
 Assists with the collection and monitoring of evaluation data
(Process & Outcomes)
 Assists the State and external evaluation team with
conducting and monitoring evaluation activities
 Assist with the collection and monitoring of NOMs data
utilizing two main database systems, the Database Builder
(DbB) and MDS.
 Membership
 Staff/ Partners knowledgeable, training, experience in
evaluation
36
Mobilizing the CPAW
 Who in the community has training/experience in conducting needs
assessments, data collection and analysis? (e.g. Surveys, town hall
meetings)
 Who has training/experience in strategic planning, mobilizing
resources?
 Who has training/experience in evaluation, evaluation activities?
 Who has time and staff to complete these tasks within the next 10
months?
 Who is knowledgeable about the community?
 Who can help you to establish other valuable professional
relationships?
37
Sustaining the CPAW
 Continue developing effective professional relationships
with your CPAW as they will:
 Serve as lead team for coordinating SPF process
 Provide guidance through the implementation of the SPF model
 Build capacity & develop Action Plan
 Assess community readiness
 Implement effective strategies
 evidence-based Programs, Policies, and Practices
 Assist with preparing reports
 Participate in program evaluation process
 Hold Workgroups together
 Internal linkages (membership agreements)
 External linkages (MOU/MOA)
 Active Participation
38
CPAWs vs Coalition
 CPAW
 Focus on specific issue (GASPS goals & objectives)
 Working groups, doers
 Provide technical assistance
 Gathering data & information to support GASPS initiative
 May serve as coalition sub-committee
 The Coalition
 Often serve as decision-making body
 Focus on a variety of issues that impact local community
 Social
 Policy
 Health
 Comprise of representatives from different core sectors
Establishing Coalition
 Coalition should represent the demographics, cultural, ethnic,
and linguistic make-up of the community served.
 Youth (18 or younger)
 Parent
 Business
 Media
 School/ Universities
 Youth Serving Organization
 Law Enforcement
 Religious/Fraternal Organization
 Civic/Volunteer Groups
 Healthcare Professional
 State, local, or tribal governmental agency with expertise in the field of
substance abuse
 Other organization involved in reducing substance abuse
 Technical Assistance & Support Services
 TA/training/coaching system is a collaborative effort
between State Office, RPS & GSU
 Regional sites and target communities
 Technical assistance & support services modalities
 Face-to-face training
 Standing training sessions
 Face-to-face TA sessions
 Web-based or distance-based Training and TA sessions
 Face-to-face or distance-based coaching
 Online webpage www.ga-sps.org
GASPS Design
 Data structure
 Data Warehouse / Repository Database
 Provides a systemic mean to store, organize, manage, and analyze
huge amounts of data from multiple data sources efficiently
 Utilizes a unified technology platform across multiple agencies that
enables effective management information reporting from various
substance use prevention data systems across the state, regions, and
sub-regions
 Two main datasets would be used for this initiative:
  Minimum Data Set (MDS)
 Database Builder (DbB)
GASPS Design
Questions?
BREAK
15 Minutes
Yotin Srivanjarean, MPA
Director of Programs
Victoria Huynh
Program Coordinator
Amanda Luong
Program Administrative
Support
GEORGIA STRATEGIC PREVENTION FRAMEWORK
STATE INCENTIVE GRANT (GA SPF SIG)
PRIORITY: REDUCE ALCOHOL-RELATED TRAFFIC
CRASHES AND FATALITIES
PREPARED BY CENTER FOR PAN ASIAN COMMUNITY SERVICES,
INC. (CPACS)
Center for Pan Asian Community
Services, Inc.
CPACS mission is to create and deliver
culturally and linguistically competent
and comprehensive health & social
services.
•Population
•2010, Gwinnett County had a total population of 805,321
persons
•2010, 10.7% were A&PI
•Age
•Median age of Gwinnett residents is 34
29.1% of population under 18
6.8% over 65
•Language
•High rates of LEP Limited English Proficiency
•29% speaks a language other than English
•A& PI Sub-populations
•Asian Indian, Vietnamese, Korean, & Chinese
Source: http://quickfacts.census.gov/qfd/states/13/13135.html
Gwinnett County
Prevent and reduce rate of alcohol-related
crashes and fatalities with in the Asian &
Pacific Islander community in Gwinnett
County.
PRIORITY AREA
Number of Alcohol Related Crashes
and Fatalities in Gwinnett County
Year Crashes Fatalities
2010 391 16
2009 416 5
2008 551 24
2007 653 17
Source: Georgia Department of Transportation, Office of Traffic Safety and
Design
Alcohol-Related Crashes and
Fatalities in Gwinnett County
How to select strategies
• Needs Assessment Process
• Evidence-Based Strategies
• Best Fit
• Community Coalition Input
Intervening Variables
• Social & Community Norms
– Refer to the acceptability or unacceptability of
certain behaviors in a community
– Target Populations: 16-20 year olds and 21-34 year olds
• Enforcement & Adjudication
– Refers to the rules and regulations surrounding
alcohol, including those in our community who are
responsible for enforcing the rules
– Target Populations: 21-34 year olds
PRIME For Life Curriculum
PRIME For Life is an alcohol and drug program
for people of all ages. It is designed to gently but
powerfully challenge common beliefs and attitudes
that directly contribute to high-risk alcohol and
drug use.
Law Enforcement
The enforcement of impaired driving laws, paired
with increased attention to the enforcement,
serves as an effective strategy for calling
attention to drinking and driving issues
Source: Voas, R.B. (1997): Drinking and driving prevention in the community: program planning and
implementation.
Media Coverage
Chinese- Atlanta Chinese News
http://www.atlantachinesenews.com/News/2011/07/07-15/B_ATL_P02.pdf
 
Korean:Atlanta Cho Sun
http://www.atlantachosun.com/data/read.php?id=news_online&no=20139
 
Korean: Korean Daily
http://search.koreadaily.com/search_result.asp?query=GATE
 
Chinese:World Journal
http://www.worldjournal.com/view/wjgaflnews/14717150/article%E9%98%B2%E6%AD%A2%E9%85%92%E5%BE%8C%E9%
 
Chinese: Epoch Times
http://www.epochtimes.com/gb/11/7/15/n3315846p.htm
http://www.epochtimes.com/b5/11/7/15/n3315846.htm%E4%BA%9E%E8%A3%94%E5%AA%92%E9%AB%94%E8%88%87%
-
 
Korean American Association of Greater Atlanta
http://www.atlantaka.com/new/dataset/view.php?id=whatsup&no=360
 
