EXECUTIVE’S HANDBOOK ON IT STRATEGY AND
GOVERNANCE
K. Musundire CA(Z), RPA, CISM
2018
INTRODUCTION
1. IT Industry Overview
2. What is IT Strategy
- Core components expected to be found in an IT Strategy
- Relationship between IT and Business Strategy
3. IT Governance
- Applicable guidance- legal, regulatory and theory
- Common pitfalls
2
1. SETTING THE CONTEXT…
What’s coming? Overview of the Technology industry in 2018
1. IT INDUSTRY OVERVIEW
IT is increasingly advancing and has become pervasive causing digital disruptions in social,
public & business environments. As a result more than ever, enterprises and their executives
strive to:
 maintain high quality information to support business decisions
 generate business value from IT enabled investments i.e achieve strategic goals & realise
business benefits through effective & innovative use of IT.
 achieve operational excellence through the reliable & efficient application of technology.
 maintain IT related risk at an acceptable level.
 optimise the cost of IT services & technology.
 comply with ever-increasing relevant laws, regulations, contractual agreements & policies.
 Successful enterprises have recognised that the board & executives need to embrace it like
any other significant part of doing business. boards & management both in business & it
functions must collaborate and work together, so that IT is included within the governance
and management approach
2. WHY IT GOVERNANCE?
• The widespread use of technology has created a critical dependence on IT which has
brought about the need to focus on IT Governance
• The volatile nature of the IT industry call for focussed control structures
• IT Governance consists of leadership, organizational structures and processes that will
ensure that IT sustains and extends the organizations strategies and objectives
• IT Governance ensures that it goals are met, IT risks are mitigated such that IT delivers value
to sustain and grow the business
• The business has its set goals! And IT is a driver of business goals
• Whatever IT is planning, those plans must be in alignment with organizational goals
• Whatever IT does, there must be a common goal
2. WHY IT GOVERNANCE? (CONT’D)
• If you are a financial institution, your business goals may be to
provide seamless service which is not defined by the walls of a
banking hall
• How can IT support this business objective?
• Internet banking
• Mobile Banking systems
• Increased emphasis on Information Security
• Digitizing systems to reduce transacting costs
2. IT GOVERNANCE
Relevant literature on IT Governance in
Zimbabwe
• Zimbabwe Code on Corporate Governance
• Corporate Governance Bill
• Companies Act
• COBIT 5
• ITIL
8
The Zimbabwe Code on
Corporate Governance
and the Corporate
Governance Bill places
an explicit requirement
on the Board to oversee
IT in the same way that
Finance, Risk and
Internal Audit receives
Board attention.
3. IT GOVERNANCE… THE BENEFITS
• Reduction in IT risks
• Reduction in costs
• Return on investment is assured, allowing enterprise to meet
objectives
• Fewer surprises and less frustration due to projects follow up
• Improvement in quality
• Enhanced service delivery
4. 5 KEY IT DECISIONS
DIGITIZATION
• DRIVEN BY business
Strategy
• How is IT to be used
ENTERPRISE
ARCHITECTURE
• Logically
organizing data,
applications and
infrastructure to
achieve
standardization
and integration
IT
INFRASTRACTUR
E STRATEGIES
• Delivery of
technical and
reliable services
through shared
capabilities
BUSINESS
APPLICATION
NEEDS
• Acquiring and
developing
applications based
on business needs
and specifications
IT INVESTMENT
• Where and how
much to invest on it
projects
IT Governance
Strategic
alignment
Value
Delivery
Risk
Manage
ment
Performa
nce
Manage
ment
Resource
Manage
ment
5. IT GOVERNANCE… THE CORE FOCUS AREAS
5.1 STRATEGIC ALIGNMENT
• It strategic alignment is the
combined alignment of all IT
units’ strategies, plans,
processes, investments and
decisions to support the overall
functionality and purpose of the
organization
5.2 QUESTION TO THOSE CHARGED WITH MANAGING INFORMATION
RESOURCE
• What are the major problems being faced by your organization from the following
perspectives
• People
• Processes
• Systems
• How are these problems and challenges reflected on the IT Unit’s balanced scorecard? If these are not
represented, there is a possible strategic risk between IT and the rest of the business
5.2 VALUE DELIVERY
• Value delivery is about executing the value proposition, delivering on promises made in building the
business case.
