Excavation Data
Excavation to Reduce Level
Trench: 10m2x1m deep
Excavation Output: 1.75-2.00 hour/m3
Required 1 General Construction Worker at RM52.50 per day
Allow 15% profit including overhead
5m3 lorry hire rate RM400 per day
Return trip 30 minutes
Loading trip require 60 minutes
Unloading trip require 60 minutes
Allow 15% idle factor
Allow 2 unskilled labourers for loading and unloading at RM52.50 per day per person
Excavation to Pit for Pad Foundation and Column Stump
Pit size: 0.45x0.45x2.1m deep and 9 nos
Column stump: 0.25x0.25x0.16m deep
Allow 13% compaction for ordinary soil
Excavation output: 3.00-4.50 hour/m3
Required 2 General Construction Worker at RM52.50 per day
Additional 25% of time required to excavate and backfill
Allow 15% profit including overhead
Excavation to Trench for Ground Beam
Trench size: 66x0.25x0.55
Excavation Output: 2.00-2.75 hour/m3
Required 2 General Construction Worker at RM52.50 per day
Allow 15% profit including overhead
Calculation:-
Excavation to Reduce Level
Quantity
Excavation < 1.50m deep 10m2 x 1m
10m3
Time Required
Excavation < 1.50m deep 10m3 x 1.75 hour/m3
17.50 hour
Labour Cost
Hour rate for General Construction Worker RM52.50/8 hour
RM6.56/hour
Hour required x hour rate RM6.56/hour x 17.50 hour
RM114.80
Removal of Surplus
Trench size 10m3
No of trips 10m3 / 5m3/trip
2 trip
Time Required 2 trip x (1+1+0.5)hour x 1.15 hour
5.75 hour
Per day 5.75 hour/ 8 hour/day
0.72
≈1 day
Allow 2 unskilled labourers for loading and unloading at RM52.50 per day per person RM52.50/day x 1 day x 2 labourers
RM105
Truck cost Rm400/day x 1 day
RM400
Total Cost
Excavate and Removal of surplus RM114.80+RM105+RM400
RM619.80
Unit rate RM619.80/10
RM61.98
Allow 15% profit including overhead RM61.98x0.15
RM9.30
71.28/m3
Excavation to Pit for Pad Foundation and Column Stump
Quantity
Pit Size (0.45mx0.45mx2.10m) x 9nos
3.83m3
Excavation <1.50m deep 0.45mx0.45mx1.50mx9nos
2.73m3
Excavation >1.50m - 3.00m deep 0.45mx0.45mx(2.10m-1.50m)x9nos
1.09m3
Backfill [(0.45x0.45x1.6)-(0.25x0.25x1.6)]x9
2.02m3
Allow 13% compaction 2.02x13%
0.26m3
2.28m3
Time Required
Excavation <1.50m deep 2.73m3 x 3.00hour/m3
8.19 hour
Excavation >1.50m - 3.00m deep 1.09m3x3.50hour/m3
3.82 hour
Backfill 2.28m3x1hour/m3
2.28hour
Total hour 14.29hour
Additional 25% time to backfill and excavate 14.29hourx1.25
17.86hour
Cost
Hourly rate of a General Construction Worker RM52.50/8hours
RM6.56/hour
Hour required x 2 General Construction Worker 17.86 hour x RM6.56/hourx2
RM234.32
Allow 15% profit including overhead RM234.32x1.15
RM269.47
Unit Rate RM269.47/3.83m3
RM70.36/m3
Excavate to Trench for Ground Beam
Quantity
Excavate <1.50m deep 66mx0.25mx0.55m
9.08m3
Time Required
Excavate <1.50m deep 9.08m3 x 2.00 hour/m3
18.15 hour
Cost
Hour rate of General Construction Worker RM52.50/8 hour
RM6.56/hour
Hour rate x Time required 18.15 hour x RM6.56/hour
RM119.06
Allow 15% profit including overhead RM119.06x1.15
RM136.92
Unit Rate RM136.92/9.08m3
RM15.08/m3

