The Powerstation
Phase 1: Problem Finding
Aaron Pierce
Construction Site Research
Jobsite: Shelby Engineering   Partition teams 1&2
Construction Site Research
Plug it in, plug it in…   Partition teams 1&2
Phase 2: Problem Research + Initial Concepts
Aaron
Plug It In: jobsite cord management:

Plugging in and getting the power you need to get the job done right.




                                                                        Construction Site Research
                                                                        Partition teams 1&2
Plug it in & Charge it Up…

Addressing the issues of charging
more than one Li-Ion battery and
plugs that supply power to 3 or
more separate extension cords.




                                    Construction Site Research
                                    Partition teams 1&2
Is there a better way to do this?

While self-built power boxes provide
temporary power, they increase the
risk of blowing breakers, with the
possibility of electrocution.




                                       Construction Site Research
                                       Partition teams 1&2
Can we appeal to smaller scale
construction?

Commercial site renovations
encounter the same problem as
larger build-outs , but on a smaller
scale.

They need to be able to deliver the
equivalent amount of power from a
smaller junction box.




                                       Construction Site Research
                                       Partition teams 1&2
OSHA Requirements:

Keep cords free from walkways
and standing or flowing water

Battery Charging:
                                Battery charging installations must be located in areas
                                designated for that purpose. When batteries are being
                                charged, vent caps must be maintained in functioning
                                condition and kept in place to avoid electrolyte spray.

                                Also, charging apparatus must be protected from
                                damage...




                                                                            Construction Site Research
                                                                            Partition teams 1&2
Goals…

Use established temporary power.

Accommodate multiple batteries
and cords.

Deliver more power , more
efficiently.




                                   Construction Site Research
                                   Partition teams 1&2
The Fit:

Address the issues found from OSHA to safely provide electricity from a temporary power source

Accommodate existing power cables, multiple outlets and battery chargers, in a rugged and durable way.




                                                                                       Construction Site Research
                                                                                       Partition teams 1&2
Criteria

Easier to use than existing methods
of “jerry-rigging” electrical
connections.

Multiple cord and battery bays.

More efficiently use available
temporary power.




                                      Construction Site Research
                                      Partition teams 1&2
Professionals




Multipurpose Charger
Market Research

Where is everybody?       Specialized                                          Variety

Tool Base:
Specialized or Tool Variety

Audience:
Professional or DIY




                                            DIYers



                                                        Construction Site Research
                                                        Partition teams 1&2
Battery Product Analysis…

Companies…
Makita
$25 - $170

12v-18v Single Battery Chargers

Automotive Application




                                  Construction Site Research
                                  Partition teams 1&2
Battery Product Analysis…

Companies…
Bosch
$30 - $100

Single and Dual Bay Battery
Chargers

Automotive Application

No Cord Management
Or powerstrip capacity




                              Construction Site Research
                              Partition teams 1&2
Battery Product Analysis…

Companies…
Milwaukee
$25 - $160

Single to Triple Bay
Li-ion Battery Chargers

Limited cord management

No power strip capacity




                            Construction Site Research
                            Partition teams 1&2
Battery Product Analysis…

Companies…
DeWalt
$25 - $160

Single to Triple Bay
Li-ion Battery Chargers

Jobsite Radio

Light cord management




                            Construction Site Research
                            Partition teams 1&2
Initial Sketches: Power Station

Criteria…

Invincible

Multiple Li-Ion/Nickel Cadmium
Battery Chargers

Cord & Plug Management

Powered by 120V Power Source

OSHA Compliant




                                  Construction Site Research
                                  Partition teams 1&2
Initial Sketches: Power Station

Criteria…

Invincible

Multiple Li-Ion/Nickel Cadmium
Battery Chargers

Cord & Plug Management

Powered by 120V Power Source

OSHA Compliant




                                  Construction Site Research
                                  Partition teams 1&2
Phase 3: Concept Development
Aaron Pierce
Plug It In: Jobsite cord management:

Plugging in and getting the power you need to get the job done right.




