Enhancing the flexibility to the
           design
             of
    Selangkah System


Name                : Muhammad Izzat Bin Abd. Hadi
Matrix No           : 2010681642
Supervisor’s Name   : Pn. Suriyati Razali
Research Background
―Enhancement is the process of adding new functionality to a system.
This is usually done at the request of system users. This activity
requires a full life-cycle of its own. That is, enhancements demand
requirements, design, implementation, and test.‖
                                            (Roger S. Pressman,2001)


―System design is associated with building a formal morphology of
the system, comprising the process of defining the system
parameters, submodels, and criteria, selecting an optimal candidate,
and preparing a detail implementation plan for the chosen candidate.
It is primarily a wholistic approach to engineering a system, and is
differentiated from operations research and other analytical
methods. ‖
                                            (Charles C Willow,2007)
Research Background
   This research focus on the Sistem Semakan Syarat Selangkah
    ke UiTM (Selangkah).

   Selangkah System is developed and owned by Bahagian
    Pengambilan Pelajar (BPP) UiTM.

   Selangkah System is to assist student in identify the suitable
    programme for them based on their SPM or STPM results.

   Selangkah System also assist universities staff itself in order to
    guiding student during outreach program such as Karnival
    Pengajian Tinggi Negara (KPTN) where they will meet the
    student and give information about each programme offered.
Manual System :
SPM’s candidate and STPM’s candidate         Current Selangkah System:
check their eligibility to enter UiTM with   SPM candidate and STPM candidate to
the manually.                                check either they are eligible to apply for
https://online.mohe.gov.my/upu/emas/ind      the program required by the SPM results.
ex_epanduan.php?pagefunc=epanduan             http://www.selangkah.uitm.edu.my/
Problem Statement




             Current normal practice in UiTM the
             rules and regulation of programme
             frequently change every year

             However the developer of the system
             is having difficulties to change system
             functionality that relates to the new
             regulation because the rules are hard-
             coded. Furthermore, there is no paper
             documentation        on    the   system
             description.
Aim
Aim :

To enhance the design for existing system to make more flexible in
changing the regulation every year and provide the appropriate
documentation for existing systems.

―A flexible system is a system designed to maintain a high level of
performance through real time changes in configuration when
operating conditions or requirements change in a predictable or
unpredictable way.‖
                     (Andrew Olewnik and Kemper Lewis, 2006)
Objectives & Scope
   The objectives are:
    ◦ To review functionality Selangkah System.
    ◦ To verify requirement document.
    ◦ To design Selangkah System that allow
      flexible in changing rule.

   Scope
    ◦ To be used for SPM and STPM candidate
      to apply programme in UiTM only.
Stakeholders
   Student:
    ◦ SPM’s candidate
    ◦ STPM’s candidate

    The administrator
Significant of Project
   To the student
    ◦ Allow student to search for suitable
      programme to enter UiTM

   To the administrator:
    ◦ To ease system developer do the changes
      on the rules and regulation
Literature Review
    Title / Author                          Important Quotes                         Findings

Software Engineering    -Enhancement is the process of adding new functionality The terminology
(A Pratitioner’s        to a system. This is usually done at the request of system for
Approach)               users. This activity requires a full life-cycle of its own. Enhancement
                        That is, enhancements demand requirements, design,
Roger S. Pressman       implementation, and test.
(2001)
                        -Enhancement as software is used, the customer/user will
                        recognize additional functions that will provide benefit.
                        Perfective maintenance extends the software beyond its
                        original functional requirements
Ethical Issues in       Enhancement is typically contraposed to therapy. In broad The terminology
Human Enhancement       terms, therapy aims to fix something that has gone wrong, for
                        by curing specific diseases or injuries, while enhancement Enhancement
Nick Bostrom, Rebecca   interventions aim to improve the state of an organism
Roache                  beyond its normal healthy state.
(2008)
Literature Review
     Title / Author                         Important Quotes                          Findings

A decision support       A flexible system is a system designed to maintain a high The terminology
framework for flexible   level of performance through real time changes in for Flexible
system design            configuration when operating conditions or requirements System
                         change in a predictable or unpredictable way.
Andrew Olewnik,
Kemper Lewis
(2006)

