SlideShare a Scribd company logo
CURRICULUM VITAE
● HARIKRISHNAN N A
Hkna.official@gmail.com
Mob: +91 75948 13278
OBJECTIVE
Over the past six years, my professional focus has centered on highway and
infrastructure projects, where I've gained extensive experience managing and overseeing
entire project lifecycles. In addition to my primary work on roads and highways, I've also
ventured into the realm of commercial building projects. Balancing these diverse
responsibilities has presented notable challenges, particularly in meeting ambitious
project timelines and deliverables. However, these experiences have further honed my
ability to navigate complex tasks and ensure successful project completions within
specified timeframes.
AREAS EXPERTIES
➢ Pre-Design survey, topography; provide field data relevant to the shape, contour,
location, elevation or dimension of land for engineering, construction and other
purpose. Establishing survey control points relative to project requirements,
traversing, detail survey & plotting, setting out & leveling. As-built surveys and
preparation of reports.
➢ Plan, manage and monitor the implementation of correct QA/QC procedures are in
place for survey section. Identifying errors and help surveyors in trouble shooting
areas, ensuring zero defects in setting outs, collect and review survey data,
maintenance and inspection of survey equipment and preparing and maintaining
calibration schedule and records, Co-ordination and inspection with clients.
Page 1 of 7
TECHNICAL QUALIFICATIONS
➢ Landsurveyor Recognized by Technical Board.
➢ Draughtsman Civil(NCVT)
➢ CPR AED & First Aid Certified
● EMPLOYMENT HISTORY
● 6 month experience in maps surveying
Ottapalam, Palakkad. (PWD projects)
01/06/2018 - 31/12/2018
Position: surveyor
● 4 year experience in Greenworth Infrastructure pvt ltd
Eranakulam. (NH85,KSTP Project)
01/01/2019 - 03/05/2023
Position: Project Engineer
● Currently, I am working In Lebami Builders and Developers
Position: Project manager
● DUTIES AND RESPONSIBILITIES
1. Project Planning: Develop a comprehensive project plan outlining scope, objectives,
timelines, resources, and deliverables.
2. Resource Management: Allocate resources efficiently to tasks and manage the project
budget effectively.
3. Team Leadership: Build and lead a motivated project team, fostering collaboration and
resolving conflicts.
4. Stakeholder Communication: Maintain clear and open communication with
stakeholders, updating them on progress, risks, and changes.
5. Risk Management: Identify potential risks to the project and develop mitigation
strategies to minimize their impact.
6. Quality Control: Ensure that project deliverables meet quality standards and are
aligned with stakeholder expectations.
Page 2 of 7
7. Schedule Management: Monitor project timelines and milestones, making adjustments
as necessary to keep the project on track.
8. Problem-solving: Address issues and challenges that arise during the project lifecycle,
finding practical solutions to keep the project moving forward.
9. Documentation and Reporting: Maintain accurate project documentation and prepare
regular status reports for stakeholders and leadership.
10. Change Management: Evaluate and manage changes to project scope, schedule, and
resources, ensuring that changes are properly assessed and approved.
11. Closure and Evaluation: Oversee the project closure process, including lessons
learned sessions and project evaluations to capture insights for future projects.
SOFTWERES USED
AutoCAD, Civil 3D & MS office. (MS Excel),SW DTM
LANGUAGES KNOWN
English, Hindi, Tamil and Malayalam
PERMANENT ADDRESS
Neelanchery (Ho)
Kizhakkumpuram(po)
Mannur
Palakkad,678642
PERSONAL DETAILS
Nationality : Indian
Date of Birth : 23/07/1994
Marital status. : Married
Religion. : Hindu
Caste. : Nair
HOBBIES AND INTERESTS
Cooking
Teaching
Football
The above-mentioned details are true up to my best knowledge.
HARIKRISHNAN N A
Page 3 of 7
Page 4 of 7
Page 5 of 7
Page 6 of 7
Page 7 of 7

