ENVIRONMENTAL IMPACT ASSESSMENT
6.1 INTRODUCTION
The purpose of an Environmental Impact Assessment (EIA) is to identify the significant positive
and negative impacts of a project on the local and regional environment, and to determine
appropriate measures to exploit the benefits and mitigate any adverse effects.
Environmental Impact Assessment (EIA) to consider the study of :-
6.2 BASELINE CONDITIONS
6.2.1 Physical Environment
The project is located in the Tekeze River Basin, about 80 km to the west-south-west of
Mekele, the regional capital of Tigray. The topography of the basin is flat and relatively low lying
to the north-west, close to the Sudanese border, but is mountainous in the east, where the elevation
rises to over 4,500m in the Simien highlands. The climate is dry, with an average rainfall ranging
from less then 500 mm in the north-western lowlands to over 1400 mm in the high mountains,
mostly confined to the months June to August.
The Tekeze River drains an area of around 68,000 km² in NW Ethiopia, before joining the
River Atbara in Sudan. The damsite is situated in the middle reaches of the river, where it flows in
a generally northerly direction with a catchment area of 30,390 km². The mean annual flow at the
site is 3,750 Mm3 (119 m3/s) varying from over 1,600 Mm3/month in August to less than 17 Mm3
/month on average in the drier period December to April.
6.2.2 Biological Environment
The flora and fauna in the study area were assessed through field observations, discussions with
local inhabitants and surveys of the available literature. The investigations did not include specific
species or habitat surveys, which were outside the scope of the study.
 Vegetation
The catchment to the damsite is characterised by open shrubland, widely grazed and moderately
or intensively cultivated. The natural vegetation in the project area is a mixture of Acacia-
Commiphora and Combretum-Terminalia woodland, which consists of small trees and shrubs that
are mainly drought tolerant. It is reported that the acacia woodland was much denser prior to the
severe drought in the early to mid 1980s, but today the vegetation is much degraded. Only two
species, Aloe elegans and Aloe trichosantha, are endemic, but both these are common outside the
project area. About 15-25 km from the damsite, along the access road from Adi Abi, there is is an
enclosed area with a high concentration of frankinsence trees, Boswellia papyrifera. This area has a
significant commercial value and is protected by the Regional Government.
 Wildlife and Fish
The faunistic diversity of the Tekeze catchment is relatively poor, except in the Simien
National Park and the Shire Wildlife reserve, both downstream from the dam site. There is,
however, a wide variety of birdlife centred on the river corridor. Wild animal populations are low
in the project area, but species encountered around the reservoir location include mammals (leopard,
hyena, fox, baboon, etc.), reptiles (crocodile, snakes) and birds. None of the larger mammals and birds
is endemic.
The Tekeze river contains at least seven species of fish. Barbus and Clarias are migratory
species, which move seasonally between the upstream and downstream reaches of the river. Four
species also have a commercial importance.
6.2.3 Socio-Economic Environment
 Areas Around the Reservoir
The reservoir is adjacent to four Weredas, three in the Amhara Region (Beyeda, Sekota and
Zikuala) and one in the Tigray Region (Abergele). The total population of Peasant Associations
(PA) adjacent to the reservoir is about 52,200 people. However, there are no houses or settlements
within the area to be flooded up to the top water level of 1140m, and most of the villages are
located at least two kilometres from the river on the plateau,
In both the Tigray and Amhara regions Orthodox Christianity is the main religion (>99%), the
remainder largely being Muslims. In the Tekeze basin, the Orthodox Church generally plays a
dominant role in the village life, for example for resolving conflicts over land.
 Downstream areas
The Tekeze river flows through a narrow gorge down to the Shire Wildlife Reserve before
crossing the floodplain aroung Humera, close to the international border. The Kashm-El-Girba
irrigation scheme in sited on the river, now called the Setit, in the Sudan. The first road bridge over
the river below the damsite is located at Embamadre, some 100 km downstream.
The socio-economic survey revealed a 10 ha area which is used for flood recession
cultivation on the right bank of the Tekeze river, some 20 km downstream from the dam site. The
main crops grown are cotton and red peppers. According to discussions with local people, flood
recession agriculture is probably practised further downstream, but no information is available on
the location or extent of these areas. In addition, three crossing points of the Tekeze were identified
below the dam within the 20 km reach.
6.3 POTENTIAL ENVIRONMENTAL IMPACTS
The construction and operation of the Tekeze Hydropower Project will lead to a variety of
changes in the local and wider environment. Many of the effects will be beneficial, particularly the
impact at a national level of increasing the availability of electrical energy, and the potential to
develop the local economy through improved infrastructure and employment opportunities. There
will nevertheless be adverse effects, some of which will be short-term and reversible, but others that
will lead to permanent change. Although the scale and magnitude of many impacts cannot be
predicted accurately, their recognition at an early phase of the project development enables
mitigating measures, where these are practicable, to be incorporated into the design, and monitoring
programmes to be set up to assess the need for remedial action. An awareness of the residual
environmental implications of the project is also fundamental for a balanced decision as to whether
or not the project should be initiated.
6.3.1 Positive Impacts
The project will potentially have a number of beneficial impacts on the natural and the
socio-economic environment, both during its construction and its operational life. The
positive effects in the physical and biological domain and the anticipated socio-economic
benefits are discussed below
 Natural Environment
The lake will naturally develop populations of stagnant water fish species, which will lead to a
significant increase in the total fish biomass in the Tekeze river. The reservoir also offers a
potential for the development of a commercial fishery.
 Socio-Economic Environment
Positive socio-economic impacts may be anticipated from the regional development stemming from
the project. During the construction phase there will be improved employment opportunities for
