For more course tutorials visit
www.newtonhelp.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
For more course tutorials visit
www.newtonhelp.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
bis 155 week 1 ilab data analysis with spreadsheets with lab,bis 155 week 1 quiz data analysis with spreadsheets with lab,bis 155 week 1 to week 5 all quiz,bis 155 week 1 to week 7 all discussions,devry bis 155 week 1,bis 155 week 1,devry bis 155,bis 155,devry bis 155 week 1 tutorial,devry bis 155 week 1 assignment,devry bis 155 week 1 help
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
For more classes visit
www.snaptutorial.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
For more course tutorials visit
www.newtonhelp.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
BIS 155 Education Specialist / snaptutorial.comMcdonaldRyan131
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
For more classes visit
www.snaptutorial.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
Bis 155 Exceptional Education / snaptutorial.comDavis142
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle
Have you ever imagined what it would be like if your charts became dynamic?
Not getting us, right? Well, here it is.
Each time you modify your Excel spreadsheet (add or delete data), your charts automatically reflect the changes on refreshing. You never have to manually update data on your charts again. All this, by specifying a ‘Smart Sheet Range’ for Excel in the Collabion Charts wizard. Interesting?
Stuck with preset themes? Not impressed with your dashboard color scheme? All you need is flexibility to pick the colors you desire. But first, let us understand why colors are so important?
Colors have a profound effect on human psychology and evoke certain reactions which may vary from person to person. They play a vital role in all our activities and influence our responses.
Hence the freedom of choosing colors is very enticing. With Collabion Charts for SharePoint, you will get that freedom! Yes, you can use the colors of your choice in your charts.
In the world of data visualization, colors play an important role. They help us differentiate among various data plots we represent on our charts.
However, some conventional colors also highlight certain kinds of messages. For example, red represents warnings and green represents safer situations. But then again, choosing the right hues is totally dependent on personal preferences.
So go ahead and choose from myriads of colors to enhance the look and feel of your single-series charts in Collabion Charts for SharePoint.
Visit http://collabion.com
Bis 155 Enhance teaching / snaptutorial.comHarrisGeorg46
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
BIS 155 Lab 3 of 7: Alice Barr Realty Analysis
bis 155 week 1 ilab data analysis with spreadsheets with lab,bis 155 week 1 quiz data analysis with spreadsheets with lab,bis 155 week 1 to week 5 all quiz,bis 155 week 1 to week 7 all discussions,devry bis 155 week 1,bis 155 week 1,devry bis 155,bis 155,devry bis 155 week 1 tutorial,devry bis 155 week 1 assignment,devry bis 155 week 1 help
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
For more classes visit
www.snaptutorial.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
For more course tutorials visit
www.newtonhelp.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
BIS 155 Education Specialist / snaptutorial.comMcdonaldRyan131
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
For more classes visit
www.snaptutorial.com
Excel Project 1 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.
Bis 155 Exceptional Education / snaptutorial.comDavis142
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle
Have you ever imagined what it would be like if your charts became dynamic?
Not getting us, right? Well, here it is.
Each time you modify your Excel spreadsheet (add or delete data), your charts automatically reflect the changes on refreshing. You never have to manually update data on your charts again. All this, by specifying a ‘Smart Sheet Range’ for Excel in the Collabion Charts wizard. Interesting?
Stuck with preset themes? Not impressed with your dashboard color scheme? All you need is flexibility to pick the colors you desire. But first, let us understand why colors are so important?
Colors have a profound effect on human psychology and evoke certain reactions which may vary from person to person. They play a vital role in all our activities and influence our responses.
Hence the freedom of choosing colors is very enticing. With Collabion Charts for SharePoint, you will get that freedom! Yes, you can use the colors of your choice in your charts.
In the world of data visualization, colors play an important role. They help us differentiate among various data plots we represent on our charts.
However, some conventional colors also highlight certain kinds of messages. For example, red represents warnings and green represents safer situations. But then again, choosing the right hues is totally dependent on personal preferences.
So go ahead and choose from myriads of colors to enhance the look and feel of your single-series charts in Collabion Charts for SharePoint.
Visit http://collabion.com
Bis 155 Enhance teaching / snaptutorial.comHarrisGeorg46
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
BIS 155 Lab 3 of 7: Alice Barr Realty Analysis
YearQuarterLocationCarClassRevenue NumCars 2015Q1AirportEconomy$342,140 3,267 2015Q1AirportPremium$349,852 3,205 2015Q1DowntownEconomy$343,252 3,705 2015Q1DowntownPremium$351,060 3,477 2015Q2AirportEconomy$422,192 4,068 2015Q2AirportPremium$370,128 3,487 2015Q2DowntownEconomy$455,424 4,800 2015Q2DowntownPremium$296,120 2,897 2015Q3AirportEconomy$580,576 3,214 2015Q3AirportPremium$752,272 3,581 2015Q3DowntownEconomy$504,800 4,200 2015Q3DowntownPremium$471,816 3,500 2015Q4AirportEconomy$533,744 3,576 2015Q4AirportPremium$496,840 3,192 2015Q4DowntownEconomy$582,504 3,350 2015Q4DowntownPremium$619,900 3,199 2016Q1AirportEconomy$486,252 3,440 2016Q1AirportPremium$701,460 3,787 2016Q1DowntownEconomy$415,016 3,430 2016Q1DowntownPremium$552,324 3,629 2016Q2AirportEconomy$486,056 3,424 2016Q2AirportPremium$626,232 3,392 2016Q2DowntownEconomy$488,588 3,551 2016Q2DowntownPremium$585,156 3,440 2016Q3AirportEconomy$503,212 3,287 2016Q3AirportPremium$665,548 3,474 2016Q3DowntownEconomy$483,256 3,515 2016Q3DowntownPremium$643,168 3,493 2016Q4AirportEconomy$555,768 3,848 2016Q4AirportPremium$687,844 3,327 2016Q4DowntownEconomy$421,120 3,947 2016Q4DowntownPremium$527,900 3,371 2017Q1AirportEconomy$589,668 3,524 2017Q1AirportPremium$912,900 3,602 2017Q1DowntownEconomy$422,288 3,613 2017Q1DowntownPremium$663,276 3,327 2017Q2AirportEconomy$427,320 3,947 2017Q2AirportPremium$561,124 3,371 2017Q2DowntownEconomy$321,768 3,524 2017Q2DowntownPremium$674,672 3,602
Excel Project 3 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete
rubric used in grading this exercise, click on the Assignments tab, then on the title Excel
Project 3. Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel
capabilities for graphing. The graphs will be copied into a Microsoft PowerPoint file and
the student will develop appropriate findings and recommendations based on analysis
of the data.
