1
SVKM’S NMIMS UNIVERSITY
Mukesh Patel School of Technology Management &
Engineering
Executive Summary
On
PRODUCTIVITY IMPROVEMENT OF LOCATOR ASSEMBLY
By
HARSH THAKER
MBATech Mechanical [K038]
Nuclear equipment Department,
Larsen & Toubro Ltd
2
INDEX
1. ABSTRACT ------------------------------------------------------------------------------------------------------------3
2. INTRODUCTION----------------------------------------------------------------------------------------------------4
3. MY CONTRIBUTION TO THE LOCATOR ASSEMBLY PROJECT-------------------------------------------5
4. CONCLUSION-------------------------------------------------------------------------------------------------------6
3
1. ABSTRACT
Larsen & Toubro Limited (L&T) is a technology, engineering, construction and manufacturing
company. It is one of the largest and most respected companies in India's private sector. The
historical background of M/S LARSEN & TOUBRO highlights its gradual establishment. This
report starts with introduction to the company with the company spectrum and later highlights
the different engineering departments of company.
I was placed in the Nuclear Power Plant Equipment SBU, PMG Department of Heavy
Engineering Division (HED). I gained experience and knowledge about the importance of work
culture and planning & execution, which is one of the privileges of working in the PMG – Project
Management Group.
In this department project named LOCATOR ASSEMBLY is going on. LOCATOR ASSEMBLY is the
assembly of different component which is then used in nuclear reactor which is setup in
KAKRAPUR AND RAJASTHAN. Major operation done by L&T in this project is welding of different
component of locator assembly in dust free environment shop.
Following problems were faced during the operation on locator assembly
 Inaccurate fixture design for trial welding which leads to welding defects like (suck back,
excess filler metal etc.)
 Lot of time consumption in handling the assembly within the shop
 No proper ergonomics within the shop leading decrease in productivity
In order to address this problem I have made two fixture design on 3D software, both the
design are proposed to my mentor with their pros and cons. I have also made the layout of the
shop on the basis of the sequence of the process it follows and to reduce the material handling
time in the shop. I have tried to put my sincere efforts to make this report a worthy & honest
declaration of whatever I accomplished at M/S Larsen & Toubro Ltd.
4
2. INTRODUCTION:I worked as “junior supervisor” at the DFE (dust free environment) shop,
where the locator assembly were made. I use to take the status of each locator assembly and
make the record of them. I use to give this status to my mentor on daily basis. I was also
responsible for keeping the record of requirements in the shop for near future, which includes
raw material, tools (filler metal, grinding machine, vernier calliper etc.). I also co-ordinate
different department like quality check department, welding engineering department, project
management department by giving them status and informing problem faced by welders during
welding.
I also use to coordinate with store department at time of any dispatch of the assembly
or procurement of the assembly from the vendors or customer by producing request
notice in the system.
Following were my responsibility during my internship:
1. Getting the detail of the work assign to the welder on each day.
2. Keeping the record of the locator assembly in the shop and no. of operation
done on it.
3. Collecting the record of the Radiographic Test from the R.T. department.
4. Intimating the store department if there is some requirement of any raw
material in the store
5. Coordinating with the vendors in order to know the delivery date of the locator
assembly at the shop
6. Keeping the record of the problem found in the locator assembly during the
radiographic test.
7. Keeping the record of the solution decided for those failed assemblies by
welding engineering department.
5
3. MY CONTRIBUTION TO THE LOCATOR ASSEMBLY PROJECT.
I have first analysed the problem faced on automatic welding machine
due to fixture. I had then list down the problem face due to the fixtures on the weld joint.
Following were the problems faced due to inaccurate fixture
1. Multiple layer of filler material on the circumference of the pipe
2. Constant variation of the voltage and current in the automatic machine due to
varying distance between the pipe and the Torch.
3. Sensitivity of the machine for voltage and current was difficult to set.
4. Common defect found in radiographic test of the pipe were: SUCK BACK, EXCESS
PENITRATION, VOID AT SIDE OF THE PIPE.
In order to address this problem I have made two fixture design on 3D
software.(unigraphics , solidworks).Both the fixture designs are made such that it can fix
almost all the standard O.D. Pipes which are commonly available at the shop.
Both the designs are analysed by me and I have made pros and cons of each design and
submitted to my mentor.
I have also made the layout of the shop in order to avoid following problem
1. Lot of time consumption in handling the assembly within the shop
2. No proper ergonomics within the shop leading decrease in productivity
3. No define path for walking in the shop especially while inspection.
There were few operation (like: liquid penetration test, radiographic test, dimension
inspection) done on the locator assembly which cannot be identified weather it is done
or not by just looking at it. Hence to avoid such problem I have developed few logical
symbols which are kept on the locator assembly in order to understand its stage on
operation sequence.
6
4. CONCLUSION:
During the process of making design of fixture, I realised that 3-D modelling software makes the
process very easy and quick. It helps to analyse the design more efficiently and precisely. After
a brief discussion with my mentor regarding the two design of fixture proposed by me, we
concluded that design 1 and 2 both can serve the objective, but design 1 is expensive to make
and its use in our project will not be as excessive as compare to design 2.
I had also made shop layout, which was partially implemented and many desired
outcome were noticed like reduction in handling time, increase of productivity etc.
Shop layout can be even more modified if the Radiographic Test machine is setup
within the shop. By doing this huge amount of time can be saved during the process.