Qualitative decision     System design is associated with building a formal The terminology
making with integrated   morphology of the system, comprising the process of for System
systems design           defining the system parameters, submodels, and criteria, Design
methodology              selecting an optimal candidate, and preparing a detail
                         implementation plan for the chosen candidate. It is
Charles C Willow         primarily a wholistic approach to engineering a system,
(2007)                   and is differentiated from operations research and other
                         analytical methods.
Literature Review
    Title / Author                      Important Quotes                         Findings

Software             System documentation includes all of the documents The terminology
Documentation        describing the system itself from the requirements for System
                     specification to the final acceptance test plan. Documents Documentation
Ian Sommerville      describing the design, implementation and testing of a
(2001)               system are essential if the program is to be understood and
                     maintained. Like user documentation, it is important that
                     system documentation is structured, with overviews
                     leading the reader into more formal and detailed
                     descriptions of each aspect of the system.
Literature Review
      Title / Author                        Important Quotes                          Findings
SYSTEMS                    There are process for documentation:                   Process for
DOCUMENTATION                                                                     Documentation
(a practical case study)   -Documentation must be done parallel to the
                           development of a system if it is ever to end up
Rlcardo Ameneyro,          properly documented
Carolina Arena, Ruben      -Documentation must guide the reader only
Colmenares, Pedro          throughout the sections t h a t are relevant to his
Cornejo, Rafael Garcia,    particular interest at that time
Eloy Hernandez, Genaro     -Documentation must help to locate the modules the
Mariscal, and Socrates     maintainer has to modify in order to fulfill the new
Rivera                     requirements
(1984)                     -Documentation must aid the maintainer to evaluate
                           the impact in the system as a whole induced by the
                           proposed modification
                           -Documentation must be as dynamic as the system
                           itself and remain constantly up to dateto date
Literature Review
    Title / Author                              Important Quotes                                   Findings

Software Documentation   Process documentation falls into a number of categories:            Process System
                                                                                             Documentation
Ian Sommerville          1)Plans, estimates and schedules - These are documents
(2001)                   produced by managers which are used to predict and to control
                         the software process.

                         2)Reports - These are documents which report how resources
                         were used during the process of development.

                         3)Standards - These are documents which set out how the
                         process is to be implemented. These may be developed from
                         organizational, national or international standards.

                         4)Working papers - These are often the principal technical
                         communication documents in a project. They record the ideas
                         and thoughts of the engineers working on the project are
                         interim versions of product documentation, describe
                         implementation strategies and set out problems which have
                         been identified. They often, implicitly, record the rationale for
                         design decisions.

                         5)Memos and electronic mail messages - These record the
                         details of everyday communications between managers and
                         development engineers.
Literature Review
    Title / Author                            Important Quotes                         Findings
Important Papers In The   -Document preparation has been an increasingly Important of
History Of Document       important application of computers for over twenty-five System
Preparation Systems:      years. When first developed, document preparation Documentation
Basic Sources             systems were only one of many applications supported
                          on a computing system (and, indeed, an application that
Richard Furut             system administrators often tried to suppress rather than
(1992)                    support). In the modern computing environment, it is
                          common to find computers that are used only for
                          document preparation.