local people, for work constructing the civil works, access road, camp and transmission lines.
There will also be a temporary surge in economic activity during the construction phase, and new
markets and services will develop in the area to provide goods and services for the workers and
their families
Under operation, the main positive impact will be the generation of reliable energy for Ethiopia.
 Negative Impacts
The following section summarises the main negative impacts of the project on the physical,
biological and socio-economic environment, and includes a specific assessment of the potential
impacts downstream of the dam.
 Physical impacts
The construction activities will give rise to a temporary local deterioration in air quality, and will
produce high noise levels and vibration. The construction works and the removal the vegetation
cover in the reservoir area prior to first filling will increase the risk of erosion in area, leading to the
loss of fertile soils and higher rates of sedimentation in the river.
 Biological impacts
This area includes a significant number of important riverine forest and savannah woodland
vegetation communities, and their loss will reduce both the region’s biodiversity and the availability
of wildlife habitats. The natural forest cover is critical for the maintenance of soil stability, and
plays an important role in protecting against erosion and increased sedimentation in the drainage
system. Forests and woodland ecosystems also contain a wide range of plant species of commercial
and domestic importance.
6.3.2 Summary of Significant Environmental Impacts
6.3.1 Summary of Significant Environmental Impacts
The main positive and negative impacts predicted to arise from the scheme are summarised in Table
Significant Environmental Impacts
Positive Impacts related to: Physical and Biological Environment Socio-Economic Environment
Construction and
Impoundment
Creation of aquatic habitat for a variety
of birds and fish species
Increased local employment
opportunities
Development of local economy
Operation Downstream regulation may be
beneficial to some aquatic flora and
fauna
Increase in regional and national
energy supplies
Potential development of
commercial fishery in the
reservoir
Improved seasonal regime for
irrigation abstraction downstream
Negative Impacts related to:
Project Location Destruction of aquatic wildlife habitat
and elimination of riverine fishes in the
reservoir
Creation of breeding sites for vectors of
water-borne diseases
Risk of loss of protected Frankincense
trees for access road and transmission
lines
Loss of 231ha of flood recession
cropland, 68ha of irrigated
cropland, loss of grazing land
Disruption of cross-valley
communication links by
inundation of crossing paths (9
upstream and 3 downstream
within 20km)
Construction and
impoundment
Risk of erosion and pollution (water
pollution, dust, noise)
Creation of breeding sites for tropical
diseases vectors
Effects on aquatic fauna due to
reduction in downstream flows to
compensation levels throughout the
period of impoundment
Temporary loss of about 200ha of
land for construction camps
Permanent loss of land for access
road and transmission lines
Increased health risks for local
population and workers
Effects on downstream irrigation
and flood retreat agriculture
Project Operation Increased population pressure on
natural vegetation and wildlife
resources
Siltation in the reservoir
Decrease in flows downstream during
wet season and increase during dry
season
Changes in reservoir water quality and
risk of eutrophication and growth of
invasive water weeds
Downstream impacts on water quality
and aquatic fauna
Increase in transmission of water-
related diseases
Effects on downstream flood
retreat cultivation
Possible flooding of crossing
paths in the valley below the dam
Inundation of the Merdianos
sacred spring
6.4 MITIGATION MEASURES
The proposed mitigation measures to minimise adverse impacts and enhance the benefits of the
scheme are summarised in Table.
Mitigation Measures
Item No Unit Unit cost Total cost
(Birr) (Birr)
1 Compensation for income foregone
1.1 temporary loss of land for camp site cosntruction 200 ha 3,000 600,000
1.2 Loss of flood recession cropland 231 ha 6,000 1,386,000
1.3 Loss of grazing land in reservoir area 168 ha 650 109,200
1.4 Loss of irrigated land in reservoir areas 68 ha 16,000 1,088,000
2 Infrastructure
2.1 Water supply wells 16 borehole 200,000 3,200,000
2.2 Sanitation facilities 1,000 pit latrine 225 225,000
2.3 Health facilities 1 h. centre 2,500,000 2,500,000
2.4 River crossing replacements across reservoir 9 ferry annual maintenance
9 ferryman of the scheme
2.5 River crossing replacements below dam 3 irish
crossing
200,000 600,000
2.6 Small scale irrigation development 150 ha 15,000 2,250,000
3 Community health control programme lump sum 745,000
4 Agricultural extension services lump sum 1,000,000
5 Compensation for Merdianos spring ceremony
or civil
works
6 Survey of downstream flood recession
agriculture and crossing paths
23,400
7 Contingency for mitigation measures for
downstream agricultural land losses
240,000
8 Contingency for mitigation measures for river
crossing replacement
2,400,000
9 Preparation of catchment plans for conservation
areas
2,100,000
10 Implementation and management of
conservation areas
9,000,000
20% contingency 5,493,320
TOTAL 32,959,920
6.5 MONITORING PLAN
An appropriate monitoring programme is recommended to verify the magnitude and scale of the
predicted impacts, and to detect any unforeseen impacts at an early stage. One of the most
important aims of monitoring is to ensure that any necessary corrective action arising from
unforeseen adverse impacts, or from different magnitudes of recognised impacts, is undertaken
before significant environmental damage results.
The EIA studies have shown that there has been relatively little monitoring of existing
environmental conditions in the area. It is therefore important to establish a monitoring programme
prior to the start of construction, in order to establish background conditions against which future
change can be assessed.
Monitoring Activities and Costs
Subject Activity Frequency Responsible Organisation
Water Quality Survey of the physico-
chemical parameters of the
reservoir water
quarterly for 5 years MWR
Fishery Fisheries monitoring in the
river and reservoir
quarterly for 5 years Ministry of Agriculture
- Fisheries Sector
Health Survey of disease vectors
(mosquitoes and snails)
annual survey for 5
years
Ministry of Health
Human health survey annual survey for 3
years
Ministry of Health - Malaria
Control Office
Environmental
co-ordination
Compensation plan 6 man months MWR or EELPA
20%
contingency
214,000
TOTAL 1,284,000

