Planning and Selection of Heavy Construction Equipment in Civil
Engineering
Mr. Nilesh D. Chinchore *, Prof. Pranay R. Khare**
*(Department of Civil Engineering, Savitribai Phule Pune University, Pune, Maharashtra, India.)
** (Department of Civil Engineering, Savitribai Phule Pune University, Pune, Maharashtra, India)
ABSTRACT
Construction equipment planning and selection plays crucial role for the success of construction
firms.Inadequate manual processes of equipmentplanning and selection and the subjective decisions of
equipment managers usually result in major losses in construction firms. An indispensable item of resources, it
produces output at accelerated speed, enables completion of task in limited time. Equipment saves manpower,
which is becoming costly and more demanding day by day. Equipment improves quality, productivity and
safety. Construction equipment planning aims at identifying construction equipment for executing project tasks,
assessing equipment performance capability, forecasting date wise requirement of number and type of
equipment and finally participating in the selection of equipment to be acquired. To derive full benefits from the
equipment, there should be proper selection and good planning of its operations. This paper deals with the
planning and selection procedure for equipment adopted by a company to achieve its objective of timely project
completion.
Keywords - Construction Equipment, Equipment Operation, Planning andSelection, Project Task, Timely
Project Completion
I. INTRODUCTION
The infrastructure development is an important
aspect for the overall development of country. India
is considered as the hub for service industry for
which the infrastructure development plays an
important role. The major problem frequently faced
by contractor in the selection of most suitable
equipment. Under given conditions, one of the
largest elements of investigation of contractor would
be own and operating cost of plant and equipment.
The capital investment on purchase and/or
rental/lease, and operation of the plant and
equipment being very high, it has to be managed so
as to ensure maximum return on investment,
productivity and minimum operating, maintenance
and repair cost. Thus appropriate selection and
planning is essential for successful completion of
project and to secure maximum profit out of it.The
type of equipment selected usually depends upon the
characteristics of material to be handled. Whether to
use wheeled equipment or track equipment; whether
to use dragline excavator or power shovel, are some
of the typical questions that are to be answered by
the planner of construction equipment.
II. PROPER PLANNING
Modern highway construction projects are
complex in nature and success of a project depends
greatly on proper and scientific planning. Before
starting any project its planning is done with great
care, as the efficiency of the whole project largely
depends upon its planning. While planning each and
every detail should be worked out in anticipation and
should be considered carefully. Planning of a
construction project involves deciding aboutthe
extent of mechanization, equipment planning, and
execution planning etc. while planning a highway
project equipment manager should be carefully
decided the extent of mechanization so as to
minimize the cost of project.
III. SELECTION
Proper selection of equipment for a highway
construction project is of vital importance for its
speedy and economical completion. Problem of
equipment selection has become more complicated,
because large variety of equipments are being
manufactured now-a-days. For selection of
equipment, a considerable experience in the
operation and maintenance in the field is essential.
Records kept for operation, maintenance and actual
output obtained under comparable conditions of
previous projects will greatly help in taking decision
for equipment selection. With the undertaking of
new projects and the retirement of old machinery
and equipment, it becomes necessary to acquire new
construction equipment. In this stage, sufficient
knowledge base of current brands and products is
necessary. It is also important to determine what sort
of equipment and capacity is needed.
RESEARCH ARTICLE OPEN ACCESS
Mr. Nilesh D. Chinchore Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29-31
www.ijera.com 30 | P a g e
In fact, selection of equipment for the project is one
of the key decisions in planning and executing a
construction project, which affects how the work
will be done, the time required to complete the work,
and the cost that will be accrued. Generally, an
equipment manager is responsible of selecting the
equipment, whereas it is the responsibility of the
construction planning group to select equipment.
Nevertheless, both the inventory ofequipment in
hand and the standard equipment policy play an
important role in equipment selection. Therefore,
final decision on the equipment required for the
projects is generally given by equipment managers,
project managers, and construction planning group
together. Often, the decision making process can
create tensions in the firm. Once the selection of
equipment is made, a choice has to be made whether
to buy, rent, or lease it. These decisions are given
based on the economic standing and strategy of the
firm, and the nature and frequency of equipment use.
IV. SOURCING INFORMATION
The contractor may decide on the choice of the
manufacture based on its own past experience of
from experience of other. A different kind of
information is needed to be collected before
selecting a particular manufacturer. Trade catalogues
and advertisement in trade journals are important
source of information for evaluation and sourcing of
equipment. The information collected about
equipment should include-
 Name of manufacturer
 Model number
 Engine type, horse power and speed
 Machine dimensions
 Type of controls
 Operating pressure
 Fuel consumption
 Type of transmission
 Weight
 Warranty periods
 Maintenance details etc.
V. COMMON FACTORS AFFECTING
SELECTION OF EQUIPMENT
Every equipment has certain factors those are in
common and which are taken into consideration
while selecting equipment. They are listed as
follows-
