Fugitive Emissions www.WIKA-FAST.com 1 
Fugitive Emissions 
WIKA - Part of your business
Fugitive Emissions www.WIKA-FAST.com 2 
Fugitive Emissions: 
 Fugitive emissions are often seen as an unavoidable byproduct of running a 
refinery or petrochemical plant 
 Leaks may be overlooked because they are considered insignificant and 
difficult to detect 
 Yet, the EPA doesn’t hesitate to levy fines 
Unavoidable Byproduct of Doing Business?
Fugitive Emissions www.WIKA-FAST.com 3 
Fugitive Emissions: 
 Fugitive emissions are even more dangerous 
than combustion leaks because you can’t see 
them without specialized detection equipment 
 Fugitive emissions are also: 
 A fire hazard 
 Dangerous to employee and community health 
 Lost product and profits 
• Refineries lose more than $3 million in fuel 
each year to fugitive emission leaks* 
• That’s fuel that is never used or sold 
The Dangers 
* Source: “Direct Measurement of Fugitive Emissions of Hydrocarbons from a Refinery,” 
J. Air & Waste Manage. Assoc. 58:1047–1056.
Fugitive Emissions www.WIKA-FAST.com 4 
The Problems You Face 
Fugitive emissions are hard to detect 
AND 
A typical plant has more than 300,000 connections (potential leak points)
Fugitive Emissions www.WIKA-FAST.com 5 
The Needle in the Haystack 
More than 83% of controllable fugitive emissions come 
from only 0.24% of the piping components*, such as: 
 Valves 
 Pumps 
 Compressors 
 Pressure relief valves 
 Connectors 
* Source: American Petroleum Institute
Fugitive Emissions www.WIKA-FAST.com 6 
Rethinking Instrumentation 
Tapping Potential Gauge Leaks
Fugitive Emissions www.WIKA-FAST.com 7 
Focus on Gauges 
One potential leak point that you may not have thought about is your 
gauges, which comprise a significant portion of your connections
Fugitive Emissions www.WIKA-FAST.com 8 
Potential Leak Point 
 WIKA welds its stainless steel case to its 
stainless steel socket 
 Other manufacturers screw the socket 
into the gauge with a rubber O-ring, 
which is prone to wear out and create a 
leak point 
 With hundreds of gauges in your 
plant, it’s impossible to monitor 
each one 
 That’s why WIKA has developed 
solutions to protect against leaks
Fugitive Emissions www.WIKA-FAST.com 9 
All-Welded System 
 Diaphragm seal and pressure gauge permanently welded 
together to create a sealed pressure measurement system 
 Removes all threaded connections to provide dual 
containment that helps eliminate potential leak paths 
 Helium leak tested; Helium is the smallest stable gas 
molecule, so if we can contain it, we can contain your 
gases 
 Removes the possibility of misapplication or tampering 
 Complies with the EPA’s 
“Dual Containment Requirements”
Fugitive Emissions www.WIKA-FAST.com 10 
Fugitive Emissions: A Costly Nightmare... A Simple Solution
Fugitive Emissions www.WIKA-FAST.com 11 
Internet connection required to play videos
Fugitive Emissions www.WIKA-FAST.com 12 
Let The Instrument Experts Help 
WIKA Services and Solutions
Best Practices www.WIKA-FAST.com 13 
Let us be your gauge experts 
Full Audit Service Team 
 Gauges, if used properly, can help you 
identify an issue before costly problems 
develop 
 Our Full Audit Service Team (FAST) will 
take care of your gauges to help 
o Lower inventory costs 
o Improve reliability 
o Reduce gauge maintenance costs 
 And best of all, FAST is the only solution 
you need—a total care services program 
at no additional cost to you 
WIKA’s FAST engineers helped a large chemical plant 
address 50 years of gauge proliferation. Read the case 
study to learn more.
Best Practices www.WIKA-FAST.com Full Audit Service Team (FAST) 
14 
FAST Expertise 
Expertise 
Over 
250 
Instrument 
Audits 
Over 
150K 
Instruments 
Reviewed
Best Practices www.WIKA-FAST.com A Full Suite of 
Services at Zero Cost 
15 
FAST Program 
Instrument 
Audit 
Turnaround 
Instrument 
Planning 
