This document summarizes the development and validation of models relating specific conductance (SC) to chloride concentration in surface waters in Massachusetts. Two linear regression models were generated using historic statewide data from 1994-2012 - one for freshwaters (R2=0.9445) and one for coastal waters (R2=0.9951). Both showed a strong relationship between SC and chloride. The models were validated using independent EPA and USGS data, with slopes close to 1:1, indicating the MassDEP models accurately predict chloride from SC. This allows statewide chloride monitoring via the less expensive SC method.