More Related Content

Similar to Excavation

Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
ahmong4
 
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
HafidzQadli1
 
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Nikhil Jaipurkar
 
Productivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying ActivityProductivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying Activity
Manish Kumar PGP - NICMAR Pune
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
Sanjay Patnaik
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculation
Krishna Deo Prasad
 
Ambuja Cements Ltd. Internship Project Presentation
Ambuja Cements Ltd. Internship Project PresentationAmbuja Cements Ltd. Internship Project Presentation
Ambuja Cements Ltd. Internship Project Presentation
Subharaj Chakraborty
 

Similar to Excavation (7)

Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptxJoint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
Joint Operation Mining Plan (28 Ha) - PT Jagad Rayatama.pptx
 
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
Appendix 11   analysis of rates - balsio shp phase ii - 28032014Appendix 11   analysis of rates - balsio shp phase ii - 28032014
Appendix 11 analysis of rates - balsio shp phase ii - 28032014
 
Productivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying ActivityProductivity analysis of Burried/underground cable laying Activity
Productivity analysis of Burried/underground cable laying Activity
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculation
 
Ambuja Cements Ltd. Internship Project Presentation
Ambuja Cements Ltd. Internship Project PresentationAmbuja Cements Ltd. Internship Project Presentation
Ambuja Cements Ltd. Internship Project Presentation
 

More from Arthur Wilson

Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
Arthur Wilson
 
Activity id
Activity idActivity id
Activity id
Arthur Wilson
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
Arthur Wilson
 
Final 2
Final  2Final  2
Final 2
Arthur Wilson
 
Law relating-to-payment
Law relating-to-paymentLaw relating-to-payment
Law relating-to-payment
Arthur Wilson
 
Cl report final
Cl report finalCl report final
Cl report final
Arthur Wilson
 
Vm assignment - presentation slide (1)
Vm   assignment - presentation slide (1)Vm   assignment - presentation slide (1)
Vm assignment - presentation slide (1)
Arthur Wilson
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
Arthur Wilson
 
De assignment-finalized-28112017
De assignment-finalized-28112017De assignment-finalized-28112017
De assignment-finalized-28112017
Arthur Wilson
 
De assignment-finalized-28112017 6
De assignment-finalized-28112017 6De assignment-finalized-28112017 6
De assignment-finalized-28112017 6
Arthur Wilson
 
De assignment-finalized-28112017 5
De assignment-finalized-28112017 5De assignment-finalized-28112017 5
De assignment-finalized-28112017 5
Arthur Wilson
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4
Arthur Wilson
 
De assignment-finalized-28112017 3
De assignment-finalized-28112017 3De assignment-finalized-28112017 3
De assignment-finalized-28112017 3
Arthur Wilson
 
De assignment-finalized-28112017 2
De assignment-finalized-28112017 2De assignment-finalized-28112017 2
De assignment-finalized-28112017 2
Arthur Wilson
 
Research proposal draft v3
Research proposal draft v3Research proposal draft v3
Research proposal draft v3
Arthur Wilson
 
Chapter 2 draft v1
Chapter 2 draft v1Chapter 2 draft v1
Chapter 2 draft v1
Arthur Wilson
 
Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0
Arthur Wilson
 
De &amp; be final workshop submission
De &amp; be final workshop submissionDe &amp; be final workshop submission
De &amp; be final workshop submission
Arthur Wilson
 
Community service
Community serviceCommunity service
Community service
Arthur Wilson
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
Arthur Wilson
 

More from Arthur Wilson (20)

Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Activity id
Activity idActivity id
Activity id
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
 
Final 2
Final  2Final  2
Final 2
 
Law relating-to-payment
Law relating-to-paymentLaw relating-to-payment
Law relating-to-payment
 
Cl report final
Cl report finalCl report final
Cl report final
 
Vm assignment - presentation slide (1)
Vm   assignment - presentation slide (1)Vm   assignment - presentation slide (1)
Vm assignment - presentation slide (1)
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
De assignment-finalized-28112017
De assignment-finalized-28112017De assignment-finalized-28112017
De assignment-finalized-28112017
 
