The document introduces Corix's pre-packaged EXS Energy Transfer Stations, which provide efficient, standardized solutions for district energy systems. The EXS stations enable safe and cost-effective transfer of thermal energy to end users, with benefits like reduced construction time, lower costs, and simplified procurement. Corix leverages over 50 years of experience to design, fabricate, test, and deliver turnkey EXS packages that drop on-site and connect to district energy pipelines.
Esri GeoConX 2016 White Paper Presentation by Peter Zimmermann of UDC Inc. and Robert Smith of Pacific Gas & Electric.
While recently converting their electric distribution sources, PG&E included an initiative to convert their GIS data into a standalone ArcSchematics model. The schematics model was developed to support the engineering group as well as PG&E‘s DMS outage management system and was tailored to provide a geo-schematic representation following major roadways to enhance locating of key primary system features. Software was developed to allow daily GIS updates to feed the schematics model directly thus greatly reducing latency between the two systems. Maintenance of schematics consists of daily executed minor whitespace management edits ensuring ease of use.
UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...UDC
Esri GeoConX 2016 White Paper Presentation by Hamid Akhavan of UDC Inc. and Robert Smith of Pacific Gas & Electric.
In 2015, PG&E deployed an Esri/ArcFM based solution for managing underground electric facilities across the downtown San Francisco area. The data density presented unique challenges in automating the workflows to maintain data accuracy, coherent annotation and legible views of the data. This presentation explores the complexities encountered and how they were overcome to provide an effective underground facilities management solution.
Esri GeoConX 2016 White Paper Presentation by TJ Houle of UDC Inc. and Jesse Jennings and Angela Reising of Pacific Gas & Electric.
Pacific Gas and Electric and UDC Inc. have partnered to develop a method to manage Gas Pressure Systems data in ArcGIS. Their solution provides tools for editing, monitoring, and updating Gas Pressure Systems and allows engineers to review these systems for completeness in an easy to use web viewer. This presentation is an overview of the Gas Pressure System management process.
Power Point Presentation for (Advance Project Management)Obi-Ugbo Alex
This document outlines a proposal for the design and construction of a drainage system in a rural community with 150,000 residents that experiences flooding. The 9-month project will involve excavating trenches, pouring concrete, laying 381 pipes totaling 7,620 linear meters, and installing manholes. The total cost is estimated at $1,418,548. Key personnel include a project manager, civil engineer, and laborers. Progress will be tracked weekly and the system will be inspected upon completion. Potential issues that could impact the schedule or budget include weather delays, utility conflicts, traffic disruptions, or site conditions.
M.Alamsha Faiz is an experienced MEP Supervisor with over 7 years of experience in facilities management across various organizations in Dubai. He currently works as an MEP Supervisor at Engineering Maintenance Company managing maintenance of electrical, HVAC, and plumbing systems. Some of his responsibilities include planning preventative maintenance schedules, coordinating repairs, overseeing teams, and ensuring optimal productivity. He has experience working on various commercial and airport projects, and possesses expertise in electrical systems, generators, chillers, and building automation.
Sachin Mohelay has over 10 years of experience in engineering, procurement, and project management in the power and process industries. He is currently the Assistant General Manager at Jindal Power Limited in Gurgaon, where he is responsible for project engineering, procurement, management, and coordination of various packages including coal handling plants, conveyor systems, HVAC systems, and other equipment. Prior to his current role, Mohelay held positions in maintenance planning, commissioning, and structural fabrication and erection. He holds a B.Tech in Mechanical Engineering and postgraduate qualifications in international business and piping design.
The document provides information about two projects:
1) The SOLARIS project which involved upgrading the ACMV and chilled water distribution systems for two office towers. Key aspects included installing VAV terminals, a BMS, and optimizing the chilled water pump speeds to reduce energy usage.
2) The Raffles City project which involved replacing the kitchen exhaust system in a shopping mall. This included installing new centrifugal fans, vibration monitoring, and ductwork upgrades to improve system performance.
The document introduces Corix's pre-packaged EXS Energy Transfer Stations, which provide efficient, standardized solutions for district energy systems. The EXS stations enable safe and cost-effective transfer of thermal energy to end users, with benefits like reduced construction time, lower costs, and simplified procurement. Corix leverages over 50 years of experience to design, fabricate, test, and deliver turnkey EXS packages that drop on-site and connect to district energy pipelines.
