Oil & Gas
            www.enginuitypeople.com.au
About us…
Enginuity People Australia is a specialist
business within Oil & Gas recruitment across
Australia.

We commenced trading in 2008 in Sydney
as a specialist engineering provider.

Our ongoing success and diversification our
office network now includes Sydney, Perth,
Brisbane and Melbourne. With over 10 +
experienced consultants all working a
specific niche area across Australia.
Combined with our sister company PRA, we
have 176 contractors working through
ourselves. (August 2012)

Bringing together innovation, technology and
our market knowledge we provide
permanent, contract and temporary staff to
both large and small-scale clients.

.                Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050
                               http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
Our areas of expertise…
Oil & Gas

Geosciences, Drilling and Completions, HSE, QA/QC, Project Services, Mechanical
Engineering and Electrical, Controls & Instrumentation

Typical projects

Drilling & Completions campaigns, On and Offshore projects, Pipelines, Construction and
Infrastructure, Demobilisation and Sub Sea projects.




                   Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050
                                 http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
Enginuity Capability – Nationally
                                                Enginuity Australia




            Perth                    Brisbane                           Sydney                     Melbourne




                                                                                                     Mining Technical
               Project Controls             SMP                                HSEQ
                                                                                                         Services




                                                                      Electrical, Instrumentatio
                    HSEQ                   HSEQ                                                    Civil/ SMP Engineering
                                                                             n & Controls




                                                                          Environmental
            Reservoir Engineering      Project Controls                                                 Geosciences
                                                                          & Sustainability




                Geosciences                QA/QC                              Drilling




                                                                              QA/QC
                    QA/QC




            Drilling & Completions




                                        http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
Max Silvester :What I specialise in...
Contract & Permanent QA / QC positions across Australia.

Typical positions I recruit for are:

QA/QC Coordinator
Lead QA/QC
QA/QC Manager
QA/QC Welding Inspector
QA/QC Welding Supervisor
Coatings / Painting

Typical Qualifications:

Welding Technology Institute Australia (WTIA) such as: WTIA
Certified Welding Supervisor to AS 1976 Certificate No. 10.
International Institute of Welding (IIW)
Certification Scheme for Welding and Inspection Personnel
(CSWIP)
Lead Auditor
National Association of Corrosion Engineers (N.A.C.E)


                   Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050
                                 http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
Our points of difference…
•We understand our market- Our
consultants work very niche vertical
markets and therefore become subject
matter experts within their discipline. We
also have the advantage of people within
our organisation with technical
qualifications.

•We aim to work with each candidate
exclusively - allowing us to present you
with people who will not come from other
sources.

•We value our candidates and much as
our clients – customer service is very
important. We highly value each and every
person we deal with in order to ultimately
find you the best.




                 Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050
                               http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
What they say about us…
“Enginuity have been attentive and focussed recruitment agents who was able to provide candidates at a
crunch and deliver through good quality candidates with minimal fuss. This relationship was critical to the
timing of getting people on board. I would certainly recommend Enginuity and will be utilising their services
again.”




“We have had a good relationship with Enginuity in the past 12 month within our HSE division in particular,
they have provided us with multiple people – all of which we have been very happy with. They were attentive
throughout the important stages and kept us in the loop at every part of the process.”




“Enginuity has assisted me with recruitment at two different companies over the past year. Each time they
were able to adapt their approach to the business and to the candidates he was asked to source. Excellent
technical knowledge and ability to establish relationships quickly makes Enginuity an invaluable contributor
to the recruitment process.

As a client, I could always be assured that once given a brief , that they would come back to me quickly with
top quality, employable candidates and honest up to date market information.

They are passionate and driven recruiters and combine professionalism with genuine friendship which
makes them both highly commendable and highly recommendable”
Enginuity Sydney
Contact Us!                                                       Level 10, 50 Margaret St
                                                                  Sydney NSW 2000
                                                                  02 8234 3500
                                                                  02 8234 3555
                                                                  Sydney@enginuitypeople.com.au


                                                                  Enginuity Melbourne
                                                                  Level 13, 356 Collins St
                                                                  Melbourne VIC 300
                                                                  03 8637 3300
                                                                  03 8637 3330
                                                                  Melbourne@enginuitypeople.com.au


                                                                  Enginuity Brisbane
                                                                  Level 4, 225 Montague Road
                                                                  Brisbane QLD 4101
                                                                  07 3071 7207
                                                                  Brisbane@enginuitypeople.com.au


