Fastrack Services...

Need leading-edge PCAs in the shortest timescale?
                                                                      Look no further!

Exception’s Fastrack facility is unique in the UK. No other quick turn service can provide such technically advanced products to such
demanding timescales.

Investment in the very latest technology, as well in our people, means that we can produce technically demanding builds within
a 24 hour period if required, setting new industry standards. Fastrack customers benefit from industry-leading manufacturing
technology, including a new DEK 03i Printer, an Asscon VP56 vapor phase oven, upgraded MyData placement machines and
a Yes Tech AOI machine.

These enhancements give Fastrack unparalleled flexibility and capabilities - vital in keeping Exception and their clients ahead of
their respective competitors. Having the ability to produce products to Class 3 standards with components such as 01005s, 0.3 pitch
BGA’s and package on package (POP) means that Fastrack can meet and often exceed the industry’s latest standards and demands.
Fastrack works closely with all of its clients and their designated design houses - including Exception’s own PCB manufacturing facility
- allowing them to take on and support all types of demanding prototype and NPI development.

Unlike other quick-turn operations, our Fastrack facility runs autonomously from the rest of Exception’s electronics manufacturing
business, ensuring that dedicated resources – in terms of both technology and people - are always there when needed. Acting as a
business within a business, Fastrack is able to focus 100 per cent on the needs of clients and ensure that critical factors - such as time
and quality - are delivered without compromise, every time.

It’s little surprise to hear that 55 per cent of our commissions are undertaken in under five days, with many taking just 24 hours from
the agreement of ‘clear to build’ to product delivery.

Fastrack undertakes the most technically demanding jobs for sectors such as medical, aerospace
and defence, telecoms, transport and the
oil and gas industries.




    Exception’s ability to meet exacting turnaround
    schedules is a crucial element of the relationship
    between our two organisations.
              Adrian Temple-Brown, Technical Manager
                                  NextWave Wireless

                                                               Making the difference in electronics outsourcing
As one of Europe’s leading outsourced electronics specialists, Exception delivers quality and
efficiency across a number of key business functions




Printed Circuit Assembly (PCA) -
an individually tailored solution for any PCA requirement:
• latest surface mounted technology or conventional build
• complete materials management
• IPC and RoHS assessed
• low volume, high mix capability                            Sourcing -
                                                             tailored procurement programme:
                                                             • dedicated secure customer warehouses
Equipment Assembly -
                                                             • full ERP (enterprise resource planning) inventory
full mechanical and electrical assembly build:
                                                               management system
• wiring harnesses and looms
                                                             • obsolescence management component traceability
• prototyping and final assembly
• functionality and environmental test solutions
• IPC assessed                                               Environmental Stress Screening -
                                                             screening PCAs and equipment to military specifications:
• customised manufacturing cells dedicated to client
                                                             • improve design robustness
                                                             • reduce product failure
Design for Manufacture (DFM) -
                                                             • screen out component weakness
value-added design services from concept to manufacture:
                                                             • reduce warranty returns
• design verification for manufacture, inspection and test
• data handling
• first article reports                                       Test -
• DFM reports                                                thorough product testing:
• design for RoHS compliance                                 • fully tailored test solution
• component specification                                     • flying probe testing
                                                             • ICT testing
Design for Testing (DFT) -                                   • automated test software
unique capabilities for maximum test coverage:               • dedicated support team
• optimisation of PCB test points during design              • extensive RF and digital experience
• specialist tools and test equipment including hardware
  and software
• RF test capability
• ICT and Fixture creation
• dedicated team to create optimum test solutions




+44 (0)845 051 4663                                                     www.outsourcedelectronics.com

eXception EMS "Fastrack Service"

  • 1.
    Fastrack Services... Need leading-edgePCAs in the shortest timescale? Look no further! Exception’s Fastrack facility is unique in the UK. No other quick turn service can provide such technically advanced products to such demanding timescales. Investment in the very latest technology, as well in our people, means that we can produce technically demanding builds within a 24 hour period if required, setting new industry standards. Fastrack customers benefit from industry-leading manufacturing technology, including a new DEK 03i Printer, an Asscon VP56 vapor phase oven, upgraded MyData placement machines and a Yes Tech AOI machine. These enhancements give Fastrack unparalleled flexibility and capabilities - vital in keeping Exception and their clients ahead of their respective competitors. Having the ability to produce products to Class 3 standards with components such as 01005s, 0.3 pitch BGA’s and package on package (POP) means that Fastrack can meet and often exceed the industry’s latest standards and demands. Fastrack works closely with all of its clients and their designated design houses - including Exception’s own PCB manufacturing facility - allowing them to take on and support all types of demanding prototype and NPI development. Unlike other quick-turn operations, our Fastrack facility runs autonomously from the rest of Exception’s electronics manufacturing business, ensuring that dedicated resources – in terms of both technology and people - are always there when needed. Acting as a business within a business, Fastrack is able to focus 100 per cent on the needs of clients and ensure that critical factors - such as time and quality - are delivered without compromise, every time. It’s little surprise to hear that 55 per cent of our commissions are undertaken in under five days, with many taking just 24 hours from the agreement of ‘clear to build’ to product delivery. Fastrack undertakes the most technically demanding jobs for sectors such as medical, aerospace and defence, telecoms, transport and the oil and gas industries. Exception’s ability to meet exacting turnaround schedules is a crucial element of the relationship between our two organisations. Adrian Temple-Brown, Technical Manager NextWave Wireless Making the difference in electronics outsourcing
  • 2.
    As one ofEurope’s leading outsourced electronics specialists, Exception delivers quality and efficiency across a number of key business functions Printed Circuit Assembly (PCA) - an individually tailored solution for any PCA requirement: • latest surface mounted technology or conventional build • complete materials management • IPC and RoHS assessed • low volume, high mix capability Sourcing - tailored procurement programme: • dedicated secure customer warehouses Equipment Assembly - • full ERP (enterprise resource planning) inventory full mechanical and electrical assembly build: management system • wiring harnesses and looms • obsolescence management component traceability • prototyping and final assembly • functionality and environmental test solutions • IPC assessed Environmental Stress Screening - screening PCAs and equipment to military specifications: • customised manufacturing cells dedicated to client • improve design robustness • reduce product failure Design for Manufacture (DFM) - • screen out component weakness value-added design services from concept to manufacture: • reduce warranty returns • design verification for manufacture, inspection and test • data handling • first article reports Test - • DFM reports thorough product testing: • design for RoHS compliance • fully tailored test solution • component specification • flying probe testing • ICT testing Design for Testing (DFT) - • automated test software unique capabilities for maximum test coverage: • dedicated support team • optimisation of PCB test points during design • extensive RF and digital experience • specialist tools and test equipment including hardware and software • RF test capability • ICT and Fixture creation • dedicated team to create optimum test solutions +44 (0)845 051 4663 www.outsourcedelectronics.com