Esri GeoConX 2016 White Paper Presentation by Peter Zimmermann of UDC Inc. and Robert Smith of Pacific Gas & Electric.
While recently converting their electric distribution sources, PG&E included an initiative to convert their GIS data into a standalone ArcSchematics model. The schematics model was developed to support the engineering group as well as PG&E‘s DMS outage management system and was tailored to provide a geo-schematic representation following major roadways to enhance locating of key primary system features. Software was developed to allow daily GIS updates to feed the schematics model directly thus greatly reducing latency between the two systems. Maintenance of schematics consists of daily executed minor whitespace management edits ensuring ease of use.
UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...UDC
Esri GeoConX 2016 White Paper Presentation by Hamid Akhavan of UDC Inc. and Robert Smith of Pacific Gas & Electric.
In 2015, PG&E deployed an Esri/ArcFM based solution for managing underground electric facilities across the downtown San Francisco area. The data density presented unique challenges in automating the workflows to maintain data accuracy, coherent annotation and legible views of the data. This presentation explores the complexities encountered and how they were overcome to provide an effective underground facilities management solution.
Esri GeoConX 2016 White Paper Presentation by TJ Houle of UDC Inc. and Jesse Jennings and Angela Reising of Pacific Gas & Electric.
Pacific Gas and Electric and UDC Inc. have partnered to develop a method to manage Gas Pressure Systems data in ArcGIS. Their solution provides tools for editing, monitoring, and updating Gas Pressure Systems and allows engineers to review these systems for completeness in an easy to use web viewer. This presentation is an overview of the Gas Pressure System management process.
Power Point Presentation for (Advance Project Management)Obi-Ugbo Alex
This document outlines a proposal for the design and construction of a drainage system in a rural community with 150,000 residents that experiences flooding. The 9-month project will involve excavating trenches, pouring concrete, laying 381 pipes totaling 7,620 linear meters, and installing manholes. The total cost is estimated at $1,418,548. Key personnel include a project manager, civil engineer, and laborers. Progress will be tracked weekly and the system will be inspected upon completion. Potential issues that could impact the schedule or budget include weather delays, utility conflicts, traffic disruptions, or site conditions.
M.Alamsha Faiz is an experienced MEP Supervisor with over 7 years of experience in facilities management across various organizations in Dubai. He currently works as an MEP Supervisor at Engineering Maintenance Company managing maintenance of electrical, HVAC, and plumbing systems. Some of his responsibilities include planning preventative maintenance schedules, coordinating repairs, overseeing teams, and ensuring optimal productivity. He has experience working on various commercial and airport projects, and possesses expertise in electrical systems, generators, chillers, and building automation.
Sachin Mohelay has over 10 years of experience in engineering, procurement, and project management in the power and process industries. He is currently the Assistant General Manager at Jindal Power Limited in Gurgaon, where he is responsible for project engineering, procurement, management, and coordination of various packages including coal handling plants, conveyor systems, HVAC systems, and other equipment. Prior to his current role, Mohelay held positions in maintenance planning, commissioning, and structural fabrication and erection. He holds a B.Tech in Mechanical Engineering and postgraduate qualifications in international business and piping design.
The document provides information about two projects:
1) The SOLARIS project which involved upgrading the ACMV and chilled water distribution systems for two office towers. Key aspects included installing VAV terminals, a BMS, and optimizing the chilled water pump speeds to reduce energy usage.
2) The Raffles City project which involved replacing the kitchen exhaust system in a shopping mall. This included installing new centrifugal fans, vibration monitoring, and ductwork upgrades to improve system performance.
The document provides information on the design of a new office building tailored for legal firms in Newcastle upon Tyne, England. It includes the site location and constraints, inspiration for the design, laser scanning of the site, architectural plans for each level, and details on the structural, architectural, and MEP (mechanical, electrical, plumbing) models created in Revit. Next steps include clash detection between models in Navisworks and construction animations.
This document summarizes Balpara's involvement in several infrastructure projects in Melbourne, including:
- Relocating electrical assets for the Melbourne Metro Rail Project in various locations including Arden, Parkville, CBD North, CBD South, and Domain.