                                                                  Enginuity Perth
                                                                  Level 26, 44 St George Terrace
                                                                  Perth WA 6000
                                                                  08 6317 3000
                                                                  08 6317 3033
                                                                  perth@enginuitypeople.com.au

          http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545

Enginuity

  • 1.
    Oil & Gas www.enginuitypeople.com.au
  • 2.
    About us… Enginuity PeopleAustralia is a specialist business within Oil & Gas recruitment across Australia. We commenced trading in 2008 in Sydney as a specialist engineering provider. Our ongoing success and diversification our office network now includes Sydney, Perth, Brisbane and Melbourne. With over 10 + experienced consultants all working a specific niche area across Australia. Combined with our sister company PRA, we have 176 contractors working through ourselves. (August 2012) Bringing together innovation, technology and our market knowledge we provide permanent, contract and temporary staff to both large and small-scale clients. . Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050 http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
  • 3.
    Our areas ofexpertise… Oil & Gas Geosciences, Drilling and Completions, HSE, QA/QC, Project Services, Mechanical Engineering and Electrical, Controls & Instrumentation Typical projects Drilling & Completions campaigns, On and Offshore projects, Pipelines, Construction and Infrastructure, Demobilisation and Sub Sea projects. Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050 http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
  • 4.
    Enginuity Capability –Nationally Enginuity Australia Perth Brisbane Sydney Melbourne Mining Technical Project Controls SMP HSEQ Services Electrical, Instrumentatio HSEQ HSEQ Civil/ SMP Engineering n & Controls Environmental Reservoir Engineering Project Controls Geosciences & Sustainability Geosciences QA/QC Drilling QA/QC QA/QC Drilling & Completions http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
  • 5.
    Max Silvester :WhatI specialise in... Contract & Permanent QA / QC positions across Australia. Typical positions I recruit for are: QA/QC Coordinator Lead QA/QC QA/QC Manager QA/QC Welding Inspector QA/QC Welding Supervisor Coatings / Painting Typical Qualifications: Welding Technology Institute Australia (WTIA) such as: WTIA Certified Welding Supervisor to AS 1976 Certificate No. 10. International Institute of Welding (IIW) Certification Scheme for Welding and Inspection Personnel (CSWIP) Lead Auditor National Association of Corrosion Engineers (N.A.C.E) Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050 http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
  • 6.
    Our points ofdifference… •We understand our market- Our consultants work very niche vertical markets and therefore become subject matter experts within their discipline. We also have the advantage of people within our organisation with technical qualifications. •We aim to work with each candidate exclusively - allowing us to present you with people who will not come from other sources. •We value our candidates and much as our clients – customer service is very important. We highly value each and every person we deal with in order to ultimately find you the best. Sydney +61 2 8234 3500 | Melbourne +61 3 8637 3300 | Brisbane +61 7 3071 7200 | Perth +61 8 6317 3050 http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545
  • 7.
    What they sayabout us… “Enginuity have been attentive and focussed recruitment agents who was able to provide candidates at a crunch and deliver through good quality candidates with minimal fuss. This relationship was critical to the timing of getting people on board. I would certainly recommend Enginuity and will be utilising their services again.” “We have had a good relationship with Enginuity in the past 12 month within our HSE division in particular, they have provided us with multiple people – all of which we have been very happy with. They were attentive throughout the important stages and kept us in the loop at every part of the process.” “Enginuity has assisted me with recruitment at two different companies over the past year. Each time they were able to adapt their approach to the business and to the candidates he was asked to source. Excellent technical knowledge and ability to establish relationships quickly makes Enginuity an invaluable contributor to the recruitment process. As a client, I could always be assured that once given a brief , that they would come back to me quickly with top quality, employable candidates and honest up to date market information. They are passionate and driven recruiters and combine professionalism with genuine friendship which makes them both highly commendable and highly recommendable”
  • 8.
    Enginuity Sydney Contact Us! Level 10, 50 Margaret St Sydney NSW 2000 02 8234 3500 02 8234 3555 Sydney@enginuitypeople.com.au Enginuity Melbourne Level 13, 356 Collins St Melbourne VIC 300 03 8637 3300 03 8637 3330 Melbourne@enginuitypeople.com.au Enginuity Brisbane Level 4, 225 Montague Road Brisbane QLD 4101 07 3071 7207 Brisbane@enginuitypeople.com.au Enginuity Perth Level 26, 44 St George Terrace Perth WA 6000 08 6317 3000 08 6317 3033 perth@enginuitypeople.com.au http://www.enginuitypeople.com.au | ABN: 78 132 200 545 | ACN: 132 200 545