 Scope of work to be carried out- since the
first concern is getting the job done, the
time frame within which the work is
required to be carried out, the specification
of work and the methodology adopted will
be of primary concern
 Use of available- for a work where full
utilization of new equipment for its entire
working life is not foreseen and its
utilization on
 Further project is uncertain it may be
desirable to utilize existing old equipment
even though its operation would be
somewhat more expensive. The deprecation
cost of new machine is likely to be high and
this would rise the owing cost of the
machine and consequently unit cost of
work. Economic should be worked out.
 Suitability for job conditions-the equipment
selected should suit the demands of the job
conditions. Climate of region and working
conditions should be kept in view while
selecting the type of equipment.
 Uniformity in type- it is desirable to have
minimum number of types so that there is
uniformity in the type of equipment on a
project. It is desirable to select common
type of engine for different machine such as
excavators, dump trucks, tractor and
scrapers purchased on the projects.
 Size of equipment :- while large size of
machines are capable of giving large
outputs on full load, the cost of production
is usually greater than that of smaller units
if worked out on part loads. Large size of
equipment requires corresponding large
size of matching equipment. And shutting
down of one primary unit may result in
making several other equipment idle.
Transportation and shipment are usually
difficult and expensive. However large
equipment’s are more study and suitable for
tough working conditions. It is also
desirable to have equipment of same size
on the project. If there are standbys the cost
of smaller equipment as standby may be
less that of larger size of equipment.
 Use of standard Equipments :- standard
equipments are commonly manufactured
and are commonly available and are
moderately priced. The spare parts of
standard equipment are easily available and
less expensive. After the work is over, it is
generally easier to dispose of standard
equipment.
 Unit cost production :- the economics is
one of the most important considerations in
selection of equipment. While working out
owing cost all items of expenses, such as
freight, packaging and forwarding,
insurance, erection and commissioning etc.
should be included with the price paid to
supplier.
 Country of origin :- when imports are
unavoidable, it is preferable to import from
Mr. Nilesh D. Chinchore Int. Journal of Engineering Research and Applications www.ijera.com
ISSN : 2248-9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29-31
www.ijera.com 31 | P a g e
a soft currency than from a hard currency
area, if equipment quality is available.
 Availability of spare parts :- Down time for
want of necessary spare parts commonly
accounts for long idle periods during
working life of equipment, especially of
imported equipment. Availability of spare
parts at reasonable cost during the entire
working life should be assured while
selecting a particular type of equipment.
 Versatility – the equipment selected should
be if possible, be capable of performing
more than one function and should have
feature of inter convertibility as far as
possible.
 Selection of manufacturer: - it is desirable
to have equipment of the same
manufacturer on a project as far as possible
and to have minimum number of different
makes of equipment. The quality of local
dealers is also important.
 Suitability of local labor :- available
operators and technicians should be able to
handle selected equipment.
 Technical consideration :- the efficient
performance of any piece of equipment
and its service life are conditioned by
following factors :
a. Strength
b. Rigidity
c. Vibration stability
d. Resistance to wear
e. Heat resistance
f. Reliability
g. Maintainability
A balance between reliability, investment cost and
operating cost should be found since a policy of
selecting the lowest priced equipment can often lead
to higher life cycle costs.
VI. CONCLUSION
Equipment plays an important role in today’s
infrastructure projects as they are more demanding
and highway projects are need to be completed in
stipulated time with best quality. Proper selection
and planning of equipment is very important for
timely completion of project, within plant cost and
for increasing profit, margin. Selection and planning
needs to exercise very seriously as it is one of the
factors that affect the progress of work.
Planning of equipment depends upon nature and
quality of work and time available for
completion.Planning of equipment needs to be done
by a well experienced person, who has got good
exposure of execution of work and who knows the
factors that affect the output of equipment.
Selection is a process in which the equipment that is
most suitable for a particular job is found out. And
decision is made regarding the make of the
equipment to be procured.
REFERENCES
Journal Papers:
[1] Masoud Navazandeh Sajoudi, Mohammadali
Kazerooni Sadi, Arham Abdullah,
Mohammadreza Kasraei, Hoda Rezaie
“EVALUATION OF FACTORS
AFFECTING ON CONSTRUCTION
EQUIPMENT ACQUISITION METHODS
IN MALAYSIA” 2011 International
Conference on Information and Finance
IPEDR vol.21 (2011) © (2011) IACSIT
Press, Singapore
[2] Y.R.Anbhule and Prof. M.B.Kumthekar,
“3D EQUIPMENT MANAGEMENT
SYSTEM FORHIGHWAY
CONSTRUCTION PROJECTS:
CONCEPTUAL DESIGN”. IOSR Journal of
Mechanical and Civil Engineering (IOSR-
JMCE)ISSN: 2278-1684,
Books:
[1] Construction Equipment
Management(2006), “Planning and
Selection of Equipment”, Centre for
Distance Education, NICMAR, Pune.
[2] Deodhar, S. V.(2001), “Construction
Equipment and Job Planning”, Khanna
Publisher, Second Edition.
[3] Singh Jagman, (2001)“Heavy Construction
– Planning, Equipment and Methods”,
Oxford and IBH Publishing Co. Pvt. Ltd.,
SecondEdition.
[4] S.C.Sharma, “Construction Equipment
and its Management”(Delhi, Khanna
Publishers, 2010)
[5] S.Seetharaman, Construction Engineering
and Management(Delhi, Umesh
Publications,2002)
Thesis:
[1] Collecting Construction Equipment Activity
Data from Caltrans Project Records by Justin
Mark Kable B.S. (University of California,
Davis) 2004