- Surveying over 250km of underground HV cables for a Victorian government fire prevention initiative with Powercor over the past four years.
- Providing project management, electrical and NBN design services for the Little Green residential estate.
- Conducting surveys and designing the route and pole placements for a new 22kV powerline as part of the Mernda Rail Extension Project.
- Providing design and as-built detailing to install new 66
After more than a decade of delay, a new NY Bridge to replace the existing Tappan Zee Bridge is becoming a reality. In 2011, new design-build legislation was enacted, concurrent environmental review and procurement processes were completed, a project labor agreement was negotiated with the labor unions, and pre-construction activities commenced — all with an unprecedented level of transparency and community involvement. The bridge is being designed and built for the New York State Thruway Authority by Tappan Zee Constructors, LLC (TZC), a consortium of some of the world’s best-known and most highly-regarded design, engineering and construction firms. Mr. Glinski, TZC’s Safety Manager, Cranes & Rigging, will share insights on his role at the project which will include TZC’s safety program and a project overview.
Speaker: John Glinski, Tappan Zee Constructors, LLC
Green Cat Renewables is a consulting firm that specializes in the development and construction of onshore wind farms. They have experience with projects ranging from single turbines to multi-turbine projects up to 85MW. The development process involves feasibility studies, planning applications, design work, tendering construction contracts, and overseeing construction which includes site preparation, turbine installation, and commissioning. Financial due diligence and securing financing is also part of developing a project before handing it over for long-term operations. Green Cat Renewables has grown significantly over the past decade to now employ over 40 people across multiple offices in the UK.
Mr Lee M. Bellingham is an adaptable and hard-working individual with strong communication and organizational skills. He has over 30 years of experience in various roles including as a gas engineer, warehouse coordinator, and trade team manager. Mr. Bellingham holds numerous qualifications and certifications in gas, electrical, and renewable energy installations. He is seeking new opportunities to continue applying his skills and experience.
This document provides a summary of Jeffery McAulay's work experience and qualifications. It outlines his current role as an Operations Engineer at a gas company, with responsibilities including managing pipeline and equipment projects, providing safety guidance, and developing procedures. Previous engineering roles are also summarized, including planning and designing gas distribution systems, managing projects, and providing technical support. His education and technical skills are listed, along with references available upon request.
The client was producing 20 MMscf/d of natural gas but several new wells increased production potential by 4 MMscf/d. However, the existing gas gathering and compression system could not accommodate the full increase. GCC performed an audit of the system and modeled pipeline and compressor equipment. This identified modifications to allow production of the new capacity of 30 MMscf/d along with additional future capacity. GCC's redesign of the gathering system and reallocation of compression resources allowed the client to maintain 30 MMscf/d production while reducing annual costs by $800,000.
This document provides an overview and agenda for an Energy Trust of Oregon envelope design training event held on October 2015. The training covered key topics related to building enclosure design including critical barriers like the thermal barrier, air barrier and vapor barrier. It discussed approaches to designing continuous barriers and managing issues like thermal bridging. Insulation strategies like interior, exterior and split insulation were also reviewed. The document aimed to educate designers on best practices for creating efficient, durable and low energy building enclosures.
Cheryl Massie Presentation New York City Green PlanRyan Slack
The document summarizes New York City's Greener, Greater Buildings Plan, which includes four laws aimed at improving energy efficiency in buildings. The laws require benchmarking and audits for large buildings, lighting upgrades and submetering, and compliance with the NYC Energy Conservation Code. Buildings over 50,000 square feet must follow energy auditing, retrocommissioning, and benchmarking requirements on staggered schedules between 2010-2025. Financial assistance and training resources are available from groups like NYSERDA, ConEdison, and the Urban Green Council.
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systemsmelanie_bissonnette
This document proposes occupancy-based control of VAV systems and lighting to improve energy efficiency. It analyzes the potential savings from using common occupancy sensors and more advanced sensors to adjust minimum airflow, lighting, and thermostat setpoints based on occupancy. Simulation results show the advanced sensors yield greater savings than common sensors, reducing whole building energy use by up to 18% compared to 5.9% for common sensors. Significant savings come from reducing unnecessary reheating through improved minimum airflow control based on occupancy.
