Introduction
Definition of Terms
 Wastewater Engineering: Wastewater Engineering is traditionally a branch of
Civil Engineering and subset of Environmental Engineering which deals with
application of engineering methods to improve sanitation of human
communities primarily by providing removal & disposal of human waste in
addition to the supply of safe and potable water.
 Sanitation is the hygienic means of preventing human contact from hazards
of waste to promote health and potable water is that water which is fit for
drinking.
 Wastewater: It may be defined as a combination of liquid and water carried
solid waste from residences, institutions, commercial & industrial
establishment, agricultural field and can encompass a large range of
potentials contaminants and concentrations.
11/5/2020
3
Constituents of Wastewater
1. pH
2. Total Solids (TSS+TDS)
3. Oil & grease
4. B.O.D. (Biochemical Oxygen Demand)
5. C.O.D.
6. Nitrogen & Phosphorous
7.
Heavy Metals (lead, copper, chromium, cadmium, mercury, bismuth,
nickel, iron)
8. Refractory organic matters (pesticides)
9. Temperature
10. Toxic substances
11. Pathogen & pathogen indicators
11/5/2020
4
 Sewage: It is also known as domestic wastewater or municipal wastewater.
It is type of wastewater that is produced by a community of people which
is potential source of pollutants as it includes human waste (human
excreta).
 Sullage: Sullage is the term used to indicate the wastewater from household
sinks, showers and bath but not waste liquid or excreta from toilet. In other
words, it is all wastewater generated in household or office building without
fecal contamination.
 Effluent: It is an outflowing of water from a sewage treatment plant or
facility or wastewater discharge from any waste industrial facility. It is
defined by the USEPA (United States Environmental Protection Agency)
as wastewater treated or untreated that flows out from a treatment plant,
sewer or industrial outfall. Generally refers to wastes discharge into surface
water.
11/5/2020
5
 Sewer: It is an underground conduits or drains through which sewage is
carried to a point of discharge or disposal. It refers to:
 Sanitary sewer: A system of pipes used to transport human waste.
 Storm sewer: carry rainwater from roof & street surfaces.
 Separate sewer: carry households and industrial waste.
 Combined sewer: those which carry both sewage and storm water.
 House sewer: it is a pipe carrying away the sewage from a building to street
sewer.
 Main or trunk sewer: it is a sewer that receives sewage from many tributary
and serving as a outlet for a large territory.
 Branch/ sub main sewer: it is a sewer which receives sewage from a relatively
small area usually a few laterals and discharge into a mains.
 Lateral sewer: it is a sewer which collects sewage directly from the house.
 Outfall sewer: it is a sewer that receives the sewage from the collecting
system to a final discharge or disposal point.
11/5/2020
6
System of sanitation:
● Conservancy System (Dry System): Different types of wastes (dry or wet,
foul or non-foul) are manually collected separately and transported over
vehicles to the outskirts of the city and disposed off by composting method.
 Disadvantages:
i. Health hazards to the personnel handling the sewage
ii. Nuisance condition prevail while collecting and transporting
iii. It is inhuman practice and social injustice
● Water carriage system: The wastes from water-closets (WC) are collected by
flushing with water and this water is used to transport the wastes to
treatment works by a system of pipes.
 Advantages
i. Hygienic but costly
ii. Waste strength is reduced by dilution and the waste becomes more amenable
for treatment.
11/5/2020
7
 Advantages of modern water carriage system over old conservancy system:
1. The water carriage system is more hygienic because in this system waste collected
and carried in closed conduit as it is produced, where in old conservancy system
waste is collected and carried by buckets and cart.
2. In old conservancy system, chances of water pollution is more as wastes are buried
underground.
3. In modern water carriage system, problem of creating foul smell and unhygienic
condition does not exists.
4. Modern water carriage system, do not occupy the floor area or don't impair the
beauty of surroundings as sewage is carried by underground pipes (popularly
known as sewers).
5. The water carriage system allows the construction of bathrooms and latrine
together, thus occupying lesser space with their compact design.
11/5/2020
8
Sewerage:
The entire system of collecting, carrying and safe disposal of sewage through sewers is
known as sewerage.
● Types of sewerage systems:
i. Separate system
ii. Combined system
iii. Partially separate system
11/5/2020
9
● When both sanitary sewage and storm water are carried in a single sewer,
called a combined system.
 Combined system is used in the following circumstances:
1. When both the sanitary sewage and the storm water require pumping
2. When density of population is so high, the space may not be available to
have two separate sewers
3. When the storm sewer exists already, sanitary sewage also can be admitted
in the same sewer provided its quantity is small compared to storm water
4. When the rainfall is evenly distributed during the whole year
11/5/2020
10
 Combined system:
11/5/2020
11
● Two separate sets of sewers are installed, one for sanitary sewage and other
for storm water.
 This system is desirable on the following conditions