                                                                        Construction Site Research
                                                                        Partition teams 1&2
The Scenario…

Electricians are required to install
the temporary power on many
jobsites.

They wire up a few GFCI outlets
from the junction box, to provide a
semi-reliable power source for the
contractor to use.




                                       Construction Site Research
                                       Partition teams 1&2
A power struggle…

As the workers use cordless tools
more, more battery chargers are
needed.

These added chargers drain the
needed power supply for corded
tools, resulting in tripped
breakers.




                                    Construction Site Research
                                    Partition teams 1&2
Time and money wasted…


Repetitious building and tearing
down temporary power.

Outlets in an unmanaged way
creating problems for battery
chargers and corded tools.

Workers having to walk back and
forth from chargers.

Chargers being stolen.




                                   Construction Site Research
                                   Partition teams 1&2
Critical To Qualities…

Use established temporary
power methods.

Accommodate multiple batteries
and cords in a modular fashion

Deliver power more efficiently.

Save the electrician time and
money by eliminating menial
installation problems




                                  Construction Site Research
                                  Partition teams 1&2
The Concept Goals:

Accommodate the issues seen on jobsites with temporary power installation and usage with a new kind of
product.

Manage existing power cables, multiple outlets and battery chargers, in a rugged and durable way that is
transportable from either vehicles or gang boxes.




                                                                                         Construction Site Research
                                                                                         Partition teams 1&2
Concept Direction :
Lithium Battery Charger

Pros…

Invincible

Multiple Li-Ion/Nickel Cadmium
Battery Chargers

Multiple Battery chargers

Powered by 120V Power Source

OSHA Compliant




                                 Construction Site Research
                                 Partition teams 1&2
Concept Direction :
Lithium Battery Charger

Cons…

Patented by Ryobi

Lack of security

No storage or cord management

Not modular

Not enough plugs, batteries are still
distant from workers in one location.




                                        Construction Site Research
                                        Partition teams 1&2
Concept Competing Products…

The 10C – Multicharger

Ryobi’s Multi-Battery Charger

Knaack’s Job Boxes: Storage

Where does all this converge?




                                Construction Site Research
                                Partition teams 1&2
Development…




               Construction Site Research
               Partition teams 1&2
Construction Site Research
Partition teams 1&2
Initial Sketches

Based on feedback from Jim Watson
and the BSCI team, I explored those
possibilities through sketches




                                      Construction Site Research
                                      Partition teams 1&2
Initial Sketches

Based on feedback from Jim Watson
and the BSCI team, I explored those
possibilities through sketching




                                      Construction Site Research
                                      Partition teams 1&2
Feedback on Sketches




                       Construction Site Research
                       Partition teams 1&2
Feedback on Sketches

Based on feedback from Michael
Schumacher, a general contractor

“My electricians can use this, the
cords just get ‘thrown’ into the
back of the truck, and get
tangled. This would give the cords
a place to go at the end of the
day”




                                     Construction Site Research
                                     Partition teams 1&2
Sequence of Use

After reviewing the sequence of
use, It became obvious that I was
creating more steps to the process
than making each step more
efficient. These concepts became
simpler.




                                     Construction Site Research
                                     Partition teams 1&2
Sketch Model Development

Black and Decker Senior Designer
Tom Murray visited our studio,
providing further feedback into the
development of a sketch model




                                      Construction Site Research
                                      Partition teams 1&2
Sketch Model Development

Black and Decker Senior Designer
Tom Murray visited our studio,
providing further feedback into the
development of a “sketch model”

“…avoid a functionless, flat lid A
5-gallon bucket recess would add
further functionality, along with
charger bays for cell phones or
iPhones.”




                                      Construction Site Research
                                      Partition teams 1&2
Sketch Model Feedback

Greg Lanier, owner of
Auburn Electrical Construction Co., Inc.

