This document outlines SCRRA's Design Quality Assurance Plan. It provides background on SCRRA, describing its mission to provide regional rail services in Southern California. It then details SCRRA's operations, organization, funding, and assets. The plan establishes procedures to ensure design quality, including design input and output requirements, roles and responsibilities, checking procedures, audits, training, and record keeping. It aims to verify that design documents are developed correctly using industry standards and competent professionals.
This document outlines the testing requirements and certification process for football turf fields through FIFA's Quality Programme. It details both laboratory and field testing procedures. Laboratory testing evaluates turf performance, durability, and material properties. Field testing assesses playability, injury risk, and durability with actual use. Certification levels of FIFA Quality and FIFA Quality Pro are granted if fields pass all tests. Regular retesting is required to maintain certification. The document provides tables outlining specific performance criteria for both laboratory and field tests.
The document provides a detailed description of the proposed Nicaragua Canal Project, including:
- The canal would span 275.5 km from the Pacific to Caribbean coasts of Nicaragua, crossing Lake Nicaragua.
- Key facilities include two locks, ports, dredge disposal areas, excavated material placement areas, a dam, dikes, and breakwaters.
- Associated infrastructure includes roads, bridges, power lines, quarries, cement plants, and improvements to existing ports.
- Construction is planned over 5-7 years and will require extensive earthworks, dredging, and materials transport. Operations will require ship transit management and maintenance dredging.
This document provides an executive summary and analysis of port development in China. It discusses China's economic growth and its relationship to the global economy and trade. Key points include China's continued economic growth despite the global financial crisis, its focus on developing national logistics networks, and forecasts for growth in foreign trade and container throughput at Chinese ports in 2011. The report also examines throughput capacity, demand, and development trends for various bulk cargoes and regions in China.
This report summarizes quality control efforts, kaizen improvements, and 5S practices at an Indian silica refractory plant. Quality control involved analyzing brick expansion data from kilns using statistical tools to better understand non-uniformity. Probability distributions examined likelihood of bricks meeting size standards. Relationships between apparent porosity and bulk density were derived. Kaizen suggestions included layout redesign, safety precautions, and housekeeping. Pictorial recommendations illustrated paths, signage and equipment changes. Excel tools simulated processes to allow flexible analysis. The aim was improving production quality and efficiency through data-driven methods.
Taylor IARU report on building certification schemes pdf (1)Finnoula Taylor
This document provides information on various sustainable building certification schemes, including BREEAM, DGNB, LEED, and STARS. It summarizes the key aspects of each scheme, such as the background, certification process, criteria, costs, and case studies of buildings that have achieved certification. It also profiles the certification schemes used by several universities in the IARU (International Alliance of Research Universities). The document concludes by discussing potential sustainable building projects at the University of Copenhagen that could help raise its green rating under these certification schemes.
Final Report (TCP/RLA/0069)
Development of Standards for the Construction and Inspection of Fishing Vessels
Final Report TCP/RLA/0069 http://www.slideshare.net/safetyforfishermen/final-report-of-project-57610513
Annex I http://www.slideshare.net/safetyforfishermen/annex-i-57610511
Annex II http://www.slideshare.net/safetyforfishermen/annex-ii-57610508
Annex III http://www.slideshare.net/safetyforfishermen/annex-iii
Annex IV http://www.slideshare.net/safetyforfishermen/annex-iv-57610500
Annex V http://www.slideshare.net/safetyforfishermen/annex-v-57610497
Annex VI http://www.slideshare.net/safetyforfishermen/annex-vi-57610495
Schedule 1 http://www.slideshare.net/safetyforfishermen/schedule-1-57610492
Schedule 2 http://www.slideshare.net/safetyforfishermen/schedule-2-57610486
Schedule 3 http://www.slideshare.net/safetyforfishermen/schedule-3-57610481
Schedule 4 http://www.slideshare.net/safetyforfishermen/schedule-4-57610477
Schedule 5 http://www.slideshare.net/safetyforfishermen/schedule-5-57610474
Schedule 6 http://www.slideshare.net/safetyforfishermen/schedule-6-57610470
Schedule 7 http://www.slideshare.net/safetyforfishermen/schedule-7-57610465
Schedule 8 http://www.slideshare.net/safetyforfishermen/schedule-8-57610456
Schedule 9 http://www.slideshare.net/safetyforfishermen/schedule-9-57610450
Schedule 10 http://www.slideshare.net/safetyforfishermen/schedule-10-57610439
Schedule 11 http://www.slideshare.net/safetyforfishermen/schedule-11-57610431
Annex VII http://www.slideshare.net/safetyforfishermen/annex-vii-57610416
Annex VIII http://www.slideshare.net/safetyforfishermen/annex-viii-57610410
Annex IX http://www.slideshare.net/safetyforfishermen/annex-ix-57610400
Annex X http://www.slideshare.net/safetyforfishermen/annex-x-57610393
Annex XI http://www.slideshare.net/safetyforfishermen/annex-xi-57610383
This document describes the Focused Build solution for SAP Solution Manager. It provides an overview of the key components and processes in Focused Build projects, including:
- Project management with templates for Focused Build projects
- Requirements management and linking requirements to business processes
- Work package management for implementing requirements
- Test management with extensions for test planning and test execution tracking
- Defect management for tracking issues found during testing
- Document management for project documentation
This document outlines the regulations for the 2012/13 UAE F1 in Schools National Finals competition. It defines key terms and covers general competition information such as competing team structure, categories, and responsibilities. It also describes the various judging categories and procedures for specifications, engineering, presentation, racing, and awards. The regulations aim to ensure fair competition while encouraging innovation.
This document outlines the testing requirements and certification process for football turf fields through FIFA's Quality Programme. It details both laboratory and field testing procedures. Laboratory testing evaluates turf performance, durability, and material properties. Field testing assesses playability, injury risk, and durability with actual use. Certification levels of FIFA Quality and FIFA Quality Pro are granted if fields pass all tests. Regular retesting is required to maintain certification. The document provides tables outlining specific performance criteria for both laboratory and field tests.
The document provides a detailed description of the proposed Nicaragua Canal Project, including:
- The canal would span 275.5 km from the Pacific to Caribbean coasts of Nicaragua, crossing Lake Nicaragua.
- Key facilities include two locks, ports, dredge disposal areas, excavated material placement areas, a dam, dikes, and breakwaters.
- Associated infrastructure includes roads, bridges, power lines, quarries, cement plants, and improvements to existing ports.
- Construction is planned over 5-7 years and will require extensive earthworks, dredging, and materials transport. Operations will require ship transit management and maintenance dredging.
This document provides an executive summary and analysis of port development in China. It discusses China's economic growth and its relationship to the global economy and trade. Key points include China's continued economic growth despite the global financial crisis, its focus on developing national logistics networks, and forecasts for growth in foreign trade and container throughput at Chinese ports in 2011. The report also examines throughput capacity, demand, and development trends for various bulk cargoes and regions in China.
This report summarizes quality control efforts, kaizen improvements, and 5S practices at an Indian silica refractory plant. Quality control involved analyzing brick expansion data from kilns using statistical tools to better understand non-uniformity. Probability distributions examined likelihood of bricks meeting size standards. Relationships between apparent porosity and bulk density were derived. Kaizen suggestions included layout redesign, safety precautions, and housekeeping. Pictorial recommendations illustrated paths, signage and equipment changes. Excel tools simulated processes to allow flexible analysis. The aim was improving production quality and efficiency through data-driven methods.
Taylor IARU report on building certification schemes pdf (1)Finnoula Taylor
This document provides information on various sustainable building certification schemes, including BREEAM, DGNB, LEED, and STARS. It summarizes the key aspects of each scheme, such as the background, certification process, criteria, costs, and case studies of buildings that have achieved certification. It also profiles the certification schemes used by several universities in the IARU (International Alliance of Research Universities). The document concludes by discussing potential sustainable building projects at the University of Copenhagen that could help raise its green rating under these certification schemes.
Final Report (TCP/RLA/0069)
Development of Standards for the Construction and Inspection of Fishing Vessels
Final Report TCP/RLA/0069 http://www.slideshare.net/safetyforfishermen/final-report-of-project-57610513
Annex I http://www.slideshare.net/safetyforfishermen/annex-i-57610511
Annex II http://www.slideshare.net/safetyforfishermen/annex-ii-57610508
Annex III http://www.slideshare.net/safetyforfishermen/annex-iii
Annex IV http://www.slideshare.net/safetyforfishermen/annex-iv-57610500
Annex V http://www.slideshare.net/safetyforfishermen/annex-v-57610497
Annex VI http://www.slideshare.net/safetyforfishermen/annex-vi-57610495
Schedule 1 http://www.slideshare.net/safetyforfishermen/schedule-1-57610492
Schedule 2 http://www.slideshare.net/safetyforfishermen/schedule-2-57610486
Schedule 3 http://www.slideshare.net/safetyforfishermen/schedule-3-57610481
Schedule 4 http://www.slideshare.net/safetyforfishermen/schedule-4-57610477
Schedule 5 http://www.slideshare.net/safetyforfishermen/schedule-5-57610474
Schedule 6 http://www.slideshare.net/safetyforfishermen/schedule-6-57610470
Schedule 7 http://www.slideshare.net/safetyforfishermen/schedule-7-57610465
Schedule 8 http://www.slideshare.net/safetyforfishermen/schedule-8-57610456
Schedule 9 http://www.slideshare.net/safetyforfishermen/schedule-9-57610450
Schedule 10 http://www.slideshare.net/safetyforfishermen/schedule-10-57610439
Schedule 11 http://www.slideshare.net/safetyforfishermen/schedule-11-57610431
Annex VII http://www.slideshare.net/safetyforfishermen/annex-vii-57610416
Annex VIII http://www.slideshare.net/safetyforfishermen/annex-viii-57610410
Annex IX http://www.slideshare.net/safetyforfishermen/annex-ix-57610400
Annex X http://www.slideshare.net/safetyforfishermen/annex-x-57610393
Annex XI http://www.slideshare.net/safetyforfishermen/annex-xi-57610383
This document describes the Focused Build solution for SAP Solution Manager. It provides an overview of the key components and processes in Focused Build projects, including:
- Project management with templates for Focused Build projects
- Requirements management and linking requirements to business processes
- Work package management for implementing requirements
- Test management with extensions for test planning and test execution tracking
- Defect management for tracking issues found during testing
- Document management for project documentation
This document outlines the regulations for the 2012/13 UAE F1 in Schools National Finals competition. It defines key terms and covers general competition information such as competing team structure, categories, and responsibilities. It also describes the various judging categories and procedures for specifications, engineering, presentation, racing, and awards. The regulations aim to ensure fair competition while encouraging innovation.
The document describes the Concourse Financial Software Suite, which is a back office processing solution for electronic payments. It has a continuous processing architecture that allows for near real-time processing. It includes several modular business services for settlement, reconciliation, disputes, and fees and commissions. The core system provides a transaction repository, linking of related transaction records, configurable business rules, and online summaries and reporting.
This document is a cheat sheet for the C programming language. It provides an introduction to C and covers basic data types, control flow, expressions, operators, program structure, advanced data types like arrays and pointers, advanced concepts like file I/O and dynamic memory allocation, and multi-file programs. The cheat sheet was written by Andrew Sterian and contains a table of contents and 8 sections covering various aspects of the C language.
This document is the procurement operations procedures manual for HCC. It provides definitions for over 75 procurement-related terms used throughout the manual. The table of contents shows that the manual contains articles on general provisions, sources of supplies and services, procurement methods, competitive sealed bidding, competitive sealed proposals, construction procurement, contract administration and close out. The document establishes standard procedures and guidelines for HCC's procurement processes.
Productivity growth is important to the firm because it means that it can meet its (perhaps growing) obligations to workers, shareholders, and governments (taxes and regulation), and still remain competitive or even improve its competitiveness in the market place.
USACE Construction Quality Management manualJerico Awat
This Documents is Downloaded from United States Army Corps of Engineers on this website:
http://www.saj.usace.army.mil/Divisions/Construction/training_CQMC.htm
The document outlines regulations for the UAE F1 in Schools National Finals competition. It defines key terms and covers general competition information such as the categories, team responsibilities, and regulations documents. It also describes the various judging categories including specifications, engineering, portfolio/display, presentation, and racing. Details are provided on preparation requirements, scoring, and procedures for each judging category.
This document is the Final Environmental Impact Report for the proposed E & B Oil Drilling & Production Project in Hermosa Beach, California. The proposed project includes oil drilling and production operations as well as construction of a new City maintenance yard. Key aspects of the proposed oil project analyzed in the report include site preparation, drilling and testing of up to 10 new wells, construction of processing facilities and pipelines, long-term operations, and eventual decommissioning. The report also evaluates alternatives to the proposed project and their environmental impacts. Potential impacts of the proposed projects on aesthetics, air quality, biology, cultural resources, energy, and other issue areas are identified and mitigation measures are proposed.
This document is a business plan for a proposed Servpro franchise in South Anchorage, Alaska. It provides details on the company goals and ownership structure. The franchise will offer property restoration services for fire, water, mold and other disasters. It presents an analysis of the Anchorage market size and demand for these services, estimating the potential market share and annual losses. The plan requests a $398,100 loan to cover start-up costs such as equipment, vehicles, facilities, and hiring technicians to launch the new franchise.
Construction Quality Management (CQM) is a partnered effort between the government and contractor to ensure construction is performed according to plans and specifications, on time, within budget, and safely. The contractor has primary responsibility for quality control through compliance with contract requirements, while the government provides quality assurance through reviews, inspections and tests to ensure the contractor's quality control is effective. CQM aims to be proactive through prevention rather than reactive by relying on inspections to achieve quality, enabling both parties to get the most value from the project.
F1i s 2012wf-competition-regulations-rev1PedroRomanoCE
This document outlines the regulations for the 2012 F1 in Schools World Finals competition. It defines key terms and outlines the general information, competition format, judging criteria and procedures for the various elements of the competition including specifications, engineering, presentations, racing and awards. Revisions from 2011 are noted in the preface. The regulations cover team eligibility, project requirements, schedules, responsibilities and procedures to ensure a fair competition that determines the World Champions of F1 in Schools.
This document outlines SL TN America's supplier production part approval process (PPAP) requirements. It details the elements required for a PPAP submission, including design records, process flow diagrams, measurement system analysis studies, dimensional results, material and performance test results, production process studies, and more. Suppliers must meet these requirements and obtain approval before parts can be mass produced. The document provides guidelines to help suppliers understand and comply with SL TN's PPAP process.
The document provides a training module on market development projects for CLP staff. It covers topics such as introduction to small business and financial planning, market and value chain analysis, designing interventions, and challenges in milk, meat, and fodder markets. The 5-day training schedule details the session contents, methodology, and timing for each topic to provide participants with knowledge and skills related to market development approaches.