More Related Content

What's hot

IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...
IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET Journal
 
Chapter5 technicalanalysis
Chapter5 technicalanalysisChapter5 technicalanalysis
Chapter5 technicalanalysis
AKSHAYA0000
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET Journal
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET Journal
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET Journal
 
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Moustafa Ismail Abu Dief
 
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET Journal
 
Overall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesOverall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industries
IAEME Publication
 
Profiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyProfiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technology
Liu PeiLing
 
FACILITY PLANNING
FACILITY PLANNINGFACILITY PLANNING
FACILITY PLANNING
Endashaw Yohannes Hailu
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
Mahibur Rahman
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
IRJET Journal
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction Management
IRJET Journal
 
062 Logistics & Productivity PART 1
062  Logistics & Productivity PART 1062  Logistics & Productivity PART 1
062 Logistics & Productivity PART 1
Dr Fereidoun Dejahang
 
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
IJAEMSJORNAL
 
Apprisal of Loan proposal
Apprisal of Loan proposal Apprisal of Loan proposal
Apprisal of Loan proposal
Md Abdullah Al Mamun
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET Journal
 

What's hot (20)

IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...
IRJET- A Study and Analysis of Construction Equipment Management used in ...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
Chapter5 technicalanalysis
Chapter5 technicalanalysisChapter5 technicalanalysis
Chapter5 technicalanalysis
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
IRJET- Controlling and Monitoring the Construction Projects by using Earned V...
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
 
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4Ss ccp course cost engineering management  training- 2017 - moustafa  ch  1-4
Ss ccp course cost engineering management training- 2017 - moustafa ch 1-4
 
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
IRJET- Literature Review on Hauling Equipment Productivity using Cycle Time C...
 
