What is being proposed?
The plans are to create a 5km,      created by widening the existing
two lane dual carriageway           road until Aller. The road then
between Penn Inn and the Torbay     swings west before proceeding
Ring Road at Kerswell Gardens.      in a southerly direction to bypass
                                    Kingskerswell, joining the
Starting just before the Penn Inn
                                    Torbay Ring Road west of
roundabout, a flyover would take
                                    Kerswell Gardens.
traffic onto a dual carriageway,
The Government’s
challenge to reduce costs
The scheme was forecast to cost     over a longer period. This will not
£121m, but as the Government        change or lessen the benefits of
spending review took effect last    the scheme – there will still be
year, all transport schemes under   gains from the very start, but it will
consideration were asked to look    mean that not all the work will be
for savings.                        done at the same time.
Engineers at Devon County Council   As a result, the immediate cost
and Torbay Council reviewed the     of the scheme has been reduced
proposals and concluded that        to £110m, although Devon and
the scheme could be rolled out in   Torbay will have to contribute
stages, to reduce the immediate     more through a variety of funding
cost and spread the spending        packages.
So what has changed?
At Penn Inn, the new bridge over     At Edginswell Junction, the dualling
the roundabout would be narrower.    that was planned for the road at
Losing this extra width will save    this point would also be built at
a significant sum, but it will not   a later date, also reducing the
materially change the way the        immediate cost of the scheme.
road operates.
                                       Finally, omitting the metre wide
The Aller Junction is being            hard strips has reduced the width
reconfigured to reduce its immediate of the road construction. This
cost. As there are alternative ways to change also means that the 50mph
access the new road, two new slip      speed limit will be extended from
roads and the Aller Link Road would Aller through to Edginswell.
be built at a later date.
New jobs, new local
opportunities
134,000 people live in Torbay, but   effect across the tourism and retail
these numbers swell dramatically     sectors. As a result, the new road
during the tourist seasons, making   could create an additional 7,960
the roads even more crowded.         jobs across Devon and Torbay.
Tourism is a key part of Torbay’s    Around 3,500 of these jobs would
economy, with nearly 17% of all      be in Torbay, with around 750 being
jobs in the tourist industry, so a   in the tourist sector.
good transport network is vital.
                                    With the increase in employment,
The scheme will create the right    this will bring another £125m per
environment for local businesses to year into Torbay’s economy, which
thrive, which will have a knock on  will transform the area.
Land Management
With such a large scale project,   Careful use has been made of
it has also been important to      the contours of the land, creating
ensure that the visual impact      artificial cuttings where necessary
of the road is minimised as far    to screen the new route from
as possible.                       houses and viewpoints.
Costs
2010   Cost of scheme                          £121m
       Department for Transport contribution   £108m


2011   Cost of current scheme                  £110m
       Department for Transport contribution   £76m
       Devon County Council contribution       £17m
       Torbay Council contribution             £17m
What happens next?
The scheme is in a development          the Secretary of State, construction
pool competing against 45 other         could start in 2012 and the road
schemes for a share of £630m.           could be in operation by
The total value of all the schemes is   December 2015.
around £900m so it’s clear that not
all of them will be successful.         However, we have lots to do in
                                        the meantime. We have reduced
A new final business case is            our costs significantly without
being produced at the moment,           compromising the effectiveness
which will be submitted by 9            of the scheme. There are clear
September 2011. A decision on the       economic, social and environmental
successful schemes is expected          benefits. So now the road needs
by Christmas. If the scheme was
                                        your support!
granted permission to proceed by
How to help
We need to show the Ministers          the road by writing to the Minister
making the decision that this is       responsible for making the decision
the best option. The case has to       and to our MPs. Their details are on
demonstrate that this is best for      the newsletter – ask staff for a copy.
the area, that it has the backing of The more detail you can give
the community and so the money       about the difference a new road
should be spent here, on this road.  will make, the more effective the
There will be some that disagree,    letter will be. MPs and Ministers get
and the same process applies.        thousands of letters each day, so
Writing to the Minister and MPs will it’s important to make it stand out
be very important in either case.    and make it personal.
You can help make the case for         Thank you very much for your help.
More information
For more information please visit our website:
www.southdevonlinkroad.co.uk
or email: sdlr@coastmarcoms.co.uk
or contact:
Paul Ewings at
Matford Offices
Devon County Council
County Hall
Topsham Road
Exeter
EX2 4QW

