Digital Enterprise Research Institute                                                     www.deri.ie




               Enterprise Energy Management using a
              Linked Dataspace for Energy Intelligence
                            Edward Curry, Souleiman Hasan, Sean O’Riain
               The Second IFIP Conference on Sustainable Internet and ICT for Sustainability
                                            (SustainIT 2012)




© Copyright 2011 Digital Enterprise Research Institute. All rights
reserved.

     Digital Enterprise Research Institute
     National University of Ireland, Galway
                                                                     Enabling Networked Knowledge
Motivation
Digital Enterprise Research Institute                                      www.deri.ie



  n    2010 MIT Sloan / IBM report on Analytics
         ¨    Embedding business insight into day-to-day
               operations is critical to success
         ¨    Single greatest opportunity and challenge for
               the data-driven enterprise


  n    2010 survey of 600+ CIOs & IT Managers
         ¨    Paucity of sustainability information (i.e energy)
         ¨    Lost opportunity to leverage information to
               improve sustainability
         ¨    Significant challenges ahead



                                                      Enabling Networked Knowledge
New Engineering Building at
                           NUI Galway
Digital Enterprise Research Institute                                                           www.deri.ie


                                        Cost	
  -­‐	
  €	
  40,000,000	
  	
  	
  




                                                                           Enabling Networked Knowledge
                                                                                        3	
  
Research Motivation
                                   A Real-World Example
Digital Enterprise Research Institute                                                                                                      www.deri.ie


                  Cost	
  -­‐	
  €	
  40,000,000	
  	
  	
     AirCon	
  8:30-­‐11:00	
  &	
  15:00-­‐16:00	
  Mon	
  to	
  Fri	
  	
  	
  




                           CO2	
  levels	
  
                                                                                                          Occupancy	
  Pa@ern	
  
                                                                                                  Time          Monday Tuesday Wednesday Thursday Friday
       ASHRAE	
  	
  
                                                                                                  08:00-­‐09:00
       62.1-­‐2010	
                                                                              09:00-­‐10:00 237               237      200      237
                                                                                                  10:00-­‐11:00          237      237      237      200
                                                                                                  11:00-­‐12:00 237      180      180      145      237
                                                                                                  12:00-­‐13:00 237      200      237      200      149
                                                                                                  13:00-­‐14:00                   145
                                                                                                  14:00-­‐15:00 221      237      145               140
                                                                                                  15:00-­‐16:00 221               120      160      140
                                                                                                  16:00-­‐17:00 149               250      160
                                                                                                  17:00-­‐18:00 200                        160

                                                                                        Enabling Networked Knowledge
                                                                                                     4	
  
Energy Intelligence
Digital Enterprise Research Institute                                         www.deri.ie




   n    What is Energy Intelligence?
           ¨  Transforms               raw data into meaningful energy
               information
           ¨  Enables effective strategic, tactical, and operational
               decision-making for energy mgmt.
           ¨  Provides energy consumption of business activities
               so they can be understood and optimized




                                                         Enabling Networked Knowledge
Enterprise Energy Management
Digital Enterprise Research Institute                              www.deri.ie




  Energy Intelligence platforms within an Enterprise will
          need to support four key requirements




                                              Enabling Networked Knowledge
Holistic Energy Consumption
Digital Enterprise Research Institute                                              www.deri.ie


                                         FaciliIes	
  

                    Data	
  Centre	
                         Business	
  Travel	
  


                                                                    	
  
          Office	
  IT	
                                            Daily	
  Commute	
  

                                                                            	
  
                                           Holis&c	
  
                                           Energy	
  
                                         Management	
  
                                                          Enabling Networked Knowledge
Multi-Level Energy Analysis
Digital Enterprise Research Institute                                                     www.deri.ie
                                                                         CIO
   Strategic Analysis                         CEO
                                                                                 Example KPI:
   •    CIO needs high-level                                                     Energy used by
        business function power                                            global IT department
        usage
   •    CSO real-time carbon                                            Helpdesk
        emissions                       CSO                                     Example KPI:
                                                                                PUE of the
   Tactical Analysis                                                       Data Center in Dublin