                          -In addition to being an important target for development
                          projects, document preparation systems have become the
                          focus of academic research, carried out both in
                          universities and in industrial research centers. Indeed,
                          the research is wide ranging as a successful document
                          preparation system draws ideas from a broad collection
                          of areas. Document preparation systems have also been
                          the target of standardization, and international standards
                          organizations have issued standards for some parts of the
                          document preparation process.
Literature Review
   Title / Author                     Important Quotes                 Findings
The Information         The documentation of information system is a Important of
Systems                 component of communication, control and System
Documentation –         monitoring of the development, operation and Documentation
                        maintenance project. At the same time, the
Another Problem
                        documentation should be regarded as one of
for Project             the results of the stages of the system life
Management              cycle. This is why, the system documentation
                        is important from the viewpoint of the project
Prof. Dumitru Oprea,    management and of its development and
Assoc. Prof. Gabriela   operation. Unfortunately, one can find that
Mesnita                 most often in practice the documentation is
(2006)                  either incomplete or totally missing.
Research Methodology
                                           Description of
  Stage     Process      Method                                Deliverables
                                             Activities
                                       -Identify and
                                       understand the
                                       problem
                      Problem
                                       -Identify the aim,      Project
Planning              identification
                                       scope, objectives and   proposal
                                       significance
                                       -Plan the project
                                       schedule
Research Methodology
                                                    Description of
   Stage          Process        Method                                    Deliverables
                                                        Activities
                            Interview session   Identify admission rules
                            (Admin staff at     and regulation
             Requirement                        procedure
                            BPP)
             Review
                            Observe          Identify system
                            Selangkah System functionality
                                                                         SRS for
                                                -Provide descriptions of
                                                                         Selangkah
                                                identified functionality
            Requirement                                                  System
                                                -Create requirement
            Specification
Requirement                 Interview session   models :
            and                                                                    1
                            (Developer)         use case diagram
            Requirement
                                                Use case Description
            Modeling
                                                Sequence Diagram

                                                -Verify requirement
             Requirement    Requirement         with:
                                                Admin                     Verified SRS
             Verification   checklist
                                                Developer                           2
Research Methodology
                                     Description of
   Stage      Process       Method                    Deliverables
                                       Activities
                                     Understand
           Review
                          Document   the Selangkah
           current system
                          review     System
           architecture
                                     architecture
                                     To design
                                     Selangkah
                                     System:        SDD for
System
Design                               according to Selangkah
                                     application    System
           Detail design             architecture           3
                                     used
                                     allow
                                     flexibility in
                                     changing rules
                                     and regulation
Project Schedule(CSP600: 12.9.2011 –
23.12.2011)
TASK NAME                  START        FINISH      DURATION
Identify topic & problem   12/9/2011    2/11/2011    37 Days
statement
Identify supervisor        13/9/2011    28/9/2011    11 Days
Research topic &           15/9/2011    20/10/201    25 Days
Working title                           1
Problem statement &        22/9/2011    28/10/201    26 Days
objectives                              1
Literature Review          13/10/2011   24/11/201    30 Days
                                        1
Research Methodology       31/10/2011   24/11/201    18 Days
                                        1
First draft submission     18/11/2011   18/11/201    0 Days
                                        1
Mock presentation          18/11/2011   18/11/201    0 Days
                                        1
Project Schedule (CSP650: 23.01.2012 –
 16.07.2012)
TASK NAME                     START       FINISH      DURATION
Project progress              23/1/2012   29/6/2012    114 Days
Requirement review            23/1/2012   6/2/2012     14 Days
Requirement Requirement       8/2/2012    22/2/2012    14 Days
Specification and
Requirement Modeling
Requirement Verification      23/2/2012   23/3/2012    30 Days
System Design                 23/1/2012   31/5/2012    93 Days
Draft submission              1/6/2012    1/6/2012      0 Days
Validation of project draft   6/6/2012    15/6/2012    7 Days
Validation of final project   20/6/2012   21/6/2012     1 Days
report

Final project presentation    25/6/2012   13/7/2012    14 Days
Final project report          16/7/2012   16/7/2012     0 Days
submission
References
   Rlcardo Ameneyro, Carolina Arena, Ruben Colmenares,Pedro Cornejo, Rafael Garcia,
    Eloy Hernandez,Genaro Mariscal, and Socrates Rivera, (1984) SYSTEMS
    DOCUMENTATION (a practical case study), Centro de Procesamiento Arturo
    Rosenblueth Ministry of Public Education, Mexico.
   Charles C Willow (2007), Qualitative decision making with integrated systems design
    methodology, Management Information Systems, Department of Management &
    Marketing, School of Business Administration, Monmouth University, West Long
    Branch, NJ 07764-1898, USA
   Richard Furuta (1992), Important Papers In The History Of Document Preparation
    Systems: Basic Sources, National Institute of Standards and Technology and University
    of Maryland
   Nick Bostrom, Rebecca Roache (2008), Ethical Issues in Human Enhancement,New
    Waves in Applied Ethics, eds. Jesper Ryberg, Thomas Petersen & Clark Wolf (Pelgrave
    Macmillan, 2008):
   Prof. Dumitru Oprea, Assoc. Prof. Gabriela Mesnita (2006), The Information Systems
    Documentation – Another Problem for Project Management, University, Iasi, Romania
   Roger S. Pressman(2001), Software Engineering (A Pratitioner’s Approach), Americas,
    New York, NY, 10020
   Ian Sommerville (2001), Software Documentation, Lancaster University, UK
   Andrew Olewnik, Kemper Lewis(2006), A decision support framework for
    flexible system design, University at Buffalo—SUNY, USA