A large rental car company has two metropolitan locations, one at the airport and
another centrally located in downtown. It has been operating since 2015 and each
location summarizes its car rental revenue quarterly. Both locations rent two classes of
cars: economy and premium. Rental revenue is maintained separately for the two
classes of rental vehicles.
The data for this case resides in the file Excel Project 3-data.txt and can be downloaded
by clicking on the Assignments tab, then on the data tile name. It is a text file (with the
file type .txt).
Do not create your own data, you must use the data provided and only the data
provided.
Element
Requirement
Points
Allocated
Comments
#
1
1 - Open Excel and save a blank worksheet with
the following name:
0.2
Use Print Preview
to review how
spreadsheet
would print.
a.“Student’s First InitialLast Name E.
Marina Andros works in the Financials Department of Eastern Mobile- a.pdfPierschdJohnstonb
Marina Andros works in the Financials Department of Eastern Mobile, a communications
company in Alexandria, Virginia. She is using an Excel workbook to analyze the company's
recent financial performance, and asks for your help in creating advanced types of charts and
PivotTables to provide an overview of mobile phone plans, customers, and orders. Go to the
Plans worksheet, which contains a column chart in the range F18:K31 showing sales of each plan
type in Quarter 2. Marina wants to create a similar chart showing the Quarter 1 data.
Provide a chart showing Quarter 1 data as follows:
Copy the Q2 Sales chart.
Paste the chart in cell A18.
Select the copied chart and drag the blue outline from the range G4:G16 to the range F4:F16 to
change the data shown in the chart.
The Ads table in the range I4:K16 compares the amount of advertising purchased in the previous
year and the number of mobile phone plans sold. Marina asks you to create a chart that shows the
relationship between the advertising spent and the plans sold.
Insert a Scatter chart that shows the relationship between the advertising amount (range J4:J16)
and the number of plans sold (range K4:K16).
Resize and position the Scatter chart so that it covers the range L3:R16.
Use Ad Amount and Plans Sold as the chart title.
Marina wants to analyze the relationship between advertising spent and the plans sold.
Add a Linear trendline to the scatter chart.
Go to the Customers worksheet, which contains customer details in a table named Customers.
Marina wants to display the payments customers made in each of five states where Eastern
Mobile does business.
Insert a recommended PivotTable based on the Customers table as follows:
Insert the Sum of Payment by State recommended PivotTable. [Mac Hint: Use the State field in
the Rows area, the Payments field in the Values area, and show grand totals for rows and
columns.]
Use Payments by State Pivot as the name of the new worksheet.
Apply the Light Orange, Pivot Style Medium 12 style to the PivotTable.
Add a second copy of the Payment field to the Values area of the Field List, and then change its
summary function to Average so that Marina can compare the average payments to the totals.
Change the Number format of the two value fields to Currency with 0 decimal places and the $
symbol.
Use Total Payments as the column heading in cell B3, and use Average Payment as the column
heading in cell C3.
Insert a PivotChart based on the new PivotTable as follows to help Marina visualize the data:
Insert a Combo PivotChart based on the Payments by State PivotTable.
Display the Total Payments as a Clustered Column chart and the Average Payment as a Line
chart.
Include a secondary axis for the Average Payment data.
Hide the Field List so that you can format the value axis of the chart.
Change the maximum bounds for the value axis on the left to 1,400.
Change the PivotChart colors to Monochromatic Palette 4.
Resize and position the chart so that it covers the range .
Excel Project 3 – MS Excel Use the project description H.docxSANSKAR20
Excel Project 3 – MS Excel
Use the project description HERE to complete this activity. For a review of the complete
rubric used in grading this exercise, click on the Assignments tab, then on the title Excel
Project 3. Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel
capabilities for graphing. The graphs will be copied into a Microsoft PowerPoint file and
the student will develop appropriate findings and recommendations based on analysis
of the data.
A large rental car company has two metropolitan locations, one at the airport and
another centrally located in downtown. It has been operating since 2015 and each
location summarizes its car rental revenue quarterly. Both locations rent two classes of
cars: economy and premium. Rental revenue is maintained separately for the two
classes of rental vehicles.