More Related Content

What's hot

GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA Prashant Sharma
 
A Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of BangladeshA Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of Bangladeshsuvash roy
 
LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998Mr Cornish
 
how human population growth affecting resource depletion
how human population growth affecting resource depletionhow human population growth affecting resource depletion
how human population growth affecting resource depletionSekho Science
 
Salinity risk assessment in bangladesh
Salinity risk assessment in bangladeshSalinity risk assessment in bangladesh
Salinity risk assessment in bangladeshNahin Mahfuz Seam
 
Kerala flood and after. 300918
Kerala   flood and after. 300918Kerala   flood and after. 300918
Kerala flood and after. 300918Abraham Paul
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management pptkarthekiya
 
Geo l15 flood_drought_india
Geo l15 flood_drought_indiaGeo l15 flood_drought_india
Geo l15 flood_drought_indiaMukesh Bugaliya
 
Dams and their Effects on forests and tribal people
Dams and their Effects on forests and tribal peopleDams and their Effects on forests and tribal people
Dams and their Effects on forests and tribal peopleArchitGupta119
 
Paase Koh Lecture Liongson
Paase Koh Lecture LiongsonPaase Koh Lecture Liongson
Paase Koh Lecture Liongsonleony1948
 
Wtershed management
Wtershed managementWtershed management
Wtershed managementGhassan Hadi
 
Dams & environment
Dams & environmentDams & environment
Dams & environmentRAJ BAIRWA
 
Water ressource assessment
Water ressource assessmentWater ressource assessment
Water ressource assessmentSubhash sapkota
 
Disaster: How we can reduce the risk of it.
Disaster: How we can reduce the risk of it.Disaster: How we can reduce the risk of it.
Disaster: How we can reduce the risk of it.Prashant .
 
Causes of japan flood 2015
Causes of japan flood 2015Causes of japan flood 2015
Causes of japan flood 2015virgo_az
 
Integrated Flood Management Project
Integrated Flood Management ProjectIntegrated Flood Management Project
Integrated Flood Management ProjectWaterCap
 

What's hot (20)

GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, &  MANAGEMENT  PROSPECTS  IN  INDIA
GROUNDWATER QUALITY:- PROBLEMS CHALLENGES, & MANAGEMENT PROSPECTS IN INDIA
 
A Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of BangladeshA Seminar on Salinity Problem on Coastal Region of Bangladesh
A Seminar on Salinity Problem on Coastal Region of Bangladesh
 
LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998LEDC flooding case study Bangladesh 1998
LEDC flooding case study Bangladesh 1998
 
Salinity problem in bangladesh
Salinity problem in bangladeshSalinity problem in bangladesh
Salinity problem in bangladesh
 
