bis 155 week 1 ilab data analysis with spreadsheets with lab,bis 155 week 1 quiz data analysis with spreadsheets with lab,bis 155 week 1 to week 5 all quiz,bis 155 week 1 to week 7 all discussions,devry bis 155 week 1,bis 155 week 1,devry bis 155,bis 155,devry bis 155 week 1 tutorial,devry bis 155 week 1 assignment,devry bis 155 week 1 help
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
Bis 155 Enhance teaching / snaptutorial.comHarrisGeorg46
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
BIS 155 Lab 3 of 7: Alice Barr Realty Analysis
Bis 155 Exceptional Education / snaptutorial.comDavis142
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle
Bis 155 Effective Communication / snaptutorial.comBaileyac
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
BIS 155 Lab 3 of 7: Alice Barr Realty Analysis
BIS 155 Education Specialist / snaptutorial.comMcdonaldRyan131
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
Bis 155 Education Organization / snaptutorial.comBaileya121
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
bis 155 week 1 ilab data analysis with spreadsheets with lab,bis 155 week 1 quiz data analysis with spreadsheets with lab,bis 155 week 1 to week 5 all quiz,bis 155 week 1 to week 7 all discussions,devry bis 155 week 1,bis 155 week 1,devry bis 155,bis 155,devry bis 155 week 1 tutorial,devry bis 155 week 1 assignment,devry bis 155 week 1 help
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
Bis 155 Enhance teaching / snaptutorial.comHarrisGeorg46
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
BIS 155 Lab 3 of 7: Alice Barr Realty Analysis
Bis 155 Exceptional Education / snaptutorial.comDavis142
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle
Bis 155 Effective Communication / snaptutorial.comBaileyac
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
BIS 155 Lab 3 of 7: Alice Barr Realty Analysis
BIS 155 Education Specialist / snaptutorial.comMcdonaldRyan131
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
BIS 155 iLab 2: First National Bank (New)
Bis 155 Education Organization / snaptutorial.comBaileya121
For more classes visit
www.snaptutorial.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
For more course tutorials visit
www.newtonhelp.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Inspiring Innovation -- bis155.comkopiko101
For more course tutorials visit
www.bis155.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lessons in Excellence / bis155.comkopiko33
For more course tutorials visit
www.bis155.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
Devry bis 155 final exam guide (music on demand) newuopassignment
bis 155 week 1 ilab data analysis with spreadsheets with lab,bis 155 week 1 quiz data analysis with spreadsheets with lab,bis 155 week 1 to week 5 all quiz,bis 155 week 1 to week 7 all discussions,devry bis 155 week 1,bis 155 week 1,devry bis 155,bis 155,devry bis 155 week 1 tutorial,devry bis 155 week 1 assignment,devry bis 155 week 1 help
Excel Project 3 – MS Excel (Fall 2018)Use the project descriptiogalinagrabow44ms
Excel Project 3 – MS Excel (Fall 2018)
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title Excel Project #3. Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting. The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained separately for the four classes of rental vehicles.
The data for this case resides in the file fall2018rentalcars.txt and can be downloaded by clicking on the Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Step Requirement Comments 1 Open Excel and save a blank workbook with the following name: a. “Student’s First InitialLast Name Excel Project 3” Example: JSmith Excel Project 3 b. Set Page Layout Orientation to Landscape Use Print Preview to review how the first worksheet would print. 2 Change the name of the worksheet to Analysis by. 3 In the Analysis by worksheet: a. Beginning in Row 1, enter the four labels in column A (one label per row) in the following order: Name:, Class/Section:, Project:, Date Due: b. Place a blank row between each label. Please note the colon : after each label. c. Align the labels to the right side in the cells It may be necessary to adjust the column width so the four labels are clearly visible within Column C (not extending into Column D). Format for text in column A: • Arial 10 point • Normal font • Right-align all four labels in the cells
Step Requirement Comments 4 In the Analysis by worksheet with all entries in column C: a. Enter the appropriate values for your Name, Class and Section, Project, Date Due across from the appropriate label in column A. b. Use the formatting in the Comments column (to the right). It may be necessary to adjust the column width so the four labels are clearly visible within Column C (not extending into Column D). Format for text in column C: • Arial 10 point • Bold • Left-align all four values in the cells 5 a. Create four new worksheets: Data, Slide 2, Slide 3, Filter Analysis. Upon completion, there must be the Analysis by worksheet as well as the four newly created worksh ...
