Orkney – many things to many people
Ptolemy 2nd century map
The Orkney Way: Stepping forward together, creating the future, learning from the past.
- Innovation and Enterprise for
the New World
Presented by Gareth Davies
Chair Aquatera Group
gareth.davies@aquatera.co.uk
Building from our core environmental competence in
ecological, social and physical sciences we have
assembled a comprehensive capacity across all major
areas of sustainability including:
• Strategic planning
• Option evaluation
• Project impact assessment & permitting
• Surveying & data management
• Technology development support
• Deployment and operations support
• Performance evaluation & management
• Education, training & public awareness
• Biodiversity management
• Community & societal development
• Sustainable business & supply chain development
Delivering across many core sectors on a local and
global basis
Aquatera – delivering expert sustainability services
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
• Objectives – clarifies purpose & boundaries
• Resource planning – delivers localisation
• Basis of design – basic foundation
• Change management – keeping control
• Risk and opportunity management – dealing with
reality
• Option evaluation – identifies the best overall solution
• Execution plan – basis for performance evaluation
• Schedule – timescales, dependencies, contingencies
• Budget – key driver, need enough, but not too much
• Compliance register – regulations, policy and
aspirations
• Project description – explains things for all
Programme/project management tools and attributes
• Determining the possible zone of effect – makes things
manageable
• Baseline data – feeds design and consenting
• Impact assessment – drives acceptability
• Mitigation plan – defines freedom to operate
• Monitoring plan – verifies status and performance
• Reporting – tells the world what is going on
• Performance evaluation – answers to stakeholders
• Consultation – gives team external feedback
• Dealing with feedback – determines credibility
• Action planning – keeps things moving and performing
• PR, dissemination and comms – shares key messages
• Cumulative assessment – who will you influence and
who influences you
• Transboundary assessment – who might be affected
beyond the horizon
Over 300 environmental, social, economic, engineering and marine
operations studies and projects undertaken over 20 years including
projects for offshore floating wind, offshore wind, onshore wind,
wave, tidal, substations, subsea cables, overhead lines, ports,
pipelines, offshore oil & gas, storage terminal and hydrogen sectors
(see below for details)
Local area experience around Orkney
Strategic planning 2 0 2 3 3 2 2 3 2 1 1 0 3
Site and route finding 1 2 10 4 5 8 6 5 2 1 1 0 1
Scoping 0 1 16 5 5 6 5 2 2 0 1 0 1
Baseline surveys 0 1 12 3 10 5 5 2 1 0 1 0 0
EIAs 0 1 9 3 4 3 2 0 1 0 1 0 0
HRA 0 1 9 3 4 3 2 0 1 0 1 0 0
Monitoring 0 0 10 1 10 0 3 0 1 0 5 2 0
Logistics & marine ops 0 1 0 1 5 2 1 0 (10) 0 0 (5) 0
Supply chain
management 1 1 3 2 3 1 1 0 (5) 0 1 0 1
Commercial & market
analysis 0 0 3 2 5 1 1 1 2 0 0 1 1
Total (295) 4 8 74 27 54 31 28 13 27 2 12 8 7
Shetland
Orkney
Sutherland & Caithness
Western
Isles
Atlantic
Margin
Sector key
Offshore floating wind
Offshore wind
Onshore wind
Wave
Tidal
Substations
Subsea cables
Overhead lines
Ports
Pipelines
Offshore oil & gas
Storage terminal
Hydrogen
Wider Scottish experience
Sector key
Offshore floating wind
Offshore wind
Onshore wind
Wave
Tidal
Substations
Subsea cables
Overhead lines
Ports
Pipelines
Offshore oil & gas
Storage terminal
Hydrogen
Number and types of projects in the vicinity
Past examples Last 30
years
Next 30
years
Future examples
Tera projects = 10,000s people;
>£1Bs; 5-10 yrs
None - 30-50
nearby
Offshore wind farms, Scapa Flow Wind Hub,
hydrogen hubs, transmission network building
Giga projects = >1000s people,
£100Ms, >5 years
Flotta, Moray Firth wind farm, offshore oil
fields, Dounreay
1 (50
nearby)
20 -50 Onshore wind farms, tidal farms, distribution grid
upgrade, transhipment ports, oil transition
Mega projects = 100-1000 people,
£10-100M, 2-5 years
Onshore wind farms, large civil works,
ferries, hospitals, schools
10 100 Offshore fish farms, large boat replacement,
ferries, lager harbour works
Macro projects = 10-100, 1-10 m, 1-
2 yrs
Nearshore fish farms, large research
projects, housing, public buildings, civil
works, small ports
100 200 Local harbour expansion, small boat replacement,
aircraft replacement, larger research projects,
housing, public buildings, civil works,
Large projects = 5-10, 100k-1M,
0.5-1 yr
Variety of public works, business premises,
single house builds, plant replacement
1000 1500 Variety of public works, business premises, single
house builds, plant replacement
Standard = 5 ish, 10-100k, 3-6
months
Common in business, house improvements,
vehicle upgrade, day boat replacement
10000 15000 Common in business, house improvements,
vehicle upgrade, day boat replacement
Mini projects – 2-5, 1-10k, 1-3
months
Widespread in business, house
improvements
100000 150000 Widespread in business, house improvements
Micro projects = 1-2, <5k, 1 month All kinds of business, enterprise 1million 1.5million All kinds of business, enterprise
‘Project’ tasks = 1-2, free or 1-2k, 1
to few days
All kinds of activity 10million 15million All kinds of activity
How do we prepare for and deal with future challenges
Orkney Innovation a Enterprise Ecosystem
Local visionaries and thought leaders
Local adopters, committed risk takers and innovators along with their support teams and off-Orkney collaborators
Academic Pioneers Business Pioneers Community Pioneers Government Pioneers
Strategic inventors
Living laboratory
Innovation Hub Aspire ORKNEY
Enterprise sectors
Sustainable
energy
Agriculture
Fisheries Maritime
Food and
drink
Digital
enterprise
Crafts
Environmental
Archaeology
and history
Arts &
culture
Retail
3rd
sector
Health and
care
Local
government
Tourism
Sport
Events
Activities
Progressive
commerce
Innovative
services &
technologies
Applied
research
Dissemination &
conversation
Promotion &
performance
VISION
STRATEGY
ORGANISATION
INVOLVEMENT
ACTION
SUPPORT
Orkney has taken time to build the right structures, now it is ready to unleash & share its potential!
Islands Deal (ICNZ)
Orkney Community Partnership (Public Sector focus)
Orkney Total Energy Mix – data for 2019
Heat & light
Transport
(largely)
Done
To do
To do
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
• Clean energy generation
o Offshore wind, onshore wind, tidal energy,
solar, heat pumps
• Infrastructure
o Distribution cables, transmission cables,
substations, storage and balancing facilities,
hydrogen conversion plant, interconnector
cables, hydrogen pipelines, oil terminal
transition, mega wind port & wider port
expansion
• Energy transition programme for buildings
o Housing, business, public buildings
• Transport transition programme
o Road vehicles, agri & construction plant,
vessels and boats, aircraft refueling and
replacement
o New drones and autonomous vehicles
Carbon transition needs
• Data management
o Data connections, gathering, storage and use
• Research
• Training & capacity building
• Supply chain capacity building
• Outreach
o Public information, engagement and dialogue
o Online portal of experiences