Overall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesOverall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industries
 
Profiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyProfiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technology
 
FACILITY PLANNING
FACILITY PLANNINGFACILITY PLANNING
FACILITY PLANNING
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
 
IRJET- Optimization in Construction Management
IRJET-  	  Optimization in Construction ManagementIRJET-  	  Optimization in Construction Management
IRJET- Optimization in Construction Management
 
062 Logistics & Productivity PART 1
062  Logistics & Productivity PART 1062  Logistics & Productivity PART 1
062 Logistics & Productivity PART 1
 
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
A Computerized System for Managing Con-struction Materials for Gaza Strip Bui...
 
Apprisal of Loan proposal
Apprisal of Loan proposal Apprisal of Loan proposal
Apprisal of Loan proposal
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
 

Viewers also liked

Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...
Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...
Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...
IJERA Editor
 
Epicresearch daily derivatives market report on 16 january 2015
Epicresearch daily derivatives market report on 16 january 2015Epicresearch daily derivatives market report on 16 january 2015
Epicresearch daily derivatives market report on 16 january 2015
Epic Research Limited
 
Where Have We Been & Where Are We Going?
Where Have We Been & Where Are We Going?Where Have We Been & Where Are We Going?
Where Have We Been & Where Are We Going?
Philip Bourne
 
Text Mining: (Asynchronous Sequences)
Text Mining: (Asynchronous Sequences)Text Mining: (Asynchronous Sequences)
Text Mining: (Asynchronous Sequences)
IJERA Editor
 
Anagnorisi diaforetikotitas final
Anagnorisi diaforetikotitas finalAnagnorisi diaforetikotitas final
Anagnorisi diaforetikotitas finalMaria Michali
 
Опыт стратегического управления ИБ
Опыт стратегического управления ИБОпыт стратегического управления ИБ
Опыт стратегического управления ИБ
Infor-media
 
S T U D Y O F G I T A D R
S T U D Y  O F  G I T A  D RS T U D Y  O F  G I T A  D R
S T U D Y O F G I T A D R
drsolapurkar
 
Vemma Viet Nam Hai Nguyen 0915344612
Vemma Viet Nam    Hai Nguyen 0915344612Vemma Viet Nam    Hai Nguyen 0915344612
Vemma Viet Nam Hai Nguyen 0915344612
Vemma QuangNam
 
Sk rpt matematik tahun 3 by wahyu hidayat
Sk rpt matematik tahun 3 by wahyu hidayatSk rpt matematik tahun 3 by wahyu hidayat
Sk rpt matematik tahun 3 by wahyu hidayat
izz_zafran
 
無題 1
無題 1無題 1
無題 1
footballmax
 
The Minimum Total Heating Lander By The Maximum Principle Pontryagin
The Minimum Total Heating Lander By The Maximum Principle PontryaginThe Minimum Total Heating Lander By The Maximum Principle Pontryagin
The Minimum Total Heating Lander By The Maximum Principle Pontryagin
IJERA Editor
 
Risensi Buku
Risensi Buku Risensi Buku
Risensi Buku
Azie Rahman
 
о внесении изменений в постановление
о внесении изменений в постановлениео внесении изменений в постановление
о внесении изменений в постановление
patriot29
 
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
IJERA Editor
 
A Literature Review on Organizational Commitment – A Comprehensive Summary
A Literature Review on Organizational Commitment – A Comprehensive SummaryA Literature Review on Organizational Commitment – A Comprehensive Summary
A Literature Review on Organizational Commitment – A Comprehensive Summary
IJERA Editor
 
Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...
Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...
Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...
IJERA Editor
 
Litvanya ulke raporu_2013
Litvanya ulke raporu_2013Litvanya ulke raporu_2013
Litvanya ulke raporu_2013
UlkeRaporlari2013
 

Viewers also liked (20)

Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...
Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...
Segmentation and Classification of Brain MRI Images Using Improved Logismos-B...
 
