Phase 1: Building Project Team
• For designing, developing and supporting cooperative and responsible team,
follow the guidelines below:
• 1. Setting clear target for the results that the team will come out with to.
• 2. Setting clear objectives to measure the team’s performance.
• 3. Define harmonic and regular communication mechanism between team
members.
• 4. Assign the role of leader & the communicator.
1
Phase 2: Readiness Assessment
• In this phase, a check list could be used to assess the level of applications
for the proposed criteria as shown in Table 4. No. 5 represents the
good/sufficient applications and No. 1 represents the bad/insufficient
applications.
2
Phase 3: Technology Selection
• One of the problems may face the decision makers is how to select the
appropriate ERP systems, two checklists can be used to simplify this
decision. Table 5 shows ERP product selection check list, whereas Table 6
shows Stakeholder selection check list.
3
Cont..
4
Phase 4: Business blueprint
• This can be done through the following steps:
• 1. (AS IS) analysis: AS IS analysis the process of collecting detailed data
about the currently performed
• processes to identify weakness and assess potential improvements.
• 2. (TO BE): TO-BE is depend on the as-is analysis and on the weakness
issues and determine the desired
• processes that will be expected to improve the shortage in current process.
• 3. Gap analysis and action plan: Gap Analysis is the process of comparing
current state of business process to desired expected future state of
business process that should be implemented by ERP, then creating possible
actions to address the identified gap. The work team can exhibit the gap
analysis to its ERP vendors or implementation partner and ask them to
explain how ERP system can map the current process (AS IS) to desired 5
Phase 5: Realization
• This can be done through the following steps
• 1. Developing integration with other existing business applications.
• 2. Build the hardware infrastructure.
• 3. Install the software and customizations.
• 4. Data migration from legacy systems to the new system.
• 5. Develop training materials to users
• 6. Integration tests
• 7. Drawing up end-user documentation
• 8. Conducting end-users training
6
Phase 6: Testing
• There are different types of ERP Testing can be used:
• 1. Functional Testing
• 2. Business Process Testing
• 3. Data Conversion/Migration Testing
• 4. Application/Data Integration Testing
• 5. Performance Testing
• 6. Security Testing
7
Phase7: Final preparation
• This phase is the last phase before system goes live, this can be done
through the following steps:
• 1. Create a help desk,
• 2. Fix the system’s issues and bugs.
• 3. Terminate the data migration process.
• 4. Provide the end-users training.
• 5. Provide the end-users manual.
• 6. Determine the Go Live date.
8
Phase 8: Go live & support
• This can be done through the following steps:
• 1. The work team support the Help Desk,
• 2. Rework and fix the bugs
• 3. Monitor the functional performances,
• 4. Make necessary upgrade.
9
Thank You…..
10

More Related Content

Similar to ERP_Assigen45_enterpeise resource planning.pptx

Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
ShivareddyGangam
 
System development analysis life cycle
System development analysis life cycleSystem development analysis life cycle
System development analysis life cycle
Communication telecom
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
Priyanka Karancy
 
SE Lecture 2.ppt
SE Lecture 2.pptSE Lecture 2.ppt
SE Lecture 2.ppt
ssusere16bd9
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptx
usama537223
 
Software Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking StudySoftware Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking Study
John Carter
 
STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)
Ch Fahadi
 
Software testing and introduction to quality
Software testing and introduction to qualitySoftware testing and introduction to quality
Software testing and introduction to quality
DhanashriAmbre
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
Majane Padua
 
sdlc presentation.pptx
sdlc presentation.pptxsdlc presentation.pptx
sdlc presentation.pptx
waseemasghar20
 
Se 381 - lec 28 -- 34 - 12 jun12 - testing 1 of 2
Se 381 -  lec 28 -- 34 - 12 jun12 - testing 1 of 2Se 381 -  lec 28 -- 34 - 12 jun12 - testing 1 of 2
Se 381 - lec 28 -- 34 - 12 jun12 - testing 1 of 2
babak danyal
 
Erp
ErpErp
Unit 3 for st
Unit 3 for stUnit 3 for st
Unit 3 for st
Poonkodi Jayakumar
 
Process Models IN software Engineering
Process Models IN software EngineeringProcess Models IN software Engineering
Process Models IN software Engineering
Arid Agriculture university rawalpindi
 
Performance Management - Herman Augnis
Performance Management - Herman Augnis Performance Management - Herman Augnis
Performance Management - Herman Augnis
Preeti Bhaskar
 
Test Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdfTest Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdf
nandanbh86
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
navya sree
 
Software Development Life Cycle & Its Models
Software Development Life Cycle & Its ModelsSoftware Development Life Cycle & Its Models
Software Development Life Cycle & Its Models
Dr.Purushottam Petare
 
1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx
gianggiang114
 
System development life cycle
System development life cycleSystem development life cycle
System development life cycle
Yaswanth Babu Gummadivelli
 

Similar to ERP_Assigen45_enterpeise resource planning.pptx (20)

Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
 
System development analysis life cycle
System development analysis life cycleSystem development analysis life cycle
System development analysis life cycle
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
SE Lecture 2.ppt
SE Lecture 2.pptSE Lecture 2.ppt
SE Lecture 2.ppt
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptx
 
Software Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking StudySoftware Quality Dashboard Benchmarking Study
Software Quality Dashboard Benchmarking Study
 
STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)
 
Software testing and introduction to quality
Software testing and introduction to qualitySoftware testing and introduction to quality
Software testing and introduction to quality
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
sdlc presentation.pptx
sdlc presentation.pptxsdlc presentation.pptx
sdlc presentation.pptx
 
Se 381 - lec 28 -- 34 - 12 jun12 - testing 1 of 2
Se 381 -  lec 28 -- 34 - 12 jun12 - testing 1 of 2Se 381 -  lec 28 -- 34 - 12 jun12 - testing 1 of 2
Se 381 - lec 28 -- 34 - 12 jun12 - testing 1 of 2
 
Erp
ErpErp
Erp
 
Unit 3 for st
Unit 3 for stUnit 3 for st
Unit 3 for st
 
Process Models IN software Engineering
Process Models IN software EngineeringProcess Models IN software Engineering
Process Models IN software Engineering
 
Performance Management - Herman Augnis
Performance Management - Herman Augnis Performance Management - Herman Augnis
Performance Management - Herman Augnis
 
Test Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdfTest Maturity Model is generally based on Capability Maturity Model .pdf
Test Maturity Model is generally based on Capability Maturity Model .pdf
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Software Development Life Cycle & Its Models
Software Development Life Cycle & Its ModelsSoftware Development Life Cycle & Its Models
Software Development Life Cycle & Its Models
 
1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx
 
System development life cycle
System development life cycleSystem development life cycle
System development life cycle
 

Recently uploaded

Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
edwin408357
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
Yasser Mahgoub
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
PIMR BHOPAL
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
Kamal Acharya
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 

Recently uploaded (20)

Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
Engineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdfEngineering Standards Wiring methods.pdf
Engineering Standards Wiring methods.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
VARIABLE FREQUENCY DRIVE. VFDs are widely used in industrial applications for...
 
Gas agency management system project report.pdf
Gas agency management system project report.pdfGas agency management system project report.pdf
Gas agency management system project report.pdf
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 

ERP_Assigen45_enterpeise resource planning.pptx

  • 1. Phase 1: Building Project Team • For designing, developing and supporting cooperative and responsible team, follow the guidelines below: • 1. Setting clear target for the results that the team will come out with to. • 2. Setting clear objectives to measure the team’s performance. • 3. Define harmonic and regular communication mechanism between team members. • 4. Assign the role of leader & the communicator. 1
  • 2. Phase 2: Readiness Assessment • In this phase, a check list could be used to assess the level of applications for the proposed criteria as shown in Table 4. No. 5 represents the good/sufficient applications and No. 1 represents the bad/insufficient applications. 2
  • 3. Phase 3: Technology Selection • One of the problems may face the decision makers is how to select the appropriate ERP systems, two checklists can be used to simplify this decision. Table 5 shows ERP product selection check list, whereas Table 6 shows Stakeholder selection check list. 3
  • 5. Phase 4: Business blueprint • This can be done through the following steps: • 1. (AS IS) analysis: AS IS analysis the process of collecting detailed data about the currently performed • processes to identify weakness and assess potential improvements. • 2. (TO BE): TO-BE is depend on the as-is analysis and on the weakness issues and determine the desired • processes that will be expected to improve the shortage in current process. • 3. Gap analysis and action plan: Gap Analysis is the process of comparing current state of business process to desired expected future state of business process that should be implemented by ERP, then creating possible actions to address the identified gap. The work team can exhibit the gap analysis to its ERP vendors or implementation partner and ask them to explain how ERP system can map the current process (AS IS) to desired 5
  • 6. Phase 5: Realization • This can be done through the following steps • 1. Developing integration with other existing business applications. • 2. Build the hardware infrastructure. • 3. Install the software and customizations. • 4. Data migration from legacy systems to the new system. • 5. Develop training materials to users • 6. Integration tests • 7. Drawing up end-user documentation • 8. Conducting end-users training 6
  • 7. Phase 6: Testing • There are different types of ERP Testing can be used: • 1. Functional Testing • 2. Business Process Testing • 3. Data Conversion/Migration Testing • 4. Application/Data Integration Testing • 5. Performance Testing • 6. Security Testing 7
  • 8. Phase7: Final preparation • This phase is the last phase before system goes live, this can be done through the following steps: • 1. Create a help desk, • 2. Fix the system’s issues and bugs. • 3. Terminate the data migration process. • 4. Provide the end-users training. • 5. Provide the end-users manual. • 6. Determine the Go Live date. 8
  • 9. Phase 8: Go live & support • This can be done through the following steps: • 1. The work team support the Help Desk, • 2. Rework and fix the bugs • 3. Monitor the functional performances, • 4. Make necessary upgrade. 9