Lecture 1 flood
Lecture 1 floodLecture 1 flood
Lecture 1 flood
 
how human population growth affecting resource depletion
how human population growth affecting resource depletionhow human population growth affecting resource depletion
how human population growth affecting resource depletion
 
Salinity risk assessment in bangladesh
Salinity risk assessment in bangladeshSalinity risk assessment in bangladesh
Salinity risk assessment in bangladesh
 
Kerala flood and after. 300918
Kerala   flood and after. 300918Kerala   flood and after. 300918
Kerala flood and after. 300918
 
Mekong ARCC - Final workshop - Socio-Economic Study
Mekong ARCC - Final workshop - Socio-Economic StudyMekong ARCC - Final workshop - Socio-Economic Study
Mekong ARCC - Final workshop - Socio-Economic Study
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management ppt
 
Geo l15 flood_drought_india
Geo l15 flood_drought_indiaGeo l15 flood_drought_india
Geo l15 flood_drought_india
 
Dams and their Effects on forests and tribal people
Dams and their Effects on forests and tribal peopleDams and their Effects on forests and tribal people
Dams and their Effects on forests and tribal people
 
Paase Koh Lecture Liongson
Paase Koh Lecture LiongsonPaase Koh Lecture Liongson
Paase Koh Lecture Liongson
 
Wtershed management
Wtershed managementWtershed management
Wtershed management
 
Dams & environment
Dams & environmentDams & environment
Dams & environment
 
Water ressource assessment
Water ressource assessmentWater ressource assessment
Water ressource assessment
 
Disaster: How we can reduce the risk of it.
Disaster: How we can reduce the risk of it.Disaster: How we can reduce the risk of it.
Disaster: How we can reduce the risk of it.
 
Causes of japan flood 2015
Causes of japan flood 2015Causes of japan flood 2015
Causes of japan flood 2015
 
Integrated Flood Management Project
Integrated Flood Management ProjectIntegrated Flood Management Project
Integrated Flood Management Project
 
Water resources
Water resourcesWater resources
Water resources
 

Viewers also liked

Cómo acreditar los derechos de autor
Cómo acreditar los derechos de autorCómo acreditar los derechos de autor
Cómo acreditar los derechos de autorRoger Girón
 
Evolutionär webbdesign - Webbdagarna Stockholm 2016
Evolutionär webbdesign  - Webbdagarna Stockholm 2016Evolutionär webbdesign  - Webbdagarna Stockholm 2016
Evolutionär webbdesign - Webbdagarna Stockholm 2016Conversionista
 
201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ
201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ
201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャEC-CUBE
 
Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.
Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.
Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.Linderoths
 
Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...
Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...
Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...Luanvanyhoc.com-Zalo 0927.007.596
 
Economic, Environmental & Socio-cultural Considerations
Economic, Environmental & Socio-cultural ConsiderationsEconomic, Environmental & Socio-cultural Considerations
Economic, Environmental & Socio-cultural Considerationsthomasmary607
 
The Socio Cultural Impact of Tourism
The Socio Cultural Impact of TourismThe Socio Cultural Impact of Tourism
The Socio Cultural Impact of Tourismtellstptrisakti
 
The impact of tourism on a host country
The impact of tourism on a host countryThe impact of tourism on a host country
The impact of tourism on a host countryKaren Houston
 
Impact Of Multinational Companies
Impact Of Multinational CompaniesImpact Of Multinational Companies
Impact Of Multinational Companiessabiya
 
Private sector skills - what value to the NHS?
Private sector skills - what value to the NHS?Private sector skills - what value to the NHS?
Private sector skills - what value to the NHS?Nigel Brindley
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
Economic impact of tourism
Economic impact of tourismEconomic impact of tourism
Economic impact of tourismEman Abbas
 
Av1 unidade produtora de refeicoes
Av1 unidade produtora de refeicoesAv1 unidade produtora de refeicoes
Av1 unidade produtora de refeicoesSuzane Miorelli
 
AWSで始めるサーバレスな RESTful API システム
AWSで始めるサーバレスな RESTful API システムAWSで始めるサーバレスな RESTful API システム
AWSで始めるサーバレスな RESTful API システムMasayuki Kato
 
Socio-cultural Development - Vygotsky
Socio-cultural Development - VygotskySocio-cultural Development - Vygotsky
Socio-cultural Development - VygotskyCorey Durward
 
SOCIO-CULTURAL IMPACTS OF TOURISM
SOCIO-CULTURAL IMPACTS OF TOURISMSOCIO-CULTURAL IMPACTS OF TOURISM
SOCIO-CULTURAL IMPACTS OF TOURISMEjay Samson
 

Viewers also liked (17)

How to Stress Less
How to Stress LessHow to Stress Less
How to Stress Less
 
Cómo acreditar los derechos de autor
Cómo acreditar los derechos de autorCómo acreditar los derechos de autor
Cómo acreditar los derechos de autor
 
Evolutionär webbdesign - Webbdagarna Stockholm 2016
Evolutionär webbdesign  - Webbdagarna Stockholm 2016Evolutionär webbdesign  - Webbdagarna Stockholm 2016
Evolutionär webbdesign - Webbdagarna Stockholm 2016
 
201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ
201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ
201703 EC-CUBE 3.1開発方針説明会:機能カスタマイズ編 02_機能カスタマイズのためのアーキテクチャ
 
Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.
Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.
Kickstarta den digitala transformationen 2017 - 3 sätt att komma igång.
 
Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...
Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...
Nghiên cứu đặc điểm lâm sàng, cận lâm sàng và điều trị hạ nartri máu ở bệnh n...
 
Economic, Environmental & Socio-cultural Considerations
Economic, Environmental & Socio-cultural ConsiderationsEconomic, Environmental & Socio-cultural Considerations
Economic, Environmental & Socio-cultural Considerations
 
The Socio Cultural Impact of Tourism
The Socio Cultural Impact of TourismThe Socio Cultural Impact of Tourism
The Socio Cultural Impact of Tourism
 
The impact of tourism on a host country
The impact of tourism on a host countryThe impact of tourism on a host country
The impact of tourism on a host country
 
Impact Of Multinational Companies
Impact Of Multinational CompaniesImpact Of Multinational Companies
Impact Of Multinational Companies
 
Private sector skills - what value to the NHS?
Private sector skills - what value to the NHS?Private sector skills - what value to the NHS?
Private sector skills - what value to the NHS?
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Economic impact of tourism
Economic impact of tourismEconomic impact of tourism
Economic impact of tourism
 
Av1 unidade produtora de refeicoes
Av1 unidade produtora de refeicoesAv1 unidade produtora de refeicoes
Av1 unidade produtora de refeicoes
 
AWSで始めるサーバレスな RESTful API システム
AWSで始めるサーバレスな RESTful API システムAWSで始めるサーバレスな RESTful API システム
AWSで始めるサーバレスな RESTful API システム
 
Socio-cultural Development - Vygotsky
Socio-cultural Development - VygotskySocio-cultural Development - Vygotsky
Socio-cultural Development - Vygotsky
 
SOCIO-CULTURAL IMPACTS OF TOURISM
SOCIO-CULTURAL IMPACTS OF TOURISMSOCIO-CULTURAL IMPACTS OF TOURISM
SOCIO-CULTURAL IMPACTS OF TOURISM
 

Similar to Environmental impact assessment

ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011Torsten Kowal
 
Land Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water QualityLand Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water QualityHannah Kiesler
 
Environment as important water use for hydro-infrastructure's consideration
Environment as important water use for hydro-infrastructure's considerationEnvironment as important water use for hydro-infrastructure's consideration
Environment as important water use for hydro-infrastructure's considerationCPWF Mekong
 
Climate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processClimate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processNAP Events
 
18. Environmental Impacts of Dams (Supply).pdf
18. Environmental Impacts of Dams (Supply).pdf18. Environmental Impacts of Dams (Supply).pdf
18. Environmental Impacts of Dams (Supply).pdfMuhammadAjmal326519
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Louisette Lanteigne
 
CHAPTER 5 NATURAL ENVIRONMENT
CHAPTER 5 NATURAL ENVIRONMENTCHAPTER 5 NATURAL ENVIRONMENT
CHAPTER 5 NATURAL ENVIRONMENTWan Nur hafizah
 
Chapter 5 natural environment
Chapter 5   natural environmentChapter 5   natural environment
Chapter 5 natural environmentSofea Adlin
 
EbA Along Bedkot-Jhilmila Lake Corridor.pptx
EbA Along Bedkot-Jhilmila Lake Corridor.pptxEbA Along Bedkot-Jhilmila Lake Corridor.pptx
EbA Along Bedkot-Jhilmila Lake Corridor.pptxHarish Singh Bist
 
15. Biodiversity and in land water A Presentation By Mr. Allah Dad Khan Vis...
15. Biodiversity and in land water A Presentation By Mr. Allah  Dad Khan  Vis...15. Biodiversity and in land water A Presentation By Mr. Allah  Dad Khan  Vis...
15. Biodiversity and in land water A Presentation By Mr. Allah Dad Khan Vis...Mr.Allah Dad Khan
 
Environmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectEnvironmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectTanveer Abbas
 
Sudan SUDAN: NAPA PROJECT PROFILE
Sudan SUDAN: NAPA PROJECT PROFILESudan SUDAN: NAPA PROJECT PROFILE
Sudan SUDAN: NAPA PROJECT PROFILEelodieperrat
 
Land Use And Regulation
Land Use And RegulationLand Use And Regulation
Land Use And RegulationKetan Wadodkar
 

Similar to Environmental impact assessment (20)

ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011ADB Mekong Climate Change Study - wrapup presentation April 2011
ADB Mekong Climate Change Study - wrapup presentation April 2011
 
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
Evolution of Strategic Environmental Assessment (SEA) to inform hydropower de...
 