Cobre - Gestión de Activos – Guía para la aplicación de la norma 55001Horacio Felauto
La gestión de activos representa un cambio cultural en el planeamiento estratégico de las empresas que agrega a la visión tradicional sobre productos y clientes la visión de los activos y del valor que estos son capaces de generar al negocio. Autor: International Copper Association Latin America
This business plan is for a proposed recycling and upcycling plant called NewGate India located in Hyderabad, Andhra Pradesh. The plan outlines setting up a facility that will collect post-consumer and industrial waste to recycle into new materials and upcycle into saleable products. It will focus on plastic, paper, and e-waste recycling initially. The plan discusses conducting market research to identify opportunities, setting up the production process with necessary equipment and partnerships, and implementing strategies for pricing, distribution, promotion and organizational structure. The goal is to divert waste from landfills while generating profit and creating jobs.
This document is a business plan for a proposed recycling and upcycling plant. The plan outlines the company's operations, including collecting recyclable materials, sorting and processing them, and transforming some materials into new products through upcycling. The company aims to divert waste from landfills while producing goods for sale. It will target both commercial and residential customers. Competition in the recycling industry is growing but demand remains high due to increasing environmental awareness. The business will utilize various machinery, equipment, and technologies to efficiently process materials. It intends to locate near suppliers and transportation hubs. Marketing efforts will promote the environmental and social benefits of the venture. The ownership structure and initial employee roles are also defined.
Chemicals industry is a diversified industry and covers more than 80,000 commercial products. It provides key building blocks to a host of downstream industries such as automobiles, textiles, papers, paints, soaps, detergents, pharmaceuticals among many others. It is a capital intensive industry which employs approx. 2 Mn people in India. As a result, it plays a key role in the economic and social development of the country. It is a critical element of the manufacturing industry and is highly fragmented in the downstream sector. Globally, chemical industry was valued at $ 4.5 Tn in 2016 and is expected to grow at 5.5% per annum till 2020 driven by demand from end use industries. The industry is increasingly shifting eastwards in line with the shift of its key consumer industries (e.g. automotive, electronics, etc.), to leverage higher manufacturing competitiveness of emerging Asian economies and to serve the increasing local demand. China, as result of this shift, is the largest contributor with 34% share followed by European Union (17%) and North America (16%) to the global chemical industry.
This document presents a social impact assessment and resettlement action plan for the upgrading and rehabilitation of the Shamozai to Dadahara Road in Khyber Pakhtunkhwa province, Pakistan. It identifies 13 project affected persons who will lose cropped land or trees due to the project. It outlines entitlements and compensation for affected persons according to World Bank and government policies. Implementation and monitoring plans are included to guide resettlement activities and address grievances.
This document provides the procedures manual for HCC Procurement Operations. It outlines the mission, vision, purpose and authorities for procurement at HCC. It defines key terms and establishes standards for ethics, conflicts of interest, procurement methods and processes. The manual describes the different types of purchase orders and requisitions, timetables for competitive bidding and proposals, and guidelines for drafting specifications and handling mistakes in bids. It aims to ensure procurement complies with applicable laws and policies in a fair, ethical and efficient manner.
Triangle Bike Share - New Venture PlanJosh Bielick
New venture plan for 501(c)3 bike share operator for the Triangle, NC.
Written for North Carolina State University MIE 413 and NCSU Lulu eGames 2012.
TBS branding and design by http://mattyow.com
This document provides an overview of the Hyperion Business Modeling Solutions Guide. It discusses who should use the guide, how the guide is structured, conventions used in the guide, related documentation, accessing the online help, and additional support resources. The guide is intended for developers of activity-based management models, activity-based costing project leaders, and managers looking for solutions to business problems. It contains case studies demonstrating how to use the Model Approach and Hyperion Business Modeling to address common issues like product and customer profitability. Support resources include documentation, training, consulting services, and technical support.
This chapter describes the work of the Independent Evaluation Office of UNDP to further strengthen the quality and use of evaluation in UNDP. During 2013, this process included the launch of an International Evaluation Advisory Panel, efforts to implement new systems and methodologies that are consistent with recommendations from a 2012 peer review of the Independent Evaluation Office of UNDP, and work on an independent review of the UNDP Evaluation Policy. 2.1 International Evaluation Advisory Panel Established in 2013, the International Evaluation Advisory Panel 1 provides support and advice to help the Independent Evaluation Office of UNDP produce high-quality evaluations that further the Office’s objective of enhancing overall UNDP performance and results. The eleven Advisory Panel members, internationally recognized leaders in evaluation, were selected through an open and competitive process. International Evaluation Advisory Panel members have been contracted to provide support in the following areas: a) Recommending improvements to the overall coherence and consistency of the Independent Evaluation Office of UNDP approach, work programme and methodologies; b) Reviewing key deliverables, including guidance covering methodologies and procedures and specific evaluation documents (e.g. terms of reference, draft and final reports); and c) Advising the Independent Evaluation Office of UNDP on ways to raise its prominence, including improving knowledge-sharing platforms and dissemination strategies. The advisory work is underway and all advisers have been engaged, thus providing thorough oversight and advice on the work of the Independent Evaluation Office of UNDP. For subsequent Annual Reports on Evaluation, the panel will independently comment on Independent Evaluation Office of UNDP work to the UNDP Executive Board.
The document provides details on Link Resources' involvement in various biofuel and biomass energy projects, including:
1) Assisting a company in developing and planning a large cellulosic ethanol plant that would use municipal solid waste as a feedstock. Link was contracted for engineering, procurement, construction oversight, commissioning, and long-term operations.
2) Helping an Australian biodiesel company optimize their technology, start up their first large plant, and develop the infrastructure to expand into the North American market. Link's work included developing ISO-9000 compliant processes for quality control across the company's operations.
3) Providing evaluations and reviews to the Department of Energy and Department of Agriculture on various bio
The document describes the Concourse Financial Software Suite, which is a back office processing solution for electronic payments. It has a continuous processing architecture that allows for near real-time processing. It includes several modular business services for settlement, reconciliation, disputes, and fees and commissions. The core system provides a transaction repository, linking of related transaction records, configurable business rules, and online summaries and reporting.
This document is a cheat sheet for the C programming language. It provides an introduction to C and covers basic data types, control flow, expressions, operators, program structure, advanced data types like arrays and pointers, advanced concepts like file I/O and dynamic memory allocation, and multi-file programs. The cheat sheet was written by Andrew Sterian and contains a table of contents and 8 sections covering various aspects of the C language.
This document is the procurement operations procedures manual for HCC. It provides definitions for over 75 procurement-related terms used throughout the manual. The table of contents shows that the manual contains articles on general provisions, sources of supplies and services, procurement methods, competitive sealed bidding, competitive sealed proposals, construction procurement, contract administration and close out. The document establishes standard procedures and guidelines for HCC's procurement processes.
Productivity growth is important to the firm because it means that it can meet its (perhaps growing) obligations to workers, shareholders, and governments (taxes and regulation), and still remain competitive or even improve its competitiveness in the market place.
USACE Construction Quality Management manualJerico Awat
This Documents is Downloaded from United States Army Corps of Engineers on this website:
http://www.saj.usace.army.mil/Divisions/Construction/training_CQMC.htm
The document outlines regulations for the UAE F1 in Schools National Finals competition. It defines key terms and covers general competition information such as the categories, team responsibilities, and regulations documents. It also describes the various judging categories including specifications, engineering, portfolio/display, presentation, and racing. Details are provided on preparation requirements, scoring, and procedures for each judging category.
This document is the Final Environmental Impact Report for the proposed E & B Oil Drilling & Production Project in Hermosa Beach, California. The proposed project includes oil drilling and production operations as well as construction of a new City maintenance yard. Key aspects of the proposed oil project analyzed in the report include site preparation, drilling and testing of up to 10 new wells, construction of processing facilities and pipelines, long-term operations, and eventual decommissioning. The report also evaluates alternatives to the proposed project and their environmental impacts. Potential impacts of the proposed projects on aesthetics, air quality, biology, cultural resources, energy, and other issue areas are identified and mitigation measures are proposed.
This document is a business plan for a proposed Servpro franchise in South Anchorage, Alaska. It provides details on the company goals and ownership structure. The franchise will offer property restoration services for fire, water, mold and other disasters. It presents an analysis of the Anchorage market size and demand for these services, estimating the potential market share and annual losses. The plan requests a $398,100 loan to cover start-up costs such as equipment, vehicles, facilities, and hiring technicians to launch the new franchise.
Construction Quality Management (CQM) is a partnered effort between the government and contractor to ensure construction is performed according to plans and specifications, on time, within budget, and safely. The contractor has primary responsibility for quality control through compliance with contract requirements, while the government provides quality assurance through reviews, inspections and tests to ensure the contractor's quality control is effective. CQM aims to be proactive through prevention rather than reactive by relying on inspections to achieve quality, enabling both parties to get the most value from the project.
F1i s 2012wf-competition-regulations-rev1PedroRomanoCE
This document outlines the regulations for the 2012 F1 in Schools World Finals competition. It defines key terms and outlines the general information, competition format, judging criteria and procedures for the various elements of the competition including specifications, engineering, presentations, racing and awards. Revisions from 2011 are noted in the preface. The regulations cover team eligibility, project requirements, schedules, responsibilities and procedures to ensure a fair competition that determines the World Champions of F1 in Schools.
This document outlines SL TN America's supplier production part approval process (PPAP) requirements. It details the elements required for a PPAP submission, including design records, process flow diagrams, measurement system analysis studies, dimensional results, material and performance test results, production process studies, and more. Suppliers must meet these requirements and obtain approval before parts can be mass produced. The document provides guidelines to help suppliers understand and comply with SL TN's PPAP process.
The document provides a training module on market development projects for CLP staff. It covers topics such as introduction to small business and financial planning, market and value chain analysis, designing interventions, and challenges in milk, meat, and fodder markets. The 5-day training schedule details the session contents, methodology, and timing for each topic to provide participants with knowledge and skills related to market development approaches.
Cobre - Gestión de Activos – Guía para la aplicación de la norma 55001Horacio Felauto
La gestión de activos representa un cambio cultural en el planeamiento estratégico de las empresas que agrega a la visión tradicional sobre productos y clientes la visión de los activos y del valor que estos son capaces de generar al negocio. Autor: International Copper Association Latin America
This business plan is for a proposed recycling and upcycling plant called NewGate India located in Hyderabad, Andhra Pradesh. The plan outlines setting up a facility that will collect post-consumer and industrial waste to recycle into new materials and upcycle into saleable products. It will focus on plastic, paper, and e-waste recycling initially. The plan discusses conducting market research to identify opportunities, setting up the production process with necessary equipment and partnerships, and implementing strategies for pricing, distribution, promotion and organizational structure. The goal is to divert waste from landfills while generating profit and creating jobs.
This document is a business plan for a proposed recycling and upcycling plant. The plan outlines the company's operations, including collecting recyclable materials, sorting and processing them, and transforming some materials into new products through upcycling. The company aims to divert waste from landfills while producing goods for sale. It will target both commercial and residential customers. Competition in the recycling industry is growing but demand remains high due to increasing environmental awareness. The business will utilize various machinery, equipment, and technologies to efficiently process materials. It intends to locate near suppliers and transportation hubs. Marketing efforts will promote the environmental and social benefits of the venture. The ownership structure and initial employee roles are also defined.
Chemicals industry is a diversified industry and covers more than 80,000 commercial products. It provides key building blocks to a host of downstream industries such as automobiles, textiles, papers, paints, soaps, detergents, pharmaceuticals among many others. It is a capital intensive industry which employs approx. 2 Mn people in India. As a result, it plays a key role in the economic and social development of the country. It is a critical element of the manufacturing industry and is highly fragmented in the downstream sector. Globally, chemical industry was valued at $ 4.5 Tn in 2016 and is expected to grow at 5.5% per annum till 2020 driven by demand from end use industries. The industry is increasingly shifting eastwards in line with the shift of its key consumer industries (e.g. automotive, electronics, etc.), to leverage higher manufacturing competitiveness of emerging Asian economies and to serve the increasing local demand. China, as result of this shift, is the largest contributor with 34% share followed by European Union (17%) and North America (16%) to the global chemical industry.
This document presents a social impact assessment and resettlement action plan for the upgrading and rehabilitation of the Shamozai to Dadahara Road in Khyber Pakhtunkhwa province, Pakistan. It identifies 13 project affected persons who will lose cropped land or trees due to the project. It outlines entitlements and compensation for affected persons according to World Bank and government policies. Implementation and monitoring plans are included to guide resettlement activities and address grievances.
This document provides the procedures manual for HCC Procurement Operations. It outlines the mission, vision, purpose and authorities for procurement at HCC. It defines key terms and establishes standards for ethics, conflicts of interest, procurement methods and processes. The manual describes the different types of purchase orders and requisitions, timetables for competitive bidding and proposals, and guidelines for drafting specifications and handling mistakes in bids. It aims to ensure procurement complies with applicable laws and policies in a fair, ethical and efficient manner.
Triangle Bike Share - New Venture PlanJosh Bielick
New venture plan for 501(c)3 bike share operator for the Triangle, NC.
Written for North Carolina State University MIE 413 and NCSU Lulu eGames 2012.
TBS branding and design by http://mattyow.com
This document provides an overview of the Hyperion Business Modeling Solutions Guide. It discusses who should use the guide, how the guide is structured, conventions used in the guide, related documentation, accessing the online help, and additional support resources. The guide is intended for developers of activity-based management models, activity-based costing project leaders, and managers looking for solutions to business problems. It contains case studies demonstrating how to use the Model Approach and Hyperion Business Modeling to address common issues like product and customer profitability. Support resources include documentation, training, consulting services, and technical support.
This chapter describes the work of the Independent Evaluation Office of UNDP to further strengthen the quality and use of evaluation in UNDP. During 2013, this process included the launch of an International Evaluation Advisory Panel, efforts to implement new systems and methodologies that are consistent with recommendations from a 2012 peer review of the Independent Evaluation Office of UNDP, and work on an independent review of the UNDP Evaluation Policy. 2.1 International Evaluation Advisory Panel Established in 2013, the International Evaluation Advisory Panel 1 provides support and advice to help the Independent Evaluation Office of UNDP produce high-quality evaluations that further the Office’s objective of enhancing overall UNDP performance and results. The eleven Advisory Panel members, internationally recognized leaders in evaluation, were selected through an open and competitive process. International Evaluation Advisory Panel members have been contracted to provide support in the following areas: a) Recommending improvements to the overall coherence and consistency of the Independent Evaluation Office of UNDP approach, work programme and methodologies; b) Reviewing key deliverables, including guidance covering methodologies and procedures and specific evaluation documents (e.g. terms of reference, draft and final reports); and c) Advising the Independent Evaluation Office of UNDP on ways to raise its prominence, including improving knowledge-sharing platforms and dissemination strategies. The advisory work is underway and all advisers have been engaged, thus providing thorough oversight and advice on the work of the Independent Evaluation Office of UNDP. For subsequent Annual Reports on Evaluation, the panel will independently comment on Independent Evaluation Office of UNDP work to the UNDP Executive Board.
The document provides details on Link Resources' involvement in various biofuel and biomass energy projects, including:
1) Assisting a company in developing and planning a large cellulosic ethanol plant that would use municipal solid waste as a feedstock. Link was contracted for engineering, procurement, construction oversight, commissioning, and long-term operations.