Social Marketing Campaign
Modeled after Montana’s Most of Us Campaign
Social NormsTheory: maintains that our
individual behavior is strongly influenced by
our perceptions of the attitudes and
behaviors of our peers
Challenges
• Law Enforcement: limitation of support
• Finding data on API community specifically
alcohol-related
• Diversities within API Communities
• Involvement from local businesses
• Support from parents and young adults
Partners/Collaborations
• Media
• Law Enforcement
• Government
• Community Leaders/Partners
• Leveraging fiscal agent’s contacts
Contact Information
Victoria Huynh
GATE Program Coordinator
Victoria.Huynh@cpacs.org
770-936-0969 Ext 137
Amanda Luong
GATE Program Administrative
Assistant
Amanda.Luong@cpacs.org
770-936-0969 Ext 188
Center for Pan Asian Community
Services, Inc. (CPACS)
3510 Shallowford Road NE
Atlanta, GA 30341
Office: 770-936-0969
Fax: 770-458-9377
www.cpacs.org
Questions?
Contractual Obligations
and
Expectations
Contractual Obligations &
Expectations
READ and Become Familiar With Your
Contract!
Contract Provisions,
Obligations, Expectations
 Audits & Financial
Reporting
 Nondiscrimination
 Confidentiality
 Inspection of Work
Performed
 Contract Modification/
Alteration
 Right to Suspend Contract
 Approval of
Subcontractors
 Publicity
 Insurance
 Drug-Free Workplace
 Cooperation With Other
Contractors
 Criminal History
Investigations
Contract Overview:
Highlighting Key Points
SUBCONTRACTORS
Any agent (e.g. Organization, Business, Agency, Individual, Etc.) that
the contractor uses to fulfill the requirements of this contract.
◊ A list and a copy of any subcontracts developed and/or
subcontractors identified must be submitted to your Regional
Prevention Specialist for approval prior to execution of the
subcontract.
◊ Note: Please pay attention to Para #121 Subcontractor Payment
Quarterly Report for the Department of Administrative Services.
Contract Overview:
Highlighting Key Points
Prior Approval Must Be Received
Before Use!
Publicity Materials
 Signs
 Notices
 Information Pamphlets
 Press Releases
 Brochures
 Radio Television Announcements
DBHDD Logo Use
Georgia Department of Behavioral Health and Developmental Disabilities
Office of Prevention Services and Programs
FONT: Georgia
Georgia Department of Behavioral Health and
Developmental Disabilities
Office of Prevention Services and Programs
Contract Overview:
Highlighting Key Points
Drug-Free Workplace (Para #127)
GEORGIA STATE AND FEDERAL CONTRACT & GRANT
RECIPIENTS MUST MAINTAIN A DRUG FREE
WORKPLACE
Individual: He/she certifies that he/she will not engage in the
unlawful manufacture, sale, distribution, dispensation, possession, or
use of a controlled substance or marijuana during the performance
of this contract.
Drug-Free Workplace
Entity: It hereby certifies that it will comply with the Drug-
Free Workplace Act of 1988 (Public Law 100-690,
Title V, Subtitle D; 41 U.S.C 701 et seq.) and that:
1. A drug-free workplace will be provided for the Contractor’s
employees during the performance of this contract; and
2. It will secure from any subcontractor hired to work in a drug-free
workplace the following written certification:
Written Certification
Re: Drug Free Workplace
“As part of the subcontracting agreement with (Contractor’s Name), (Subcontractor’s
Name), certifies to the Contractor that a drug-free workplace will be provided for the
subcontractor’s employees during the performance of this contract pursuant to
paragraph 7 of subsection B of Code Section 50-24-3.”
___________________ ___________________
Signature Date
______________________
Printed Name and Title
Drug-Free Workplace
For More Information:
http://www.livedrugfree.org/Georgia-Drug-Free-
Workplace.drugfree10.0.html
Criminal History Investigations (Para #137)
 Contractor agrees that for the filling of positions, classes of positions,
volunteers, agency staff , and/or other indentified individuals that have direct
interaction/direct care/treatment/custodial responsibilities for services rendered
under this contract, will undergo a criminal history investigation which shall
include a fingerprint check record check.
 Fingerprint record checks shall be submitted via Live Scan electronic
fingerprint technology and the Contractor must utilize the following method to
comply with this requirement:
Contractor will register with the Georgia Applicant Processing
Services (GAPS)
at www.ga.cogentid.com and follow the instructions provided at that
website.
Contract Overview:
Highlighting Key Points
Criminal History Records Checks
for Contractors
For information on DBHDD’s Criminal Records
process, please click on the DBHDD website and
under the Tab “Provider Information” there will be
another link marked “Background Policy and
Cogent Information”.
DBHDD Website:
http://dbhdd.georgia.gov
 Mandatory Conference Attendance:
 7th Annual Summit on Substance Abuse, Mental Health, and
School Safety/Discipline: (Callaway Gardens/March 5 – 7, 2012)
 Georgia School of Addiction Studies: (Savannah/August 27 – 31, 2012).
 Prevention Credentialing:
 Prevention Credentialing Consortium of Georgia:
Please see www.pcc-ga.org for more information regarding
Prevention Certification.
Contract Overview:
Workforce Development
Deliverables/Timeline
Where to Begin……
PRE-ASSESSMENT
 Hire/Identify a Program Coordinator
 Attend Georgia Strategic Prevention System (GASPS)
orientation
 Attend required initial training (SPF Overview)
 Submit an organizational chart
 Submit an Alcohol Prevention Initiative staffing chart
Deliverables/Timeline
 Join, establish and/or convene a Substance Abuse Prevention
Coalition or a Drug-free Community Coalition (aside from a
Family Connection Collaborative)
 Convene the Community Prevention Alliance Workgroup
(CPAW) consisting of 3 sub-workgroups:
1) Epidemiology (Epi) Workgroup
2) Planning & Operational Workgroup
3) Evaluation & Sustainability Workgroup
 Submit Partnership Agreements for the Community
Prevention Alliance (MOUs, MOAs)
Timeline Overview of GASPS Statewide
Alcohol Initiative
GASPS FY2011-2012 Requirements
DUE DATE
  OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP
PRE-ASSESSMENT
Hire/Identify a Program Coordinator (FTE) with benefits
Attend Georgia Strategic Prevention System (GASPS)
orientation
Attend required initial training (SPF Overview)
Submit an organizational chart
Submit an alcohol prevention Initiative staffing chart
Join, establish and/or convene a Substance Abuse
Prevention /Drug-free Community Coalition (aside from a
Family Connection Collaborative)
Convene the Community Prevention Alliance Workgroup
(CPAW) consisting of 3 sub-workgroups:
1) Epi workgroup
2) Planning & Operational Workgroup
3) Evaluation & Sustainability Workgroup
                     
Submit Partnership Agreements for the Community
Prevention Alliance (MOUs, MOAs)
                     
Participate in the statewide Social Media Campaign
Deliverables/Timeline
 Participate in the statewide Social Media/Marketing Campaign
Do You Know….
 Monthly Progress Report (MPR): Due on the 5th
Working Day Following the End of the Previous
Month.
 Monthly Invoice Submission: Due on the 5th
Working Day Following the End of the Previous Month
Along With the MPR.
Contract Overview:
Reporting Requirements
Monthly Progress Report
APPENDIX F FY12 ANNEX D
CONTRACT BUDGET AND MONTHLY CUMULATIVE CONTRACT EXPENDITURE REPORT
Contractor:  
Contract Number: 441-93- 
_____________________________________
__  
Contractor's Expenditure/Account #:  
Electronic Funds Transfer? Yes ______ (Must have completed authorization for EFT on file.) No ________
 
Remit Checks or Remittance Advice to:  
 
Name: Address: 
 
Attn:    City/State/Zip:  
                 
Prior Cumulative Month of ___________
Type Expense Approved Budget Contract Expenditure Expenditures for Reimb Balance of Funds
A. Personal Services       $0.00
B. Regular Operating       $0.00
C. Travel       $0.00
D. Equipment               $0.00
E. Facility Costs               $0.00
F. Per Diem/Fees/Contract       $0.00
G. Telecommunications       $0.00
H. Other (Specify)       $0.00
        $0.00
        $0.00
TOTAL $0.00                                   -                                           -    $0.00
Approval for Payment
I, the undersigned, certify that the expenditures reported have This expenditure report is within limits of 
been made for program accomplishments within the approved approved budget.  Programmatic deliverables
budgeted items: are being fulfilled.
Prepared by:
   