• Answers the following questions
• Are we doing the right things (scope)?
• At the right cost, are we getting the benefits?
• At the right time?
Like any investment, any investor should expect a return on the investment. Governance is concerned with
ensuring the benefits from the project are obtained.
• Typical Failure in ensuring Value Delivery: Most entities run ERP’s like SAP yet they use less than 50% of
their capacity.
• ROI on IT is rarely measured. ROI= NET PROFIT/ INVESTMENT
5.2.1 PRACTICAL EXAMPLE
2017 governance failures in a local financial institution
• One financial institution invested in a new agency banking system, values invested were estimated to be north of
$1million.
• Projections were that the platform will allow thousands of new accounts monthly
• At the end of the last financial year the institution only managed to create less than 100 accounts through the
platform
Governance failures were:
• No business case was made prior to the investment to analyse if the solution is based on a market need
• No project risk management was done
• There was no IT steering committee, decisions were centralized in one dominant executive
• No due diligence was performed on the supplier, the vendor could not resolve some problems
• No post mortem was done, that institution may make the same mistakes
5.3 RESOURCE MANAGEMENT
• Its about the optimal investment in and proper management of critical IT resources
which include
• Applications
• Information
• Infrastructure
• People
• Key issues relate to optimization of knowledge and infrastructure
• Is there really no capability to develop some of the acquired systems?
• Do you really need to build your own data centre?
• Are we operating cost efficient and effective it services?
5.3.1 PRACTICAL EXAMPLE, RESOURCE MANAGEMENT
• One institution invested in a new system and subsequently acquired 3 other systems
• In a few months, the institution found that the first system was able to perform the functions
embedded in the subsequently acquired systems
• The initially acquired system was not being put to optimal use leading to Users requesting for
additional systems to perform functions which they did not know were already capable of being
performed by the first system
The governance failures were
- There was no IT steering committee to drive return on investment
- Lack of understanding of acquired system. No-one sought to understand the system, no one
took stock of the skills gap to support the systems.
5.4. RISK MANAGEMENT
• Consists of instituting a formal framework which puts some rigour in how it
measures, accepts and manages risk as well as reporting on what it is managing
in terms of risk
• Management should have a clear understanding of the organizations’ risk
appetite, compliance requirements
5.4.1.EACH IT PROJECT MUST HAVE A RISK REGISTER
• Senior management must be involved. Don’t
expect IT to effectively manage their own risk
without being monitored
• Each project must have its own risk register.
• The project risk register must cover pertinent
risks such as
• Market risks affecting project success
• Cyber security risks
• Technological volatility risks
• Skills assessments
• Over reliance on a vendor
5.5 PERFORMANCE MANAGEMENT
• Consists of tracking and monitoring of strategy implementation, project
completion, resource usage, process performance and service delivery using
tools like balanced score card
• As management look at those contracts with vendors, monitor performance
on contracts
6. RELATIONSHIP BETWEEN IT & BUSINESS STRATEGY
Business Strategy IS Strategy
Info systems supports business strategy
7. IT STRATEGY…..WHAT IS IT?
• PROCESS TO ALIGN IT CAPABILITY WITH BUSINESS STRATEGY.
KEY OBJECTIVE OF IT STRATEGY:
• Deliver the right technology & applications to the right place ,at the right time and at the right level of cost
efficiency & effectiveness.
IT STRATEGY SHOULD ANSWER THE FOLLOWING QUESTIONS:
• Are we doing the right things with technology to address the organisation most important business priorities?
• Are we making the right technology investments?
• Do we measure what is the real value to the organisation derived from that technology.?
• Is our current information technology agile enough and flexible to continuously successfully support the
organisation.?
• Can our strategy support current & future business needs?
7.1 CORE COMPONENTS FOR IS STRATEGY
IT INFRASTRUCTURE
STRATEGY
- All the hardware, the
software & operating
systems running on it
representing the
engine that delivers all
of what IT delivers for
the enterprise.