   •    Manager needs energy
        usage of business                                               Maintenance Personnel
        processes, business line or
                                                                                  Example KPI:
        group                                                                     kWhs used by
                                                                            server 172.16.0.8

   Operational Analysis
   •    Technician needs
        equipment power usage                                                  Building
   •    Low-level monitoring
        Sensors, events                                              Data Center



                                                          Enabling Networked Knowledge
                                               8 of XYZ
Business Context of
                             Energy Consumption
Digital Enterprise Research Institute                                                   www.deri.ie



                                                     Energy




                             Finance                                      Resource
                                                                          Allocation




                                                               Human
                                        Asset Mgmt            Resources




                                                                   Enabling Networked Knowledge
Energy Situational
                                Awareness
Digital Enterprise Research Institute                                           www.deri.ie




       n    Help users to:
              ¨  Understand            energy data
              ¨  Make          appropriate energy saving decisions
              ¨  Support energy performance objectives and
                  other business performance objectives
                     –  human resources (i.e. occupancy comfort)
                     –  enterprise resource planning (i.e. room utilization).




                                                        Enabling Networked Knowledge
Proposed Approach
Digital Enterprise Research Institute                                          www.deri.ie



 n    Architecture for Energy Intelligence Platforms
        ¨  Dataspace                   for Information Management
        ¨  Linked            Data for sharing Information
        ¨  Complex                Event Processing for Interpreting Data




                                                          Enabling Networked Knowledge
What is a Dataspace?
Digital Enterprise Research Institute                                                www.deri.ie



      n  Emerging data management architecture
      n  Recognizes expense obtaining upfront
          unifying schema across all sources
             ¨  Co-existence            of data without unifying schema
             ¨  Loosely            integrated set of data sources
      n    Data integrated on “as needed” basis
             ¨  Tighter integration achieved in an incremental
                 "pay-as-you-go" fashion

             Franklin, A. Halevy, and D. Maier From databases to dataspaces: a new
             abstraction for information management,” Sigmod Record, 34(4) 2005.



                                                           Enabling Networked Knowledge
DBMS vs Dataspace
Digital Enterprise Research Institute                                     www.deri.ie




                                        DBMS          Dataspace

        Model                           Relational    All

        Formats                         Homogenous    Heterogeneous

        Control                         Complete      Partial

        Query                           Precise       Approximate

        Integration                     Explicit      Implicit/
                                                      Incremental


                                                     Enabling Networked Knowledge
The Linked Open Data cloud
Digital Enterprise Research Institute                                    www.deri.ie




                                                2008
                                             2007        2008           2010
                                                                        2009
                                                   2008      2009
                                                     2008




                                                    Enabling Networked Knowledge
                                                                              14
                                        14
Linked Open Data cloud
                                 - domains
Digital Enterprise Research Institute                                                                       www.deri.ie
                                                                                                    BestBuy
http://lod-cloud.net/                                                                               Overstock.com
                                                                                                    Facebook
                                                                                                    US government
                                                                                                    UK government
                                        Media



                                                                   User-generated


            Government                                                              Publications
                                                                                                    BBC
                                                                                                    New York Times

                                            Cross-domain
                           Geo
                                                                             Life sciences


                                                                                                   LinkedGeoData
 Over 300 open data sets with more than 35 billion facts,
 interlinked by 500 million typed links.
   Linking Open Data cloud diagram, by Richard Cyganiak and Anja Jentzsch.