Epicresearch daily derivatives market report on 16 january 2015
Epicresearch daily derivatives market report on 16 january 2015Epicresearch daily derivatives market report on 16 january 2015
Epicresearch daily derivatives market report on 16 january 2015
 
Kdj15
Kdj15Kdj15
Kdj15
 
Where Have We Been & Where Are We Going?
Where Have We Been & Where Are We Going?Where Have We Been & Where Are We Going?
Where Have We Been & Where Are We Going?
 
Text Mining: (Asynchronous Sequences)
Text Mining: (Asynchronous Sequences)Text Mining: (Asynchronous Sequences)
Text Mining: (Asynchronous Sequences)
 
Anagnorisi diaforetikotitas final
Anagnorisi diaforetikotitas finalAnagnorisi diaforetikotitas final
Anagnorisi diaforetikotitas final
 
Опыт стратегического управления ИБ
Опыт стратегического управления ИБОпыт стратегического управления ИБ
Опыт стратегического управления ИБ
 
S T U D Y O F G I T A D R
S T U D Y  O F  G I T A  D RS T U D Y  O F  G I T A  D R
S T U D Y O F G I T A D R
 
Vemma Viet Nam Hai Nguyen 0915344612
Vemma Viet Nam    Hai Nguyen 0915344612Vemma Viet Nam    Hai Nguyen 0915344612
Vemma Viet Nam Hai Nguyen 0915344612
 
Sk rpt matematik tahun 3 by wahyu hidayat
Sk rpt matematik tahun 3 by wahyu hidayatSk rpt matematik tahun 3 by wahyu hidayat
Sk rpt matematik tahun 3 by wahyu hidayat
 
無題 1
無題 1無題 1
無題 1
 
The Minimum Total Heating Lander By The Maximum Principle Pontryagin
The Minimum Total Heating Lander By The Maximum Principle PontryaginThe Minimum Total Heating Lander By The Maximum Principle Pontryagin
The Minimum Total Heating Lander By The Maximum Principle Pontryagin
 
Risensi Buku
Risensi Buku Risensi Buku
Risensi Buku
 
о внесении изменений в постановление
о внесении изменений в постановлениео внесении изменений в постановление
о внесении изменений в постановление
 
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
 
14_10_2014
14_10_201414_10_2014
14_10_2014
 
A Literature Review on Organizational Commitment – A Comprehensive Summary
A Literature Review on Organizational Commitment – A Comprehensive SummaryA Literature Review on Organizational Commitment – A Comprehensive Summary
A Literature Review on Organizational Commitment – A Comprehensive Summary
 
Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...
Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...
Intrusion Detection and Countermeasure in Virtual Network Systems Using NICE ...
 
Litvanya ulke raporu_2013
Litvanya ulke raporu_2013Litvanya ulke raporu_2013
Litvanya ulke raporu_2013
 
Budapest Transcript
Budapest TranscriptBudapest Transcript
Budapest Transcript
 

Similar to Planning and Selection of Heavy Construction Equipment in Civil Engineering

Unit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdfUnit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdf
D. Y. Patil College of Engineering & Technology, Kolhapur, Maharastra, India
 
Construction Equipment used in construction projects
Construction Equipment used in construction projectsConstruction Equipment used in construction projects
Construction Equipment used in construction projects
D. Y. Patil College of Engineering & Technology, Kolhapur, Maharastra, India
 
Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction Project
IRJET Journal
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptx
megha desai
 
CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptx
megha desai
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
kriti201
 
cme-161001164236.pdf
cme-161001164236.pdfcme-161001164236.pdf
cme-161001164236.pdf
AtulBorse3
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
GAURAV. H .TANDON
 
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
Shree Swami atmanand saraswati inst. of technology, surat
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
narayanch1979
 
H0341034041
H0341034041H0341034041
H0341034041
inventionjournals
 
Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysis
anshagrawal2121
 
The Cost of Injection Molding Machines.pptx
The Cost of Injection Molding Machines.pptxThe Cost of Injection Molding Machines.pptx
The Cost of Injection Molding Machines.pptx
yantonginjection2021
 
Techno delacruz report
Techno delacruz reportTechno delacruz report
Techno delacruz report
Arvin Dela Cruz
 