1. When it is required to treat only sanitary sewage and storm-water is not
treated
2. When the topography is flat which necessitates deep-cutting if combined
sewers are used
3. Frequency and intensity of storms are not of high magnitude, where storm
water can be collected by surface drains
4. Sewer laying requires rock-cutting, where cost of cutting is more for large
combined sewers
5. When the financial position does not permit to have large combined sewers
6. When there is a chance of combined sewers backing-up the flow into the
house sewers
11/5/2020
12
 Separate system:
11/5/2020
13
 Partially separate system:
11/5/2020
14
 Pattern of sewerage layout:
● The network of sewers can be laid in different patterns, depending on the
topography and development pattern of a city or town. The types of
patterns are as follows:
i. Perpendicular pattern
ii. Intercepter pattern
iii. Zone pattern
iv. Fan pattern
v. Radial pattern
 The factors which determine the pattern of sewerage are as follows:
• Type of system (combined or separate)
• Street lay-out
• Topography and hydrological characteristics of the area
• Location of treatment works
11/5/2020
15
Pattern of sewerage layout:
11/5/2020
16
Quantity
Estimation
of
Sewage
11/5/2020
17
 Components of wastewater flow:
Total Wastewater Flow
Dry Weather Flow (DWF) Wet Weather Flow (WWF)
 DWF: Dry weather flow is the flow through the sewer that would normally
be available during non-rainfall period. It consists mainly of Domestic
sewage and Industrial sewage.
 WWF: It is higher than DWF due to the contribution from inflow and
infiltration in the sewer system.
11/5/2020
18
11/5/2020
19
11/5/2020
20
 Evaluation of sewage discharge:
Apart from the accounted water supply by the water authority that will
converted into wastewater, following quantities are considered while
estimating the sewage quantity:
1. Addition due to unaccounted private water supply.
2. Addition due to infiltration.
3. Subtraction due to water losses
4. Subtraction due to water losses not entering into the sewerage system.
● Net quantity of sewage: [(Accounted quantity of water supply from the
water sources) + (unaccounted private water supplies) + (Infiltration) –
(subtraction due to water loss) – (water not entering into the sewerage
system)]
● 75-80% of water supplied is considered as sewage produced.
11/5/2020
21
 Variation in sewage flow:
Typical hourly variation in sewage flow
11/5/2020
22
 Relations:
For estimating design discharge following relations can be considered:
1. Maximum daily flow = 2 x average daily flow
2. Maximum hourly flow = 1.5 x maximum daily flow
= 3 x average daily flow
3. Minimum daily flow = 2/3 x average daily flow
4. Minimum hourly flow = 1/2 x minimum daily flow
= 1/3 average daily flow
1. Subtraction due to water losses
2. Subtraction due to water losses not entering into the sewerage system.
11/5/2020
23
 Design period:
The future period for which provisions are made in designing capacities of
various components of sewerage scheme.
Design period depends upon the following factors:
1. Ease and difficulty in expansion.
2. Amount and availability of investment.
3. Anticipated rate of population growth including shift of communities,
industries & commercial development.
4. Hydraulic constraints of the system design.
5. Life of the material and equipment.
Components Design Period
Lateral dia.<15 cm Full development
Trunk/main sewer 40 - 50 years
Treatment unit 15 – 20 years
Pumping plant 5 – 10 years
11/5/2020
24
 Problem-1:
A city has a projected population of 60,000 spread over area of 50 hectare.
Find the design discharge for the separate sewer line by assuming rate of
water supply of 250 litre per capita per day and out of this total supply 75%
reaches into the sewer as wastewater.
● Hints:
(DWF) is defined as = population x per capita rate of sewage contributed per
day (or) DWF = (Density of population x Area served by the sewer) x per
capita rate of flow
Per capita sanitary sewage = 75-80% of per capita water demand
Since dry-weather-flow depends on the quantity of water used, and as there
are fluctuations in rate of water consumption, there will be fluctuations in dry
weather flow also.
11/5/2020
25
 Quantity estimation of storm water:
A portion of rainfall that falls on the ground is lost as evaporation and
percolation. The remaining flows over the ground surface as storm water.
The quantity of storm water that goes to the sewers depends on the following
factors:
i. Intensity and duration of rainfall
ii. Time of concentration
iii. Run off coefficient
iv. Catchment area.
a. Area of the catchment
b. Slope & shape of the catchment
c. Obstruction in the flow of water
d. Initial state of catchment area with respect to wetness
e. Number & size of the ditches present in catchment area
f. Porosity of soil
g. Atmospheric temperature & humidity
11/5/2020
26
● Time of concentration:
The period after which the entire catchment area will start contributing to the
runoff is called “Time of concentration” and it is the summation of inlet
time and travel time.
A
B
Tt
Ti
= Inlet time; A = inlet point of sewer
= Travel time; B = point of concentration
Tc = Ti + Tt
The runoff will be maximum when the duration
of rainfall is equal to the time of concentration,
this is called critical rainfall duration.
Ti
Tt
● Inlet time (Ti) ● Travel time (Tt)
= (Length of drain / velocity)
11/5/2020
27
 methods for quantity estimation of storm water:
b
T
a
I