                                                                                    Enabling Networked Knowledge
                                                                  15
Linked Data Principles
Digital Enterprise Research Institute                                www.deri.ie


   1.      Use URIs to identify the “things” in your data
   2.      Use HTTP URIs so people (and machines) can
           look them up on the Web
   3.      When a URI is looked up, return a
           description of the thing in a structured
           format (RDF)
   4.      Include links to related things to provide
           context
       http://www.w3.org/DesignIssues/LinkedData.html



                                                Enabling Networked Knowledge
Why Graphs and Ontologies?
Digital Enterprise Research Institute                                                                    www.deri.ie



                                         Cities:Dublin
                                                                          Geo:hasLargestCity
                                                           84421km2
  Wikipedia.org                                                                         Geo:IslandOfIreland
                                          Geo:hasCapital
                                                               Geo:area
                                                                                     Geo:locatedOn

                                                      EU:RepublicOfIreland




                                                      EU:RepublicOfIreland
                                                                                     Gov:hasDepartment
                                        Gov:hasTaoiseach
    Gov.ie                               Person:EndaKenny
                                                                            IE:DepartmentOfFinance



                                                                          Enabling Networked Knowledge
What is Linked Data?
Digital Enterprise Research Institute                               www.deri.ie




       18
                                               Enabling Networked Knowledge
Linked Dataspace
Digital Enterprise Research Institute                               www.deri.ie




                    Dataspace + Linked Data = Linked Dataspace




                                               Enabling Networked Knowledge
                                        19
Linked dataspace for
                                Energy Intelligence
Digital Enterprise Research Institute                                                         www.deri.ie

                                            Organisation-level
                     Business Process                                     Personal-level




                                          Linked	
  dataspace	
  for	
  
                                           Energy	
  Intelligence	
  



                          Office IT                                          Corporate
                                        Building            Logistics
                                                Data Center

                                                                         Enabling Networked Knowledge
                                                            20	
  	
  
Linked dataspace for
Digital Enterprise Research Institute
                                          Energy Intelligence                                                                            www.deri.ie


                                                                                                                  Energy Saving Applications
      Applications




                                                                                                            n 
                     Decision Support Energy Analysis
                         Systems          Model
                                                             Energy and
                                                      Sustainability Dashboards
                                                                               Situation Awareness
                                                                                       Apps
                                                                                                            n    Energy Awareness
                                                                                          Complex Events


                                                                                                           n     Complex Event Processing
    Services
    Support




                        Entity                                                          Complex Event
                                          Data          Provenance       Search &
                     Management                                                           Processing
                                         Catalog                          Query             Engine
                       Service




                                                                                                            n    Interlinked Cloud of Energy
     Linked Data




                                                                                                                  Data



                       Adapter          Adapter           Adapter           Adapter           Adapter
                                                                                                           n     Resource Description
                                                                                                                  Framework (RDF)
      Sources




                                                                                                           n     Semantic Sensor Network
                                                                                                                  Ontology (SSN)


                                                                                                                  Enabling Networked Knowledge
Entity Graph in Cloud
Digital Enterprise Research Institute                                                                               www.deri.ie


      Linked Dataspace                       Corporate System

                                   “Edward Curry”           “DGSIT”                           Corporate
                                    foaf:name	
                en:memberOf	
                   Building
                                         h:p://www.deri.ie/about/team/
                                           member/edward_curry#me	
                            Office IT

                                               owl:sameAs                   owl:sameAs

         h:p://www.deri.ie/about/team/                                            h:p://www.deri.ie/about/team/
           member/edward_curry#me   	
                                              member/edward_curry#me   	
  

                                                                                           rm:occupant	
  
                en:has_a	
  
                                                                                         h:p://lab.linkeddata.deri.ie/
        h:p://energy.deri.ie#macbook15698	
                                                2010/deri-­‐rooms#r202e	
  
       foaf:name	
                 en:consumption	
                                        foaf:name	
       en:consumption	
  

      “MacBook Pro”               10kWh                                               “202e”               50kWh

               Office IT System                                                  Building Management System


                                                                             Enabling Networked Knowledge
Energy Saving Applications
Digital Enterprise Research Institute                                          www.deri.ie




    Enterprise Energy                   Smart Buildings               Green Cloud
       Observatory                                                     Computing




                                                          Enabling Networked Knowledge
               Office IT Energy Mgmt.              Personal Energy Mgmt.
DERI Energy Overview
Digital Enterprise Research Institute                            www.deri.ie




                                            Enabling Networked Knowledge
IT Energy
Digital Enterprise Research Institute                             www.deri.ie