Energy Consulting Engineering 179D Energy Efficient Commercial Real Estate Ta...Kari Mueller, PE, LEED AP
This document provides information about section 179D of the tax code, which allows commercial building owners and designers of public buildings to receive tax deductions for making energy efficient improvements. It qualifies buildings that achieve at least 10% savings in lighting, HVAC systems, or building envelopes. A 50% reduction in overall energy usage provides a maximum $1.80/square foot deduction. The document outlines the qualification process, required documentation, eligible building types, examples of past percentage requirements, and case studies of projects that benefited from the deduction.
Digital Utility® Compliance Manager at PG&E for CP SurveyUDC
PG&E and UDC provide a brief overview of UDC's enterprise Esri ArcGIS application that supports end-to-end management of planned work, preventative maintenance, inspections and surveys and provides robust compliance management and reporting capabilities for gas and electric utilities. In our joint presentation given at the Schneider Link 2018 conference, we focus on PG&E's use of Compliance Manager for Cathodic Protection Survey and the benefits realized by the Utility from this solution.
PSE Engineering custom designs compressor packages according to customer requirements and continually develops compressor configurations to provide optimized solutions for customers. For a natural gas gathering project in Central Europe, PSE equipped a single-stage Ariel JGC/2 compressor with an all-electric eHydroCOM capacity control system to ensure a constant feed pressure into the pipeline despite fluctuating suction pressures from varying numbers of connected gas wells. The electric control system provides stepless operation for customized gas extraction at high efficiency with minimal space requirements and energy savings compared to conventional bypass solutions.
Managing Massive Updates - Using GIS to Fuel Gas ComplianceSSP Innovations
NIPSCO was required to undergo massive data updates to their GIS to meet new gas regulation. A series of projects allowed for the rectification of all gas transmission assets and the manual update of system-wide records to accommodate the requirements. SSP technology was implemented to allow for outsourced updates to be replayed into the versioned production GIS while maintaining fulltime day-to-day editing. This provided maximum flexibility while minimizing downtime and any performance impact.
Ronnie Richer has over 25 years of experience in mechanical engineering and design, working on projects for companies in the aerospace, pulp and paper, construction, and engineering research industries. He has specialized expertise in mechanical design for aircraft interiors, systems integration, and ensuring design compliance with regulatory standards. His background includes roles as a lead mechanical engineer, mechanical designer, detailer, and researcher.
Diana Hamilton of Delcan presents an industrial retrofit project to LEED silver standard.
Presented at the 5th annual Green Building Festival in Toronto, Canada, 2009.
The document summarizes several projects completed as a consulting engineer, including environmental impact surveys of gas compression stations, design of a natural gas compression station, rectification of an underperforming cooling tower, bringing an incinerator up to safe operating standards, mechanical design for an offshore substructure, an expert witness report on a boiler collapse, refurbishing mechanical services for a dry dock, testing a gas turbine installation, design of a steam system for a brewery, delivery of a clinical waste incinerator, and conducting energy surveys to identify opportunities to reduce clients' energy consumption. The roles included lead engineer, project leader, mechanical engineer, and energy specialist.
Transform 66 Outside the Beltway: Feb. 27, 2018Fairfax County
This document provides a project roadmap and timeline for the Transform 66 Outside the Beltway project with the following key details:
The express lanes are scheduled to open in December 2022. Early construction activities are currently underway including surveys. Right of way acquisition is also starting in spring 2018 and will involve over 200 property owners. Construction will ramp up in spring 2018 with lane shifts, tree removal, and utility relocation. Final noise, traffic, and environmental analyses will be completed in spring 2018. The corridor aesthetics plan and final design activities will also be ongoing.
Global Power Supply (GPS) is a full service provider of new and used power systems including used industrial diesel generators, natural gas generators, custom genset enclosures, UPS power systems, automatic transfer switches (ATS), CRAC/CRAH equipment, and electrical switchgear.
The document provides information on the design of a new office building tailored for legal firms in Newcastle upon Tyne, England. It includes the site location and constraints, inspiration for the design, laser scanning of the site, architectural plans for each level, and details on the structural, architectural, and MEP (mechanical, electrical, plumbing) models created in Revit. Next steps include clash detection between models in Navisworks and construction animations.