The data for this case resides in the file Excel Project 3-data.txt and can be downloaded
by clicking on the Assignments tab, then on the data tile name. It is a text file (with the
file type .txt).
Do not create your own data, you must use the data provided and only the data
provided.
Element
Requirement
Points
Allocated
Comments
#
1
1 - Open Excel and save a blank worksheet with
the following name:
0.2
Use Print Preview
to review how
spreadsheet
would print.
a.“Student’s First InitialLast Name Excel Project 1”
Example: JSmith Excel Project 1
b. Set Page Layout to Landscape
2
Change the name of the worksheet to Analysis
by.
0.1
3
a. In the Analysis by worksheet, enter the four
labels vertically in column A in the following order:
Name:, Class/Section:, Project:, Date Due:
0.3
Use the following
text format:
b. with a row between each label, please note the
colon, (:) , after each label.
Arial 10 point
Bold
It may be necessary to adjust the column width so
the four labels are clearly visible.
Align values
Right in the cell
4
a. In the Analysis by worksheet, with all entries in
column C, enter the appropriate values for Name,
Class and Section, Project, Date Due.
0.3
Use the following
text format:
It may be necessary to adjust the column width so
the four labels are clearly visible.
Arial 10 point
Bold
b. formatting
Align values left
in the cells
5
a. Create three new worksheets: Data, Slide 2,
Slide 3. Upon completion, there should be
Analysis by as well as the three newly created
worksheets.
0.4
b. Delete any other worksheets.
6
If necessary, reorder the four worksheets so they
are in the following order: Analysis by, Data,
Slide 2, Slide 3.
0.1
7
a. In the Data worksheet, import the text file Excel
Project 3.txt.
0.5
The field names
should be in the
top row of the
worksheet with
the data directly
under it in rows.
This action may
not be necessary
as this is part of
th ...
Excel Project 3 – MS Excel (Fall 2018)Use the project descriptiogalinagrabow44ms
Excel Project 3 – MS Excel (Fall 2018)
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title Excel Project #3. Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting. The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained separately for the four classes of rental vehicles.
The data for this case resides in the file fall2018rentalcars.txt and can be downloaded by clicking on the Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Step Requirement Comments 1 Open Excel and save a blank workbook with the following name: a. “Student’s First InitialLast Name Excel Project 3” Example: JSmith Excel Project 3 b. Set Page Layout Orientation to Landscape Use Print Preview to review how the first worksheet would print. 2 Change the name of the worksheet to Analysis by. 3 In the Analysis by worksheet: a. Beginning in Row 1, enter the four labels in column A (one label per row) in the following order: Name:, Class/Section:, Project:, Date Due: b. Place a blank row between each label. Please note the colon : after each label. c. Align the labels to the right side in the cells It may be necessary to adjust the column width so the four labels are clearly visible within Column C (not extending into Column D). Format for text in column A: • Arial 10 point • Normal font • Right-align all four labels in the cells
Step Requirement Comments 4 In the Analysis by worksheet with all entries in column C: a. Enter the appropriate values for your Name, Class and Section, Project, Date Due across from the appropriate label in column A. b. Use the formatting in the Comments column (to the right). It may be necessary to adjust the column width so the four labels are clearly visible within Column C (not extending into Column D). Format for text in column C: • Arial 10 point • Bold • Left-align all four values in the cells 5 a. Create four new worksheets: Data, Slide 2, Slide 3, Filter Analysis. Upon completion, there must be the Analysis by worksheet as well as the four newly created worksh ...
Grader - Instructions Excel 2019 ProjectExcel_Comprehensive_Capstone2_Summer_Revenue
Project Description:
In this project, you will apply skills you practiced from the objectives in Excel Chapters 4 through 10. You will develop a workbook for Frank Osei, the Vice President of Finance, that includes financial information and analysis regarding summer product revenue.
Steps to Perform:
Step
Instructions
Points Possible
1
Open the Excel file
Student_
Excel_Comp_Cap2_Summer_Revenue.xlsx downloaded with this project.
0
2
On the Maine Store worksheet, in the range B9:B16, use the Fill Series feature to enter interest rates beginning with
8.00%. Decrease the amounts by
.50% ending with
4.50%. Format the rates as Percent Style with two decimal places and apply bold and center.
4
3
In cell B8, enter a PMT function using the information in the range B2:B4 to calculate a monthly payment. Be sure that the result displays as a positive number.
2
4
In cells B8:H16, create a Data Table using the information in cells B2:B4 where the row input cell is the Period and the column input cell is the rate. Apply the format in B8 to the results in the data table, and then AutoFit columns C:H. Format the payment option closest to and less than $10,000 per month with the Note cell style. Change the Orientation to Landscape.
4
5
On the Quarterly Apparel Costs worksheet, apply the Currency [0] cell style to the range B6:E6. Apply the Comma [0] cell style to the range B7:E17. To the range B18:E18, apply the Currency [0] and Total cell styles.
2
6
Name the ranges B6:E10
Swim_Costs; B11:E14
Shirt_Costs; B15:E16
Jacket_Costs; and B17:E17
Hats_Costs.
2
7
Insert a new row 15. In cell A15, type
Go Explore Shirts. In cell B15, type
9500. In cell C15, type
9695. In cell D15, type
8315. In cell E15, type
9275. Display the Name Manager, and then edit the
Shirt_Costs name to include row 15. Select
Hats_Costs, and edit the name to
Headwear_Costs. (Mac users, click Define Name and make edits using the Define Name dialog box.)