Land Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water QualityLand Conservation for the Protection of Water Quality
Land Conservation for the Protection of Water Quality
 
Wetland degradation in Bangladesh
Wetland degradation in BangladeshWetland degradation in Bangladesh
Wetland degradation in Bangladesh
 
Aquatic management
Aquatic managementAquatic management
Aquatic management
 
Environment as important water use for hydro-infrastructure's consideration
Environment as important water use for hydro-infrastructure's considerationEnvironment as important water use for hydro-infrastructure's consideration
Environment as important water use for hydro-infrastructure's consideration
 
Climate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP processClimate change vulnerability and adaptation in Egygpt and NAP process
Climate change vulnerability and adaptation in Egygpt and NAP process
 
18. Environmental Impacts of Dams (Supply).pdf
18. Environmental Impacts of Dams (Supply).pdf18. Environmental Impacts of Dams (Supply).pdf
18. Environmental Impacts of Dams (Supply).pdf
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02
 
CHAPTER 5 NATURAL ENVIRONMENT
CHAPTER 5 NATURAL ENVIRONMENTCHAPTER 5 NATURAL ENVIRONMENT
CHAPTER 5 NATURAL ENVIRONMENT
 
Chapter 5 natural environment
Chapter 5   natural environmentChapter 5   natural environment
Chapter 5 natural environment
 
EbA Along Bedkot-Jhilmila Lake Corridor.pptx
EbA Along Bedkot-Jhilmila Lake Corridor.pptxEbA Along Bedkot-Jhilmila Lake Corridor.pptx
EbA Along Bedkot-Jhilmila Lake Corridor.pptx
 
15. Biodiversity and in land water A Presentation By Mr. Allah Dad Khan Vis...
15. Biodiversity and in land water A Presentation By Mr. Allah  Dad Khan  Vis...15. Biodiversity and in land water A Presentation By Mr. Allah  Dad Khan  Vis...
15. Biodiversity and in land water A Presentation By Mr. Allah Dad Khan Vis...
 
Degradation and Loss of Peri-Urban Ecosystems
Degradation and Loss of Peri-Urban EcosystemsDegradation and Loss of Peri-Urban Ecosystems
Degradation and Loss of Peri-Urban Ecosystems
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
AN OVERVIEW.pptx
AN OVERVIEW.pptxAN OVERVIEW.pptx
AN OVERVIEW.pptx
 
Environmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectEnvironmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower project
 
Sudan SUDAN: NAPA PROJECT PROFILE
Sudan SUDAN: NAPA PROJECT PROFILESudan SUDAN: NAPA PROJECT PROFILE
Sudan SUDAN: NAPA PROJECT PROFILE
 
Bibhu santosh behera (2)
Bibhu santosh behera (2)Bibhu santosh behera (2)
Bibhu santosh behera (2)
 
Land Use And Regulation
Land Use And RegulationLand Use And Regulation
Land Use And Regulation
 

Recently uploaded

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall girls in Ahmedabad High profile
 

Recently uploaded (20)

VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Green Banking
Green Banking Green Banking
Green Banking
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
 

