Dynamics NAV
Vertical Solutions

Craig Keenan & Ian Barker
31 October 2012
Our Agenda

    Why use industry vertical solutions?
    Intergen’s “kit-bag”
           Advanced Job Management
           MarketPlace
           Asset Maintenance
           ZetaDocs
           Advanced Budgeting
           Others…in brief
Your presenters



 Craig Keenan                                      Ian Barker
 Dynamics Practice Lead – Western Australia        Consultant – Western Australia

       12 years, 60+ implementations                 6 years supporting, implementing, and
       BA, solution lead, project manager             selling NAV

       Focus on businesses that sell services &      At Intergen for 1 year taking a Solution
        deliver projects                               Lead role




Dynamics NAV Vertical Solutions
Business Challenges
                                                         Vertical
             Client               ROI & TCO                                  Agile            Collaborative
                                                          Market
              Pull                 Pressure                                Adaptation           Execution
                                                       Specialisation




                                                                                    Delivering anytime,
          Meeting industry-specific           Ensuring minimal customisation
                                                                                anywhere access to data and
               requirements                       and effective upgrades
                                                                                            tools




Dynamics NAV Vertical Solutions
Business & Industry Challenges
                                                        Vertical
             Client               ROI & TCO                                  Agile            Collaborative
                                                         Market
              Pull                 Pressure                                Adaptation          Execution
                                                      Specialisation




                                                                                    Delivering anytime,
          Meeting industry-specific           Ensuring minimal customization
                                                                                anywhere access to data and
               requirements                       and effective upgrades
                                                                                            tools




Dynamics NAV Vertical Solutions
Dynamics NAV Industry focus




                                  Wholesale/     Projects &
         Manufacturing                                        Public Sector   Retail
                                  Distribution    Service
                                                                                       Other


         Financial Management Reporting and Business Intelligence Supply Chain Management
         Sales and MarketingHuman Resources Management Interoperability and Productivity




Dynamics NAV Vertical Solutions
Advanced Jobs Mngt.
            +
Advanced Jobs Management
A snapshot…
 For                              Project & job based businesses
 Needing to                       • Use complex work breakdown structures
                                  • Hold multiple budget sets per project
                                  • Plan & assign resources
                                  • Plan, procure & consume items
                                  • Calculate estimate to complete or forecast position
 Vendor                           To-Increase (Inner Circle member for 4 consecutive years)
 Adoption                         CfMD, 150+ sites worldwide
 Customers




Dynamics NAV Vertical Solutions
Pain Points
                                       CoA segment used
                                                                       Single budget/no %
                                       for jobs bloating the
                                                                         complete details
                                          GL account list
                                                                      preventing profitability
                                                                           forecasting



             Difficulty interpreting
              transactional data
             resulting in after the                                              Missing functionality forcing
                   event views                                                      manual intervention
                                                                                  (e.g. pricing rules, dept. revenue
                                                                                recog., system managed approvals)




             Project managers bypassing the                     Limited support &
               system resulting in duplicate                   product development
               data entry, limited visibility &                  creating future-
                dependence on individuals                       proofing concerns




Dynamics NAV Vertical Solutions
Pain Points
                                       CoA segment used
                                                                       Single budget/no %
                                       for jobs bloating the
                                                                         complete details
                                          GL account list
                                                                      preventing profitability
                                                                           forecasting



             Difficulty interpreting
              transactional data
             resulting in after the                                              Missing functionality forcing
                   event views                                                      manual intervention
                                                                                  (e.g. pricing rules, dept. revenue
                                                                                recog., system managed approvals)




             Project managers bypassing the                     Limited support &
               system resulting in duplicate                   product development
               data entry, limited visibility &                  creating future-
                dependence on individuals                       proofing concerns




Dynamics NAV Vertical Solutions
Advanced Jobs Management




  Jobs with WBS          Resource     Integrated      Real-Time      Est. to Complete   System Managed     Graphical
                         Planning    Procurement   Financial Views                          Approvals    Visualisations



                                  Advanced Jobs Management




Dynamics NAV Vertical Solutions
Jobs with WBS          Resource    Integrated      Real-Time      Est. to Complete   System Managed     Graphical
                         Planning   Procurement   Financial Views                         Approvals     Visualisations




Dynamics NAV Vertical Solutions
Jobs with WBS          Resource                 Integrated      Real-Time      Est. to Complete   System Managed     Graphical
                         Planning                Procurement   Financial Views                         Approvals     Visualisations