Instrument 
Failure Analysis 
Instrument Safety 
Training 
WIKA’s Instrument 
Audit provides expert 
analysis and solutions 
form our FAST 
engineers who help you 
put the right gauges in 
place for your 
applications to improve 
reliability and lower 
costs. 
Our team performs an 
Instrument Audit, 
standardizes the 
instruments you need 
and sends the products 
to you when you need 
them... before your 
turnaround begins so 
you can avoid delays. 
Send us your failed 
gauge, and our 
engineers will conduct 
a root cause analysis. 
By understanding the 
mode of failure, our 
FAST engineers can 
recommend a reliable 
solution. 
Our FAST engineers 
train your team to look 
for signs of instrument 
failure when completing 
a scheduled evaluation 
of your instrumentation.
Best Practices www.WIKA-FAST.com 16 
FAST Instrument Audit 
 Visual inspection of pressure, temperature gauges to build a 
comprehensive record of gauge installations and rate problematic 
conditions 
 Data analysis to provide engineering-based recommendations that 
improve, standardize and consolidate your population 
 Implementation support, including ERP imports, MOC 
documentation, and Easy Order Guides 
 Improves reliability, and decreases inventory and maintenance costs 
year after year 
Establishes a Sustainable Gauge Maintenance 
Program
25% 
20% 
30% 
Average FAST Audit Savings 
$51,171Ɨ in first year savings, Ongoing annual savings of $21,073ƗƗ 
Less gauge failures and less time to replace 
Correct gauges for processing conditions 
Standardize on full scale ranges, options for gauges 
Decrease 
Maintenance Costs* 
Reduction in Inventory* 
Increase in Reliability* 
First year savings only includes engineering resources for physical audit, storeroom review, data compilation, and implementation support. Based on average audit of 1,000 installations, requiring two instrumentation engineers for one week ƗƗ Ongoing annual savings. Inventory savings based on industry averages for overhead, inventory management, shrinkage, obsolescence, inventory tax, and cost of capital *Based on results from more than 250 WIKA instrument audits
Best Practices www.WIKA-FAST.com 18 
 Our team performs a full Instrumentation 
Audit and standardizes what 
instruments you need...before your 
turnaround actually begins 
 With this advanced preparation, we 
ensure that the right instruments are at 
your plant at the exact time you need 
them – eliminating the risk of delay 
 Action plan with part number, IOM and 
data sheet for each installation 
FAST Turnaround Instrument Planning 
Ensure the Right Instrumentation for 
Start-up
Best Practices www.WIKA-FAST.com 19 
FAST Instrument Failure Analysis 
Getting to the Root of the Problem 
 If you have gauges that are continually 
failing, then send them to us 
 Our FAST engineers will perform a root 
cause analysis 
 Can alert you to problems with more 
expensive equipment 
 Reduces likelihood of downtime and 
decreases maintenance costs 
WIKA’s FAST engineers accessed a recurring gauge 
failure and identified a larger issue before costly repairs 
were required. Learn how.
Best Practices www.WIKA-FAST.com 20 
FAST Instrument Safety Training 
 Education and training are best tools to 
maintain operational efficiency and 
employee safety in your plant 
 Our Instrument Safety Training will teach 
your team to look for warning signs 
 Held at your site or ours, the training helps 
reduce maintenance costs and wrench 
time 
20 
FAST FACT 
U.S. process plants lose more than $10 billion per year 
from abnormal situations caused by human error. 
Source: Abnormal Situation Management Consortium 
FAST Instrument Safety Training
Best Practices www.WIKA-FAST.com 21 
How much could you save with FAST 
Audit? 
Contact us for a Cost Savings Estimate or to 
Learn More about WIKA’s FAST Services. 
1-855-651-FAST 
info@wika-fast.com