Contractor Signature Signature of DHR Approving Authority
   
Typed Name and Title Typed Name and Title
     
Date Phone Date Approved
Expenditure Report
Contract Overview:
Other Reporting Requirements
MDS
DbB
Contract Overview:
Regional Prevention Specialist Staff
1
2
6
3
4
5
VACANT
DEANNE BERGEN
912- 303-1868
dsbergen@dbhdd.ga.gov
TAMIKA JONAS
706-575-0364
tsjonas@dbhdd.ga.gov
Region4prevention@yahoo.com
BECKY CROFT
706-295-6290
bjcroft@dbhdd.ga.gov
KIMBERLY FLUELLEN
404-463-6441
krfluellen@dbhdd.ga.gov
VACANT
Questions?
Kevin Barrere - Program DirectorKevin Barrere - Program Director
Chris McDonald – Asst. CoordinatorChris McDonald – Asst. Coordinator
Bibb County, GA SPF-SIGBibb County, GA SPF-SIG
Bibb County, GABibb County, GA
SPF SIGSPF SIG
Macon GA metropolitanMacon GA metropolitan
area Populationarea Population 230,000230,000
PopulationPopulation isis equallyequally
divideddivided
Caucasian and African-Caucasian and African-
AmericanAmerican
Male sub-group 25-34Male sub-group 25-34
Female sub-group 35-44Female sub-group 35-44
Priority 1: Reducing alcohol related
crashes & fatalities
InterveningVariables /Contributing FactorsInterveningVariables /Contributing Factors
Perception that alcohol isPerception that alcohol is
not as dangerous as othernot as dangerous as other
drugsdrugs
Perception that there is aPerception that there is a
low risk of penalties.low risk of penalties.
Retail AvailabilityRetail AvailabilitySocialSocial NormsNormsLow Perceived RiskLow Perceived Risk
Low adultLow adult
communitycommunity
involvement /involvement /
awarenessawareness
Low support forLow support for
Compliance withCompliance with
the laws / sales tothe laws / sales to
intoxicatedintoxicated
patronspatrons
ProductProduct
Environmental Strategies
along with
Community Based
Processes
Community Assessment Ranking 4Community Assessment Ranking 4
Pre-Planning phase…Pre-Planning phase…
Strategies link toStrategies link to
Intervening VariablesIntervening Variables
and Contributing Factorsand Contributing Factors
Lucas Hopkins, Macon State College
School of Business, Marketing Department
Focus GroupsFocus Groups
Creating MessagingCreating Messaging
Pre-TestingPre-Testing
Community / Merchant OutreachCommunity / Merchant Outreach
Craig
Hamilton
Comic Artist
Highly VisibleHighly Visible
Sobriety Check PointsSobriety Check Points
DesignatedDesignated Drivers
Defining DrinksDefining Drinks
BreathalyzersBreathalyzers in Barsin Bars Counting Your DrinksCounting Your Drinks
Responsible Beverage Service Training
R.A.S.S. Training
R.A.S.S.
Training
(Responsible
Alcohol Sales
and Service
Training)
given by
Stephanie
Kootsikas of
MADD.
R.A.S.S. Training helps servers
and employers have a better
understanding of how to safely
and legally provide alcoholic
beverages to their customers.
Media Advocacy
Sustainability and Moving Forward!Sustainability and Moving Forward!
Drug Free CoalitionDrug Free Coalition
Creating PreventionCreating Prevention
NetworksNetworks
Integrating ServicesIntegrating Services
Researching & applying forResearching & applying for
grantsgrants
Thank You!Thank You!
Questions?
Community initiative
Task force
Training and Technical Assistance – Coaching Team
Roles & Responsibilities
The primary role of the CITF Coach is to:
Partner with the RPS team to move the GASPS providers
through the SPF process;
Assist the RPS team in gaining a better understanding of the
specific needs of GASPS providers;
Ensure timely and appropriate guidance throughout the SPF
process.
Training and
Technical Assistance
Training: To increase knowledge and skills of SPF
using various state approved tools
Technical Assistance: Coach GASPS providers
to understand and adopt the principles of SPF
Getting Help Has Never Been Easier
Support Elements
RPS: Regional Prevention
Specialist
GSU Coaches: Georgia State
University Prevention Coaches
Electronic Control Coordination
Operations (ECCO): T/TA
tracking system
Your First Stop
www.ga-sps.orgVisit the GASPS Portal:
•To submit questions or
request support via
ECCO
•Access documents
•Learn about upcoming
events
Electronic Control Coordination
Operations (ECCO):
 ECCO allows you to
submit questions and
request Training and
TA support at any time
 Web-based and
accessible from any
browser
Using ECCO
 To enter ALL contract
related inquiries
 To enter ALL
requests for technical
support or training
regarding any aspect
of GASPS
Steps for Entering an ECCO
Request
 Go the GASPS Portal at
www.ga-sps.org
 Click on the ECCO link
 Enter all of the requested
information to the best of
your knowledge
 Enter the nature of your
concern/request
 Click Submit
There will be a
screen shot placed
here
ECCO Helps Share Provider
Needs
Provider RPS/GSU
Expect to receive a follow-up call with a response or requesting
additional information to address the matter within 1-2 business
days.
What Never Gets Entered
Into ECCO
 Personal information (i.e.
SSN, personal addresses)
 Gossip
 Non-factual information
Your RPS Team
 Review your progress
reports
 Address ECCO requests
 Visit your operations
 Provide training,
technical assistance, and
guidance on contractual
and GASPS related
issues
Your GSU Support
 Provide the research for
SPF application
 Collaborate with RPS to
provide training on SPF
related issues
 Administer technical
assistance on SPF related
issues
Training & Technical Assistance
Modalities
In an effort to maximize TTA resources and
create minimum staff burden for GASPS
providers, RPS/GSU will employ the following
modalities to deliver TTA services:
Face to face training/TA sessions (F2F)
Conference Call TA sessions (CC)
Conference Call/Screen Share TA sessions
(CSS)
Webinar trainings (WT)
 F2F sessions can be
scheduled for training or
technical assistance
 Typically focused around
the current SPF step or
transition
 Product/deliverable
centered
Face-to-Face (F2F)
 C sessions are generally used to
handle very specific issues or
general care and share.
 Conference call-in instructions
will be sent out via email prior to
the call with an agenda and
additional details to prepare for
the call.
Conference Call (C)
 CSS calls can be used for TA with one
or multiple providers.
 Call in/log in instructions will be sent
out via email prior to the call with an
agenda and additional details to
prepare for the call.
 Gotomeeting.com is the system used
by CITF for distance-based training
and TA.
Conference Call/Screen Share
(CSS)
 WT can be used for training with
multiple providers.
 Instructions will be sent out via
email prior to the webinar to register
and provide additional details to
prepare you for the webinar.
Webinar Training (WT)
Support Team by Region
Regio
n
RPS Team GSU CITF Team
1 Becky Croft Marcus Bouligny - Coach
2 Kristie Burchett*
3 Kimberly Fluellen Tiffiany Aholou - Coach
4 Tamika Jonas*
5 Tamika Jonas Shayla Bennett - Coach
6 Deanne Bergen
* Interim
Dr. Jim Wolk, PI
Adriel Jones – Logistics
Dr. Amy Glass – Research
Questions?
Evaluation
It’s a Bird! It’s a Plane! It’s
Questions?
Blakely, GA
Early County
 Small, rural community
 Total population: 12,000
 County Seat: Blakely
Population 5,000
 Very strong sense of community
Priority 2
Reduce the number of youth arrests due
to possession of alcohol products.
Top 3 Intervening Variables
Social Availability
Social and Community Norms
Low Perceived Risk
Target Population
All youth ages 11-20
Evidence based, online prevention curriculum
Listed on NREPP
 Has been shown to decrease
the acceptance of underage
drinking
 Has been shown to increase
knowledge of alcohol’s effect on
the mind and body
 Targets 9th
grade, though
appropriate for all high school
grades.
 Social and Community Norms:
Rite of passage
 Low Perceived Risk: Lack of
concern for health-related
issues
 Highest past 30 day use was
10th
grade and 8th
grade
respectively
Social marketing campaign developed through SPF-SIG in Florida
 Asks parents to “Be Clear. Be
Firm. Be Consistent. Be the
Wall between your teen and
alcohol.”
 Social and Community Norms:
◦ Rite of passage
◦ Adults consider it acceptable to
provide alcohol to minors
 Social availability:
◦ Provision of alcohol to minors
(outside of home)
◦ Availability at home from parents
◦ Parties where youth can serve
themselves
Under police supervision an underage “decoy” approaches adults outside of a store
and asks them to purchase alcohol for him/her.
 Targets adults who are
purchasing alcohol for youth
 A warning will be issued by law
enforcement to individuals who
make the purchase
• Low perceived risk: Lack of
concern for getting caught
supplying alcohol to youth
 Active participation from the CAC.
◦ Representative of the community
◦ Significant buy-in for Be The Wall
 Access into the schools and support from administrators
 Partnership with law enforcement
 Significant community support
Questions?
Next Steps
Closing Remarks

Gasps orientation master ppt final-revised 12-7-11(1)