                          Preferred vendor arrangements held
                          on item card




Dynamics NAV Vertical Solutions
Jobs with WBS          Resource    Integrated      Real-Time      Est. to Complete   System Managed        Graphical
                         Planning   Procurement   Financial Views                         Approvals        Visualisations




                                                                                                        Profitability

Revenue



Budget/actual costs                                                                                     Forecast costs




Summary by cost type,
drill-down




People & machine
labour quantity



Open PO summary –
not receipted, receipted
Dynamics NAV Vertical Solutions
not invoiced
Jobs with WBS          Resource    Integrated      Real-Time      Est. to Complete   System Managed     Graphical
                         Planning   Procurement   Financial Views                         Approvals     Visualisations




Dynamics NAV Vertical Solutions
Jobs with WBS          Resource    Integrated      Real-Time      Est. to Complete   System Managed     Graphical
                         Planning   Procurement   Financial Views                         Approvals     Visualisations




Dynamics NAV Vertical Solutions
MarketPlace
MarketPlace
 A snapshot
 For                              Integrated E-Commerce Solution (B2B, B2C, Internal Portal)
 Needing to                       • CMS
                                  • Integration between web and NAV
                                  • E-Commerce functionality
                                  • Provide online customer self-service
                                  • Out of the box sales management integration
 Vendor                           GearsERP
 Adoption                         Based on Kentico – 15,000+ web sites worldwide
 Customers




Dynamics NAV Vertical Solutions
MarketPlace
 Real-Time NAV Integrated E-Commerce




                         Web Front   NAV and      Customisable   B2B/B2C   Mobile Friendly
                           End       The Web



                                               MarketPlace




Dynamics NAV Vertical Solutions
Web Front   NAV and      Customisable   B2B/B2C   Mobile Friendly
                           End       The Web




                                               MarketPlace

Dynamics NAV Vertical Solutions
Web Front   NAV and      Customisable   B2B/B2C   Mobile Friendly
                           End       The Web




                                               MarketPlace

Dynamics NAV Vertical Solutions
Web Front   NAV and      Customisable   B2B/B2C   Mobile Friendly
                           End       The Web




                                               MarketPlace

Dynamics NAV Vertical Solutions
Web Front   NAV and      Customisable   B2B/B2C   Mobile Friendly
                           End       The Web




                                               MarketPlace

Dynamics NAV Vertical Solutions
Asset Maintenance
Asset Maintenance
 A snapshot
 For                              Equipment requiring reactive and preventative maintenance

 Needing to                       • Build parent, child, sub-assembly, component structures
                                  • Create and document work requests and work orders
                                  • Attach work instructions and relevant documentation
                                  • Create scheduled maintenance program
                                  • Analyse cost trends over a specific period
 Vendor                           Tectura
 Adoption                         CfMD
 Customers                        Mechanised Mining Solutions




Dynamics NAV Vertical Solutions
Asset Maintenance
 Maintenance Schedules & Problem Rapid Response




           Detailed Data          Work Requests   Work Instructions   Maintenance     Backlog    Costing
                                   And Orders     And Attachments     Procedures    Management



                                              Asset Maintenance




Dynamics NAV Vertical Solutions
Detailed Data          Work Requests   Work Instructions   Maintenance     Backlog    Costing
                                   And Orders     And Attachments     Procedures    Management




                                              Asset Maintenance

Dynamics NAV Vertical Solutions
Detailed Data          Work Requests   Work Instructions   Maintenance     Backlog    Costing
                                   And Orders     And Attachments     Procedures    Management




                                              Asset Maintenance

Dynamics NAV Vertical Solutions
Detailed Data          Work Requests   Work Instructions   Maintenance     Backlog    Costing
                                   And Orders     And Attachments     Procedures    Management




                                              Asset Maintenance

Dynamics NAV Vertical Solutions
Detailed Data          Work Requests   Work Instructions   Maintenance     Backlog    Costing
                                   And Orders     And Attachments     Procedures    Management




                                              Asset Maintenance

Dynamics NAV Vertical Solutions
Detailed Data          Work Requests   Work Instructions   Maintenance     Backlog    Costing
                                   And Orders     And Attachments     Procedures    Management




                                              Asset Maintenance

Dynamics NAV Vertical Solutions
Zetadocs Document
Page with full                    Management
picture and
some text