YearQuarterLocationCarClass Revenue NumCars 2017Q1DowntownEconomy $976,803 6,137 2017Q1AirportEconomy $1,047,031 5,773 2015Q3DowntownEconomy $804,931 5,564 2016Q4AirportEconomy $958,989 5,370 2016Q1DowntownEconomy $750,562 5,048 2015Q3AirportEconomy $733,215 4,917 2016Q4DowntownEconomy $735,993 4,751 2016Q3DowntownEconomy $712,136 4,703 2016Q2DowntownEconomy $670,068 4,459 2015Q4AirportEconomy $639,838 4,256 2015Q4AirportPremium $663,293 4,137 2016Q3AirportPremium $688,190 4,081 2015Q4DowntownPremium $623,279 4,072 2017Q1AirportPremium $709,705 4,024 2017Q2AirportPremium $721,899 4,008 2016Q2AirportPremium $626,117 3,773 2017Q2DowntownEconomy $600,403 3,748 2016Q3AirportEconomy $620,543 3,665 2016Q1AirportPremium $590,987 3,621 2015Q3DowntownPremium $540,136 3,584 2015Q4DowntownEconomy $531,619 3,582 2015Q2AirportEconomy $501,606 3,470 2016Q1AirportEconomy $521,223 3,406 2015Q1AirportEconomy $469,217 3,387 2016Q2DowntownPremium $522,789 3,283 2017Q2AirportEconomy $621,746 3,282 2015Q2DowntownPremium $487,304 3,274 2016Q4AirportPremium $564,853 3,260 2015Q3AirportPremium $504,843 3,194 2016Q3DowntownPremium $517,084 3,185 2016Q1DowntownPremium $444,067 2,840 2015Q2DowntownEconomy $396,037 2,839 2015Q1DowntownEconomy $374,342 2,817 2016Q4DowntownPremium $450,598 2,748 2017Q1DowntownPremium $451,848 2,695 2015Q1DowntownPremium $370,169 2,537 2015Q1AirportPremium $375,634 2,507 2016Q2AirportEconomy $384,966 2,277 2015Q2AirportPremium $316,848 2,057 2017Q2DowntownPremium $344,292 2,008
Excel Project 2 – MS Excel
Summer 2018
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #2. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including creating a pivot table, charting, and written analysis and recommendations in support of a business
enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained
separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file with the file type .txt.
Do not create your own data. You must use the data provided, and only the data provided.
Default Formatting: All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that ad.
Excel Project 2 – MS Excel Summer 2018 Use the project.docxelbanglis
Excel Project 2 – MS Excel
Summer 2018
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #2. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including creating a pivot table, charting, and written analysis and recommendations in support of a business
enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained
separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file with the file type .txt.
Do not create your own data. You must use the data provided, and only the data provided.
Default Formatting: All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1 – 5.
Step Requirement
Points
Allocated
Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s First InitialLast Name Excel Project 2”
Example: JSmith Excel Project 2.
b. Set Page Layout Orientation to Landscape.
0.2
Use Print Preview to review
how the first worksheet
would print.
2 Change the name of the worksheet to Analysis by. 0.1
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order:
Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four
labels are clearly visible.
0.3
Format for text in column
A:
• Arial 10 point
• Normal font
• Right-align all four
labels in the cells
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name, Class
and Section, Project, Date Due across from the
appropriate label in column A.