More Related Content

What's hot

fazil resume
fazil resumefazil resume
fazil resume
mohamed fazil
 
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET Journal
 
Presentation on mechanical engineering
Presentation on mechanical engineering Presentation on mechanical engineering
Presentation on mechanical engineering
Piyush Shanker
 
How does the plastic injection moulding process work?
How does the plastic injection moulding process work?How does the plastic injection moulding process work?
How does the plastic injection moulding process work?
Essentra Components
 
Mould manufacturing capability - Bluestar Mould
Mould manufacturing capability - Bluestar MouldMould manufacturing capability - Bluestar Mould
Mould manufacturing capability - Bluestar Mould
Huy Dickens
 
PRO Creo
PRO CreoPRO Creo
PRO Creo
Luke Rumming
 

What's hot (6)

fazil resume
fazil resumefazil resume
fazil resume
 
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
 
Presentation on mechanical engineering
Presentation on mechanical engineering Presentation on mechanical engineering
Presentation on mechanical engineering
 
How does the plastic injection moulding process work?
How does the plastic injection moulding process work?How does the plastic injection moulding process work?
How does the plastic injection moulding process work?
 
Mould manufacturing capability - Bluestar Mould
Mould manufacturing capability - Bluestar MouldMould manufacturing capability - Bluestar Mould
Mould manufacturing capability - Bluestar Mould
 
PRO Creo
PRO CreoPRO Creo
PRO Creo
 

Viewers also liked

Curriculum Vitae Brendan Blackford
Curriculum Vitae Brendan BlackfordCurriculum Vitae Brendan Blackford
Curriculum Vitae Brendan Blackford
Brendan Blackford
 
Prosepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_finalProsepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_final
Wilfred Brown
 
DESVENTAJAS DEL TIC
DESVENTAJAS DEL TICDESVENTAJAS DEL TIC
DESVENTAJAS DEL TIC
nidia_dioses_olaya
 
Executive Summary (MIP)
Executive Summary (MIP)Executive Summary (MIP)
Executive Summary (MIP)
harsh654321
 
Life at Dell
Life at DellLife at Dell
Prosepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_finalProsepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_final
Wilfred Brown
 
20July2016 Michelle Tucker Resume
20July2016 Michelle Tucker Resume20July2016 Michelle Tucker Resume
20July2016 Michelle Tucker Resume
Michelle Tucker
 

Viewers also liked (7)

Curriculum Vitae Brendan Blackford
Curriculum Vitae Brendan BlackfordCurriculum Vitae Brendan Blackford
Curriculum Vitae Brendan Blackford
 
Prosepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_finalProsepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_final
 
DESVENTAJAS DEL TIC
DESVENTAJAS DEL TICDESVENTAJAS DEL TIC
DESVENTAJAS DEL TIC
 
Executive Summary (MIP)
Executive Summary (MIP)Executive Summary (MIP)
Executive Summary (MIP)
 
Life at Dell
Life at DellLife at Dell
Life at Dell
 
Prosepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_finalProsepctus employee retention wilfred brown_final
Prosepctus employee retention wilfred brown_final
 
20July2016 Michelle Tucker Resume
20July2016 Michelle Tucker Resume20July2016 Michelle Tucker Resume
20July2016 Michelle Tucker Resume
 