                                             Enabling Networked Knowledge
                                        25
iEnergy – Personal
Digital Enterprise Research Institute                                www.deri.ie




                                                Enabling Networked Knowledge
Summary
Digital Enterprise Research Institute                                       www.deri.ie


   n    Energy Intelligence platforms have 4 key requirements:
           ¨    Holistic energy consumption
           ¨    Multi-level energy analysis
           ¨    Business context energy consumption
           ¨    Energy situational awareness
   n    Linked dataspace for Energy Intelligence (LEI)
           ¨    Supports requirements using Dataspaces, Linked Data,
                 Complex Event Processing for Situational Awareness
   n    Future work
           ¨    Investigate appropriate support services for linked dataspaces
                 using approximation techniques
           ¨    Interoperability of system services as RESTful services.


                                                       Enabling Networked Knowledge
Further Reading
Digital Enterprise Research Institute                              www.deri.ie




  E. Curry, S. Hasan, and S. O’Riáin, “Enterprise Energy Management
  using a Linked Dataspace for Energy Intelligence,” in The Second IFIP
  Conference on Sustainable Internet and ICT for Sustainability
  (SustainIT 2012)

  http://www.edwardcurry.org/publications/curry_SustainIT_2012.pdf


                                              Enabling Networked Knowledge
Selected References
Digital Enterprise Research Institute                                      www.deri.ie


  Sustainability Use Cases
  n  Curry, E., et al . (2011). An Entity-Centric Approach To Green Information
      Systems. 19th European Conference on Information Systems (ECIS 2011).
  n  Curry, E., & Donnellan, B. (2012). Green and Sustainable Informatics. In,
      Harnessing Green IT: Principles and Practices. John Wiley & Sons
  n  Curry, E. et al. An Environmental Chargeback for Data Center and Cloud
      Computing Consumers, in First International Workshop on Energy-Efficient
      Data Centers, 2012.
  n  Curry, E. et al, Building Optimisation using Scenario Modeling and Linked
      Data, in 1st Workshop Linked Data in Architecture and Construction 2012
  n  Curry E. et al, Enterprise Energy Management using a Linked dataspace for
      Energy Intelligence. In: The Second IFIP Conference on Sustainable Internet
      and ICT for Sustainability (SustainIT) 2012.




                                                     Enabling Networked Knowledge
Selected References
Digital Enterprise Research Institute                                      www.deri.ie

 Information Management
 n  Hasan, S. et al. (2011). Toward Situation Awareness for the Semantic
     Sensor Web: Complex Event Processing with Dynamic Linked Data
     Enrichment. 4th International Workshop on Semantic Sensor Networks
 n  Hasan, S. et al, Approximate Semantic Matching of Heterogeneous Events,
     in 6th ACM International Conference on Distributed Event-Based Systems
 n  Curry E. (2012) System of Systems Information Interoperability using a
     Linked Dataspace In: IEEE 7th International Conference on System of
     Systems Engineering (SOSE 2012).
 IT Management
 n  Curry, E. et al. Developing an Sustainable IT Capability: Lessons From
     Intel’s Journey, MIS Quarterly Executive, vol. 11, no. 2, pp. 61-74, 2012.
 n  Donnellan B. et al, (2011) A Capability Maturity Framework for Sustainable
     Information and Communication Technology. IEEE IT Professional 13(1).
 n  Curry E, et al, (2012) A Maturity Model For Energy Efficiency in Mature Data
     Centres, 1st International Conference on Smart Grids and Green IT Systems