Introduction to machine design |1st unit|
Introduction to machine design |1st unit|Introduction to machine design |1st unit|
Introduction to machine design |1st unit|
divakar kumar Choudhary
 
Unit V- Equipment Management.pptx
Unit V- Equipment Management.pptxUnit V- Equipment Management.pptx
Unit V- Equipment Management.pptx
PranavDevale2
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
Raghavendra Rachamadugu
 
Plant location and layout in any industry
Plant location and layout in any industryPlant location and layout in any industry
Plant location and layout in any industry
Mehran University of Engineering and Technology Jamshoro
 
vertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfvertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdf
INDRAKUMARPADWANI1
 
Technical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsTechnical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjs
MeghaSingh506383
 

Similar to Planning and Selection of Heavy Construction Equipment in Civil Engineering (20)

Unit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdfUnit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdf
 
Construction Equipment used in construction projects
Construction Equipment used in construction projectsConstruction Equipment used in construction projects
Construction Equipment used in construction projects
 
Selection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction ProjectSelection Criteria of Equipment in Construction Project
Selection Criteria of Equipment in Construction Project
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptx
 
CL 380_Unit-1.pptx
CL 380_Unit-1.pptxCL 380_Unit-1.pptx
CL 380_Unit-1.pptx
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
 
cme-161001164236.pdf
cme-161001164236.pdfcme-161001164236.pdf
cme-161001164236.pdf
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
 
H0341034041
H0341034041H0341034041
H0341034041
 
Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysis
 
The Cost of Injection Molding Machines.pptx
The Cost of Injection Molding Machines.pptxThe Cost of Injection Molding Machines.pptx
The Cost of Injection Molding Machines.pptx
 
Techno delacruz report
Techno delacruz reportTechno delacruz report
Techno delacruz report
 
Introduction to machine design |1st unit|
Introduction to machine design |1st unit|Introduction to machine design |1st unit|
Introduction to machine design |1st unit|
 
Unit V- Equipment Management.pptx
Unit V- Equipment Management.pptxUnit V- Equipment Management.pptx
Unit V- Equipment Management.pptx
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Plant location and layout in any industry
Plant location and layout in any industryPlant location and layout in any industry
Plant location and layout in any industry
 
vertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdfvertical screw drive lifting mechanism.pdf
vertical screw drive lifting mechanism.pdf
 
Technical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsTechnical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjs
 

Recently uploaded

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 

Recently uploaded (20)

