TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
Episode 358: Work Breakdown Structure for a Shipyard Project
1. How to Claim PM Podcast
PDUs in the PMI CCRS
Episode 358: Work Breakdown Structure for a
Shipyard Project (Free)
2. Listen to this episode of the PM Podcast with our
guest Fernando Remolina González.
In this interview he discuss about how powerful
project management planning and controlling tool is
the Work Breakdown Structure (WBS).
3. Fernando Remolina González is a project management
professional and works for the Curacao Drydock Company in
ship repair, engineering and ship conversion.
4. To listen to this interview go to:
http://www.project-management-
podcast.com/index.php/podcast-episodes/701-episode-358-
work-breakdown-structure-for-a-shipyard-project
Subscribe to the PM Podcast in iTunes:
https://itunes.apple.com/us/podcast/project-management-
podcast/id79900698