What is Plant and machinery
• For project cost estimation Plant and machinery needs to understand
• Plant and Machinery of Project means equipment
• Pressure vessels, tanks pups, piping, heat exchanger , separator, Clarifier equipment(M)
• Electrical motors, control panel , cable trays, internal lighting, external lighting
• Instruments for operation, safety, process control, automation electrical
• Plant and machinery for construction includes equipment required for
construction which is included in Building and civil work Equipment and
machinery required for
• Foundation, Internal road, machinery for electrical work Diesel generator
• DPENDING ON TYPE OF PROJECT THIS REQUIRMENTS VARIES
• For road project require more construction equipment as compared to Refinery
or Water and waste water treatment cost
Elements of Greenfield Project Cost
(Typical Petrochemical Project)
1. Land and site development : 3-5 %
2. Buildings and civil works : 5-10 %
3. Plant and machinery
Process equipment 40-60 %
4. Know-how and engineering
Design engineering : 15-25 %
5. Expenses on foreign 1-3
technicians and training of
Indian technicians abroad :
6. Miscellaneous fixed assets : 2-5
7. Per-operative expenses : 15-20
8. Contingencies : 8-10
9. Preliminary and capital issue related
expenses : 1-2
10. Margin money : 3-6
Elements of Green field project Solar PV plant
1. Land and site development : 10-15 %
2. Buildings and civil works : 3-4 %
3. Plant and machinery 40-50%
Solar panel /electrical /battery back up
4. Know-how and engineering
Design engineering : 4-5 %
5. Expenses on for surviving 1-2%
technicians and training of
Indian technicians abroad : 1-3%
6. Miscellaneous fixed assets : 2-5%
7. Per-operative expenses : 5-10 %
8. Contingencies : 5-8%
9. Preliminary and capital issue related
expenses : 1-2 %
10. Margin money : 1-2 %
Develop the elements of project
1. Real estate plot development 2. Waste water treatment plat
3. Commercial complex 4. water treat plant 5 Road project – National Highway,
Estimation of land Requirement -I
1Plant Battery limit .
2.Outside battery limit facilities
• Storage
• Liquid storage (tanks)
• Hazardous
• Non-hazardous
• Drumming area
• Liquid storage
• Solid storage building and silo
• Gas metering station
• Packaging and bagging unit
• Utilities:
• Water storage (raw water storage
• and fire water storage)
• Water treatment plant
• Boiler (Steam)
• Co-generation
• Instrument air
• Refrigeration unit
• Inert gas generator
• Cooling tower
• Electrical sub-station
• Diesel power generating unit
3 Building Cost Elements
• Workshop
• Warehouse
• R&D building
• Admin building
• Gate and time office
• Weigh bridge
• Canteen
• Workers center
• Fire station
• Excise office
• Car park and cycle park
• Truck parking and so on
4. Effluent Treatment Plant
5. Total Area (1 to 4)
6. Site Development Area
• (Including landscaping)
• 7. Roads within Factory
• Total area required
• Area for housing of plant personnel
Estimate of Land and Site Development
1. Cost of Land Rs.
Rate Rs/m2
or Rs/hectare
Area m2
/hectare
Total
2. Cost of Leveling and Develop-
ment Rate Rs/m2
Area
Total
3. Cost of Fencing
Length Rs/m
Type of fencing
Rate of fencing Rs/m
4. Cost of Gates
Cost of gate Rs/gate
Number of gates
5. Cost of Laying Road Rs/km
Buildings and Civil Works
Factory Buildings Rs
- Factory building for the main plant, and effluent
treatment plant
- Factory buildings for auxiliary services steam,
water, workshop, electrical power station
- Administrative buildings
- Research and Development Centre
- Warehouses, yard facilities for
• raw materials
• intermediates
• products and also for furnace oil/fuel oil/diesel oil
Total factory buildings Rs
2. Non-Factory Buildings
2. Non-Factory Buildings
- Miscellaneous non-factory buildings:
Canteen, gate house, time office, excise house, workers amenities,
medical centre, car park, cycle stand, etc.
- Quarters for essential staff
- RCC and other structural materials
- Garages
- Storm water drains
- Civil engineering work for effluent treatment plant - lagoons
etc.
- Architects fees
- Plant model
Total non-factory buildings Rs.
Interest During Period of Construction
Fund Flow Statement during construction period: 24 months, 2months grid
Project Cost
Component
(with
Contingencies)
1 2 3 4 5 6 7 8 9 10 11 12
1. Land and site
development
√ √
2. Building √ √ √ √ √ √ √ √ √ √
3. Plant & Machinery √ √ √ √ √ √ √ √ √ √ √
4. Know-how √ √ √
5. Detailed engg √ √ √ √ √ √ √ √ √ √ √ √
6. Expenses on training
of persons
√ √ √ √
7. Miscellaneous fixed
assets
√ √ √ √
8. Ore-operative exp. √ √ √ √ √ √ √ √ √ √ √ √
9. Prelim & issue
related exp.
√ √ √
1
0
Margin money √
Total X1 X3 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12
Fund flow subsidy √
Promoter’s
contribution
√ √ √
Term Loan √ √ √ √ √ √ √
Public issue √ √
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
Miscellaneous and Contingency cost
• For know how known project miscellaneous cost is that cost where we
know the requirement however quantity is difficult to estimate
Give example :
• For New and different technology or expected problems mislenious
cost includes above
• Contingency is generally related to unit rate variation cost and depends
on project span, gestation period of project
• While estimation one can declare these cost by indicating the basis
• During the final estimation and budgeting of cost it is governed by
various factors and market condition, but basis is important

