SlideShare a Scribd company logo
1 of 3
Douglas L. Scott
12205 W. Nantucket Wichita, Ks. | Cell (316) 210-7312 | dlscott1@gte.net
____________________________________________________________________________________________________
High energy, effective leader, focused on producing highly efficient products, as well as build and lead
highly effective teams, extract innovative solutions, and produce results that effect the corporations
bottom line. Empowers leaders, encourages forward thinking, drives teams to results, coaches through
challenges to find solutions. Utilizes talent from global operations to benchmark best practices and
standard work in order to create a culture of continuous improvement and learning.
Areas of Expertise:
Operations Management Continuous Process Improvement
Industrial Engineering Process Standardization
Sales and Marketing Team Building
________________Professional Experience______________
Spirit AeroSystems – Wichita, Kansas 2014 - Jan 15, 2016
Director Global Production Engineering
Directly responsible for the production support for Operations located in Wichita Kan., Tulsa Ok., Kinston North
Carolina, Prestwick Scotland and Subang Malaysia. Teams include Industrial Engineers, Manufacturing
Engineers, Continuous Improvement Core teams, Six Sigma Teams/Projects includes Black and Green Belt
training. Multi skilled teams included Master Scheduling, Change Board, Process and Project M.E.’s, Industrial
Engineers, and Simulation capability. Spirit customer base currently includes Boeing, Airbus, Rolls Royce,
Mitsubishi and Bombardier.
Selected Accomplishments:
• Centralized and organized the (Global Production Engineering) GPE organization of 670 employees that
had recently been a fragmented group between Operations and Engineering. This was enabled to drive a
more efficient and standardized organization and processes into place.
• Successfully planned and executed for our Boeing customer, 6 - 737 fuselage replacements that were lost
to a derailment accident in Montana, this being executed during a high production rate and met all
contracted delivery dates.
• Launched $10M Factory Optimization Project to upgrade 737 Fuselage and Propulsions factory floor
space – included work place organization, material presentation and consumable kitting enhancements
o Realized over $5M one time savings for capital avoidance projects and annual savings of over
$1.6M recurring benefit
Most current work:
• Kinston N.C. Airbus A350 Fuselage Rate Enablement
• 737Max and 777X Boeing New Programs
Vice President of Operations – Commercial Fuselages / Propulsion Structures 2012-2014
Directly responsible for all operations for Spirit AeroSystems Wichita Operations. Directly managed more than 2400
employees while overseeing 12 production programs generating over $6B in revenue annually and growing. Set department
goals, authorized spending, administered operating budget of over $240 million per year and managed daily production.
Selected Accomplishments and cost savings contributing to the bottom line:
• Implemented a Management Operating System to effectively manage a large production organization
• Reduced cost and flow of all production lines to improve performance through identified Lean Projects
o Realized 4X savings in the factory and office environments for every $ spent in lean labor
o With factory optimization projects, realization of tools, tool accountability and perishable tool
reductions were accounted for over $100K for 2015.
• Worked with IAM though Joint Partner Steering Committee activities
• Excellent working relationship with the IAM
Director of Operations - Propulsion Structures and Systems 2010 -2012
Directly responsible for all operations and functional organizations within the Propulsion Structures and Systems facet of
Spirit. Directly managed more than 1200 employees while overseeing 9 production programs generating over $3B in
revenue annually and growing. Set department goals, authorized spending, administered operating budget of over $80
million per year and managed daily production.
Selected Accomplishments:
• Implemented advanced technologies along with MR&D and Engineering to enable Spirit’s capability as a leader in
assembly technology
• Advance Composite manufacturing technologies advancement with the intent to build 787 fuselage’s, demonstrated
360 deg. barrel capability which ultimately ended up with a contract win for 787 - 41 section.
• Inventory reduction of $100M in sheet metal fabrication
Executive Director Sales and Marketing 2005-2010
Directly responsible for managing incoming RFP responses to include attracting RFP’s, capturing work and maintaining
customer relationships to further attract future business.
Selected Accomplishments:
• Established newly formed Sales and Marketing group upon inception of Spirit AeroSystems, Inc.
• Organized Spirits first Airshow presence at Paris and Farnborough Airshows
• Established Spirit Defense and was President of the newly formed organization
The Boeing Co. - Industrial Engineering/Business Management/Operations Exec. Management 1981-2005
Multiple positions as I advanced from entry level Industrial Engineer to Executive Level Product Line Manger
Selected Accomplishments:
• Industrial Engineering Manager – Air Force One – Yankee White Clearance
• B52 Program Management – Top Secret Clearance
• Boeing Composite Process Action Team Leader for Wichita
__________________________Education____________________________
Bachelor of Science in Marketing/Business Administration Kansas State University
Master’s in Business Administration Friends University Wichita, Kansas

