This is an example of a basic E-house configuration
that can be used for Power and Control requirements in
many industries.
Modular structures, customized enclosures, shelters
and ISO Containers can be outfitted and tested for
worldwide deployment within a factory setting.
Modular Structures produce repeatability which gives
you built in Quality.
Building Size:
Exterior Dimensions
(W x L x H)
Interior Dimensions
(W x L x H)
Floor Area
(ft²)
Approx. Gross
Weight (lbs)
168” x 540” x 144” 157” x 529” x 114” 565 70,000
Structure:
 Manufactured with structural steel members to meet all load requirements.
 The Base is designed to withstand a uniform load 250 PSF over the entire
floor area, with a maximum deflection not exceed L/360.
 The long and short bottom rails of the base are made of WF 14x26 with
2”x2”x1/8” tubing support between the two flanges, 48” apart for additional
support. In addition to that a 1” thick x 2” wide flat bar (with 3 holes 15/16”
diameter) is welded to the long side bottom rails 10’ apart to provide support
points for the lifting lugs. A 1” removable lifting lug with 3 holes of 15/16”
diameter is attached to the flat bar (welded to the base) by 3 bolts 7/8”
diameter x 5” LG, grade L9.
 The cross members, going along the short side, are made of 4”x10”x3/8”
HSST@ 16” apart, at max load area and 24” thereafter. Bracing made of
C8x13.75 @ 48” centers
 The floor is covered by ¼” checker plate to meet the specifications and
provides more stability to the base. Painted grey
 After spraying polyurethane foam on the base for insulation, it will be covered
with 18 gage steel sheets to create an under pan for protection and will be
undercoated for rust prevention.
 Four (4) welded ground pads on all four corners of base.
Lifting Lugs.
Structural Framing:
 All corner posts made of 4”x4”x1/4” HSS
 All intermediate posts made of 4”x4”x1/4” HSS
located 10’ apart.
 The top rails made of tubing 6”x4”x1/4” raised and welded to the top of the
posts, and braced by wall bracing ¼” thick x 6” wide flat bar. This will support
the walls and increase their structural strength.
 The door structure frame is made of 6”x2”x1/8” tubing, connected between
the top rail to the base, and supported by traverse tubing.
 In the middle of the roof, along the long side, a tubing
10”x4”x1/4” raised and welded to the posts for supporting
purling joints
 Studs are fully welded to the posts, made of 14 gage
2”x4”x2” at 16’ apart horizontally that will provide support
for hanging electrical components and equipment.
Roof Structure:
 Roof tapered C channel 2”x10”-6”x2”x1/8 TH. (Purling) welded to the top rails
and middle support tubing 10”x4”x1/4”.
 Above the tapered channel, we install 10 gage steel sheets to support the
roof structure and create a leak resistant structure, stitch weld to the tapered
C channel and fully welded together.
 Roof studs 1”x2”x1” is stitch welded to the steel sheets for installing the
exterior corrugated steel panels.
Insulation:
 The unit will be insulated using Roxul Mineral Wool insulation, which is fire
rated.
 Walls R14
 Roof R23
 Floor R23
Exterior Finish:
 The exterior walls and roof are covered with 11ga galvanized sheet panels
fixed to the studs by # 14 stainless self-drilling screws.
The edges are covered by flashing, and the right and left
walls contain rain gutters with one down spout located at
the front. The exterior is primed with epoxy primer and
painted with urethane paint.
 The exterior is caulked and all the opening are covered
and sealed.
Interior Finish:
 The interior walls and ceiling are covered with
18ga galvanized G 90 steel sheets, fixed to
the studs by 3/16 aluminum rivets. Each
sheet is overlapped and finishing trim is
added. Primed with epoxy primer and painted
with urethane white paint.
 Prior to the painting, the galvanized steel
sheets are light sanded, degreased and cleaned, then sprayed with primer
wash to increase the adhesion of the primer to the metal surfaces, as per
standard method for painting galvanized steel.
 The floor is cleaned, light sanded and painted with urethane floor paint.
Exterior Door Features:
 The door frame structure is made of 6” x 2” x 1/8” steel tubing.
 One (1) Double Door, 72” x 108” and One (1) Man door, 36” x 84”
 Each door is equipped with an aluminum weather canopy fixed with bolts
above each door.
 Included hardware:
 Hold open door closure (allow the door to be kept open).
 Panic bar hardware with cylinder.
 Weather strips for sealing.
 Door sweep to be installed outside of the door
 Door caps
 Spring lock for transportation purpose only. To be removed at
site
 Equipment Doors will be supplied for exterior equipment access.
 Each door will have a gasket seal and three point lock, lockable
 Six (6) 24” access doors
 Seven (7) 36” access doors
 One (1) 48´access door
Painting:
 Base structure is sandblasted before exterior is added
 Exterior colour to be advised (Equipment Grey)
 The interior and exterior will be cleaned and degreases.
 The surfaces will be lightly sanded to enhance the adhesion strength of the
primer
 The surfaces will be coated by edge primer which is important to increase
the contact of the coating to the surfaces
 Prime with epoxy primer
 Paint with urethane paint
 One coat of anti-graffiti paint
 Total coverage 6 mill minimum
Mechanical:
Each building will be provided with two (2) HVAC systems for cooling and heating.
Two (2) 6 ton HVAC industrial units with 10kW of heating each.
 Both units controlled by led-lag controller.
 Intake and return filters c/w with extra set of filters.
Electrical E-house Building:
 (1) 30 circuit 200A 120/240V breaker panel fed from
station switchgear breaker
 (5) 2 lamp 4’ vapour proof fluorescent fixtures
 (2) 3way switches
 (5) duplex receptacles
 (2) emergency exit light fixtures
 (2) 70W HPS outdoor fixtures c/w photocells
 (2) power and control wiring for HVAC
 (1) 15A 125V circuit for PLC panel
 (1) 40A 240V circuit to customer supplied battery charger
 (1) install and strap customer supplied batteries and DC breaker
 (1) install customer supplied DC panel c/w main breaker
 (1) 150A 125V DC wiring from battery to charger
 (1) 150A 123V DC wiring from charger to DC panel
 (1) fire alarm panel c/w 1 smoke, 1 heat detector, 1 bell, 2 alarm, 2
trouble contacts, monitoring by others
 (2) telephone outlets wire back to Communication cabinet
 (1) Exterior Blue beacon as per specifications
 (1) inspection to CSA standards
Accessories:
 Two (2) 20lb ABC fire extinguisher
 Two (2) Basic Eyewash Station
 One (1) Wall mounted hinged table