o Island decarbonisation toolbox
• Commercialisation tools
o Investment funds and syndicates
o IP bank of proven solutions
• Adaption of governance
o policy, regulations, standards and practises
E.g. Orkney – Centre of Excellence in the blue economy
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
E.g. Orkney a global hub for blue energy
Wave
Thermal
Wind Tidal
Floating solar
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
• Integrated energy
• New solutions
• Digital connection
• Improved efficiency
• Greater flexibility
• More affordable
• Local organisation
E.g. Sustainable energy solutions – ReFLEX project
E.g. New coastal port facilities – Scapa Deepwater Quay
E.g. Scapa Flow Mega Wind Hub – future configuration
E.g. Laying foundations for a hydrogen economy (Surf & Turf, Big Hit, HyDINE)
E.g. Exploring maritime hydrogen - HIMET Plug & play decarbonisation
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
• Expanding into a major hydrogen
production and export hub
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
ORKNEY, Scapa Flow – Atlantic’s Arctic Gateway
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
Data management and storage
Make cool and cold
an asset
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
Over Orkney,
Shetland and the
Western Isles over
the next 10-15 years
there will be a
foreseeable
investment of £8,950
billion investment in
local energy systems,
enabling mechanisms
and supporting
infrastructure
Core island infrastructure for carbon transition
Around £9 billion
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
Offshore wind ‘round 1’
• A wind leasing round is
currently underway which
is expected to lead to over
£20 billion further
investment in
energy generation over
the next 10 years. 77
applications received for
15 locations.
Scotwind
Perhaps 10 offshore wind
developments of 1-2 GW,
each approximately £2Billion in
value = £10-20 billion
Around £20-30 billion
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
Offshore wind ‘plus’
• To reach full Net-Zero UK likely
to need a further 100-130 GW
of offshore wind
Around £100-150 billion??
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
• Contributing capacity to address the
Climate Emergency
• Delivering capacity that will be more
difficult and costly to provide other ways
• Working with decarbonised port and
vessels operations
• Managed locally but with strong support
and collaboration
• Supporting remote, rural and island
communities
• Minimised biodiversity footprint
• Facilitating oil economy transition
Sustainability credentials
‘ORKNEY WAY’
Stepping forward together,
creating the future,
learning from the past.
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
The ORKNEY INNOVATION HUB
ENERGY TRANSPORT DIGITAL ENTERPRISE
• Generation & storage
• Efficiency
• Management
• Shipping
• Aviation
• Vehicles
• Connectivity
• Data management
• Island commerce
Our foundation: ORKNEY THE LIVING LABORATORY
Education, research, learning, expertise, facilities, experience, solutions, success
Our inspiration: THE ORKNEY WAY
Working together, creating the future, learning from the past
ORKNEY INNOVATION HUB
Recognition as a centre of excellence, mandate to lead innovation, flexibility to explore new solutions
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
What are the Tools that Orkney has to help meet these Challenges?
Our Infrastructure
Roads, ports, airports
Vehicles, boats, aircraft
Houses, commercial & public
buildings
Power grid, water, sewage
Communications
Our Resources
Productive land
Productive seas
Renewables
Oil & gas
Wildlife and landscape
Heritage & history
Our People
Strong community spirit
Experience and skills
Adaptability
Creativity
Openness
Mindfulness
Our Place
Island archipelago
Scapa Flow
Gateway/hub location
Strategic pedigree
Vision from life on the edge
Our Stewardship
Clearly bounded responsibility
Extensive scope of responsibility
Local regulatory presence
Commitment to sustainability
Easy access & conversations
Our collective endeavour
Proven capacity for working
together
Strong shared goals
The wider diaspora
Our new found friends
Bringing all of this together requires excellent programme and project management
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
• Much of life and community development can be considered as series of projects & applying good project
management principles can help reduce risks and achieve better outcomes
• The need for this is exacerbated in a place on the edge where conditions are harsh, supply chains are long and the
breadth and capacity are limited
• Despite or perhaps because of this Orkney’s resources and contribution to carbon transition are set to be immense;
delivering over 100 GW of renewables capacity, associated energy conversion and storage along with supporting port
and energy transmission infrastructure along with accelerated community transition to decarbonisation and then
helping other communities follow suit are already and will continue to require monumental project management
• An essential part of the step change required towards decarbonization will be to choose the right options, do the right
things, in the right order, at the right time, at an affordable cost and in a sustainable/just manner
• Orkney is preparing itself for this next revolution in its eras of strategic contribution to the wider need. To assemble
and deliver 10,000 wind turbines, decarbonise its own energy matrix, to host pioneering blue energy technology, be a
hub for onward energy connections …. We need four things
o Recognition – of the unique contribution that Orkney can and should make
o Mandate – from the wider our community for us to deliver that contribution
o Flexibility – so that we can deliver it in a more sustainable way to benefit all rather than the few
• We also need excellent programme and project management!
Conclusions
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
Is it worth it? – Local contribution to reducing the UK carbon footprint
Energy storage and conversion
Low carbon shipping
Decarbonised port operations
Offset residual emissions
Offshore wind generation
Low carbon construction/materials
2050 Net ZERO requires 115
to 172 GW of renewables –
presently 34 GW. Need 3-5 x
more than what we have
Onshore wind generation
Tidal, wave and solar generation
Orkney and surrounding
areas could contribute
between 20% and 50%
to reducing UK carbon
emissions footprint
Integrated energy systems
Low carbon vehicle transport
Low carbon heating
Sharing and export of solutions to
other parts of the UK and globally
Confidential and commercially sensitive
© Aquatera Ltd, October 2021
Is it worth it? – Local contribution to reducing the UK carbon footprint
Energy storage and conversion
Low carbon shipping
Decarbonised port operations
Offset residual emissions
Offshore wind generation
Low carbon construction/materials
2050 Net ZERO requires 115
to 172 GW of renewables –
presently 34 GW. Need 3-5 x
more than what we have
Onshore wind generation
Tidal, wave and solar generation
Orkney and surrounding
areas could contribute
between 20% and 50%
to reducing UK carbon
emissions footprint
Integrated energy systems
Low carbon vehicle transport
Low carbon heating
Sharing and export of solutions to
other parts of the UK and globally
YES
It is essential