Conversation Notes:
-Wire Size to Amperage
-Breakers and GFCI outlets
-Thinner Wheels
-Jobsite Security Problems are #1
-DeWalt Tools vs. everyone else




                                           Construction Site Research
                                           Partition teams 1&2
Sketch Model Feedback

Greg Lanier, owner of
Auburn Electrical Construction Co., Inc.

Model Notes
-iPad/Smart phone compatibility
-No need to link multiples
-Lockable and Secure
-More Storage on the lid and back of
station
-Larger, Sturdier Handle
-Thinner wheels, like a bike




                                           Construction Site Research
                                           Partition teams 1&2
Final Concept:
After choosing the concept that best
met the end-user needs, and do so in an
attractive way within that context.




                                          Construction Site Research
                                          Partition teams 1&2
Final Concept:
The DeWalt PowerStation
After choosing the concept that
best met the end-user needs, and
do so in an attractive way within
that context.




                                    Construction Site Research
                                    Partition teams 1&2
Strong Sturdy Handles
Carry handles on both ends allow for
easy pick up and set down in the bed of
a truck, trailer, or gangbox.




                                          Construction Site Research
                                          Partition teams 1&2
Secure
Incorporates for a padlock through the
snap-latch handle to keep chargers and
cords safe.




                                         Construction Site Research
                                         Partition teams 1&2
Modular
Two modular units nest on either side of
the DeWalt Powerstation provide two
outlets and a multi-chemistry battery
charger with a 15’ cord wrapped at the
back of the uniit.




                                           Construction Site Research
                                           Partition teams 1&2
Atop-lid Storage

Clear lidded containers for hard-to-find
hardware, charging your connectivity
devices.




                                           Construction Site Research
                                           Partition teams 1&2
Strong Sturdy Handle
Handle extends up to the best height for
users, approximately 32”




                                           Construction Site Research
                                           Partition teams 1&2
Snap Latch Lid
By squeezing the latch on the front of
the Powerstation




                                         Construction Site Research
                                         Partition teams 1&2
Final Solution: The Powerstation
Aaron Pierce
The problem…
       Many solutions available to
electricians have to be adapted or
    modified to install temporary
               power on a jobsite.
The “traditional” way…
Most large commercial jobsites
construct Spider boxes that are
heavy and cumbersome to
relocate.
The interface problem…
   Cordless Drills use batteries that
        are plugged into chargers.
     These must be in an easy and
       time-saving location to the
                            workers.
11/21




11/19                                           11/29




                      11/22



 Model Development
Appearance model construction
      from welding to painted
                    assembly.

                                11/30
Powered Storage Container
           The Powerstation uses the
        power supplied by scope, in a
        way that is modular. Allowing
      the workers to charge and work
                     on the same line.
15’ Working Radii
15’ Extension Cords supplied on
 the unit make working on parts
  of the of the building from the
              same unit possible.
Portable, Secure Storage
The Powerstation makes it easier to
take down the equipment at the
end of the day, locking up with the
extension cords, batteries and
chargers.
quence of use: Step 1
 Romex Cables are wired into
 ystem, powering the interior
et, and modular units
Sequence of use: 2
Pull out the modular units. plug in
any other tools. Begin working.
DeWalt Powerstation presentation
DeWalt Powerstation presentation
DeWalt Powerstation presentation
DeWalt Powerstation presentation
DeWalt Powerstation presentation
DeWalt Powerstation presentation

More Related Content

Viewers also liked

Interface builder: Friend or foe
Interface builder: Friend or foeInterface builder: Friend or foe
Interface builder: Friend or foe
Zoltán Váradi
 
Assignment 2 lesson plan
Assignment 2 lesson planAssignment 2 lesson plan
Assignment 2 lesson plan
natim28
 
1 s2.0-0304386 x9500113u-main
1 s2.0-0304386 x9500113u-main1 s2.0-0304386 x9500113u-main
1 s2.0-0304386 x9500113u-main
Al Baha University
 