Dynamics NAV Vertical Solutions
Zetadocs for NAV
 A snapshot
 For                              Electronic Document Management

 Vendor                           Equisys
 Adoption                         CfMD
 Needing to                       • Automate the sending and storage of documents
                                  •
                                  • Save on stationary, postage, and storage costs
                                  • Improve customer service by helping your finance, sales and
                                    customer services teams respond more quickly to enquiries
                                  • Helps achieve sustainability targets




Dynamics NAV Vertical Solutions
Zetadocs
 The problem with paper




                          NAV
                          user




Dynamics NAV Vertical Solutions
Zetadocs
 The problem with paper




                          NAV
                          user




Dynamics NAV Vertical Solutions
Zetadocs
 How it works
                                                      Link




                            Email, fax          SharePoint   NAV

                                         NAV
                                         user


                                  MFP            Zetadocs Express &
                                                Zetadocs for NAV users


Dynamics NAV Vertical Solutions
Zetadocs
 Supplier Invoicing Scenario




                                  NAV    SharePoint   NAV
                                  user




Dynamics NAV Vertical Solutions
Advanced Budgets
Advanced Budgets
A snapshot…
 For                              Distributed budgeting using NAV functionality
 Needing to                       • Adopt GL and dimension structures (also apply for security)
                                  • Copy previous budget or actuals as starting point
                                  • Use spreading or calculation rules to insert values
                                  • Apply system managed workflow & approvals
 Vendor                           Intergen
 Adoption                         Version 1 ready for release




Dynamics NAV Vertical Solutions
Advanced Budgets
                                      Use Excel meaning
                                      duplicate data entry           Licensing costs limit the
                                        & exposure to                number of contributors
                                         formula error                  with access to the
                                                                         budgeting tool



              Roll-up reporting
            difficult impacting the
                 ability to view                                                   Required calculations/
             consolidated/input                         Pain                    compilation are not supported
                   set results
                                                       Points                    (e.g. spread methods, allocations,
                                                                                   calculation inputs & formulas)




                     Compromised usability &                    System managed
                       accessibility inhibits                workflow & approvals
                        regular updates/                        are not supported
                          reforecasting                       resulting dependence
                                                                  on individuals




Dynamics NAV Vertical Solutions
Advanced Budgets
                                      Use Excel meaning
                                      duplicate data entry           Licensing costs limit the
                                        & exposure to                number of contributors
                                         formula error                  with access to the
                                                                         budgeting tool



              Roll-up reporting
            difficult impacting the
                 ability to view                                                     Required calculations/
             consolidated/input                         Pain                          relationships are not
                                                                                            supported
                   set results
                                                       Points                    (e.g. spread methods, allocations,
                                                                                   calculation inputs & formulas)




                     Compromised usability &                    System managed
                       accessibility inhibits                workflow & approvals
                        regular updates/                        are not supported
                          reforecasting                       resulting dependence
                                                                  on individuals




Dynamics NAV Vertical Solutions
Advanced Budgets




   Contributor            Budget    Formula/      Fixed Asset   Advanced      System Managed   Version 2
   Assignment              Entry   Calculations   Integration   Allocations       Approvals



                                    Advanced Budgets




Dynamics NAV Vertical Solutions
Contributor            Budget    Formula/      Fixed Asset   Advanced      System Managed   Version 2
   Assignment              Entry   Calculations   Integration   Allocations      Approvals




Dynamics NAV Vertical Solutions
Contributor            Budget    Formula/      Fixed Asset   Advanced      System Managed   Version 2
   Assignment              Entry   Calculations   Integration   Allocations      Approvals




Dynamics NAV Vertical Solutions
Contributor            Budget    Formula/      Fixed Asset   Advanced      System Managed   Version 2
   Assignment              Entry   Calculations   Integration   Allocations      Approvals




Dynamics NAV Vertical Solutions
Contributor            Budget    Formula/      Fixed Asset         Advanced      System Managed   Version 2
   Assignment              Entry   Calculations   Integration         Allocations      Approvals




                                                                Sales budget integration


                                                                Foreign currency budgets


                                                                 Budget consolidation


                                                                         Notes


                                                     Budget Administrator enhancements




Dynamics NAV Vertical Solutions
Others…in brief

 Document Capture                  Akeyto    Automated data entry (OCR), purchase approval/workflow (Web)