De assignment-finalized-28112017 6
De assignment-finalized-28112017 6De assignment-finalized-28112017 6
De assignment-finalized-28112017 6
 
De assignment-finalized-28112017 5
De assignment-finalized-28112017 5De assignment-finalized-28112017 5
De assignment-finalized-28112017 5
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4
 
De assignment-finalized-28112017 3
De assignment-finalized-28112017 3De assignment-finalized-28112017 3
De assignment-finalized-28112017 3
 
De assignment-finalized-28112017 2
De assignment-finalized-28112017 2De assignment-finalized-28112017 2
De assignment-finalized-28112017 2
 
Research proposal draft v3
Research proposal draft v3Research proposal draft v3
Research proposal draft v3
 
Chapter 2 draft v1
Chapter 2 draft v1Chapter 2 draft v1
Chapter 2 draft v1
 
Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0
 
De &amp; be final workshop submission
De &amp; be final workshop submissionDe &amp; be final workshop submission
De &amp; be final workshop submission
 
Community service
Community serviceCommunity service
Community service
 
Elemental cost analysis
Elemental cost analysisElemental cost analysis
Elemental cost analysis
 

Recently uploaded

4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
Social Samosa
 
Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...
Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...
Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...
Kaxil Naik
 
Experts live - Improving user adoption with AI
Experts live - Improving user adoption with AIExperts live - Improving user adoption with AI
Experts live - Improving user adoption with AI
jitskeb
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
Bill641377
 
Build applications with generative AI on Google Cloud
Build applications with generative AI on Google CloudBuild applications with generative AI on Google Cloud
Build applications with generative AI on Google Cloud
Márton Kodok
 
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Aggregage
 
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
v7oacc3l
 
Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024
facilitymanager11
 
Challenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more importantChallenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more important
Sm321
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
aqzctr7x
 
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens""Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
sameer shah
 
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
xclpvhuk
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
hyfjgavov
 
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
taqyea
 
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging DataPredictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
Kiwi Creative
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
ihavuls
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
bmucuha
 
Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024
ElizabethGarrettChri
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
nyfuhyz
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
Lars Albertsson
 

Recently uploaded (20)

4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
4th Modern Marketing Reckoner by MMA Global India & Group M: 60+ experts on W...
 
Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...
Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...
Orchestrating the Future: Navigating Today's Data Workflow Challenges with Ai...
 
Experts live - Improving user adoption with AI
Experts live - Improving user adoption with AIExperts live - Improving user adoption with AI
Experts live - Improving user adoption with AI
 
Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...Population Growth in Bataan: The effects of population growth around rural pl...
Population Growth in Bataan: The effects of population growth around rural pl...
 
Build applications with generative AI on Google Cloud
Build applications with generative AI on Google CloudBuild applications with generative AI on Google Cloud
Build applications with generative AI on Google Cloud
 
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
Beyond the Basics of A/B Tests: Highly Innovative Experimentation Tactics You...
 
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
在线办理(英国UCA毕业证书)创意艺术大学毕业证在读证明一模一样
 
Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024Monthly Management report for the Month of May 2024
Monthly Management report for the Month of May 2024
 
Challenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more importantChallenges of Nation Building-1.pptx with more important
Challenges of Nation Building-1.pptx with more important
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens""Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
"Financial Odyssey: Navigating Past Performance Through Diverse Analytical Lens"
 
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
一比一原版(Unimelb毕业证书)墨尔本大学毕业证如何办理
 
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
一比一原版兰加拉学院毕业证(Langara毕业证书)学历如何办理
 
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
一比一原版(harvard毕业证书)哈佛大学毕业证如何办理
 
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging DataPredictably Improve Your B2B Tech Company's Performance by Leveraging Data
Predictably Improve Your B2B Tech Company's Performance by Leveraging Data
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理一比一原版(UO毕业证)渥太华大学毕业证如何办理
一比一原版(UO毕业证)渥太华大学毕业证如何办理
 
Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024Open Source Contributions to Postgres: The Basics POSETTE 2024
Open Source Contributions to Postgres: The Basics POSETTE 2024
 
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
一比一原版(UMN文凭证书)明尼苏达大学毕业证如何办理
 