More Related Content

What's hot

Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell
 
Alfonso Iannotta Resume
Alfonso Iannotta ResumeAlfonso Iannotta Resume
Alfonso Iannotta ResumeAl Iannotta
 
Technical Operations Manager job from abrs
Technical Operations Manager job from abrsTechnical Operations Manager job from abrs
Technical Operations Manager job from abrsMark Long
 
Farley kenneth-resume-2016
Farley kenneth-resume-2016Farley kenneth-resume-2016
Farley kenneth-resume-2016Ken Farley
 
Tom's Resume 7 (1)
Tom's Resume 7 (1)Tom's Resume 7 (1)
Tom's Resume 7 (1)Thomas Hippe
 
J keith hubbard director of operations
J  keith hubbard  director of operationsJ  keith hubbard  director of operations
J keith hubbard director of operationsJ. Keith Hubbard
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017Kent White
 
Chris Scocco Resume
Chris Scocco ResumeChris Scocco Resume
Chris Scocco ResumeChris Scocco
 
Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard
 
Brian Andrews Resume 2016
Brian Andrews Resume 2016Brian Andrews Resume 2016
Brian Andrews Resume 2016Brian Andrews
 
Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016Dion H. Metcalfe
 
CV update Feb 2016
CV update Feb 2016CV update Feb 2016
CV update Feb 2016ewan forgie
 
Gregory Walley Resume 07.16
Gregory Walley Resume 07.16Gregory Walley Resume 07.16
Gregory Walley Resume 07.16Greg Walley
 
MJonesMFG Management Resume
MJonesMFG Management ResumeMJonesMFG Management Resume
MJonesMFG Management ResumeMark R. Jones
 
MJonesMFG Operation Resume
MJonesMFG Operation ResumeMJonesMFG Operation Resume
MJonesMFG Operation ResumeMark R. Jones
 

What's hot (20)

Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017
 
Chris Irgens
Chris IrgensChris Irgens
Chris Irgens
 
Alfonso Iannotta Resume
Alfonso Iannotta ResumeAlfonso Iannotta Resume
Alfonso Iannotta Resume
 
Technical Operations Manager job from abrs
Technical Operations Manager job from abrsTechnical Operations Manager job from abrs
Technical Operations Manager job from abrs
 
Farley kenneth-resume-2016
Farley kenneth-resume-2016Farley kenneth-resume-2016
Farley kenneth-resume-2016
 
Tom's Resume 7 (1)
Tom's Resume 7 (1)Tom's Resume 7 (1)
Tom's Resume 7 (1)
 
J keith hubbard director of operations
J  keith hubbard  director of operationsJ  keith hubbard  director of operations
J keith hubbard director of operations
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
 
Chris Scocco Resume
Chris Scocco ResumeChris Scocco Resume
Chris Scocco Resume
 
Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2Rod Kennard Resume _Nov 2016_V2
Rod Kennard Resume _Nov 2016_V2
 
Brian Andrews Resume 2016
Brian Andrews Resume 2016Brian Andrews Resume 2016
Brian Andrews Resume 2016
 
Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016Dion Metcalfe Resume - Revised 19 Jan 2016
Dion Metcalfe Resume - Revised 19 Jan 2016
 
Rods Resume update
Rods Resume updateRods Resume update
Rods Resume update
 
CV update Feb 2016
CV update Feb 2016CV update Feb 2016
CV update Feb 2016
 
Resume_Kalpesh_1
Resume_Kalpesh_1Resume_Kalpesh_1
Resume_Kalpesh_1
 
CL + CV AUG 2016
CL + CV AUG 2016CL + CV AUG 2016
CL + CV AUG 2016
 
Gregory Walley Resume 07.16
Gregory Walley Resume 07.16Gregory Walley Resume 07.16
Gregory Walley Resume 07.16
 
MJonesMFG Management Resume
MJonesMFG Management ResumeMJonesMFG Management Resume
MJonesMFG Management Resume
 
Cmrw executive
Cmrw executiveCmrw executive
Cmrw executive
 
MJonesMFG Operation Resume
MJonesMFG Operation ResumeMJonesMFG Operation Resume
MJonesMFG Operation Resume
 

Viewers also liked (12)

deborah
deborah deborah
deborah
 
Rampres
RampresRampres
Rampres
 
Digipak Analysis X3
Digipak Analysis X3Digipak Analysis X3
Digipak Analysis X3
 
Slidepresent
SlidepresentSlidepresent
Slidepresent
 
Gp6 gcit1015-new
Gp6 gcit1015-newGp6 gcit1015-new
Gp6 gcit1015-new
 
SEGMENT A: COSTUME/HAIR/MAKE-UP RESEARCH
SEGMENT A: COSTUME/HAIR/MAKE-UP RESEARCHSEGMENT A: COSTUME/HAIR/MAKE-UP RESEARCH
SEGMENT A: COSTUME/HAIR/MAKE-UP RESEARCH
 