  • 1.
    Georgia Strategic PreventionSystem (GASPS) Office of Prevention Services and Programs (OPSP) Division of Addictive Diseases Department of Behavioral Health and Development Disabilities Statewide Alcohol Initiative Orientation December 2, 2011
  • 2.
    Travis Fretwell Division ofAddictive Diseases, Office of Prevention Services & Programs Assistant Executive Director, Division of Addictive Diseases, Director, Office of Prevention Services and Programs Welcome!
  • 3.
  • 4.
    Introduction of StateStaff Christopher Wood Prevention Team Lead Margie Irizarry Epidemiologist Tanisha Grimes State Evaluator Barbara Dorman Executive Secretary Kristie Burchett, State Prevention Specialist Supervisor Tamika Jonas, Regional Specialist (Region 6) Deanne Bergen, Regional Specialist (Region 5) Kim Fluellen, Regional Specialist (Region 3) Becky Croft, Regional Specialist (Region 1) Vacant (Region 2 & 6)
  • 5.
    Statewide Contractors  GeorgiaState University  University of Georgia, Carl Vinson Institute of Government
  • 6.
    Vision & MissionStatement Vision Healthy fully realized Georgians living in communities free of the debilitating effects of substance use & abuse Mission To systematically implement a statewide multi-level strategy that assists communities in developing and implementing prevention programs and policies in anticipation of and in response to its citizens
  • 7.
    GA Prevention System Background  New Direction  Funded by the Office of Prevention Services and Programs (OPSP), DAD, DBHDD  Umbrella that provides centralized organization to OPSP projects & initiatives GASPS / Alcohol Initiative Other Substances SPF SIG Prescription Drugs SPF SPE
  • 8.
    What is GAStrategic Prevention System (GASPS)?  A multilevel network-based system aimed to prevent substance use and abuse and promote healthy choices and lifestyle among Georgians by implementing sustainable evidence-based strategies (programs, policies, and practices or EBPPP)
  • 9.
    OVERVIEW  Objectives ofSAPTBG FY2011-12  State selected goals  Why focus solely on Alcohol  GASPS initiative  Strategic Prevention Framework (SPF) Model  Public Health Model  GASPS Design  SPF SIG community (CPACS)
  • 10.
    OVERVIEW  Contract Overview SPF SIG community (Macon Safe Decisions)  Georgia State University (GSU)  TA & Support Services  Evaluation  SPF SIG community (Early Choices)  Next Steps  Closing Remarks
  • 11.
    Objectives of SAPTBG FY2011-12 Objectives  Statewide Alcohol Initiative  Implement sustainable Evidence-based prevention strategies (programs/practices/policies)  Findings epidemiological/needs assessment data  Research-based  Align with state selected goals  Target high need communities / high risk population  Utilize SPF & Public Health Model  Foster collaboration / build capacity & infrastructure  Cultivate cultural competency
  • 12.
    State Selected Goals Reduce the early onset of alcohol use among 9-20 year olds  Reduce access to alcohol and binge drinking among 9-20 year olds  Reduce binge & heavy drinking among 18-25 year olds.
  • 13.
    Why Focus Solelyon Alcohol?  Most widely substance use among youth1  Health Consequences (2001-2005)  157 youth <21 died each year from alcohol- related illness/injury  46% of youth alcohol-attributable deaths were due to motor-vehicle crashes  34% of youth alcohol-attributable deaths were due to homicide or suicide2 Sources: 1.U.S. Department of Health and Human Services. The Surgeon General's Call to Action to Prevent and Reduce Underage Drinking. Rockville, MD: U.S. Department of Health and Human Services; 2007. 2.2001-2005 Alcohol-Related Disease Impact (ARDI) Software, Centers for Disease Control and Prevention (http://www.cdc.gov/alcohol/ardi.htm).
  • 14.
     Youth ages9-20 use it more than any other substance  Average of 2,375 people in GA die from alcohol-related injuries or illness each year  3rd leading cause of death in GA Source: 1. Youth Alcohol Use 2009 Georgia Data Summary. http://health.state.ga.us/pdfs/epi/cdiee/CDIEE%20Data%20Summaries%202009 /2009%20Alcohol%20Data%20Summary.pdf Why Focus Solely on Alcohol?
  • 15.
    Why Focus Solelyon Alcohol?  Youth alcohol use is also associated with increased risk for:  Physical assault  Sexual assault  Academic problems  Tobacco use  Drug use  Unplanned and unprotected sexual activity Source: Youth Alcohol Use 2010 Georgia Data Summaryhttp://health.state.ga.us/pdfs/epi/cdiee/CDIEE%20Data%20Summaries %202010/YouthAlcoholUse2010.pdf
  • 16.
    Why Focus Solelyon Alcohol?  Youth who consume alcohol are 5 times more likely to become dependent on or abuse alcohol than those who wait until 211  Excessive alcohol use among youth is associated with brain damage, intellectual impairment, and memory problems2,3 Sources: 1. Hingson RW, Heeren T, Winter MR. Age at drinking onset and alcohol dependence: age at onset, duration, and severity. Pediatrics 2006;160:739–746 2. U.S. Department of Health and Human Services. The Surgeon General's Call to Action to Prevent and Reduce Underage Drinking. Rockville, MD: U.S. Department of Health and Human Services; 2007. 3. Zeigler DW, Wang CC, Yoast RA, Dickinson BD, McCaffree MA, Robinowitz CB, Sterling ML. The neurocognitive effects of alcohol on adolescents and college students. Preventive Medicine 2005 40: 23-32.
  • 17.
    Why Focus Solelyon Alcohol?  Drinking Behaviors  21% of GA HS students had first drink before age 13  32% of GA MS & 68% HS students had one or more alcoholic drinks at least once in their lifetime  Approx 331,386 (34%) HS students had at least one drink in the last 30 days  Approx 181,634 (19%) GA HS students binge drink (consuming five or more drinks at one time)  Among GA HS who consumed alcohol:  41% drank liquor rather than malt beverages  17% beer  14% other types of beverages (e.g. wine and wine coolers) Source: 2009 Georgia Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
  • 18.
    Binge drinking bygrade level/age, Georgia 2009 18 14 22 23 11 0 25 50 9th Grade 10th Grade 11th Grade 12th Grade Adults 18+* Percent Usual beverage type consumed by high school students, Georgia 2009 41 17 17 14 12 0 25 50 Liquor Beer Malt Beverages Other Beverages** No Usual Type Percent Why Focus Solely on Alcohol? *Binge drinking among adults is defined as five or more drinks per episode for men and four or more drinks per episode for women**Other beverages include wine, wine coolers, and other types of alcoholic beverages. Source: 2009 Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp). 2009 Georgia Behavioral Risk Factor Surveillance Survey (http://health.state.ga.us/epi/brfss/index.asp).
  • 19.
    Why Focus Solelyon Alcohol?  Drinking & Driving  ~ 66,953 (7%) HS reported driving & driving  Among 12th graders, 12% reported driving after consuming alcohol  Youth Access to Alcohol  36% of HS who reported alcohol use got it from someone else  Among HS who consumed alcohol, 82% did so at their home or someone else’s home Source: 2009 Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
  • 20.
    Alcohol source forhigh school students, Georgia 2009 36 24 9 9 22 0 25 50 Given to Them Gave Someone Money to Buy Took from Store or Family Bought from Store, Restaurant, or at Public Event Got Some Other Way Percent *Other locations include public places, public events, in vehicles, and on school property. Why Focus Solely on Alcohol? Source: 2009 Youth Risk Behavioral Surveillance Survey (http://health.state.ga.us/epi/cdiee/studenthealth.asp).
  • 21.
    Lifetime Prevalence ofSubstance Use, GA High School Students (YRBS 2005-2009) 73.2 73.6 67.9 56.1 56.9 49.2 38.7 38.1 36.6 14.9 11.4 11.6 8.3 6 5.96.4 4.9 4.65.3 7.7 6.5 4.3 2.4 3.84 3.9 4.5 0 10 20 30 40 50 60 70 80 90 100 2005 2007 2009 Ever drank alcohol Ever smoked cigarette Ever smoked marijuana Ever used glue, aerosol spray cans, paints, or sprays to get high Ever used cocaine Ever used methamphetamine Ever used ectasy Ever used heroin Why Focus Solely on Alcohol?
  • 22.
    Current Use ofSubstance Use, GA High School Students (YRBS 2005-2009) 39.9 37.7 34.3 20.8 19 18.818.9 19.6 18.317.2 18.6 16.9 3 2.6 2.5 0 10 20 30 40 50 2005 2007 2009 Drank alcohol during the past 30 days Binge alcohol use (5 or more drinks) in the last 30 days Used marijuana during the past 30 days Smoked cigarettes during the past 30 days Used cocaine during the past 30 days Why Focus Solely on Alcohol?
  • 23.
    Why Focus Solelyon Alcohol? First Time Substance Use, GA High School Students (YRBS 2005-2009) 26.8 23.9 20.7 14.9 14.5 11.9 8.2 8.1 8 0 10 20 30 40 50 2005 2007 2009 Drank alcohol before age 13 Smoked before age 13 Tried Marijuana before age 13
  • 24.
  • 25.
    What is GAStrategic Prevention System (GASPS)?  Purpose  Build capacity and infrastructure within:  State  Regions  sub regions / communities  By means of:  key policy stakeholders and resources mobilization  coalition and workforce development  research infrastructure enhancement
  • 26.