0.2
Format for text in column
C:
• Arial 10 point
• Bold
Step Requirement
Points
Allocated
Comments
b. Use the formatting in the Comments column (to the
right).
It may be necessary to adjust the column width so the four
labels are clearly visible.
• Left-align all four
values in the cells
5
a. Create new workshe ...
Excel Project 3 – MS Excel (Fall 2018) Use the project.docxcravennichole326
Excel Project 3 – MS Excel
(Fall 2018)
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #3. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting.
The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and
recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly.
Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained
separately for the four classes of rental vehicles.
The data for this case resides in the file fall2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Step Requirement Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s First InitialLast Name Excel Project 3”
Example: JSmith Excel Project 3
b. Set Page Layout Orientation to Landscape
Use Print Preview to review
how the first worksheet
would print.
2 Change the name of the worksheet to Analysis by.
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order:
Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four
labels are clearly visible within Column C (not extending into
Column D).
Format for text in column
A:
• Arial 10 point
• Normal font
• Right-align all four
labels in the cells
Step Requirement Comments
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name, Class
and Section, Project, Date Due across from the
appropriate label in column A.
b. Use the formatting in the Comments column (to the
right).
It may be necessary to adjust the column width so the four
labels are clearly visible within Column C (not extending into
Column D).
Format for text in column
C:
• Arial 10 point
• Bold
• Left-align all four
values in the cells
5
a. Create four new worksheets: Data, Slide 2, Slide 3.
For more course tutorials visit
www.newtonhelp.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Inspiring Innovation -- bis155.comkopiko101
For more course tutorials visit
www.bis155.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lessons in Excellence / bis155.comkopiko33
For more course tutorials visit
www.bis155.com
BIS 155 Course Project Excel Project
BIS 155 Lab 1 of 7: Saddle River Marching Band
BIS 155 iLab 1 Upper Saddle River Marching Band (New)
BIS 155 Lab 2 of 7: Excel's Advanced Formulas & Functions
bis 155,devry bis 155,devry bis 155 complete course,devry bis 155 entire course,bis 155 final exams,devry bis 155 week 1,devry bis 155 week2,devry bis 155 week 3,devry bis 155 week 4,devry bis 155 week 5,devry bis 155 week 6,devry bis 155 tutorials,devry bis 155 assignments,bis 155 help
Devry bis 155 final exam guide (music on demand) newuopassignment
bis 155 week 1 ilab data analysis with spreadsheets with lab,bis 155 week 1 quiz data analysis with spreadsheets with lab,bis 155 week 1 to week 5 all quiz,bis 155 week 1 to week 7 all discussions,devry bis 155 week 1,bis 155 week 1,devry bis 155,bis 155,devry bis 155 week 1 tutorial,devry bis 155 week 1 assignment,devry bis 155 week 1 help
Excel Project 3 – MS Excel (Fall 2018)Use the project descriptiogalinagrabow44ms
Excel Project 3 – MS Excel (Fall 2018)
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title Excel Project #3. Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting. The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained separately for the four classes of rental vehicles.
The data for this case resides in the file fall2018rentalcars.txt and can be downloaded by clicking on the Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Step Requirement Comments 1 Open Excel and save a blank workbook with the following name: a. “Student’s First InitialLast Name Excel Project 3” Example: JSmith Excel Project 3 b. Set Page Layout Orientation to Landscape Use Print Preview to review how the first worksheet would print. 2 Change the name of the worksheet to Analysis by. 3 In the Analysis by worksheet: a. Beginning in Row 1, enter the four labels in column A (one label per row) in the following order: Name:, Class/Section:, Project:, Date Due: b. Place a blank row between each label. Please note the colon : after each label. c. Align the labels to the right side in the cells It may be necessary to adjust the column width so the four labels are clearly visible within Column C (not extending into Column D). Format for text in column A: • Arial 10 point • Normal font • Right-align all four labels in the cells
Step Requirement Comments 4 In the Analysis by worksheet with all entries in column C: a. Enter the appropriate values for your Name, Class and Section, Project, Date Due across from the appropriate label in column A. b. Use the formatting in the Comments column (to the right). It may be necessary to adjust the column width so the four labels are clearly visible within Column C (not extending into Column D). Format for text in column C: • Arial 10 point • Bold • Left-align all four values in the cells 5 a. Create four new worksheets: Data, Slide 2, Slide 3, Filter Analysis. Upon completion, there must be the Analysis by worksheet as well as the four newly created worksh ...