More Related Content

What's hot

Konecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive MaintenanceKonecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive Maintenance
Konecranes
 
Are You Ready For Your Next Air Quality Facility Inspection?
Are You Ready For Your Next Air Quality Facility Inspection?Are You Ready For Your Next Air Quality Facility Inspection?
Are You Ready For Your Next Air Quality Facility Inspection?
All4 Inc.
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
Pritesh Gandhi
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
NSW Environment and Planning
 
SMART PUMPS NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)
SMART PUMPS  NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)SMART PUMPS  NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)
SMART PUMPS NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)
Ashish Saxena
 
Asset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines rAsset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines r
rmorgan1209
 
Geo Therm Ltd company main brochure 2020
Geo Therm Ltd company main brochure 2020Geo Therm Ltd company main brochure 2020
Geo Therm Ltd company main brochure 2020
Tony Dale
 
2018 senseye deck lars (small)
2018 senseye deck   lars (small)2018 senseye deck   lars (small)
2018 senseye deck lars (small)
Lars Tapani Ulph
 
Lifecycle Care in Real Time
Lifecycle Care in Real TimeLifecycle Care in Real Time
Lifecycle Care in Real Time
Konecranes
 
Asset health-odi-methodology
Asset health-odi-methodologyAsset health-odi-methodology
Asset health-odi-methodology
matsoh
 
UAV flyer
UAV flyerUAV flyer
UAV flyer
Stephen Brett
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On Augustus
Edwin A Merrick
 
ae_infographic_assetregister_v4
ae_infographic_assetregister_v4ae_infographic_assetregister_v4
ae_infographic_assetregister_v4
Emeka Onuh
 
Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...
Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...
Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...
ASK EHS Engineering & Consultants
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS Data
All4 Inc.
 
Iris Presentation
Iris PresentationIris Presentation
Iris Presentation
Steve Willetts
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes
 
Sunoco Case Study
Sunoco Case StudySunoco Case Study
Sunoco Case Study
Robert Johnson
 
Incident lifecyle
Incident lifecyle   Incident lifecyle

What's hot (19)

Konecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive MaintenanceKonecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive Maintenance
 
Are You Ready For Your Next Air Quality Facility Inspection?
Are You Ready For Your Next Air Quality Facility Inspection?Are You Ready For Your Next Air Quality Facility Inspection?
Are You Ready For Your Next Air Quality Facility Inspection?
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
SMART PUMPS NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)
SMART PUMPS  NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)SMART PUMPS  NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)
SMART PUMPS NEW BUSINESS MODELS WITH IoT (INTERNT OF THINGS)
 
Asset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines rAsset risk management of bulk materials handling machines r
Asset risk management of bulk materials handling machines r
 
Geo Therm Ltd company main brochure 2020
Geo Therm Ltd company main brochure 2020Geo Therm Ltd company main brochure 2020
Geo Therm Ltd company main brochure 2020
 
2018 senseye deck lars (small)
2018 senseye deck   lars (small)2018 senseye deck   lars (small)
2018 senseye deck lars (small)
 
Lifecycle Care in Real Time
Lifecycle Care in Real TimeLifecycle Care in Real Time
Lifecycle Care in Real Time
 
Asset health-odi-methodology
Asset health-odi-methodologyAsset health-odi-methodology
Asset health-odi-methodology
 
UAV flyer
UAV flyerUAV flyer
UAV flyer
 
General Presentation On Augustus
General Presentation On AugustusGeneral Presentation On Augustus
General Presentation On Augustus
 
ae_infographic_assetregister_v4
ae_infographic_assetregister_v4ae_infographic_assetregister_v4
ae_infographic_assetregister_v4
 
Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...
Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...
Permit to Work (PTW) Software: Permit Control, Isolation & Control, Job Hazar...
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS Data
 
Iris Presentation
Iris PresentationIris Presentation
Iris Presentation
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
 
Sunoco Case Study
Sunoco Case StudySunoco Case Study
Sunoco Case Study
 
Incident lifecyle
Incident lifecyle   Incident lifecyle
Incident lifecyle
 

Similar to Fugitive Emissions: How to Prevent Potential Leak Points

Predictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure GaugesPredictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure Gauges
WIKA Instrument, LP
 
System design for the water industry - Andy Verwer
System design for the water industry -  Andy VerwerSystem design for the water industry -  Andy Verwer
System design for the water industry - Andy Verwer
PROFIBUS and PROFINET InternationaI - PI UK
 