2) Helping an Australian biodiesel company optimize their technology, start up their first large plant, and develop the infrastructure to expand into the North American market. Link's work included developing ISO-9000 compliant processes for quality control across the company's operations.
3) Providing evaluations and reviews to the Department of Energy and Department of Agriculture on various bio
This document provides summaries of multiple projects involving biofuels, biomass power plants, trigeneration facilities, and transition management. It describes Link's roles on projects including developing processes for an Australian biodiesel group, providing outage management for a biomass power plant, assisting with project development for a trigeneration CHP company, and aiding the transition of the Portsmouth Gaseous Diffusion Facility. The document serves as a reference of Link's past performance on various energy and facility transition projects.
The document provides details on Link Resources' involvement in various biofuel and biomass energy projects, including:
1) Assisting the development and planning of a large cellulosic ethanol plant that would convert municipal solid waste into ethanol using a strong acid process. Link was contracted for engineering oversight, commissioning, and long-term operations.
2) Completing the startup of Australian Biodiesel Group's first large biodiesel plant in Australia and developing their organization and processes to transition into the North American market, producing biodiesel from beef tallow.
3) Engaging with the Department of Energy and Department of Agriculture to evaluate various biofuel and biomass technology proposals seeking federal grants or loans
This document provides a quality management plan (QMP) for Engineering Management Support, Inc. for February 2016 through January 2017. The QMP outlines the company's commitment to quality and client satisfaction. It describes the quality assurance program components and objectives. The QMP also details the quality management system, including management commitment and responsibilities, personnel qualifications, project management, document control, and quality control reviews. It provides policies and procedures for data acquisition, design and construction of engineered systems, and corrective actions.
This Quality Management Plan (QMP) describes the quality assurance program for Engineering Management Support, Inc. (EMSI). The program is based on principles of client satisfaction, employee participation, problem prevention, and continuous improvement. It establishes responsibilities for quality assurance roles including the President, Quality Assurance Officer, Project Manager, and others. The QMP covers elements such as management commitment, personnel training, document control, quality control reviews, and corrective actions. It applies to EMSI's data collection, reporting, and engineering design and construction activities.
This Quality Management Plan (QMP) describes the quality assurance program for Engineering Management Support, Inc. (EMSI). The program is based on principles of client satisfaction, employee participation, problem prevention, and continuous improvement. It establishes responsibilities for quality assurance roles including the President, Quality Assurance Officer, Project Manager, and Quality Control Reviewer. The QMP covers elements such as management commitment, personnel training, document control, quality control reviews, and corrective actions. It applies to EMSI's data collection, reporting, and engineering design and construction activities.
This document provides a step-by-step guide for developing a quality policy. It outlines five stages for formulating a quality policy, including doing groundwork, strategic planning, drafting the policy, obtaining approval, and implementing the policy. Each stage contains several defined steps to bring stakeholders together, understand needs, gather input, draft the policy, and build consensus around the final approved version. The goal is to establish a robust but practical quality policy that reflects stakeholder priorities and drives continuous improvement.
Leaked google general guidelines for ads quality evaluation june 15 2011Bitsytask
This document provides guidelines for evaluating the quality of advertisements on Google search pages. Raters are instructed to understand user intent for search queries, evaluate ad creatives for relevance to the query and landing pages for quality, and provide overall quality ratings. Key aspects of ads and tasks that raters must consider include user queries, ad creatives, landing pages, advertisers, and user intent. Raters are also given guidance on safety, confidentiality, and using rating tools and comment codes. Specific types of problematic ads like pornography and malware sites are also addressed. The overall goal is to help improve ad quality and relevance for search engine users.
The document provides a table of contents for a thesis on the impact of audit software adoption on auditor performance. The thesis will include 5 chapters: an introduction, literature review, research framework and hypotheses development, research methodology, and results and discussions.
Chapter 1 introduces the background and importance of audit quality and the impact of information technology on audit judgments. It defines the research problem, objectives, and significance of the study.
Chapter 2 reviews literature on technology adoption standards and tools in auditing. It examines the relationship between technology adoption and individual performance. Theoretical models of technology acceptance are also discussed.
Chapter 3 develops the research framework and hypotheses. It operationalizes variables of audit software adoption, its determinants,
This document provides an overview of quality improvement initiatives in the Kenyan health sector. It discusses the Kenya Quality Model (KQM) and the Kenya Quality Model for Health (KQMH), which use a systems approach to management. The document also describes how the 5S principles of continuous quality improvement (CQI) - sorting, systematic arrangement, shine, standardization, and sustainability - can be implemented using a step-wise Total Quality Management (TQM) approach. This allows organizations to operationalize the KQMH. Various 5S and CQI tools are also outlined that can aid in the implementation of quality improvement activities according to the KQMH framework.
PRINCE2 is a project management methodology that provides principles, processes, and techniques. It is divided into seven processes: starting up a project, initiating a project, directing a project, controlling a stage, managing product delivery, managing stage boundaries, and closing a project. Each process contains activities to be performed with defined inputs and outputs. The methodology also includes components like the business case, organization, plans, controls, risk management, quality, and configuration management. PRINCE2 provides a structured approach to project management with an emphasis on dividing projects into manageable and controlled stages.
Service Marketing Management - Managing Customer Satisfaction at a authorized...Gopalakrishnan D
The document discusses managing customer satisfaction at a Maruti authorized service station. It outlines the service process in 4 stages: service initiation, in-service experience, service delivery, and post-service experience. It notes that service contributes 75% of earnings from a customer over their lifetime. Factors like time, communication, staff behavior and expertise impact customer satisfaction at each stage of service. Measuring and closing gaps between expectations and perceptions is important to improve satisfaction.
The document provides guidelines for lifting operations from the International Marine Contractors Association (IMCA). It outlines responsibilities and requirements for planning and conducting safe lifting operations, including defining routine and non-routine lifts, developing lift plans, selecting qualified personnel, inspecting lifting equipment, and more. Key aspects covered are risk assessment procedures, developing engineered lift plans for complex lifts, selection and inspection of lifting gear, and establishing communication protocols for lift teams. The guidelines aim to promote safety practices across IMCA member companies involved in marine construction and related industries.
The document provides guidelines for lifting operations from the International Marine Contractors Association (IMCA). It outlines responsibilities and requirements for planning and conducting lifts safely. Key points include:
1) Personnel roles like competent person, lift supervisor and lifting team are defined to plan and execute lifts.
2) Lifts are categorized as routine or non-routine based on factors like equipment, load, environment and team experience. More stringent planning is required for non-routine lifts.
3) Planning includes risk assessments, lift plans, equipment selection and inspection, communication protocols, and contingencies. Thorough examination of lifting equipment is required based on its inspection frequency.
The guidelines emphasize the importance of personnel competencies,
The Economics of Sustainability in the Comemrcial Real Estate Sectorscottbrooker
The goal of this white peper is to help real estate managers better understand the motivations behind management decisions, through qualitative and quantitative research and models, an provide recommendations to make the case for energy effeciency improvements. Questions answered with the paper include;
-How does energy effeciency improvement get implemented?
-Who is the driver behind the decision?
-What financial metrics are used to determine if an investment makes economic sense?
How does a real estate amanger choose one investment vehicle over another?
The document provides an overview of installing and using the osCommerce online merchant system. It describes the requirements and steps to install osCommerce, including pre-installation, installation procedure, and post-installation steps. It then outlines the key areas of the catalog frontend and administration backend, covering configuration settings, catalog management, customers/orders, localization, reports, and tools.
This document is a business plan for a traffic control solution called Smart Solution in Ho Chi Minh City, Vietnam. It includes an executive summary that describes the plan, benefits, competitive strengths, entry strategy, growth strategy, and financial needs. It then provides background on the history of traffic control in Vietnam and introduces the Smart Solution system, which uses equipment, software, and infrastructure to monitor traffic and transfer information. The document discusses factors in the external environment like technology, economics, demographics, politics, law, ecology, and culture that may impact the plan. It also does an analysis of the industry using Porter's Five Forces model and identifies critical success factors. Finally, it proposes mission/vision statements and strategies for marketing, products
This document provides guidance on managing SAP ERP 6.0 upgrade projects. It discusses determining the upgrade strategy and scope, including technical considerations and enhancement package installation options. It also covers resourcing models, scheduling, estimating costs and effort. The document outlines building a project team and roles, as well as quality assurance and testing practices. It provides details on cutover planning and post cutover activities. Best practices are shared for project management and technical implementation.
This document provides an overview of BizTalk and discusses its key components and features. It covers topics like why BizTalk is useful, how its messaging engine works using publish/subscribe, developing the BizTalk environment, and includes examples of using various adapters like FTP and file. The document is organized into chapters that cover messaging basics and schemas, maps, and pipelines.
Diseño del sistema integrado de gestión de la calidad. Fruti-Dulces _planteam...LuisMogrovejo3
Este documento presenta el diseño de un Sistema Integrado de Gestión de Calidad para la empresa Productos Fruti-Dulces S.A. con el fin de mejorar sus procesos y cumplir con los requisitos legales y de calidad. Se realiza un diagnóstico de la situación actual identificando brechas frente al Decreto 3075 de 1997 y la Norma ISO 9001:2015. Adicionalmente, se propone un plan de acción que incluye la reestructuración organizacional, la definición de políticas, objetivos, procesos y proced
This document provides an introduction to quality management in the construction industry. It discusses how quality is a key issue, but there is no common definition. It is viewed differently by various project stakeholders. The document emphasizes that quality should matter to everyone in the construction business. It outlines some of the key factors that are important for achieving quality, such as leadership, skills, training, culture, governance, and attitude. The overall aim is to provide guidance on best practices for quality management and planning to help improve construction quality.
This document provides standards for general civil construction projects for Watercare. It outlines requirements for various civil construction activities including: site works, earthworks, pipe laying, concrete works, painting, demolition, masonry, plumbing, carpentry, metal roofing, polymer chambers, and testing. The document underwent minor revisions in version 1.1 including updates to referenced standards, requirements for tracer wire installation and HDD works, and clarification of tolerances for pipe laying. It is meant to be used in conjunction with Watercare's other cross-referenced standards and drawings.
Diseño del sistema integrado de gestión de la calidad. Fruti-Dulces _planteam...LuisMogrovejo3
Este documento presenta el diseño del Sistema Integrado de Gestión de Calidad para la empresa Productos Fruti-Dulces S.A. con el fin de cumplir con los requisitos legales y normativos, mejorar sus procesos y asegurar la calidad y satisfacción de sus clientes. Se realiza un diagnóstico de la situación actual identificando brechas vs normas. Se propone una estructura organizacional, mapa de procesos, políticas, objetivos, indicadores y documentación para implementar el sistema. El diseño propuesto busca protocolizar
Design-Build Quality Management Plan (QMP) Outline.pdfLuisMogrovejo3
This document provides an outline for a Quality Management Plan (QMP) for a design-build project. It encourages the design-builder to follow the provided format and sections when developing their own project-specific QMP. Key sections include project quality organization roles and responsibilities, administration procedures for training, audits, and documentation, and quality control for design, construction, and as-built drawings. The outline is provided for informational purposes only, and the contracting agency does not endorse its content or guarantee compliance.
The document summarizes a constructability analysis of a monorail project conducted by Bo Wang. It discusses constructability and its benefits, provides examples of existing monorail systems, and identifies factors that influence constructability in the planning, design, and construction phases of monorail projects. These factors include project objectives, scope, site information, guideway design, and construction methods. The analysis aims to develop techniques to improve constructability and implement them through the project life cycle.
Este documento presenta la tesis de grado para obtener el título de Magíster en Sistemas Integrados de Gestión de la Calidad, Ambiente y Seguridad. La tesis propone una guía metodológica para un sistema de gestión de calidad basado en la norma ISO 9001:2008 para empresas fiscalizadoras de obras civiles. El documento contiene la introducción, marco teórico, investigación, resultados, la propuesta que incluye los requisitos de la norma ISO 9001, y las conclusiones y recomendaciones.
Este documento establece los procedimientos para la elaboración y control de documentos, registros y auditorías internas del Sistema de Gestión de Calidad del CONOCER. Define la jerarquía y estructura de los documentos, así como los códigos y procesos para su creación, aprobación, control y actualización. También describe los procedimientos para realizar auditorías internas de calidad, controlar productos no conformes, y establecer acciones correctivas y preventivas.
This document presents a construction quality control system for urban metro projects in China based on Computer Integrated Construction (CIC) technology. The system codes sub-projects, links construction processes to responsible parties and standards, and uses multisource data fusion to automatically assess quality risks and provide early warnings. The system addresses current issues with unclear quality standards, responsibility ambiguity among many project participants, and lack of process quality control. It establishes a 3D model integrating organization, construction processes, and product parameters to ensure each control point is assigned responsible parties and standards. The system was applied to a metro project in Wuhan and was found to be scientific, applicable and effective for construction quality control.
This document outlines SCRRA's Design Quality Assurance Plan. It provides background on SCRRA, describing its mission to provide regional rail services in Southern California. It then details SCRRA's operations, organization, funding, and assets. The plan establishes procedures to ensure design quality, including design input and output requirements, roles and responsibilities, checking procedures, reviews, audits, and record keeping. It aims to verify that design documents are developed correctly using industry standards and competent professionals.
This document outlines WMATA's Quality Management System Plan (QMSP) to implement a comprehensive Quality Management System (QMS) across the agency. The QMS aims to promote reliability, efficiency, process improvement and shift focus from reactive to proactive quality management. It will integrate quality principles and requirements through strategic, tactical and directive documents. Key elements include management commitment to quality, 15 core QMS standards, a framework for documentation and oversight, and procedures for continuous improvement. The QMSP provides guidance for employees and transparency for customers on WMATA's quality approach.
This document provides an introduction to quality management in the construction industry. It discusses how quality is a key issue, but there is no common definition. It is viewed differently by various project stakeholders. The document emphasizes that quality should matter to everyone in the construction business. It outlines some of the key factors that are important for achieving quality, such as leadership, skills, training, culture, governance, and attitude. The overall aim is to simplify an understanding of quality and provide a better way to improve it in the complex construction industry.
Design-Build Quality Management Plan (QMP) Outline.pdfLuisMogrovejo3
This document provides an outline for a Quality Management Plan (QMP) for a design-build transportation project. It describes the quality policy, format, roles and responsibilities of the quality organization, design and construction quality processes, documentation requirements, audits, and other administrative elements. The goal is to ensure all work meets contract requirements for safety, schedule, budget, and quality. Appendices provide more detailed quality procedures and forms.
RTD partnered with private companies to accelerate construction of the FasTracks rapid transit expansion through the EAGLE public-private partnership. This was the first public-private partnership for a transit project in the US. RTD also partnered with local governments to rehabilitate historic Denver Union Station and construct a multimodal transportation hub through financing. Additionally, RTD prepared participants for future opportunities and strengthened contacts between agencies through the Multi-Agency Exchange program, which shares knowledge between RTD and peer agencies.