SERVICE
-Established through
SLAs or simply inferred
from a budget, an
enterprise signs on for
a certain level of
service out of its
infrastructure
operation.
APPLICATION
PORTFOLIO CHANGE
-This strategic element
covers the rate and
extent of change to
the application over a
defined future period.
BUSINESS PROCESS
INTEGRATION
- This represents the
degree to which the
enterprise operates as
a single unit.
SOURCING
Addresses the source
of all people who
perform the work
needed to execute the
strategy whether
internal employees or
external personnel
from business partners.
7.2 IT STRATEGY…COMMON PITFALLS
• LACK OF OWNERSHIP, LACK OF ACCOUNTABILITY AND COMMITMENT BY MANAGEMENT. LEAVE IT
ALL TO THE CIO.
• NOT DISCUSSING IT ISSUES UNTIL THERE ARE PROBLEMS.. LACK OF PLANNING
• NOT TRACKING PROGRESS EFFECTIVELY
• NOT HAVING REGULAR REVIEWS & UPDATES
• NOT BEING ABLE TO IDENTIFY APPROPRIATE TALENT & SKILLS
• NOT HAVING A SKILLS UPGRADE BUDGET TO ALLOW STAFF SKILLS TO MOVE WITH THE
TECHNOLOGY
7.2 IT STRATEGY…COMMON PITFALLS (CONT’D)
FAILURE TO REALISE RETURN ON IT INVESTMENTS. FAILURE OF IT INITIATIVES TO BRING
INNOVATION OR DELIVER THE PROMISED BENEFITS.
ENTERPRISE EFFICIENCY & CORE PROCESSES NEGATIVELY IMPACTED BY POOR QUALITY OF IT
DELIVERABLES.
DEADLINES NOT MET, PROJECT COSTS HIGHER THAN EXPECTED & QUALITY LOWER THAN
ANTICIPATED.
INFLEXIBLE IT ORGANIZATIONAL STRUCTURE
NO DEFINED GOVERNANCE OR RISK FRAMEWORK
INCONSISTENT POLICIES & PROCEDURES.
POOR COMMUNICATION.
7.2 IT STRATEGY…COMMON PITFALLS (CONT’D)
• Lack of ownership and commitment -departments and users left to be the owners of the system. Hence no
strategies put in place to monitor IT systems and evaluate benefits from informantion systems. IT projects not
prioritised. Ideal situation is IT project plans with set milestones in place. Steering committee whose members
include senior management should be in place to monitor the projects, tracking progress vs milestones and
monitoring performance of systems. Eg a company where it was not represented in executive management
and was under finance only to realise importance of ict to the business after loss of key information
• Tracking of progress- where a system is implemented, tracking for achievement of milestones should be
done to meet project financial budget, timelines and determine if project scope and parameters are
appropriate
7.3 IMPLICATIONS ON BUSINESS PERFORMANCE
• Resources May End Up Being Channelled To The Wrong Areas
• Businesses May Fail To Identify Opportunities For Growth.
• Failure To Identify Risks Being Faced By The Business .
• Business May Fail To Come Up With Appropriate Responses To Risks.
7.4 HOW SHOULD IT GOVERNANCE BE
STRUCTURED
BOARD/ AUDIT COMMITTEE
• Drive Enterprise Alignment
• Direction of value
• Overall responsibility for
Risk Management including
Cyber Security risk
• Measure Performance
IT STEERING COMMITTEE
• Align and structure IT
organisation with
overall business goals
• Establish risk frame
work to manage and
monitor risks
• Measure performance
to goals
• Establish IT
competencies
• Manage resources
• Create an innovative
environment.
MANAGEMENT/ CEO
• Financier
• Push for return on
investment
8. WISE WORDS
No IT strategy lives in isolation. An IT strategy formulated without appropriate Governance structures and
processes to support it will not be survive these VUCA times.