More Related Content

Similar to Elements of Project Cost and plant and machinery construction

Similar to Elements of Project Cost and plant and machinery construction (20)

Techno delacruz report
Techno delacruz reportTechno delacruz report
Techno delacruz report
 
Pranav.Varshney
Pranav.VarshneyPranav.Varshney
Pranav.Varshney
 
Dragon Sourcing case study Supporting New Factory launch
Dragon Sourcing case study Supporting New Factory launchDragon Sourcing case study Supporting New Factory launch
Dragon Sourcing case study Supporting New Factory launch
 
How does sourcing services help to start a new company in China?
How does sourcing services help to start a new company in China?How does sourcing services help to start a new company in China?
How does sourcing services help to start a new company in China?
 
Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
Copy of Eng.OMARA CV
Copy of Eng.OMARA CVCopy of Eng.OMARA CV
Copy of Eng.OMARA CV
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
HVAC - R in Noida
HVAC - R in NoidaHVAC - R in Noida
HVAC - R in Noida
 
Abdul ahad shahzad resume
Abdul ahad shahzad resumeAbdul ahad shahzad resume
Abdul ahad shahzad resume
 
project appraisal-new.ppt
project appraisal-new.pptproject appraisal-new.ppt
project appraisal-new.ppt
 
Project report
Project reportProject report
Project report
 

Recently uploaded

The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFVivekanand Anglo Vedic Academy
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesAmanpreetKaur157993
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxLimon Prince
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismDabee Kamal
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportDenish Jangid
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjMohammed Sikander
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxAdelaideRefugio
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...EduSkills OECD
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................MirzaAbrarBaig5
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi RajagopalEADTU
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code ExamplesPeter Brusilovsky
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...Gary Wood
 
ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptxPoojaSen20
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesPooky Knightsmith
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 

Recently uploaded (20)

The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptx
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 