Enhancing the flexibility to the design of selangkah system

  • 1.
    Enhancing the flexibilityto the design of Selangkah System Name : Muhammad Izzat Bin Abd. Hadi Matrix No : 2010681642 Supervisor’s Name : Pn. Suriyati Razali
  • 2.
    Research Background ―Enhancement isthe process of adding new functionality to a system. This is usually done at the request of system users. This activity requires a full life-cycle of its own. That is, enhancements demand requirements, design, implementation, and test.‖ (Roger S. Pressman,2001) ―System design is associated with building a formal morphology of the system, comprising the process of defining the system parameters, submodels, and criteria, selecting an optimal candidate, and preparing a detail implementation plan for the chosen candidate. It is primarily a wholistic approach to engineering a system, and is differentiated from operations research and other analytical methods. ‖ (Charles C Willow,2007)
  • 3.
    Research Background  This research focus on the Sistem Semakan Syarat Selangkah ke UiTM (Selangkah).  Selangkah System is developed and owned by Bahagian Pengambilan Pelajar (BPP) UiTM.  Selangkah System is to assist student in identify the suitable programme for them based on their SPM or STPM results.  Selangkah System also assist universities staff itself in order to guiding student during outreach program such as Karnival Pengajian Tinggi Negara (KPTN) where they will meet the student and give information about each programme offered.
  • 4.
    Manual System : SPM’scandidate and STPM’s candidate Current Selangkah System: check their eligibility to enter UiTM with SPM candidate and STPM candidate to the manually. check either they are eligible to apply for https://online.mohe.gov.my/upu/emas/ind the program required by the SPM results. ex_epanduan.php?pagefunc=epanduan http://www.selangkah.uitm.edu.my/
  • 5.
    Problem Statement Current normal practice in UiTM the rules and regulation of programme frequently change every year However the developer of the system is having difficulties to change system functionality that relates to the new regulation because the rules are hard- coded. Furthermore, there is no paper documentation on the system description.
  • 6.
    Aim Aim : To enhancethe design for existing system to make more flexible in changing the regulation every year and provide the appropriate documentation for existing systems. ―A flexible system is a system designed to maintain a high level of performance through real time changes in configuration when operating conditions or requirements change in a predictable or unpredictable way.‖ (Andrew Olewnik and Kemper Lewis, 2006)
  • 7.
    Objectives & Scope  The objectives are: ◦ To review functionality Selangkah System. ◦ To verify requirement document. ◦ To design Selangkah System that allow flexible in changing rule.  Scope ◦ To be used for SPM and STPM candidate to apply programme in UiTM only.
  • 8.
    Stakeholders  Student: ◦ SPM’s candidate ◦ STPM’s candidate  The administrator
  • 9.
    Significant of Project  To the student ◦ Allow student to search for suitable programme to enter UiTM  To the administrator: ◦ To ease system developer do the changes on the rules and regulation
  • 10.
    Literature Review Title / Author Important Quotes Findings Software Engineering -Enhancement is the process of adding new functionality The terminology (A Pratitioner’s to a system. This is usually done at the request of system for Approach) users. This activity requires a full life-cycle of its own. Enhancement That is, enhancements demand requirements, design, Roger S. Pressman implementation, and test. (2001) -Enhancement as software is used, the customer/user will recognize additional functions that will provide benefit. Perfective maintenance extends the software beyond its original functional requirements Ethical Issues in Enhancement is typically contraposed to therapy. In broad The terminology Human Enhancement terms, therapy aims to fix something that has gone wrong, for by curing specific diseases or injuries, while enhancement Enhancement Nick Bostrom, Rebecca interventions aim to improve the state of an organism Roache beyond its normal healthy state. (2008)
  • 11.
