Turning Industrial Area into an
Eco –Industrial Park:
Case study of Harare
Presentation by
Taurai Mpaso R113641T
Supervisor : Eng K Mugwindiri
PROBLEM STATEMENT
Problems
More waste in land fills
Money lost in form of waste
Extensive use of virgin materials
Waste - loss of something valuable that occurs because too much of it
is being used or because it is being used in a way that is not necessary
or effective
(Merriamwebstardictionary.com)
Aim
•Assessment of Harare industrial sites
setup and practices to develop possible
industrial symbiosis connections.
OBJECTIVES
• To identify current eco-related activities
• To identify common inputs required, by products, wastes
produced and the potential major users of the by-products
and waste in the same industries
• To identify possible material exchange with the view of
improving energy efficiencies, recycling water and materials,
waste management and dematerialisation
ECO INDUSTRIAL PARKS
Resource (Material) Flow in Today’s Society Ideal Resource (Material) Flow
CASE STUDY FINDINGS
Industrial Composition
30%
12%
10%
32%
16%
MANUFACTURING PROCESSING RECYCLING SERVICE CONSTRUCTION
Chart Title
Current symbiotic practice
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
Never Rarely Often Always
The company physically change materials with other companies
The company re-use, recycle and reduce waste products and by- products
The company sell by products to
other company for re-use
The company re-use/reuse water
Water consumption
35%
41%
24%
LESS THAN 2CUBIC METERS MORE THA 2 BUT LESS THAN
7 CUBIC METERS
ABOVE 7 CUBIC METERS
Waste Generated
63%
17%
20%
solid waste fluid effluents other
Development of Prototype
Due to geographical location of the identified potential
members the best type was a Virtual Eco Industrial Park
The final model is a combination of two development
scenarios, it is a combination of existing organisational
relationships and Anchor tenant model. The models take the
following assumptions:
• Members chosen are willing to participate fully
• Technical feasibility
• Economic feasibility
• Portfolio feasibility
Stage one: Baseline Activities
Cement
industry
(Lafarge)
Fertiliser and
chemical industry
(ZimPhos)
Power Generation
(ZPC)
Capacity
450 000 tonnes per annum
Current substitute raw material use
0.18% fly ash and 9.6% for brick rubble.
Processes
103kg of coal to produce a tonne of cement
And this produce a tonne of CO2
Capacity
200 000 tonnes of fertilisers and
65 000 tonnes of phosphoric acid
Current outputs
Operating at 20% capacity
Process
325 000 tonnes of gypsum is produced
Deposited in 2 dumps
Capacity
50MW of electricity
Current
25MW of electricity
Process
16 250 tonnes fly ash
4 225 tonnes bottom ash
65 000-81 250 tonnes of coal
Stage two
•The stage identifies production practices and recycling
opportunities that can provide economic and
environmental benefits if implemented independently
by each member.
•For each major player identified possible methods of
limiting the pollution impacts of their production
methods are proposed.
Stage 3: Industrial Symbiosis
Key
Industry located in Msasa
Industry located in Granite site
Industry located in Southerton
Industry located in Workington
Cement
industry
(Lafarge)
Fertiliser and
chemical industry
(ZimPhos)
Power Generation
(ZPC)
Fly ash
11 250 tonnes
Gypsum
13 000 tonnes
CSA specification of fly ash
Type F : 8% CaO
Type CI : 8-20% CaO
Type CH : > 20% CaO
Road
Construction
Max 25% mass
ratio fly ash
Increase fly ash ratio
to 2.5% and
Gypsum composition
To 4%
Remaining
fly ash
Municipal
solid waste
(fuel in the kiln)
Effects of using MSW fuel
CO2 emissions reduced
avoids landfilling waste
reduces methane
emissions
Industries identified in Harare
MSASA GRANITE SITE SOUTHERTON WORKINGTON
Lafarge Cement,
Feedmix,
GMB,
Zimphos
Multimanufacuring
Firtst Plastics
Prime Sole
Gyproc
Delta-Coca cola
Art Corporation
National Tyre Service
PG industries
Pro- Plastics
Delta-Beer brew
Schewpess
Hunyani Papers
ZLT
Cairns
Savanna
BAT
Craster International
Cochraine
Brown Enginnering
Windmill
ZFC
Turnall
CAFCA
National Foods
Verspak
Dairiboard
Zimbabwe sugar refinery
Unilever
Cottco
Colcom
Zesa thermal power plant
Key
Industry located in Msasa
Industry located in Granite site
Industry located in Southerton
Industry located in Workington
Stage 4: New Members
Cement
industry
(Lafarge)
Fertiliser and
chemical industry
(ZimPhos)
Stock feeds
(Feedmix)
Rubber: Sole
manufacturing
(Prime Sole)
Rubber: tire
manufacture
(NTS)
Construction
industry
(PG Industries)
Paper Milling
(Hunyani Holdings)
Power Generation
(ZPC)
Sugar refinery
(Star Sugars)
Colour codesShapes representation
Major Members
New Members
By product exchange
Recycling
Fertiliser
(Windmill)
Fertiliser
(Windmill)
Food processing
(GMB)
Phosphoric acid
Sulphuric acid
Phosphate rock
Waste grain
Bagasse
Calcium
carbonate
Fly ash
Bottom
ash
Waste
tires
Road
Construction
Key
Industry located in Msasa
Industry located in Granite site
Industry located in Southerton
Industry located in Workington
Stage 5: Combined Symbiosis and Pollution prevention
Cement
industry
(Lafarge)
Fertiliser and
chemical industry
(ZimPhos)
Stock feeds
(Feedmix)Rubber: Sole
manufacturing
(Prime Sole)
Rubber: tire
manufacture
(NTS)
Construction
industry
(PG Industries)
Paper Milling
(Hunyani Holdings)
Power Generation
(ZPC)
Sugar refinery
(Star Sugars)
Colour codesShapes representation
Major Members
New Members
By product exchange
Recycling
Fertiliser
(Windmill)
Fertiliser
(ZFC)
Food processing
(GMB)
Phosphoric acid
Sulphuric acid
Phosphate rock
Waste grain
Bagasse
Calcium
carbonate
Fly ash
Bottom
ash
Waste
tires
Metal industry
(Craster International)
Heavy Vehicles
(Barzem)
Scrap
metal
Furniture
Clusters
Saw dust
Shavings
Used
paper Additional MembersWaste
Metal
dealer
Scrap
metal
Waste
Rubber
dealer
Used rubber
Waste
paper
dealer
CLEVELAND DAM
Supplementary water for Msasa
water treatment
chemicals
rubble
Road
Construction
Plaster board
Gyproc
gypsum
Fly
ash
Recommendations
Technological development
Members acquire technologies specifically to suit the network formulated
Development of administration centres
Formulated and financed by members from companies and interested
groups
Government Intervention
1. Legislation modification
2. Funding initiative
3. Spear heading Project
4. Resuscitation of transport network
Conclusion
Eco Industrial Parks are the way to go as it will
deal with 15%-20% of waste-material that will
end up in dumpsites
THANK YOU