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 

Planning and Selection of Heavy Construction Equipment in Civil Engineering

  • 1. Mr. Nilesh D. Chinchore Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29-31 www.ijera.com 29 | P a g e Planning and Selection of Heavy Construction Equipment in Civil Engineering Mr. Nilesh D. Chinchore *, Prof. Pranay R. Khare** *(Department of Civil Engineering, Savitribai Phule Pune University, Pune, Maharashtra, India.) ** (Department of Civil Engineering, Savitribai Phule Pune University, Pune, Maharashtra, India) ABSTRACT Construction equipment planning and selection plays crucial role for the success of construction firms.Inadequate manual processes of equipmentplanning and selection and the subjective decisions of equipment managers usually result in major losses in construction firms. An indispensable item of resources, it produces output at accelerated speed, enables completion of task in limited time. Equipment saves manpower, which is becoming costly and more demanding day by day. Equipment improves quality, productivity and safety. Construction equipment planning aims at identifying construction equipment for executing project tasks, assessing equipment performance capability, forecasting date wise requirement of number and type of equipment and finally participating in the selection of equipment to be acquired. To derive full benefits from the equipment, there should be proper selection and good planning of its operations. This paper deals with the planning and selection procedure for equipment adopted by a company to achieve its objective of timely project completion. Keywords - Construction Equipment, Equipment Operation, Planning andSelection, Project Task, Timely Project Completion I. INTRODUCTION The infrastructure development is an important aspect for the overall development of country. India is considered as the hub for service industry for which the infrastructure development plays an important role. The major problem frequently faced by contractor in the selection of most suitable equipment. Under given conditions, one of the largest elements of investigation of contractor would be own and operating cost of plant and equipment. The capital investment on purchase and/or rental/lease, and operation of the plant and equipment being very high, it has to be managed so as to ensure maximum return on investment, productivity and minimum operating, maintenance and repair cost. Thus appropriate selection and planning is essential for successful completion of project and to secure maximum profit out of it.The type of equipment selected usually depends upon the characteristics of material to be handled. Whether to use wheeled equipment or track equipment; whether to use dragline excavator or power shovel, are some of the typical questions that are to be answered by the planner of construction equipment. II. PROPER PLANNING Modern highway construction projects are complex in nature and success of a project depends greatly on proper and scientific planning. Before starting any project its planning is done with great care, as the efficiency of the whole project largely depends upon its planning. While planning each and every detail should be worked out in anticipation and should be considered carefully. Planning of a construction project involves deciding aboutthe extent of mechanization, equipment planning, and execution planning etc. while planning a highway project equipment manager should be carefully decided the extent of mechanization so as to minimize the cost of project. III. SELECTION Proper selection of equipment for a highway construction project is of vital importance for its speedy and economical completion. Problem of equipment selection has become more complicated, because large variety of equipments are being manufactured now-a-days. For selection of equipment, a considerable experience in the operation and maintenance in the field is essential. Records kept for operation, maintenance and actual output obtained under comparable conditions of previous projects will greatly help in taking decision for equipment selection. With the undertaking of new projects and the retirement of old machinery and equipment, it becomes necessary to acquire new construction equipment. In this stage, sufficient knowledge base of current brands and products is necessary. It is also important to determine what sort of equipment and capacity is needed. RESEARCH ARTICLE OPEN ACCESS
  • 2. Mr. Nilesh D. Chinchore Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29-31 www.ijera.com 30 | P a g e In fact, selection of equipment for the project is one of the key decisions in planning and executing a construction project, which affects how the work will be done, the time required to complete the work, and the cost that will be accrued. Generally, an equipment manager is responsible of selecting the equipment, whereas it is the responsibility of the construction planning group to select equipment. Nevertheless, both the inventory ofequipment in hand and the standard equipment policy play an important role in equipment selection. Therefore, final decision on the equipment required for the projects is generally given by equipment managers, project managers, and construction planning group together. Often, the decision making process can create tensions in the firm. Once the selection of equipment is made, a choice has to be made whether to buy, rent, or lease it. These decisions are given based on the economic standing and strategy of the firm, and the nature and frequency of equipment use. IV. SOURCING INFORMATION The contractor may decide on the choice of the manufacture based on its own past experience of from experience of other. A different kind of information is needed to be collected before selecting a particular manufacturer. Trade catalogues and advertisement in trade journals are important source of information for evaluation and sourcing of equipment. The information collected about equipment should include-  Name of manufacturer  Model number  Engine type, horse power and speed  Machine dimensions  Type of controls  Operating pressure  Fuel consumption  Type of transmission  Weight  Warranty periods  Maintenance details etc. V. COMMON FACTORS AFFECTING SELECTION OF EQUIPMENT Every equipment has certain factors those are in common and which are taken into consideration while selecting equipment. They are listed as follows-  Scope of work to be carried out- since the first concern is getting the job done, the time frame within which the work is required to be carried out, the specification of work and the methodology adopted will be of primary concern  Use of available- for a work where full utilization of new equipment for its entire working life is not foreseen and its utilization on  Further project is uncertain it may be desirable to utilize existing old equipment even though its operation would be somewhat more expensive. The deprecation cost of new machine is likely to be high and this would rise the owing cost of the machine and consequently unit cost of work. Economic should be worked out.  