More Related Content

What's hot

Electrical wiring domestic and industries
Electrical wiring domestic and industriesElectrical wiring domestic and industries
Electrical wiring domestic and industries
Pavan Kumar Mallepoola
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Power System Operation
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
Ankush Bharti
 
Electric system
Electric systemElectric system
Electric system
SayanSarkar55
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
SURESH GOPAL
 
Panel designing
Panel designingPanel designing
Panel designing
AKANSHA GURELE
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
k,l polytechnic roorkee
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput
 
Main Parts of Electric Locomotive
Main Parts of Electric LocomotiveMain Parts of Electric Locomotive
Main Parts of Electric Locomotive
HARISH KUMAR MAHESHWARI
 
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
Pavan choudhary
 
Power Line Carrier Communication PLCC
Power Line Carrier Communication PLCCPower Line Carrier Communication PLCC
Power Line Carrier Communication PLCC
Power System Operation
 
Survey & ts for ehv lines
Survey & ts for ehv linesSurvey & ts for ehv lines
Survey & ts for ehv linesMahesh Sontyal
 
Generator protection
Generator protectionGenerator protection
Generator protection
Chetan Patil
 
Components of Transmission Lines
Components of Transmission LinesComponents of Transmission Lines
Components of Transmission Lines
Electrical Slides
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
Emran Ali
 