     Purpose  Systematicallyimplement SPF model across the state  Implement strategies aimed at population level change  Comprehensive approach  Inform policy development  Increase funding opportunities What is GA Strategic Prevention System (GASPS)?
  • 27.
  • 28.
    Profile population needs, resources, andreadiness to address needs and gaps Monitor, evaluate, sustain, and improve or replace those that fail Implement evidence- based prevention programs and activities Develop a Comprehensive Strategic Plan Mobilize and/or build capacity to address needs 1.Assess 2.Build Capacity 3.Plan4.Implement 5.Monitor, Evaluate SAMHSA's Strategic Prevention Framework (SPF)
  • 29.
    Public Health Model Population-based  Focuses on preventing health problems and promoting healthy living for whole groups of people (e.g. age groups, communities)  Multiple causal factors or determinants that influence problems  Comprehensive Action Plan People (Host) Physical and Social Contexts (Environment) ATOD and Related Products (Agent)
  • 31.
    GASPS Design  State Advisory Steering Committee (ASC)  State Prevention Alliance Workgroup (SPAW)  TA & Support Services  Data Structure  |  Region*  Regional Prevention Alliance Workgroup (RPAW)  TA & Support Services  Data Structure  |  Sub Region  Community Prevention Alliance Workgroup (CPAW)  TA & Support Services  Data Structure
  • 32.
    Purpose of CPAW The purpose of a local CPAW is to build capacity and infrastructure within an organization in a defined community as well as work in partnership with other community stakeholders to execute strategies to achieve successful results through this grant program.
  • 33.
    Establish Multidiscipline Workgroup Assemble Workgroup Epi Planning & Operation Evaluation & Sustainability Establish workgroup procedures and operating structure Foster collaboration & active communication to meet selected goals & objectives
  • 34.
    Epi Representative /Workgroup Purpose  Participates in data collection, review, and analysis  Assists with the development of a needs assessment report  Gathers & analyzes data for decision making during the implementation of the SPF model  Reviews existing secondary or archival data sources  Identifies gaps in existing data  Membership  Data-source representatives (e.g. university faculty) who are knowledgeable in data collection, manipulation, and analysis. 34
  • 35.
    Planning & Operation Representative/ Workgroup 35 Purpose Assists with developing the action plan & other required reports Helps to identify potential evidence-based strategies Drives effective and efficient use of prevention resources Develops and oversees operational procedures across system Assists with resource planning & technical assistance needs Look at community readiness Membership Programmatic staff, partners, other related field representatives
  • 36.
    Evaluation & Sustainability Representative/ Workgroup  Purpose  Assists with the collection and monitoring of evaluation data (Process & Outcomes)  Assists the State and external evaluation team with conducting and monitoring evaluation activities  Assist with the collection and monitoring of NOMs data utilizing two main database systems, the Database Builder (DbB) and MDS.  Membership  Staff/ Partners knowledgeable, training, experience in evaluation 36
  • 37.
    Mobilizing the CPAW Who in the community has training/experience in conducting needs assessments, data collection and analysis? (e.g. Surveys, town hall meetings)  Who has training/experience in strategic planning, mobilizing resources?  Who has training/experience in evaluation, evaluation activities?  Who has time and staff to complete these tasks within the next 10 months?  Who is knowledgeable about the community?  Who can help you to establish other valuable professional relationships? 37
  • 38.
    Sustaining the CPAW Continue developing effective professional relationships with your CPAW as they will:  Serve as lead team for coordinating SPF process  Provide guidance through the implementation of the SPF model  Build capacity & develop Action Plan  Assess community readiness  Implement effective strategies  evidence-based Programs, Policies, and Practices  Assist with preparing reports  Participate in program evaluation process  Hold Workgroups together  Internal linkages (membership agreements)  External linkages (MOU/MOA)  Active Participation 38
  • 39.
    CPAWs vs Coalition CPAW  Focus on specific issue (GASPS goals & objectives)  Working groups, doers  Provide technical assistance  Gathering data & information to support GASPS initiative  May serve as coalition sub-committee  The Coalition  Often serve as decision-making body  Focus on a variety of issues that impact local community  Social  Policy  Health  Comprise of representatives from different core sectors
  • 40.
    Establishing Coalition  Coalitionshould represent the demographics, cultural, ethnic, and linguistic make-up of the community served.  Youth (18 or younger)  Parent  Business  Media  School/ Universities  Youth Serving Organization  Law Enforcement  Religious/Fraternal Organization  Civic/Volunteer Groups  Healthcare Professional  State, local, or tribal governmental agency with expertise in the field of substance abuse  Other organization involved in reducing substance abuse
  • 41.
     Technical Assistance& Support Services  TA/training/coaching system is a collaborative effort between State Office, RPS & GSU  Regional sites and target communities  Technical assistance & support services modalities  Face-to-face training  Standing training sessions  Face-to-face TA sessions  Web-based or distance-based Training and TA sessions  Face-to-face or distance-based coaching  Online webpage www.ga-sps.org GASPS Design
  • 42.
     Data structure Data Warehouse / Repository Database  Provides a systemic mean to store, organize, manage, and analyze huge amounts of data from multiple data sources efficiently  Utilizes a unified technology platform across multiple agencies that enables effective management information reporting from various substance use prevention data systems across the state, regions, and sub-regions  Two main datasets would be used for this initiative:   Minimum Data Set (MDS)  Database Builder (DbB) GASPS Design
  • 43.
  • 44.
  • 45.
    Yotin Srivanjarean, MPA Directorof Programs Victoria Huynh Program Coordinator Amanda Luong Program Administrative Support GEORGIA STRATEGIC PREVENTION FRAMEWORK STATE INCENTIVE GRANT (GA SPF SIG) PRIORITY: REDUCE ALCOHOL-RELATED TRAFFIC CRASHES AND FATALITIES PREPARED BY CENTER FOR PAN ASIAN COMMUNITY SERVICES, INC. (CPACS)
  • 46.
    Center for PanAsian Community Services, Inc. CPACS mission is to create and deliver culturally and linguistically competent and comprehensive health & social services.
  • 50.
    •Population •2010, Gwinnett Countyhad a total population of 805,321 persons •2010, 10.7% were A&PI •Age •Median age of Gwinnett residents is 34 29.1% of population under 18 6.8% over 65 •Language •High rates of LEP Limited English Proficiency •29% speaks a language other than English •A& PI Sub-populations •Asian Indian, Vietnamese, Korean, & Chinese Source: http://quickfacts.census.gov/qfd/states/13/13135.html Gwinnett County
  • 52.
    Prevent and reducerate of alcohol-related crashes and fatalities with in the Asian & Pacific Islander community in Gwinnett County. PRIORITY AREA
  • 53.
    Number of AlcoholRelated Crashes and Fatalities in Gwinnett County Year Crashes Fatalities 2010 391 16 2009 416 5 2008 551 24 2007 653 17 Source: Georgia Department of Transportation, Office of Traffic Safety and Design
  • 54.
  • 55.
    How to selectstrategies • Needs Assessment Process • Evidence-Based Strategies • Best Fit • Community Coalition Input
  • 56.
    Intervening Variables • Social& Community Norms – Refer to the acceptability or unacceptability of certain behaviors in a community – Target Populations: 16-20 year olds and 21-34 year olds • Enforcement & Adjudication – Refers to the rules and regulations surrounding alcohol, including those in our community who are responsible for enforcing the rules – Target Populations: 21-34 year olds
  • 57.
    PRIME For LifeCurriculum PRIME For Life is an alcohol and drug program for people of all ages. It is designed to gently but powerfully challenge common beliefs and attitudes that directly contribute to high-risk alcohol and drug use.
  • 60.
    Law Enforcement The enforcementof impaired driving laws, paired with increased attention to the enforcement, serves as an effective strategy for calling attention to drinking and driving issues Source: Voas, R.B. (1997): Drinking and driving prevention in the community: program planning and implementation.
  • 62.
    Media Coverage Chinese- AtlantaChinese News http://www.atlantachinesenews.com/News/2011/07/07-15/B_ATL_P02.pdf   Korean:Atlanta Cho Sun http://www.atlantachosun.com/data/read.php?id=news_online&no=20139   Korean: Korean Daily http://search.koreadaily.com/search_result.asp?query=GATE   Chinese:World Journal http://www.worldjournal.com/view/wjgaflnews/14717150/article%E9%98%B2%E6%AD%A2%E9%85%92%E5%BE%8C%E9%   Chinese: Epoch Times http://www.epochtimes.com/gb/11/7/15/n3315846p.htm http://www.epochtimes.com/b5/11/7/15/n3315846.htm%E4%BA%9E%E8%A3%94%E5%AA%92%E9%AB%94%E8%88%87% -   Korean American Association of Greater Atlanta http://www.atlantaka.com/new/dataset/view.php?id=whatsup&no=360  