The document analyzes the constructability of monorail projects. It defines constructability and discusses its benefits. It then provides definitions and examples of monorail systems. The document identifies factors that influence monorail constructability, such as project objectives, scope, and site information from the planning phase, as well as guideway layout, structure, and maintenance facilities from the design phase. It develops a framework to improve monorail constructability through a hierarchy of techniques and case studies.
Diseño del sistema integrado de gestión de la calidad. Fruti-Dulces _planteam...LuisMogrovejo3
Este documento presenta el diseño de un Sistema Integrado de Gestión de Calidad para la empresa Productos Fruti-Dulces S.A. con el fin de mejorar sus procesos y cumplir con los requisitos legales y de calidad. Se realiza un diagnóstico de la situación actual identificando brechas vs normatividad. Luego se propone una estructura organizacional, mapa de procesos, políticas, objetivos y documentación necesaria para implementar el sistema. Finalmente se incluyen mecanismos de seguimiento y mejora continua para garant
Este documento describe el procedimiento para gestionar las no conformidades en una organización. Explica cómo detectar no conformidades, generarlas manual o automáticamente en el sistema, asignar responsables e información relevante como acciones tomadas. El objetivo es identificar incumplimientos para corregirlos y prevenir su repetición, a través de un seguimiento y cierre efectivo de cada no conformidad.
This document provides standards for general civil construction projects for Watercare. It outlines requirements for various civil construction activities including: site works, earthworks, pipe laying, concrete works, painting, demolition, masonry, plumbing, carpentry, metal roofing, polymer chambers, and testing. The document underwent minor revisions in version 1.1 including updates to referenced standards, requirements for tracer wire installation and HDD works, clarification of tolerances for pipe laying, and expanded tables for pressure testing.
This document is a Project Quality Plan for the Grassy Mountain gold mine project in Oregon. It outlines the quality policy, objectives, responsibilities, and processes to be followed to ensure quality in design, procurement, construction, and commissioning. The key responsibilities include the Project Manager overseeing quality, the Engineering Manager ensuring design quality, the Construction Manager ensuring construction quality, and the Project Quality Manager implementing and auditing the quality system. Inspection and testing will be conducted at various stages by quality inspectors and contractors are required to meet quality control requirements. Non-conformances will be addressed and corrective actions tracked in a register.
Este documento establece el método de ENAC para clasificar las no conformidades detectadas durante los procesos de acreditación de un organismo de evaluación de la conformidad. Las no conformidades se clasifican como mayores o menores dependiendo de su gravedad. El documento describe el tratamiento que debe dar el organismo a las no conformidades, incluyendo el análisis de causas, la extensión del problema y las acciones correctivas. También especifica la información que debe enviar el organismo a ENAC a través de un plan de acciones correctivas y los plazos correspondientes.
Batteries -Introduction – Types of Batteries – discharging and charging of battery - characteristics of battery –battery rating- various tests on battery- – Primary battery: silver button cell- Secondary battery :Ni-Cd battery-modern battery: lithium ion battery-maintenance of batteries-choices of batteries for electric vehicle applications.
Fuel Cells: Introduction- importance and classification of fuel cells - description, principle, components, applications of fuel cells: H2-O2 fuel cell, alkaline fuel cell, molten carbonate fuel cell and direct methanol fuel cells.
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
Literature Review Basics and Understanding Reference Management.pptxDr Ramhari Poudyal
Three-day training on academic research focuses on analytical tools at United Technical College, supported by the University Grant Commission, Nepal. 24-26 May 2024
Understanding Inductive Bias in Machine LearningSUTEJAS
This presentation explores the concept of inductive bias in machine learning. It explains how algorithms come with built-in assumptions and preferences that guide the learning process. You'll learn about the different types of inductive bias and how they can impact the performance and generalizability of machine learning models.
The presentation also covers the positive and negative aspects of inductive bias, along with strategies for mitigating potential drawbacks. We'll explore examples of how bias manifests in algorithms like neural networks and decision trees.
By understanding inductive bias, you can gain valuable insights into how machine learning models work and make informed decisions when building and deploying them.
International Conference on NLP, Artificial Intelligence, Machine Learning an...gerogepatton
International Conference on NLP, Artificial Intelligence, Machine Learning and Applications (NLAIM 2024) offers a premier global platform for exchanging insights and findings in the theory, methodology, and applications of NLP, Artificial Intelligence, Machine Learning, and their applications. The conference seeks substantial contributions across all key domains of NLP, Artificial Intelligence, Machine Learning, and their practical applications, aiming to foster both theoretical advancements and real-world implementations. With a focus on facilitating collaboration between researchers and practitioners from academia and industry, the conference serves as a nexus for sharing the latest developments in the field.
6. DQAP June 2015
v
SCRRA Design Quality Assurance Plan
LIST OF FIGURES
FIGURE 2.2 SCRRA System Map....................................................................... 4
FIGURE 4.4 SCRRA QC Color Chart ............................................................... 29
LIST OF FLOW CHARTS
FLOW CHART 1 Checking Calculations ................................................................. 30
FLOW CHART 2 Checking Drawings ...................................................................... 31
FLOW CHART 3 Disciplinary and Interdisciplinary Reviews ................................... 32
FLOW CHART 4 Interdisciplinary Reviews Prior to Client Submittal ...................... 33
FLOW CHART 5 Interdisciplinary Reviews after Client Review............................... 34
LIST OF APPENDICES
APPNDIX A: QUALITY ASSURANCE FORMS ................................................. 35
QA-01 Review Comments
QA-02 Calculations Checklist
QA-03 Drawings Checklist
QA-04 Specifications Checklist
QA-05 Engineer’s Estimate Checklist
QA-06 Study or Report Checklist
QA-07 Quality Assurance Statement
QA-08 Quality Audit
QA-09 Quality Audit Item Finding
APPNDIX B: SAMPLE DOCUMENTS ............................................................... 36
Project File Index
Document Control Log
Check Print Stamp
APPNDIX C: REFERENCES.............................................................................. 37
7. DQAP 1 June 2015
SCRRA Design Quality Assurance Plan
1.0 FORWARD
1.1 Purpose
This document serves to define the procedures that govern the initiation, progress and
execution of design work for the Southern California Regional Rail Authority (SCRRA).
A Quality control/Quality Assurance (QA/QC) program establishes the formal organizational
procedures or practices for ensuring the SCRRA’s requirements and expectations are fully
met. A QA/QC program provides checks and balances within an organization to assure
quality in the final contract documents. QA/QC programs are implemented at different levels
or phases of project activities.
Quality Control is the process of checking the accuracy of calculations and consistency of
the drawings, detecting and correcting design omissions and errors prior to finalizing design
plans and verifying the specifications for the SCRRA design projects.
Quality Assurance is the process of reviewing the quality control process for use and
effectiveness at preventing mistakes, ensuring compliance and consistency in the
development of design plans and specifications.
The purpose of these guidelines is to assist the consultant‐led project team in creating a
project specific GEC Quality Control Plan for preconstruction activities. These guidelines
represent minimum requirements for plan implementation. The GEC merges these
guidelines with their Quality Assurance/Quality Control requirements. The GEC is
responsible for the overall quality of the final design product and is required to incorporate
the review of all sub‐consultant’s work into the project specific GEC Quality Control plan.
The project specific GEC Quality Control Plan assists with the verification that the design
and project documents are produced with due diligence using acceptable industry
standards, appropriate techniques, available resources and reasonable decisions by
competent professionals. The project specific GEC Quality Control Plan is a process tool
and does not replace the sound judgment and experience of competent professionals. It is
the project design team’s responsibility to ensure the quality of project documents before
they are submitted to SCRRA.
This is a control document and as such shall be updated on a periodic and as needed basis.
The Director of Engineering and Construction will periodically issue revisions to this
document. Any deviation from the procedures presented herein must be approved in
advance by the Director of Engineering and Construction or his/her designate.
1.2 Changes/ Updates
Forward any proposed changes or updates to the Director of Engineering and Construction
for consideration.
1.3 Acronyms
The following acronyms are used in this document:
8. DQAP 2 June 2015
SCRRA Design Quality Assurance Plan
BNSF Burlington Northern Santa Fe Railway Company
CADD Computer-Aided Drafting and Design
CTO Contract Task Order
DQAP Design Quality Assurance Plan
GEC General Engineering Consultant
IDR Interdisciplinary Review
IEOC Inland Empire-Orange County
IFB Invitation for Bids
METRO Los Angeles County Metropolitan Transportation Authority
OCTA Orange County Transportation Authority
PM Project Manager
PWP Project Work Plan
QA/QC Quality Assurance / Quality Control
RCTC Riverside County Transportation Commission
SANBAG San Bernardino Associated Governments
SCRRA Southern California Regional Rail Authority
UP Union Pacific Railroad
VCTC Ventura County Transportation Commission
1.4 Definitions
Supervisor/Group
Leader
A licensed professional engineer who manages a group of
Engineers and Technicians. The supervisor/group leader is
responsible for assigning work to Engineers and Technicians
based on their level of experience and the complexity of the
project. In addition, a supervisor/group leader is responsible for
internal Quality Assurance reviews
Design Engineer A licensed professional engineer or engineering assistant working
under the direct supervision of a licensed professional engineer.
The Design Engineer is a person capable of performing analyses
and calculations.
Checker A licensed professional engineer or engineering assistant working
under the direct supervision of a licensed professional engineer.
Technician A drafter or engineer who generates and revises details, plan
sheets, and drawings in electronic format
Engineer-of-
Record
A licensed professional engineer who signs and seals the final
plan set
9. DQAP 3 June 2015
SCRRA Design Quality Assurance Plan
2.0 SCRRA
2.1 Introduction
In August 1991, SCRRA was formed as a regional Joint Powers Authority (JPA). Its purpose
is to plan, design, construct, operate, and maintain regional commuter rail lines serving the
counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura. Today, SCRRA
operates one of the fastest growing commuter rail systems in the country. SCRRA’s rail
system operates in what can be typically categorized as an urban and suburban
environment. With a system comprising more than 512 route-miles, SCRRA is the nation’s
second largest commuter rail system, second only to the Long Island Railroad.
SCRRA’s mission statement declares that SCRRA is a premier regional rail system,
including commuter and other passenger services, linking communities to employment and
activity centers. SCRRA provides reliable transportation and mobility for the region, leading
toward more livable communities.
SCRRA is committed to and characterized by the following attributes:
Technically superior and safe operations
Customer focus and accessibility
Dependable, high-quality service
Cost-effective and high-value service
Strategically located network of lines and stations
Integration with other transit modes
Environmental sensitivity
Community involvement and partnerships with both the public and private sectors
2.2 Commuter Operations
2.2.1 SCRRA System
The SCRRA system began operation in October 1992 with three lines: San Bernardino,
Santa Clarita, and Ventura. The Riverside Line started in June 1993, and the Orange County
Line, which extends 19 miles into northern San Diego County, started in March 1994. The
sixth line, Inland Empire-Orange County, started in October 1995. Most recently, SCRRA
initiated service on the 91 Line (Riverside-Fullerton-Downtown Los Angeles) in May 2002.
Today, SCRRA operates service on the following seven lines:
Ventura County Line
Antelope Valley Line
San Bernardino Line
Riverside Line
Orange County Line
Inland Empire-Orange County Line
91 Line (Riverside-Fullerton-Downtown Los Angeles)
10. DQAP 4 June 2015
SCRRA Design Quality Assurance Plan
With the exception of the Inland Empire-Orange County Line, all services extend from the
terminal station to Los Angeles Union Station. Figure 2-1, below, shows the SCRRA system,
including stations and connecting rail transit lines.
FIGURE 2.2
With the exception of the Inland Empire/Orange County Line, all services extend from the
terminal station to LA Union Station.
Metrolink has no operations on the following holidays: New Year's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Amtrak, BNSF, and
UP, however, operate every day of the year on many SCRRA lines.
2.2.1 Services
Hours of operation vary by line. Scheduled passenger services are shown on the most
recently issued passenger schedule, which may be obtained from the Official Metrolink
11. DQAP 5 June 2015
SCRRA Design Quality Assurance Plan
Website at www.metrolinktrains.com. Additional special event trains may be operated on
some weekends.
2.2.2 SCRRA Facilities & Infrastructure
Metrolink operates on conventional railroad track and right of way, which are owned either by
one of the County Transportation Agencies or a private freight railroad company that has
conveyed operating rights to SCRRA.
The design, operation and maintenance of the Metrolink System are governed by Federal
Railroad Administration (FRA) regulations and California Public Utilities Commission (CPUC)
General Orders.
SCRRA owns a fleet of locomotives and coaches that are maintained at the Metrolink
Central Maintenance Facility (CMF) located at 1555 San Fernando Road, Los Angeles,
California. Vehicle inspection and light repair is also performed at various layover sites
throughout the system. A new maintenance facility is under construction in the City of Colton
(1945 Bordwell St., Colton CA 92324) to service SCRRA locomotives and coaches.
Metrolink train operations are dispatched from the Metrolink Operations Center (MOC)
located at 2558 Supply Street, Building A, Pomona, CA. MOC is manned 24 hours a day,
365 days per year.
2.2.3 Operations
In addition to Metrolink service, the SCRRA system tracks also carry Amtrak passenger
operations and freight operations. The primary freight carriers on the system are the BNSF
and the UP.
2.3 Organization
SCRRA consists of five county transportation agencies, each of which is a voting member.
These county transportation agencies, with their respective number of votes, are:
Los Angeles County Metropolitan Transportation Authority (METRO), with four
votes
Orange County Transportation Authority (OCTA), with two votes
Riverside County Transportation Commission (RCTC), with two votes
San Bernardino Associated Governments (SANBAG), with two votes
Ventura County Transportation Commission (VCTC), with one vote
Ex-officio members of SCRRA include the Southern California Association of Governments
(SCAG), the San Diego Association of Governments, and the State of California Department
of Transportation (Caltrans).
SCRRA is governed by a board of directors, consisting of eleven members representing the
five counties that comprise the agency. An executive staff manages the operation of the
SCRRA system.
12. DQAP 6 June 2015
SCRRA Design Quality Assurance Plan
2.4 Funding
SCRRA receives operating and capital funding from many sources. SCRRA fare box returns
fund the largest portion of the system’s operating cost. Constituent counties provide
additional funds through operating subsidies, which are calculated relative to the service
miles in each county. Other sources of operating funds include utility easement fees,
advertising revenue, and railroad user charges.
Capital funding is received from several sources and can vary from year to year, and from
project to project. The primary source of capital funds is SCRRA’s constituent counties.
Other capital funding comes from federal sources and the State of California. SCRRA also
obtains funds from third parties whose contracts require certain work to be performed by
SCRRA forces. This is referred to as third party projects work.