YearQuarterLocationCarClass Revenue NumCars 2017Q1DowntownEconomy $976,803 6,137 2017Q1AirportEconomy $1,047,031 5,773 2015Q3DowntownEconomy $804,931 5,564 2016Q4AirportEconomy $958,989 5,370 2016Q1DowntownEconomy $750,562 5,048 2015Q3AirportEconomy $733,215 4,917 2016Q4DowntownEconomy $735,993 4,751 2016Q3DowntownEconomy $712,136 4,703 2016Q2DowntownEconomy $670,068 4,459 2015Q4AirportEconomy $639,838 4,256 2015Q4AirportPremium $663,293 4,137 2016Q3AirportPremium $688,190 4,081 2015Q4DowntownPremium $623,279 4,072 2017Q1AirportPremium $709,705 4,024 2017Q2AirportPremium $721,899 4,008 2016Q2AirportPremium $626,117 3,773 2017Q2DowntownEconomy $600,403 3,748 2016Q3AirportEconomy $620,543 3,665 2016Q1AirportPremium $590,987 3,621 2015Q3DowntownPremium $540,136 3,584 2015Q4DowntownEconomy $531,619 3,582 2015Q2AirportEconomy $501,606 3,470 2016Q1AirportEconomy $521,223 3,406 2015Q1AirportEconomy $469,217 3,387 2016Q2DowntownPremium $522,789 3,283 2017Q2AirportEconomy $621,746 3,282 2015Q2DowntownPremium $487,304 3,274 2016Q4AirportPremium $564,853 3,260 2015Q3AirportPremium $504,843 3,194 2016Q3DowntownPremium $517,084 3,185 2016Q1DowntownPremium $444,067 2,840 2015Q2DowntownEconomy $396,037 2,839 2015Q1DowntownEconomy $374,342 2,817 2016Q4DowntownPremium $450,598 2,748 2017Q1DowntownPremium $451,848 2,695 2015Q1DowntownPremium $370,169 2,537 2015Q1AirportPremium $375,634 2,507 2016Q2AirportEconomy $384,966 2,277 2015Q2AirportPremium $316,848 2,057 2017Q2DowntownPremium $344,292 2,008
Excel Project 2 – MS Excel
Summer 2018
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #2. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including creating a pivot table, charting, and written analysis and recommendations in support of a business
enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained
separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file with the file type .txt.
Do not create your own data. You must use the data provided, and only the data provided.
Default Formatting: All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that ad.
Excel Project 2 – MS Excel Summer 2018 Use the project.docxelbanglis
Excel Project 2 – MS Excel
Summer 2018
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #2. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including creating a pivot table, charting, and written analysis and recommendations in support of a business
enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent two classes of cars: economy and premium. Rental revenue is maintained
separately for the two classes of rental vehicles.
The data for this case resides in the file summer2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file with the file type .txt.
Do not create your own data. You must use the data provided, and only the data provided.
Default Formatting: All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1 – 5.
Step Requirement
Points
Allocated
Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s First InitialLast Name Excel Project 2”
Example: JSmith Excel Project 2.
b. Set Page Layout Orientation to Landscape.
0.2
Use Print Preview to review
how the first worksheet
would print.
2 Change the name of the worksheet to Analysis by. 0.1
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order:
Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four
labels are clearly visible.
0.3
Format for text in column
A:
• Arial 10 point
• Normal font
• Right-align all four
labels in the cells
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name, Class
and Section, Project, Date Due across from the
appropriate label in column A.