  • 63.
    Social Marketing Campaign Modeledafter Montana’s Most of Us Campaign Social NormsTheory: maintains that our individual behavior is strongly influenced by our perceptions of the attitudes and behaviors of our peers
  • 65.
    Challenges • Law Enforcement:limitation of support • Finding data on API community specifically alcohol-related • Diversities within API Communities • Involvement from local businesses • Support from parents and young adults
  • 66.
    Partners/Collaborations • Media • LawEnforcement • Government • Community Leaders/Partners • Leveraging fiscal agent’s contacts
  • 68.
    Contact Information Victoria Huynh GATEProgram Coordinator Victoria.Huynh@cpacs.org 770-936-0969 Ext 137 Amanda Luong GATE Program Administrative Assistant Amanda.Luong@cpacs.org 770-936-0969 Ext 188 Center for Pan Asian Community Services, Inc. (CPACS) 3510 Shallowford Road NE Atlanta, GA 30341 Office: 770-936-0969 Fax: 770-458-9377 www.cpacs.org
  • 69.
  • 70.
  • 71.
    Contractual Obligations & Expectations READand Become Familiar With Your Contract!
  • 72.
    Contract Provisions, Obligations, Expectations Audits & Financial Reporting  Nondiscrimination  Confidentiality  Inspection of Work Performed  Contract Modification/ Alteration  Right to Suspend Contract  Approval of Subcontractors  Publicity  Insurance  Drug-Free Workplace  Cooperation With Other Contractors  Criminal History Investigations
  • 73.
    Contract Overview: Highlighting KeyPoints SUBCONTRACTORS Any agent (e.g. Organization, Business, Agency, Individual, Etc.) that the contractor uses to fulfill the requirements of this contract. ◊ A list and a copy of any subcontracts developed and/or subcontractors identified must be submitted to your Regional Prevention Specialist for approval prior to execution of the subcontract. ◊ Note: Please pay attention to Para #121 Subcontractor Payment Quarterly Report for the Department of Administrative Services.
  • 74.
    Contract Overview: Highlighting KeyPoints Prior Approval Must Be Received Before Use! Publicity Materials  Signs  Notices  Information Pamphlets  Press Releases  Brochures  Radio Television Announcements
  • 75.
    DBHDD Logo Use GeorgiaDepartment of Behavioral Health and Developmental Disabilities Office of Prevention Services and Programs FONT: Georgia Georgia Department of Behavioral Health and Developmental Disabilities Office of Prevention Services and Programs
  • 76.
    Contract Overview: Highlighting KeyPoints Drug-Free Workplace (Para #127) GEORGIA STATE AND FEDERAL CONTRACT & GRANT RECIPIENTS MUST MAINTAIN A DRUG FREE WORKPLACE Individual: He/she certifies that he/she will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of this contract.
  • 77.
    Drug-Free Workplace Entity: Ithereby certifies that it will comply with the Drug- Free Workplace Act of 1988 (Public Law 100-690, Title V, Subtitle D; 41 U.S.C 701 et seq.) and that: 1. A drug-free workplace will be provided for the Contractor’s employees during the performance of this contract; and 2. It will secure from any subcontractor hired to work in a drug-free workplace the following written certification:
  • 78.
    Written Certification Re: DrugFree Workplace “As part of the subcontracting agreement with (Contractor’s Name), (Subcontractor’s Name), certifies to the Contractor that a drug-free workplace will be provided for the subcontractor’s employees during the performance of this contract pursuant to paragraph 7 of subsection B of Code Section 50-24-3.” ___________________ ___________________ Signature Date ______________________ Printed Name and Title
  • 79.
    Drug-Free Workplace For MoreInformation: http://www.livedrugfree.org/Georgia-Drug-Free- Workplace.drugfree10.0.html
  • 80.
    Criminal History Investigations(Para #137)  Contractor agrees that for the filling of positions, classes of positions, volunteers, agency staff , and/or other indentified individuals that have direct interaction/direct care/treatment/custodial responsibilities for services rendered under this contract, will undergo a criminal history investigation which shall include a fingerprint check record check.  Fingerprint record checks shall be submitted via Live Scan electronic fingerprint technology and the Contractor must utilize the following method to comply with this requirement: Contractor will register with the Georgia Applicant Processing Services (GAPS) at www.ga.cogentid.com and follow the instructions provided at that website. Contract Overview: Highlighting Key Points
  • 81.
    Criminal History RecordsChecks for Contractors For information on DBHDD’s Criminal Records process, please click on the DBHDD website and under the Tab “Provider Information” there will be another link marked “Background Policy and Cogent Information”. DBHDD Website: http://dbhdd.georgia.gov
  • 82.
     Mandatory ConferenceAttendance:  7th Annual Summit on Substance Abuse, Mental Health, and School Safety/Discipline: (Callaway Gardens/March 5 – 7, 2012)  Georgia School of Addiction Studies: (Savannah/August 27 – 31, 2012).  Prevention Credentialing:  Prevention Credentialing Consortium of Georgia: Please see www.pcc-ga.org for more information regarding Prevention Certification. Contract Overview: Workforce Development
  • 83.
    Deliverables/Timeline Where to Begin…… PRE-ASSESSMENT Hire/Identify a Program Coordinator  Attend Georgia Strategic Prevention System (GASPS) orientation  Attend required initial training (SPF Overview)  Submit an organizational chart  Submit an Alcohol Prevention Initiative staffing chart
  • 84.
    Deliverables/Timeline  Join, establishand/or convene a Substance Abuse Prevention Coalition or a Drug-free Community Coalition (aside from a Family Connection Collaborative)  Convene the Community Prevention Alliance Workgroup (CPAW) consisting of 3 sub-workgroups: 1) Epidemiology (Epi) Workgroup 2) Planning & Operational Workgroup 3) Evaluation & Sustainability Workgroup  Submit Partnership Agreements for the Community Prevention Alliance (MOUs, MOAs)
  • 85.
    Timeline Overview ofGASPS Statewide Alcohol Initiative GASPS FY2011-2012 Requirements DUE DATE   OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PRE-ASSESSMENT Hire/Identify a Program Coordinator (FTE) with benefits Attend Georgia Strategic Prevention System (GASPS) orientation Attend required initial training (SPF Overview) Submit an organizational chart Submit an alcohol prevention Initiative staffing chart Join, establish and/or convene a Substance Abuse Prevention /Drug-free Community Coalition (aside from a Family Connection Collaborative) Convene the Community Prevention Alliance Workgroup (CPAW) consisting of 3 sub-workgroups: 1) Epi workgroup 2) Planning & Operational Workgroup 3) Evaluation & Sustainability Workgroup                       Submit Partnership Agreements for the Community Prevention Alliance (MOUs, MOAs)                       Participate in the statewide Social Media Campaign
  • 86.
    Deliverables/Timeline  Participate inthe statewide Social Media/Marketing Campaign Do You Know….
  • 87.
     Monthly ProgressReport (MPR): Due on the 5th Working Day Following the End of the Previous Month.  Monthly Invoice Submission: Due on the 5th Working Day Following the End of the Previous Month Along With the MPR. Contract Overview: Reporting Requirements
  • 88.
  • 89.
    APPENDIX F FY12ANNEX D CONTRACT BUDGET AND MONTHLY CUMULATIVE CONTRACT EXPENDITURE REPORT Contractor:   Contract Number: 441-93-  _____________________________________ __   Contractor's Expenditure/Account #:   Electronic Funds Transfer? Yes ______ (Must have completed authorization for EFT on file.) No ________   Remit Checks or Remittance Advice to:     Name: Address:    Attn:    City/State/Zip:                     Prior Cumulative Month of ___________ Type Expense Approved Budget Contract Expenditure Expenditures for Reimb Balance of Funds A. Personal Services       $0.00 B. Regular Operating       $0.00 C. Travel       $0.00 D. Equipment               $0.00 E. Facility Costs               $0.00 F. Per Diem/Fees/Contract       $0.00 G. Telecommunications       $0.00 H. Other (Specify)       $0.00         $0.00         $0.00 TOTAL $0.00                                   -                                           -    $0.00 Approval for Payment I, the undersigned, certify that the expenditures reported have This expenditure report is within limits of  been made for program accomplishments within the approved approved budget.  Programmatic deliverables budgeted items: are being fulfilled. Prepared by:     Contractor Signature Signature of DHR Approving Authority     Typed Name and Title Typed Name and Title       Date Phone Date Approved Expenditure Report