 Dynamics Anywhere                Dynamics   Integrated mobility solution
                                  Anywhere
 Allocations                      Intergen   Identify source & target accounts, apply static & variable
                                             allocation rules, allocate budget & actual values
 Recurring invoices               Intergen   Sales invoice template & billing frequency/period rules

 EFT                               Tectura   Electronic funds transfer & e-mailing of remittance advices

 Auto bank rec                     Tectura   Import bank file & auto-match transactions

 AgilesWorkflow                    Agiles    Integrated workflow solution

 Dynamics NAV                     Intergen   Various usability & functionality enhancements
 Extensions




Dynamics NAV Vertical Solutions
Vertical Solutions
In a nutshell…
■ Used to provide extended or niche functionality
■ The use of ISV/3rd party providers is a Microsoft strategy
■ Assess maturity based on adoption/references and CfMD
■ Perpetual licensing model & SharePoint/Web clients will provide
  opportunities to extend outside the core user group




Dynamics NAV Vertical Solutions
Any questions?
Do you want to
know more?


Find us in the
Experience Lounge
at the end of this
presentation.
Thank you
Dynamics Day 2012: Dynamics NAV Vertical Solutions

Dynamics Day 2012: Dynamics NAV Vertical Solutions

  • 1.
    Dynamics NAV Vertical Solutions CraigKeenan & Ian Barker 31 October 2012
  • 2.
    Our Agenda Why use industry vertical solutions? Intergen’s “kit-bag” Advanced Job Management MarketPlace Asset Maintenance ZetaDocs Advanced Budgeting Others…in brief
  • 3.
    Your presenters CraigKeenan Ian Barker Dynamics Practice Lead – Western Australia Consultant – Western Australia  12 years, 60+ implementations  6 years supporting, implementing, and  BA, solution lead, project manager selling NAV  Focus on businesses that sell services &  At Intergen for 1 year taking a Solution deliver projects Lead role Dynamics NAV Vertical Solutions
  • 4.
    Business Challenges Vertical Client ROI & TCO Agile Collaborative Market Pull Pressure Adaptation Execution Specialisation Delivering anytime, Meeting industry-specific Ensuring minimal customisation anywhere access to data and requirements and effective upgrades tools Dynamics NAV Vertical Solutions
  • 5.
    Business & IndustryChallenges Vertical Client ROI & TCO Agile Collaborative Market Pull Pressure Adaptation Execution Specialisation Delivering anytime, Meeting industry-specific Ensuring minimal customization anywhere access to data and requirements and effective upgrades tools Dynamics NAV Vertical Solutions
  • 6.
    Dynamics NAV Industryfocus Wholesale/ Projects & Manufacturing Public Sector Retail Distribution Service Other Financial Management Reporting and Business Intelligence Supply Chain Management Sales and MarketingHuman Resources Management Interoperability and Productivity Dynamics NAV Vertical Solutions
  • 7.
  • 8.
    Advanced Jobs Management Asnapshot… For Project & job based businesses Needing to • Use complex work breakdown structures • Hold multiple budget sets per project • Plan & assign resources • Plan, procure & consume items • Calculate estimate to complete or forecast position Vendor To-Increase (Inner Circle member for 4 consecutive years) Adoption CfMD, 150+ sites worldwide Customers Dynamics NAV Vertical Solutions
  • 9.
    Pain Points CoA segment used Single budget/no % for jobs bloating the complete details GL account list preventing profitability forecasting Difficulty interpreting transactional data resulting in after the Missing functionality forcing event views manual intervention (e.g. pricing rules, dept. revenue recog., system managed approvals) Project managers bypassing the Limited support & system resulting in duplicate product development data entry, limited visibility & creating future- dependence on individuals proofing concerns Dynamics NAV Vertical Solutions
  • 10.
    Pain Points CoA segment used Single budget/no % for jobs bloating the complete details GL account list preventing profitability forecasting Difficulty interpreting transactional data resulting in after the Missing functionality forcing event views manual intervention (e.g. pricing rules, dept. revenue recog., system managed approvals) Project managers bypassing the Limited support & system resulting in duplicate product development data entry, limited visibility & creating future- dependence on individuals proofing concerns Dynamics NAV Vertical Solutions