More Related Content

What's hot

An overview of Zambia’s mining sector
An overview of Zambia’s mining sectorAn overview of Zambia’s mining sector
An overview of Zambia’s mining sector
Business Finland
 
Eu India Grid Project Presentation Andy
Eu India Grid Project Presentation AndyEu India Grid Project Presentation Andy
Eu India Grid Project Presentation Andy
google
 
$300 million still up for grabs
$300 million still up for grabs$300 million still up for grabs
$300 million still up for grabs
Rebecca Enright
 
MMV Case Study - LinkedIn
MMV Case Study - LinkedInMMV Case Study - LinkedIn
MMV Case Study - LinkedIn
Daniel Alexander
 
fact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewfact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overview
Devan Gopal
 
M3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-BrochureM3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-Brochure
Padraig Smyth
 
Mattishall Community Project 2
Mattishall Community Project 2Mattishall Community Project 2
Mattishall Community Project 2
Wendy Norfolk
 
Presentation 13th October 09 Mattishall Community Project
Presentation 13th October 09   Mattishall Community ProjectPresentation 13th October 09   Mattishall Community Project
Presentation 13th October 09 Mattishall Community Project
NorfolkRCC
 

What's hot (8)

An overview of Zambia’s mining sector
An overview of Zambia’s mining sectorAn overview of Zambia’s mining sector
An overview of Zambia’s mining sector
 
Eu India Grid Project Presentation Andy
Eu India Grid Project Presentation AndyEu India Grid Project Presentation Andy
Eu India Grid Project Presentation Andy
 
$300 million still up for grabs
$300 million still up for grabs$300 million still up for grabs
$300 million still up for grabs
 
MMV Case Study - LinkedIn
MMV Case Study - LinkedInMMV Case Study - LinkedIn
MMV Case Study - LinkedIn
 
fact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overviewfact-sheet-wheatstone-project-overview
fact-sheet-wheatstone-project-overview
 
M3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-BrochureM3-Clonee-to-Kells-Motorway-Opening-Brochure
M3-Clonee-to-Kells-Motorway-Opening-Brochure
 
Mattishall Community Project 2
Mattishall Community Project 2Mattishall Community Project 2
Mattishall Community Project 2
 
Presentation 13th October 09 Mattishall Community Project
Presentation 13th October 09   Mattishall Community ProjectPresentation 13th October 09   Mattishall Community Project
Presentation 13th October 09 Mattishall Community Project
 

Similar to Exhibition boards 2

South Devon Link Road presentation
South Devon Link Road presentationSouth Devon Link Road presentation
South Devon Link Road presentation
DevonCountyCouncil
 
Gt create presentation
Gt create presentationGt create presentation
Gt create presentation
Duncan Dibble
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
Candice Spiroski
 
City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016
Samantha Beneke
 
Key lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemesKey lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemes
Switch2 Energy Limited
 
Delivering our transport future now
Delivering our transport future nowDelivering our transport future now
Delivering our transport future now
JumpingJaq
 
Stevenage Revision
Stevenage RevisionStevenage Revision
Stevenage Revision
missm
 
Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2
Claus Otto Nielsen
 
Eu sulphur directive_dfds
Eu sulphur directive_dfdsEu sulphur directive_dfds
Eu sulphur directive_dfds
Joachim Woehlkens
 
Global District Energy Awards 2013 Overview
Global District Energy Awards 2013 OverviewGlobal District Energy Awards 2013 Overview
Global District Energy Awards 2013 Overview
Pôle Réseaux de Chaleur - Cerema
 
D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014
D2N2lep
 
009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future
djhutch
 
405235 State Of Estate Vis5
405235 State Of Estate Vis5405235 State Of Estate Vis5
405235 State Of Estate Vis5
highgate10
 
Ceca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growthCeca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growth
Place North West
 
Sustainable Transport
Sustainable TransportSustainable Transport
Sustainable Transport
Parliamentary Yearbook
 
Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...
Project Controls Expo
 
David Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon AmbitionsDavid Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon Ambitions
icarb
 
West of England Joint Transport Study summary newsletter
West of England Joint Transport Study summary newsletterWest of England Joint Transport Study summary newsletter
West of England Joint Transport Study summary newsletter
West of England: building our future
 
CSPR
CSPRCSPR
Broadband Summit 1
Broadband Summit 1Broadband Summit 1
Broadband Summit 1
Jesse Norman
 

Similar to Exhibition boards 2 (20)

South Devon Link Road presentation
South Devon Link Road presentationSouth Devon Link Road presentation
South Devon Link Road presentation
 