This document summarizes Balpara's involvement in several infrastructure projects in Melbourne, including:
- Relocating electrical assets for the Melbourne Metro Rail Project in various locations including Arden, Parkville, CBD North, CBD South, and Domain.
- Surveying over 250km of underground HV cables for a Victorian government fire prevention initiative with Powercor over the past four years.
- Providing project management, electrical and NBN design services for the Little Green residential estate.
- Conducting surveys and designing the route and pole placements for a new 22kV powerline as part of the Mernda Rail Extension Project.
- Providing design and as-built detailing to install new 66
After more than a decade of delay, a new NY Bridge to replace the existing Tappan Zee Bridge is becoming a reality. In 2011, new design-build legislation was enacted, concurrent environmental review and procurement processes were completed, a project labor agreement was negotiated with the labor unions, and pre-construction activities commenced — all with an unprecedented level of transparency and community involvement. The bridge is being designed and built for the New York State Thruway Authority by Tappan Zee Constructors, LLC (TZC), a consortium of some of the world’s best-known and most highly-regarded design, engineering and construction firms. Mr. Glinski, TZC’s Safety Manager, Cranes & Rigging, will share insights on his role at the project which will include TZC’s safety program and a project overview.
Speaker: John Glinski, Tappan Zee Constructors, LLC
Green Cat Renewables is a consulting firm that specializes in the development and construction of onshore wind farms. They have experience with projects ranging from single turbines to multi-turbine projects up to 85MW. The development process involves feasibility studies, planning applications, design work, tendering construction contracts, and overseeing construction which includes site preparation, turbine installation, and commissioning. Financial due diligence and securing financing is also part of developing a project before handing it over for long-term operations. Green Cat Renewables has grown significantly over the past decade to now employ over 40 people across multiple offices in the UK.
Mr Lee M. Bellingham is an adaptable and hard-working individual with strong communication and organizational skills. He has over 30 years of experience in various roles including as a gas engineer, warehouse coordinator, and trade team manager. Mr. Bellingham holds numerous qualifications and certifications in gas, electrical, and renewable energy installations. He is seeking new opportunities to continue applying his skills and experience.
This document provides a summary of Jeffery McAulay's work experience and qualifications. It outlines his current role as an Operations Engineer at a gas company, with responsibilities including managing pipeline and equipment projects, providing safety guidance, and developing procedures. Previous engineering roles are also summarized, including planning and designing gas distribution systems, managing projects, and providing technical support. His education and technical skills are listed, along with references available upon request.
The client was producing 20 MMscf/d of natural gas but several new wells increased production potential by 4 MMscf/d. However, the existing gas gathering and compression system could not accommodate the full increase. GCC performed an audit of the system and modeled pipeline and compressor equipment. This identified modifications to allow production of the new capacity of 30 MMscf/d along with additional future capacity. GCC's redesign of the gathering system and reallocation of compression resources allowed the client to maintain 30 MMscf/d production while reducing annual costs by $800,000.
This document provides an overview and agenda for an Energy Trust of Oregon envelope design training event held on October 2015. The training covered key topics related to building enclosure design including critical barriers like the thermal barrier, air barrier and vapor barrier. It discussed approaches to designing continuous barriers and managing issues like thermal bridging. Insulation strategies like interior, exterior and split insulation were also reviewed. The document aimed to educate designers on best practices for creating efficient, durable and low energy building enclosures.
Cheryl Massie Presentation New York City Green PlanRyan Slack
The document summarizes New York City's Greener, Greater Buildings Plan, which includes four laws aimed at improving energy efficiency in buildings. The laws require benchmarking and audits for large buildings, lighting upgrades and submetering, and compliance with the NYC Energy Conservation Code. Buildings over 50,000 square feet must follow energy auditing, retrocommissioning, and benchmarking requirements on staggered schedules between 2010-2025. Financial assistance and training resources are available from groups like NYSERDA, ConEdison, and the Urban Green Council.
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systemsmelanie_bissonnette
This document proposes occupancy-based control of VAV systems and lighting to improve energy efficiency. It analyzes the potential savings from using common occupancy sensors and more advanced sensors to adjust minimum airflow, lighting, and thermostat setpoints based on occupancy. Simulation results show the advanced sensors yield greater savings than common sensors, reducing whole building energy use by up to 18% compared to 5.9% for common sensors. Significant savings come from reducing unnecessary reheating through improved minimum airflow control based on occupancy.