EV Charger SMPS Based.pdf
EV Charger SMPS Based.pdfEV Charger SMPS Based.pdf
EV Charger SMPS Based.pdf
LalitKapoor7
 
Electrical
ElectricalElectrical
Unit 2 Reactive Power Management
Unit 2 Reactive Power ManagementUnit 2 Reactive Power Management
Unit 2 Reactive Power Management
SANTOSH GADEKAR
 

What's hot (20)

Electrical wiring domestic and industries
Electrical wiring domestic and industriesElectrical wiring domestic and industries
Electrical wiring domestic and industries
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
Types of-tower
Types of-towerTypes of-tower
Types of-tower
 
Electric system
Electric systemElectric system
Electric system
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Panel designing
Panel designingPanel designing
Panel designing
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Main Parts of Electric Locomotive
Main Parts of Electric LocomotiveMain Parts of Electric Locomotive
Main Parts of Electric Locomotive
 
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
 
Power Line Carrier Communication PLCC
Power Line Carrier Communication PLCCPower Line Carrier Communication PLCC
Power Line Carrier Communication PLCC
 
Survey & ts for ehv lines
Survey & ts for ehv linesSurvey & ts for ehv lines
Survey & ts for ehv lines
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
Components of Transmission Lines
Components of Transmission LinesComponents of Transmission Lines
Components of Transmission Lines
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
 
EV Charger SMPS Based.pdf
EV Charger SMPS Based.pdfEV Charger SMPS Based.pdf
EV Charger SMPS Based.pdf
 
FYP Report
FYP ReportFYP Report
FYP Report
 
Electrical
ElectricalElectrical
Electrical
 
Unit 2 Reactive Power Management
Unit 2 Reactive Power ManagementUnit 2 Reactive Power Management
Unit 2 Reactive Power Management
 

Viewers also liked

Resurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practiceResurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practice
Nicolaie Constantinescu
 
Los ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andreaLos ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andrea
Andreamarissad
 
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
bcpulse
 
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
bcpulse
 
Orquídeas - Aprendizagem
Orquídeas - AprendizagemOrquídeas - Aprendizagem
Orquídeas - AprendizagemClaudia Costa
 
Portfólio Eduardo Monteiro
Portfólio Eduardo MonteiroPortfólio Eduardo Monteiro
Portfólio Eduardo Monteiro
Eduardo Monteiro
 
Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3
mokhalfanz
 
Mba capstone presentation
Mba capstone presentationMba capstone presentation
Mba capstone presentation
Minh Nguyen
 
Dasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImiaDasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImia
mokhalfanz
 
Cv october-2011 sabry-
Cv  october-2011   sabry-Cv  october-2011   sabry-
Cv october-2011 sabry-
Sabry Elnaggar
 
Towards a Platform for Global Health
Towards a Platform for Global HealthTowards a Platform for Global Health
Towards a Platform for Global Health
Philip Bourne
 
The FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems BiologyThe FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems Biology
FAIRDOM
 
Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...
FAIRDOM
 
FAIR data overview
FAIR data overviewFAIR data overview
Centrais de alarme
Centrais de alarmeCentrais de alarme
Centrais de alarme
Claudia Costa
 
EV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor corEV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor cor
Ana Carneirinho
 
An overview of the MyHeart Counts app
An overview of the MyHeart Counts appAn overview of the MyHeart Counts app
An overview of the MyHeart Counts app
London School of Hygiene and Tropical Medicine
 

Viewers also liked (20)

Resurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practiceResurse educaționale deschise - repere practice
Resurse educaționale deschise - repere practice
 
Los ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andreaLos ilicitos tributarios actividad 3 andrea
Los ilicitos tributarios actividad 3 andrea
 
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
Алексей Альшевский - "Дар Святого Духа" | 22.05.2016
 
Manoranjan Bal Resume
Manoranjan Bal ResumeManoranjan Bal Resume
Manoranjan Bal Resume
 
DORMAAccessSolutions10-15r1-16_lo
DORMAAccessSolutions10-15r1-16_loDORMAAccessSolutions10-15r1-16_lo
DORMAAccessSolutions10-15r1-16_lo
 