  • 11.
    Advanced Jobs Management Jobs with WBS Resource Integrated Real-Time Est. to Complete System Managed Graphical Planning Procurement Financial Views Approvals Visualisations Advanced Jobs Management Dynamics NAV Vertical Solutions
  • 12.
    Jobs with WBS Resource Integrated Real-Time Est. to Complete System Managed Graphical Planning Procurement Financial Views Approvals Visualisations Dynamics NAV Vertical Solutions
  • 13.
    Jobs with WBS Resource Integrated Real-Time Est. to Complete System Managed Graphical Planning Procurement Financial Views Approvals Visualisations Preferred vendor arrangements held on item card Dynamics NAV Vertical Solutions
  • 14.
    Jobs with WBS Resource Integrated Real-Time Est. to Complete System Managed Graphical Planning Procurement Financial Views Approvals Visualisations Profitability Revenue Budget/actual costs Forecast costs Summary by cost type, drill-down People & machine labour quantity Open PO summary – not receipted, receipted Dynamics NAV Vertical Solutions not invoiced
  • 15.
    Jobs with WBS Resource Integrated Real-Time Est. to Complete System Managed Graphical Planning Procurement Financial Views Approvals Visualisations Dynamics NAV Vertical Solutions
  • 16.
    Jobs with WBS Resource Integrated Real-Time Est. to Complete System Managed Graphical Planning Procurement Financial Views Approvals Visualisations Dynamics NAV Vertical Solutions
  • 17.
  • 18.
    MarketPlace A snapshot For Integrated E-Commerce Solution (B2B, B2C, Internal Portal) Needing to • CMS • Integration between web and NAV • E-Commerce functionality • Provide online customer self-service • Out of the box sales management integration Vendor GearsERP Adoption Based on Kentico – 15,000+ web sites worldwide Customers Dynamics NAV Vertical Solutions
  • 19.
    MarketPlace Real-Time NAVIntegrated E-Commerce Web Front NAV and Customisable B2B/B2C Mobile Friendly End The Web MarketPlace Dynamics NAV Vertical Solutions
  • 20.
    Web Front NAV and Customisable B2B/B2C Mobile Friendly End The Web MarketPlace Dynamics NAV Vertical Solutions
  • 21.
    Web Front NAV and Customisable B2B/B2C Mobile Friendly End The Web MarketPlace Dynamics NAV Vertical Solutions
  • 22.
    Web Front NAV and Customisable B2B/B2C Mobile Friendly End The Web MarketPlace Dynamics NAV Vertical Solutions
  • 23.
    Web Front NAV and Customisable B2B/B2C Mobile Friendly End The Web MarketPlace Dynamics NAV Vertical Solutions
  • 24.
  • 25.
    Asset Maintenance Asnapshot For Equipment requiring reactive and preventative maintenance Needing to • Build parent, child, sub-assembly, component structures • Create and document work requests and work orders • Attach work instructions and relevant documentation • Create scheduled maintenance program • Analyse cost trends over a specific period Vendor Tectura Adoption CfMD Customers Mechanised Mining Solutions Dynamics NAV Vertical Solutions
  • 26.
    Asset Maintenance MaintenanceSchedules & Problem Rapid Response Detailed Data Work Requests Work Instructions Maintenance Backlog Costing And Orders And Attachments Procedures Management Asset Maintenance Dynamics NAV Vertical Solutions
  • 27.
    Detailed Data Work Requests Work Instructions Maintenance Backlog Costing And Orders And Attachments Procedures Management Asset Maintenance Dynamics NAV Vertical Solutions
  • 28.
    Detailed Data Work Requests Work Instructions Maintenance Backlog Costing And Orders And Attachments Procedures Management Asset Maintenance Dynamics NAV Vertical Solutions
  • 29.
    Detailed Data Work Requests Work Instructions Maintenance Backlog Costing And Orders And Attachments Procedures Management Asset Maintenance Dynamics NAV Vertical Solutions
  • 30.
    Detailed Data Work Requests Work Instructions Maintenance Backlog Costing And Orders And Attachments Procedures Management Asset Maintenance Dynamics NAV Vertical Solutions
  • 31.
    Detailed Data Work Requests Work Instructions Maintenance Backlog Costing And Orders And Attachments Procedures Management Asset Maintenance Dynamics NAV Vertical Solutions
  • 32.
    Zetadocs Document Page withfull Management picture and some text Dynamics NAV Vertical Solutions
  • 33.