Energy Consulting Engineering 179D Energy Efficient Commercial Real Estate Ta...Kari Mueller, PE, LEED AP
This document provides information about section 179D of the tax code, which allows commercial building owners and designers of public buildings to receive tax deductions for making energy efficient improvements. It qualifies buildings that achieve at least 10% savings in lighting, HVAC systems, or building envelopes. A 50% reduction in overall energy usage provides a maximum $1.80/square foot deduction. The document outlines the qualification process, required documentation, eligible building types, examples of past percentage requirements, and case studies of projects that benefited from the deduction.
Digital Utility® Compliance Manager at PG&E for CP SurveyUDC
PG&E and UDC provide a brief overview of UDC's enterprise Esri ArcGIS application that supports end-to-end management of planned work, preventative maintenance, inspections and surveys and provides robust compliance management and reporting capabilities for gas and electric utilities. In our joint presentation given at the Schneider Link 2018 conference, we focus on PG&E's use of Compliance Manager for Cathodic Protection Survey and the benefits realized by the Utility from this solution.
PSE Engineering custom designs compressor packages according to customer requirements and continually develops compressor configurations to provide optimized solutions for customers. For a natural gas gathering project in Central Europe, PSE equipped a single-stage Ariel JGC/2 compressor with an all-electric eHydroCOM capacity control system to ensure a constant feed pressure into the pipeline despite fluctuating suction pressures from varying numbers of connected gas wells. The electric control system provides stepless operation for customized gas extraction at high efficiency with minimal space requirements and energy savings compared to conventional bypass solutions.
Managing Massive Updates - Using GIS to Fuel Gas ComplianceSSP Innovations
NIPSCO was required to undergo massive data updates to their GIS to meet new gas regulation. A series of projects allowed for the rectification of all gas transmission assets and the manual update of system-wide records to accommodate the requirements. SSP technology was implemented to allow for outsourced updates to be replayed into the versioned production GIS while maintaining fulltime day-to-day editing. This provided maximum flexibility while minimizing downtime and any performance impact.
Ronnie Richer has over 25 years of experience in mechanical engineering and design, working on projects for companies in the aerospace, pulp and paper, construction, and engineering research industries. He has specialized expertise in mechanical design for aircraft interiors, systems integration, and ensuring design compliance with regulatory standards. His background includes roles as a lead mechanical engineer, mechanical designer, detailer, and researcher.
Diana Hamilton of Delcan presents an industrial retrofit project to LEED silver standard.
Presented at the 5th annual Green Building Festival in Toronto, Canada, 2009.
The document summarizes several projects completed as a consulting engineer, including environmental impact surveys of gas compression stations, design of a natural gas compression station, rectification of an underperforming cooling tower, bringing an incinerator up to safe operating standards, mechanical design for an offshore substructure, an expert witness report on a boiler collapse, refurbishing mechanical services for a dry dock, testing a gas turbine installation, design of a steam system for a brewery, delivery of a clinical waste incinerator, and conducting energy surveys to identify opportunities to reduce clients' energy consumption. The roles included lead engineer, project leader, mechanical engineer, and energy specialist.
Transform 66 Outside the Beltway: Feb. 27, 2018Fairfax County
This document provides a project roadmap and timeline for the Transform 66 Outside the Beltway project with the following key details:
The express lanes are scheduled to open in December 2022. Early construction activities are currently underway including surveys. Right of way acquisition is also starting in spring 2018 and will involve over 200 property owners. Construction will ramp up in spring 2018 with lane shifts, tree removal, and utility relocation. Final noise, traffic, and environmental analyses will be completed in spring 2018. The corridor aesthetics plan and final design activities will also be ongoing.
Global Power Supply (GPS) is a full service provider of new and used power systems including used industrial diesel generators, natural gas generators, custom genset enclosures, UPS power systems, automatic transfer switches (ATS), CRAC/CRAH equipment, and electrical switchgear.