More Related Content

What's hot

Turning an industrial area into an eco industrial park
Turning an industrial area into an eco industrial parkTurning an industrial area into an eco industrial park
Turning an industrial area into an eco industrial parkTaurai Mpaso
 
Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...
Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...
Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...AurovilleConsulting
 
Gujarat pcpir bharuch
Gujarat pcpir bharuchGujarat pcpir bharuch
Gujarat pcpir bharuchOutlook Menia
 
Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)
Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)
Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)halloliver
 
Sustainable materials
Sustainable materials Sustainable materials
Sustainable materials Ameeshi Goenka
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case StudyAjayashKekan
 
Sustainable design
Sustainable designSustainable design
Sustainable designTala Jazzy
 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaKetan Wadodkar
 
Decarbonising Buildings in Cities and Regions.pptx
Decarbonising Buildings in Cities and Regions.pptxDecarbonising Buildings in Cities and Regions.pptx
Decarbonising Buildings in Cities and Regions.pptxOECDregions
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projectsSandeep Kumar
 
Indoor environmental quality
Indoor environmental qualityIndoor environmental quality
Indoor environmental qualityjeff_ranson
 
Decarbonization of industry - impact on energy
Decarbonization of industry - impact on energyDecarbonization of industry - impact on energy
Decarbonization of industry - impact on energyBig Data Value Association
 
Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...Manthan Shah
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahoreAyesha Akhtar
 
Indonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptx
Indonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptxIndonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptx
Indonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptxEkkiIdhamayanto1
 

What's hot (20)

Industrial park concept
Industrial park conceptIndustrial park concept
Industrial park concept
 
Turning an industrial area into an eco industrial park
Turning an industrial area into an eco industrial parkTurning an industrial area into an eco industrial park
Turning an industrial area into an eco industrial park
 
Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...
Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...
Planning & Design Guidelines GREEN INDUSTRIAL PARK for ALEAP, Nandigama, Andh...
 