4
8
Click cell B19. On the Formulas tab, in the Formula Auditing group, click Error Checking, and then select Update Formula to Include Cells. Use the fill handle to copy the corrected formula from cell B19 across through cell E19.
2
9
On the Quarterly Apparel Costs worksheet, in cell B25, insert a SUM function to sum the Swim_Costs named range, using the name in the formula. Cr.
Excel Project 3 – MS Excel (Fall 2018) Use the project.docxcravennichole326
Excel Project 3 – MS Excel
(Fall 2018)
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #3. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting.
The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and
recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly.
Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained
separately for the four classes of rental vehicles.
The data for this case resides in the file fall2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Step Requirement Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s First InitialLast Name Excel Project 3”
Example: JSmith Excel Project 3
b. Set Page Layout Orientation to Landscape
Use Print Preview to review
how the first worksheet
would print.
2 Change the name of the worksheet to Analysis by.
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order:
Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four
labels are clearly visible within Column C (not extending into
Column D).
Format for text in column
A:
• Arial 10 point
• Normal font
• Right-align all four
labels in the cells
Step Requirement Comments
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name, Class
and Section, Project, Date Due across from the
appropriate label in column A.
b. Use the formatting in the Comments column (to the
right).
It may be necessary to adjust the column width so the four
labels are clearly visible within Column C (not extending into
Column D).
Format for text in column
C:
• Arial 10 point
• Bold
• Left-align all four
values in the cells
5
a. Create four new worksheets: Data, Slide 2, Slide 3.
Solved in excel every step. Result is exactly as the screenshot in instruction sheet. You need to insert documentation worksheet from your excel which contains your name.
need step by step instruction If you can do visual so I kno.pdfsaravanan544051
need step by step instruction. If you can do visual so I know what's it suppose to look like.
There are no results for 6. Using the data in the range B4:C28 of the Recent Website Sales
worksheet, create a Forecast sheet, forecasting website revenue through 12/31/2022.
Assume a seasonality in the data of 12 periods (or months). Name the Forecast sheet as
Forecasts. 7. Move the forecast chart to the Summary Report worksheet in the range
B18:H29. Remove the chart legend and add the chart title Two-Year Forecast. 8. Dmitry has
a sampling of product sales from three Cup and Platter classes. Create a query that
retrieves the Customers, Customer Orders, Items, Item Sales, and Stores tables from the
Support_EX_10_Sales03.accdb Access database. Create a connection to the database file
and add the tables in the Excel Data Model. Do not load any tables in an Excel table,
PivotTable, or PivotChart. 9. Go to Power Pivot and create the following table relations
between the five database tables: Connect the Customer Orders and Customers tables
through the Cust ID field. Connect the Customer Orders and Stores tables through Store ID
field Connect the Customer Orders and Item Sales tables through the Order ID field.
Connect the Item Sales and Items tables through the Item ID field. 10. Add a hierarchy to
the Items table named Item Tree and add the Class, Subclass, and Group fields to it in that
order. 11. Close Power Pivot and return to the workbook. In the Items Pivot worksheet, in
cell B4, insert a PivotTable from the Data Model. Rename the table as Items Pivot. Add the
Item Tree hierarchy from the Items table to the Rows area box, add the Type field from the
Stores table to Column area box, and add the Revenue field from the Item Sales table to the
Values area box (displaying the revenue sum). 12. Create a clustered bar PivotChart from
the Items Pivot PivotTable. Move the chart to the Summary Report worksheet in the range
J11:P29. Remove the field buttons, primary horizontal axis, and gridlines from the chart.
Move the chart legend to the bottom of the chart area. Add data labels to the chart. 13.
Dmitry wants to examine revenue from coffee maker sales. Use the Quick Explore tool to
drill down the bar chart categories through the Electrics class and the Coffee Makers
subclass down to the group level, displaying total revenue of three coffee maker types. 14.
Dmitry wants to view sales by state. In the State Revenue worksheet, add a PivotTable from
the Data Model to cell B4. Name the PivotTable as State Revenue. Place the State field from
the Customers table in the Rows area and the Revenue field from the Item Sales table in the
Values area. In the PivotTable Options dialog box, on the Display tab, click the check boxes
to show items with no data on the rows and columns. 15. Copy the data in the range
B5:C55. Use Paste Link to paste references to the data values in the range E5:F55. Format
the values in the range F5:F55 as currency. Enter State in cell E4 an.
Excel Portion of the ProjectSteps 1-4Use this ClassSection .docxcravennichole326
Excel Portion of the Project
Steps 1-4: Use this Class/Section – date format – columns popped open:
Steps 5-6: Follow instructions. Change “Revenue” to Currency and “NumCars” to Number. Use thousandth’s separator.
Steps 7-8: First three rows of table after it is sorted. Make sure titles are not chopped off.
Step 9a-b: Copy the data only to Slide 2 & 3. For Filter Analysis, use Paste | Values. There are no banded rows. Step 9(d): Reformat the table to the same style as the Data table formatting. Adjust column widths so no titles are chopped off.
Step 10: Both pivot tables have the same Grand Total: One Pivot Table is for “CarClass”. The second Pivot Table is for “Location”. Make sure titles are not chopped off.
Step 11: Follow the instructions. All charts must be formatted with the same colors. The first chart will be grouped by “CarClass”. The second chart will be grouped by “Location”.