The document outlines facility improvement projects and sustainability initiatives at Richland College over the next year. It discusses ADA renovation projects including new elevators and restroom renovations. Traffic flow on the east side of campus will be modified by adding a lane near soccer fields and relocating the DART stop. The fire alarm and card access systems will be upgraded. Preventative maintenance and HVAC system upgrades are emphasized for building efficiency. Renovations to locker rooms and decommissioning of the pool are mentioned. The process for work requests and a future customer satisfaction survey are also summarized.
C&C Construction provides various construction contracting methods including strategic partnerships, construction management with a guaranteed maximum price, and design/build. They offer services in engineering, civil works, general construction, carpentry, instrumentation, electrical work including high voltage, and have completed numerous industrial construction projects for companies in Sarnia, Ontario ranging in value from $100,000 to $2,700,000.
C&c construction group social mediaBob Galarneau
C&C provides various construction services including general contracting, civil, carpentry, engineering, instrumentation, electrical and high voltage. They focus on strategic partnerships with clients and provide design/build services. They have completed many industrial construction and facility upgrade projects for major companies in Ontario ranging from $100,000 to $2,700,000.
1) Shields provides in-house technical services including network equipment testing, configuration, kitting and staging, as well as onsite installation, maintenance, and decommissioning services on a global scale.
2) Shields has testing facilities for all major network technologies and vendors, with the ability to test over 136,000 parts in the last year, ensuring equipment reliability above original equipment manufacturer specifications.
3) Shields offers full life cycle services including preventative maintenance, decommissioning, asset recovery, and recycling to reduce costs and environmental impact for customers' networks.
This document discusses options for data center owners and operators to consider when their aging infrastructure may no longer meet current or future needs. As digital traffic and the internet of things continue to grow rapidly, data center infrastructure is facing unprecedented challenges. The document outlines various strategies to evaluate such as tuning up existing facilities, targeted modernization of critical components, adopting pod-based architectures, and building new infrastructure to right-size capacity. Each option involves analyzing business needs, costs, efficiency gains, and potential downtime to determine the best path forward.
ELMO case study, e-mobility conference, Budapest 17. March 2015Jarmo Tuisk
How to develop a nationwide quick charging infrastructure within 18 months from program manager point-of-view. Technology choices, IT back-office requirements, locations, lessons learned.
Wind Turbine Retrofit is much more than spare parts and optimizing repair supply chains. This presentation explains why Retrofit and with which strategy and solutions to solve todays problems of old turbines running out of lifetime
Henkels & McCoy Renewable Energy ServicesSammy Germany
- Henkels & McCoy is one of the largest privately held utility infrastructure companies in the US, founded in 1923 with over 5,500 employees and $1 billion in annual revenue.
- They provide a wide range of services for renewable energy, utility, and industrial clients including wind, solar, hydro, and transmission and distribution services.
- Henkels & McCoy has a strong focus on safety and established goals and plans to continuously improve their safety culture.
Henkels & McCoy Renewable Energy ServicesSammy Germany
- Henkels & McCoy is one of the largest privately held utility infrastructure companies in the US, founded in 1923 with over 5,500 employees and $1 billion in annual revenue.
- The company provides engineering, construction, and maintenance services for renewable energy, utility, and industrial clients, including wind, solar, hydro, and transmission and distribution projects.
- Henkels & McCoy has a strong safety focus and aims to continuously improve its safety culture and performance.
Turbine Technology Services provides a variety of mobile, temporary and distributed power solutions for remote locations such as Bakken, Niobrara, Eagle Ford and Permian.
The retrofit of 4 Mort Street in Canberra from 2010 aimed to improve the building's energy efficiency and NABERS rating. Key steps included an energy audit, building simulation, and upgrades to the HVAC system and lighting. This included changing to natural gas heating, installing a BMS and VAV air distribution. The retrofit was successful, increasing the NABERS rating from 2 to 4.5 stars, reducing electricity use by 30% and annual emissions by 70%, saving $120,000 per year.
Steve Arnold, ET Environmental, presented information on NGV Maintenance Facility Updates for our Natural Gas for Transportation Roundtable in Janesville, WI.
Enerdyne is an energy engineering firm formed to address the high energy costs in the Caribbean. It works to lower client energy bills by 50% or more through comprehensive energy audits and efficiency upgrades to mechanical, electrical, and building envelope systems. Enerdyne offers energy planning, auditing, design, installation, and measurement and verification services using innovative technologies. It has experience implementing projects that generate substantial, long-term savings for hotels and other commercial sectors in the Caribbean.