0.2
Format for text in column
C:
• Arial 10 point
• Bold
Step Requirement
Points
Allocated
Comments
b. Use the formatting in the Comments column (to the
right).
It may be necessary to adjust the column width so the four
labels are clearly visible.
• Left-align all four
values in the cells
5
a. Create new workshe ...
Excel Project 3 – MS Excel (Fall 2018) Use the project.docxcravennichole326
Excel Project 3 – MS Excel
(Fall 2018)
Use the project description HERE to complete this activity. For a review of the complete rubric used in grading
this exercise, click on the Assignments tab, then on the title Excel Project #3. Click on Show Rubrics if the
rubric is not already displayed.
Summary
Create a Microsoft Excel file with four worksheets that provides extensive use of Excel capabilities for charting.
The charts will be copied into a Microsoft PowerPoint file and the student will develop appropriate findings and
recommendations based on analysis of the data.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly.
Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained
separately for the four classes of rental vehicles.
The data for this case resides in the file fall2018rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data tile name. It is a text file (with the file type .txt).
Do not create your own data, you must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Step Requirement Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s First InitialLast Name Excel Project 3”
Example: JSmith Excel Project 3
b. Set Page Layout Orientation to Landscape
Use Print Preview to review
how the first worksheet
would print.
2 Change the name of the worksheet to Analysis by.
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order:
Name:, Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells
It may be necessary to adjust the column width so the four
labels are clearly visible within Column C (not extending into
Column D).
Format for text in column
A:
• Arial 10 point
• Normal font
• Right-align all four
labels in the cells
Step Requirement Comments
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name, Class
and Section, Project, Date Due across from the
appropriate label in column A.
b. Use the formatting in the Comments column (to the
right).
It may be necessary to adjust the column width so the four
labels are clearly visible within Column C (not extending into
Column D).
Format for text in column
C:
• Arial 10 point
• Bold
• Left-align all four
values in the cells
5
a. Create four new worksheets: Data, Slide 2, Slide 3.
Excel Project 2 – MS Excel (Summer 2019) Use the pro.docxAASTHA76
Excel Project 2 – MS Excel
(Summer 2019)
Use the project description below to complete this activity (all the details are included in this document). For a
review of the complete rubric used in grading this exercise, click on the Assignments tab, then on the title
"Excel Project 2." Click on Show Rubrics if the rubric is not already displayed.
Summary
Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities
including charting, and written analysis and recommendations in support of a business enterprise.
A large rental car company has two metropolitan locations, one at the airport and another centrally located in
downtown. It has been operating since 2015 and each location summarizes its car rental revenue
quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is
maintained separately for the four classes of rental vehicles.
The data for this case resides in the file summer2019rentalcars.txt and can be downloaded by clicking on the
Assignments tab, then on the data file name. It is a text file (with the file type .txt).
Do not create your own data. You must use the data provided and only the data provided.
Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and
decimal point variations for numeric data, but Arial 10 will be the default font and font size.
Tutorials
Note: Tutorials that address activities used in this project have been assigned in Week 1, 2 and 3.
Step
Requirement
Comments
1
Open Excel and save a blank workbook with the following
name:
a. “Student’s LastFirstInitial Name Excel Project 2” Example:
SmithJaneP Excel Project 2.
b. Set Page Layout Orientation to Landscape.
Use Print Preview to
review how the first
worksheet would
print.
2 Change the name of the worksheet to Analysis by.
3
In the Analysis by worksheet:
a. Beginning in Row 1, enter the four labels in column
A (one label per row) in the following order: Name:,
Class/Section:, Project:, Date Due:
b. Place a blank row between each label. Please note
the colon : after each label.
c. Align the labels to the right side in the cells.
It may be necessary to adjust the column width so the four labels are
clearly visible within Column A (not extending into Column B).