Step 12: Both pivot tables have the same Grand Total:One Pivot “CarClass”. The second Pivot table is for “Location”. Make sure titles are not chopped off.
Step 13: Follow the instructions. All charts must be formatted with the colors in Step 11. One chart is grouped by “CarClass”. The second chart is grouped by “Location”.
Step 14: If the table is formatted like the other tables, that is OK. If the table is not formatted like the other tables, make sure Revenue is Currency and NumCars is Number with thousandth’s separator. Neither of these two columns have decimal places.
Turn on the filters.
Step 15a: Uncheck and then re-check only the titles indicated. in the. Leave the filter on. You have three rows showing.
Step 15b: In Row 34, use a simple formula to calculate the two totals. Do not turn the filters off. There should only be four rows visible in the work sheet. Here are your check figures:
PowerPoint Portion of the Project
Step 16-17:Slide 1: The title of the presentation. Use some title other than Excel Project #3. Do not use identifiers from Step 17d, but only the information as shown below.
The theme is your choice.
Step 18: Slide 2: Follow instructions. Use the Speaker Notes section to “talk” to the audience about what you want to say about this slide. Be sure to introduce yourself.
Speaker Notes
Step 19: Slide 3: Follow instructions. Your Speaker Notes are what you “say” to the audience about what is presented in the charts. Do not type what you say onto the slide!
Speaker Notes
Steps 20-21: Slide 4: Follow the instructions.
Speaker Notes
Step 22: Follow the instructions. There should be no footer nor Slide # on the Title Slide. The first slide
with a Slide Number and a footer is Slide #2, and the number should be a “2”.
Step 23: Add a transition to all slides. Mix it up. Don’t add the same transition to every slide.
Step 24: Animate some words or the graphic. Do not add an animation to every slide as that detracts from the presentation.
In.
Excel Project 2 – MS Excel (Summer 2019) Use the pro.docxAASTHA76
Excel Project 2 – MS Excel
(Summer 2019)
Use the project description below to complete this activity (all the details are included in this document). For a
review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title
"Excel Project 2." Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including charting, and written analysis and recommendations in support of a business enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is
maintained separately for the four classes of rental vehicles.
The data for this case resides in the file summer2019rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file (with the file type .txt).
Do not create your own data. You must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1, 2 and 3.
Step
Requirement
Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s LastFirstInitial Name Excel Project 2” Example:
SmithJaneP Excel Project 2.
b. Set Page Layout Orientation to Landscape.
Use Print Preview to
review how the first
worksheet would
print.
2 Change the name of the worksheet to Analysis by.
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order: Name:,
Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells.
It may be necessary to adjust the column width so the four labels are
clearly visible within Column A (not extending into Column B).
Format for column A:
• Arial 10 point
• Normal font
• Right-align all
four labels in the
cells
Step
Requirement
Comments
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name (in cell C1),
Class and Section (cell C3), Project (cell C5), and Date
(cell C7) across from the appropriate label in column A.
b. Use the formatting in the Comments column (to the right).
It may be necessary to adjust the column width so the four labels
are clearly visible within Column C (not extending into Colu.
Excel Project 2 – MS Excel Summer 2018 Use the project.docxelbanglis
Excel Project 2 – MS Excel
Summer 2018
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #2. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including creating a pivot table, charting, and written analysis and recommendations in support of a business
enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained
separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file with the file type .txt.
Do not create your own data. You must use the data provided, and only the data provided.
Default Formatting: All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1 – 5.
Step Requirement
Points
Allocated
Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s First InitialLast Name Excel Project 2”
Example: JSmith Excel Project 2.
b. Set Page Layout Orientation to Landscape.
0.2
Use Print Preview to review
how the first worksheet
would print.
2 Change the name of the worksheet to Analysis by. 0.1
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order:
Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four
labels are clearly visible.
0.3
Format for text in column
A:
• Arial 10 point
• Normal font
• Right-align all four
labels in the cells
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name, Class
and Section, Project, Date Due across from the
appropriate label in column A.
0.2
Format for text in column
C:
• Arial 10 point
• Bold
Step Requirement
Points
Allocated
Comments
b. Use the formatting in the Comments column (to the
right).
It may be necessary to adjust the column width so the four
labels are clearly visible.
• Left-align all four
values in the cells
5
a. Create new workshe ...