2.5 Assets
The Real Estate holdings maintained and operated by SCRRA are owned by the individual
counties that comprise the authority. The fixed improvements and equipment are owned
collectively by the counties that are partners in the SCRRA JPA. Asset ownership is
presented below:
Real Property Owner
Ventura County Line In Los Angeles County: METRO & UP
In Ventura County: VCTC & UP
Antelope Valley Line METRO
River Corridor (Dayton to
Soto)
METRO
San Bernardino Line In Los Angeles County: METRO
In San Bernardino County: SANBAG
Riverside Line Riverside Terminal: RCTC
rest of Riverside Line: UP
Orange County Line Los Angeles to Fullerton: BNSF
Fullerton to San Clemente: OCTA
In San Diego County: NCTD
IEOC Line Riverside to Atwood: BNSF
Atwood to Orange: OCTA
91 Line BNSF
Central Maintenance Facility SCRRA
Pomona MOC SCRRA
Passenger Stations Varies; however, station sites are typically owned by the
local municipality
13. DQAP 7 June 2015
SCRRA Design Quality Assurance Plan
3.0 MANAGEMENT RESPONSIBILITY
3.1 Policy
The policy of SCRRA is to provide a safe, reliable and efficient transportation system that
provides mobility and a better quality of life for the SCRRA constituent counties within
available financial resources. Each GEC and its subconsultants shall support this policy by
attaining a level of quality in the design of project components to meet the objectives and
criteria of each CTO assignment.
3.2 Organization
The GEC shall establish and shall submit for SCRRA approval an organization for Project
Management and Quality Assurance.
The overall project design effort shall be the responsibility of the GEC Project Manager. The
GEC shall name a Quality Assurance (QA) Manager, who shall act in an independent role to
review, audit and oversee corrective actions through the final design and construction
stages.
3.2.1 Responsibility and Authority
The GEC shall designate, by name, the qualified individuals assigned who will be
responsible for management, performance of work, and verification activities including
quality audits.
The GEC Project Manager shall be responsible for maintaining liaison with SCRRA, as well
as for overall technical and administrative control of the project. In turn, the GEC Project
Manager shall keep GEC subconsultant staff informed of progress and client directives.
It is the GEC Project Manager’s responsibility to ensure that project assignments are
implemented in accordance with the contract and to make available any resources
necessary for the successful completion of the project. In addition, the GEC Project Manager
shall ensure adherence to the DQAP.
The GEC shall propose a CTO Manager for each CTO, which assignment shall be approved
by the SCRRA Engineering Manager. The CTO Manager shall be responsible for the day-
to-day execution of work under his or her assigned CTO.
The GEC QA Manager shall be responsible for auditing the implementation and
conformance of the DQAP. This may be done by way of periodic project audits, spot checks,
interviews with staff, or other means determined by each QA Manager. This DQAP contains
the minimum details of the methods to meet the project quality requirements.
The following positions will, as a minimum, be covered under this assignment requirement:
14. DQAP 8 June 2015
SCRRA Design Quality Assurance Plan
Position Description of Responsibilities
GEC Project Manager Overall service quality and responsiveness
Overall contract administration
CTO Manager and design team assignment
CTO proposal development
CTO schedule assurance
Coordination with SCRRA Engineering Manager
Coordination of work under all ongoing CTOs
CTO Manager Overall task lead for scope fulfillment under assigned CTO
Coordination with SCRRA Project Manager/
Responsible to advance design, identify conflicts, make
recommendation on resolution, communicate final disposition
to design team
Quality Assurance
Manager
Overall Quality Plan Implementation
Quality Audits
Quality Plan
Submittal Review Assurance
Checker Check the calculations or detail drawings for errors, omissions,
completeness, applicability, and conformance
Technician Generate and revises details, plan sheets, and drawings in
electronic format
Engineer-of-Record Sign and seals the final plan set
3.2.2 Functional and Technical Interfaces
The GEC shall maintain an open dialogue with the SCRRA Project Manager and other
SCRRA staff during the life of the project. The GEC Project Manager shall work closely with
assigned CTO Manager(s), SCRRA Project Manager(s) and the SCRRA Engineering
Manager to ensure that project goals under each CTO are met.
Refer to SCRRA Design Procedures Manual for reporting and requirements during design
development.
3.3 Project Planning and Implementation
3.3.1 Contract Review
The GEC Project Manager and each CTO Manager shall thoroughly review and understand
the provisions of the GEC contract.
3.3.2 Communications Plan
To ensure project coordination, the GEC shall prepare a communications plan to facilitate
coordination among team members throughout the life of the project. Elements of the
communications plan shall include:
15. DQAP 9 June 2015
SCRRA Design Quality Assurance Plan
Single Point-of-Contact: The GEC Project Manager shall be in charge of the
overall project, shall actively participate in the daily activities, and shall be on the job
from start to finish. The CTO Manager for each CTO shall be named.
Assignment of Responsibilities: Roles and responsibilities of the GEC project
team members shall be established to assure no duplication of effort. The GEC shall
ensure project continuity and provide proactive response to SCRRA needs and
concerns, as required.
Project Directory: Contact information for GEC personnel, SCRRA staff, and
relevant third-party stakeholders shall be provided to team members involved in each
CTO.
Progress Meetings and Reporting: Project review meetings with GEC team
members and appropriate SCRRA staff shall be held at an agreed-upon interval to
bring issues to immediate resolution. The GEC shall conduct frequent progress
review updates and shall prepare a monthly progress report. The responsible GEC
Project Manager shall ensure that meeting minutes are recorded and filed.
3.3.3 Project Work Plan
The GEC shall develop a Project Work Plan (PWP) for each CTO in accordance with the
requirements of the SCRRA Design Procedures Manual. The PWP shall define how the
CTO scope of work will be accomplished to meet SCRRA objectives. The approved CTO
Proposal shall be used as input into the development of the PWP. The GEC QA Manager
shall review and sign off on the PWP prior to its submission to SCRRA.
In the PWP, the GEC Project Manager and the CTO Manager shall identify and organize the
specific assignments in terms of sequence of work, the type and number of people required
for each phase, and the timing at which various tasks are to be started and completed.
The PWP shall include the following elements:
Project Overview: project location, SCRRA objectives, key project issues
Project Administration: project organization, assigned responsibilities, staffing
plan, contacts, reporting requirements, project control systems
Design: unique design requirements; tasks and methods required to complete
engineering, planning, and design activities
Scope of Work: from approved CTO Proposal
The PWP shall contain a level of detail commensurate with the complexity of the CTO
activities and knowledge of special concerns and issues.
3.3.4 Project Schedule
The GEC shall submit a baseline schedule at the start of each CTO. The baseline schedule
will serve as the basis for monitoring and controlling project activities to help GEC decide
how to use their resources to achieve time and cost goals; help management to evaluate
alternatives; form the basis for determining staffing resources, materials, and capital
16. DQAP 10 June 2015
SCRRA Design Quality Assurance Plan
requirements; and, provide a means for tracking progress. The baseline schedule will be
reviewed and approved by Contract Manager. The schedule shall show different tasks to be
completed, expected sequence of design, and effect of any changes to the overall schedule.
The schedule will use Oracle’s Primavera product.
Baseline schedule shall utilize computerized Critical Path Method (CPM) network
scheduling. Baseline schedule shall show the order in which the GEC proposes to carry out
the work with logical links between work activities, and calculations made using the critical
path method to determine the controlling operation or operations. The GEC will ensure that
activity sequences are logical and that schedule shows a coordinated plan for complete
performance of the work. The baseline schedule shall include the entire scope of work
through the end of the CTO. The GEC will show how to complete the work, the activities
that define the critical path and float on other activities.
The GEC will use the latest version of Primavera P6 Professional Project Management
software.
3.3.5 Project Kick-Off
The GEC shall schedule and host a team meeting upon receipt of notice to proceed under
each CTO. Refer to SCRRA Design Procedures Manual.
3.3.6 Design Directives
The GEC Project Manager shall review and concur with all design directives provided by
SCRRA prior to the beginning of design work. The GEC Project Manager shall be
responsible for advising SCRRA of points requiring clarification, distributing documents for
review, and identifying and amending discrepancies within the design directive in a timely
manner.
If amendments to the original CTO proposal (assumptions, criteria, standards) are required,
these changes shall be documented and filed with the original scope of work. Records of
design directive reviews and amendments shall be maintained and made accessible to all
personnel involved in the review process. The GEC shall retain these records in the contract
file.
3.3.7 Scope Change Management
The written approval of SCRRA is required prior to the performance of any activity or task
that is not defined in the approved CTO. Further, the GEC shall obtain approval of SCRRA
prior to proceeding with work that reflects a change in basis of design or design approach.
Out of scope work that results from SCRRA request, third party request, regulator request,
unanticipated conditions, or change in requirements shall be documented by the GEC. A
revised CTO proposal shall be prepared and submitted to SCRRA for approval prior to
proceeding with the work, in accordance with the requirements of the SCRRA Design
Procedures Manual.
17. DQAP 11 June 2015
SCRRA Design Quality Assurance Plan
3.4 Documentation Requirements
3.4.1 General
The GEC Project Manager shall ensure that a document control filing system is established
to address the filing of all documents expected to be developed or received during the term
of the contract. A standardized document control index shall serve as the basis for the
contract’s filing system. A sample file index is provided in Appendix B. All contract-related
documents shall be indexed, logged into the project document control log, and filed in
accordance with the project filing system. Project records shall include documents of both
internal and external origin such as studies, reports, calculations, standards and record
drawings, as well as incoming and outgoing correspondence. In-process documents are not
required to be placed into the contract files, but may be for convenience.
Electronic communications that are relevant to contract scope, requirements, or budget, or
include design inputs, or comments on deliverables shall be printed and placed into the file.
Electronic communications, however, shall not be substituted fro approvals required by
contract.
3.4.2 Document Control Requirements
Documents requiring control shall be maintained by using logs of the current revision level, a
master original of the document, and a log of those individuals that received the document.
When changes to a controlled document occur, the GEC Project Manager shall ensure that
revisions are provided to those requiring the information. The GEC shall maintain records
regarding the issuance and revision of controlled documents.
Documents Requiring Control Means of Control
Calculations Calculation Indices
Correspondence Correspondence Log
Design Criteria and Directives Correspondence Log
Drawings Drawing Lists
Reports Report List / Correspondence
Specifications Specifications List / Correspondence
3.4.3 Document and Data Changes
GEC shall assure that all changes to documents and data are reviewed and approvals
documented. The document changes shall be made following the procedures established in
this plan prior to documents being released to SCRRA.
3.4.4 Document Submittal to SCRRA
Upon completion of each CTO, and at designated milestone submittals, the GEC shall
submit hardcopy and electronic documents to the SCRRA Engineering Manager. Quality
records, such as review comment forms and checklists, shall be submitted with deliverables
to demonstrate that appropriate quality procedures have been followed. Refer to SCRRA
Design Procedures Manual.
18. DQAP 12 June 2015
SCRRA Design Quality Assurance Plan
3.4.5 Records Close-Out
Upon completion of the term of the GEC contract, the GEC Project Manager shall ensure
that files are maintained in accordance with the retention requirements of the contract.
3.5 Control of Subconsultants
3.5.1 General
Prior to the start of work, the GEC shall provide each subconsultant with a copy of the
DQAP. All subconsultants shall adhere to the requirements of the Design Quality Assurance
Plan.
3.5.2 Subconsultant Performance Review
The GEC shall monitor the performance of each of its subconsultants.
The GEC shall conduct regular status and review meetings with subconsultants to review
progress, ensure that up-to-date information is being used, and verify that appropriate
activities are being performed.
The GEC Project Manager has the responsibility to verify that all subconsultant work has
been reviewed and checked prior to submittal. Subconsultants shall make advanced
submissions of all studies, reports and plans to GEC prior to submission to other agencies
and SCRRA. The GEC shall review the subconsultant submissions for conformity with the
design control procedure described herein.
19. DQAP 13 June 2015
SCRRA Design Quality Assurance Plan
4.0 DESIGN CONTROL
4.1 General
The GEC and its subconsultants shall become familiar with the SCRRA DQAP before
proceeding with design activities. The DQAP shall be implemented and utilized throughout
the course of design development.
4.2 Design Input
4.2.1 General
The design shall meet all applicable parts of the State of California general laws, California
Public Utilities Commission (CPUC) requirements, FRA safety requirements, and the
specific project requirements. Where any conflict in criteria exists, the stricter criteria shall
govern.
Unless specifically noted otherwise in these criteria, the latest edition of the standard, code,
or guideline that is applicable at the time the design is initiated shall be used. If a new edition
of or amendment to a standard, code, or guideline is issued before the design is completed,
the design shall conform to the new requirements to the extent approved or required by the
agency enforcing the standard, code, or guideline changed.
The most recent editions of the following publications and documents were used:
AASHTO - American Association of State Highway and Transportation Officials
ADA - Americans with Disabilities Act
AREMA - American Railway Engineering and Maintenance-of-Way Association
(AREMA) Recommended Practice
Cal/OSHA - State of California Division of Occupational Safety and Health safety
orders
Caltrans - Caltrans Highway Design Manual (HDM)
CBC – California Building Code
CPUC – California Public Utilities Commission General Orders
FRA – Federal Railroad Administration, Track Safety Standards, particularly 49 Code
of Federal Regulations (CFR) 213, 214, 234, and 236
FTA - Federal Transit Administration, Federal Highway Administration (FHWA)
"Greenbook" Standard Specifications for Public Works Construction, written and
promulgated by Public Works Standards, Inc.
Government Codes of the State of California
UBC—Uniform Building Code, including seismic requirements
49 CFR 195, Transportation of Hazardous Liquids by Pipeline
4.2.2 SCRRA Standards
SCRRA has developed a number of standard plans, specifications, and manuals that shall
be applied to this project. In particular, standard plans and specifications shall be used
20. DQAP 14 June 2015
SCRRA Design Quality Assurance Plan
wherever possible to reduce engineering and construction costs. All standards and manuals
shall be adhered to throughout this project unless waived in writing by SCRRA Director of
Engineering and Construction.
SCRRA Engineering Standards
SCRRA Standard Specifications
SCRRA Design Criteria Manual
SCRRA Design Procedures Manual
SCRRA Design Quality Assurance Manual
SCRRA CADD Standards
SCRRA Track Maintenance, Right-of-Way and Structures Engineering Instructions
Standard Operating Procedures (SOPs)
4.2.3 SCRRA Guidelines
The following SCRRA documents will also be referenced and revised as appropriate:
SCRRA Highway-Rail Grade Crossings Recommended Design Practices and
Standards Manual
Grade Separation Guidelines
Excavation Support Guidelines
Landscape Design Guidelines
Rails-with-trails Design Guidelines
Quiet Zone Implementation Guidelines and Procedures
SCRRA Temporary Traffic Control Guidelines
Where procedures, standards, or codes outside of SCRRA-published documents are used
to define the design, these design inputs shall be approved by the SCRRA Engineering
Manager prior to implementation. Any exceptions to SCRRA design criteria or other stated
design requirements shall also be documented for submittal and approval by the SCRRA
Engineering Manager. A list of relevant design criteria, including codes and standards, shall
be prepared and made available to all design personnel.
The GEC and subconsultants shall compile, record, and verify project site condition
information through appropriate field surveys, inspections, and document searches. Refer to
SCRRA Design Procedures Manual.