  • 90.
    Contract Overview: Other ReportingRequirements MDS DbB
  • 91.
    Contract Overview: Regional PreventionSpecialist Staff 1 2 6 3 4 5 VACANT DEANNE BERGEN 912- 303-1868 dsbergen@dbhdd.ga.gov TAMIKA JONAS 706-575-0364 tsjonas@dbhdd.ga.gov Region4prevention@yahoo.com BECKY CROFT 706-295-6290 bjcroft@dbhdd.ga.gov KIMBERLY FLUELLEN 404-463-6441 krfluellen@dbhdd.ga.gov VACANT
  • 93.
  • 94.
    Kevin Barrere -Program DirectorKevin Barrere - Program Director Chris McDonald – Asst. CoordinatorChris McDonald – Asst. Coordinator Bibb County, GA SPF-SIGBibb County, GA SPF-SIG
  • 95.
    Bibb County, GABibbCounty, GA SPF SIGSPF SIG Macon GA metropolitanMacon GA metropolitan area Populationarea Population 230,000230,000 PopulationPopulation isis equallyequally divideddivided Caucasian and African-Caucasian and African- AmericanAmerican Male sub-group 25-34Male sub-group 25-34 Female sub-group 35-44Female sub-group 35-44
  • 96.
    Priority 1: Reducingalcohol related crashes & fatalities InterveningVariables /Contributing FactorsInterveningVariables /Contributing Factors Perception that alcohol isPerception that alcohol is not as dangerous as othernot as dangerous as other drugsdrugs Perception that there is aPerception that there is a low risk of penalties.low risk of penalties. Retail AvailabilityRetail AvailabilitySocialSocial NormsNormsLow Perceived RiskLow Perceived Risk Low adultLow adult communitycommunity involvement /involvement / awarenessawareness Low support forLow support for Compliance withCompliance with the laws / sales tothe laws / sales to intoxicatedintoxicated patronspatrons ProductProduct
  • 97.
    Environmental Strategies along with CommunityBased Processes Community Assessment Ranking 4Community Assessment Ranking 4 Pre-Planning phase…Pre-Planning phase…
  • 98.
    Strategies link toStrategieslink to Intervening VariablesIntervening Variables and Contributing Factorsand Contributing Factors
  • 99.
    Lucas Hopkins, MaconState College School of Business, Marketing Department Focus GroupsFocus Groups Creating MessagingCreating Messaging Pre-TestingPre-Testing Community / Merchant OutreachCommunity / Merchant Outreach
  • 100.
  • 101.
    Highly VisibleHighly Visible SobrietyCheck PointsSobriety Check Points DesignatedDesignated Drivers Defining DrinksDefining Drinks
  • 102.
    BreathalyzersBreathalyzers in BarsinBars Counting Your DrinksCounting Your Drinks Responsible Beverage Service Training
  • 103.
    R.A.S.S. Training R.A.S.S. Training (Responsible Alcohol Sales andService Training) given by Stephanie Kootsikas of MADD. R.A.S.S. Training helps servers and employers have a better understanding of how to safely and legally provide alcoholic beverages to their customers.
  • 104.
  • 105.
    Sustainability and MovingForward!Sustainability and Moving Forward! Drug Free CoalitionDrug Free Coalition Creating PreventionCreating Prevention NetworksNetworks Integrating ServicesIntegrating Services Researching & applying forResearching & applying for grantsgrants
  • 106.
  • 107.
  • 108.
    Community initiative Task force Trainingand Technical Assistance – Coaching Team
  • 109.
    Roles & Responsibilities Theprimary role of the CITF Coach is to: Partner with the RPS team to move the GASPS providers through the SPF process; Assist the RPS team in gaining a better understanding of the specific needs of GASPS providers; Ensure timely and appropriate guidance throughout the SPF process.
  • 110.
    Training and Technical Assistance Training:To increase knowledge and skills of SPF using various state approved tools Technical Assistance: Coach GASPS providers to understand and adopt the principles of SPF
  • 111.
    Getting Help HasNever Been Easier Support Elements RPS: Regional Prevention Specialist GSU Coaches: Georgia State University Prevention Coaches Electronic Control Coordination Operations (ECCO): T/TA tracking system
  • 112.
    Your First Stop www.ga-sps.orgVisitthe GASPS Portal: •To submit questions or request support via ECCO •Access documents •Learn about upcoming events
  • 113.
    Electronic Control Coordination Operations(ECCO):  ECCO allows you to submit questions and request Training and TA support at any time  Web-based and accessible from any browser
  • 114.
    Using ECCO  Toenter ALL contract related inquiries  To enter ALL requests for technical support or training regarding any aspect of GASPS
  • 115.
    Steps for Enteringan ECCO Request  Go the GASPS Portal at www.ga-sps.org  Click on the ECCO link  Enter all of the requested information to the best of your knowledge  Enter the nature of your concern/request  Click Submit There will be a screen shot placed here
  • 116.
    ECCO Helps ShareProvider Needs Provider RPS/GSU Expect to receive a follow-up call with a response or requesting additional information to address the matter within 1-2 business days.
  • 117.
    What Never GetsEntered Into ECCO  Personal information (i.e. SSN, personal addresses)  Gossip  Non-factual information
  • 118.
    Your RPS Team Review your progress reports  Address ECCO requests  Visit your operations  Provide training, technical assistance, and guidance on contractual and GASPS related issues
  • 119.
    Your GSU Support Provide the research for SPF application  Collaborate with RPS to provide training on SPF related issues  Administer technical assistance on SPF related issues
  • 120.
    Training & TechnicalAssistance Modalities In an effort to maximize TTA resources and create minimum staff burden for GASPS providers, RPS/GSU will employ the following modalities to deliver TTA services: Face to face training/TA sessions (F2F) Conference Call TA sessions (CC) Conference Call/Screen Share TA sessions (CSS) Webinar trainings (WT)
  • 121.
     F2F sessionscan be scheduled for training or technical assistance  Typically focused around the current SPF step or transition  Product/deliverable centered Face-to-Face (F2F)
  • 122.
     C sessionsare generally used to handle very specific issues or general care and share.  Conference call-in instructions will be sent out via email prior to the call with an agenda and additional details to prepare for the call. Conference Call (C)
  • 123.
     CSS callscan be used for TA with one or multiple providers.  Call in/log in instructions will be sent out via email prior to the call with an agenda and additional details to prepare for the call.  Gotomeeting.com is the system used by CITF for distance-based training and TA. Conference Call/Screen Share (CSS)
  • 124.
     WT canbe used for training with multiple providers.  Instructions will be sent out via email prior to the webinar to register and provide additional details to prepare you for the webinar. Webinar Training (WT)
  • 125.
    Support Team byRegion Regio n RPS Team GSU CITF Team 1 Becky Croft Marcus Bouligny - Coach 2 Kristie Burchett* 3 Kimberly Fluellen Tiffiany Aholou - Coach 4 Tamika Jonas* 5 Tamika Jonas Shayla Bennett - Coach 6 Deanne Bergen * Interim Dr. Jim Wolk, PI Adriel Jones – Logistics Dr. Amy Glass – Research
  • 126.
  • 127.
  • 129.
    It’s a Bird!It’s a Plane! It’s
  • 132.
  • 133.
  • 134.
     Small, ruralcommunity  Total population: 12,000  County Seat: Blakely Population 5,000  Very strong sense of community
  • 135.
    Priority 2 Reduce thenumber of youth arrests due to possession of alcohol products. Top 3 Intervening Variables Social Availability Social and Community Norms Low Perceived Risk Target Population All youth ages 11-20
  • 136.
    Evidence based, onlineprevention curriculum Listed on NREPP  Has been shown to decrease the acceptance of underage drinking  Has been shown to increase knowledge of alcohol’s effect on the mind and body  Targets 9th grade, though appropriate for all high school grades.  Social and Community Norms: Rite of passage  Low Perceived Risk: Lack of concern for health-related issues  Highest past 30 day use was 10th grade and 8th grade respectively
  • 137.
    Social marketing campaigndeveloped through SPF-SIG in Florida  Asks parents to “Be Clear. Be Firm. Be Consistent. Be the Wall between your teen and alcohol.”  Social and Community Norms: ◦ Rite of passage ◦ Adults consider it acceptable to provide alcohol to minors  Social availability: ◦ Provision of alcohol to minors (outside of home) ◦ Availability at home from parents ◦ Parties where youth can serve themselves
  • 138.
    Under police supervisionan underage “decoy” approaches adults outside of a store and asks them to purchase alcohol for him/her.  Targets adults who are purchasing alcohol for youth  A warning will be issued by law enforcement to individuals who make the purchase • Low perceived risk: Lack of concern for getting caught supplying alcohol to youth
  • 139.
     Active participationfrom the CAC. ◦ Representative of the community ◦ Significant buy-in for Be The Wall  Access into the schools and support from administrators  Partnership with law enforcement  Significant community support
  • 140.
  • 141.
  • 143.