#3RdTT_What is social media management?
#3RdTT_What is social media management?#3RdTT_What is social media management?
#3RdTT_What is social media management?
The Post Institute: Center for Life-Long Learning
 
operating systems
operating systemsoperating systems
operating systems
chukey
 
Presentatie bryo
Presentatie bryoPresentatie bryo
Presentatie bryo
Wim Berghmans
 
Chef Dave Parker Portfolio
Chef Dave Parker PortfolioChef Dave Parker Portfolio
Chef Dave Parker Portfolio
chefparker1
 
Using prices policies to promote healthier diets WHO Europe
Using prices policies to promote healthier diets WHO EuropeUsing prices policies to promote healthier diets WHO Europe
Using prices policies to promote healthier diets WHO Europe
Héctor Lousa @HectorLousa
 
Inv pres q42013_-_final
Inv pres q42013_-_finalInv pres q42013_-_final
Inv pres q42013_-_final
CNOServices
 
451782 (1)
451782 (1)451782 (1)
451782 (1)
Al Baha University
 
Limitações do HTML no Desenvolvimento de Jogos Multiplataforma
Limitações do HTML no Desenvolvimento de Jogos MultiplataformaLimitações do HTML no Desenvolvimento de Jogos Multiplataforma
Limitações do HTML no Desenvolvimento de Jogos Multiplataforma
Jean Carlo Machado
 
Photo1
Photo1Photo1
Photo1
alexwafafa
 
McCormick Thesis Presentation
McCormick Thesis PresentationMcCormick Thesis Presentation
McCormick Thesis Presentation
Jennifer Vernali Crutchfield
 
Air india crisis
Air india crisisAir india crisis
Air india crisis
Ankit Chauhan
 
Waldorf pedagogia
Waldorf pedagogiaWaldorf pedagogia
Waldorf pedagogia
uzuxunago
 

Viewers also liked (15)

Interface builder: Friend or foe
Interface builder: Friend or foeInterface builder: Friend or foe
Interface builder: Friend or foe
 
Assignment 2 lesson plan
Assignment 2 lesson planAssignment 2 lesson plan
Assignment 2 lesson plan
 
1 s2.0-0304386 x9500113u-main
1 s2.0-0304386 x9500113u-main1 s2.0-0304386 x9500113u-main
1 s2.0-0304386 x9500113u-main
 
#3RdTT_What is social media management?
#3RdTT_What is social media management?#3RdTT_What is social media management?
#3RdTT_What is social media management?
 
operating systems
operating systemsoperating systems
operating systems
 
Presentatie bryo
Presentatie bryoPresentatie bryo
Presentatie bryo
 
Chef Dave Parker Portfolio
Chef Dave Parker PortfolioChef Dave Parker Portfolio
Chef Dave Parker Portfolio
 
Using prices policies to promote healthier diets WHO Europe
Using prices policies to promote healthier diets WHO EuropeUsing prices policies to promote healthier diets WHO Europe
Using prices policies to promote healthier diets WHO Europe
 
Inv pres q42013_-_final
Inv pres q42013_-_finalInv pres q42013_-_final
Inv pres q42013_-_final
 
451782 (1)
451782 (1)451782 (1)
451782 (1)
 
Limitações do HTML no Desenvolvimento de Jogos Multiplataforma
Limitações do HTML no Desenvolvimento de Jogos MultiplataformaLimitações do HTML no Desenvolvimento de Jogos Multiplataforma
Limitações do HTML no Desenvolvimento de Jogos Multiplataforma
 
Photo1
Photo1Photo1
Photo1
 
McCormick Thesis Presentation
McCormick Thesis PresentationMcCormick Thesis Presentation
McCormick Thesis Presentation
 
Air india crisis
Air india crisisAir india crisis
Air india crisis
 
Waldorf pedagogia
Waldorf pedagogiaWaldorf pedagogia
Waldorf pedagogia
 

Similar to DeWalt Powerstation presentation

Dc power plants for telecom and data
Dc power plants for telecom and dataDc power plants for telecom and data
Dc power plants for telecom and data
Anil Upadhyay
 