4.3 Design Output
The GEC shall ensure that the completed designs comply with published SCRRA standards,
procedures, and criteria, as well as with referenced standards and codes and documented
design directives received from SCRRA.
Design control measures, as described below, shall be implemented in the development of
engineering designs. Design review comments may be recorded directly on the design
documents or through use of a SCRRA Design Review Comment Form QA-01 or DPM-31
(see Appendix A).
21. DQAP 15 June 2015
SCRRA Design Quality Assurance Plan
4.3.1 Calculations
Calculations shall be legible and suitable for reproduction. Calculations shall be reviewed in
accordance with this procedure prior to use of results or conclusions in subsequent work.
Calculations shall be organized in a logical manner with sufficient notes such that they can be
understood, without clarification from the Design Engineer, by an individual technically
competent in the subject matter.
Results of calculations shall be clearly identified, and voided/superseded calculations shall be
marked as such. The Design Engineer shall check to see that results of a design are
adequately reflected in documents that are influenced by the design (e.g., drawings,
specifications and estimates).
All calculations shall include:
Purpose of calculation Design criteria and applicable codes
Assumptions Conclusions
Input data, with source References
Design methods or theories Identification of information requiring
confirmation
The GEC shall assign to a qualified person, other than the Design Engineer, the task of
checking calculations. That person shall review the calculations to assure that all work
intended to be covered by the calculation has been performed. The calculations shall also
be examined for the following:
Purpose of calculation has been clearly identified
Approach is satisfactory
Current design criteria and codes have been used
Assumptions are clearly identified as such, and are reasonable
Design methods are consistent with accepted practice
Calculation results are reasonable based on engineering judgment and comparison
with previous solutions to similar problems
Mathematics are correct and accurate
Computer programs used are applicable for the problem being solved
Design Engineer has initialed and dated the calculations, including revisions
Calculations are legible and suitable for reproduction and filing
Superseded and voided calculations are so noted
The checker shall record his/her review of the calculations by initialing the "checked by"
space on each sheet. The reviewer shall record all comments on a calculations checklist
(Manual and Computer Calculation Check Lists are included at Appendix A). The comments
22. DQAP 16 June 2015
SCRRA Design Quality Assurance Plan
shall indicate which calculations were found to be satisfactory and which were found to be
unsatisfactory.
The GEC Project Manager shall ensure that checker comments reconciled and appropriate
revisions made.
Calculations and checklists shall become part of the project record.
The process for checking calculations is graphically shown in Flow Chart 1 – Checking
Calculations.
4.3.2 Drawings
Drawings shall be prepared and reviewed in accordance with the DQAP and shall specify
the characteristic elements which, if properly constructed, will produce a product that is
consistent with the design objective. The GEC Project Manager and the CTO Manager shall
ensure that design personnel are provided with proper information to prepare the drawings.
The GEC PM and/or CTO Manager shall conduct frequent reviews of drawings to assure
that proper standards and format are being utilized in their preparation.
Drawings shall be checked and back checked prior to each progress submittal. Each check
print drawing set shall bear a stamp, imprint, or cover sheet that documents the progression
of design checks, corrections, back checks, and approval, accompanied by name and initials
of checkers and reviewers. The dates of checks and back checks, corrections, and approval
shall be documented on the check print set.
The check print drawing set shall be reviewed for the following:
Scope of drawings is satisfactory
Interfaces with other drawings are correct
Previous comments to check prints have been incorporated into completed drawing
Details are presented clearly
Dimensions are correct and consistent, and tolerances are appropriate
Drawing is legible and will reproduce satisfactorily
Originating Design Engineer has initialed and dated drawing
Drawing Titles and Numbers agree with drawing list
Revisions are adequately identified as to what was changed, and the correct revision
number and date are shown (only after submission of final drawings)
Conforms to SCRRA CADD Drafting Standards, Guidelines, and Criteria
Upon completion of the check print review and correction process, the GEC shall assign
qualified personnel to ensure that drawings are complete and meet SCRRA project
objectives. The Drawing Checklist included in Appendix A shall be used for this purpose.
This review shall encompass:
23. DQAP 17 June 2015
SCRRA Design Quality Assurance Plan
Previous comments to check prints have been incorporated into completed drawing
Client comments on previous progress submittals have been incorporated or
otherwise addressed
Design is in compliance with SCRRA approved design requirements, standards, and
codes
Material specifications referenced in design incorporated into drawings
Drawings incorporate design elements of the supporting engineering disciplines
Drawing set, combined with specifications and reference standards, adequately
describes the entirety of work that is to be performed in the associated construction
contract
The final drawings shall be signed and sealed by the Engineer-of-Record who is responsible
charge of the work.
The process for checking calculations is graphically shown in Flow Chart 2 – Checking
Drawings.
4.3.3 Specifications
The GEC shall prepare the technical specifications in accordance with the SCRRA’s most
recent standards. Technical Specifications shall include Project Specific Specifications,
which revise, amend, or supplement SCRRA Standard Specifications.
The specifications shall be reviewed by qualified personnel to ensure that all elements are
appropriately detailed to reflect the needs of the project. The Specification Review Checklist
in Appendix A shall be used for this purpose.
Specifications review shall encompass checks for the following:
Basic technical requirements are listed, including reference specifications, codes,
and industrial standards
Quality acceptance criteria are established
Unique material, product, or installation requirements are identified
Source inspection and audit requirements are identified
Submittal requirements, including certifications and shop drawings, are clearly
presented
Provisions for measurement and payment are consistent with SCRRA standard
specifications
Requirements have been coordinated with appropriate SCRRA General Conditions
Specifications do not duplicate or conflict with contract drawings
24. DQAP 18 June 2015
SCRRA Design Quality Assurance Plan
4.3.4 Engineer’s Estimates
Supporting calculations for Engineer’s Estimates shall be reviewed in accordance with the
Calculations review procedure described above. Additionally, the Engineer’s Estimate shall
be subjected to a separate review to consider its completeness and consistency with the
drawings and specifications. The GEC PM and CTO Manager shall verify that this review
has been completed.
The Engineer’s Estimate review shall consider the following:
Quantities are supported by calculations in conformance with this DQAP
Sources or calculation methods for unit prices and back-up calculations for lump
sum prices are provided
Pay items and measurement units are consistent with the specifications, including
SCRRA Standard Specifications and Project Specific Specifications.
Work items included in the Engineer’s Estimate is consistent with the representation
of the work on the Drawings and in the Specifications
The entirety of the work required is covered by the sum of the bid items, without
duplication
4.3.5 Technical Studies and Reports
The format of technical studies and reports shall be appropriate to the scope and complexity
of the report. The GEC Project Manager shall coordinate specific format requirements with
SCRRA prior to submission. At a minimum, a technical study or report document shall
contain the following elements: Cover, Introduction (Purpose), Technical Analysis, and
Conclusions.
The study or report shall be reviewed by a technically competent individual for technical
adequacy and completeness. The Study or Report Review Checklist in Appendix A shall be
used for this purpose. Study and Report review shall encompass checks for the following:
Input data sources are cited
Objectives are clearly stated
Assumptions or criteria have been identified
Alternatives considered are consistent with assigned scope
Conclusions or recommendations are provided
Prior to submission, the GEC Project Manager shall review the study or report for overall
adequacy, completeness, and compliance with SCRRA requirements.
4.4 Checking Procedure
Each Checker shall mark design output to indicate corrections, questions, actions,
agreement, and final disposition of review comments. Design documents may cycle through
25. DQAP 19 June 2015
SCRRA Design Quality Assurance Plan
several iterations of corrections or questions if the CTO Manager is not satisfied that review
comments have been adequately addressed. In the case of disagreement among GEC
reviewers, the GEC Project Manager shall determine if input from SCRRA is required (Refer
to Design Input and Response to SCRRA Comments). If the disagreement does not require
SCRRA input, then the supervising engineer (engineer in charge) shall have ultimate
authority over the resolution of review comments within his or her area of charge. Figure 4.4
shows the SCRRA QC Color Chart that shows the method of marking documents during
checking process.
4.5 Roles and Responsibilities
4.5.1 GEC Responsible for Quality
Prepares and administers corporate quality standards.
Reviews project specific Designer Quality Control Plans for compliance with
corporate policies/standards.
4.5.2 Quality Assurance Manager
Verifies that all project documents were checked in accordance with the Quality
Assurance/Quality Control procedures.
Cannot perform ANY of the Quality Control Procedures.
4.5.3 Engineer of Record
Responsible for the design.
Stamps the final plans and calculations.
Licensed in the State of California
4.5.4 CTO Manager
Typically is the Project Manager for the GEC.
Implements the Quality Assurance/Quality Control Procedures.
4.5.5 Design Engineer (Originator)
Prepares the contract documents in accordance with applicable standards, manuals,
guidelines, procedures, and contract requirements
Responsible for design completeness, accuracy, adequacy and inter‐disciplinary
coordination.
Responsible to ensure quality control is performed and documented.
Cannot rely upon the Quality Assurance/Quality Control procedure to correct design
or calculation deficiencies.
Presents all calculations in a neat and logical manner to facilitate checking.
Reviews the completed plan set to ensure that it satisfies the design intent.
Cannot function as the Checker or Quality Assurance Manager.
Stamps each drawing, calculations with sign-off stamp.
Provide black/white reports, calculations, plans originals without any colors.
26. DQAP 20 June 2015
SCRRA Design Quality Assurance Plan
4.5.6 Design Lead
Ensures Quality Assurance/Quality Control procedure compliance within their
specialized discipline (including sub‐consultants).
Monitors design activities for compliance with criteria and standards.
Verifies that assigned personnel are capable of performing the required analysis or
calculations.
Releases the completed contract documents for their specialized discipline (Do not
release any contract documents until the Quality Assurance/Quality Control process
is complete).
4.5.7 CADD Manager
Verifies that all project drawings follow SCRRA’s CADD Standards.
Develops a CADD management strategy to unify the project teams CAD work
(including sub‐consultants).
4.5.8 Checker
Checks work product independently of the Design Engineer.
Can only check work that he/she did not originate.
Must be competent and experienced in the type of element being checked.
Cannot function as the Design Engineer, Back Checker or Quality Assurance
Manager.
Examines the contract documents for requirements of the project, technical
adequacy/accuracy, presentation quality, compatibility with other projects
elements/documents, and conformance with applicable standards.
Indicate with Yellow Highlight each item that is correct. Mark in Red the required
corrections, additions or deletions. Blue for notes and comments for clarification or
direction but not to be drafted.
4.5.9 Back Checker
Reviews corrections asserted by the Checker.
Revise the contract documents to include the changes identified by the Checker.
Place a green check mark near each of the Red corrections to denote each part has
been properly updated. STET and cross out will be used when agreed no change
should be made.
Sign and date the check prints.
4.5.10 Updater
Reviews the revised drawings and the check print/set.
Cannot function as the Verifier or Quality Assurance Manager.
Place a green circle near each of the Back Checker’s green check mark.
Consults with the Checker or Design Engineer if not in agreement with the revisions.
Any items of disagreement between the Checker, or Design Engineer shall be
27. DQAP 21 June 2015
SCRRA Design Quality Assurance Plan
submitted to the Project Team Design Leader (Project Engineer or the Project
Manager) for resolution.
4.5.11 Corrector
Incorporates all corrections.
In most cases, the Corrector is the Design Engineer.
Cannot function as the Verifier or Quality Assurance Manager.
Print final document when all updates are complete.
4.5.12 Verifier
Verifies back checked corrections were accurately made.
Indicate with Yellow Highlight all information is correctly updated.
In most cases, the Verifier is the Checker.
Cannot function as the Corrector or Quality Assurance Manager.
4.6 Detailed Checking Procedure
4.6.1 Provide Check Prints
The Design Engineer (Originator) provides check prints to the Checker by completing the
following:
Create the check print. The check print does not have to be a hard copy. It may be a
.pdf or other format that the Checker and Back Checker can appropriately review
and annotate as required.
Place a check print stamp on the check print
Number, sign, and date the check print.
4.6.2 Checking
The Checker performs a thorough review of the check print for design intent, completeness,
consistency, technical adequacy, and conformance to applicable standards and format. Use
the following color code on the check print to document the QC review:
Yellow Highlight – Verification/Concurrence of Correct items, highlight if correct.
Red - Corrections, line through incorrect item and provide correction or add missing
items.
Blue - Commentary notes, including discussion items, questions, references, and
methods of checking.
Complete the appropriate design QC checklist or checklist items. Sign and date the check
print stamp when complete. Give the completed and signed check prints, design QC
checklist, and cover sheet to the Back Checker.
28. DQAP 22 June 2015
SCRRA Design Quality Assurance Plan
There is no need for back checking or further signatures on the check print stamp in the
case where no corrections, additions, or deletions are found. Return all completed and
signed QC documentation to the Design Engineer.
4.6.3 Back Checking
The Back Checker reviews the Checker’s corrections on the check print. To document the
back check review process:
Green Checkmark - Agreement with the Checker’s corrections, place a check next
to the Checker’s correction.
Green - Additional corrections or alterations to the Checker’s corrections. The
Checker then confirms the Back Checker’s corrections with red check.
The Back Checker crosses out the Checker’s correction and adds additional corrections or
alterations in green when not in agreement with the Checker’s marks. Do not obliterate any
of the Checker’s marks.
Discuss all changes to the Checker’s corrections with the Checker. The Checker places a
red check next to the cross out if in agreement. The Back Checker and Checker should
resolve differences encountered during the checking process together. The discipline design
lead is consulted to resolve the differences if the two individuals cannot reach resolution.
Sign and date the check print stamp when back checking is completed. Document the
decisions on the check print or cover sheet if discussion between the Checker and Back
Checker was needed to resolve concerns. Sign and date the check print stamp when back
checking is completed.
4.6.4 Corrections
The Corrector makes the corrections and circles the red (or green) check print corrections in
green when incorporated. Sign and date the check print stamp when all of the corrections
are made. Provide the Verifier with the original check print and an updated check print. Do
not place a check print stamp on the updated check print.
4.6.5 Verifying
The Verifier compares the original check print with the updated check print to confirm that all
corrections are incorporated without error. Highlight the green-circled item in yellow on the
check print if a correction was properly made. Annotate the updated check print with
instructions and return it to the Corrector if a correction was not made or is in error. The
Corrector then completes the corrections and prints a new updated check print for the
Verifier.
Sign and date the check print stamp once all corrections are verified. All information must be
highlighted indicating that all information was checked.
29. DQAP 23 June 2015
SCRRA Design Quality Assurance Plan
4.6.6 Disposition of Checked Project Documents
The Design Engineer uploads the QC check prints into E: Drive once all verification is
complete and maintain all original check prints.
4.6.7 Additional Changes or Corrections
A new check print must be made to check the area that is changed when a change is made
to a checked specification or special provision. The check print is stamped and labeled
check print 2, 3, 4, etc., as applicable and attached to the previous check prints. The
checking follows the same procedure as that of the original check print except only the
portions that changed need to be checked.
4.7 Disciplinary Reviews
Discipline reviews will be conducted by technical leaders. The goal of discipline review is to
validate all components within a discipline, including calculations, drawings, specifications,
Engineer’s Estimates, technical studies and reports, conformance with standards, and
design theory.