Editor's Notes

  • #2 Today, we will talk to you about the Georgia Strategic Prevention system or GASPS for short and the framework embedded within. This initiative is funded by the OPSP, DAD, DBHDD.
  • #10 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #12 The objectives of this RFP are to: Conduct statewide initiative, and we’ll go into the details shortly; To implement sustainable evidence-based strategies including programs, policies, and practices. And when we say evidence-based strategies, we are referring to strategies that are based on studies, on current epidemiological data or assessment data your community have collected, that support and align the state selected goals and are aimed to impact communities in need and target population; The main objective of this initiative is to incorporate the SAMHSA/CSAP SPF model and use it as the underlying framework for GASPS; In addition to the SPF model, we want you to utilize the PH model comprehensive approach and we will discuss this one in more detail in a moment; This initiative also calls for collaboration, buld capacity and infrastructure, cultivate cultural competency and ultimately, impact your goals by attaining evidence-based outcomes. Program: individually focused strategies. Design to change individual attributes, behavior, knowledge Policies: Aimed to change conditions in a larger environment…rules, regulations, laws Practices: Standard activities that are based on policy or used to support the implementation of policy.
  • #13 The statewide goals are: To prevent and reduce early onset of alcohol use among youth; Reduce youth less than 21 access to alcohol And Reduce excessive alcohol use and related consequences among youth and adults ages 9-25. These goals have been revised based on existing data, measures and indicators. These goals are specific and measurable. Some or most of you may be familiar with the survey questions that can be used to measure these goals, including NOMS, the student health survey, and the YRBS and BRFSS. So, there are standard measures in place that will allow us to see if changes occurred in target community and/or population and if there was any impact in the outcomes of the overall goals across the state.
  • #14 So, why focus solely on alcohol? Alcohol is the most widely substance use among youth. When looking at consequences, based on the data from 2001-2005, 157 UA youth died each year from alcohol related illness or injury. 46% of youth alcohol attributable deaths were due to crashes
  • #15 Latest evidence also indicates that youth ages 9-20use alcohol more than any other drug. In fact, alcohol is the 3rd leading cause of death in GA.
  • #17 It has also been documented that youth who consume alcohol at an early age are 5 times more likely to become dependent on or abuse alcohol compare to those that start at a later age. In addition, excessive alcohol use such as binge drinking among youth has been associated with brain damage, intellectual impairment, and memory problems.
  • #18 Recent data on drinking behaviors show 21% of GA HS had their first drink before age 13, 32% of middle schoolers have drank alcohol at least once, approximately 19% of high schoolers reported binge drinking.
  • #19 The graph on the left show binge drinking by grade level. The graph on the right shows type of beverages consumed by HS students and as you can see, 41% reported haven drank liquor.
  • #22 When comparing cumulative data from three years, you can see lifetime prevalence of substance use for HS is over 70% and decreased a bit to 68% in 2009 compare with other substance use.
  • #23 For current substance use, we see prevalence of alcohol among HS to stay above 30% for the three years.
  • #24 When comparing first time substance use among HS, again, we see alcohol to be the substance of choice.
  • #25 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #30 This is the public health model I refer to earlier, which targets multiple causal factors or determinants that influence problems. The theory behind this model is that in order to make an impact on those risks or causal factors, you need to target the host, the environment, and the agent.
  • #35 Moving along to the CLEOW. The purpose of the CLEOW is to Bring systematic, analytical thinking to the problem or consequences of the use of sobstances, in order to effectively uralize prevention resources in your community Promote deta-driven decision through all stages of SPF SIG Provide core support to the SPF SIG CAC Promote cross systems planning, implementation, monitoring and evaluation efforts The CLEOW must comprise data-source representatives who are knowledgeable in data collection, data manipulation, and analysis.
  • #36 Your CLEOW must include a minimum of three representatives from the categories listed below. Individuals from behavioral health and/or public health professionals in the field of epidemiology and/or social science research Someone from acadimia and/or medical professionals And program evaluators
  • #37 Here is a list of potential resources where you can find your CLEOW members. These include Community coalitions University faculty/staff/researchers Prevention agencies/certified prevention specialists Health department/health care providers Private evaluation/consulting organizations Businesses Health care organizations Faith-baised organizations Although only three members are required to establish your CLEOW, we encourage you to have representation from as many disciplines as you can, in order to have a well rounded network of professional, who are knowledgeable and have the expertise in deta.
  • #38 Mobilizing the CAC and CLEOW. Here are some questions you may consider on how to mobilize your CAC and CLEOW. Fist, You want to ask yourself Who in the community has training/experience in condocting needs assessments and in data collection and analysis? You want to find people with the expertise in data. Another question you want to consider is who has the time and staff to complete these tasks within the next 12 months? Remember these are volunteers. They may have limited time to participate in meetings and any activities related to the project; therefore, you want to make sure you bring aboard not just key stakeholders, but also people who would be actively involve in the project. You also want to know Who is knowledgeable about the community? For instance, you want to identify who can help you to find sources of data, who knows existing organizations or coalitions that can help you to organize project-related activities such as tawn hall meetings, etc. In addtion, Who can help you to establish other valiuable professional relationships? For example, you want to establish relationships with those Who can introduce you to influential people or key stakeholders In your workbook, you can find additional resources and recommendations on how to mobilize your CAC and CLEOW. We also included in your packet, the CADCA Primers, which include a wealth of resources and links related to SPF SIG.
  • #39 In addition to mobilizing your CAC and CLEOW, you want to work on sustainability. You want to continue developing effective professional relationships with your CAC &amp; CLEOW as they will: Serve as lead organizations for coordinating SPF SIG process provide guidance through the needs assessment help you to build capacity &amp; develop the Strategic Plan Assess your community readiness for implementing SPF SIG Select &amp; implement effective strategies including evidence-based Programs, Policies, and Practices Participate in the program evaluation process
  • #44 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #64 Amanda : Will show images of messages (bring them too) Prevention effort specifically tailored and geared for API. Using partnerships to spread the word Show picture(vh): We developed these two campaign messages by utilizing primary data collected from the community. Ways we disseminate info: fb, newspaper, flyers, coaster, etc. 3. In language: focus group
  • #65 Picture from amanda
  • #70 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #72 One of the most important things to do is to become familiar with your contract. You should be familiar with all aspects of the contract. However due to time today I will only be highlighting a few obligations and expectations. I am taking a little bit of time to highlight these provisions because historically Prevention Contractors have had questions. After today, if you have specific questions regarding any of the contractual obligations please contact your Regional Prevention Specialist.
  • #73 These are just a few of the provisions, obligations, and expectations that you should be familiar with. The highlighted expectations/obligations are what we will be focusing on today. RPS and myself will be following up on all provisions, obligations, and/or requirements.
  • #74 A report of all payments that together total more than $2500 to any single subcontractor, supplier, business partner, etc. that the contractor uses to fulfill the requirements of this contract…..Due on a quarterly basis to DOAS, Office of Small and Minority Business.
  • #75 Or other similar information prepared by or for the Contractor. Prior approval for the materials must be received from the Programmatic Division (DBHDD/OPSP). All media and public information materials must also be approved by the Commissioner’s Office of Communications.
  • #76 As you develop publications and you have questions please contact your RPS. Don’t forget to highlight the various ways that this can be used.
  • #78 If a contractor is an Entity other than an individual….
  • #81 Fingerprint-based criminal hx record check.
  • #84 **Review Timeline Overview of GASPS Statewide Alcohol Initiative FY12 Understanding…..Some deliverables will be flexible and some deliverables will not…..Show examples….
  • #86 You will be able to access the orientation manual next week that will contain all the documents and information that is being covered today.
  • #87 This DBHDD Campaign is in the process of being developed and will encompass a variety of different issues and offices within the Division of Addictive Diseases. You should start seeing and hearing about the campaign in later December and/or right after the first of the year. The campaign will begin by targeting DUI prevention and will continue to be expanded to encompass the alcohol prevention initiative. More information to come……See on the Deliverable/Timeline adjustment to be flexible.
  • #88 MPR: Have a copy of the MPR for participants. Briefly cover (matches the deliverables listed in the annex and on the timeline we just reviewed. If you happen to forget when the MPR is due then please be sure to look back at the deliverable timeline. Monthly Invoice: Need to determine what to do. Be sure to let them know that the final invoice will need to be in prior to 9/15.
  • #92 GSU Coach as well…..
  • #94 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #108 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #127 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #128 Question to the group: When does evaluation usually happen? [Usually at the end---this presentation is a prime example---joke] -Evaluation usually happens at the end of a program, instead of the beginning as a program is being developed so you can build measures in the beginning to measure all of your progress and results. For GASPS we want to start at the beginning so we can measure our outcomes and process as we implement this new initiative. Although in the SPF framework its “step 5” it’s embedded in each of the steps as we plan, develop and implement strategies
  • #129 Often evaluators may not receive a warm welcome and some people are hesitant when we come into the building---and we’re used to it . Question to the group: What are some of the words you think about when you hear the word evaluation? I’ve heard “Fear, being judged, being shown what I’m doing wrong, anxiety about data.”
  • #130 However, a good evaluation gives you information to see the successes of your program, and some things you may need to improve on I order to better reach your target population. It also helps show the sustainability of your programs and helps when applying for funding
  • #131 For GASPS we want to evaluate and look at different things. Evaluation will be along every step of the way-- (1) Is the process that we are going through as we learn the SPF model and apply it to our programming, trainings, workforce development, challenges and triumphs and how we all work together at the different levels. (2) We also want to look at the different outcomes once we implement our strategies. Did we reduce underage drinking and heavy and binge drinking? Did we change behaviors? We will be working with everyone to have steps in place as we do our needs assessment, planning, capacity building and implementation. By the time we actually get to the “Evaluation phase it’ll be second nature and you will have doing it the entire time!
  • #132 So now we know you have something to look forward when it comes to and the Evaluation Team will be here to work with you. We can’t do it without you, whether its completing a survey, or feedback form or being asked questions what you think about something. It’s all to make our programs better and we look forward to working with you!
  • #133 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you
  • #136 The highest number of arrests was among white males. Other data indicates consumption among all ages and ethnicities. Ex: 6th grade focus group. The contributing factors listed on the strategy slides to show how the strategies are directly linked to the contributing factors/intervening variables
  • #137 ECHS - incorporated into the 9th grade health class (200 students) Alternative - principal is planning to make it a requirement for students to return to the high school(10) Private school – will be taught in Technology to all grades (106) All sections are narrated so there is not a literacy barrier for students who may not read on grade-level. One class to begin next week as a pilot
  • #138 Social marketing sells a behavior. In this case it’s that underage drinking is not acceptable. Most parents are not providing alcohol though they may not be clear about what their rules/expectations are regarding alcohol. They also may not be monitoring alcohol in the home. Talk about the image testing – how well parents related to the images Baseline intercept surveys conducted at middle school report card pick up
  • #141 We will provide you with an overview on: The objectives of the RFP you are applying to; the state selected goals to be addressed, then we are going to talk about why the focus of this RFP is solely on alcohol; we will provide you some data/scientific evidence that supports that decision; then we will give you a detailed overview on the GA SPS initiative, and will discuss the two models embedded in this initiative: the SAMHSA/CSAP SPF model and the PH model. Will discuss the overall framework or design of GASPS and what is expected you