Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Formato sena ingles 2013
1. NATIONAL SERVICE OF LEARNING
FORM FORMATION`S PROJECT
Name: Bryan Tovar. Hernan Jimenez Grade: 9-B
Dirección General
Dirección de Formación Profesional
1.1 Educational Institution:
Direction Web:Tecnoinventores9-b.blogspot.com Tel: 6100896
I.E.T.I. SIMONA DUQUE
1.2 MUNICIPALITY:
Antioquia
Marinilla
Solar Ecological panel Based on Gelatine
1.2 Name of the project:
1.3 Training Program that responds to
I strengthen my profile for the world of the work. (Integration of the degrees 9 º of the IETISD with the
Technical Average)
9 Months
1.4 Estimated time of execution of the
project (months):
No Company
1.5Companies or institutions that take part
in his formulation or financing : (if exist)
1.7 Key words of search
Panel, Solar, Ecological, Cell, Photocell, Gelatine, Copper, Zinc.
2. 2. Structure of the Project
2.1 Approaching the Problem
What we want is to create a solar cell with different materials to make it cheap and accessible for that this helps our Planet
2.2 Justification of the Project
One Gave East I project Thinking About The Need Of The Persons Since The Solar Panel Is Based on Gelatine, It is Economic and Helps to the Improvement
Of The Environment
2.3 General objetive
To transform The Solar Radiation Into Electric power By means of A Solar Ecological Panel Based on Gelatine
2.4 Specific objetive:
· To design Our Project This way To take Her To A Model(Prototype)
· To construct The Solar Panel Using Recyclable Materials
· To be employed At Equipment And At Class
· To expose Our Project In order that The People Find out
2.5 scope: It can Be To Municipal Level
2.5.1 Beneficiaries of the All The Persons That Use
project
Social
His Benefit Is That The Population Is going To have Less Electrical Consumption
2.5.2 Impact
Economic
Fewer Costs In Energy And Fewer Expenses
Environmental
The Panel Not to be going To contaminate And It was Taking care Of The Environment
Technological
She is Alternative A New Energy
2.5.3 Restrictionsorassociatedrisks:
That The Gelatine Might Deteriorate Easily Without A System Of Refrigeration
2.5.4. Products or results of the project
3. That The Gelatine Without Flavor Gave To Us A Major Increase Of Solar power Together with A foilOf Zinc and One Of Copper
2.6:Innovation/ Technologicalmanagement
Yes
The project addresses a need of the productive sector
yes/no
Yes
The project improves the process / product / service exists?.
yes/no
No
The project involves the use of new techniques and process
technologies
yes/no
No
The end products are susceptible to industrial protection and /
or copyright
yes/no
Yes
The products obtained in the project can be positioned in the
market?.
yes/no
2.7 Productiveassessment
Yes
With the development of the project can meet the need for a
potential customer.
yes/no
Feasibility of project business plan
yes/no
The Panel Can Easily sold By His Low Cost
4. 3. Planning
3.1 PROCESS STAGES
Fase 1:
Fundamentación
PHASE 2:formulación
3.2
ACTIVITIES
OF THE
PROJECT
We started
with an Idea
3.3. RESULTS
OF
LEARNING(a
partirof the
program of
formation)
We continue
to make the
project by
asking
questions
and a
Valuation
Table
3.4
ASSOCIATE
COMPETITIO
N
science
EVIDENCES
A range of
alternative energy
science
Exposure of
the Project
The textual Project
finished
There was no
competition
associated
Termination of Data
Work and
There was no
equipment in
competition
order to build
associated
the project
Completion of the
project (Model)
Have the
project
completed
There was no
AND have a
competition
good
associated
management
on the
Project
Exposing the
different people
including the Jury
Basic rules of
Completion
of the Project
the Draft
4 PHASE:ANALYSIS AND
Build the
CONSTRUCTION OF THE
project
PROPOSAL
5 PHASE:
TEACHERSTHA
HOURS
T TAKE PART
Learn more
AskingQuest about the
ions
solar panels
and Electrical
Energy
PHASE 3:DIAGNOSTIC
DESCRIPTION OF THE ACTIVITY