End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024End-to-end pipeline agility - Berlin Buzzwords 2024
End-to-end pipeline agility - Berlin Buzzwords 2024
 

Excavation

  • 1. Excavation Data Excavation to Reduce Level Trench: 10m2x1m deep Excavation Output: 1.75-2.00 hour/m3 Required 1 General Construction Worker at RM52.50 per day Allow 15% profit including overhead 5m3 lorry hire rate RM400 per day Return trip 30 minutes Loading trip require 60 minutes Unloading trip require 60 minutes Allow 15% idle factor Allow 2 unskilled labourers for loading and unloading at RM52.50 per day per person Excavation to Pit for Pad Foundation and Column Stump Pit size: 0.45x0.45x2.1m deep and 9 nos Column stump: 0.25x0.25x0.16m deep Allow 13% compaction for ordinary soil Excavation output: 3.00-4.50 hour/m3 Required 2 General Construction Worker at RM52.50 per day Additional 25% of time required to excavate and backfill Allow 15% profit including overhead Excavation to Trench for Ground Beam Trench size: 66x0.25x0.55 Excavation Output: 2.00-2.75 hour/m3 Required 2 General Construction Worker at RM52.50 per day Allow 15% profit including overhead
  • 2. Calculation:- Excavation to Reduce Level Quantity Excavation < 1.50m deep 10m2 x 1m 10m3 Time Required Excavation < 1.50m deep 10m3 x 1.75 hour/m3 17.50 hour Labour Cost Hour rate for General Construction Worker RM52.50/8 hour RM6.56/hour Hour required x hour rate RM6.56/hour x 17.50 hour RM114.80 Removal of Surplus Trench size 10m3 No of trips 10m3 / 5m3/trip 2 trip Time Required 2 trip x (1+1+0.5)hour x 1.15 hour 5.75 hour Per day 5.75 hour/ 8 hour/day 0.72 ≈1 day Allow 2 unskilled labourers for loading and unloading at RM52.50 per day per person RM52.50/day x 1 day x 2 labourers RM105 Truck cost Rm400/day x 1 day RM400 Total Cost Excavate and Removal of surplus RM114.80+RM105+RM400 RM619.80 Unit rate RM619.80/10 RM61.98 Allow 15% profit including overhead RM61.98x0.15 RM9.30 71.28/m3
  • 3. Excavation to Pit for Pad Foundation and Column Stump Quantity Pit Size (0.45mx0.45mx2.10m) x 9nos 3.83m3 Excavation <1.50m deep 0.45mx0.45mx1.50mx9nos 2.73m3 Excavation >1.50m - 3.00m deep 0.45mx0.45mx(2.10m-1.50m)x9nos 1.09m3 Backfill [(0.45x0.45x1.6)-(0.25x0.25x1.6)]x9 2.02m3 Allow 13% compaction 2.02x13% 0.26m3 2.28m3 Time Required Excavation <1.50m deep 2.73m3 x 3.00hour/m3 8.19 hour Excavation >1.50m - 3.00m deep 1.09m3x3.50hour/m3 3.82 hour Backfill 2.28m3x1hour/m3 2.28hour Total hour 14.29hour Additional 25% time to backfill and excavate 14.29hourx1.25 17.86hour Cost Hourly rate of a General Construction Worker RM52.50/8hours RM6.56/hour Hour required x 2 General Construction Worker 17.86 hour x RM6.56/hourx2 RM234.32 Allow 15% profit including overhead RM234.32x1.15 RM269.47 Unit Rate RM269.47/3.83m3 RM70.36/m3
  • 4. Excavate to Trench for Ground Beam Quantity Excavate <1.50m deep 66mx0.25mx0.55m 9.08m3 Time Required Excavate <1.50m deep 9.08m3 x 2.00 hour/m3 18.15 hour Cost Hour rate of General Construction Worker RM52.50/8 hour RM6.56/hour Hour rate x Time required 18.15 hour x RM6.56/hour RM119.06 Allow 15% profit including overhead RM119.06x1.15 RM136.92 Unit Rate RM136.92/9.08m3 RM15.08/m3