                                                     Enabling Networked Knowledge

Enterprise Energy Management using a Linked Dataspace for Energy Intelligence

  • 1.
    Digital Enterprise ResearchInstitute www.deri.ie Enterprise Energy Management using a Linked Dataspace for Energy Intelligence Edward Curry, Souleiman Hasan, Sean O’Riain The Second IFIP Conference on Sustainable Internet and ICT for Sustainability (SustainIT 2012) © Copyright 2011 Digital Enterprise Research Institute. All rights reserved. Digital Enterprise Research Institute National University of Ireland, Galway Enabling Networked Knowledge
  • 2.
    Motivation Digital Enterprise ResearchInstitute www.deri.ie n  2010 MIT Sloan / IBM report on Analytics ¨  Embedding business insight into day-to-day operations is critical to success ¨  Single greatest opportunity and challenge for the data-driven enterprise n  2010 survey of 600+ CIOs & IT Managers ¨  Paucity of sustainability information (i.e energy) ¨  Lost opportunity to leverage information to improve sustainability ¨  Significant challenges ahead Enabling Networked Knowledge
  • 3.
    New Engineering Buildingat NUI Galway Digital Enterprise Research Institute www.deri.ie Cost  -­‐  €  40,000,000       Enabling Networked Knowledge 3  
  • 4.
    Research Motivation A Real-World Example Digital Enterprise Research Institute www.deri.ie Cost  -­‐  €  40,000,000       AirCon  8:30-­‐11:00  &  15:00-­‐16:00  Mon  to  Fri       CO2  levels   Occupancy  Pa@ern   Time Monday Tuesday Wednesday Thursday Friday ASHRAE     08:00-­‐09:00 62.1-­‐2010   09:00-­‐10:00 237 237 200 237 10:00-­‐11:00 237 237 237 200 11:00-­‐12:00 237 180 180 145 237 12:00-­‐13:00 237 200 237 200 149 13:00-­‐14:00 145 14:00-­‐15:00 221 237 145 140 15:00-­‐16:00 221 120 160 140 16:00-­‐17:00 149 250 160 17:00-­‐18:00 200 160 Enabling Networked Knowledge 4  
  • 5.
    Energy Intelligence Digital EnterpriseResearch Institute www.deri.ie n  What is Energy Intelligence? ¨  Transforms raw data into meaningful energy information ¨  Enables effective strategic, tactical, and operational decision-making for energy mgmt. ¨  Provides energy consumption of business activities so they can be understood and optimized Enabling Networked Knowledge
  • 6.
    Enterprise Energy Management DigitalEnterprise Research Institute www.deri.ie Energy Intelligence platforms within an Enterprise will need to support four key requirements Enabling Networked Knowledge
  • 7.
    Holistic Energy Consumption DigitalEnterprise Research Institute www.deri.ie FaciliIes   Data  Centre   Business  Travel     Office  IT   Daily  Commute     Holis&c   Energy   Management   Enabling Networked Knowledge
  • 8.
    Multi-Level Energy Analysis DigitalEnterprise Research Institute www.deri.ie CIO Strategic Analysis CEO Example KPI: •  CIO needs high-level Energy used by business function power global IT department usage •  CSO real-time carbon Helpdesk emissions CSO Example KPI: PUE of the Tactical Analysis Data Center in Dublin •  Manager needs energy usage of business Maintenance Personnel processes, business line or Example KPI: group kWhs used by server 172.16.0.8 Operational Analysis •  Technician needs equipment power usage Building •  Low-level monitoring Sensors, events Data Center Enabling Networked Knowledge 8 of XYZ
  • 9.
    Business Context of Energy Consumption Digital Enterprise Research Institute www.deri.ie Energy Finance Resource Allocation Human Asset Mgmt Resources Enabling Networked Knowledge
  • 10.
    Energy Situational Awareness Digital Enterprise Research Institute www.deri.ie n  Help users to: ¨  Understand energy data ¨  Make appropriate energy saving decisions ¨  Support energy performance objectives and other business performance objectives –  human resources (i.e. occupancy comfort) –  enterprise resource planning (i.e. room utilization). Enabling Networked Knowledge
  • 11.