15226891 pss7
15226891 pss715226891 pss7
15226891 pss7
 
Music advertisement poster analysis x3
Music advertisement poster analysis x3Music advertisement poster analysis x3
Music advertisement poster analysis x3
 
Asad CV 2015 Final
Asad CV 2015 FinalAsad CV 2015 Final
Asad CV 2015 Final
 
Slidepresent
SlidepresentSlidepresent
Slidepresent
 
6. chenopodiaceae
6. chenopodiaceae6. chenopodiaceae
6. chenopodiaceae
 
Question 1
Question 1Question 1
Question 1
 

Similar to Doug Scott (2)

Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott Bean
 
William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant, PMP
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2John Kidd
 
SHAMOUN MALEK - Resume, Update Nov 2015
SHAMOUN MALEK - Resume, Update Nov 2015SHAMOUN MALEK - Resume, Update Nov 2015
SHAMOUN MALEK - Resume, Update Nov 2015Malek Shamoun
 
KMabin_resume_SEP2019
KMabin_resume_SEP2019KMabin_resume_SEP2019
KMabin_resume_SEP2019Kyle Mabin
 
McKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptx
McKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptxMcKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptx
McKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptxAjay Gangakhedkar
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashevtashevraphael
 
Resume M Pitcher 2010 08 27
Resume   M Pitcher 2010 08 27Resume   M Pitcher 2010 08 27
Resume M Pitcher 2010 08 27Michael Pitcher
 
15-02-10 Bosenko Resume
15-02-10 Bosenko Resume15-02-10 Bosenko Resume
15-02-10 Bosenko ResumeDaysman
 
DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_Doug Williams
 
Daniel DenBoer_Resume_2013 Summary
Daniel DenBoer_Resume_2013 SummaryDaniel DenBoer_Resume_2013 Summary
Daniel DenBoer_Resume_2013 SummaryDaniel DenBoer
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013Austin C. Mattson II
 

Similar to Doug Scott (2) (20)

Scott a. bean resume july 2016
Scott a. bean resume july 2016Scott a. bean resume july 2016
Scott a. bean resume july 2016
 
DWADAMS RESUME2
DWADAMS RESUME2DWADAMS RESUME2
DWADAMS RESUME2
 
William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016William Bryant - Resume PMP 2016
William Bryant - Resume PMP 2016
 
2015.08 John Kidd cv.2
2015.08 John Kidd cv.22015.08 John Kidd cv.2
2015.08 John Kidd cv.2
 
SHAMOUN MALEK - Resume, Update Nov 2015
SHAMOUN MALEK - Resume, Update Nov 2015SHAMOUN MALEK - Resume, Update Nov 2015
SHAMOUN MALEK - Resume, Update Nov 2015
 
KMabin_resume_SEP2019
KMabin_resume_SEP2019KMabin_resume_SEP2019
KMabin_resume_SEP2019
 
bdots16 (1)
bdots16 (1)bdots16 (1)
bdots16 (1)
 
McKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptx
McKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptxMcKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptx
McKinsey Proposal in Support of the - 2008-09 Presidential Transition.pptx
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashev
 
BAMIDELE Ali CV
BAMIDELE Ali CVBAMIDELE Ali CV
BAMIDELE Ali CV
 
M Pitcher Resume
M Pitcher ResumeM Pitcher Resume
M Pitcher Resume
 
Resume M Pitcher 2010 08 27
Resume   M Pitcher 2010 08 27Resume   M Pitcher 2010 08 27
Resume M Pitcher 2010 08 27
 
15-02-10 Bosenko Resume
15-02-10 Bosenko Resume15-02-10 Bosenko Resume
15-02-10 Bosenko Resume
 
DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_DougWilliams2016Resume-_with NOV_
DougWilliams2016Resume-_with NOV_
 
Daniel DenBoer_Resume_2013 Summary
Daniel DenBoer_Resume_2013 SummaryDaniel DenBoer_Resume_2013 Summary
Daniel DenBoer_Resume_2013 Summary
 
RES_Bob_Polcyn_2015
RES_Bob_Polcyn_2015RES_Bob_Polcyn_2015
RES_Bob_Polcyn_2015
 
Anthony_Scianna_Resume
Anthony_Scianna_ResumeAnthony_Scianna_Resume
Anthony_Scianna_Resume
 
Jeffrey M Singleton 2013 resume
Jeffrey M Singleton 2013 resumeJeffrey M Singleton 2013 resume
Jeffrey M Singleton 2013 resume
 
Smiley Stephen Resume
Smiley Stephen ResumeSmiley Stephen Resume
Smiley Stephen Resume
 