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
Алексей Альшевский - "Дух Святой в истории" | 05.06.2016
 
Orquídeas - Aprendizagem
Orquídeas - AprendizagemOrquídeas - Aprendizagem
Orquídeas - Aprendizagem
 
Cv Essec Cyrl
Cv Essec CyrlCv Essec Cyrl
Cv Essec Cyrl
 
Portfólio Eduardo Monteiro
Portfólio Eduardo MonteiroPortfólio Eduardo Monteiro
Portfólio Eduardo Monteiro
 
Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3Konsep TermodinamikaTugas 3
Konsep TermodinamikaTugas 3
 
Mba capstone presentation
Mba capstone presentationMba capstone presentation
Mba capstone presentation
 
Dasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImiaDasar-Dasar Ilmu KImia
Dasar-Dasar Ilmu KImia
 
Cv october-2011 sabry-
Cv  october-2011   sabry-Cv  october-2011   sabry-
Cv october-2011 sabry-
 
Towards a Platform for Global Health
Towards a Platform for Global HealthTowards a Platform for Global Health
Towards a Platform for Global Health
 
The FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems BiologyThe FAIRDOM Commons for Systems Biology
The FAIRDOM Commons for Systems Biology
 
Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...Reproducibility of model-based results: standards, infrastructure, and recogn...
Reproducibility of model-based results: standards, infrastructure, and recogn...
 
FAIR data overview
FAIR data overviewFAIR data overview
FAIR data overview
 
Centrais de alarme
Centrais de alarmeCentrais de alarme
Centrais de alarme
 
EV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor corEV3#5: Exercicios com o sensor cor
EV3#5: Exercicios com o sensor cor
 
An overview of the MyHeart Counts app
An overview of the MyHeart Counts appAn overview of the MyHeart Counts app
An overview of the MyHeart Counts app
 

Similar to Ehouse Specification Sample

Skid unit -presentation of bunk housing, oil field, gas field, man camps
Skid unit -presentation of bunk housing, oil field, gas field, man campsSkid unit -presentation of bunk housing, oil field, gas field, man camps
Skid unit -presentation of bunk housing, oil field, gas field, man camps
Clayton Homes ( A Berkshire - Hathaway Company)
 
Trailers dry freight_strick101
Trailers dry freight_strick101Trailers dry freight_strick101
Trailers dry freight_strick101
Anjer Inc
 
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialEuro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Roland Laufer
 
AmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler
 
K House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK PrefabK House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK Prefab
EPACK Prefab
 
K House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptxK House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptx
EPACK Prefab
 
Procamp tech spec msb 21
Procamp tech spec msb 21Procamp tech spec msb 21
Procamp tech spec msb 21biznetswe
 
PEB - Standard Product Specifications
PEB - Standard Product SpecificationsPEB - Standard Product Specifications
PEB - Standard Product Specifications
Ajay Kathuria
 
Eric Buck resume 2017
Eric Buck resume 2017Eric Buck resume 2017
Eric Buck resume 2017
Eric Buck
 
U.S. Bellows Expansion Joints In-Depth Webinar
U.S. Bellows Expansion Joints In-Depth WebinarU.S. Bellows Expansion Joints In-Depth Webinar
U.S. Bellows Expansion Joints In-Depth Webinar
Piping Technology & Products, Inc.
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSSin Byrne
 
Visual Dictionary Revised 2
Visual Dictionary Revised 2Visual Dictionary Revised 2
Visual Dictionary Revised 2siding
 
Aac
AacAac
Sectional Door System
Sectional Door SystemSectional Door System
Sectional Door System
Cressy Door Company, Inc.
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
Sajeewa Lakmal
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
SmarterHomeGuide
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 

Similar to Ehouse Specification Sample (20)

Skid unit -presentation of bunk housing, oil field, gas field, man camps
Skid unit -presentation of bunk housing, oil field, gas field, man campsSkid unit -presentation of bunk housing, oil field, gas field, man camps
Skid unit -presentation of bunk housing, oil field, gas field, man camps
 