4
.
25 Duration of storm a b
5 – 20 minutes 30 10
20 – 100 minutes 40 20
*The value is prescribed by US
Ministry of Health
11/5/2020
28
● Empirical Formula:
1. Burkli-Zeigler Formula
2. Dicken’s Formula
Where,
Qp = Peak runoff in cumecs
C = co-efficient of runoff having average value as 0.7
I = maximum rainfall intensity, usually adopted as 2.5 -7.5 cm/hr
A = area of the basin (drainage area) in hectares
S = slope of the ground surface of the basin in m per thousand metres.
Where,
C = co-efficient of runoff having average value as 0.7
M = catchment area in sq.km
C = constant depends upon nature of catchment area and intensity of rainfall, the
value usually taken as 11.5.
11/5/2020
29
3. Ryve’s Formula
Value of C1
Location Value
Area within 24 km from the coast 6.8
Areas within 24 – 16 km from the coast 8.8
Limited areas near hill 10.1
4. Inglis Formula 5. Nawab Jung Bahadur Formula
The value of constant C2 varies between
48 – 60 and M’ is the catchment area in
acres.
11/5/2020
30
 Worked out example:
The catchment area is 300 hectares. The surface cover in the catchment can
be classified as given below:
Types of cover Runoff co-efficient percentage
Roofs 0.9 15
Pavements & yards 0.8 15
Lawn & gardens 0.15 25
Roads 0.40 20
Open ground 0.10 15
Single family dwelling 0.50 10
Calculate the runoff co-efficient and quantity of storm water runoff, if
intensity of rainfall is 30 mm/h for rain with duration equal to time of
concentration. If population density in the area is 350 persons per hectare and
rate of water supply is 200 LPCD, calculate design discharge for separate
system, partially separate system and combined system.
11/5/2020
31
Hydraulic
Design of
Sewer
11/5/2020
32
 Difference between water supply pipe and sewer:
1. In water supply pipe, velocity greater than self cleansing velocity is not
essential because of solids is not present in the suspension. But in sewer, to
avoid deposition of solids self cleansing velocity is necessary at all possible
discharge.
2. Water supply pipes carries water under pressure. Hence, the pipe can be
laid up & down the hills & valley within certain limit. Sewer pipes carries
sewage under gravity. Therefore it is required to be laid at a continuous
falling gradient in the downward direction towards the outfall.
3. Water supply pipes flowing full under pressure. Sewers are design to run
partial full at maximum discharge. The extra space ensure non pressure
gravity flow. This will minimize the leakage from sewer from faulty joints or
cracks if any.
11/5/2020
33
 provisions of free boards in sewer:
● Free board is provided to counteract the following factors:
1. Safeguard against lower estimation of the quantity of wastewater to be
collected at the end of design period due to private water supplies by
industries and public. Thus to ensure that sewers will never flow full,
eliminating pressure flow inside the sewers.
2. Large scale of infiltration of storm water through wrong or illegal
connection, cracks or open joints in the sewers.
3. Unforeseen increase in population or water consumption & consequent
increase in sewage production.
 Sewers with dia <400 mm are design to run half full at maximum discharge
 Dia. >400 mm are designed to flow 2/3rd to 3/4th full at maximum discharge
11/5/2020
34
Values of freeboard to be adopted for the design of S.W. Drains
Peak Discharge (cumecs) Freeboard (m)
<0.3 0.3
0.3 – 1.0 0.4
1.0 – 5 0.5
5 – 10 0.6
10 – 30 0.75
30 – 150 0.90
>150 1.0
 Minimum dia. of sewer will be adopted 200 mm for cities having present or
base year population over 1,00,000.
 In hilly location, minimum dia. of 150 mm shall be adopted
 For house sewers connection pipe and public sewers, minimum dia. of 100
mm will be adopted based on the number of house.
11/5/2020
35
 Hydraulic formula for determining flow velocity :
Q = A x V
1. Manning’s formula
Where,
V = velocity of flow in sewer in m/s
r = hydraulic mean depth of flow in m
s = hydraulic gradient or slope
n = rugosity coefficient (0.011 – 0.015)
Q = discharge in cumecs
A = area of flow in sq.m
11/5/2020
36
2. Chezy’s formula
3. Crimp & Burge’s formula
4. William - Hazens’s formula
11/5/2020
37
 Minimum velocity/ self-cleansing velocity :
*Maximum velocity should
be limited to 3 m/s
11/5/2020
38
● Design of circular sewers (Running Full)
 Hydraulic elements of sewer are
 Sectional area (A) or diameter (D)
 Hydraulic mean radius (R)
 Velocity (U)
 Slope (S)
 Out of the four quantities Q, D, U and S, if any two quantities are known or
assumed then the remaining two quantities can be found by sewer
formulae.
 These quantities have been solved for wide range of values and readymade
charts are available by which the design of sewers flowing just full can be
done very easily.
 Such readymade chart is known as Nomogram.
11/5/2020
39
Nomogram based on Manning’s formula for n= 0.013 for sewers running full
11/5/2020
40
● Flow through partially full circular sewer
 Most of the time, the sewers do not run full, i.e. run partially full.
 Such conditions exits in the following cases
 Upper reaches of laterals and branch sewers
 Initial stages after commissioning
 During the lean hours of the day
 Readymade charts are available for the analysis of such problems.
 The different parameters are d/D, u/U, a/A, q/Q.
 If any parameter is known then other parameters could be found out from
the charts.
11/5/2020
41
Hydraulic elements of circular sewer for all values of
roughness and slope
11/5/2020
42
d/D a/A p/P r/R v/V q/Q
1.0 1 1 1 1 1
0.9 0.949 0.857 1.192 1.124 1.066
0.8 0.858 0.703 1.217 1.140 0.988
0.7 0.748 0.631 1.185 1.120 0.838
0.6 0.626 0.564 1.110 1.072 0.671
0.5 0.5 0.5 1 1 0.5
0.4 0.373 0.444 0.857 0.902 0.337
0.3 0.252 0.369 0.684 0.776 0.196
0.2 0.143 0.296 0.482 0.615 0.088
0.1 0.052 0.205 0.254 0.401 0.021
0.0 0 0 0 0 0
Proportionate values of hydraulic elements for circular sewer when
flowing partially full (for constant ‘n’)
11/5/2020
43
PROBLEM-1:
A combined sewer was designed to serve an area of 60 sq.km. with an average
population of 185 persons per hectare. Average rate of sewer flow is 350 LPCD,
maximum flow is 50% in excess of average sewage flow. Rainfall equivalent of
12 mm in 24 hours can be considered for design, all of which is contributing in
surface runoff. What will be the discharge in the sewer. Find the diameter of
sewer if running full at maximum discharge.
PROBLEM-2:
Design a sewer running 0.7 times full for a maximum discharge of a town
provided with the separate system serving a population of 80,000 persons. The
water supplied from water works to the town at a rate of 190 LPCD. Given
n=0.013, S= 1 in 600, neglect variation of n. Check for minimum & maximum
velocity, assuming min. flow 1/3rd of avg. flow & max. flow is 3 times of avg.
flow.
11/5/2020
44
THANK YOU