Gt create presentation
Gt create presentationGt create presentation
Gt create presentation
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 
City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016City Rail Link sustainabiilty annual review 2015 - 2016
City Rail Link sustainabiilty annual review 2015 - 2016
 
Key lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemesKey lessons from the most successful community heating schemes
Key lessons from the most successful community heating schemes
 
Delivering our transport future now
Delivering our transport future nowDelivering our transport future now
Delivering our transport future now
 
Stevenage Revision
Stevenage RevisionStevenage Revision
Stevenage Revision
 
Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2
 
Eu sulphur directive_dfds
Eu sulphur directive_dfdsEu sulphur directive_dfds
Eu sulphur directive_dfds
 
Global District Energy Awards 2013 Overview
Global District Energy Awards 2013 OverviewGlobal District Energy Awards 2013 Overview
Global District Energy Awards 2013 Overview
 
D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014D2N2 Growth Deal July 2014
D2N2 Growth Deal July 2014
 
009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future009 Eco-island: The hub of a sustainable future
009 Eco-island: The hub of a sustainable future
 
405235 State Of Estate Vis5
405235 State Of Estate Vis5405235 State Of Estate Vis5
405235 State Of Estate Vis5
 
Ceca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growthCeca north west infrastructure the routemap for regional growth
Ceca north west infrastructure the routemap for regional growth
 
Sustainable Transport
Sustainable TransportSustainable Transport
Sustainable Transport
 
Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...Governance and Assurance for Nationally Significant Infrastructure Projects b...
Governance and Assurance for Nationally Significant Infrastructure Projects b...
 
David Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon AmbitionsDavid Wilson | Scotland’s Low Carbon Ambitions
David Wilson | Scotland’s Low Carbon Ambitions
 
West of England Joint Transport Study summary newsletter
West of England Joint Transport Study summary newsletterWest of England Joint Transport Study summary newsletter
West of England Joint Transport Study summary newsletter
 
CSPR
CSPRCSPR
CSPR
 
Broadband Summit 1
Broadband Summit 1Broadband Summit 1
Broadband Summit 1
 

Recently uploaded

SAP S/4 HANA sourcing and procurement to Public cloud
SAP S/4 HANA sourcing and procurement to Public cloudSAP S/4 HANA sourcing and procurement to Public cloud
SAP S/4 HANA sourcing and procurement to Public cloud
maazsz111
 
WeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation TechniquesWeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation Techniques
Postman
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
Zilliz
 
Trusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process MiningTrusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process Mining
LucaBarbaro3
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
ScyllaDB
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
HarisZaheer8
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
saastr
 
Public CyberSecurity Awareness Presentation 2024.pptx
Public CyberSecurity Awareness Presentation 2024.pptxPublic CyberSecurity Awareness Presentation 2024.pptx
Public CyberSecurity Awareness Presentation 2024.pptx
marufrahmanstratejm
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
June Patch Tuesday
June Patch TuesdayJune Patch Tuesday
June Patch Tuesday
Ivanti
 
A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024
Intelisync
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
Edge AI and Vision Alliance
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
Tomaz Bratanic
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
Pixlogix Infotech
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
MichaelKnudsen27
 
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
alexjohnson7307
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
Tatiana Kojar
 

Recently uploaded (20)

SAP S/4 HANA sourcing and procurement to Public cloud
SAP S/4 HANA sourcing and procurement to Public cloudSAP S/4 HANA sourcing and procurement to Public cloud
SAP S/4 HANA sourcing and procurement to Public cloud
 
WeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation TechniquesWeTestAthens: Postman's AI & Automation Techniques
WeTestAthens: Postman's AI & Automation Techniques
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
 
Trusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process MiningTrusted Execution Environment for Decentralized Process Mining
Trusted Execution Environment for Decentralized Process Mining
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
AWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptxAWS Cloud Cost Optimization Presentation.pptx
AWS Cloud Cost Optimization Presentation.pptx
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
 
Public CyberSecurity Awareness Presentation 2024.pptx
Public CyberSecurity Awareness Presentation 2024.pptxPublic CyberSecurity Awareness Presentation 2024.pptx
Public CyberSecurity Awareness Presentation 2024.pptx
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
June Patch Tuesday
June Patch TuesdayJune Patch Tuesday
June Patch Tuesday
 
A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024A Comprehensive Guide to DeFi Development Services in 2024
A Comprehensive Guide to DeFi Development Services in 2024
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
 
GraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracyGraphRAG for Life Science to increase LLM accuracy
GraphRAG for Life Science to increase LLM accuracy
 
Best 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERPBest 20 SEO Techniques To Improve Website Visibility In SERP
Best 20 SEO Techniques To Improve Website Visibility In SERP
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
 
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
leewayhertz.com-AI in predictive maintenance Use cases technologies benefits ...
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
 

Exhibition boards 2

  • 1. What is being proposed? The plans are to create a 5km, created by widening the existing two lane dual carriageway road until Aller. The road then between Penn Inn and the Torbay swings west before proceeding Ring Road at Kerswell Gardens. in a southerly direction to bypass Kingskerswell, joining the Starting just before the Penn Inn Torbay Ring Road west of roundabout, a flyover would take Kerswell Gardens. traffic onto a dual carriageway,
  • 2. The Government’s challenge to reduce costs The scheme was forecast to cost over a longer period. This will not £121m, but as the Government change or lessen the benefits of spending review took effect last the scheme – there will still be year, all transport schemes under gains from the very start, but it will consideration were asked to look mean that not all the work will be for savings. done at the same time. Engineers at Devon County Council As a result, the immediate cost and Torbay Council reviewed the of the scheme has been reduced proposals and concluded that to £110m, although Devon and the scheme could be rolled out in Torbay will have to contribute stages, to reduce the immediate more through a variety of funding cost and spread the spending packages.
  • 3. So what has changed? At Penn Inn, the new bridge over At Edginswell Junction, the dualling the roundabout would be narrower. that was planned for the road at Losing this extra width will save this point would also be built at a significant sum, but it will not a later date, also reducing the materially change the way the immediate cost of the scheme. road operates. Finally, omitting the metre wide The Aller Junction is being hard strips has reduced the width reconfigured to reduce its immediate of the road construction. This cost. As there are alternative ways to change also means that the 50mph access the new road, two new slip speed limit will be extended from roads and the Aller Link Road would Aller through to Edginswell. be built at a later date.
  • 4. New jobs, new local opportunities 134,000 people live in Torbay, but effect across the tourism and retail these numbers swell dramatically sectors. As a result, the new road during the tourist seasons, making could create an additional 7,960 the roads even more crowded. jobs across Devon and Torbay. Tourism is a key part of Torbay’s Around 3,500 of these jobs would economy, with nearly 17% of all be in Torbay, with around 750 being jobs in the tourist industry, so a in the tourist sector. good transport network is vital. With the increase in employment, The scheme will create the right this will bring another £125m per environment for local businesses to year into Torbay’s economy, which thrive, which will have a knock on will transform the area.
  • 5. Land Management With such a large scale project, Careful use has been made of it has also been important to the contours of the land, creating ensure that the visual impact artificial cuttings where necessary of the road is minimised as far to screen the new route from as possible. houses and viewpoints.
  • 6. Costs 2010 Cost of scheme £121m Department for Transport contribution £108m 2011 Cost of current scheme £110m Department for Transport contribution £76m Devon County Council contribution £17m Torbay Council contribution £17m
  • 7. What happens next? The scheme is in a development the Secretary of State, construction pool competing against 45 other could start in 2012 and the road schemes for a share of £630m. could be in operation by The total value of all the schemes is December 2015. around £900m so it’s clear that not all of them will be successful. However, we have lots to do in the meantime. We have reduced A new final business case is our costs significantly without being produced at the moment, compromising the effectiveness which will be submitted by 9 of the scheme. There are clear September 2011. A decision on the economic, social and environmental successful schemes is expected benefits. So now the road needs by Christmas. If the scheme was your support! granted permission to proceed by
  • 8. How to help We need to show the Ministers the road by writing to the Minister making the decision that this is responsible for making the decision the best option. The case has to and to our MPs. Their details are on demonstrate that this is best for the newsletter – ask staff for a copy. the area, that it has the backing of The more detail you can give the community and so the money about the difference a new road should be spent here, on this road. will make, the more effective the There will be some that disagree, letter will be. MPs and Ministers get and the same process applies. thousands of letters each day, so Writing to the Minister and MPs will it’s important to make it stand out be very important in either case. and make it personal. You can help make the case for Thank you very much for your help.
  • 9. More information For more information please visit our website: www.southdevonlinkroad.co.uk or email: sdlr@coastmarcoms.co.uk or contact: Paul Ewings at Matford Offices Devon County Council County Hall Topsham Road Exeter EX2 4QW