More Related Content

Similar to DOC-20240514-WA0014..pdfmodern survey kll

Environmental Engineering.pptx
Environmental Engineering.pptxEnvironmental Engineering.pptx
Environmental Engineering.pptx
BonnelAlos1
 
Resume
ResumeResume
Project Manager.docx
 Project Manager.docx Project Manager.docx
Project Manager.docx
kathiravanveeramani3
 
Getting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptxGetting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptx
RizwanQureshi64
 
10 Essential Tips for a Successful Construction Project
10 Essential Tips for a Successful Construction Project10 Essential Tips for a Successful Construction Project
10 Essential Tips for a Successful Construction Project
jkhbuildcon488
 
JINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CV
Jinu Louis
 
Project Management Methodologies
Project Management MethodologiesProject Management Methodologies
Project Management Methodologies
Monief Eid,Prince2,Prosci, Lean Six Sigma &ITIL
 
Sr._Project_Manager_Resume_Jan2015
Sr._Project_Manager_Resume_Jan2015Sr._Project_Manager_Resume_Jan2015
Sr._Project_Manager_Resume_Jan2015
Scort Christy
 
Mastering Project Management - Key Principles and Practices.pdf
Mastering Project Management - Key Principles and Practices.pdfMastering Project Management - Key Principles and Practices.pdf
Mastering Project Management - Key Principles and Practices.pdf
KEYS Consulting
 
Project Management Pocket Skills Guide
Project Management Pocket Skills GuideProject Management Pocket Skills Guide
Project Management Pocket Skills Guide
Emily Robinson
 
Skills_Matrix_7793
Skills_Matrix_7793Skills_Matrix_7793
Skills_Matrix_7793
Marjorie Severino
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
Raja Manyam
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
SharanabasappaDegoan
 
Mervyn_Stephens CV
Mervyn_Stephens CVMervyn_Stephens CV
Mervyn_Stephens CV
Mervyn Stephens
 
The Complete Guide to Project Management Life Cycle Phases.pdf
The Complete Guide to Project Management Life Cycle Phases.pdfThe Complete Guide to Project Management Life Cycle Phases.pdf
The Complete Guide to Project Management Life Cycle Phases.pdf
educationedge.ca
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
mahmood mansor
 
Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508
Maximo Aton
 
one of the Effective Project Management updated 2023 doc 5.docx
one of the Effective Project Management updated 2023 doc 5.docxone of the Effective Project Management updated 2023 doc 5.docx
one of the Effective Project Management updated 2023 doc 5.docx
intel-writers.com
 
project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
MARYJULDULAGAN
 
Isam_Bashir_1 no photo
Isam_Bashir_1 no photoIsam_Bashir_1 no photo
Isam_Bashir_1 no photo
Isam Bashir
 

Similar to DOC-20240514-WA0014..pdfmodern survey kll (20)

Environmental Engineering.pptx
Environmental Engineering.pptxEnvironmental Engineering.pptx
Environmental Engineering.pptx
 
Resume
ResumeResume
Resume
 
Project Manager.docx
 Project Manager.docx Project Manager.docx
Project Manager.docx
 
Getting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptxGetting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptx
 
10 Essential Tips for a Successful Construction Project
10 Essential Tips for a Successful Construction Project10 Essential Tips for a Successful Construction Project
10 Essential Tips for a Successful Construction Project
 
JINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CVJINU STEPHEN LOUIS - CV
JINU STEPHEN LOUIS - CV
 
Project Management Methodologies
Project Management MethodologiesProject Management Methodologies
Project Management Methodologies
 
Sr._Project_Manager_Resume_Jan2015
Sr._Project_Manager_Resume_Jan2015Sr._Project_Manager_Resume_Jan2015
Sr._Project_Manager_Resume_Jan2015
 
Mastering Project Management - Key Principles and Practices.pdf
Mastering Project Management - Key Principles and Practices.pdfMastering Project Management - Key Principles and Practices.pdf
Mastering Project Management - Key Principles and Practices.pdf
 