Eliminating Weak Links: How a Pressure Sensor Can Affect Equipment Reliability
Eliminating Weak Links: How a Pressure Sensor Can Affect Equipment ReliabilityEliminating Weak Links: How a Pressure Sensor Can Affect Equipment Reliability
Eliminating Weak Links: How a Pressure Sensor Can Affect Equipment Reliability
WIKA Instrument, LP
 
Are your sensors oil field tough?
Are your sensors oil field tough?Are your sensors oil field tough?
Are your sensors oil field tough?
WIKA Instrument, LP
 
DISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATION
DISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATIONDISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATION
DISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATION
wle-ss
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
Design World
 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docx
stirlingvwriters
 
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building SolutionValve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Bassam Gomaa
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
almassa group
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
almassa group
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
Koncar - Electrical Engineering Institute
 
Cutting the Cord
Cutting the CordCutting the Cord
Cutting the Cord
RLE Technologies
 
Digital Transformation through Product and Service Innovation - Session Spons...
Digital Transformation through Product and Service Innovation - Session Spons...Digital Transformation through Product and Service Innovation - Session Spons...
Digital Transformation through Product and Service Innovation - Session Spons...
Amazon Web Services
 
Industrial Preventative Maintenance - Nanoprecise
Industrial Preventative Maintenance - NanopreciseIndustrial Preventative Maintenance - Nanoprecise
Industrial Preventative Maintenance - Nanoprecise
Nanoprecise
 
Test Metrics in Agile: A Powerful Tool to Demonstrate Value
Test Metrics in Agile: A Powerful Tool to Demonstrate ValueTest Metrics in Agile: A Powerful Tool to Demonstrate Value
Test Metrics in Agile: A Powerful Tool to Demonstrate Value
TechWell
 
AI Solutions for Industries (short)
AI Solutions for Industries (short)AI Solutions for Industries (short)
AI Solutions for Industries (short)
byteLAKE
 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdf
bkbk37
 
Datasheet_SE-Wonderware_AlarmAdviser
Datasheet_SE-Wonderware_AlarmAdviserDatasheet_SE-Wonderware_AlarmAdviser
Datasheet_SE-Wonderware_AlarmAdviser
Suman Singh
 
An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...
MARIO524285
 
ATS Inspect: See the Quality!
ATS Inspect: See the Quality! ATS Inspect: See the Quality!
ATS Inspect: See the Quality!
António Moreira Lopes
 

Similar to Fugitive Emissions: How to Prevent Potential Leak Points (20)

Predictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure GaugesPredictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure Gauges
 
System design for the water industry - Andy Verwer
System design for the water industry -  Andy VerwerSystem design for the water industry -  Andy Verwer
System design for the water industry - Andy Verwer
 
Eliminating Weak Links: How a Pressure Sensor Can Affect Equipment Reliability
Eliminating Weak Links: How a Pressure Sensor Can Affect Equipment ReliabilityEliminating Weak Links: How a Pressure Sensor Can Affect Equipment Reliability
Eliminating Weak Links: How a Pressure Sensor Can Affect Equipment Reliability
 
Are your sensors oil field tough?
Are your sensors oil field tough?Are your sensors oil field tough?
Are your sensors oil field tough?
 
DISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATION
DISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATIONDISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATION
DISCUSSION ON DIGITAL OILFIELD FULL-FIELD OPTIMIZATION
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docx
 
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building SolutionValve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
Valve and Actuator Catalog EMEA - Catalog Ecostruxure Building Solution
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Advanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machinesAdvanced condition monitoring system for rotating machines
Advanced condition monitoring system for rotating machines
 
Cutting the Cord
Cutting the CordCutting the Cord
Cutting the Cord
 
Digital Transformation through Product and Service Innovation - Session Spons...
Digital Transformation through Product and Service Innovation - Session Spons...Digital Transformation through Product and Service Innovation - Session Spons...
Digital Transformation through Product and Service Innovation - Session Spons...
 