Gujarat pcpir bharuch
Gujarat pcpir bharuchGujarat pcpir bharuch
Gujarat pcpir bharuch
 
Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)
Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)
Copenhagen - Solutions For Sustainable Cities 2012 (Export Catalogue)
 
BREEAM
BREEAMBREEAM
BREEAM
 
Sustainable materials
Sustainable materials Sustainable materials
Sustainable materials
 
Green Building in India with Case Study
Green Building in India with Case StudyGreen Building in India with Case Study
Green Building in India with Case Study
 
Sustainable design
Sustainable designSustainable design
Sustainable design
 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (Nmia
 
Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
 
Decarbonising Buildings in Cities and Regions.pptx
Decarbonising Buildings in Cities and Regions.pptxDecarbonising Buildings in Cities and Regions.pptx
Decarbonising Buildings in Cities and Regions.pptx
 
Decarbonization by 2050
Decarbonization by 2050Decarbonization by 2050
Decarbonization by 2050
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Indoor environmental quality
Indoor environmental qualityIndoor environmental quality
Indoor environmental quality
 
Decarbonization of industry - impact on energy
Decarbonization of industry - impact on energyDecarbonization of industry - impact on energy
Decarbonization of industry - impact on energy
 
Breeam
BreeamBreeam
Breeam
 
Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...Economic evaluation and comparison between green building and conventional bu...
Economic evaluation and comparison between green building and conventional bu...
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Indonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptx
Indonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptxIndonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptx
Indonesia-Eco-industrial Park in Korea-Information session Final(20220616).pptx
 

Similar to Eco industrial park

Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Cairn India Limited
 
Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)mamdouh sabour
 
IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...
IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...
IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...IRJET Journal
 
Waste to energy projects with reference to MSW, Sourabh Manuja, TERI, India
Waste to energy projects with reference to MSW, Sourabh Manuja, TERI, IndiaWaste to energy projects with reference to MSW, Sourabh Manuja, TERI, India
Waste to energy projects with reference to MSW, Sourabh Manuja, TERI, IndiaESD UNU-IAS
 
(Ximb) sustainability - cement industry
(Ximb) sustainability -  cement industry(Ximb) sustainability -  cement industry
(Ximb) sustainability - cement industrySustainabilityXIMB
 
Easme rmsummit PLATIRUS & CEBRA
Easme rmsummit PLATIRUS & CEBRAEasme rmsummit PLATIRUS & CEBRA
Easme rmsummit PLATIRUS & CEBRAJokin Hidalgo
 
Zero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesZero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesSooraj Garg
 
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)Mahmoud Izzat Mahmoud
 
IRJET - Application of Geopolymer Concrete in Construction of Green Building
IRJET -  	  Application of Geopolymer Concrete in Construction of Green BuildingIRJET -  	  Application of Geopolymer Concrete in Construction of Green Building
IRJET - Application of Geopolymer Concrete in Construction of Green BuildingIRJET Journal
 
Feb 20 landsmiths and sentinel presentation to haryana government
Feb 20    landsmiths and sentinel presentation to haryana governmentFeb 20    landsmiths and sentinel presentation to haryana government
Feb 20 landsmiths and sentinel presentation to haryana governmentAjaypal s Randhawa
 
Minergy Corporate presentation
Minergy Corporate presentationMinergy Corporate presentation
Minergy Corporate presentationslideshareminergy
 
INDUSTRIAL SYMBIOSIS.pdf
INDUSTRIAL SYMBIOSIS.pdfINDUSTRIAL SYMBIOSIS.pdf
INDUSTRIAL SYMBIOSIS.pdfDrReyaIssac
 
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar MuniyasamyHall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy7391456
 
Energy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesEnergy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesDr Ramhari Poudyal
 
APPLICATION OF CLEANER PRODUCTION.pptx
APPLICATION OF CLEANER PRODUCTION.pptxAPPLICATION OF CLEANER PRODUCTION.pptx
APPLICATION OF CLEANER PRODUCTION.pptxEr. Rahul Jarariya
 

Similar to Eco industrial park (20)

Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
 
Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)
 
IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...
IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...
IRJET- Using Solid Waste & Alternate Fuel Raw (AFR) Material as a Fuel in Co-...
 