Environmental impact assessment

  • 1. ENVIRONMENTAL IMPACT ASSESSMENT 6.1 INTRODUCTION The purpose of an Environmental Impact Assessment (EIA) is to identify the significant positive and negative impacts of a project on the local and regional environment, and to determine appropriate measures to exploit the benefits and mitigate any adverse effects. Environmental Impact Assessment (EIA) to consider the study of :- 6.2 BASELINE CONDITIONS 6.2.1 Physical Environment The project is located in the Tekeze River Basin, about 80 km to the west-south-west of Mekele, the regional capital of Tigray. The topography of the basin is flat and relatively low lying to the north-west, close to the Sudanese border, but is mountainous in the east, where the elevation rises to over 4,500m in the Simien highlands. The climate is dry, with an average rainfall ranging from less then 500 mm in the north-western lowlands to over 1400 mm in the high mountains, mostly confined to the months June to August. The Tekeze River drains an area of around 68,000 km² in NW Ethiopia, before joining the River Atbara in Sudan. The damsite is situated in the middle reaches of the river, where it flows in a generally northerly direction with a catchment area of 30,390 km². The mean annual flow at the site is 3,750 Mm3 (119 m3/s) varying from over 1,600 Mm3/month in August to less than 17 Mm3 /month on average in the drier period December to April. 6.2.2 Biological Environment The flora and fauna in the study area were assessed through field observations, discussions with local inhabitants and surveys of the available literature. The investigations did not include specific species or habitat surveys, which were outside the scope of the study.  Vegetation The catchment to the damsite is characterised by open shrubland, widely grazed and moderately or intensively cultivated. The natural vegetation in the project area is a mixture of Acacia- Commiphora and Combretum-Terminalia woodland, which consists of small trees and shrubs that are mainly drought tolerant. It is reported that the acacia woodland was much denser prior to the severe drought in the early to mid 1980s, but today the vegetation is much degraded. Only two species, Aloe elegans and Aloe trichosantha, are endemic, but both these are common outside the project area. About 15-25 km from the damsite, along the access road from Adi Abi, there is is an enclosed area with a high concentration of frankinsence trees, Boswellia papyrifera. This area has a significant commercial value and is protected by the Regional Government.  Wildlife and Fish The faunistic diversity of the Tekeze catchment is relatively poor, except in the Simien National Park and the Shire Wildlife reserve, both downstream from the dam site. There is, however, a wide variety of birdlife centred on the river corridor. Wild animal populations are low in the project area, but species encountered around the reservoir location include mammals (leopard, hyena, fox, baboon, etc.), reptiles (crocodile, snakes) and birds. None of the larger mammals and birds is endemic. The Tekeze river contains at least seven species of fish. Barbus and Clarias are migratory species, which move seasonally between the upstream and downstream reaches of the river. Four species also have a commercial importance.
  • 2. 6.2.3 Socio-Economic Environment  Areas Around the Reservoir The reservoir is adjacent to four Weredas, three in the Amhara Region (Beyeda, Sekota and Zikuala) and one in the Tigray Region (Abergele). The total population of Peasant Associations (PA) adjacent to the reservoir is about 52,200 people. However, there are no houses or settlements within the area to be flooded up to the top water level of 1140m, and most of the villages are located at least two kilometres from the river on the plateau, In both the Tigray and Amhara regions Orthodox Christianity is the main religion (>99%), the remainder largely being Muslims. In the Tekeze basin, the Orthodox Church generally plays a dominant role in the village life, for example for resolving conflicts over land.  Downstream areas The Tekeze river flows through a narrow gorge down to the Shire Wildlife Reserve before crossing the floodplain aroung Humera, close to the international border. The Kashm-El-Girba irrigation scheme in sited on the river, now called the Setit, in the Sudan. The first road bridge over the river below the damsite is located at Embamadre, some 100 km downstream. The socio-economic survey revealed a 10 ha area which is used for flood recession cultivation on the right bank of the Tekeze river, some 20 km downstream from the dam site. The main crops grown are cotton and red peppers. According to discussions with local people, flood recession agriculture is probably practised further downstream, but no information is available on the location or extent of these areas. In addition, three crossing points of the Tekeze were identified below the dam within the 20 km reach. 6.3 POTENTIAL ENVIRONMENTAL IMPACTS The construction and operation of the Tekeze Hydropower Project will lead to a variety of changes in the local and wider environment. Many of the effects will be beneficial, particularly the impact at a national level of increasing the availability of electrical energy, and the potential to develop the local economy through improved infrastructure and employment opportunities. There will nevertheless be adverse effects, some of which will be short-term and reversible, but others that will lead to permanent change. Although the scale and magnitude of many impacts cannot be predicted accurately, their recognition at an early phase of the project development enables mitigating measures, where these are practicable, to be incorporated into the design, and monitoring programmes to be set up to assess the need for remedial action. An awareness of the residual environmental implications of the project is also fundamental for a balanced decision as to whether or not the project should be initiated. 6.3.1 Positive Impacts The project will potentially have a number of beneficial impacts on the natural and the socio-economic environment, both during its construction and its operational life. The positive effects in the physical and biological domain and the anticipated socio-economic benefits are discussed below  Natural Environment The lake will naturally develop populations of stagnant water fish species, which will lead to a significant increase in the total fish biomass in the Tekeze river. The reservoir also offers a potential for the development of a commercial fishery.  Socio-Economic Environment Positive socio-economic impacts may be anticipated from the regional development stemming from the project. During the construction phase there will be improved employment opportunities for local people, for work constructing the civil works, access road, camp and transmission lines. There will also be a temporary surge in economic activity during the construction phase, and new markets and services will develop in the area to provide goods and services for the workers and their families