Trailers dry freight_strick101
Trailers dry freight_strick101Trailers dry freight_strick101
Trailers dry freight_strick101
 
Design Guide2016-2
Design Guide2016-2Design Guide2016-2
Design Guide2016-2
 
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialEuro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
 
AmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler Architectural Specifications
AmeriKooler Architectural Specifications
 
K House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK PrefabK House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK Prefab
 
K House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptxK House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptx
 
Procamp tech spec msb 21
Procamp tech spec msb 21Procamp tech spec msb 21
Procamp tech spec msb 21
 
PEB - Standard Product Specifications
PEB - Standard Product SpecificationsPEB - Standard Product Specifications
PEB - Standard Product Specifications
 
Eric Buck resume 2017
Eric Buck resume 2017Eric Buck resume 2017
Eric Buck resume 2017
 
U.S. Bellows Expansion Joints In-Depth Webinar
U.S. Bellows Expansion Joints In-Depth WebinarU.S. Bellows Expansion Joints In-Depth Webinar
U.S. Bellows Expansion Joints In-Depth Webinar
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 
Visual Dictionary Revised 2
Visual Dictionary Revised 2Visual Dictionary Revised 2
Visual Dictionary Revised 2
 
Aac
AacAac
Aac
 
Sectional Door System
Sectional Door SystemSectional Door System
Sectional Door System
 
Lv panel specification
Lv panel specificationLv panel specification
Lv panel specification
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 

Recently uploaded

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 

Recently uploaded (20)

WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 

Ehouse Specification Sample

  • 1. This is an example of a basic E-house configuration that can be used for Power and Control requirements in many industries. Modular structures, customized enclosures, shelters and ISO Containers can be outfitted and tested for worldwide deployment within a factory setting. Modular Structures produce repeatability which gives you built in Quality.
  • 2. Building Size: Exterior Dimensions (W x L x H) Interior Dimensions (W x L x H) Floor Area (ft²) Approx. Gross Weight (lbs) 168” x 540” x 144” 157” x 529” x 114” 565 70,000 Structure:  Manufactured with structural steel members to meet all load requirements.  The Base is designed to withstand a uniform load 250 PSF over the entire floor area, with a maximum deflection not exceed L/360.  The long and short bottom rails of the base are made of WF 14x26 with 2”x2”x1/8” tubing support between the two flanges, 48” apart for additional support. In addition to that a 1” thick x 2” wide flat bar (with 3 holes 15/16” diameter) is welded to the long side bottom rails 10’ apart to provide support points for the lifting lugs. A 1” removable lifting lug with 3 holes of 15/16” diameter is attached to the flat bar (welded to the base) by 3 bolts 7/8” diameter x 5” LG, grade L9.  The cross members, going along the short side, are made of 4”x10”x3/8” HSST@ 16” apart, at max load area and 24” thereafter. Bracing made of C8x13.75 @ 48” centers  The floor is covered by ¼” checker plate to meet the specifications and provides more stability to the base. Painted grey  After spraying polyurethane foam on the base for insulation, it will be covered with 18 gage steel sheets to create an under pan for protection and will be undercoated for rust prevention.  Four (4) welded ground pads on all four corners of base. Lifting Lugs. Structural Framing:  All corner posts made of 4”x4”x1/4” HSS  All intermediate posts made of 4”x4”x1/4” HSS located 10’ apart.
  • 3.  The top rails made of tubing 6”x4”x1/4” raised and welded to the top of the posts, and braced by wall bracing ¼” thick x 6” wide flat bar. This will support the walls and increase their structural strength.  The door structure frame is made of 6”x2”x1/8” tubing, connected between the top rail to the base, and supported by traverse tubing.  In the middle of the roof, along the long side, a tubing 10”x4”x1/4” raised and welded to the posts for supporting purling joints  Studs are fully welded to the posts, made of 14 gage 2”x4”x2” at 16’ apart horizontally that will provide support for hanging electrical components and equipment. Roof Structure:  Roof tapered C channel 2”x10”-6”x2”x1/8 TH. (Purling) welded to the top rails and middle support tubing 10”x4”x1/4”.  Above the tapered channel, we install 10 gage steel sheets to support the roof structure and create a leak resistant structure, stitch weld to the tapered C channel and fully welded together.  Roof studs 1”x2”x1” is stitch welded to the steel sheets for installing the exterior corrugated steel panels. Insulation:  The unit will be insulated using Roxul Mineral Wool insulation, which is fire rated.  Walls R14  Roof R23  Floor R23
  • 4. Exterior Finish:  The exterior walls and roof are covered with 11ga galvanized sheet panels fixed to the studs by # 14 stainless self-drilling screws. The edges are covered by flashing, and the right and left walls contain rain gutters with one down spout located at the front. The exterior is primed with epoxy primer and painted with urethane paint.  The exterior is caulked and all the opening are covered and sealed. Interior Finish:  The interior walls and ceiling are covered with 18ga galvanized G 90 steel sheets, fixed to the studs by 3/16 aluminum rivets. Each sheet is overlapped and finishing trim is added. Primed with epoxy primer and painted with urethane white paint.  Prior to the painting, the galvanized steel sheets are light sanded, degreased and cleaned, then sprayed with primer wash to increase the adhesion of the primer to the metal surfaces, as per standard method for painting galvanized steel.  The floor is cleaned, light sanded and painted with urethane floor paint. Exterior Door Features:  The door frame structure is made of 6” x 2” x 1/8” steel tubing.  One (1) Double Door, 72” x 108” and One (1) Man door, 36” x 84”  Each door is equipped with an aluminum weather canopy fixed with bolts above each door.  Included hardware:  Hold open door closure (allow the door to be kept open).  Panic bar hardware with cylinder.  Weather strips for sealing.  Door sweep to be installed outside of the door  Door caps  Spring lock for transportation purpose only. To be removed at site
  • 5.  Equipment Doors will be supplied for exterior equipment access.  Each door will have a gasket seal and three point lock, lockable  Six (6) 24” access doors  Seven (7) 36” access doors  One (1) 48´access door Painting:  Base structure is sandblasted before exterior is added  Exterior colour to be advised (Equipment Grey)  The interior and exterior will be cleaned and degreases.  The surfaces will be lightly sanded to enhance the adhesion strength of the primer  The surfaces will be coated by edge primer which is important to increase the contact of the coating to the surfaces  Prime with epoxy primer  Paint with urethane paint  One coat of anti-graffiti paint  Total coverage 6 mill minimum Mechanical: Each building will be provided with two (2) HVAC systems for cooling and heating. Two (2) 6 ton HVAC industrial units with 10kW of heating each.  Both units controlled by led-lag controller.  Intake and return filters c/w with extra set of filters. Electrical E-house Building:  (1) 30 circuit 200A 120/240V breaker panel fed from station switchgear breaker  (5) 2 lamp 4’ vapour proof fluorescent fixtures  (2) 3way switches  (5) duplex receptacles  (2) emergency exit light fixtures  (2) 70W HPS outdoor fixtures c/w photocells  (2) power and control wiring for HVAC  (1) 15A 125V circuit for PLC panel  (1) 40A 240V circuit to customer supplied battery charger  (1) install and strap customer supplied batteries and DC breaker  (1) install customer supplied DC panel c/w main breaker  (1) 150A 125V DC wiring from battery to charger  (1) 150A 123V DC wiring from charger to DC panel
  • 6.  (1) fire alarm panel c/w 1 smoke, 1 heat detector, 1 bell, 2 alarm, 2 trouble contacts, monitoring by others  (2) telephone outlets wire back to Communication cabinet  (1) Exterior Blue beacon as per specifications  (1) inspection to CSA standards Accessories:  Two (2) 20lb ABC fire extinguisher  Two (2) Basic Eyewash Station  One (1) Wall mounted hinged table