More Related Content

What's hot

Environmentalengg
EnvironmentalenggEnvironmentalengg
Environmentalengg
jagadish108
 
Rainwater Harvesting 201
Rainwater Harvesting 201Rainwater Harvesting 201
Rainwater Harvesting 201
D4Z
 
Srorm water management
Srorm water managementSrorm water management
Srorm water management
Siddhi Vakharia
 
Critical assesment of the Sustainable Urban Drainage component of the Church ...
Critical assesment of the Sustainable Urban Drainage component of the Church ...Critical assesment of the Sustainable Urban Drainage component of the Church ...
Critical assesment of the Sustainable Urban Drainage component of the Church ...
Achim von Malotki
 
stormwater management
 stormwater management stormwater management
stormwater management
Siddhi Vakharia
 
Water supply system
Water supply systemWater supply system
Water supply system
aishah
 
Rainwater Harvesting and Utilisation Policy Maker
Rainwater Harvesting and Utilisation Policy MakerRainwater Harvesting and Utilisation Policy Maker
Rainwater Harvesting and Utilisation Policy Maker
K9T
 
L 4 wastewater flow rates
L 4 wastewater flow ratesL 4 wastewater flow rates
L 4 wastewater flow rates
Dr. shrikant jahagirdar
 
Integrating Rainwater Harvesting & Stormwater Management
Integrating Rainwater Harvesting & Stormwater ManagementIntegrating Rainwater Harvesting & Stormwater Management
Integrating Rainwater Harvesting & Stormwater Management
Gaurav Singh
 
Wastewater Management: Overview and Case Studies
Wastewater Management: Overview and Case StudiesWastewater Management: Overview and Case Studies
Wastewater Management: Overview and Case Studies
Antea Group
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET Journal
 
RAIN WATER HARVESTING
RAIN WATER HARVESTING RAIN WATER HARVESTING
RAIN WATER HARVESTING
DEEPAK SAHU
 
Chapter 1 &amp; 2 ss (1)
Chapter 1 &amp; 2 ss (1)Chapter 1 &amp; 2 ss (1)
Chapter 1 &amp; 2 ss (1)
Michael Birhanu
 
Rain and Greywater
Rain and GreywaterRain and Greywater
Rain and Greywater
wirethehouse
 
Quantity of Water
Quantity of WaterQuantity of Water
Quantity of Water
ChandanGupta201
 
Evs rainwater harvesting calcutta university
Evs rainwater harvesting calcutta universityEvs rainwater harvesting calcutta university
Evs rainwater harvesting calcutta universitysashipro
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
Sharifah Ain
 
T4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCE THE EGYPTIAN EXPERIENCE
T4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCETHE EGYPTIAN EXPERIENCET4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCETHE EGYPTIAN EXPERIENCE
T4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCE THE EGYPTIAN EXPERIENCE
FAO
 

What's hot (20)

Environmentalengg
EnvironmentalenggEnvironmentalengg
Environmentalengg
 
Rainwater Harvesting 201
Rainwater Harvesting 201Rainwater Harvesting 201
Rainwater Harvesting 201
 
Srorm water management
Srorm water managementSrorm water management
Srorm water management
 
Critical assesment of the Sustainable Urban Drainage component of the Church ...
Critical assesment of the Sustainable Urban Drainage component of the Church ...Critical assesment of the Sustainable Urban Drainage component of the Church ...
Critical assesment of the Sustainable Urban Drainage component of the Church ...
 
stormwater management
 stormwater management stormwater management
stormwater management
 
Water supply system
Water supply systemWater supply system
Water supply system
 
Rainwater Harvesting and Utilisation Policy Maker
Rainwater Harvesting and Utilisation Policy MakerRainwater Harvesting and Utilisation Policy Maker
Rainwater Harvesting and Utilisation Policy Maker
 
Site 6 suds
Site 6 sudsSite 6 suds
Site 6 suds
 
L 4 wastewater flow rates
L 4 wastewater flow ratesL 4 wastewater flow rates
L 4 wastewater flow rates
 
Rainwater harvesting - CCRT
Rainwater harvesting - CCRTRainwater harvesting - CCRT
Rainwater harvesting - CCRT
 
Integrating Rainwater Harvesting & Stormwater Management
Integrating Rainwater Harvesting & Stormwater ManagementIntegrating Rainwater Harvesting & Stormwater Management
Integrating Rainwater Harvesting & Stormwater Management
 
Wastewater Management: Overview and Case Studies
Wastewater Management: Overview and Case StudiesWastewater Management: Overview and Case Studies
Wastewater Management: Overview and Case Studies
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...
 