    Proposed Approach Digital EnterpriseResearch Institute www.deri.ie n  Architecture for Energy Intelligence Platforms ¨  Dataspace for Information Management ¨  Linked Data for sharing Information ¨  Complex Event Processing for Interpreting Data Enabling Networked Knowledge
  • 12.
    What is aDataspace? Digital Enterprise Research Institute www.deri.ie n  Emerging data management architecture n  Recognizes expense obtaining upfront unifying schema across all sources ¨  Co-existence of data without unifying schema ¨  Loosely integrated set of data sources n  Data integrated on “as needed” basis ¨  Tighter integration achieved in an incremental "pay-as-you-go" fashion Franklin, A. Halevy, and D. Maier From databases to dataspaces: a new abstraction for information management,” Sigmod Record, 34(4) 2005. Enabling Networked Knowledge
  • 13.
    DBMS vs Dataspace DigitalEnterprise Research Institute www.deri.ie DBMS Dataspace Model Relational All Formats Homogenous Heterogeneous Control Complete Partial Query Precise Approximate Integration Explicit Implicit/ Incremental Enabling Networked Knowledge
  • 14.
    The Linked OpenData cloud Digital Enterprise Research Institute www.deri.ie 2008 2007 2008 2010 2009 2008 2009 2008 Enabling Networked Knowledge 14 14
  • 15.
    Linked Open Datacloud - domains Digital Enterprise Research Institute www.deri.ie BestBuy http://lod-cloud.net/ Overstock.com Facebook US government UK government Media User-generated Government Publications BBC New York Times Cross-domain Geo Life sciences LinkedGeoData Over 300 open data sets with more than 35 billion facts, interlinked by 500 million typed links. Linking Open Data cloud diagram, by Richard Cyganiak and Anja Jentzsch. Enabling Networked Knowledge 15
  • 16.
    Linked Data Principles DigitalEnterprise Research Institute www.deri.ie 1.  Use URIs to identify the “things” in your data 2.  Use HTTP URIs so people (and machines) can look them up on the Web 3.  When a URI is looked up, return a description of the thing in a structured format (RDF) 4.  Include links to related things to provide context http://www.w3.org/DesignIssues/LinkedData.html Enabling Networked Knowledge
  • 17.
    Why Graphs andOntologies? Digital Enterprise Research Institute www.deri.ie Cities:Dublin Geo:hasLargestCity 84421km2 Wikipedia.org Geo:IslandOfIreland Geo:hasCapital Geo:area Geo:locatedOn EU:RepublicOfIreland EU:RepublicOfIreland Gov:hasDepartment Gov:hasTaoiseach Gov.ie Person:EndaKenny IE:DepartmentOfFinance Enabling Networked Knowledge
  • 18.
    What is LinkedData? Digital Enterprise Research Institute www.deri.ie 18 Enabling Networked Knowledge
  • 19.
    Linked Dataspace Digital EnterpriseResearch Institute www.deri.ie Dataspace + Linked Data = Linked Dataspace Enabling Networked Knowledge 19
  • 20.
    Linked dataspace for Energy Intelligence Digital Enterprise Research Institute www.deri.ie Organisation-level Business Process Personal-level Linked  dataspace  for   Energy  Intelligence   Office IT Corporate Building Logistics Data Center Enabling Networked Knowledge 20    
  • 21.
    Linked dataspace for DigitalEnterprise Research Institute Energy Intelligence www.deri.ie Energy Saving Applications Applications n  Decision Support Energy Analysis Systems Model Energy and Sustainability Dashboards Situation Awareness Apps n  Energy Awareness Complex Events n  Complex Event Processing Services Support Entity Complex Event Data Provenance Search & Management Processing Catalog Query Engine Service n  Interlinked Cloud of Energy Linked Data Data Adapter Adapter Adapter Adapter Adapter n  Resource Description Framework (RDF) Sources n  Semantic Sensor Network Ontology (SSN) Enabling Networked Knowledge
  • 22.