Project Management Pocket Skills Guide
Project Management Pocket Skills GuideProject Management Pocket Skills Guide
Project Management Pocket Skills Guide
 
Skills_Matrix_7793
Skills_Matrix_7793Skills_Matrix_7793
Skills_Matrix_7793
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Mervyn_Stephens CV
Mervyn_Stephens CVMervyn_Stephens CV
Mervyn_Stephens CV
 
The Complete Guide to Project Management Life Cycle Phases.pdf
The Complete Guide to Project Management Life Cycle Phases.pdfThe Complete Guide to Project Management Life Cycle Phases.pdf
The Complete Guide to Project Management Life Cycle Phases.pdf
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508
 
one of the Effective Project Management updated 2023 doc 5.docx
one of the Effective Project Management updated 2023 doc 5.docxone of the Effective Project Management updated 2023 doc 5.docx
one of the Effective Project Management updated 2023 doc 5.docx
 
project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
 
Isam_Bashir_1 no photo
Isam_Bashir_1 no photoIsam_Bashir_1 no photo
Isam_Bashir_1 no photo
 

Recently uploaded

一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
xuqdabu
 
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
8db3cz8x
 
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
1jtj7yul
 
Production.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd ddddddddddddddddddddddddddddddddddProduction.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd dddddddddddddddddddddddddddddddddd
DanielOliver74
 
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
nudduv
 
按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理
按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理
按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理
yizxn4sx
 
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
yizxn4sx
 
加急办理美国南加州大学毕业证文凭毕业证原版一模一样
加急办理美国南加州大学毕业证文凭毕业证原版一模一样加急办理美国南加州大学毕业证文凭毕业证原版一模一样
加急办理美国南加州大学毕业证文凭毕业证原版一模一样
u0g33km
 
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDARLORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
lorraineandreiamcidl
 
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
xuqdabu
 
按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理
按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理
按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理
6oo02s6l
 
按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理
按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理
按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理
terpt4iu
 
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
zpc0z12
 
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
yizxn4sx
 
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
2g3om49r
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
nudduv
 
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
uyesp1a
 
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
eydeofo
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
xuqdabu
 
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
snfdnzl7
 

Recently uploaded (20)

一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
一比一原版(Monash文凭证书)莫纳什大学毕业证如何办理
 
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理按照学校原版(QU文凭证书)皇后大学毕业证快速办理
按照学校原版(QU文凭证书)皇后大学毕业证快速办理
 
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
按照学校原版(SUT文凭证书)斯威本科技大学毕业证快速办理
 
Production.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd ddddddddddddddddddddddddddddddddddProduction.pptxd dddddddddddddddddddddddddddddddddd
Production.pptxd dddddddddddddddddddddddddddddddddd
 
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
一比一原版(ANU文凭证书)澳大利亚国立大学毕业证如何办理
 
按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理
按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理
按照学校原版(Greenwich文凭证书)格林威治大学毕业证快速办理
 
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
 
加急办理美国南加州大学毕业证文凭毕业证原版一模一样
加急办理美国南加州大学毕业证文凭毕业证原版一模一样加急办理美国南加州大学毕业证文凭毕业证原版一模一样
加急办理美国南加州大学毕业证文凭毕业证原版一模一样
 
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDARLORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
LORRAINE ANDREI_LEQUIGAN_GOOGLE CALENDAR
 
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
一比一原版(UQ文凭证书)昆士兰大学毕业证如何办理
 
按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理
按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理
按照学校原版(Birmingham文凭证书)伯明翰大学|学院毕业证快速办理
 
按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理
按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理
按照学校原版(Adelaide文凭证书)阿德莱德大学毕业证快速办理
 
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
按照学校原版(UST文凭证书)圣托马斯大学毕业证快速办理
 
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
按照学校原版(Westminster文凭证书)威斯敏斯特大学毕业证快速办理
 
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
1比1复刻澳洲皇家墨尔本理工大学毕业证本科学位原版一模一样
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
 
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
按照学校原版(Columbia文凭证书)哥伦比亚大学毕业证快速办理
 