RAIN WATER HARVESTING
RAIN WATER HARVESTING RAIN WATER HARVESTING
RAIN WATER HARVESTING
 
Chapter 1 &amp; 2 ss (1)
Chapter 1 &amp; 2 ss (1)Chapter 1 &amp; 2 ss (1)
Chapter 1 &amp; 2 ss (1)
 
Rain and Greywater
Rain and GreywaterRain and Greywater
Rain and Greywater
 
Quantity of Water
Quantity of WaterQuantity of Water
Quantity of Water
 
Evs rainwater harvesting calcutta university
Evs rainwater harvesting calcutta universityEvs rainwater harvesting calcutta university
Evs rainwater harvesting calcutta university
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 
T4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCE THE EGYPTIAN EXPERIENCE
T4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCETHE EGYPTIAN EXPERIENCET4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCETHE EGYPTIAN EXPERIENCE
T4: GROUNDWATER MANAGEMENT AND WATER GOVERNANCE THE EGYPTIAN EXPERIENCE
 

Similar to Ee ii ce(pc)505- module 1_2_3

Wastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdfWastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdf
Amdework Belay
 
Project report
Project reportProject report
Project report
basirkhan12
 
Design of sewage treatment plant 2
Design of sewage treatment plant 2Design of sewage treatment plant 2
Design of sewage treatment plant 2
Shekhar Roy
 
Water Supply Compilation of Reports
Water Supply Compilation of ReportsWater Supply Compilation of Reports
Water Supply Compilation of Reports
Jahh Lavz
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
Fayaz Uddin
 
Environmental Engineering II M2.pptx
Environmental Engineering II M2.pptxEnvironmental Engineering II M2.pptx
Environmental Engineering II M2.pptx
WaliEdwardian1
 
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
CSA Symposium 2016 -Shawn Miller  Day 1 Session 3CSA Symposium 2016 -Shawn Miller  Day 1 Session 3
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
ACDI/VOCA
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
Arslan Nawazish
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvestingrahul_5587
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavementcathexis123
 
unit-I.pptx
unit-I.pptxunit-I.pptx
unit-I.pptx
Mohan Marumudi
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
AsnelTiffa
 
130618_ CF_rainwater harvest_report_issue 2
130618_ CF_rainwater harvest_report_issue 2130618_ CF_rainwater harvest_report_issue 2
130618_ CF_rainwater harvest_report_issue 2Gordon Hirst
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Management
haroldtaylor1113
 
Green Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycleGreen Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycle
ctlachu
 
L5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptxL5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptx
PRACHI DESSAI
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
Tulsiram Bhattarai
 
Presentation to AAAEA Technical conference
Presentation to AAAEA Technical conferencePresentation to AAAEA Technical conference
Presentation to AAAEA Technical conference
hbaroudi
 
Storm water collection (itp)
Storm water collection (itp)Storm water collection (itp)
Storm water collection (itp)
AjayPatel389
 

Similar to Ee ii ce(pc)505- module 1_2_3 (20)

Wastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdfWastewater and Solid waste management.pdf
Wastewater and Solid waste management.pdf
 
Project report
Project reportProject report
Project report
 
Design of sewage treatment plant 2
Design of sewage treatment plant 2Design of sewage treatment plant 2
Design of sewage treatment plant 2
 
Water Supply Compilation of Reports
Water Supply Compilation of ReportsWater Supply Compilation of Reports
Water Supply Compilation of Reports
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 
Environmental Engineering II M2.pptx
Environmental Engineering II M2.pptxEnvironmental Engineering II M2.pptx
Environmental Engineering II M2.pptx
 
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
CSA Symposium 2016 -Shawn Miller  Day 1 Session 3CSA Symposium 2016 -Shawn Miller  Day 1 Session 3
CSA Symposium 2016 -Shawn Miller Day 1 Session 3
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
unit-I.pptx
unit-I.pptxunit-I.pptx
unit-I.pptx
 
Ee 2
Ee 2Ee 2
Ee 2
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
130618_ CF_rainwater harvest_report_issue 2
130618_ CF_rainwater harvest_report_issue 2130618_ CF_rainwater harvest_report_issue 2
130618_ CF_rainwater harvest_report_issue 2
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Management
 
Green Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycleGreen Buildings-reduce resue and recycle
Green Buildings-reduce resue and recycle
 
L5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptxL5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptx
 
Design and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer AppurtenancesDesign and Construction of Sewers And Sewer Appurtenances
Design and Construction of Sewers And Sewer Appurtenances
 
Presentation to AAAEA Technical conference
Presentation to AAAEA Technical conferencePresentation to AAAEA Technical conference
Presentation to AAAEA Technical conference
 
Storm water collection (itp)
Storm water collection (itp)Storm water collection (itp)
Storm water collection (itp)
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 