Similar to EXECUTIVE SUMMARY

RahulNavale
RahulNavaleRahulNavale
RahulNavale
Rahul Nawalez
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
eSAT Publishing House
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET Journal
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET Journal
 
IRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET- Design Development and Analysis of Low Pressure Bladeless TurbineIRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET Journal
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
Syed Jafri
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET Journal
 
Mark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement Presentation
Mark Redmond
 
DESIGN OF MACHINE ELEMENTS NOTES.PDF SHARE
DESIGN OF MACHINE ELEMENTS NOTES.PDF SHAREDESIGN OF MACHINE ELEMENTS NOTES.PDF SHARE
DESIGN OF MACHINE ELEMENTS NOTES.PDF SHARE
SelvaBabu2
 
ThermX1-Report
ThermX1-ReportThermX1-Report
ThermX1-Report
Ahmad Alshehri
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
MustafaElAkkad
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET Journal
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
FASI93
 
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
IRJET Journal
 
Ijtra150166
Ijtra150166Ijtra150166
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
eldhoev
 
Mechanical Measurement & Metrology ( PDFDrive ).pdf
Mechanical Measurement & Metrology ( PDFDrive ).pdfMechanical Measurement & Metrology ( PDFDrive ).pdf
Mechanical Measurement & Metrology ( PDFDrive ).pdf
NurulAlia43
 
Mechanical Measurement and metrology.pdf
Mechanical Measurement and metrology.pdfMechanical Measurement and metrology.pdf
Mechanical Measurement and metrology.pdf
Mahamad Jawhar
 
Meterology
MeterologyMeterology
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET Journal
 

Similar to EXECUTIVE SUMMARY (20)

RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
IRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET- Design Development and Analysis of Low Pressure Bladeless TurbineIRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
IRJET- Design Development and Analysis of Low Pressure Bladeless Turbine
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 
Mark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement Presentation
 
DESIGN OF MACHINE ELEMENTS NOTES.PDF SHARE
DESIGN OF MACHINE ELEMENTS NOTES.PDF SHAREDESIGN OF MACHINE ELEMENTS NOTES.PDF SHARE
DESIGN OF MACHINE ELEMENTS NOTES.PDF SHARE
 
ThermX1-Report
ThermX1-ReportThermX1-Report
ThermX1-Report
 
Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant Preliminary Study of an Assembling Plant
Preliminary Study of an Assembling Plant
 
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...IRJET-  	  Design, Development and Manufacturing of Dedicated Fixture for the...
IRJET- Design, Development and Manufacturing of Dedicated Fixture for the...
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
 
Ijtra150166
Ijtra150166Ijtra150166
Ijtra150166
 
Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
 
Mechanical Measurement & Metrology ( PDFDrive ).pdf
Mechanical Measurement & Metrology ( PDFDrive ).pdfMechanical Measurement & Metrology ( PDFDrive ).pdf
Mechanical Measurement & Metrology ( PDFDrive ).pdf
 
Mechanical Measurement and metrology.pdf
Mechanical Measurement and metrology.pdfMechanical Measurement and metrology.pdf
Mechanical Measurement and metrology.pdf
 
Meterology
MeterologyMeterology
Meterology
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 