Electrical17OCT
Electrical17OCTElectrical17OCT
Electrical17OCT
Jay Tenison
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
ahmed al badarneh
 
DC SUPPLY SYSTEM.ppt
DC SUPPLY SYSTEM.pptDC SUPPLY SYSTEM.ppt
DC SUPPLY SYSTEM.ppt
banukiransamboju
 
EIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIES
EIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIESEIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIES
EIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIES
DesignTeam8
 
Presentation chargiing station for electric vechile car(battery operated)
Presentation chargiing station for electric vechile car(battery operated)Presentation chargiing station for electric vechile car(battery operated)
Presentation chargiing station for electric vechile car(battery operated)
Mahesh Chandra Manav
 
Link
LinkLink
Link
LinkLink
The current & future trends on ultra high
The current & future trends on ultra highThe current & future trends on ultra high
The current & future trends on ultra high
chandan kumar
 
Gz3612511256
Gz3612511256Gz3612511256
Gz3612511256
IJERA Editor
 
Uday Presentation
Uday PresentationUday Presentation
Uday Presentation
girishav123
 
IRJET - Single Phase Inverter using MOSFET
IRJET -  	  Single Phase Inverter using MOSFETIRJET -  	  Single Phase Inverter using MOSFET
IRJET - Single Phase Inverter using MOSFET
IRJET Journal
 
Adam Downey Resume
Adam Downey ResumeAdam Downey Resume
Adam Downey Resume
Adam Downey
 
GROUP-1-AT212.pptx
GROUP-1-AT212.pptxGROUP-1-AT212.pptx
GROUP-1-AT212.pptx
JesselynCea
 
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearNew Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
Schneider Electric
 
MZiegenfuss616
MZiegenfuss616MZiegenfuss616
MZiegenfuss616
Mark Ziegenfuss
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
Sandia National Laboratories: Energy & Climate: Renewables
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
Habib Ali Khan
 
ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...
ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...
ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...
ADVLSI
 
GloSho'14: Company Showcase - Eutricity
GloSho'14: Company Showcase - Eutricity GloSho'14: Company Showcase - Eutricity
GloSho'14: Company Showcase - Eutricity
Los Angeles Cleantech Incubator (LACI)
 

Similar to DeWalt Powerstation presentation (20)

Dc power plants for telecom and data
Dc power plants for telecom and dataDc power plants for telecom and data
Dc power plants for telecom and data
 
Electrical17OCT
Electrical17OCTElectrical17OCT
Electrical17OCT
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
DC SUPPLY SYSTEM.ppt
DC SUPPLY SYSTEM.pptDC SUPPLY SYSTEM.ppt
DC SUPPLY SYSTEM.ppt
 
EIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIES
EIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIESEIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIES
EIS BASED BATTERY MANAGEMENT SYSTEMS - ADVANTAGES, CHALLENGES, AND STRATEGIES
 
Presentation chargiing station for electric vechile car(battery operated)
Presentation chargiing station for electric vechile car(battery operated)Presentation chargiing station for electric vechile car(battery operated)
Presentation chargiing station for electric vechile car(battery operated)
 
Link
LinkLink
Link
 
Link
LinkLink
Link
 
The current & future trends on ultra high
The current & future trends on ultra highThe current & future trends on ultra high
The current & future trends on ultra high
 
Gz3612511256
Gz3612511256Gz3612511256
Gz3612511256
 
Uday Presentation
Uday PresentationUday Presentation
Uday Presentation
 
IRJET - Single Phase Inverter using MOSFET
IRJET -  	  Single Phase Inverter using MOSFETIRJET -  	  Single Phase Inverter using MOSFET
IRJET - Single Phase Inverter using MOSFET
 
Adam Downey Resume
Adam Downey ResumeAdam Downey Resume
Adam Downey Resume
 
GROUP-1-AT212.pptx
GROUP-1-AT212.pptxGROUP-1-AT212.pptx
GROUP-1-AT212.pptx
 
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage SwitchgearNew Approaches for Maintenance Grounding in Medium Voltage Switchgear
New Approaches for Maintenance Grounding in Medium Voltage Switchgear
 
MZiegenfuss616
MZiegenfuss616MZiegenfuss616
MZiegenfuss616
 
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
2014 PV Performance Modeling Workshop: AE's Perspective on PV Inverter Modeli...
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...
ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...
ADVEInc "Meet the Experts Forum 25February2010 - Electronics & IC Design Serv...
 