  • 3. Under operation, the main positive impact will be the generation of reliable energy for Ethiopia.  Negative Impacts The following section summarises the main negative impacts of the project on the physical, biological and socio-economic environment, and includes a specific assessment of the potential impacts downstream of the dam.  Physical impacts The construction activities will give rise to a temporary local deterioration in air quality, and will produce high noise levels and vibration. The construction works and the removal the vegetation cover in the reservoir area prior to first filling will increase the risk of erosion in area, leading to the loss of fertile soils and higher rates of sedimentation in the river.  Biological impacts This area includes a significant number of important riverine forest and savannah woodland vegetation communities, and their loss will reduce both the region’s biodiversity and the availability of wildlife habitats. The natural forest cover is critical for the maintenance of soil stability, and plays an important role in protecting against erosion and increased sedimentation in the drainage system. Forests and woodland ecosystems also contain a wide range of plant species of commercial and domestic importance.
  • 4. 6.3.2 Summary of Significant Environmental Impacts 6.3.1 Summary of Significant Environmental Impacts The main positive and negative impacts predicted to arise from the scheme are summarised in Table
  • 5. Significant Environmental Impacts Positive Impacts related to: Physical and Biological Environment Socio-Economic Environment Construction and Impoundment Creation of aquatic habitat for a variety of birds and fish species Increased local employment opportunities Development of local economy Operation Downstream regulation may be beneficial to some aquatic flora and fauna Increase in regional and national energy supplies Potential development of commercial fishery in the reservoir Improved seasonal regime for irrigation abstraction downstream Negative Impacts related to: Project Location Destruction of aquatic wildlife habitat and elimination of riverine fishes in the reservoir Creation of breeding sites for vectors of water-borne diseases Risk of loss of protected Frankincense trees for access road and transmission lines Loss of 231ha of flood recession cropland, 68ha of irrigated cropland, loss of grazing land Disruption of cross-valley communication links by inundation of crossing paths (9 upstream and 3 downstream within 20km) Construction and impoundment Risk of erosion and pollution (water pollution, dust, noise) Creation of breeding sites for tropical diseases vectors Effects on aquatic fauna due to reduction in downstream flows to compensation levels throughout the period of impoundment Temporary loss of about 200ha of land for construction camps Permanent loss of land for access road and transmission lines Increased health risks for local population and workers Effects on downstream irrigation and flood retreat agriculture Project Operation Increased population pressure on natural vegetation and wildlife resources Siltation in the reservoir Decrease in flows downstream during wet season and increase during dry season Changes in reservoir water quality and risk of eutrophication and growth of invasive water weeds Downstream impacts on water quality and aquatic fauna Increase in transmission of water- related diseases Effects on downstream flood retreat cultivation Possible flooding of crossing paths in the valley below the dam Inundation of the Merdianos sacred spring 6.4 MITIGATION MEASURES
  • 6. The proposed mitigation measures to minimise adverse impacts and enhance the benefits of the scheme are summarised in Table. Mitigation Measures Item No Unit Unit cost Total cost (Birr) (Birr) 1 Compensation for income foregone 1.1 temporary loss of land for camp site cosntruction 200 ha 3,000 600,000 1.2 Loss of flood recession cropland 231 ha 6,000 1,386,000 1.3 Loss of grazing land in reservoir area 168 ha 650 109,200 1.4 Loss of irrigated land in reservoir areas 68 ha 16,000 1,088,000 2 Infrastructure 2.1 Water supply wells 16 borehole 200,000 3,200,000 2.2 Sanitation facilities 1,000 pit latrine 225 225,000 2.3 Health facilities 1 h. centre 2,500,000 2,500,000 2.4 River crossing replacements across reservoir 9 ferry annual maintenance 9 ferryman of the scheme 2.5 River crossing replacements below dam 3 irish crossing 200,000 600,000 2.6 Small scale irrigation development 150 ha 15,000 2,250,000 3 Community health control programme lump sum 745,000 4 Agricultural extension services lump sum 1,000,000 5 Compensation for Merdianos spring ceremony or civil works 6 Survey of downstream flood recession agriculture and crossing paths 23,400 7 Contingency for mitigation measures for downstream agricultural land losses 240,000 8 Contingency for mitigation measures for river crossing replacement 2,400,000 9 Preparation of catchment plans for conservation areas 2,100,000 10 Implementation and management of conservation areas 9,000,000 20% contingency 5,493,320 TOTAL 32,959,920
  • 7. 6.5 MONITORING PLAN An appropriate monitoring programme is recommended to verify the magnitude and scale of the predicted impacts, and to detect any unforeseen impacts at an early stage. One of the most important aims of monitoring is to ensure that any necessary corrective action arising from unforeseen adverse impacts, or from different magnitudes of recognised impacts, is undertaken before significant environmental damage results. The EIA studies have shown that there has been relatively little monitoring of existing environmental conditions in the area. It is therefore important to establish a monitoring programme prior to the start of construction, in order to establish background conditions against which future change can be assessed. Monitoring Activities and Costs Subject Activity Frequency Responsible Organisation Water Quality Survey of the physico- chemical parameters of the reservoir water quarterly for 5 years MWR Fishery Fisheries monitoring in the river and reservoir quarterly for 5 years Ministry of Agriculture - Fisheries Sector Health Survey of disease vectors (mosquitoes and snails) annual survey for 5 years Ministry of Health Human health survey annual survey for 3 years Ministry of Health - Malaria Control Office Environmental co-ordination Compensation plan 6 man months MWR or EELPA 20% contingency 214,000 TOTAL 1,284,000