EXECUTIVE SUMMARY

  • 1. 1 SVKM’S NMIMS UNIVERSITY Mukesh Patel School of Technology Management & Engineering Executive Summary On PRODUCTIVITY IMPROVEMENT OF LOCATOR ASSEMBLY By HARSH THAKER MBATech Mechanical [K038] Nuclear equipment Department, Larsen & Toubro Ltd
  • 2. 2 INDEX 1. ABSTRACT ------------------------------------------------------------------------------------------------------------3 2. INTRODUCTION----------------------------------------------------------------------------------------------------4 3. MY CONTRIBUTION TO THE LOCATOR ASSEMBLY PROJECT-------------------------------------------5 4. CONCLUSION-------------------------------------------------------------------------------------------------------6
  • 3. 3 1. ABSTRACT Larsen & Toubro Limited (L&T) is a technology, engineering, construction and manufacturing company. It is one of the largest and most respected companies in India's private sector. The historical background of M/S LARSEN & TOUBRO highlights its gradual establishment. This report starts with introduction to the company with the company spectrum and later highlights the different engineering departments of company. I was placed in the Nuclear Power Plant Equipment SBU, PMG Department of Heavy Engineering Division (HED). I gained experience and knowledge about the importance of work culture and planning & execution, which is one of the privileges of working in the PMG – Project Management Group. In this department project named LOCATOR ASSEMBLY is going on. LOCATOR ASSEMBLY is the assembly of different component which is then used in nuclear reactor which is setup in KAKRAPUR AND RAJASTHAN. Major operation done by L&T in this project is welding of different component of locator assembly in dust free environment shop. Following problems were faced during the operation on locator assembly  Inaccurate fixture design for trial welding which leads to welding defects like (suck back, excess filler metal etc.)  Lot of time consumption in handling the assembly within the shop  No proper ergonomics within the shop leading decrease in productivity In order to address this problem I have made two fixture design on 3D software, both the design are proposed to my mentor with their pros and cons. I have also made the layout of the shop on the basis of the sequence of the process it follows and to reduce the material handling time in the shop. I have tried to put my sincere efforts to make this report a worthy & honest declaration of whatever I accomplished at M/S Larsen & Toubro Ltd.
  • 4. 4 2. INTRODUCTION:I worked as “junior supervisor” at the DFE (dust free environment) shop, where the locator assembly were made. I use to take the status of each locator assembly and make the record of them. I use to give this status to my mentor on daily basis. I was also responsible for keeping the record of requirements in the shop for near future, which includes raw material, tools (filler metal, grinding machine, vernier calliper etc.). I also co-ordinate different department like quality check department, welding engineering department, project management department by giving them status and informing problem faced by welders during welding. I also use to coordinate with store department at time of any dispatch of the assembly or procurement of the assembly from the vendors or customer by producing request notice in the system. Following were my responsibility during my internship: 1. Getting the detail of the work assign to the welder on each day. 2. Keeping the record of the locator assembly in the shop and no. of operation done on it. 3. Collecting the record of the Radiographic Test from the R.T. department. 4. Intimating the store department if there is some requirement of any raw material in the store 5. Coordinating with the vendors in order to know the delivery date of the locator assembly at the shop 6. Keeping the record of the problem found in the locator assembly during the radiographic test. 7. Keeping the record of the solution decided for those failed assemblies by welding engineering department.
  • 5. 5 3. MY CONTRIBUTION TO THE LOCATOR ASSEMBLY PROJECT. I have first analysed the problem faced on automatic welding machine due to fixture. I had then list down the problem face due to the fixtures on the weld joint. Following were the problems faced due to inaccurate fixture 1. Multiple layer of filler material on the circumference of the pipe 2. Constant variation of the voltage and current in the automatic machine due to varying distance between the pipe and the Torch. 3. Sensitivity of the machine for voltage and current was difficult to set. 4. Common defect found in radiographic test of the pipe were: SUCK BACK, EXCESS PENITRATION, VOID AT SIDE OF THE PIPE. In order to address this problem I have made two fixture design on 3D software.(unigraphics , solidworks).Both the fixture designs are made such that it can fix almost all the standard O.D. Pipes which are commonly available at the shop. Both the designs are analysed by me and I have made pros and cons of each design and submitted to my mentor. I have also made the layout of the shop in order to avoid following problem 1. Lot of time consumption in handling the assembly within the shop 2. No proper ergonomics within the shop leading decrease in productivity 3. No define path for walking in the shop especially while inspection. There were few operation (like: liquid penetration test, radiographic test, dimension inspection) done on the locator assembly which cannot be identified weather it is done or not by just looking at it. Hence to avoid such problem I have developed few logical symbols which are kept on the locator assembly in order to understand its stage on operation sequence.
  • 6. 6 4. CONCLUSION: During the process of making design of fixture, I realised that 3-D modelling software makes the process very easy and quick. It helps to analyse the design more efficiently and precisely. After a brief discussion with my mentor regarding the two design of fixture proposed by me, we concluded that design 1 and 2 both can serve the objective, but design 1 is expensive to make and its use in our project will not be as excessive as compare to design 2. I had also made shop layout, which was partially implemented and many desired outcome were noticed like reduction in handling time, increase of productivity etc. Shop layout can be even more modified if the Radiographic Test machine is setup within the shop. By doing this huge amount of time can be saved during the process.