4.8 Interdisciplinary Reviews
Drawings and specifications that interface with other departments or disciplines shall receive
an interdisciplinary review (IDR). This review shall take place at each milestone submittal.
The IDR shall include a review for interface, coordination, consistency and correct
representation, interferences, correct identification of materials, etc. The issues presented in
the Design Interface Matrix (refer to SCRRA Design Procedures Manual) shall be reviewed
for completeness and interfaces verified.
Duplication of information shall be avoided on drawings and between drawings and
specifications.
Refer to Flow Chart 3 – Interdisciplinary Reviews for visual depiction of this process.
4.9 Independent Reviews
Depending on project complexity, peer reviews by independent teams will be performed.
Constructability reviews will target thoroughness and completeness, staging and traffic,
schedule, and reduction in claims.
4.10 Quality Assurance Reviews
At each submittal milestone, a Quality Assurance Review shall be performed. The Quality
Assurance Manager, in conjunction with the Project Manager, shall assign a qualified
person, who has not been directly involved in the preparation of the design calculations,
drawings, specifications, or estimate, the task of performing the Quality Assurance Review.
30. DQAP 24 June 2015
SCRRA Design Quality Assurance Plan
The reviewer shall complete the Quality Assurance Review checklist. A Quality Assurance
Statement (see Appendix A) shall be included with submittals which states that the
appropriate reviews have taken place in accordance with this plan.
Quality Assurance comments shall be reviewed by the GEC Project Manager and assigned
CTO Manager. Actions taken, to include those comments not to be incorporated into the
drawings, shall be provided to the Quality Assurance Manager by the GEC Project Manager.
These responses will be reviewed and any disagreements shall be resolved prior to
submittal to SCRRA.
4.11 Response to SCRRA Comments
The GEC Project Manager shall receive all SCRRA comments on design submittals. These
shall be distributed to the CTO Manager and appropriate Technical Leads. The GEC Project
Manager shall be responsible for ascertaining that all of SCRRA’s review comments are
properly closed out before any subsequent milestone submission is made.
If any SCRRA comments are not to be incorporated into the drawings, a written response
shall be made to the SCRRA Project Manager, with copy to the SCRRA Engineering
Manager by the GEC Project Manager. The GEC Project Manager shall coordinate
resolution of these issues with SCRRA prior to subsequent submittal milestones.
Refer to Flow Chart 4 – Intra-Disciplinary Reviews Prior to Client Submittal for visual
depiction of this process and Flow Chart 5 – Intra-Disciplinary Reviews After Client Review
for visual depiction of this process
31. DQAP 25 June 2015
SCRRA Design Quality Assurance Plan
5.0 QUALITY AUDIT PROGRAM
5.1 General
The GEC Quality Assurance (QA) Manager shall perform or shall cause to be performed
periodic quality audits to provide timely, objective, and independent evaluations regarding
the extent of compliance with the requirements of the SCRRA DQAP. The audit shall
comprise a review of management processes and design control procedure to determine
conformance with the SCRRA DQAP. The QA Manager or his/her assigned auditor shall
prepare an audit report and conduct a post-audit conference to present the audit
conclusions to the GEC Project Manager.
SCRRA shall be provided with copies of Audit Reports and Audit Nonconformity Report
Reply forms. SCRRA may also assign its own staff to perform a quality audit of GEC
management and design processes.
5.2 Audit Item Findings
Any nonconforming conditions shall be documented on a Quality Audit Finding form (see
Appendix A). Each Quality Audit Finding shall indicate the applicable quality system element,
subject, or activity that was reviewed. The GEC Project Manager shall be promptly notified of
conditions that appear to require immediate corrective action.
5.3 Audit Reports
Upon completion of the audit, an audit report shall be prepared to include the following:
Scope and objectives of the audit
Details of the audit
Identification of the audit team
Identification of individuals contacted during the audit
Audit dates
Audit team’s judgment on the extent of compliance with the SCRRA DQAP
Quality Audit Item Finding forms, as appropriate
5.4 Corrective and Preventive Action
Should a disposition of nonconformity be required, the GEC Project Manager shall complete
an Audit Nonconformity Report Reply form and forward it to the auditor. The reply shall
describe the cause and extent of the unsatisfactory condition, the proposed action to correct
and, as required, prevent recurrence of the unsatisfactory condition. The reply shall also
include the names of the individuals assigned to take corrective actions and the date that
those measures will be completed.
32. DQAP 26 June 2015
SCRRA Design Quality Assurance Plan
Auditors shall evaluate the adequacy of the reply and verify that proposed
corrective/preventive actions are accomplished in a satisfactory and timely manner. Such
verifications shall be recorded.
33. DQAP 27 June 2015
SCRRA Design Quality Assurance Plan
6.0 QUALITY RECORDS
Sufficient documentation and records will be accumulated to provide objective evidence that
the design development and review process has been performed in accordance with good
engineering practice, in conformance with contractual requirements, and according to GEC
and SCRRA's direction. The documentation will include not only phase submission design
documents such as drawings, studies, reports, design calculations, communications,
instructions and directives which have a direct bearing on the project, but it will also include
Quality Assurance checklists, as described above.
The quality records will be stored with the project documents and retained in accordance
with contract requirements.
6.1 SCRRA Comments
SCRRA review comments made as a mark-up to drawings and specifications shall be
preserved by the GEC until the end of the project.
SCRRA review comments made in letter or memorandum format (including electronic) shall
be retained in the project files together with the GEC comment resolution.
6.2 Design Review Forms
Design review comment forms, indicating disposition of each comment, shall be retained in
the project files.
6.3 Check Prints
Check prints shall be kept on file as long as required (at least through bid opening) to ensure
that all review comments have been incorporated into the drawings.
6.4 Checklists
Quality review checklists for each milestone submission shall be preserved in the contract
files.
6.5 Audit Documents
Audit Reports, including Audit Item Findings, replies, and verification documents shall be
preserved in the contract files.
Audit Item findings if any along with associated replies and verification documents shall be
submitted to SCRRA with each progress submittal.
35. DQAP 28 June 2015
SCRRA Design Quality Assurance Plan
7.0 TRAINING
The GEC shall provide CTO Managers and design staff with adequate training and
supervision to ensure that personnel are adequately knowledgeable of the requirements of
the SCRRA DQAP.
37. DQAP 29 June 2015
SCRRA Design Quality Assurance Plan
Figure 4.4
SCRRA QC Color Chart
38. DQAP 30 June 2015
SCRRA Design Quality Assurance Plan
Flow Chart 1
Checking Calculations
Design Lead
Software Verified for
Accuracy
Data Input and Program
Run
Yes
Accuracy
Verified
Make Corrections
Output
Verified
Yes
No
Design Engineer
Reviews Data Input and
Reasonableness of
Output
Modify Software
QA/QC Manager
Review
Verified Output Filed in
Notebook with Date and
Name of Design
Engineer
No
Checker
Check calculations
independently
39. DQAP 31 June 2015
SCRRA Design Quality Assurance Plan
Flow Chart 2
Checking Drawings
Design Engineer
Prepare Design
Documents
Design Lead
Check and Mark Design
Documents
Design Engineer
Review Corrections
Documents
Independently Checked
if Necessary
No
Correct made
to Design
Documents?
CADD Manager
Make Changes to Design
Documents
Agree?
No
Yes
Yes
Design Engineer &
Design Lead
Review Corrections
CADD Manager
Make Changes to
Design Documents
QA Manager
Review at Random
Temporary archive
until project
completion
Design Engineer
Changes Back
Checked
Design Engineer
Changes Back
Checked
Design Lead
QC and Approved
Disagreement resolved
40. DQAP 32 June 2015
SCRRA Design Quality Assurance Plan
Flow Chart 3
Disciplinary and Interdisciplinary Reviews
Design Engineer
Prepare Design
Documents
Corrector
Incorporate all corrections
Checker
Check Documents independently
and Indicate each correct Item
and Mark the required Corrections
Back Checker
Reviews corrections asserted by
the Checker, indicate each of the
corrections and make comments
Updater
Review the revised drawings and
the check print/set and place a
check mark near each marked
changes
Design Lead
QC and approval
Verifier
Changes back checked
QA/QC Manager
Review at
Random
Copy to
Archive
41. DQAP 33 June 2015
SCRRA Design Quality Assurance Plan
Flow Chart 4
Interdisciplinary Reviews
Prior to Client Submittal
Two weeks prior to deliverable
Prime Consultant holds interdisciplinary meeting.
Resolve comments. Changes marked on both sets.
Break-up one set and distribute to disciplines.
Each Team Members sends
comments to Prime Consultant
Interdisciplinary review. Each discipline marks file set
and working sets with comments
Final deliverable sent to QA Manager for
review/approval
Each Team Member follows interdisciplinary reviews.
Prime receives one set of corrected documents with
certification
Prime Consultant compares the revised sets against
file set
To Client
42. DQAP 34 June 2015
SCRRA Design Quality Assurance Plan
FLOW CHART 5
Interdisciplinary Reviews
After Client Reviews
Agency/Client makes comments and sends
comments to Prime Consultant. Consolidate
comments and makes two sets
Interdisciplinary review by each team member and
corrected documents and comments response matrix
to Prime Consultant
Client/Prime Consultants coordination & /review
meeting(s). Both sets marked up with final comments
Prime Consultant reviews both sets. Saves one set
and second set is split up for distribution
QA Manager for review/approval
Prime Consultant receives one set of corrected
documents and comments response matrix
Prime Consultant compares the revised sets against
file set
To Client
43. DQAP 35 June 2015
SCRRA Design Quality Assurance Plan
APPENDIX A: QUALITY ASSURANCE FORMS
QA-01 Review Comments
QA-02 Calculations Checklist
QA-03 Drawings Checklist
QA-04 Specifications Checklist
QA-05 Engineer’s Estimate Checklist
QA-06 Study or Report Checklist
QA-07 Quality Assurance Statement
QA-08 Quality Audit
QA-09 Quality Audit Item Finding
44. DESIGN REVIEW COMMENTS
Reviewer: SCRRA File No.:
Submittal Name: SCRRA Project No.:
NO. DATE
SPEC
DWG
REPOR
REF.
PAGE
DISCIPLINE COMMENT RESPONDER RESPONSE
CODE
RESPONSE RESOLUTION-ACTION ITEM
1 04/30/15 X 1000 General Summary of work requires additional
description.
A
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
REVIEWER RESPONSIBILITY RESPONDER RESPONSIBILITY
Response
Codes:
A=Agreed and will comply/take action. B= Will investigate. C=Disagree for reasons noted in Response/Status Column. D=Will address in next phase.
November 2014 PAGE 1 OF 1 SCRRA Form DPM-31
45. QA-02
DESIGN QUALITY ASSURANCE PROGRAM
CALCULATION CHECKLIST
Consultant: Contract No.:
Project Name: Date:
Calculation Title: Reviewed By:
Purpose of Calculation: Computed By:
Comments: Yes No NA Remark
1. Purpose of calculation clearly defined
2. Input data taken from reviewed and accepted calculations
3. Test data appropriately factored into the calculations
4. Design criteria referenced
5. Data from interfacing sections appropriately factored in calculations
6. Assumptions clearly defined and applicable
7. Theories are applicable
8. Design methods used are consistent with accepted practices
9. Mathematics are correct and accurate
10. Results are reasonable
11. Originator of calculations initialed and dated calculations
12. Reviewer initialed the calculations
13. Calculations are legible in a form suitable for reproduction and filing
14. Copies of pertinent graphs or tables are attached
15. All work intended to be covered by calculations was performed
16. Calculations are listed in project index
Remarks:
Reviewer Date GEC Manager Date
Follow Up Action Required? Yes No If Yes Date of Follow Up Review:
QA Manager Date
46. QA-03
DESIGN QUALITY ASSURANCE PROGRAM
DRAWINGS CHECKLIST
Consultant: Contract No.:
Project Name: Date:
Design Progress Submittal: Reviewed By:
Drawing Nos. Reviewed:
Comments: Yes No NA
1. Is the scope of the set of drawings satisfactory?
2. Do the structures, equipment or comments satisfactorily meet the functional needs and
requirements?
3. Have the results of the latest design calculations been incorporated?
4. Are interfaces with other discipline drawings correct?
5. Have previous comments to check prints been incorporated?
6. Has an interdisciplinary review been made using an approved checklist?
7. Have the designer and CADD Tech signed the drawing?
8. Have the technical managers signed and dated the “checked by” space in the title box?
9. Are applicable codes, standards, loadings, etc., shown on the drawings?
10. Has accessibility for maintenance, repair and in-service inspection been provided?
11. Are materials properly identified on the drawings?
12. Are items constructible as shown?
13. Has the normal sequencing of construction trades been allowed?
14 Are right of way and construction easement boundaries clearly identified?
14. Is construction phasing or staging clearly shown?
15. Are dimensions and tolerances correct and consistent?
16. Does drafting technique conform to the SCRRA CAD standards?
17. Have duplications and redundancy of information, data and dimensioning been eliminated?
18. Do the titles and drawing numbers agree with the cover sheet list of drawings?
19. Have the revisions been adequately identified?
20. Are there outstanding comments?
Remarks:
Reviewer Date GEC Manager Date
Follow Up Action Required? Yes No If Yes Date of Follow Up Review:
GEC QA Manager Date
47. QA-04
DESIGN QUALITY ASSURANCE PROGRAM
SPECIFICATIONS CHECKLIST
Consultant: Contract No.:
Project Name: Date:
Design Progress Submittal: Reviewed By:
Spec Sections Reviewed:
Comments: Yes No NA
1. Is the specification based on CSI format or other SCRRA approved format?
2. Are project-specific specifications consistent with SCRRA Standard Specifications? Or do project
specific specifications clearly replace SCRRA Standard Specifications?
3. Is the specification complete and clear to the extent necessary to properly specify construction and
performance requirements?
4. Have duplications between drawings and specifications been eliminated?
5. Are proper codes, standards, processes, etc. referenced?
6. Have all new or unusual technical sections been approved by SCRRA?
7. Are requirements for shop drawings and other submittals properly specified, both to content and
timely submission?
8. Are material identification requirements properly specified?
9. Are new materials employed and installed in the manner approved by the manufacturer?
10. Is proper test and inspection documentation properly specified?
11. Are the acceptance criteria tests, tolerances, etc. specified and are they adequate, realistic, and in
line with ordinary construction practice?
12. Are provisions made for the qualification and approval of special construction processes and for
the personnel performing these processes?
13. Are measuring and test equipment calibration requirements and cleaning, storage and handling
requirements properly specified?