YearQuarterLocationCarClassRevenueNumCars2018Q1DowntownEconomy95530359122018Q1AirportEconomy102383156002016Q3DowntownEconomy78687052332017Q4AirportEconomy93796250762017Q1DowntownEconomy73424347592016Q3AirportEconomy71720446082017Q4DowntownEconomy71984244892017Q3DowntownEconomy69593344112017Q2DowntownEconomy65507941802016Q4AirportSUV63125639982016Q4AirportEconomy62579039952016Q4DowntownSUV60903639822017Q3AirportSUV67252239812018Q1AirportSUV69430038882018Q2AirportSUV70604338832016Q4AirportHybrid64825738632016Q4DowntownHybrid60941838342017Q3AirportHybrid67299338162016Q4AirportPremium64868037822018Q1AirportHybrid69357637782017Q3AirportPremium67265837732018Q2AirportHybrid70592137472016Q4DowntownPremium60974437462018Q2AirportPremium70621536932018Q1AirportPremium69409336892017Q2AirportSUV61238636762017Q2AirportHybrid61200135462017Q1AirportSUV57802335202018Q2DowntownEconomy58747035002016Q3DowntownSUV52822235002017Q2AirportPremium61270034552017Q3AirportEconomy60686734542017Q1AirportHybrid57799534152016Q4DowntownEconomy51986033592016Q3DowntownHybrid52799133462017Q1AirportPremium57824433212016Q3DowntownPremium52782532852016Q2AirportEconomy49101632432017Q1AirportEconomy50994632022016Q2DowntownSUV47664931842016Q1AirportEconomy45933631672017Q2DowntownSUV51135231592017Q4AirportSUV55232831402016Q3AirportSUV49330431102017Q3DowntownSUV50612031062018Q2AirportEconomy60829030862017Q2DowntownHybrid51146230822016Q2DowntownHybrid47683830452017Q4AirportHybrid55285130272017Q2DowntownPremium51120230132016Q2DowntownPremium47644030072016Q3AirportHybrid49417830022017Q4AirportPremium55213629952017Q3DowntownHybrid50540129782017Q3DowntownPremium50531829212016Q3AirportPremium49380829192017Q1DowntownSUV43393227202016Q2DowntownEconomy38773526642017Q1DowntownHybrid43435026512016Q1DowntownEconomy36650226342017Q4DowntownSUV44038026312018Q1DowntownSUV44157126192017Q1DowntownPremium43405025862017Q4DowntownHybrid44049425462018Q1DowntownHybrid44210824932017Q4DowntownPremium44112824902018Q1DowntownPremium44217824782016Q1DowntownSUV36253824412016Q1AirportSUV36785024172016Q1DowntownHybrid36244223522016Q1AirportHybrid36760023332016Q1DowntownPremium36216423152016Q1AirportPremium36717922692017Q2AirportEconomy37627720922016Q2AirportSUV30977819692016Q2AirportHybrid31019419262018Q2DowntownSUV33701219002016Q2AirportPremium30982118782018Q2DowntownHybrid33646118562018Q2DowntownPremium3370931821
Excel Project 2 – MS Excel
(Fall 2019)
Use the project description below to complete this activity (all the details are included in this document). For a
review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title
"Excel Project 2." Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including charting, and written analysis and recommendations in support of a business enterprise.
A large rental car company has two ...
Excel Project 2 Check FiguresSteps 1-2-3 As instructedStepgalinagrabow44ms
Excel Project 2 Check Figures
Steps 1-2-3: As instructed
Step 4: Appropriate values to use indicated below – adjust column widths to include all data and notice the blank row between entries:
Steps 5-6: As instructed. Disregard the “Note” under Step 5b.
Steps 7-8-9-10: Example of banded rows table and check figures for first two rows with column widths adjusted so titles are not chopped off. Table sorted by year. Filters have been turned off, but not required. Dollar sign formatted as “currency leading”, no decimals, thousandths separator; and, NumCars has thousandths separator and no decimals.
Step 11: Read the instructions carefully as it tells you where the fields go. Once created, you will format the table from the Comments area. Your Pivot Table should have six columns and five rows. Make sure the columns are wide enough so words are not chopped off. Here are the check figures for the Grand Total row:
Step 12: The chart is placed below the Pivot Table. You will have two sets of four bars, for a total of eight bars. Make sure your title identifies what the chart is. Titles are formatted with all major words with uppercase letters. Words such as “for” and “by” would not be capitalized. Do not use any abbreviations in the title.
Step 13: Format your reply so it does not run any wider than the table above. Inserting a Text Box and type inside the Text Box is a good idea.
Step 14: Read the question. It is the “combination of CarClass and Location”. Inserting a Text Box is a good idea.
Step 15: Read where the new titles are placed. Excel will automatically format them to match the existing table. If you are using a table style that has white letters, that is OK to leave them white:
Steps 16-17: Read where the titles are placed. Do not adjust column widths. Format as required:
Step 18: Only write oneformula using an IF statement and an absolute cell address. The only CarClass you can “test” is Hybrid. When you write the formula, Excel will automatically fill in the column. Format it as indicated in the Comments section.
Step 19: Read the instructions and use the formula indicated in Step 19a for Profit. When you type the one formula, Excel will automatically fill in the column. Follow the instructions for Step 19b. Use the formula indicated in that step. When you type the formula, Excel will automatically fill in the column. Follow the formatting requirements for each in the Comments.
Step 20: Read the instructions on where to place the Pivot Table. The steps tell you which fields you will use and how to format the data in the Pivot Table. The Comments also tell you how to format the data. You will have six columns and five rows. Check figures for the Pivot Table:
Step 21: Read the instructions on where to place the Pivot Table. The steps tell you which fields you will use and how to format the data in the Pivot Table. The Comments also tell you how to ...
Choose a journal article related to project status reporting, budgVinaOconner450
Choose a journal article related to project status reporting, budgeting, or risk analysis (do not re-use a journal from a prior course). Write a 2-3 page review of your chosen journal article. Please choose a peer reviewed journal, and an article that has been published in the past five (5) years.
The review should contain the journal article title, author's name and year of publication.
Your paper should contain the following headings:
· Introduction
· Summary of the article
· Relevant points made by the author
· Critique of the article
· Application of the concepts in the article
You are going to review a single journal article, therefore your reference page should only contain the information from the article you reviewed. There is no need to introduce other journals into this paper.
.