Format for column A:
• Arial 10 point
• Normal font
• Right-align all
four labels in the
cells
Step
Requirement
Comments
4
In the Analysis by worksheet with all entries in column C:
a. Enter the appropriate values for your Name (in cell C1),
Class and Section (cell C3), Project (cell C5), and Date
(cell C7) across from the appropriate label in column A.
b. Use the formatting in the Comments column (to the right).
It may be necessary to adjust the column width so the four labels
are clearly visible within Column C (not extending into Colu.
Similar to Dervy bis-155-final-exam-guide-cool-clocks-inc-new (9)
eco 372 week 2 knowledge check new,eco 372 week 2 team weekly reflection economic forecasting paper new,eco 372 week 2 individual assignment product purchases and the economy new,eco 372 week 2 assignment the real economy in the long run new,eco 372 week 2 principles of economics and the data of macroeconomics new,uop eco 372,eco 372,uop eco 372 week 2 tutorial,eco 372 week 2 assignment,uop eco 372 week 2 help
bis 155,bis 155 entire course,bis 155 devry,devry bis 155,bis 155 ilabs,bis 155 exercise, bis 155 final exam,devry bis 155 course project,bis155 week 2 ilab,bis 155 week 2 quiz,bis 155 week 2 ilab data analysis with spreadsheets with lab
bis 155 week 1 to week 5 all quiz,bis 155,bis 155 entire course,bis 155 devry,devry bis 155,bis 155 ilabs,bis 155 exercise, bis 155 final exam,devry bis 155 final exam,bis 155 course project,bis 155 free,bis 155 week 1,bis 155 week 2,bis 155 week 3,bis 155 new
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
The Roman Empire A Historical Colossus.pdfkaushalkr1407
The Roman Empire, a vast and enduring power, stands as one of history's most remarkable civilizations, leaving an indelible imprint on the world. It emerged from the Roman Republic, transitioning into an imperial powerhouse under the leadership of Augustus Caesar in 27 BCE. This transformation marked the beginning of an era defined by unprecedented territorial expansion, architectural marvels, and profound cultural influence.
The empire's roots lie in the city of Rome, founded, according to legend, by Romulus in 753 BCE. Over centuries, Rome evolved from a small settlement to a formidable republic, characterized by a complex political system with elected officials and checks on power. However, internal strife, class conflicts, and military ambitions paved the way for the end of the Republic. Julius Caesar’s dictatorship and subsequent assassination in 44 BCE created a power vacuum, leading to a civil war. Octavian, later Augustus, emerged victorious, heralding the Roman Empire’s birth.
Under Augustus, the empire experienced the Pax Romana, a 200-year period of relative peace and stability. Augustus reformed the military, established efficient administrative systems, and initiated grand construction projects. The empire's borders expanded, encompassing territories from Britain to Egypt and from Spain to the Euphrates. Roman legions, renowned for their discipline and engineering prowess, secured and maintained these vast territories, building roads, fortifications, and cities that facilitated control and integration.
The Roman Empire’s society was hierarchical, with a rigid class system. At the top were the patricians, wealthy elites who held significant political power. Below them were the plebeians, free citizens with limited political influence, and the vast numbers of slaves who formed the backbone of the economy. The family unit was central, governed by the paterfamilias, the male head who held absolute authority.
Culturally, the Romans were eclectic, absorbing and adapting elements from the civilizations they encountered, particularly the Greeks. Roman art, literature, and philosophy reflected this synthesis, creating a rich cultural tapestry. Latin, the Roman language, became the lingua franca of the Western world, influencing numerous modern languages.
Roman architecture and engineering achievements were monumental. They perfected the arch, vault, and dome, constructing enduring structures like the Colosseum, Pantheon, and aqueducts. These engineering marvels not only showcased Roman ingenuity but also served practical purposes, from public entertainment to water supply.