Ee ii ce(pc)505- module 1_2_3

  • 2. 11/5/2020 2 Introduction Definition of Terms  Wastewater Engineering: Wastewater Engineering is traditionally a branch of Civil Engineering and subset of Environmental Engineering which deals with application of engineering methods to improve sanitation of human communities primarily by providing removal & disposal of human waste in addition to the supply of safe and potable water.  Sanitation is the hygienic means of preventing human contact from hazards of waste to promote health and potable water is that water which is fit for drinking.  Wastewater: It may be defined as a combination of liquid and water carried solid waste from residences, institutions, commercial & industrial establishment, agricultural field and can encompass a large range of potentials contaminants and concentrations.
  • 3. 11/5/2020 3 Constituents of Wastewater 1. pH 2. Total Solids (TSS+TDS) 3. Oil & grease 4. B.O.D. (Biochemical Oxygen Demand) 5. C.O.D. 6. Nitrogen & Phosphorous 7. Heavy Metals (lead, copper, chromium, cadmium, mercury, bismuth, nickel, iron) 8. Refractory organic matters (pesticides) 9. Temperature 10. Toxic substances 11. Pathogen & pathogen indicators
  • 4. 11/5/2020 4  Sewage: It is also known as domestic wastewater or municipal wastewater. It is type of wastewater that is produced by a community of people which is potential source of pollutants as it includes human waste (human excreta).  Sullage: Sullage is the term used to indicate the wastewater from household sinks, showers and bath but not waste liquid or excreta from toilet. In other words, it is all wastewater generated in household or office building without fecal contamination.  Effluent: It is an outflowing of water from a sewage treatment plant or facility or wastewater discharge from any waste industrial facility. It is defined by the USEPA (United States Environmental Protection Agency) as wastewater treated or untreated that flows out from a treatment plant, sewer or industrial outfall. Generally refers to wastes discharge into surface water.
  • 5. 11/5/2020 5  Sewer: It is an underground conduits or drains through which sewage is carried to a point of discharge or disposal. It refers to:  Sanitary sewer: A system of pipes used to transport human waste.  Storm sewer: carry rainwater from roof & street surfaces.  Separate sewer: carry households and industrial waste.  Combined sewer: those which carry both sewage and storm water.  House sewer: it is a pipe carrying away the sewage from a building to street sewer.  Main or trunk sewer: it is a sewer that receives sewage from many tributary and serving as a outlet for a large territory.  Branch/ sub main sewer: it is a sewer which receives sewage from a relatively small area usually a few laterals and discharge into a mains.  Lateral sewer: it is a sewer which collects sewage directly from the house.  Outfall sewer: it is a sewer that receives the sewage from the collecting system to a final discharge or disposal point.
  • 6. 11/5/2020 6 System of sanitation: ● Conservancy System (Dry System): Different types of wastes (dry or wet, foul or non-foul) are manually collected separately and transported over vehicles to the outskirts of the city and disposed off by composting method.  Disadvantages: i. Health hazards to the personnel handling the sewage ii. Nuisance condition prevail while collecting and transporting iii. It is inhuman practice and social injustice ● Water carriage system: The wastes from water-closets (WC) are collected by flushing with water and this water is used to transport the wastes to treatment works by a system of pipes.  Advantages i. Hygienic but costly ii. Waste strength is reduced by dilution and the waste becomes more amenable for treatment.
  • 7. 11/5/2020 7  Advantages of modern water carriage system over old conservancy system: 1. The water carriage system is more hygienic because in this system waste collected and carried in closed conduit as it is produced, where in old conservancy system waste is collected and carried by buckets and cart. 2. In old conservancy system, chances of water pollution is more as wastes are buried underground. 3. In modern water carriage system, problem of creating foul smell and unhygienic condition does not exists. 4. Modern water carriage system, do not occupy the floor area or don't impair the beauty of surroundings as sewage is carried by underground pipes (popularly known as sewers). 5. The water carriage system allows the construction of bathrooms and latrine together, thus occupying lesser space with their compact design.
  • 8. 11/5/2020 8 Sewerage: The entire system of collecting, carrying and safe disposal of sewage through sewers is known as sewerage. ● Types of sewerage systems: i. Separate system ii. Combined system iii. Partially separate system
  • 9. 11/5/2020 9 ● When both sanitary sewage and storm water are carried in a single sewer, called a combined system.  Combined system is used in the following circumstances: 1. When both the sanitary sewage and the storm water require pumping 2. When density of population is so high, the space may not be available to have two separate sewers 3. When the storm sewer exists already, sanitary sewage also can be admitted in the same sewer provided its quantity is small compared to storm water 4. When the rainfall is evenly distributed during the whole year
  • 11. 11/5/2020 11 ● Two separate sets of sewers are installed, one for sanitary sewage and other for storm water.  This system is desirable on the following conditions 1. When it is required to treat only sanitary sewage and storm-water is not treated 2. When the topography is flat which necessitates deep-cutting if combined sewers are used 3. Frequency and intensity of storms are not of high magnitude, where storm water can be collected by surface drains 4. Sewer laying requires rock-cutting, where cost of cutting is more for large combined sewers 5. When the financial position does not permit to have large combined sewers 6. When there is a chance of combined sewers backing-up the flow into the house sewers