Waste to energy projects with reference to MSW, Sourabh Manuja, TERI, India
Waste to energy projects with reference to MSW, Sourabh Manuja, TERI, IndiaWaste to energy projects with reference to MSW, Sourabh Manuja, TERI, India
Waste to energy projects with reference to MSW, Sourabh Manuja, TERI, India
 
(Ximb) sustainability - cement industry
(Ximb) sustainability -  cement industry(Ximb) sustainability -  cement industry
(Ximb) sustainability - cement industry
 
Easme rmsummit PLATIRUS & CEBRA
Easme rmsummit PLATIRUS & CEBRAEasme rmsummit PLATIRUS & CEBRA
Easme rmsummit PLATIRUS & CEBRA
 
Final PPT
Final PPTFinal PPT
Final PPT
 
Zero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesZero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industries
 
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
 
James Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study ExamplesJames Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study Examples
 
IRJET - Application of Geopolymer Concrete in Construction of Green Building
IRJET -  	  Application of Geopolymer Concrete in Construction of Green BuildingIRJET -  	  Application of Geopolymer Concrete in Construction of Green Building
IRJET - Application of Geopolymer Concrete in Construction of Green Building
 
Indonesia Report
Indonesia ReportIndonesia Report
Indonesia Report
 
Low carbon Transition in the Cement Industry
Low carbon Transition in the Cement IndustryLow carbon Transition in the Cement Industry
Low carbon Transition in the Cement Industry
 
Feb 20 landsmiths and sentinel presentation to haryana government
Feb 20    landsmiths and sentinel presentation to haryana governmentFeb 20    landsmiths and sentinel presentation to haryana government
Feb 20 landsmiths and sentinel presentation to haryana government
 
Minergy Corporate presentation
Minergy Corporate presentationMinergy Corporate presentation
Minergy Corporate presentation
 
INDUSTRIAL SYMBIOSIS.pdf
INDUSTRIAL SYMBIOSIS.pdfINDUSTRIAL SYMBIOSIS.pdf
INDUSTRIAL SYMBIOSIS.pdf
 
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar MuniyasamyHall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
Hall2C Wednesday 11h15 - Dr Sudhakar Muniyasamy
 
Energy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement IndustriesEnergy Efficiency Measures in Cement Industries
Energy Efficiency Measures in Cement Industries
 
Ricardo felipi
Ricardo felipiRicardo felipi
Ricardo felipi
 
APPLICATION OF CLEANER PRODUCTION.pptx
APPLICATION OF CLEANER PRODUCTION.pptxAPPLICATION OF CLEANER PRODUCTION.pptx
APPLICATION OF CLEANER PRODUCTION.pptx
 