GloSho'14: Company Showcase - Eutricity
GloSho'14: Company Showcase - Eutricity GloSho'14: Company Showcase - Eutricity
GloSho'14: Company Showcase - Eutricity
 

Recently uploaded

modular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdfmodular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdf
RashmitaSwain3
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
k4krdgxx
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
Bianca Woods
 
一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理
一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理
一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理
67n7f53
 
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build  Your Online Presence 2024.pptxBest Digital Marketing Strategy Build  Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
pavankumarpayexelsol
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
Harry Harrold
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Designforuminternational
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
3vgr39kx
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
ellemjani
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
ijk38lw
 
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
f22b6g9c
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdfADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
GregMichaelTapawan
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
67n7f53
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
PabloMartelLpez
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
lhtvqoag
 
LGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation TemplateLGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation Template
DakshGudwani
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
wkip62b
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
Virtual Real Design
 

Recently uploaded (20)

modular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdfmodular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdf
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
 
一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理
一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理
一比一原版(LaTrobe毕业证书)拉筹伯大学毕业证如何办理
 
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build  Your Online Presence 2024.pptxBest Digital Marketing Strategy Build  Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
 
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdfADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
 
LGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation TemplateLGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation Template
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
 

DeWalt Powerstation presentation

  • 1. The Powerstation Phase 1: Problem Finding Aaron Pierce
  • 2. Construction Site Research Jobsite: Shelby Engineering Partition teams 1&2
  • 3. Construction Site Research Plug it in, plug it in… Partition teams 1&2
  • 4. Phase 2: Problem Research + Initial Concepts Aaron
  • 5. Plug It In: jobsite cord management: Plugging in and getting the power you need to get the job done right. Construction Site Research Partition teams 1&2
  • 6. Plug it in & Charge it Up… Addressing the issues of charging more than one Li-Ion battery and plugs that supply power to 3 or more separate extension cords. Construction Site Research Partition teams 1&2
  • 7. Is there a better way to do this? While self-built power boxes provide temporary power, they increase the risk of blowing breakers, with the possibility of electrocution. Construction Site Research Partition teams 1&2
  • 8. Can we appeal to smaller scale construction? Commercial site renovations encounter the same problem as larger build-outs , but on a smaller scale. They need to be able to deliver the equivalent amount of power from a smaller junction box. Construction Site Research Partition teams 1&2
  • 9. OSHA Requirements: Keep cords free from walkways and standing or flowing water Battery Charging: Battery charging installations must be located in areas designated for that purpose. When batteries are being charged, vent caps must be maintained in functioning condition and kept in place to avoid electrolyte spray. Also, charging apparatus must be protected from damage... Construction Site Research Partition teams 1&2
  • 10. Goals… Use established temporary power. Accommodate multiple batteries and cords. Deliver more power , more efficiently. Construction Site Research Partition teams 1&2