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
一比一原版(UOL文凭证书)利物浦大学毕业证如何办理
 
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide文凭证书)阿德莱德大学毕业证如何办理
 
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
按照学校原版(USD文凭证书)圣地亚哥大学毕业证快速办理
 

DOC-20240514-WA0014..pdfmodern survey kll

  • 1. CURRICULUM VITAE ● HARIKRISHNAN N A Hkna.official@gmail.com Mob: +91 75948 13278 OBJECTIVE Over the past six years, my professional focus has centered on highway and infrastructure projects, where I've gained extensive experience managing and overseeing entire project lifecycles. In addition to my primary work on roads and highways, I've also ventured into the realm of commercial building projects. Balancing these diverse responsibilities has presented notable challenges, particularly in meeting ambitious project timelines and deliverables. However, these experiences have further honed my ability to navigate complex tasks and ensure successful project completions within specified timeframes. AREAS EXPERTIES ➢ Pre-Design survey, topography; provide field data relevant to the shape, contour, location, elevation or dimension of land for engineering, construction and other purpose. Establishing survey control points relative to project requirements, traversing, detail survey & plotting, setting out & leveling. As-built surveys and preparation of reports. ➢ Plan, manage and monitor the implementation of correct QA/QC procedures are in place for survey section. Identifying errors and help surveyors in trouble shooting areas, ensuring zero defects in setting outs, collect and review survey data, maintenance and inspection of survey equipment and preparing and maintaining calibration schedule and records, Co-ordination and inspection with clients. Page 1 of 7
  • 2. TECHNICAL QUALIFICATIONS ➢ Landsurveyor Recognized by Technical Board. ➢ Draughtsman Civil(NCVT) ➢ CPR AED & First Aid Certified ● EMPLOYMENT HISTORY ● 6 month experience in maps surveying Ottapalam, Palakkad. (PWD projects) 01/06/2018 - 31/12/2018 Position: surveyor ● 4 year experience in Greenworth Infrastructure pvt ltd Eranakulam. (NH85,KSTP Project) 01/01/2019 - 03/05/2023 Position: Project Engineer ● Currently, I am working In Lebami Builders and Developers Position: Project manager ● DUTIES AND RESPONSIBILITIES 1. Project Planning: Develop a comprehensive project plan outlining scope, objectives, timelines, resources, and deliverables. 2. Resource Management: Allocate resources efficiently to tasks and manage the project budget effectively. 3. Team Leadership: Build and lead a motivated project team, fostering collaboration and resolving conflicts. 4. Stakeholder Communication: Maintain clear and open communication with stakeholders, updating them on progress, risks, and changes. 5. Risk Management: Identify potential risks to the project and develop mitigation strategies to minimize their impact. 6. Quality Control: Ensure that project deliverables meet quality standards and are aligned with stakeholder expectations. Page 2 of 7
  • 3. 7. Schedule Management: Monitor project timelines and milestones, making adjustments as necessary to keep the project on track. 8. Problem-solving: Address issues and challenges that arise during the project lifecycle, finding practical solutions to keep the project moving forward. 9. Documentation and Reporting: Maintain accurate project documentation and prepare regular status reports for stakeholders and leadership. 10. Change Management: Evaluate and manage changes to project scope, schedule, and resources, ensuring that changes are properly assessed and approved. 11. Closure and Evaluation: Oversee the project closure process, including lessons learned sessions and project evaluations to capture insights for future projects. SOFTWERES USED AutoCAD, Civil 3D & MS office. (MS Excel),SW DTM LANGUAGES KNOWN English, Hindi, Tamil and Malayalam PERMANENT ADDRESS Neelanchery (Ho) Kizhakkumpuram(po) Mannur Palakkad,678642 PERSONAL DETAILS Nationality : Indian Date of Birth : 23/07/1994 Marital status. : Married Religion. : Hindu Caste. : Nair HOBBIES AND INTERESTS Cooking Teaching Football The above-mentioned details are true up to my best knowledge. HARIKRISHNAN N A Page 3 of 7