Industrial Preventative Maintenance - Nanoprecise
Industrial Preventative Maintenance - NanopreciseIndustrial Preventative Maintenance - Nanoprecise
Industrial Preventative Maintenance - Nanoprecise
 
Test Metrics in Agile: A Powerful Tool to Demonstrate Value
Test Metrics in Agile: A Powerful Tool to Demonstrate ValueTest Metrics in Agile: A Powerful Tool to Demonstrate Value
Test Metrics in Agile: A Powerful Tool to Demonstrate Value
 
AI Solutions for Industries (short)
AI Solutions for Industries (short)AI Solutions for Industries (short)
AI Solutions for Industries (short)
 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdf
 
Datasheet_SE-Wonderware_AlarmAdviser
Datasheet_SE-Wonderware_AlarmAdviserDatasheet_SE-Wonderware_AlarmAdviser
Datasheet_SE-Wonderware_AlarmAdviser
 
An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...
 
ATS Inspect: See the Quality!
ATS Inspect: See the Quality! ATS Inspect: See the Quality!
ATS Inspect: See the Quality!
 

Recently uploaded

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 

Fugitive Emissions: How to Prevent Potential Leak Points

  • 1. Fugitive Emissions www.WIKA-FAST.com 1 Fugitive Emissions WIKA - Part of your business
  • 2. Fugitive Emissions www.WIKA-FAST.com 2 Fugitive Emissions:  Fugitive emissions are often seen as an unavoidable byproduct of running a refinery or petrochemical plant  Leaks may be overlooked because they are considered insignificant and difficult to detect  Yet, the EPA doesn’t hesitate to levy fines Unavoidable Byproduct of Doing Business?
  • 3. Fugitive Emissions www.WIKA-FAST.com 3 Fugitive Emissions:  Fugitive emissions are even more dangerous than combustion leaks because you can’t see them without specialized detection equipment  Fugitive emissions are also:  A fire hazard  Dangerous to employee and community health  Lost product and profits • Refineries lose more than $3 million in fuel each year to fugitive emission leaks* • That’s fuel that is never used or sold The Dangers * Source: “Direct Measurement of Fugitive Emissions of Hydrocarbons from a Refinery,” J. Air & Waste Manage. Assoc. 58:1047–1056.
  • 4. Fugitive Emissions www.WIKA-FAST.com 4 The Problems You Face Fugitive emissions are hard to detect AND A typical plant has more than 300,000 connections (potential leak points)
  • 5. Fugitive Emissions www.WIKA-FAST.com 5 The Needle in the Haystack More than 83% of controllable fugitive emissions come from only 0.24% of the piping components*, such as:  Valves  Pumps  Compressors  Pressure relief valves  Connectors * Source: American Petroleum Institute
  • 6. Fugitive Emissions www.WIKA-FAST.com 6 Rethinking Instrumentation Tapping Potential Gauge Leaks
  • 7. Fugitive Emissions www.WIKA-FAST.com 7 Focus on Gauges One potential leak point that you may not have thought about is your gauges, which comprise a significant portion of your connections
  • 8. Fugitive Emissions www.WIKA-FAST.com 8 Potential Leak Point  WIKA welds its stainless steel case to its stainless steel socket  Other manufacturers screw the socket into the gauge with a rubber O-ring, which is prone to wear out and create a leak point  With hundreds of gauges in your plant, it’s impossible to monitor each one  That’s why WIKA has developed solutions to protect against leaks
  • 9. Fugitive Emissions www.WIKA-FAST.com 9 All-Welded System  Diaphragm seal and pressure gauge permanently welded together to create a sealed pressure measurement system  Removes all threaded connections to provide dual containment that helps eliminate potential leak paths  Helium leak tested; Helium is the smallest stable gas molecule, so if we can contain it, we can contain your gases  Removes the possibility of misapplication or tampering  Complies with the EPA’s “Dual Containment Requirements”
  • 10. Fugitive Emissions www.WIKA-FAST.com 10 Fugitive Emissions: A Costly Nightmare... A Simple Solution
  • 11. Fugitive Emissions www.WIKA-FAST.com 11 Internet connection required to play videos
  • 12. Fugitive Emissions www.WIKA-FAST.com 12 Let The Instrument Experts Help WIKA Services and Solutions