K. Musundire -2018
9. ABOUT THE PRESENTER
KUDAKWASHE MUSUNDIRE
TelOne Audit & Risk Executive
Chartered Accountant (ICAZ)
CISM (ISACA)
Email: kmusundire@yahoo.com
10. COMMENTS & DISCUSSIONS

Executive's Handbook on IT Strategy and Governance

  • 1.
    EXECUTIVE’S HANDBOOK ONIT STRATEGY AND GOVERNANCE K. Musundire CA(Z), RPA, CISM 2018
  • 2.
    INTRODUCTION 1. IT IndustryOverview 2. What is IT Strategy - Core components expected to be found in an IT Strategy - Relationship between IT and Business Strategy 3. IT Governance - Applicable guidance- legal, regulatory and theory - Common pitfalls 2
  • 3.
    1. SETTING THECONTEXT… What’s coming? Overview of the Technology industry in 2018
  • 5.
    1. IT INDUSTRYOVERVIEW IT is increasingly advancing and has become pervasive causing digital disruptions in social, public & business environments. As a result more than ever, enterprises and their executives strive to:  maintain high quality information to support business decisions  generate business value from IT enabled investments i.e achieve strategic goals & realise business benefits through effective & innovative use of IT.  achieve operational excellence through the reliable & efficient application of technology.  maintain IT related risk at an acceptable level.  optimise the cost of IT services & technology.  comply with ever-increasing relevant laws, regulations, contractual agreements & policies.  Successful enterprises have recognised that the board & executives need to embrace it like any other significant part of doing business. boards & management both in business & it functions must collaborate and work together, so that IT is included within the governance and management approach
  • 6.
    2. WHY ITGOVERNANCE? • The widespread use of technology has created a critical dependence on IT which has brought about the need to focus on IT Governance • The volatile nature of the IT industry call for focussed control structures • IT Governance consists of leadership, organizational structures and processes that will ensure that IT sustains and extends the organizations strategies and objectives • IT Governance ensures that it goals are met, IT risks are mitigated such that IT delivers value to sustain and grow the business • The business has its set goals! And IT is a driver of business goals • Whatever IT is planning, those plans must be in alignment with organizational goals • Whatever IT does, there must be a common goal
  • 7.
    2. WHY ITGOVERNANCE? (CONT’D) • If you are a financial institution, your business goals may be to provide seamless service which is not defined by the walls of a banking hall • How can IT support this business objective? • Internet banking • Mobile Banking systems • Increased emphasis on Information Security • Digitizing systems to reduce transacting costs
  • 8.
    2. IT GOVERNANCE Relevantliterature on IT Governance in Zimbabwe • Zimbabwe Code on Corporate Governance • Corporate Governance Bill • Companies Act • COBIT 5 • ITIL 8 The Zimbabwe Code on Corporate Governance and the Corporate Governance Bill places an explicit requirement on the Board to oversee IT in the same way that Finance, Risk and Internal Audit receives Board attention.
  • 9.
    3. IT GOVERNANCE…THE BENEFITS • Reduction in IT risks • Reduction in costs • Return on investment is assured, allowing enterprise to meet objectives • Fewer surprises and less frustration due to projects follow up • Improvement in quality • Enhanced service delivery
  • 10.
    4. 5 KEYIT DECISIONS DIGITIZATION • DRIVEN BY business Strategy • How is IT to be used ENTERPRISE ARCHITECTURE • Logically organizing data, applications and infrastructure to achieve standardization and integration IT INFRASTRACTUR E STRATEGIES • Delivery of technical and reliable services through shared capabilities BUSINESS APPLICATION NEEDS • Acquiring and developing applications based on business needs and specifications IT INVESTMENT • Where and how much to invest on it projects
  • 11.
  • 12.
    5.1 STRATEGIC ALIGNMENT •It strategic alignment is the combined alignment of all IT units’ strategies, plans, processes, investments and decisions to support the overall functionality and purpose of the organization
  • 13.
    5.2 QUESTION TOTHOSE CHARGED WITH MANAGING INFORMATION RESOURCE • What are the major problems being faced by your organization from the following perspectives • People • Processes • Systems • How are these problems and challenges reflected on the IT Unit’s balanced scorecard? If these are not represented, there is a possible strategic risk between IT and the rest of the business
  • 14.