More Related Content

Similar to Dr. Gareth Davies: Transformational Projects – the Orkney story so far

Maxx wind maxxsolar-maxxcapital company bio 1-13-12
Maxx wind maxxsolar-maxxcapital company bio 1-13-12Maxx wind maxxsolar-maxxcapital company bio 1-13-12
Maxx wind maxxsolar-maxxcapital company bio 1-13-12MaxxSolar-USA Corporation
 
Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...
Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...
Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...Invest Northern Ireland
 
2-Wave and Tidal RHDHV_Brochure
2-Wave and Tidal RHDHV_Brochure2-Wave and Tidal RHDHV_Brochure
2-Wave and Tidal RHDHV_BrochureHieu Phan Trung
 
2 paul o'brien - sdi - marine renewables in scotland
2   paul o'brien - sdi - marine renewables in scotland2   paul o'brien - sdi - marine renewables in scotland
2 paul o'brien - sdi - marine renewables in scotlandjohannaparans
 
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
4 sarah nightingale decc offshore wind seminar 18 19  march 20144 sarah nightingale decc offshore wind seminar 18 19  march 2014
4 sarah nightingale decc offshore wind seminar 18 19 march 2014NaturalEngland
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonKTN
 
Power point presentation white logo v2 [compatibility mode]
Power point presentation white logo v2 [compatibility mode]Power point presentation white logo v2 [compatibility mode]
Power point presentation white logo v2 [compatibility mode]djhutch
 
Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor Kennelly Constructions
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems finalMatthew Hannon
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardInvest Northern Ireland
 
Joe harford greenexpo
Joe harford greenexpoJoe harford greenexpo
Joe harford greenexpoDamian Connon
 
Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...
Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...
Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...Irish Future Internet Forum
 
Doctoral Training Heriot Watt University FINAL
Doctoral Training Heriot Watt University FINALDoctoral Training Heriot Watt University FINAL
Doctoral Training Heriot Watt University FINALJames Green
 

Similar to Dr. Gareth Davies: Transformational Projects – the Orkney story so far (20)

Maxx wind maxxsolar-maxxcapital company bio 1-13-12
Maxx wind maxxsolar-maxxcapital company bio 1-13-12Maxx wind maxxsolar-maxxcapital company bio 1-13-12
Maxx wind maxxsolar-maxxcapital company bio 1-13-12
 
Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...
Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...
Next Steps - Support Programmes | Sam Knox, Business Development Executive, I...
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
2-Wave and Tidal RHDHV_Brochure
2-Wave and Tidal RHDHV_Brochure2-Wave and Tidal RHDHV_Brochure
2-Wave and Tidal RHDHV_Brochure
 
2 paul o'brien - sdi - marine renewables in scotland
2   paul o'brien - sdi - marine renewables in scotland2   paul o'brien - sdi - marine renewables in scotland
2 paul o'brien - sdi - marine renewables in scotland
 
Shared Via AMEC
Shared Via AMECShared Via AMEC
Shared Via AMEC
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
Scotland at LAGCOE 2017
Scotland at LAGCOE 2017Scotland at LAGCOE 2017
Scotland at LAGCOE 2017
 
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
4 sarah nightingale decc offshore wind seminar 18 19  march 20144 sarah nightingale decc offshore wind seminar 18 19  march 2014
4 sarah nightingale decc offshore wind seminar 18 19 march 2014
 
Vessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - LondonVessel Efficiency competition company elevator pitches - London
Vessel Efficiency competition company elevator pitches - London
 
Power point presentation white logo v2 [compatibility mode]
Power point presentation white logo v2 [compatibility mode]Power point presentation white logo v2 [compatibility mode]
Power point presentation white logo v2 [compatibility mode]
 
Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor Kennelly Constructions: Indigenous Contractor
Kennelly Constructions: Indigenous Contractor
 
Opportunities in Offshore Wind
Opportunities in Offshore WindOpportunities in Offshore Wind
Opportunities in Offshore Wind
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
 
Joe harford greenexpo
Joe harford greenexpoJoe harford greenexpo
Joe harford greenexpo
 
Wave hub presentation to APM SWWE branch 18 05 16
Wave hub presentation to APM SWWE branch 18 05 16Wave hub presentation to APM SWWE branch 18 05 16
Wave hub presentation to APM SWWE branch 18 05 16
 
ESIF Annual Event 2018
ESIF Annual Event 2018ESIF Annual Event 2018
ESIF Annual Event 2018
 
Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...
Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...
Barbara Fogerty, Marine Institute - Extended Recognised Maritime Picture to S...
 
Doctoral Training Heriot Watt University FINAL
Doctoral Training Heriot Watt University FINALDoctoral Training Heriot Watt University FINAL
Doctoral Training Heriot Watt University FINAL
 

More from PMIUKChapter

Learning Leadership Lessons from Rock’n’Roll
Learning Leadership Lessons from Rock’n’RollLearning Leadership Lessons from Rock’n’Roll
Learning Leadership Lessons from Rock’n’RollPMIUKChapter
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationPMIUKChapter
 
The Tay Bridge Disaster presentation pdf
The Tay Bridge Disaster presentation pdfThe Tay Bridge Disaster presentation pdf
The Tay Bridge Disaster presentation pdfPMIUKChapter
 
Innovation Basket webinar presentation 2024
Innovation Basket webinar presentation 2024Innovation Basket webinar presentation 2024
Innovation Basket webinar presentation 2024PMIUKChapter
 
How Pencils and Scotch Tape Led to the Space Elevator - slides.pptx
How Pencils and Scotch Tape Led to the Space Elevator - slides.pptxHow Pencils and Scotch Tape Led to the Space Elevator - slides.pptx
How Pencils and Scotch Tape Led to the Space Elevator - slides.pptxPMIUKChapter
 
Supercharge Your Project Management Skills with CHATGPT practical - UK.pdf
Supercharge Your Project Management Skills with CHATGPT practical - UK.pdfSupercharge Your Project Management Skills with CHATGPT practical - UK.pdf
Supercharge Your Project Management Skills with CHATGPT practical - UK.pdfPMIUKChapter
 
Doctoral Research Conference 2022.pdf
Doctoral Research Conference 2022.pdfDoctoral Research Conference 2022.pdf
Doctoral Research Conference 2022.pdfPMIUKChapter
 
