Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Formato sena ingles 2013
1. NATIONAL SERVICE OF LEARNING
FORM FORMATION`S PROJECT
Dirección General
Dirección de Formación Profesional
1.1 Educational Institution:
1.2 Name of the project:
1.3 Training Program that responds to
1.4 Estimated time of execution of the
project (months):
1.5Companies or institutions that take part
in his formulation or financing : (if exist)
1.7 Key words of search
Name: Juan José lotero Ramírez Grade: 9b
Direction Web: juanjose2837@hotmail.com Tel: 5482837
Duke simona technical
educational institution
1.2 MUNICIPALITY:
marinilla
2. 2. Structure of the Project
2.1 Approaching the Problem
This project hopes to solve water pollution the project consists of a solar panel, an electrode and a huahua components decontaminated water
2.2 Justification of theProject
We managed this project because of water pollution in recent times on the planet, and we will all affected without an effective solution
2.3 General objetive
General the revolutionary filter to remove water pollution and to dig with Paracite that has water
2.4 Specific objetive:
. -build the project
-work together
-disinfect water
Increasing the amount of drinking water
-decontaminated water as possible
2.5 scope would be a benefit to mankind because it would eliminate the risk of dying from contaminated water
2.5.1 Beneficiaries of
All general community
theproject
Social
It is a benefit to society
2.5.2 Impact
Economic
It would be very economical as it is built to a low price
Environmental
Would reducing water pollution
Technological
It would be a good step for town show
3. 2.5.3 Restrictionsorassociatedrisks: none
2.5.4. Products or results of the project decontaminate the maximum possible water
2.6:Innovation/ Technologicalmanagement
yes
The project addresses a need of the productive sector
yes/no
yes
The project improves the process / product / service exists?.
yes/no
yes
The project involves the use of new techniques and process
technologies
yes/no
yes
The end products are susceptible to industrial protection and /
or copyright
yes/no
yes
The products obtained in the project can be positioned in the
market?.
yes/no
2.7 Productiveassessment
yes
With the development of the project can meet the need for a
potential customer.
yes/no
4. Feasibility of project business plan
yes/no
yes
3. Planning
3.1 PROCESSSTAGES
Fase 1:
Fundamentación
PHASE 2:formulación
PHASE 3:DIAGNOSTIC
3.2
ACTIVITIES
OF THE
PROJECT
computing
Robotics
biodiversity
technological
advances
How to make
a water filter
that
decontaminat
e
In that this
projector to
environmenta
l influence
3.3. RESULTS
OF
LEARNING(a
partirof the
program of
formation)
3.4
ASSOCIATEC DESCRIPTION OF THEACTIVITY
OMPETITION
TEACHERSTHA
HOURS
TTAKEPART
EVIDENCES
With these words, we get the
thought of each one and ask
some questions
The portfolio
This is the question of the
project because it is the most
similar and because this project
is a way to improve water
This is a survey of the project
that will make people think and
say that the project
The portfolio
The portfolio
5. Lo que se
demoro el
4 PHASE:ANALYSIS AND proyecto en
CONSTRUCTION OF THE todo
PROPOSAL
5 PHASE:
Posters, slides
explanations
The box costs or value says what
time delay the cost
ETC
The portfolio
This is what is done to what the
project is completed along with
the portfolio
Institutional Week
Exhibition