Integrated Safety Services (ISS) is an Egyptian engineering company that provides electrical, mechanical, fire protection, and civil contracting services. ISS designs, installs, tests, and maintains complex electromechanical systems and has expertise in areas such as electrical work, low current systems, HVAC, plumbing, firefighting, coating, and engineering. ISS prides itself on quality, timely project delivery, and reliability in order to meet client needs.
EASI is an energy management firm that specializes in lowering electric bills and improving electrical system efficiency through a comprehensive energy savings program. They implement patented power treatment technologies and take a full systems approach to optimize a facility's energy usage with no equipment replacements needed. Their process involves an initial contact, facilities inspection, conditional agreement, evaluation report, agreement explanation, project design contract, installation, and ongoing savings verification. The goal is to reduce costs through improvements like power conditioning while also enhancing operations and extending equipment lifespan.
This document provides a summary of M.N Chandrashekhar's professional experience and qualifications. It includes contact information and a profile summary highlighting his 26 years of experience in installation, commissioning, and maintenance work for oil and gas projects. The bulk of the document then outlines his relevant work history, including roles leading commissioning for projects in the UAE and Qatar. It also lists his areas of expertise, such as installation, erection, commissioning, maintenance, and procurement. Personal details are provided at the end.
The document provides a capability statement for E-Tech Group, an Australian company that offers a diverse range of services including electrical, NBN, demolition, carpentry, plant hire, rubbish removal, and more. E-Tech operates across strategic metropolitan and regional bases in Australia and aims to deliver high quality, reliable services and solutions to its clients on both large and small projects. The company prioritizes safety, quality, and exceeding customer expectations.
Sijin Kuruvath Sidharthan is an Indian MEP QA/QC Engineer and Project Engineer with over 7 years experience in Qatar and India. He has extensive experience coordinating MEP works and ensuring quality control on projects such as schools, office buildings, airports and industrial facilities. He is seeking a position as an MEP Engineer or QA/QC Engineer where he can apply his skills in mechanical, electrical, fire protection and ELV systems.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
2. CLEAN ENERGY & the TRANSIT INDUSTRY
•
CE has been fueling transit buses since 1997
•
Today CE fuels over 6,500 transit buses daily for 42 Public Transit Agencies
•
CE provided over 93,000,000 GGE to the transit industry in 2013
•
We are the nation’s leading provider of DBOM services for transit and other transportation sectors
•
In recognizing the needs in the industry for compliant repair facilities, Clean Energy created a facilities modification business unit that has performed over two dozen projects since 2012.
4. FACILITY MODIFICATION SERVICES – Full Facility
Classified Zones
CNG: 18” on underside of ceiling
LNG: 18” on underside of ceiling + 18” above finished floor surfaces
Heating
No open flames or surface temperatures greater than 750°F
Monitoring
Methane Detection / Alarms (Visual & Audible)
Air Exchanges
Normal Operations & When a Leak is Detected
Upgrades
Control System, Warning Devices, Ventilation, Heating, and Electrical re-location
6. Facility Assessment / Site Details
• Electrical System Capacity • Heating System Design • Roof and Wall Construction • Mechanical Exhaust and Supply for Ventilation • Preliminary Design Drawings • Value Engineering
Engineering Design
• Develop Detailed Construction Documents
• Complete Permitting through Local Jurisdiction
Construction
• Construction Administration • Experienced Supervisors and Craftsmen • Pre-qualified Sub-contractors
FACILITY MODIFICATION- Process
7. Get advice from inside the industry!
“Design – Build” vs. “Design – Bid – Build”
Best scenario: Package the station & facility modification together
REMEMBER…
8. Full or partial shop modifications
New NGV Easy Bay™ low-cost, retractable fabric barrier (available Q4 2014)
Tension Fabric Structure (Fully Code Compliant)
FACILITY MODIFICATIONS – Menu of Services
12. For More Information Contact:
Wally Dubno
O: (949) 437-1327
wally.dubno@cleanenergyfuels.com
Click to download our NGV Easy Bay information sheet
TM