    Literature Review Title / Author Important Quotes Findings A decision support A flexible system is a system designed to maintain a high The terminology framework for flexible level of performance through real time changes in for Flexible system design configuration when operating conditions or requirements System change in a predictable or unpredictable way. Andrew Olewnik, Kemper Lewis (2006) Qualitative decision System design is associated with building a formal The terminology making with integrated morphology of the system, comprising the process of for System systems design defining the system parameters, submodels, and criteria, Design methodology selecting an optimal candidate, and preparing a detail implementation plan for the chosen candidate. It is Charles C Willow primarily a wholistic approach to engineering a system, (2007) and is differentiated from operations research and other analytical methods.
  • 12.
    Literature Review Title / Author Important Quotes Findings Software System documentation includes all of the documents The terminology Documentation describing the system itself from the requirements for System specification to the final acceptance test plan. Documents Documentation Ian Sommerville describing the design, implementation and testing of a (2001) system are essential if the program is to be understood and maintained. Like user documentation, it is important that system documentation is structured, with overviews leading the reader into more formal and detailed descriptions of each aspect of the system.
  • 13.
    Literature Review Title / Author Important Quotes Findings SYSTEMS There are process for documentation: Process for DOCUMENTATION Documentation (a practical case study) -Documentation must be done parallel to the development of a system if it is ever to end up Rlcardo Ameneyro, properly documented Carolina Arena, Ruben -Documentation must guide the reader only Colmenares, Pedro throughout the sections t h a t are relevant to his Cornejo, Rafael Garcia, particular interest at that time Eloy Hernandez, Genaro -Documentation must help to locate the modules the Mariscal, and Socrates maintainer has to modify in order to fulfill the new Rivera requirements (1984) -Documentation must aid the maintainer to evaluate the impact in the system as a whole induced by the proposed modification -Documentation must be as dynamic as the system itself and remain constantly up to dateto date
  • 14.
    Literature Review Title / Author Important Quotes Findings Software Documentation Process documentation falls into a number of categories: Process System Documentation Ian Sommerville 1)Plans, estimates and schedules - These are documents (2001) produced by managers which are used to predict and to control the software process. 2)Reports - These are documents which report how resources were used during the process of development. 3)Standards - These are documents which set out how the process is to be implemented. These may be developed from organizational, national or international standards. 4)Working papers - These are often the principal technical communication documents in a project. They record the ideas and thoughts of the engineers working on the project are interim versions of product documentation, describe implementation strategies and set out problems which have been identified. They often, implicitly, record the rationale for design decisions. 5)Memos and electronic mail messages - These record the details of everyday communications between managers and development engineers.
  • 15.
    Literature Review Title / Author Important Quotes Findings Important Papers In The -Document preparation has been an increasingly Important of History Of Document important application of computers for over twenty-five System Preparation Systems: years. When first developed, document preparation Documentation Basic Sources systems were only one of many applications supported on a computing system (and, indeed, an application that Richard Furut system administrators often tried to suppress rather than (1992) support). In the modern computing environment, it is common to find computers that are used only for document preparation. -In addition to being an important target for development projects, document preparation systems have become the focus of academic research, carried out both in universities and in industrial research centers. Indeed, the research is wide ranging as a successful document preparation system draws ideas from a broad collection of areas. Document preparation systems have also been the target of standardization, and international standards organizations have issued standards for some parts of the document preparation process.
  • 16.