Course - Monitor/Controlling & Closing the Project
Choose
a
journal
article
related
to
project
status
reporting,
budgeting,
or
risk
analysis
(do
not
re
-
use
a
journal
from
a
prior
course).
Write
a
2
-
3
page
review
of
your
chosen
journal
article.
Please
choose
a
peer
reviewed
journal,
and
an
article
that
h
as
been
published
in
the
past
five
(5)
years.
The
review
should
contain
the
journal
article
title,
author's
name
and
year
of
publication.
Your
paper
should
contain
the
following
headings:
·
Introduction
·
Summary
of
the
article
·
Relevant
points
made
by
the
author
·
Critique
of
the
article
·
Application
of
the
concepts
in
the
article
You
are
going
to
review
a
single
journal
article,
therefore
your
reference
page
should
only
contain
the
information
from
the
article
you
reviewed.
There
is
no
need
to
introduce
other
journals
into
this
paper.
.
Course
-
Monitor/Con
trolling
& Closing the
Project
Choose a journal article related to project status reporting, budgeting, or risk analysis (do not re-use a
journal from a prior course). Write a 2-3 page review of your chosen journal article. Please choose a
peer reviewed journal, and an article that has been published in the past five (5) years.
The review should contain the journal article title, author's name and year of publication.
Your paper should contain the following headings:
Introduction
Summary of the article
Relevant points made by the author
Critique of the article
Application of the concepts in the article
You are going to review a single journal article, therefore your reference page should only contain the
information from the article you reviewed. There is no need to introduce other journals into this paper.
.
Course - Monitor/Controlling & Closing the Project
Grader - Instructions Excel 2019 ProjectExcel_3F_Streets
Project Description:
In the following project, you will edit a worksheet that will be used to prepare a five-year forecast of the cos ...
Excel Project 1 – MS Excel (Summer 2018) Use the project descripti.docxelbanglis
Excel Project 1 – MS Excel (Summer 2018)
Use the project description HERE to complete this activity (all the details are included in this document). For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed. Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities including charting, and written analysis and recommendations in support of a business enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the Assignments tab, then on the data file name. It is a text file (with the file type .txt).
Do not create your own data. You must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size. Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1, 2 and 3.
Step
Requirement
Points Allocated
Comments
1
Open Excel and save a blank workbook with the following name:
a. “Student’s First InitialLast Name Excel Project 1” Example: JSmith Excel Project 1.
b. Set Page Layout Orientation to Landscape.
0.2
Use Print Preview to review how the first worksheet would print.
2
Change the name of the worksheet to Analysis by.
0.1
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column A (one label per row) in the following order: Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four labels are clearly visible.
0.3
Format for column A:
· Arial 10 point
· Normal font
· Right-align all four labels in the cells
4
In the Analysis by worksheet with all entries in column C,
a. Enter the appropriate values for your Name, Class and Section, Project, Date Due across from the appropriate label in column A.
0.2
Format for column C:
· Arial 10 point
· Bold
Step
Requirement
Points Allocated
Comments
b. Use the formatting in the Comments column (to the right).
It may be necessary to adjust the column width so the four labels are clearly visible.
• Left-align all four values in the cells
5
a. Create new worksheets:
Data, Sorted, and Airport.
Upon completion, there s ...
Excel Project 1 – MS Excel (Summer 2018) Use the project descripti.docxcravennichole326
Excel Project 1 – MS Excel (Summer 2018)
Use the project description HERE to complete this activity (all the details are included in this document). For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed. Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities including charting, and written analysis and recommendations in support of a business enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the Assignments tab, then on the data file name. It is a text file (with the file type .txt).
Do not create your own data. You must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size. Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1, 2 and 3.
Step
Requirement
Points Allocated
Comments
1
Open Excel and save a blank workbook with the following name:
a. “Student’s First InitialLast Name Excel Project 1” Example: JSmith Excel Project 1.
b. Set Page Layout Orientation to Landscape.
0.2
Use Print Preview to review how the first worksheet would print.
2
Change the name of the worksheet to Analysis by.
0.1
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column A (one label per row) in the following order: Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four labels are clearly visible.
0.3
Format for column A:
· Arial 10 point
· Normal font
· Right-align all four labels in the cells
4
In the Analysis by worksheet with all entries in column C,
a. Enter the appropriate values for your Name, Class and Section, Project, Date Due across from the appropriate label in column A.
0.2
Format for column C:
· Arial 10 point
· Bold
Step
Requirement
Points Allocated
Comments
b. Use the formatting in the Comments column (to the right).
It may be necessary to adjust the column width so the four labels are clearly visible.
• Left-align all four values in the cells
5
a. Create new worksheets:
Data, Sorted, and Airport.
Upon completion, there s.
Exp22_Excel_AppCapstone_IntroAssessment_Travel_Instructions.docx
Grader - Instructions Excel 2022 ProjectExp22_Excel_AppCapstone_IntroAssessment_Travel
Project Description:
You are considering several cities for a vacation. In particular, you are interested in Washington DC, Philadelphia, and Boston. You will format a list of memorials in DC, add Sparklines to compare the number of visitors over a 15-year period, and create a bar chart to illustrate annual visitors at each memorial. In addition, you will create a table of sightseeing locations, sort and filter the data, apply conditional formatting, and add a total row to display average time needed to spend at each memorial. Finally, you will complete a worksheet by adding formulas to compare estimated major expenses for each city.