  • 13. Best Practices www.WIKA-FAST.com 13 Let us be your gauge experts Full Audit Service Team  Gauges, if used properly, can help you identify an issue before costly problems develop  Our Full Audit Service Team (FAST) will take care of your gauges to help o Lower inventory costs o Improve reliability o Reduce gauge maintenance costs  And best of all, FAST is the only solution you need—a total care services program at no additional cost to you WIKA’s FAST engineers helped a large chemical plant address 50 years of gauge proliferation. Read the case study to learn more.
  • 14. Best Practices www.WIKA-FAST.com Full Audit Service Team (FAST) 14 FAST Expertise Expertise Over 250 Instrument Audits Over 150K Instruments Reviewed
  • 15. Best Practices www.WIKA-FAST.com A Full Suite of Services at Zero Cost 15 FAST Program Instrument Audit Turnaround Instrument Planning Instrument Failure Analysis Instrument Safety Training WIKA’s Instrument Audit provides expert analysis and solutions form our FAST engineers who help you put the right gauges in place for your applications to improve reliability and lower costs. Our team performs an Instrument Audit, standardizes the instruments you need and sends the products to you when you need them... before your turnaround begins so you can avoid delays. Send us your failed gauge, and our engineers will conduct a root cause analysis. By understanding the mode of failure, our FAST engineers can recommend a reliable solution. Our FAST engineers train your team to look for signs of instrument failure when completing a scheduled evaluation of your instrumentation.
  • 16. Best Practices www.WIKA-FAST.com 16 FAST Instrument Audit  Visual inspection of pressure, temperature gauges to build a comprehensive record of gauge installations and rate problematic conditions  Data analysis to provide engineering-based recommendations that improve, standardize and consolidate your population  Implementation support, including ERP imports, MOC documentation, and Easy Order Guides  Improves reliability, and decreases inventory and maintenance costs year after year Establishes a Sustainable Gauge Maintenance Program
  • 17. 25% 20% 30% Average FAST Audit Savings $51,171Ɨ in first year savings, Ongoing annual savings of $21,073ƗƗ Less gauge failures and less time to replace Correct gauges for processing conditions Standardize on full scale ranges, options for gauges Decrease Maintenance Costs* Reduction in Inventory* Increase in Reliability* First year savings only includes engineering resources for physical audit, storeroom review, data compilation, and implementation support. Based on average audit of 1,000 installations, requiring two instrumentation engineers for one week ƗƗ Ongoing annual savings. Inventory savings based on industry averages for overhead, inventory management, shrinkage, obsolescence, inventory tax, and cost of capital *Based on results from more than 250 WIKA instrument audits
  • 18. Best Practices www.WIKA-FAST.com 18  Our team performs a full Instrumentation Audit and standardizes what instruments you need...before your turnaround actually begins  With this advanced preparation, we ensure that the right instruments are at your plant at the exact time you need them – eliminating the risk of delay  Action plan with part number, IOM and data sheet for each installation FAST Turnaround Instrument Planning Ensure the Right Instrumentation for Start-up
  • 19. Best Practices www.WIKA-FAST.com 19 FAST Instrument Failure Analysis Getting to the Root of the Problem  If you have gauges that are continually failing, then send them to us  Our FAST engineers will perform a root cause analysis  Can alert you to problems with more expensive equipment  Reduces likelihood of downtime and decreases maintenance costs WIKA’s FAST engineers accessed a recurring gauge failure and identified a larger issue before costly repairs were required. Learn how.
  • 20. Best Practices www.WIKA-FAST.com 20 FAST Instrument Safety Training  Education and training are best tools to maintain operational efficiency and employee safety in your plant  Our Instrument Safety Training will teach your team to look for warning signs  Held at your site or ours, the training helps reduce maintenance costs and wrench time 20 FAST FACT U.S. process plants lose more than $10 billion per year from abnormal situations caused by human error. Source: Abnormal Situation Management Consortium FAST Instrument Safety Training
  • 21. Best Practices www.WIKA-FAST.com 21 How much could you save with FAST Audit? Contact us for a Cost Savings Estimate or to Learn More about WIKA’s FAST Services. 1-855-651-FAST info@wika-fast.com