    5.2 VALUE DELIVERY •Value delivery is about executing the value proposition, delivering on promises made in building the business case. • Answers the following questions • Are we doing the right things (scope)? • At the right cost, are we getting the benefits? • At the right time? Like any investment, any investor should expect a return on the investment. Governance is concerned with ensuring the benefits from the project are obtained. • Typical Failure in ensuring Value Delivery: Most entities run ERP’s like SAP yet they use less than 50% of their capacity. • ROI on IT is rarely measured. ROI= NET PROFIT/ INVESTMENT
  • 15.
    5.2.1 PRACTICAL EXAMPLE 2017governance failures in a local financial institution • One financial institution invested in a new agency banking system, values invested were estimated to be north of $1million. • Projections were that the platform will allow thousands of new accounts monthly • At the end of the last financial year the institution only managed to create less than 100 accounts through the platform Governance failures were: • No business case was made prior to the investment to analyse if the solution is based on a market need • No project risk management was done • There was no IT steering committee, decisions were centralized in one dominant executive • No due diligence was performed on the supplier, the vendor could not resolve some problems • No post mortem was done, that institution may make the same mistakes
  • 16.
    5.3 RESOURCE MANAGEMENT •Its about the optimal investment in and proper management of critical IT resources which include • Applications • Information • Infrastructure • People • Key issues relate to optimization of knowledge and infrastructure • Is there really no capability to develop some of the acquired systems? • Do you really need to build your own data centre? • Are we operating cost efficient and effective it services?
  • 17.
    5.3.1 PRACTICAL EXAMPLE,RESOURCE MANAGEMENT • One institution invested in a new system and subsequently acquired 3 other systems • In a few months, the institution found that the first system was able to perform the functions embedded in the subsequently acquired systems • The initially acquired system was not being put to optimal use leading to Users requesting for additional systems to perform functions which they did not know were already capable of being performed by the first system The governance failures were - There was no IT steering committee to drive return on investment - Lack of understanding of acquired system. No-one sought to understand the system, no one took stock of the skills gap to support the systems.
  • 18.
    5.4. RISK MANAGEMENT •Consists of instituting a formal framework which puts some rigour in how it measures, accepts and manages risk as well as reporting on what it is managing in terms of risk • Management should have a clear understanding of the organizations’ risk appetite, compliance requirements
  • 19.
    5.4.1.EACH IT PROJECTMUST HAVE A RISK REGISTER • Senior management must be involved. Don’t expect IT to effectively manage their own risk without being monitored • Each project must have its own risk register. • The project risk register must cover pertinent risks such as • Market risks affecting project success • Cyber security risks • Technological volatility risks • Skills assessments • Over reliance on a vendor
  • 20.
    5.5 PERFORMANCE MANAGEMENT •Consists of tracking and monitoring of strategy implementation, project completion, resource usage, process performance and service delivery using tools like balanced score card • As management look at those contracts with vendors, monitor performance on contracts
  • 21.
    6. RELATIONSHIP BETWEENIT & BUSINESS STRATEGY Business Strategy IS Strategy Info systems supports business strategy
  • 22.
    7. IT STRATEGY…..WHATIS IT? • PROCESS TO ALIGN IT CAPABILITY WITH BUSINESS STRATEGY. KEY OBJECTIVE OF IT STRATEGY: • Deliver the right technology & applications to the right place ,at the right time and at the right level of cost efficiency & effectiveness. IT STRATEGY SHOULD ANSWER THE FOLLOWING QUESTIONS: • Are we doing the right things with technology to address the organisation most important business priorities? • Are we making the right technology investments? • Do we measure what is the real value to the organisation derived from that technology.? • Is our current information technology agile enough and flexible to continuously successfully support the organisation.? • Can our strategy support current & future business needs?
  • 23.
