JONNI
TAMAN BATU AJIINDAHIII BLOKAO.NO.3
SAGULUNG - BATAM- INDONESIA
Position:PipingSupervisor andSupportCommisioning
E-mail Address:Jonikelvin5@gmail.com
Telp+6281277328154
Dear Sir,
Standards and qualification recognition.Herebyoffermyservices forthe application andyourgood
company withmy skillsandknowledgeandblessingof God.Your mindisfull acceptance greatly
appreciated.
The claimthat the above information istrue andcorrectto the bestof knowledge.
QUALIFICATIONS =Experience in mechanical pipingsupervisorandconstruction inthe oil and gas
industry.(Onshore andOffshore) inthe fieldof fabrication andfieldinstallation,hydrotestwithLine
systems,maintenance andensure comforms toP& ID and prepare as-builtdrawings if necessery
alsopipingisometricdrawinginstallation thatsupports prosess Commissioning.
for the position dependingonthe place andthe needs thatexistinyourcompany.
CERTIFICATE CONPENTENCY& PROFIENCY No & EXPIRED
- Passport (A7390264) Feb24rd
, 2019
- ManagementOrientation PT. McDermott
- Flange assemblyTorque tightening PT. McDermott Team
- TensioningandBolting PT. Geographe Energyindonesi
- LightRigging PT. McDermott
- SeamenBook (6202188747BP00113) Nov 04th
, 2016
- IIFCommitment&Quarantine Team GorgonCares –
- BestWorker of The month Gelobal ProcessSystemsBatam.
JOB EXPERIENCES:
1. PT. GLOBAL PROCESSSYSTEM SEKUPANGBATAM. Nop04nd
,2014 until Feb06nd
,2015
Duties:Mechanical Technician –Piping/Flange management( Hydratight).
Scope:Fabricationshop,Installation,Hydrotest,Leaktest,Punchlist,
Project:MODEC B885
2. PT. NIPPON STEEL& SUMIKIN BATAM. May 01nd
,2014 until Sept30nd
,2014
Duties:Mechanical Technician –Piping/Flange management( Hydratight).
Scope:Torque & TensionFabricationshop,Installation,Hydrotest,Leaktest,Punchlist,
Project:Tan Burup( Australia)
3. PT. NIPPON STEEL& SUMIKIN BATAM. Oct08nd
,2014 until April30nd
,2014
Duties:Pipe Fitter1
Scope:Fabricationshopandinstallationpipespool andsupportcommisioning,check
line.
Project:Tan Burup( Australia)
4. PT. McDermott Indonesia.Nop15nd
,2011 until August06nd
,2013
Duties:Mechanical Technician/piping/tensioningandboltingPT.Geographe Energy
Indonesia.
Scope:Installationpipespool andsuport.Commisioning,checkllineandmodification.
Project:ChevronPlatongGasPhase II ( Thailand )
( The BestPerformance )
Commissioning,Modification.
Project:-NorthBelut( CPP) ConocoPhillips
- SU TU VANG( STV SPP) CLIOC.
- Woodside EnergyNWSLNG-V ExpansionWoodside AustraliaEnergy
( The BestPerformance )
- ARTHIT (CPP) – CHEVRON & PTTEP.
5. PT. PUTRA BUKIT SEGUNTANG.April02nd
,2011 until Oct20nd
,2011
Duties:PipingSupervisor
Scope:Fabricationshopandinstallationpipespool systemControl,checkline.
Project:CPOBarges300 ( PT. CitraShipyard Batam indonesia)
6. COMANCHE BASE.Nop08nd
,2010 until March08nd
,2011
Duties:Pipe fitter1
Scope:Fabricationshopandrepairand installationpipe spoolsystemandsupportHydro
Testing,checkline.
Project:PT.GLOBAL INDUSTRIES ASIA ( Comanche Base )
7. ADIARTHA SWABUANA.Oct02nd
,2009 until Oct20nd
,2010
Duties:Pipe fitter1
Scope:Fabricationshopandrepairand installationpipe spoolsystem, checkline.
Project:PT.GLOBAL INDUSTRIES ASIA ( Crane Base 264)
8. PT. PUTRA BUKIT SEGUNTANG. July15nd
,2008 until May20nd
,2009
Duties:PipingSupervisor
Scope:Fabricationshopandinstallationpipespool systemControl,checkline.
Project:SupplyBothT 197 ( PT.NanIndahMutiara shipyard)
9. PT. VIKINGENGINEERING,May15nd
,2008 until July04nd
,2008
Duties:Pipe Fitter1
Scope:Fabricationshopandinstallationpipespool systemandsupportcommisioning,
checkline.
Project:Montara Modul S 312
10. ELNUSA, Dec09nd
,1995 until June05nd
,1997
Duties:Pipingforeman
Scope:Fabricationshopandrepairand installationpipe spoolsystem, checkline.
Project:PT.Badak Natural Gas Liquefact.
11. PUSPETINDO.Dec07nd
,1992 until August06nd
,1995
Duties:Pipe fitter1
Scope:Fabricationshop andinstallationpipespool systeminVessel,checkline.
Project:PT.PETRO KIMIA GRESIKEAST - JAVA
That’s all mycurriculumvitae andI’ll be responsible wheneveritwill be required,
Sincerelyyours
J o n n i

My CV Piping

  • 1.