  • 11. The Fit: Address the issues found from OSHA to safely provide electricity from a temporary power source Accommodate existing power cables, multiple outlets and battery chargers, in a rugged and durable way. Construction Site Research Partition teams 1&2
  • 12. Criteria Easier to use than existing methods of “jerry-rigging” electrical connections. Multiple cord and battery bays. More efficiently use available temporary power. Construction Site Research Partition teams 1&2
  • 13. Professionals Multipurpose Charger Market Research Where is everybody? Specialized Variety Tool Base: Specialized or Tool Variety Audience: Professional or DIY DIYers Construction Site Research Partition teams 1&2
  • 14. Battery Product Analysis… Companies… Makita $25 - $170 12v-18v Single Battery Chargers Automotive Application Construction Site Research Partition teams 1&2
  • 15. Battery Product Analysis… Companies… Bosch $30 - $100 Single and Dual Bay Battery Chargers Automotive Application No Cord Management Or powerstrip capacity Construction Site Research Partition teams 1&2
  • 16. Battery Product Analysis… Companies… Milwaukee $25 - $160 Single to Triple Bay Li-ion Battery Chargers Limited cord management No power strip capacity Construction Site Research Partition teams 1&2
  • 17. Battery Product Analysis… Companies… DeWalt $25 - $160 Single to Triple Bay Li-ion Battery Chargers Jobsite Radio Light cord management Construction Site Research Partition teams 1&2
  • 18. Initial Sketches: Power Station Criteria… Invincible Multiple Li-Ion/Nickel Cadmium Battery Chargers Cord & Plug Management Powered by 120V Power Source OSHA Compliant Construction Site Research Partition teams 1&2
  • 19. Initial Sketches: Power Station Criteria… Invincible Multiple Li-Ion/Nickel Cadmium Battery Chargers Cord & Plug Management Powered by 120V Power Source OSHA Compliant Construction Site Research Partition teams 1&2
  • 20. Phase 3: Concept Development Aaron Pierce
  • 21. Plug It In: Jobsite cord management: Plugging in and getting the power you need to get the job done right. Construction Site Research Partition teams 1&2
  • 22. The Scenario… Electricians are required to install the temporary power on many jobsites. They wire up a few GFCI outlets from the junction box, to provide a semi-reliable power source for the contractor to use. Construction Site Research Partition teams 1&2
  • 23. A power struggle… As the workers use cordless tools more, more battery chargers are needed. These added chargers drain the needed power supply for corded tools, resulting in tripped breakers. Construction Site Research Partition teams 1&2
  • 24. Time and money wasted… Repetitious building and tearing down temporary power. Outlets in an unmanaged way creating problems for battery chargers and corded tools. Workers having to walk back and forth from chargers. Chargers being stolen. Construction Site Research Partition teams 1&2
  • 25. Critical To Qualities… Use established temporary power methods. Accommodate multiple batteries and cords in a modular fashion Deliver power more efficiently. Save the electrician time and money by eliminating menial installation problems Construction Site Research Partition teams 1&2
  • 26. The Concept Goals: Accommodate the issues seen on jobsites with temporary power installation and usage with a new kind of product. Manage existing power cables, multiple outlets and battery chargers, in a rugged and durable way that is transportable from either vehicles or gang boxes. Construction Site Research Partition teams 1&2
  • 27. Concept Direction : Lithium Battery Charger Pros… Invincible Multiple Li-Ion/Nickel Cadmium Battery Chargers Multiple Battery chargers Powered by 120V Power Source OSHA Compliant Construction Site Research Partition teams 1&2
  • 28. Concept Direction : Lithium Battery Charger Cons… Patented by Ryobi Lack of security No storage or cord management Not modular Not enough plugs, batteries are still distant from workers in one location. Construction Site Research Partition teams 1&2
  • 29. Concept Competing Products… The 10C – Multicharger Ryobi’s Multi-Battery Charger Knaack’s Job Boxes: Storage Where does all this converge? Construction Site Research Partition teams 1&2
  • 30. Development… Construction Site Research Partition teams 1&2
  • 32. Initial Sketches Based on feedback from Jim Watson and the BSCI team, I explored those possibilities through sketches Construction Site Research Partition teams 1&2
  • 33. Initial Sketches Based on feedback from Jim Watson and the BSCI team, I explored those possibilities through sketching Construction Site Research Partition teams 1&2