PMI Generational Leadership Matrix.pdf
PMI Generational Leadership Matrix.pdfPMI Generational Leadership Matrix.pdf
PMI Generational Leadership Matrix.pdfPMIUKChapter
 
NAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdf
NAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdfNAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdf
NAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdfPMIUKChapter
 
Agile and Product Management Presentation by Pamela Schure
Agile and Product Management Presentation by Pamela SchureAgile and Product Management Presentation by Pamela Schure
Agile and Product Management Presentation by Pamela SchurePMIUKChapter
 
Invisible to Invaluable Presentation.pptx
Invisible to Invaluable Presentation.pptxInvisible to Invaluable Presentation.pptx
Invisible to Invaluable Presentation.pptxPMIUKChapter
 
Project Management Methodologies and Project Governance
Project Management Methodologies and Project GovernanceProject Management Methodologies and Project Governance
Project Management Methodologies and Project GovernancePMIUKChapter
 
Product Management Strategy and Product Governance
Product Management Strategy and Product GovernanceProduct Management Strategy and Product Governance
Product Management Strategy and Product GovernancePMIUKChapter
 
Stuart Thorp's Presntation.pptx
Stuart Thorp's Presntation.pptxStuart Thorp's Presntation.pptx
Stuart Thorp's Presntation.pptxPMIUKChapter
 
Sam Baker's Presentation.pptx
Sam Baker's Presentation.pptxSam Baker's Presentation.pptx
Sam Baker's Presentation.pptxPMIUKChapter
 
Playing Project Management PMI UK Chapter May 2023.pdf
Playing Project Management PMI UK Chapter May 2023.pdfPlaying Project Management PMI UK Chapter May 2023.pdf
Playing Project Management PMI UK Chapter May 2023.pdfPMIUKChapter
 
Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...
Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...
Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...PMIUKChapter
 
Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...
Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...
Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...PMIUKChapter
 
Istanbul Earthquake Loss Assessment Studies by Himmet Karaman
Istanbul Earthquake Loss Assessment Studies by Himmet Karaman Istanbul Earthquake Loss Assessment Studies by Himmet Karaman
Istanbul Earthquake Loss Assessment Studies by Himmet Karaman PMIUKChapter
 

More from PMIUKChapter (20)

Learning Leadership Lessons from Rock’n’Roll
Learning Leadership Lessons from Rock’n’RollLearning Leadership Lessons from Rock’n’Roll
Learning Leadership Lessons from Rock’n’Roll
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentation
 
The Tay Bridge Disaster presentation pdf
The Tay Bridge Disaster presentation pdfThe Tay Bridge Disaster presentation pdf
The Tay Bridge Disaster presentation pdf
 
Innovation Basket webinar presentation 2024
Innovation Basket webinar presentation 2024Innovation Basket webinar presentation 2024
Innovation Basket webinar presentation 2024
 
How Pencils and Scotch Tape Led to the Space Elevator - slides.pptx
How Pencils and Scotch Tape Led to the Space Elevator - slides.pptxHow Pencils and Scotch Tape Led to the Space Elevator - slides.pptx
How Pencils and Scotch Tape Led to the Space Elevator - slides.pptx
 
Supercharge Your Project Management Skills with CHATGPT practical - UK.pdf
Supercharge Your Project Management Skills with CHATGPT practical - UK.pdfSupercharge Your Project Management Skills with CHATGPT practical - UK.pdf
Supercharge Your Project Management Skills with CHATGPT practical - UK.pdf
 
Doctoral Research Conference 2022.pdf
Doctoral Research Conference 2022.pdfDoctoral Research Conference 2022.pdf
Doctoral Research Conference 2022.pdf
 
Leadership
LeadershipLeadership
Leadership
 
PMI Generational Leadership Matrix.pdf
PMI Generational Leadership Matrix.pdfPMI Generational Leadership Matrix.pdf
PMI Generational Leadership Matrix.pdf
 
NAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdf
NAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdfNAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdf
NAVIGATING THE GRAY OF LEADING ACROSS THE GENERATIONS.pdf
 
Agile and Product Management Presentation by Pamela Schure
Agile and Product Management Presentation by Pamela SchureAgile and Product Management Presentation by Pamela Schure
Agile and Product Management Presentation by Pamela Schure
 
Invisible to Invaluable Presentation.pptx
Invisible to Invaluable Presentation.pptxInvisible to Invaluable Presentation.pptx
Invisible to Invaluable Presentation.pptx
 
Project Management Methodologies and Project Governance
Project Management Methodologies and Project GovernanceProject Management Methodologies and Project Governance
Project Management Methodologies and Project Governance
 
Product Management Strategy and Product Governance
Product Management Strategy and Product GovernanceProduct Management Strategy and Product Governance
Product Management Strategy and Product Governance
 
Stuart Thorp's Presntation.pptx
Stuart Thorp's Presntation.pptxStuart Thorp's Presntation.pptx
Stuart Thorp's Presntation.pptx
 
Sam Baker's Presentation.pptx
Sam Baker's Presentation.pptxSam Baker's Presentation.pptx
Sam Baker's Presentation.pptx
 
Playing Project Management PMI UK Chapter May 2023.pdf
Playing Project Management PMI UK Chapter May 2023.pdfPlaying Project Management PMI UK Chapter May 2023.pdf
Playing Project Management PMI UK Chapter May 2023.pdf
 
Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...
Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...
Multi-level Network Governance for Chaotic Disaster Management Contexts by Br...
 
Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...
Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...
Delivering Crisis Projects with Business Resilience by Serhiy Kovela, Sheila ...
 
Istanbul Earthquake Loss Assessment Studies by Himmet Karaman
Istanbul Earthquake Loss Assessment Studies by Himmet Karaman Istanbul Earthquake Loss Assessment Studies by Himmet Karaman
Istanbul Earthquake Loss Assessment Studies by Himmet Karaman
 

Recently uploaded

internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girladitipandeya
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 

Recently uploaded (20)

Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 

Dr. Gareth Davies: Transformational Projects – the Orkney story so far

  • 1. Orkney – many things to many people Ptolemy 2nd century map The Orkney Way: Stepping forward together, creating the future, learning from the past.
  • 2. - Innovation and Enterprise for the New World Presented by Gareth Davies Chair Aquatera Group gareth.davies@aquatera.co.uk
  • 3. Building from our core environmental competence in ecological, social and physical sciences we have assembled a comprehensive capacity across all major areas of sustainability including: • Strategic planning • Option evaluation • Project impact assessment & permitting • Surveying & data management • Technology development support • Deployment and operations support • Performance evaluation & management • Education, training & public awareness • Biodiversity management • Community & societal development • Sustainable business & supply chain development Delivering across many core sectors on a local and global basis Aquatera – delivering expert sustainability services
  • 4. Confidential and commercially sensitive © Aquatera Ltd, October 2021 • Objectives – clarifies purpose & boundaries • Resource planning – delivers localisation • Basis of design – basic foundation • Change management – keeping control • Risk and opportunity management – dealing with reality • Option evaluation – identifies the best overall solution • Execution plan – basis for performance evaluation • Schedule – timescales, dependencies, contingencies • Budget – key driver, need enough, but not too much • Compliance register – regulations, policy and aspirations • Project description – explains things for all Programme/project management tools and attributes • Determining the possible zone of effect – makes things manageable • Baseline data – feeds design and consenting • Impact assessment – drives acceptability • Mitigation plan – defines freedom to operate • Monitoring plan – verifies status and performance • Reporting – tells the world what is going on • Performance evaluation – answers to stakeholders • Consultation – gives team external feedback • Dealing with feedback – determines credibility • Action planning – keeps things moving and performing • PR, dissemination and comms – shares key messages • Cumulative assessment – who will you influence and who influences you • Transboundary assessment – who might be affected beyond the horizon
  • 5. Over 300 environmental, social, economic, engineering and marine operations studies and projects undertaken over 20 years including projects for offshore floating wind, offshore wind, onshore wind, wave, tidal, substations, subsea cables, overhead lines, ports, pipelines, offshore oil & gas, storage terminal and hydrogen sectors (see below for details) Local area experience around Orkney Strategic planning 2 0 2 3 3 2 2 3 2 1 1 0 3 Site and route finding 1 2 10 4 5 8 6 5 2 1 1 0 1 Scoping 0 1 16 5 5 6 5 2 2 0 1 0 1 Baseline surveys 0 1 12 3 10 5 5 2 1 0 1 0 0 EIAs 0 1 9 3 4 3 2 0 1 0 1 0 0 HRA 0 1 9 3 4 3 2 0 1 0 1 0 0 Monitoring 0 0 10 1 10 0 3 0 1 0 5 2 0 Logistics & marine ops 0 1 0 1 5 2 1 0 (10) 0 0 (5) 0 Supply chain management 1 1 3 2 3 1 1 0 (5) 0 1 0 1 Commercial & market analysis 0 0 3 2 5 1 1 1 2 0 0 1 1 Total (295) 4 8 74 27 54 31 28 13 27 2 12 8 7 Shetland Orkney Sutherland & Caithness Western Isles Atlantic Margin Sector key Offshore floating wind Offshore wind Onshore wind Wave Tidal Substations Subsea cables Overhead lines Ports Pipelines Offshore oil & gas Storage terminal Hydrogen
  • 6. Wider Scottish experience Sector key Offshore floating wind Offshore wind Onshore wind Wave Tidal Substations Subsea cables Overhead lines Ports Pipelines Offshore oil & gas Storage terminal Hydrogen
  • 7. Number and types of projects in the vicinity Past examples Last 30 years Next 30 years Future examples Tera projects = 10,000s people; >£1Bs; 5-10 yrs None - 30-50 nearby Offshore wind farms, Scapa Flow Wind Hub, hydrogen hubs, transmission network building Giga projects = >1000s people, £100Ms, >5 years Flotta, Moray Firth wind farm, offshore oil fields, Dounreay 1 (50 nearby) 20 -50 Onshore wind farms, tidal farms, distribution grid upgrade, transhipment ports, oil transition Mega projects = 100-1000 people, £10-100M, 2-5 years Onshore wind farms, large civil works, ferries, hospitals, schools 10 100 Offshore fish farms, large boat replacement, ferries, lager harbour works Macro projects = 10-100, 1-10 m, 1- 2 yrs Nearshore fish farms, large research projects, housing, public buildings, civil works, small ports 100 200 Local harbour expansion, small boat