Suitability for job conditions-the equipment selected should suit the demands of the job conditions. Climate of region and working conditions should be kept in view while selecting the type of equipment.  Uniformity in type- it is desirable to have minimum number of types so that there is uniformity in the type of equipment on a project. It is desirable to select common type of engine for different machine such as excavators, dump trucks, tractor and scrapers purchased on the projects.  Size of equipment :- while large size of machines are capable of giving large outputs on full load, the cost of production is usually greater than that of smaller units if worked out on part loads. Large size of equipment requires corresponding large size of matching equipment. And shutting down of one primary unit may result in making several other equipment idle. Transportation and shipment are usually difficult and expensive. However large equipment’s are more study and suitable for tough working conditions. It is also desirable to have equipment of same size on the project. If there are standbys the cost of smaller equipment as standby may be less that of larger size of equipment.  Use of standard Equipments :- standard equipments are commonly manufactured and are commonly available and are moderately priced. The spare parts of standard equipment are easily available and less expensive. After the work is over, it is generally easier to dispose of standard equipment.  Unit cost production :- the economics is one of the most important considerations in selection of equipment. While working out owing cost all items of expenses, such as freight, packaging and forwarding, insurance, erection and commissioning etc. should be included with the price paid to supplier.  Country of origin :- when imports are unavoidable, it is preferable to import from
  • 3. Mr. Nilesh D. Chinchore Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29-31 www.ijera.com 31 | P a g e a soft currency than from a hard currency area, if equipment quality is available.  Availability of spare parts :- Down time for want of necessary spare parts commonly accounts for long idle periods during working life of equipment, especially of imported equipment. Availability of spare parts at reasonable cost during the entire working life should be assured while selecting a particular type of equipment.  Versatility – the equipment selected should be if possible, be capable of performing more than one function and should have feature of inter convertibility as far as possible.  Selection of manufacturer: - it is desirable to have equipment of the same manufacturer on a project as far as possible and to have minimum number of different makes of equipment. The quality of local dealers is also important.  Suitability of local labor :- available operators and technicians should be able to handle selected equipment.  Technical consideration :- the efficient performance of any piece of equipment and its service life are conditioned by following factors : a. Strength b. Rigidity c. Vibration stability d. Resistance to wear e. Heat resistance f. Reliability g. Maintainability A balance between reliability, investment cost and operating cost should be found since a policy of selecting the lowest priced equipment can often lead to higher life cycle costs. VI. CONCLUSION Equipment plays an important role in today’s infrastructure projects as they are more demanding and highway projects are need to be completed in stipulated time with best quality. Proper selection and planning of equipment is very important for timely completion of project, within plant cost and for increasing profit, margin. Selection and planning needs to exercise very seriously as it is one of the factors that affect the progress of work. Planning of equipment depends upon nature and quality of work and time available for completion.Planning of equipment needs to be done by a well experienced person, who has got good exposure of execution of work and who knows the factors that affect the output of equipment. Selection is a process in which the equipment that is most suitable for a particular job is found out. And decision is made regarding the make of the equipment to be procured. REFERENCES Journal Papers: [1] Masoud Navazandeh Sajoudi, Mohammadali Kazerooni Sadi, Arham Abdullah, Mohammadreza Kasraei, Hoda Rezaie “EVALUATION OF FACTORS AFFECTING ON CONSTRUCTION EQUIPMENT ACQUISITION METHODS IN MALAYSIA” 2011 International Conference on Information and Finance IPEDR vol.21 (2011) © (2011) IACSIT Press, Singapore [2] Y.R.Anbhule and Prof. M.B.Kumthekar, “3D EQUIPMENT MANAGEMENT SYSTEM FORHIGHWAY CONSTRUCTION PROJECTS: CONCEPTUAL DESIGN”. IOSR Journal of Mechanical and Civil Engineering (IOSR- JMCE)ISSN: 2278-1684, Books: [1] Construction Equipment Management(2006), “Planning and Selection of Equipment”, Centre for Distance Education, NICMAR, Pune. [2] Deodhar, S. V.(2001), “Construction Equipment and Job Planning”, Khanna Publisher, Second Edition. [3] Singh Jagman, (2001)“Heavy Construction – Planning, Equipment and Methods”, Oxford and IBH Publishing Co. Pvt. Ltd., SecondEdition. [4] S.C.Sharma, “Construction Equipment and its Management”(Delhi, Khanna Publishers, 2010) [5] S.Seetharaman, Construction Engineering and Management(Delhi, Umesh Publications,2002) Thesis: [1] Collecting Construction Equipment Activity Data from Caltrans Project Records by Justin Mark Kable B.S. (University of California, Davis) 2004