Recently uploaded

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 

Eco industrial park

  • 1. Turning Industrial Area into an Eco –Industrial Park: Case study of Harare Presentation by Taurai Mpaso R113641T Supervisor : Eng K Mugwindiri
  • 2. PROBLEM STATEMENT Problems More waste in land fills Money lost in form of waste Extensive use of virgin materials Waste - loss of something valuable that occurs because too much of it is being used or because it is being used in a way that is not necessary or effective (Merriamwebstardictionary.com)
  • 3. Aim •Assessment of Harare industrial sites setup and practices to develop possible industrial symbiosis connections.
  • 4. OBJECTIVES • To identify current eco-related activities • To identify common inputs required, by products, wastes produced and the potential major users of the by-products and waste in the same industries • To identify possible material exchange with the view of improving energy efficiencies, recycling water and materials, waste management and dematerialisation
  • 5. ECO INDUSTRIAL PARKS Resource (Material) Flow in Today’s Society Ideal Resource (Material) Flow
  • 6. CASE STUDY FINDINGS Industrial Composition 30% 12% 10% 32% 16% MANUFACTURING PROCESSING RECYCLING SERVICE CONSTRUCTION Chart Title
  • 7. Current symbiotic practice 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% Never Rarely Often Always The company physically change materials with other companies The company re-use, recycle and reduce waste products and by- products The company sell by products to other company for re-use The company re-use/reuse water
  • 8. Water consumption 35% 41% 24% LESS THAN 2CUBIC METERS MORE THA 2 BUT LESS THAN 7 CUBIC METERS ABOVE 7 CUBIC METERS Waste Generated 63% 17% 20% solid waste fluid effluents other
  • 9. Development of Prototype Due to geographical location of the identified potential members the best type was a Virtual Eco Industrial Park The final model is a combination of two development scenarios, it is a combination of existing organisational relationships and Anchor tenant model. The models take the following assumptions: • Members chosen are willing to participate fully • Technical feasibility • Economic feasibility • Portfolio feasibility
  • 10. Stage one: Baseline Activities Cement industry (Lafarge) Fertiliser and chemical industry (ZimPhos) Power Generation (ZPC) Capacity 450 000 tonnes per annum Current substitute raw material use 0.18% fly ash and 9.6% for brick rubble. Processes 103kg of coal to produce a tonne of cement And this produce a tonne of CO2 Capacity 200 000 tonnes of fertilisers and 65 000 tonnes of phosphoric acid Current outputs Operating at 20% capacity Process 325 000 tonnes of gypsum is produced Deposited in 2 dumps Capacity 50MW of electricity Current 25MW of electricity Process 16 250 tonnes fly ash 4 225 tonnes bottom ash 65 000-81 250 tonnes of coal
  • 11. Stage two •The stage identifies production practices and recycling opportunities that can provide economic and environmental benefits if implemented independently by each member. •For each major player identified possible methods of limiting the pollution impacts of their production methods are proposed.
  • 12. Stage 3: Industrial Symbiosis Key Industry located in Msasa Industry located in Granite site Industry located in Southerton Industry located in Workington Cement industry (Lafarge) Fertiliser and chemical industry (ZimPhos) Power Generation (ZPC) Fly ash 11 250 tonnes Gypsum 13 000 tonnes CSA specification of fly ash Type F : 8% CaO Type CI : 8-20% CaO Type CH : > 20% CaO Road Construction Max 25% mass ratio fly ash Increase fly ash ratio to 2.5% and Gypsum composition To 4% Remaining fly ash Municipal solid waste (fuel in the kiln) Effects of using MSW fuel CO2 emissions reduced avoids landfilling waste reduces methane emissions
  • 13. Industries identified in Harare MSASA GRANITE SITE SOUTHERTON WORKINGTON Lafarge Cement, Feedmix, GMB, Zimphos Multimanufacuring Firtst Plastics Prime Sole Gyproc Delta-Coca cola Art Corporation National Tyre Service PG industries Pro- Plastics Delta-Beer brew Schewpess Hunyani Papers ZLT Cairns Savanna BAT Craster International Cochraine Brown Enginnering Windmill ZFC Turnall CAFCA National Foods Verspak Dairiboard Zimbabwe sugar refinery Unilever Cottco Colcom Zesa thermal power plant
  • 14. Key Industry located in Msasa Industry located in Granite site Industry located in Southerton Industry located in Workington Stage 4: New Members Cement industry (Lafarge) Fertiliser and chemical industry (ZimPhos) Stock feeds (Feedmix) Rubber: Sole manufacturing (Prime Sole) Rubber: tire manufacture (NTS) Construction industry (PG Industries) Paper Milling (Hunyani Holdings) Power Generation (ZPC) Sugar refinery (Star Sugars) Colour codesShapes representation Major Members New Members By product exchange Recycling Fertiliser (Windmill) Fertiliser (Windmill) Food processing (GMB) Phosphoric acid Sulphuric acid Phosphate rock Waste grain Bagasse Calcium carbonate Fly ash Bottom ash Waste tires Road Construction
  • 15. Key Industry located in Msasa Industry located in Granite site Industry located in Southerton Industry located in Workington Stage 5: Combined Symbiosis and Pollution prevention Cement industry (Lafarge) Fertiliser and chemical industry (ZimPhos) Stock feeds (Feedmix)Rubber: Sole manufacturing (Prime Sole) Rubber: tire manufacture (NTS) Construction industry (PG Industries) Paper Milling (Hunyani Holdings) Power Generation (ZPC) Sugar refinery (Star Sugars) Colour codesShapes representation Major Members New Members By product exchange Recycling Fertiliser (Windmill) Fertiliser (ZFC) Food processing (GMB) Phosphoric acid Sulphuric acid Phosphate rock Waste grain Bagasse Calcium carbonate Fly ash Bottom ash Waste tires Metal industry (Craster International) Heavy Vehicles (Barzem) Scrap metal Furniture Clusters Saw dust Shavings Used paper Additional MembersWaste Metal dealer Scrap metal Waste Rubber dealer Used rubber Waste paper dealer CLEVELAND DAM Supplementary water for Msasa water treatment chemicals rubble Road Construction Plaster board Gyproc gypsum Fly ash
  • 16. Recommendations Technological development Members acquire technologies specifically to suit the network formulated Development of administration centres Formulated and financed by members from companies and interested groups Government Intervention 1. Legislation modification 2. Funding initiative 3. Spear heading Project 4. Resuscitation of transport network
  • 17. Conclusion Eco Industrial Parks are the way to go as it will deal with 15%-20% of waste-material that will end up in dumpsites