    Zetadocs for NAV A snapshot For Electronic Document Management Vendor Equisys Adoption CfMD Needing to • Automate the sending and storage of documents • • Save on stationary, postage, and storage costs • Improve customer service by helping your finance, sales and customer services teams respond more quickly to enquiries • Helps achieve sustainability targets Dynamics NAV Vertical Solutions
  • 34.
    Zetadocs The problemwith paper NAV user Dynamics NAV Vertical Solutions
  • 35.
    Zetadocs The problemwith paper NAV user Dynamics NAV Vertical Solutions
  • 36.
    Zetadocs How itworks Link Email, fax SharePoint NAV NAV user MFP Zetadocs Express & Zetadocs for NAV users Dynamics NAV Vertical Solutions
  • 37.
    Zetadocs Supplier InvoicingScenario NAV SharePoint NAV user Dynamics NAV Vertical Solutions
  • 38.
  • 39.
    Advanced Budgets A snapshot… For Distributed budgeting using NAV functionality Needing to • Adopt GL and dimension structures (also apply for security) • Copy previous budget or actuals as starting point • Use spreading or calculation rules to insert values • Apply system managed workflow & approvals Vendor Intergen Adoption Version 1 ready for release Dynamics NAV Vertical Solutions
  • 40.
    Advanced Budgets Use Excel meaning duplicate data entry Licensing costs limit the & exposure to number of contributors formula error with access to the budgeting tool Roll-up reporting difficult impacting the ability to view Required calculations/ consolidated/input Pain compilation are not supported set results Points (e.g. spread methods, allocations, calculation inputs & formulas) Compromised usability & System managed accessibility inhibits workflow & approvals regular updates/ are not supported reforecasting resulting dependence on individuals Dynamics NAV Vertical Solutions
  • 41.
    Advanced Budgets Use Excel meaning duplicate data entry Licensing costs limit the & exposure to number of contributors formula error with access to the budgeting tool Roll-up reporting difficult impacting the ability to view Required calculations/ consolidated/input Pain relationships are not supported set results Points (e.g. spread methods, allocations, calculation inputs & formulas) Compromised usability & System managed accessibility inhibits workflow & approvals regular updates/ are not supported reforecasting resulting dependence on individuals Dynamics NAV Vertical Solutions
  • 42.
    Advanced Budgets Contributor Budget Formula/ Fixed Asset Advanced System Managed Version 2 Assignment Entry Calculations Integration Allocations Approvals Advanced Budgets Dynamics NAV Vertical Solutions
  • 43.
    Contributor Budget Formula/ Fixed Asset Advanced System Managed Version 2 Assignment Entry Calculations Integration Allocations Approvals Dynamics NAV Vertical Solutions
  • 44.
    Contributor Budget Formula/ Fixed Asset Advanced System Managed Version 2 Assignment Entry Calculations Integration Allocations Approvals Dynamics NAV Vertical Solutions
  • 45.
    Contributor Budget Formula/ Fixed Asset Advanced System Managed Version 2 Assignment Entry Calculations Integration Allocations Approvals Dynamics NAV Vertical Solutions
  • 46.
    Contributor Budget Formula/ Fixed Asset Advanced System Managed Version 2 Assignment Entry Calculations Integration Allocations Approvals Sales budget integration Foreign currency budgets Budget consolidation Notes Budget Administrator enhancements Dynamics NAV Vertical Solutions
  • 47.
    Others…in brief DocumentCapture Akeyto Automated data entry (OCR), purchase approval/workflow (Web) Dynamics Anywhere Dynamics Integrated mobility solution Anywhere Allocations Intergen Identify source & target accounts, apply static & variable allocation rules, allocate budget & actual values Recurring invoices Intergen Sales invoice template & billing frequency/period rules EFT Tectura Electronic funds transfer & e-mailing of remittance advices Auto bank rec Tectura Import bank file & auto-match transactions AgilesWorkflow Agiles Integrated workflow solution Dynamics NAV Intergen Various usability & functionality enhancements Extensions Dynamics NAV Vertical Solutions
  • 48.
    Vertical Solutions In anutshell… ■ Used to provide extended or niche functionality ■ The use of ISV/3rd party providers is a Microsoft strategy ■ Assess maturity based on adoption/references and CfMD ■ Perpetual licensing model & SharePoint/Web clients will provide opportunities to extend outside the core user group Dynamics NAV Vertical Solutions
  • 49.
  • 50.
    Do you wantto know more? Find us in the Experience Lounge at the end of this presentation.
  • 51.