  • 14. 11/5/2020 14  Pattern of sewerage layout: ● The network of sewers can be laid in different patterns, depending on the topography and development pattern of a city or town. The types of patterns are as follows: i. Perpendicular pattern ii. Intercepter pattern iii. Zone pattern iv. Fan pattern v. Radial pattern  The factors which determine the pattern of sewerage are as follows: • Type of system (combined or separate) • Street lay-out • Topography and hydrological characteristics of the area • Location of treatment works
  • 17. 11/5/2020 17  Components of wastewater flow: Total Wastewater Flow Dry Weather Flow (DWF) Wet Weather Flow (WWF)  DWF: Dry weather flow is the flow through the sewer that would normally be available during non-rainfall period. It consists mainly of Domestic sewage and Industrial sewage.  WWF: It is higher than DWF due to the contribution from inflow and infiltration in the sewer system.
  • 20. 11/5/2020 20  Evaluation of sewage discharge: Apart from the accounted water supply by the water authority that will converted into wastewater, following quantities are considered while estimating the sewage quantity: 1. Addition due to unaccounted private water supply. 2. Addition due to infiltration. 3. Subtraction due to water losses 4. Subtraction due to water losses not entering into the sewerage system. ● Net quantity of sewage: [(Accounted quantity of water supply from the water sources) + (unaccounted private water supplies) + (Infiltration) – (subtraction due to water loss) – (water not entering into the sewerage system)] ● 75-80% of water supplied is considered as sewage produced.
  • 21. 11/5/2020 21  Variation in sewage flow: Typical hourly variation in sewage flow
  • 22. 11/5/2020 22  Relations: For estimating design discharge following relations can be considered: 1. Maximum daily flow = 2 x average daily flow 2. Maximum hourly flow = 1.5 x maximum daily flow = 3 x average daily flow 3. Minimum daily flow = 2/3 x average daily flow 4. Minimum hourly flow = 1/2 x minimum daily flow = 1/3 average daily flow 1. Subtraction due to water losses 2. Subtraction due to water losses not entering into the sewerage system.
  • 23. 11/5/2020 23  Design period: The future period for which provisions are made in designing capacities of various components of sewerage scheme. Design period depends upon the following factors: 1. Ease and difficulty in expansion. 2. Amount and availability of investment. 3. Anticipated rate of population growth including shift of communities, industries & commercial development. 4. Hydraulic constraints of the system design. 5. Life of the material and equipment. Components Design Period Lateral dia.<15 cm Full development Trunk/main sewer 40 - 50 years Treatment unit 15 – 20 years Pumping plant 5 – 10 years
  • 24. 11/5/2020 24  Problem-1: A city has a projected population of 60,000 spread over area of 50 hectare. Find the design discharge for the separate sewer line by assuming rate of water supply of 250 litre per capita per day and out of this total supply 75% reaches into the sewer as wastewater. ● Hints: (DWF) is defined as = population x per capita rate of sewage contributed per day (or) DWF = (Density of population x Area served by the sewer) x per capita rate of flow Per capita sanitary sewage = 75-80% of per capita water demand Since dry-weather-flow depends on the quantity of water used, and as there are fluctuations in rate of water consumption, there will be fluctuations in dry weather flow also.
  • 25. 11/5/2020 25  Quantity estimation of storm water: A portion of rainfall that falls on the ground is lost as evaporation and percolation. The remaining flows over the ground surface as storm water. The quantity of storm water that goes to the sewers depends on the following factors: i. Intensity and duration of rainfall ii. Time of concentration iii. Run off coefficient iv. Catchment area. a. Area of the catchment b. Slope & shape of the catchment c. Obstruction in the flow of water d. Initial state of catchment area with respect to wetness e. Number & size of the ditches present in catchment area f. Porosity of soil g. Atmospheric temperature & humidity
  • 26. 11/5/2020 26 ● Time of concentration: The period after which the entire catchment area will start contributing to the runoff is called “Time of concentration” and it is the summation of inlet time and travel time. A B Tt Ti = Inlet time; A = inlet point of sewer = Travel time; B = point of concentration Tc = Ti + Tt The runoff will be maximum when the duration of rainfall is equal to the time of concentration, this is called critical rainfall duration. Ti Tt ● Inlet time (Ti) ● Travel time (Tt) = (Length of drain / velocity)
  • 27. 11/5/2020 27  methods for quantity estimation of storm water: b T a I   4 . 25 Duration of storm a b 5 – 20 minutes 30 10 20 – 100 minutes 40 20 *The value is prescribed by US Ministry of Health
  • 28. 11/5/2020 28 ● Empirical Formula: 1. Burkli-Zeigler Formula 2. Dicken’s Formula Where, Qp = Peak runoff in cumecs C = co-efficient of runoff having average value as 0.7 I = maximum rainfall intensity, usually adopted as 2.5 -7.5 cm/hr A = area of the basin (drainage area) in hectares S = slope of the ground surface of the basin in m per thousand metres. Where, C = co-efficient of runoff having average value as 0.7 M = catchment area in sq.km C = constant depends upon nature of catchment area and intensity of rainfall, the value usually taken as 11.5.
  • 29. 11/5/2020 29 3. Ryve’s Formula Value of C1 Location Value Area within 24 km from the coast 6.8 Areas within 24 – 16 km from the coast 8.8 Limited areas near hill 10.1 4. Inglis Formula 5. Nawab Jung Bahadur Formula The value of constant C2 varies between 48 – 60 and M’ is the catchment area in acres.