Steps to Perform:
Step
Instructions
Points Possible
1
Start Excel. Download and open the file named
Exp22_Excel_AppCapstone_IntroAssessment_Travel.xlsx. Grader has automatically added your last name to the beginning of the filename.
0
2
One worksheet has the original default name, Sheet1. You want to give the worksheet a meaningful name.
Rename Sheet1 as
DC2017.
1
3
You want to move the Year Completed column between the Memorial and 2002 columns.
Select and cut column F. Insert cut cells in cell B1.
3
4
Now you want to separate the worksheet title and source from the dataset with a blank row.
Insert a blank row between rows 2 and 3.
2
5
Now you are ready to work with the DC2020 worksheet. Your first task is to correct spelling errors.
Display the DC2020 worksheet. Check the spelling and correct all misspelled words.
2
6
Continue using the DC2020 worksheet. You will format the headings on row 4.
Select the range A4:G4, wrap the text, apply Center horizontal alignment, and apply Blue, Accent 5, Lighter 60% fill color.
5
7
You now want to format the title so that it is more prominent.
Merge and center the title in the range A1:G1. Apply Blue, Accent5 cell style and bold to the title.
4
8
The first column is too narrow for the names of the memorials. You will increase the width to display the full memorial names.
Change the width of column A to
34.
0
9
Sparklines provide visual representations of data. You will insert sparklines for the dataset.
Select the range C5:F10 and insert Line Sparklines in the range G5:G10.
4
10
Now you will format the sparklines.
Select the range G5:G10, display the high point sparkline marker, and change the color of the high point markers to Dark Red.
3
11
You want to create a chart that compares the number of visitors for each memorial.
Select the ranges A4:A10 and C4:F10 and create a clustered column chart. Apply the Monochromatic Palette 12 chart color. Apply the gradient fill to the chart area. Do not change the default gradient options..
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
2. GETTING STARTED
Download the following file from the SAM website:
SC_Excel2013_C3_P1a_FirstLastName_1.xlsx
Open the file you just downloaded and save it with the name:With the file
SC_Excel2013_C3_P1a_FirstLastName _2.xlsx still open, ensure that your first and
last name is displayed in cell B6 of the Documentation sheet. If cell B6 does not
display your name, delete the file and download a new copy from the SAM website.
SC_Excel2013_C3_P1a_FirstLastName_2.xlsx
Hint: If you do not see the .xlsx file extension in the Save file dialog box, do not type it. Excel will add the file extension for you
automatically.
PROJECT STEPS
1. Move the sheet 4 May 2015 Revenue Detail to the left of the sheet 11 May 2015
Revenue Detail.
2. On the 4 May 2015 Revenue Detail sheet, freeze rows 1 through 3. (Hint: Select cell
A4 as the cell on which to freeze panes.)
3. Delete column M.
4. Create a Line Sparkline in cell L5 based on the data in B5:J5. Copy the
Line Sparkline you create in cell L5 into the range L6:L11.
5. In the stacked column chart with the title Revenue Per Dispatch Center ,
add a primary horizontal axis title of Dispatch Center and a primary vertical axis title
of Revenue.
6. Change the style of the stacked column chart to Chart Style 3 (3rd
column, 1st
row of the Chart Styles palette).
7. In the stacked column chart, change the number format of the vertical
axis to Accounting style with 0 decimal places.
8. In the 3-D pie chart titled Share of Total Revenue, add data labels to this
chart using the Outside End style.
9. Switch to the 11 May 2015 Revenue Detail sheet. Select the range A4:K4
and rotate the text to 45 degrees.
3. 10. Change the Sparkline style for the range L5:L11 to Sparkline Style Accent 6,
(no dark or light).
11. Use the entry in cell A5 to fill the range A6:A11 with consecutive dates.
12. Change the fill color of the range A12:K12 to Standard Yellow (4th
column in the
Standard Colors palette).
13. Use the Recommended Charts tool to create a Clustered Column chart based
on the range A4:J11. Move the chart to its own chart sheet. Use 11 May 2015 Revenue
Chart as the name of the new chart sheet.
14. In the clustered column chart created in step 13, change the chart title to
Revenue per Dispatch Center - Week of May 11, 2015. Add a primary horizontal axis
title of Dispatch Center and a primary vertical axis title of Revenue.
15. In the clustered column chart, change the number format of the vertical axis to
the Accounting style with 0 decimal places. (Tip: The vertical axis will already be
formatted with the Accounting style, so only change the number of decimal points
displayed.)
16. Switch to the 2016 Revenue Projection sheet. Edit the formula in cell C7 so that
the reference to cell C4 is an absolute reference. Copy the formula in cell C7 to the
range C8:C11.
17. Perform a goal seek analysis to determine what value of cell C4 would result in
the Citywide Total Annual Revenue (cell C12) equaling $60,000,000. (Tip: Cell C4 will
be the changing cell.) Keep the result of the goal seek analysis as the new value for
cell C4.
18. Zoom the 2016 Revenue Projection sheet to 150%
19. Switch to the Credit Card Transactions sheet. In cell B11, use an IF function to
check whether the value of cell B9 is less than 70000.
a. If this condition is true, the function should multiply cell B9 by 0.03. (Tip: For the
value if true, use B9*0.03)
b. If this condition is false, the function should multiply the value in cell B9 by 0.025
and then add 350. (Tip: For the value if false, use B9*0.025+350)
4. 20. Copy the formula you entered in cell B11 to the range C11:D11.