    Literature Review Title / Author Important Quotes Findings The Information The documentation of information system is a Important of Systems component of communication, control and System Documentation – monitoring of the development, operation and Documentation maintenance project. At the same time, the Another Problem documentation should be regarded as one of for Project the results of the stages of the system life Management cycle. This is why, the system documentation is important from the viewpoint of the project Prof. Dumitru Oprea, management and of its development and Assoc. Prof. Gabriela operation. Unfortunately, one can find that Mesnita most often in practice the documentation is (2006) either incomplete or totally missing.
  • 17.
    Research Methodology Description of Stage Process Method Deliverables Activities -Identify and understand the problem Problem -Identify the aim, Project Planning identification scope, objectives and proposal significance -Plan the project schedule
  • 18.
    Research Methodology Description of Stage Process Method Deliverables Activities Interview session Identify admission rules (Admin staff at and regulation Requirement procedure BPP) Review Observe Identify system Selangkah System functionality SRS for -Provide descriptions of Selangkah identified functionality Requirement System -Create requirement Specification Requirement Interview session models : and 1 (Developer) use case diagram Requirement Use case Description Modeling Sequence Diagram -Verify requirement Requirement Requirement with: Admin Verified SRS Verification checklist Developer 2
  • 19.
    Research Methodology Description of Stage Process Method Deliverables Activities Understand Review Document the Selangkah current system review System architecture architecture To design Selangkah System: SDD for System Design according to Selangkah application System Detail design architecture 3 used allow flexibility in changing rules and regulation
  • 20.
    Project Schedule(CSP600: 12.9.2011– 23.12.2011) TASK NAME START FINISH DURATION Identify topic & problem 12/9/2011 2/11/2011 37 Days statement Identify supervisor 13/9/2011 28/9/2011 11 Days Research topic & 15/9/2011 20/10/201 25 Days Working title 1 Problem statement & 22/9/2011 28/10/201 26 Days objectives 1 Literature Review 13/10/2011 24/11/201 30 Days 1 Research Methodology 31/10/2011 24/11/201 18 Days 1 First draft submission 18/11/2011 18/11/201 0 Days 1 Mock presentation 18/11/2011 18/11/201 0 Days 1
  • 21.
    Project Schedule (CSP650:23.01.2012 – 16.07.2012) TASK NAME START FINISH DURATION Project progress 23/1/2012 29/6/2012 114 Days Requirement review 23/1/2012 6/2/2012 14 Days Requirement Requirement 8/2/2012 22/2/2012 14 Days Specification and Requirement Modeling Requirement Verification 23/2/2012 23/3/2012 30 Days System Design 23/1/2012 31/5/2012 93 Days Draft submission 1/6/2012 1/6/2012 0 Days Validation of project draft 6/6/2012 15/6/2012 7 Days Validation of final project 20/6/2012 21/6/2012 1 Days report Final project presentation 25/6/2012 13/7/2012 14 Days Final project report 16/7/2012 16/7/2012 0 Days submission
  • 22.
    References  Rlcardo Ameneyro, Carolina Arena, Ruben Colmenares,Pedro Cornejo, Rafael Garcia, Eloy Hernandez,Genaro Mariscal, and Socrates Rivera, (1984) SYSTEMS DOCUMENTATION (a practical case study), Centro de Procesamiento Arturo Rosenblueth Ministry of Public Education, Mexico.  Charles C Willow (2007), Qualitative decision making with integrated systems design methodology, Management Information Systems, Department of Management & Marketing, School of Business Administration, Monmouth University, West Long Branch, NJ 07764-1898, USA  Richard Furuta (1992), Important Papers In The History Of Document Preparation Systems: Basic Sources, National Institute of Standards and Technology and University of Maryland  Nick Bostrom, Rebecca Roache (2008), Ethical Issues in Human Enhancement,New Waves in Applied Ethics, eds. Jesper Ryberg, Thomas Petersen & Clark Wolf (Pelgrave Macmillan, 2008):  Prof. Dumitru Oprea, Assoc. Prof. Gabriela Mesnita (2006), The Information Systems Documentation – Another Problem for Project Management, University, Iasi, Romania  Roger S. Pressman(2001), Software Engineering (A Pratitioner’s Approach), Americas, New York, NY, 10020  Ian Sommerville (2001), Software Documentation, Lancaster University, UK  Andrew Olewnik, Kemper Lewis(2006), A decision support framework for flexible system design, University at Buffalo—SUNY, USA