replacement, aircraft replacement, larger research projects, housing, public buildings, civil works, Large projects = 5-10, 100k-1M, 0.5-1 yr Variety of public works, business premises, single house builds, plant replacement 1000 1500 Variety of public works, business premises, single house builds, plant replacement Standard = 5 ish, 10-100k, 3-6 months Common in business, house improvements, vehicle upgrade, day boat replacement 10000 15000 Common in business, house improvements, vehicle upgrade, day boat replacement Mini projects – 2-5, 1-10k, 1-3 months Widespread in business, house improvements 100000 150000 Widespread in business, house improvements Micro projects = 1-2, <5k, 1 month All kinds of business, enterprise 1million 1.5million All kinds of business, enterprise ‘Project’ tasks = 1-2, free or 1-2k, 1 to few days All kinds of activity 10million 15million All kinds of activity
  • 8. How do we prepare for and deal with future challenges
  • 9. Orkney Innovation a Enterprise Ecosystem Local visionaries and thought leaders Local adopters, committed risk takers and innovators along with their support teams and off-Orkney collaborators Academic Pioneers Business Pioneers Community Pioneers Government Pioneers Strategic inventors Living laboratory Innovation Hub Aspire ORKNEY Enterprise sectors Sustainable energy Agriculture Fisheries Maritime Food and drink Digital enterprise Crafts Environmental Archaeology and history Arts & culture Retail 3rd sector Health and care Local government Tourism Sport Events Activities Progressive commerce Innovative services & technologies Applied research Dissemination & conversation Promotion & performance VISION STRATEGY ORGANISATION INVOLVEMENT ACTION SUPPORT Orkney has taken time to build the right structures, now it is ready to unleash & share its potential! Islands Deal (ICNZ) Orkney Community Partnership (Public Sector focus)
  • 10. Orkney Total Energy Mix – data for 2019 Heat & light Transport (largely) Done To do To do
  • 11. Confidential and commercially sensitive © Aquatera Ltd, October 2021 • Clean energy generation o Offshore wind, onshore wind, tidal energy, solar, heat pumps • Infrastructure o Distribution cables, transmission cables, substations, storage and balancing facilities, hydrogen conversion plant, interconnector cables, hydrogen pipelines, oil terminal transition, mega wind port & wider port expansion • Energy transition programme for buildings o Housing, business, public buildings • Transport transition programme o Road vehicles, agri & construction plant, vessels and boats, aircraft refueling and replacement o New drones and autonomous vehicles Carbon transition needs • Data management o Data connections, gathering, storage and use • Research • Training & capacity building • Supply chain capacity building • Outreach o Public information, engagement and dialogue o Online portal of experiences o Island decarbonisation toolbox • Commercialisation tools o Investment funds and syndicates o IP bank of proven solutions • Adaption of governance o policy, regulations, standards and practises
  • 12. E.g. Orkney – Centre of Excellence in the blue economy
  • 13. Confidential and commercially sensitive © Aquatera Ltd, October 2021 E.g. Orkney a global hub for blue energy Wave Thermal Wind Tidal Floating solar
  • 14. Confidential and commercially sensitive © Aquatera Ltd, October 2021 • Integrated energy • New solutions • Digital connection • Improved efficiency • Greater flexibility • More affordable • Local organisation E.g. Sustainable energy solutions – ReFLEX project
  • 15. E.g. New coastal port facilities – Scapa Deepwater Quay
  • 16. E.g. Scapa Flow Mega Wind Hub – future configuration
  • 17. E.g. Laying foundations for a hydrogen economy (Surf & Turf, Big Hit, HyDINE)
  • 18. E.g. Exploring maritime hydrogen - HIMET Plug & play decarbonisation
  • 19. Confidential and commercially sensitive © Aquatera Ltd, October 2021 • Expanding into a major hydrogen production and export hub
  • 20. Confidential and commercially sensitive © Aquatera Ltd, October 2021 ORKNEY, Scapa Flow – Atlantic’s Arctic Gateway
  • 21. Confidential and commercially sensitive © Aquatera Ltd, October 2021 Data management and storage Make cool and cold an asset
  • 22. Confidential and commercially sensitive © Aquatera Ltd, October 2021 Over Orkney, Shetland and the Western Isles over the next 10-15 years there will be a foreseeable investment of £8,950 billion investment in local energy systems, enabling mechanisms and supporting infrastructure Core island infrastructure for carbon transition Around £9 billion
  • 23. Confidential and commercially sensitive © Aquatera Ltd, October 2021 Offshore wind ‘round 1’ • A wind leasing round is currently underway which is expected to lead to over £20 billion further investment in energy generation over the next 10 years. 77 applications received for 15 locations. Scotwind Perhaps 10 offshore wind developments of 1-2 GW, each approximately £2Billion in value = £10-20 billion Around £20-30 billion
  • 24. Confidential and commercially sensitive © Aquatera Ltd, October 2021 Offshore wind ‘plus’ • To reach full Net-Zero UK likely to need a further 100-130 GW of offshore wind Around £100-150 billion??