  • 34. Feedback on Sketches Construction Site Research Partition teams 1&2
  • 35. Feedback on Sketches Based on feedback from Michael Schumacher, a general contractor “My electricians can use this, the cords just get ‘thrown’ into the back of the truck, and get tangled. This would give the cords a place to go at the end of the day” Construction Site Research Partition teams 1&2
  • 36. Sequence of Use After reviewing the sequence of use, It became obvious that I was creating more steps to the process than making each step more efficient. These concepts became simpler. Construction Site Research Partition teams 1&2
  • 37. Sketch Model Development Black and Decker Senior Designer Tom Murray visited our studio, providing further feedback into the development of a sketch model Construction Site Research Partition teams 1&2
  • 38. Sketch Model Development Black and Decker Senior Designer Tom Murray visited our studio, providing further feedback into the development of a “sketch model” “…avoid a functionless, flat lid A 5-gallon bucket recess would add further functionality, along with charger bays for cell phones or iPhones.” Construction Site Research Partition teams 1&2
  • 39. Sketch Model Feedback Greg Lanier, owner of Auburn Electrical Construction Co., Inc. Conversation Notes: -Wire Size to Amperage -Breakers and GFCI outlets -Thinner Wheels -Jobsite Security Problems are #1 -DeWalt Tools vs. everyone else Construction Site Research Partition teams 1&2
  • 40. Sketch Model Feedback Greg Lanier, owner of Auburn Electrical Construction Co., Inc. Model Notes -iPad/Smart phone compatibility -No need to link multiples -Lockable and Secure -More Storage on the lid and back of station -Larger, Sturdier Handle -Thinner wheels, like a bike Construction Site Research Partition teams 1&2
  • 41. Final Concept: After choosing the concept that best met the end-user needs, and do so in an attractive way within that context. Construction Site Research Partition teams 1&2
  • 42. Final Concept: The DeWalt PowerStation After choosing the concept that best met the end-user needs, and do so in an attractive way within that context. Construction Site Research Partition teams 1&2
  • 43. Strong Sturdy Handles Carry handles on both ends allow for easy pick up and set down in the bed of a truck, trailer, or gangbox. Construction Site Research Partition teams 1&2
  • 44. Secure Incorporates for a padlock through the snap-latch handle to keep chargers and cords safe. Construction Site Research Partition teams 1&2
  • 45. Modular Two modular units nest on either side of the DeWalt Powerstation provide two outlets and a multi-chemistry battery charger with a 15’ cord wrapped at the back of the uniit. Construction Site Research Partition teams 1&2
  • 46. Atop-lid Storage Clear lidded containers for hard-to-find hardware, charging your connectivity devices. Construction Site Research Partition teams 1&2
  • 47. Strong Sturdy Handle Handle extends up to the best height for users, approximately 32” Construction Site Research Partition teams 1&2
  • 48. Snap Latch Lid By squeezing the latch on the front of the Powerstation Construction Site Research Partition teams 1&2
  • 49. Final Solution: The Powerstation Aaron Pierce
  • 50. The problem… Many solutions available to electricians have to be adapted or modified to install temporary power on a jobsite.
  • 51. The “traditional” way… Most large commercial jobsites construct Spider boxes that are heavy and cumbersome to relocate.
  • 52. The interface problem… Cordless Drills use batteries that are plugged into chargers. These must be in an easy and time-saving location to the workers.
  • 53. 11/21 11/19 11/29 11/22 Model Development Appearance model construction from welding to painted assembly. 11/30
  • 54. Powered Storage Container The Powerstation uses the power supplied by scope, in a way that is modular. Allowing the workers to charge and work on the same line.
  • 55. 15’ Working Radii 15’ Extension Cords supplied on the unit make working on parts of the of the building from the same unit possible.
  • 56. Portable, Secure Storage The Powerstation makes it easier to take down the equipment at the end of the day, locking up with the extension cords, batteries and chargers.
  • 57.
  • 58. quence of use: Step 1 Romex Cables are wired into ystem, powering the interior et, and modular units
  • 59. Sequence of use: 2 Pull out the modular units. plug in any other tools. Begin working.