Austin C Mattson_II_resume_May 2013
Austin C  Mattson_II_resume_May 2013Austin C  Mattson_II_resume_May 2013
Austin C Mattson_II_resume_May 2013
 

Doug Scott (2)

  • 1. Douglas L. Scott 12205 W. Nantucket Wichita, Ks. | Cell (316) 210-7312 | dlscott1@gte.net ____________________________________________________________________________________________________ High energy, effective leader, focused on producing highly efficient products, as well as build and lead highly effective teams, extract innovative solutions, and produce results that effect the corporations bottom line. Empowers leaders, encourages forward thinking, drives teams to results, coaches through challenges to find solutions. Utilizes talent from global operations to benchmark best practices and standard work in order to create a culture of continuous improvement and learning. Areas of Expertise: Operations Management Continuous Process Improvement Industrial Engineering Process Standardization Sales and Marketing Team Building ________________Professional Experience______________ Spirit AeroSystems – Wichita, Kansas 2014 - Jan 15, 2016 Director Global Production Engineering Directly responsible for the production support for Operations located in Wichita Kan., Tulsa Ok., Kinston North Carolina, Prestwick Scotland and Subang Malaysia. Teams include Industrial Engineers, Manufacturing Engineers, Continuous Improvement Core teams, Six Sigma Teams/Projects includes Black and Green Belt training. Multi skilled teams included Master Scheduling, Change Board, Process and Project M.E.’s, Industrial Engineers, and Simulation capability. Spirit customer base currently includes Boeing, Airbus, Rolls Royce, Mitsubishi and Bombardier. Selected Accomplishments: • Centralized and organized the (Global Production Engineering) GPE organization of 670 employees that had recently been a fragmented group between Operations and Engineering. This was enabled to drive a more efficient and standardized organization and processes into place. • Successfully planned and executed for our Boeing customer, 6 - 737 fuselage replacements that were lost to a derailment accident in Montana, this being executed during a high production rate and met all contracted delivery dates. • Launched $10M Factory Optimization Project to upgrade 737 Fuselage and Propulsions factory floor space – included work place organization, material presentation and consumable kitting enhancements o Realized over $5M one time savings for capital avoidance projects and annual savings of over $1.6M recurring benefit Most current work: • Kinston N.C. Airbus A350 Fuselage Rate Enablement • 737Max and 777X Boeing New Programs
  • 2. Vice President of Operations – Commercial Fuselages / Propulsion Structures 2012-2014 Directly responsible for all operations for Spirit AeroSystems Wichita Operations. Directly managed more than 2400 employees while overseeing 12 production programs generating over $6B in revenue annually and growing. Set department goals, authorized spending, administered operating budget of over $240 million per year and managed daily production. Selected Accomplishments and cost savings contributing to the bottom line: • Implemented a Management Operating System to effectively manage a large production organization • Reduced cost and flow of all production lines to improve performance through identified Lean Projects o Realized 4X savings in the factory and office environments for every $ spent in lean labor o With factory optimization projects, realization of tools, tool accountability and perishable tool reductions were accounted for over $100K for 2015. • Worked with IAM though Joint Partner Steering Committee activities • Excellent working relationship with the IAM Director of Operations - Propulsion Structures and Systems 2010 -2012 Directly responsible for all operations and functional organizations within the Propulsion Structures and Systems facet of Spirit. Directly managed more than 1200 employees while overseeing 9 production programs generating over $3B in revenue annually and growing. Set department goals, authorized spending, administered operating budget of over $80 million per year and managed daily production. Selected Accomplishments: • Implemented advanced technologies along with MR&D and Engineering to enable Spirit’s capability as a leader in assembly technology • Advance Composite manufacturing technologies advancement with the intent to build 787 fuselage’s, demonstrated 360 deg. barrel capability which ultimately ended up with a contract win for 787 - 41 section. • Inventory reduction of $100M in sheet metal fabrication Executive Director Sales and Marketing 2005-2010 Directly responsible for managing incoming RFP responses to include attracting RFP’s, capturing work and maintaining customer relationships to further attract future business. Selected Accomplishments: • Established newly formed Sales and Marketing group upon inception of Spirit AeroSystems, Inc. • Organized Spirits first Airshow presence at Paris and Farnborough Airshows • Established Spirit Defense and was President of the newly formed organization The Boeing Co. - Industrial Engineering/Business Management/Operations Exec. Management 1981-2005 Multiple positions as I advanced from entry level Industrial Engineer to Executive Level Product Line Manger Selected Accomplishments: • Industrial Engineering Manager – Air Force One – Yankee White Clearance • B52 Program Management – Top Secret Clearance • Boeing Composite Process Action Team Leader for Wichita __________________________Education____________________________
  • 3. Bachelor of Science in Marketing/Business Administration Kansas State University Master’s in Business Administration Friends University Wichita, Kansas