  • 25. Confidential and commercially sensitive © Aquatera Ltd, October 2021 • Contributing capacity to address the Climate Emergency • Delivering capacity that will be more difficult and costly to provide other ways • Working with decarbonised port and vessels operations • Managed locally but with strong support and collaboration • Supporting remote, rural and island communities • Minimised biodiversity footprint • Facilitating oil economy transition Sustainability credentials ‘ORKNEY WAY’ Stepping forward together, creating the future, learning from the past.
  • 26. Confidential and commercially sensitive © Aquatera Ltd, October 2021 The ORKNEY INNOVATION HUB ENERGY TRANSPORT DIGITAL ENTERPRISE • Generation & storage • Efficiency • Management • Shipping • Aviation • Vehicles • Connectivity • Data management • Island commerce Our foundation: ORKNEY THE LIVING LABORATORY Education, research, learning, expertise, facilities, experience, solutions, success Our inspiration: THE ORKNEY WAY Working together, creating the future, learning from the past ORKNEY INNOVATION HUB Recognition as a centre of excellence, mandate to lead innovation, flexibility to explore new solutions
  • 27. Confidential and commercially sensitive © Aquatera Ltd, October 2021 What are the Tools that Orkney has to help meet these Challenges? Our Infrastructure Roads, ports, airports Vehicles, boats, aircraft Houses, commercial & public buildings Power grid, water, sewage Communications Our Resources Productive land Productive seas Renewables Oil & gas Wildlife and landscape Heritage & history Our People Strong community spirit Experience and skills Adaptability Creativity Openness Mindfulness Our Place Island archipelago Scapa Flow Gateway/hub location Strategic pedigree Vision from life on the edge Our Stewardship Clearly bounded responsibility Extensive scope of responsibility Local regulatory presence Commitment to sustainability Easy access & conversations Our collective endeavour Proven capacity for working together Strong shared goals The wider diaspora Our new found friends Bringing all of this together requires excellent programme and project management
  • 28. Confidential and commercially sensitive © Aquatera Ltd, October 2021 • Much of life and community development can be considered as series of projects & applying good project management principles can help reduce risks and achieve better outcomes • The need for this is exacerbated in a place on the edge where conditions are harsh, supply chains are long and the breadth and capacity are limited • Despite or perhaps because of this Orkney’s resources and contribution to carbon transition are set to be immense; delivering over 100 GW of renewables capacity, associated energy conversion and storage along with supporting port and energy transmission infrastructure along with accelerated community transition to decarbonisation and then helping other communities follow suit are already and will continue to require monumental project management • An essential part of the step change required towards decarbonization will be to choose the right options, do the right things, in the right order, at the right time, at an affordable cost and in a sustainable/just manner • Orkney is preparing itself for this next revolution in its eras of strategic contribution to the wider need. To assemble and deliver 10,000 wind turbines, decarbonise its own energy matrix, to host pioneering blue energy technology, be a hub for onward energy connections …. We need four things o Recognition – of the unique contribution that Orkney can and should make o Mandate – from the wider our community for us to deliver that contribution o Flexibility – so that we can deliver it in a more sustainable way to benefit all rather than the few • We also need excellent programme and project management! Conclusions
  • 29. Confidential and commercially sensitive © Aquatera Ltd, October 2021 Is it worth it? – Local contribution to reducing the UK carbon footprint Energy storage and conversion Low carbon shipping Decarbonised port operations Offset residual emissions Offshore wind generation Low carbon construction/materials 2050 Net ZERO requires 115 to 172 GW of renewables – presently 34 GW. Need 3-5 x more than what we have Onshore wind generation Tidal, wave and solar generation Orkney and surrounding areas could contribute between 20% and 50% to reducing UK carbon emissions footprint Integrated energy systems Low carbon vehicle transport Low carbon heating Sharing and export of solutions to other parts of the UK and globally
  • 30. Confidential and commercially sensitive © Aquatera Ltd, October 2021 Is it worth it? – Local contribution to reducing the UK carbon footprint Energy storage and conversion Low carbon shipping Decarbonised port operations Offset residual emissions Offshore wind generation Low carbon construction/materials 2050 Net ZERO requires 115 to 172 GW of renewables – presently 34 GW. Need 3-5 x more than what we have Onshore wind generation Tidal, wave and solar generation Orkney and surrounding areas could contribute between 20% and 50% to reducing UK carbon emissions footprint Integrated energy systems Low carbon vehicle transport Low carbon heating Sharing and export of solutions to other parts of the UK and globally YES It is essential