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
Andreas Schleicher presents at the OECD webinar ‘Digital devices in schools: detrimental distraction or secret to success?’ on 27 May 2024. The presentation was based on findings from PISA 2022 results and the webinar helped launch the PISA in Focus ‘Managing screen time: How to protect and equip students against distraction’ https://www.oecd-ilibrary.org/education/managing-screen-time_7c225af4-en and the OECD Education Policy Perspective ‘Students, digital devices and success’ can be found here - https://oe.cd/il/5yV
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
This presentation provides a briefing on how to upload submissions and documents in Google Classroom. It was prepared as part of an orientation for new Sainik School in-service teacher trainees. As a training officer, my goal is to ensure that you are comfortable and proficient with this essential tool for managing assignments and fostering student engagement.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
1. Dervv BIS 155 Final Exam Guide (Cool Clocks, Inc.)
NEW
Check this A+ tutorial guideline at
http://www.bis155assignment.com/bis-155-
devry/bis-155-final-exam-guide-new
www.bisl55
assignment
.com
For more classes visit
http://www.bis155assignment.com
BIS 155 Final Exam Guide (Cool Clocks, Inc.) NEW
BIS155 Practical Final Exam Instructions 1 for Cool
Clocks, Inc. (v2)
Complete the tasks below using Microsoft Excel. You
may refer to your notes, the textbook, or other
2. resources (for example, you may search the Web for
information). You may not get interactive help from
any other person (either in person or via email, text
messaging, IM, or other communications channels). I
strongly recommend that you save your work
frequently.
1. Formatting and charts (TCOs 1 & 3; 40 points)
a. Enter your name and today's date on the
Documentation sheet
b. Select the Q1&Q2 sheet, and adjust the widths of
www.bi:,he columns as needed
c. Center the title "Cool Clock, Inc. Sales by Product"
across columns A-D, increase the font size to 20, and
change the font color to red.
d. Bold the column headings "Product", "Unit
Price", "Quantity" and "Total Sales".
e. Add formulas to the Total Sales column to
calculate the total sales for each product.
f. Add a grand total at the bottom of the Total Sales
column, in cell D8.
3. g. Format the numbers in the Unit Price and Total
Sales columns as accounting or currency format
with a dollar sign and two decimal places.
h. Create a 3-D pie chart on a separate sheet that
displays the percentage of total sales for each
product & the product name. (Do not include the
grand total in the pie chart!).
i. Make the title of the chart & the worksheet tab
"Total Sales by Product".
j. Place each product percentage of sales inside its
www.bisl5Jpie
slice
-
k. Place a legend for all products on the right side
of the chart.
l. Move the sheet named “Total Sales by Product”
with the pie chart immediately after the Q1&Q2
sheet.
m. Save your work (CTRL+s) - (but leave it open to
continue).2. Formulas and applications (TCOs 2 & 7; 40
points).
4. a. On the Q1&Q2 sheet, in cell E8, add a formula
using a lookup function that will look up the grand
total in cell D8 in the table of sales and assessments
in A11:B13, and display the corresponding
assessment. Use a range lookup. (For example, if the
grand total of $12,500 is displayed in cell D8, "Good"
should be displayed in
cell E8.)
b. In cell E9 enter the label Highest Sales. In F9
enter a formula using a function to display the
highest total sales value for any product
c. In cell
E10 ente label iles. In F
enter a formula using a function to display the
lowest total sales value for any product.
d. In cell E11 enter the label Average Sales. In F11
enter a formula using a function to display the
average total sales value for all products.
e. Format the labels and statistics (Highest Sales,
Lowest Sales, and Average Sales) to display an
outline (exterior border) around these cells for
readability. Resize all columns for visibility.
5. f. Add comments to cells F9, F10, and F11. In your
comments, explain briefly in your own words what
is displayed in each cell.
g. Add gridlines and cell formatting and color
formatting to cells A10:B13.
h. Add a top and double bottom border to cell D8.
i. Protect the worksheet so the contents cannot be
accidentally changed by a user. Do not use a
password.
j. Save your work (CTRL+s) - (but leave it open to
continue).
