This document is a project report submitted by four students for their Bachelor of Engineering degree in Computer Engineering. It outlines their development of an Android application called "Spread the Smile - An Food Donating App" which aims to connect donors, NGOs, and those in need by facilitating food donations. The report includes sections on introduction and problem definition, requirements analysis, system design, and conclusions. Diagrams are provided to illustrate the system architecture, classes, use cases, activities, sequences, and database design.