    JONNI TAMAN BATU AJIINDAHIIIBLOKAO.NO.3 SAGULUNG - BATAM- INDONESIA Position:PipingSupervisor andSupportCommisioning E-mail Address:Jonikelvin5@gmail.com Telp+6281277328154 Dear Sir, Standards and qualification recognition.Herebyoffermyservices forthe application andyourgood company withmy skillsandknowledgeandblessingof God.Your mindisfull acceptance greatly appreciated. The claimthat the above information istrue andcorrectto the bestof knowledge. QUALIFICATIONS =Experience in mechanical pipingsupervisorandconstruction inthe oil and gas industry.(Onshore andOffshore) inthe fieldof fabrication andfieldinstallation,hydrotestwithLine systems,maintenance andensure comforms toP& ID and prepare as-builtdrawings if necessery alsopipingisometricdrawinginstallation thatsupports prosess Commissioning. for the position dependingonthe place andthe needs thatexistinyourcompany. CERTIFICATE CONPENTENCY& PROFIENCY No & EXPIRED - Passport (A7390264) Feb24rd , 2019 - ManagementOrientation PT. McDermott - Flange assemblyTorque tightening PT. McDermott Team - TensioningandBolting PT. Geographe Energyindonesi - LightRigging PT. McDermott - SeamenBook (6202188747BP00113) Nov 04th , 2016 - IIFCommitment&Quarantine Team GorgonCares – - BestWorker of The month Gelobal ProcessSystemsBatam. JOB EXPERIENCES: 1. PT. GLOBAL PROCESSSYSTEM SEKUPANGBATAM. Nop04nd ,2014 until Feb06nd ,2015 Duties:Mechanical Technician –Piping/Flange management( Hydratight). Scope:Fabricationshop,Installation,Hydrotest,Leaktest,Punchlist, Project:MODEC B885 2. PT. NIPPON STEEL& SUMIKIN BATAM. May 01nd ,2014 until Sept30nd ,2014 Duties:Mechanical Technician –Piping/Flange management( Hydratight). Scope:Torque & TensionFabricationshop,Installation,Hydrotest,Leaktest,Punchlist, Project:Tan Burup( Australia) 3. PT. NIPPON STEEL& SUMIKIN BATAM. Oct08nd ,2014 until April30nd ,2014 Duties:Pipe Fitter1 Scope:Fabricationshopandinstallationpipespool andsupportcommisioning,check line. Project:Tan Burup( Australia)
  • 2.
    4. PT. McDermottIndonesia.Nop15nd ,2011 until August06nd ,2013 Duties:Mechanical Technician/piping/tensioningandboltingPT.Geographe Energy Indonesia. Scope:Installationpipespool andsuport.Commisioning,checkllineandmodification. Project:ChevronPlatongGasPhase II ( Thailand ) ( The BestPerformance ) Commissioning,Modification. Project:-NorthBelut( CPP) ConocoPhillips - SU TU VANG( STV SPP) CLIOC. - Woodside EnergyNWSLNG-V ExpansionWoodside AustraliaEnergy ( The BestPerformance ) - ARTHIT (CPP) – CHEVRON & PTTEP. 5. PT. PUTRA BUKIT SEGUNTANG.April02nd ,2011 until Oct20nd ,2011 Duties:PipingSupervisor Scope:Fabricationshopandinstallationpipespool systemControl,checkline. Project:CPOBarges300 ( PT. CitraShipyard Batam indonesia) 6. COMANCHE BASE.Nop08nd ,2010 until March08nd ,2011 Duties:Pipe fitter1 Scope:Fabricationshopandrepairand installationpipe spoolsystemandsupportHydro Testing,checkline. Project:PT.GLOBAL INDUSTRIES ASIA ( Comanche Base ) 7. ADIARTHA SWABUANA.Oct02nd ,2009 until Oct20nd ,2010 Duties:Pipe fitter1 Scope:Fabricationshopandrepairand installationpipe spoolsystem, checkline. Project:PT.GLOBAL INDUSTRIES ASIA ( Crane Base 264) 8. PT. PUTRA BUKIT SEGUNTANG. July15nd ,2008 until May20nd ,2009 Duties:PipingSupervisor Scope:Fabricationshopandinstallationpipespool systemControl,checkline. Project:SupplyBothT 197 ( PT.NanIndahMutiara shipyard) 9. PT. VIKINGENGINEERING,May15nd ,2008 until July04nd ,2008 Duties:Pipe Fitter1 Scope:Fabricationshopandinstallationpipespool systemandsupportcommisioning, checkline. Project:Montara Modul S 312 10. ELNUSA, Dec09nd ,1995 until June05nd ,1997 Duties:Pipingforeman Scope:Fabricationshopandrepairand installationpipe spoolsystem, checkline. Project:PT.Badak Natural Gas Liquefact. 11. PUSPETINDO.Dec07nd ,1992 until August06nd ,1995 Duties:Pipe fitter1 Scope:Fabricationshop andinstallationpipespool systeminVessel,checkline. Project:PT.PETRO KIMIA GRESIKEAST - JAVA That’s all mycurriculumvitae andI’ll be responsible wheneveritwill be required, Sincerelyyours J o n n i