3. Data cleansing, lists, sorting, conditional
formatting, and pivot tables (TCOs 4 & 8; 40
points).
a. On the Q3 sheet, adjust the widths of the columns
as needed.
b. Column C contains each customer's combined first
and last name. Insert two empty columns to the right
of column C, and use an Excel feature to separate the
customers' first names and last
6. names into the new columns. In the first row, label
the new columns Customer First Name and Customer
Last Name. After doing this, delete the original
Customer Name column. Resize the
columns.
c. Convert the list of orders (A1 - J21) into an Excel
table.
d. Sort the table into descending order (highest to
lowest) by Order Amount.
e. Apply conditional formatting to the Order
t column so that order amounts greater
han $100 are highlighted in green.
f. Convert the table back into a range.
g. Create a pivot table on a new worksheet that uses
Customer Country as the row field, Product as the
column field, and the sum of Order Amount as
the values.
h. Place this sheet immediately after the Q3 sheet,
labeled Q3-Pivot.
7. i. Format the cells in the Pivot table using all
borders with accounting or currency format with 2
decimal places. Add gridlines to the Pivot table.
j. Save your work (CTRL+s) - (but leave it open to
continue).
4. Data consolidation, analysis, and reporting
(TCOs 5 & 9; 40 points)
a. Group the four sheets Q4 East, Q4 Central, Q4
West, and Q4 Summary.
b.
While the sheets are
ouped, bold the labels in
row 1 and column A, and format the values in cells
B2:E5 as currency with no decimal places. Resize
all columns.
c. Ungroup the sheets (very important!).
d. On the Q4 Summary sheet, use 3D formulas
to create a summary that displays the totals for
each product and quarter over all 3 regions
(East,
Central, and West).
e. Create a clustered column chart that shows
total sales of each product in each quarter.
Each cluster
8. should represent a quarter, and each individual
column should represent sales of a product within
that quarter. Place your chart on the Q4 Summary
sheet to the right of the data. Give the chart an
appropriate title.
f. Add a trend line to the chart to show how sales of
alarm clocks are changing over time.
g. In the space provided on the Q4 Summary sheet,
write a brief (2-3 paragraph) analysis report to the
manager of the Cool Clocks business. In your
report, explain your findings on the trend in sales of
alarm clocks, and any observed in sales of the
product categories; and recommend at least one
specific action that Cool Clocks should take
regarding the alarm clocks
product line.
h. Save your work (CTRL+s) - (but leave it open to
continue).
5. What-if analysis (TCO 6; 40 points)
9. a. On the Q5 sheet, please format the Title row at the
top of the worksheet stating “Detailed Sales What-if
Analysis”. Make sure it is centered across columns A -
G and has a heading format.
b. Enter formulas in cells B6, B7, and B8 to calculate
the total sales, total cost, and net income for a new
product line, based on the projected unit sales, unit
price and unit cost provided.
c. Adjust column widths as needed and format all
values except unit sales as currency with no
heading “Effect of Varying Unit Sales on Total Sales,
Total Cost, and Net Income” to calculate the total
sales, total cost and net income for projected sales of
80, 90, 100, 110, and 120 units.
e. Complete the two-variable data table under the
heading “Effect on Net Income of Varying Unit Sales
and Unit Price” to calculate the net income for
projected sales of 80, 90, 100, 110, and 120 units at
unit prices of $4, $5, $6, $7, and $8.
f. Format cells A3 - B8 with a thick box border.
10. g. Format the one-variable data table with themed
cell style. Make sure the Initial values, Total Sales,
Total Cost and Net Income have an accent color.
h. Format the two-variable data table with a themed
cell style. Make sure the initial values for the
horizontal and vertical have an accent color.
i. Add conditional formatting to the one-variable
data table. Format the top 10% with green fill.
Format the bottom 10% with red fill.
j. Save your work (CTRL+s) and close.
www.bisl5
5assignme
nt.com