Elements of Project Cost and plant and machinery construction

  • 1. Elements of Project Cost and plat machinery and construction Dr. Pramod Deshpande Sr. Associate Professor NICMAR University
  • 2. What is Plant and machinery • For project cost estimation Plant and machinery needs to understand • Plant and Machinery of Project means equipment • Pressure vessels, tanks pups, piping, heat exchanger , separator, Clarifier equipment(M) • Electrical motors, control panel , cable trays, internal lighting, external lighting • Instruments for operation, safety, process control, automation electrical • Plant and machinery for construction includes equipment required for construction which is included in Building and civil work Equipment and machinery required for • Foundation, Internal road, machinery for electrical work Diesel generator • DPENDING ON TYPE OF PROJECT THIS REQUIRMENTS VARIES • For road project require more construction equipment as compared to Refinery or Water and waste water treatment cost
  • 3. Elements of Greenfield Project Cost (Typical Petrochemical Project) 1. Land and site development : 3-5 % 2. Buildings and civil works : 5-10 % 3. Plant and machinery Process equipment 40-60 % 4. Know-how and engineering Design engineering : 15-25 % 5. Expenses on foreign 1-3 technicians and training of Indian technicians abroad : 6. Miscellaneous fixed assets : 2-5 7. Per-operative expenses : 15-20 8. Contingencies : 8-10 9. Preliminary and capital issue related expenses : 1-2 10. Margin money : 3-6 Elements of Green field project Solar PV plant 1. Land and site development : 10-15 % 2. Buildings and civil works : 3-4 % 3. Plant and machinery 40-50% Solar panel /electrical /battery back up 4. Know-how and engineering Design engineering : 4-5 % 5. Expenses on for surviving 1-2% technicians and training of Indian technicians abroad : 1-3% 6. Miscellaneous fixed assets : 2-5% 7. Per-operative expenses : 5-10 % 8. Contingencies : 5-8% 9. Preliminary and capital issue related expenses : 1-2 % 10. Margin money : 1-2 % Develop the elements of project 1. Real estate plot development 2. Waste water treatment plat 3. Commercial complex 4. water treat plant 5 Road project – National Highway,
  • 4. Estimation of land Requirement -I 1Plant Battery limit . 2.Outside battery limit facilities • Storage • Liquid storage (tanks) • Hazardous • Non-hazardous • Drumming area • Liquid storage • Solid storage building and silo • Gas metering station • Packaging and bagging unit • Utilities: • Water storage (raw water storage • and fire water storage) • Water treatment plant • Boiler (Steam) • Co-generation • Instrument air • Refrigeration unit • Inert gas generator • Cooling tower • Electrical sub-station • Diesel power generating unit
  • 5. 3 Building Cost Elements • Workshop • Warehouse • R&D building • Admin building • Gate and time office • Weigh bridge • Canteen • Workers center • Fire station • Excise office • Car park and cycle park • Truck parking and so on 4. Effluent Treatment Plant 5. Total Area (1 to 4) 6. Site Development Area • (Including landscaping) • 7. Roads within Factory • Total area required • Area for housing of plant personnel
  • 6. Estimate of Land and Site Development 1. Cost of Land Rs. Rate Rs/m2 or Rs/hectare Area m2 /hectare Total 2. Cost of Leveling and Develop- ment Rate Rs/m2 Area Total 3. Cost of Fencing Length Rs/m Type of fencing Rate of fencing Rs/m 4. Cost of Gates Cost of gate Rs/gate Number of gates 5. Cost of Laying Road Rs/km
  • 7. Buildings and Civil Works Factory Buildings Rs - Factory building for the main plant, and effluent treatment plant - Factory buildings for auxiliary services steam, water, workshop, electrical power station - Administrative buildings - Research and Development Centre - Warehouses, yard facilities for • raw materials • intermediates • products and also for furnace oil/fuel oil/diesel oil Total factory buildings Rs 2. Non-Factory Buildings 2. Non-Factory Buildings - Miscellaneous non-factory buildings: Canteen, gate house, time office, excise house, workers amenities, medical centre, car park, cycle stand, etc. - Quarters for essential staff - RCC and other structural materials - Garages - Storm water drains - Civil engineering work for effluent treatment plant - lagoons etc. - Architects fees - Plant model Total non-factory buildings Rs.
  • 8. Interest During Period of Construction Fund Flow Statement during construction period: 24 months, 2months grid Project Cost Component (with Contingencies) 1 2 3 4 5 6 7 8 9 10 11 12 1. Land and site development √ √ 2. Building √ √ √ √ √ √ √ √ √ √ 3. Plant & Machinery √ √ √ √ √ √ √ √ √ √ √ 4. Know-how √ √ √ 5. Detailed engg √ √ √ √ √ √ √ √ √ √ √ √ 6. Expenses on training of persons √ √ √ √ 7. Miscellaneous fixed assets √ √ √ √ 8. Ore-operative exp. √ √ √ √ √ √ √ √ √ √ √ √ 9. Prelim & issue related exp. √ √ √ 1 0 Margin money √ Total X1 X3 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 Fund flow subsidy √ Promoter’s contribution √ √ √ Term Loan √ √ √ √ √ √ √ Public issue √ √ Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
  • 9. Miscellaneous and Contingency cost • For know how known project miscellaneous cost is that cost where we know the requirement however quantity is difficult to estimate Give example : • For New and different technology or expected problems mislenious cost includes above • Contingency is generally related to unit rate variation cost and depends on project span, gestation period of project • While estimation one can declare these cost by indicating the basis • During the final estimation and budgeting of cost it is governed by various factors and market condition, but basis is important