    7.1 CORE COMPONENTSFOR IS STRATEGY IT INFRASTRUCTURE STRATEGY - All the hardware, the software & operating systems running on it representing the engine that delivers all of what IT delivers for the enterprise. SERVICE -Established through SLAs or simply inferred from a budget, an enterprise signs on for a certain level of service out of its infrastructure operation. APPLICATION PORTFOLIO CHANGE -This strategic element covers the rate and extent of change to the application over a defined future period. BUSINESS PROCESS INTEGRATION - This represents the degree to which the enterprise operates as a single unit. SOURCING Addresses the source of all people who perform the work needed to execute the strategy whether internal employees or external personnel from business partners.
  • 24.
    7.2 IT STRATEGY…COMMONPITFALLS • LACK OF OWNERSHIP, LACK OF ACCOUNTABILITY AND COMMITMENT BY MANAGEMENT. LEAVE IT ALL TO THE CIO. • NOT DISCUSSING IT ISSUES UNTIL THERE ARE PROBLEMS.. LACK OF PLANNING • NOT TRACKING PROGRESS EFFECTIVELY • NOT HAVING REGULAR REVIEWS & UPDATES • NOT BEING ABLE TO IDENTIFY APPROPRIATE TALENT & SKILLS • NOT HAVING A SKILLS UPGRADE BUDGET TO ALLOW STAFF SKILLS TO MOVE WITH THE TECHNOLOGY
  • 25.
    7.2 IT STRATEGY…COMMONPITFALLS (CONT’D) FAILURE TO REALISE RETURN ON IT INVESTMENTS. FAILURE OF IT INITIATIVES TO BRING INNOVATION OR DELIVER THE PROMISED BENEFITS. ENTERPRISE EFFICIENCY & CORE PROCESSES NEGATIVELY IMPACTED BY POOR QUALITY OF IT DELIVERABLES. DEADLINES NOT MET, PROJECT COSTS HIGHER THAN EXPECTED & QUALITY LOWER THAN ANTICIPATED. INFLEXIBLE IT ORGANIZATIONAL STRUCTURE NO DEFINED GOVERNANCE OR RISK FRAMEWORK INCONSISTENT POLICIES & PROCEDURES. POOR COMMUNICATION.
  • 26.
    7.2 IT STRATEGY…COMMONPITFALLS (CONT’D) • Lack of ownership and commitment -departments and users left to be the owners of the system. Hence no strategies put in place to monitor IT systems and evaluate benefits from informantion systems. IT projects not prioritised. Ideal situation is IT project plans with set milestones in place. Steering committee whose members include senior management should be in place to monitor the projects, tracking progress vs milestones and monitoring performance of systems. Eg a company where it was not represented in executive management and was under finance only to realise importance of ict to the business after loss of key information • Tracking of progress- where a system is implemented, tracking for achievement of milestones should be done to meet project financial budget, timelines and determine if project scope and parameters are appropriate
  • 27.
    7.3 IMPLICATIONS ONBUSINESS PERFORMANCE • Resources May End Up Being Channelled To The Wrong Areas • Businesses May Fail To Identify Opportunities For Growth. • Failure To Identify Risks Being Faced By The Business . • Business May Fail To Come Up With Appropriate Responses To Risks.
  • 28.
    7.4 HOW SHOULDIT GOVERNANCE BE STRUCTURED BOARD/ AUDIT COMMITTEE • Drive Enterprise Alignment • Direction of value • Overall responsibility for Risk Management including Cyber Security risk • Measure Performance IT STEERING COMMITTEE • Align and structure IT organisation with overall business goals • Establish risk frame work to manage and monitor risks • Measure performance to goals • Establish IT competencies • Manage resources • Create an innovative environment. MANAGEMENT/ CEO • Financier • Push for return on investment
  • 29.
    8. WISE WORDS NoIT strategy lives in isolation. An IT strategy formulated without appropriate Governance structures and processes to support it will not be survive these VUCA times. K. Musundire -2018
  • 30.
    9. ABOUT THEPRESENTER KUDAKWASHE MUSUNDIRE TelOne Audit & Risk Executive Chartered Accountant (ICAZ) CISM (ISACA) Email: kmusundire@yahoo.com
  • 31.
    10. COMMENTS &DISCUSSIONS