    Entity Graph inCloud Digital Enterprise Research Institute www.deri.ie Linked Dataspace Corporate System “Edward Curry” “DGSIT” Corporate foaf:name   en:memberOf   Building h:p://www.deri.ie/about/team/ member/edward_curry#me   Office IT owl:sameAs owl:sameAs h:p://www.deri.ie/about/team/ h:p://www.deri.ie/about/team/ member/edward_curry#me   member/edward_curry#me   rm:occupant   en:has_a   h:p://lab.linkeddata.deri.ie/ h:p://energy.deri.ie#macbook15698   2010/deri-­‐rooms#r202e   foaf:name   en:consumption   foaf:name   en:consumption   “MacBook Pro” 10kWh “202e” 50kWh Office IT System Building Management System Enabling Networked Knowledge
  • 23.
    Energy Saving Applications DigitalEnterprise Research Institute www.deri.ie Enterprise Energy Smart Buildings Green Cloud Observatory Computing Enabling Networked Knowledge Office IT Energy Mgmt. Personal Energy Mgmt.
  • 24.
    DERI Energy Overview DigitalEnterprise Research Institute www.deri.ie Enabling Networked Knowledge
  • 25.
    IT Energy Digital EnterpriseResearch Institute www.deri.ie Enabling Networked Knowledge 25
  • 26.
    iEnergy – Personal DigitalEnterprise Research Institute www.deri.ie Enabling Networked Knowledge
  • 27.
    Summary Digital Enterprise ResearchInstitute www.deri.ie n  Energy Intelligence platforms have 4 key requirements: ¨  Holistic energy consumption ¨  Multi-level energy analysis ¨  Business context energy consumption ¨  Energy situational awareness n  Linked dataspace for Energy Intelligence (LEI) ¨  Supports requirements using Dataspaces, Linked Data, Complex Event Processing for Situational Awareness n  Future work ¨  Investigate appropriate support services for linked dataspaces using approximation techniques ¨  Interoperability of system services as RESTful services. Enabling Networked Knowledge
  • 28.
    Further Reading Digital EnterpriseResearch Institute www.deri.ie E. Curry, S. Hasan, and S. O’Riáin, “Enterprise Energy Management using a Linked Dataspace for Energy Intelligence,” in The Second IFIP Conference on Sustainable Internet and ICT for Sustainability (SustainIT 2012) http://www.edwardcurry.org/publications/curry_SustainIT_2012.pdf Enabling Networked Knowledge
  • 29.
    Selected References Digital EnterpriseResearch Institute www.deri.ie Sustainability Use Cases n  Curry, E., et al . (2011). An Entity-Centric Approach To Green Information Systems. 19th European Conference on Information Systems (ECIS 2011). n  Curry, E., & Donnellan, B. (2012). Green and Sustainable Informatics. In, Harnessing Green IT: Principles and Practices. John Wiley & Sons n  Curry, E. et al. An Environmental Chargeback for Data Center and Cloud Computing Consumers, in First International Workshop on Energy-Efficient Data Centers, 2012. n  Curry, E. et al, Building Optimisation using Scenario Modeling and Linked Data, in 1st Workshop Linked Data in Architecture and Construction 2012 n  Curry E. et al, Enterprise Energy Management using a Linked dataspace for Energy Intelligence. In: The Second IFIP Conference on Sustainable Internet and ICT for Sustainability (SustainIT) 2012. Enabling Networked Knowledge
  • 30.
    Selected References Digital EnterpriseResearch Institute www.deri.ie Information Management n  Hasan, S. et al. (2011). Toward Situation Awareness for the Semantic Sensor Web: Complex Event Processing with Dynamic Linked Data Enrichment. 4th International Workshop on Semantic Sensor Networks n  Hasan, S. et al, Approximate Semantic Matching of Heterogeneous Events, in 6th ACM International Conference on Distributed Event-Based Systems n  Curry E. (2012) System of Systems Information Interoperability using a Linked Dataspace In: IEEE 7th International Conference on System of Systems Engineering (SOSE 2012). IT Management n  Curry, E. et al. Developing an Sustainable IT Capability: Lessons From Intel’s Journey, MIS Quarterly Executive, vol. 11, no. 2, pp. 61-74, 2012. n  Donnellan B. et al, (2011) A Capability Maturity Framework for Sustainable Information and Communication Technology. IEEE IT Professional 13(1). n  Curry E, et al, (2012) A Maturity Model For Energy Efficiency in Mature Data Centres, 1st International Conference on Smart Grids and Green IT Systems Enabling Networked Knowledge