  • 30. 11/5/2020 30  Worked out example: The catchment area is 300 hectares. The surface cover in the catchment can be classified as given below: Types of cover Runoff co-efficient percentage Roofs 0.9 15 Pavements & yards 0.8 15 Lawn & gardens 0.15 25 Roads 0.40 20 Open ground 0.10 15 Single family dwelling 0.50 10 Calculate the runoff co-efficient and quantity of storm water runoff, if intensity of rainfall is 30 mm/h for rain with duration equal to time of concentration. If population density in the area is 350 persons per hectare and rate of water supply is 200 LPCD, calculate design discharge for separate system, partially separate system and combined system.
  • 32. 11/5/2020 32  Difference between water supply pipe and sewer: 1. In water supply pipe, velocity greater than self cleansing velocity is not essential because of solids is not present in the suspension. But in sewer, to avoid deposition of solids self cleansing velocity is necessary at all possible discharge. 2. Water supply pipes carries water under pressure. Hence, the pipe can be laid up & down the hills & valley within certain limit. Sewer pipes carries sewage under gravity. Therefore it is required to be laid at a continuous falling gradient in the downward direction towards the outfall. 3. Water supply pipes flowing full under pressure. Sewers are design to run partial full at maximum discharge. The extra space ensure non pressure gravity flow. This will minimize the leakage from sewer from faulty joints or cracks if any.
  • 33. 11/5/2020 33  provisions of free boards in sewer: ● Free board is provided to counteract the following factors: 1. Safeguard against lower estimation of the quantity of wastewater to be collected at the end of design period due to private water supplies by industries and public. Thus to ensure that sewers will never flow full, eliminating pressure flow inside the sewers. 2. Large scale of infiltration of storm water through wrong or illegal connection, cracks or open joints in the sewers. 3. Unforeseen increase in population or water consumption & consequent increase in sewage production.  Sewers with dia <400 mm are design to run half full at maximum discharge  Dia. >400 mm are designed to flow 2/3rd to 3/4th full at maximum discharge
  • 34. 11/5/2020 34 Values of freeboard to be adopted for the design of S.W. Drains Peak Discharge (cumecs) Freeboard (m) <0.3 0.3 0.3 – 1.0 0.4 1.0 – 5 0.5 5 – 10 0.6 10 – 30 0.75 30 – 150 0.90 >150 1.0  Minimum dia. of sewer will be adopted 200 mm for cities having present or base year population over 1,00,000.  In hilly location, minimum dia. of 150 mm shall be adopted  For house sewers connection pipe and public sewers, minimum dia. of 100 mm will be adopted based on the number of house.
  • 35. 11/5/2020 35  Hydraulic formula for determining flow velocity : Q = A x V 1. Manning’s formula Where, V = velocity of flow in sewer in m/s r = hydraulic mean depth of flow in m s = hydraulic gradient or slope n = rugosity coefficient (0.011 – 0.015) Q = discharge in cumecs A = area of flow in sq.m
  • 36. 11/5/2020 36 2. Chezy’s formula 3. Crimp & Burge’s formula 4. William - Hazens’s formula
  • 37. 11/5/2020 37  Minimum velocity/ self-cleansing velocity : *Maximum velocity should be limited to 3 m/s
  • 38. 11/5/2020 38 ● Design of circular sewers (Running Full)  Hydraulic elements of sewer are  Sectional area (A) or diameter (D)  Hydraulic mean radius (R)  Velocity (U)  Slope (S)  Out of the four quantities Q, D, U and S, if any two quantities are known or assumed then the remaining two quantities can be found by sewer formulae.  These quantities have been solved for wide range of values and readymade charts are available by which the design of sewers flowing just full can be done very easily.  Such readymade chart is known as Nomogram.
  • 39. 11/5/2020 39 Nomogram based on Manning’s formula for n= 0.013 for sewers running full
  • 40. 11/5/2020 40 ● Flow through partially full circular sewer  Most of the time, the sewers do not run full, i.e. run partially full.  Such conditions exits in the following cases  Upper reaches of laterals and branch sewers  Initial stages after commissioning  During the lean hours of the day  Readymade charts are available for the analysis of such problems.  The different parameters are d/D, u/U, a/A, q/Q.  If any parameter is known then other parameters could be found out from the charts.
  • 41. 11/5/2020 41 Hydraulic elements of circular sewer for all values of roughness and slope
  • 42. 11/5/2020 42 d/D a/A p/P r/R v/V q/Q 1.0 1 1 1 1 1 0.9 0.949 0.857 1.192 1.124 1.066 0.8 0.858 0.703 1.217 1.140 0.988 0.7 0.748 0.631 1.185 1.120 0.838 0.6 0.626 0.564 1.110 1.072 0.671 0.5 0.5 0.5 1 1 0.5 0.4 0.373 0.444 0.857 0.902 0.337 0.3 0.252 0.369 0.684 0.776 0.196 0.2 0.143 0.296 0.482 0.615 0.088 0.1 0.052 0.205 0.254 0.401 0.021 0.0 0 0 0 0 0 Proportionate values of hydraulic elements for circular sewer when flowing partially full (for constant ‘n’)
  • 43. 11/5/2020 43 PROBLEM-1: A combined sewer was designed to serve an area of 60 sq.km. with an average population of 185 persons per hectare. Average rate of sewer flow is 350 LPCD, maximum flow is 50% in excess of average sewage flow. Rainfall equivalent of 12 mm in 24 hours can be considered for design, all of which is contributing in surface runoff. What will be the discharge in the sewer. Find the diameter of sewer if running full at maximum discharge. PROBLEM-2: Design a sewer running 0.7 times full for a maximum discharge of a town provided with the separate system serving a population of 80,000 persons. The water supplied from water works to the town at a rate of 190 LPCD. Given n=0.013, S= 1 in 600, neglect variation of n. Check for minimum & maximum velocity, assuming min. flow 1/3rd of avg. flow & max. flow is 3 times of avg. flow.