14. Are requirements for product identification and traceability included?
15. Are requirements for operation and maintenance manuals included?
16. Are requirements for spare parts and special tools included?
17. Are methods of measuring completed work and basis of payment properly specified?
18. Is nomenclature used in specification exactly as used on drawings?
19. Have all the SCRRA review comments to previous drafts been closed out?
Remarks:
Reviewer Date GEC Manager Date
Follow Up Action Required? Yes No If Yes Date of Follow Up Review:
GEC QA Manager Date
48. QA-05
DESIGN QUALITY ASSURANCE PROGRAM
ENGINEER’S ESTIMATE CHECKLIST
Consultant: Contract No.:
Project Name: Date:
Design Progress Submittal: Reviewed By:
Comments: Yes No NA Remark
1. Item quantities supported by checked calculations
2. Sources or calculation methods for unit prices provided
3. Calculations for lump sum prices provided
4. Work items consistent with representation of work on drawings
5. Work items consistent with representation of work in specifications
6. Pay items and measurement units consistent with specifications
7. Entirety of work covered by sum of bid items
8. Bid items are without duplication
9. Additives (agency costs, CM, flagging, etc.) are consistent with SCRRA
standards.
10. Construction and project contingency are appropriate for design level.
11. Engineer’s Estimate is listed in project index
Remarks:
Reviewer Date GEC Manager Date
Follow Up Action Required? Yes No If Yes Date of Follow Up Review:
GEC QA Manager Date
49. QA-06
DESIGN QUALITY ASSURANCE PROGRAM
STUDY OR REPORT CHECKLIST
Consultant: Contract No.:
Project Name: Date:
Report Title: Reviewed By:
Progress Submittal:
Comment YES NO NA
1. Objective of the Work was defined prior to start and conforms to contractual work scope
2. Supporting material was prepared and retained in accordance with the appropriate QAP
3. Supporting Data was included or referenced and retained
4. Report contains
a) Objectives
b) List of assumption requiring verification
c) Section on conclusions
5. Job file contains identification of all material used in study or report preparation
6. Calculation(s) included have been checked in accordance with DQAP
7. Drawing(s) included have been checked in accordance with DQAP
8. Engineer’s Estimate(s) included have been checked in accordance with DQAP
9. Previous review comments have been incorporated
10. Report is listed in Project Index
Remarks:
Reviewer Date GEC Manager Date
Follow Up Action Required? Yes No If Yes Date of Follow Up Review:
GEC QA Manager Date
50. QA-07
DESIGN QUALITY ASSURANCE PROGRAM
QUALITY ASSURANCE STATEMENT
Consultant: Contract No.:
Project Name: Date:
Progress Submittal:
This submittal contains the following design documents (check all that apply):
Design Document
Drawings
Project-Specific Specifications
Engineer’s Estimate
Design Calculations
Study or Report
“The design documents included in this submittal have been reviewed in accordance with the SCRRA Design Quality Assurance
Plan and have been found to meet the quality objectives set forth therein.”
Remarks:
GEC Project Manager Date GEC QA Manager Date
51. QA-08
QUALITY AUDIT
Date:
Firm Receiving Audit: Auditor:
Contract: Discussed With:
Project: File Code:
PURPOSE:
To review conformance to Quality requirements established in SCRRA quality
standards. This Quality Assurance audit covers all activities associated with
SCRRA design, procurement and construction activities.
Yes/No
1. Was the required plan and checklist to be used in the audit provided as part of the advance
notice?
2. Was a pre-audit conference held to establish the ground rules for the conduct of the audit?
3. Was a follow up audit conducted for previous audits to verify completion and the
effectiveness of corrective actions?
4. Upon audit completion did the lead auditor conduct a post audit conference with
management and supervision in the areas audited to review the audit findings?
5. Did the auditor document the audit results in an Audit Report and include reference to:
Documents reviewed, the location of the documents and the acceptability of items or
deficiencies observed in the documentation review?
Operations reviewed and the acceptable or non-acceptable areas observed?
Notations of any audit deficiencies found through interviews with persons involved in the
performance of tasks?
6. Were audit deficiencies documented on a Quality Item Report (see attached) or similar
document and included as part of the audit report?
7. Is the Audit Report addressed to the management of the audited organization, and
distributed to the GEC Quality Manager and others as appropriate?
8. Is the date established for the management of the activity audited to provide corrective
action responses?
All questions answered as “NO” are to be described in detail as to the non-conformance and the
action to be taken for each necessary correction. Use Quality Audit Item Finding for this purpose.
Prepared By: Acknowledged By:
Auditor Signature GEC Project Manager
52. QA-09
QUALITY AUDIT ITEM FINDING
File Code:
Page 1 of
Audit Drawing/Sheet: Specification:
Surveillance
1. Consultant 2. Contract No. 3. Location 4. QA Item Number
5. Subject 6. Check sheet Number 7. Issue Date
8. Discussed with 9. QA Auditor 10. Auditor Phone Number
11. Requirement reference and description of condition
12. Cause of the problem
13. Corrective action
14. Response due date 15. Response date 16. Effective date
17. Corrective action 18. QA Auditor Date
Accept Reject
19. Verification of corrective action(s)
20. Implementation 21. QA Engineer Date
Accept Reject
53. DQAP 36 June 2015
SCRRA Design Quality Assurance Plan
APPENDIX B: SAMPLE DOCUMENTS
Project File Index
Document Control Log
Check Print Stamp
55. PROJECT FILE STRUCTURE
NO SECTION CATEGORY/DESCRIPTION
8XXXXX/CXXXX-XX PROJECT/CONTRACT NO.
40.12.2 Specifications
40.12.2.1 Standard Specifications
40.12.2.2 Project Specific Specifications
40.13 Submittals
40.13.1 Problem Screening
40.13.1.1 Tier 1 Screening
40.13.1.2 Tier 2 Screening
40.13.1.3 Problem Screening Approvals
40.13.2 Concept Development
40.13.2.1 Concept Development Initiation
40.13.2.2 Concept Development Report
40.13.2.3 Quality Management
40.13.2.4 Communications
40.13.2.5 Concept Development Approvals
40.13.2.6 Contracts
40.13.3 Preliminary Engineering
40.13.3.1 Preliminary Engineering Initiation
40.13.3.2 Communications
40.13.3.3 Environmental Documents
40.13.3.4 Preliminary Engineering Report
40.13.3.5 Quality Management
40.13.3.6 Right-of-Way Access
40.13.3.7 Roadway Engineering
40.13.3.8 Structural Engineering
40.13.3.9 Utility Engineering
40.13.3.10 Preliminary Engineering Approvals
40.13.3.11 Contracts
40.13.4 Final Design
40.13.4.1 Final Design Initiation
40.13.4.2 Roadway Engineering
40.13.4.3 Right-of-Way Access
40.13.4.4 Quality Management
40.13.4.5 Environmental Documents
40.13.4.6 Structural Engineering
40.13.4.7 Utility Engineering
40.13.4.8 Communications
40.13.4.9 Final Design Submission
40.13.4.10 Certified Plans, Specifications, and Estimates
40.13.4.11 Final Design Approvals
40.13.4.12 Contracts
40.14 Project Cost Estimate
40.14.1 Quantity Calculations
40.14.2 Engineer's Estimate
40.14.3 Material List
40.14.4 Schedule of Quantities and Prices
40.15 Design Review
40.15.1 Design Interface Matrix
40.15.2 QC Reviews
40.15.3 Client Comments
40.15.4 Quality Assurance records
40.16 QA/QC
40.16.1 GEC QA/QC Plan
40.16.2 QC Manager Qualifications
40.16.3 Non-Compliance Reports
40.17 Third Party Coordination
40.17.1 Utilities
40.17.1.1 Letters
40.17.1.2 Utility Matrix
40.17.1.3 Utility Agreements
40.17.1.4 Utility As-Built
40.17.1.5 Utility Relocations
40.17.2 Fiber Optic Lines
40.17.3 Permits
40.17.3.1 Letters
40.17.3.2 Permit Matrix
40.17.4 Member Agencies
40.17.5 Local Agencies
40.17.6 Railroads
40.17.7 FRA/FTA/Level Boarding
40.17.8 CPUC
Engineering Construction Page 2 5/13/2015
56. PROJECT FILE STRUCTURE
NO SECTION CATEGORY/DESCRIPTION
8XXXXX/CXXXX-XX PROJECT/CONTRACT NO.
40.18 DSDC
40.18.1 Meetings
40.18.2 RFI
40.18.3 CN
40.18.4 Shop Drawings
40.18.5 As-Built
40.19 PTC
40.19.1 Change Management
40.19.2 Reporting Procedures
40.19.3 Surveying
40.19.4 Databases
40.19.5 Track Charts/Composite Maps
40.20 CTO Close-Out
50 BID AWARD PHASE
50.1 IFB Documents
50.2 Contractor Questions
50.3 Addenda
50.4 Bid Summary Sheet
50.5 Bid Opening
50.6 Conformed Contract
50.7 Notice to Proceed
60 CONSTRUCTION PHASE
60.1 Contract
60.1.1 Pre-Bid Information
60.1.2 Conformed Contract
60.1.3 Change Orders/CN
60.1.4 Notifications
60.1.5 Final Acceptance/Close Out
60.1.6 Bonds
60.1.7 Insurance
60.1.8 Warranties
60.1.9 Permits
60.2 Partnering
60.3 Contractor Information
60.3.1 Equipment List
60.3.2 Subcontractor List
60.3.3 Resumes/Qualifications
60.4 Subcontractors
60.4.1 Organization
60.4.2 Subcontractor List
60.4.3 Resumes/Qualifications
60.5 DBE and EED
60.5.1 DBE Plan
60.5.2 DBE Monthly Reports
60.5.3 Labor Compliance Reports
60.5.4 Certified payroll
60.5.5 Certified Payroll Non-Compliance Notice
60.6 Invoices and Payment
60.6.1 Invoices
60.6.2 Payments
60.7 Schedule
60.7.1 Baseline
60.7.2 Progress Reports/Updates
60.7.3 Two-Week Look Ahead
60.7.4 Monthly
60.8 Meetings
60.8.1 Agendas
60.8.2 Meeting Minutes
60.9 General Correspondence
60.9.1 To Contractor
60.9.2 From Contractor
60.9.3 To SCRRA
60.9.4 From SCRRA
60.9.5 To GEC
60.9.6 From GEC
60.9.7 To Utility
60.9.8 From Utility
60.9.9 To Others
60.9.10 From Others
60.9.11 E-Mails
Engineering Construction Page 3 5/13/2015
57. PROJECT FILE STRUCTURE
NO SECTION CATEGORY/DESCRIPTION
8XXXXX/CXXXX-XX PROJECT/CONTRACT NO.
60.10 Photograph Records
60.10.1 Pre-Condition Photos
60.10.2 Progress Photos
60.10.3 Safety Photos
60.11 Contract Documents
60.11.1 Drawings
60.11.2 Specifications
60.20 Submittals
60.20.1 RFI
60.20.2 RFC
60.13 Cost
60.13.1 Schedule of Values
60.13.2 Estimate Data
60.13.3 Claims
60.13.4 Conditional Waiver/Release
60.13.5 Labor/Fringe/Equipment Rates
60.13.6 Preliminary Notice
60.14 QA/QC
60.14.1 Contractor's QA/QC Plan
60.14.2 Contractor QC Manager Qualifications
60.14.3 Non-Compliance Reports
60.15 Operating Railroads
60.16 Local Agencies
60.17 Permits
60.18 Utilities
60.19 Right-of-Way
60.20 Construction Surveys
60.20.1 Survey Request by CM
60.20.2 CM's Construction Surveys
60.20.3 Contractor's Construction Surveys
60.21 RE Reports
60.21.1 Daily Reports
60.21.2 Weekly Reports
60.21.3 Monthly Status Reports
60.21.4 Extra Work Reports
60.22 Project Office Equipment and Supplies
60.22.1 Equipment Inventory
60.22.2 Shipping Records/Invoices
60.22.3 Automotive Records
60.22.4 Purchase Orders
60.23 Office Services
60.23.1 Rent
60.23.2 Utilities
60.23.3 Clerical
60.24 Safety
60.24.1 Safety program
60.24.2 Incident Reports
60.24.3 Safety Meetings
60.24.4 Training
60.24.5 Monthly Reports
60.24.6 Third party Claims
60.24.7 Contractor's Monthly Incident Summary
60.25 Public Relations
60.26 Environmental
60.26.1 Noise Control Reports
60.26.2 SWPPP Inspection Reports
60.26.3 Soil Monitoring Records
60.26.4 Environments Non-Conformance Reports
60.26.5 Cultural Resources Monitoring Reports
60.26.6 Construction Mitigation Monitoring Forms
60.27 Materials
60.27.1 Material Reports/Diaries
60.27.2 Material Testing
60.27.3 Material Certificate of Compliance
60.27.4 Acceptance Tests
60.27.5 Delivery Tickets
60.28 Hazardous Material
60.29 Project Close-Out
60.30 Team Kickoff
60.31 Construction Phases
Engineering Construction Page 4 5/13/2015
58. PROJECT FILE STRUCTURE
NO SECTION CATEGORY/DESCRIPTION
8XXXXX/CXXXX-XX PROJECT/CONTRACT NO.
60.32 Construction Complete
70 CLOSEOUT PHASE
70.1 Project Closeout Activities
80 RAIL INFRASTRUCTURE ASSETS
80.1 Track
80.1.1 Track Engineering
80.1.2 Drainage and Utilities
80.1.3 Property Acquisition Plans
80.1.4 Construction Phasing Plan
80.1.5 Erosion and Sedimentation Control Plan
80.1.6 Surveying
80.1.7 Geotechnical
80.2 Structures
80.2.1 Bridges
80.2.2 Tunnels
80.2.3 Culverts
80.2.4 Retaining Walls
80.3 Facilities
80.4 Stations
80.4.1 Site Work
80.4.2 Parking
80.4.3 Platforms
80.4.4 Pedestrian Crossings
80.4.5 Platform Amenities
80.4.6 Architectural Design
80.4.7 Structural Design
80.4.8 Mechanical Design
80.4.9 Electrical Design
80.4.10 Landscape Design
80.4.11 Communication Design
80.4.12 CIS Design
80.5 Grade Crossings
80.6 Layover Facilities
90 SCRRA DEPARTMENTS AND COORDINATION
90.1 Communications and Signals
90.1.1 Signals
90.1.2 Communications
90.1.3 PTC
90.2 Engineering and Construction
90.3 Equipment/Rolling Stock
90.4 Operations
100 PUBLIC PARTICIPATION
Engineering Construction Page 5 5/13/2015
59. Contract No. XXXX, GEC Name DOCUMENT LOG
File No. Project No.
File Name Project Name
Type
Serial
No.
Item
Dated
Date
Recorded
From To Description
Required
Action /
Distribution
Date
Action
Complete
Superseded
By
(Serial No.)
1 06/01/15 06/01/15 Sender of Document Addressee 06/01/15
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
SAMPLE FILE LOG PAGE 1 OF 1 MM.DD.YY
60. Drawn By: Date: Print No.:
QUALITY CONTROL STAMP
Checked: Date:
Back Checked: Date:
Corrected: Date:
Verified: Date:
Color Code:
Red = Correction/Change/Additions
Yellow = Changes/Additions Made
Blue = Changes/Additions Verified
Green = Comments/Notes
61. DQAP 37 June 2015
SCRRA Design Quality Assurance Plan
APPENDIX C: REFERENCES
1. Jack Shah, AIA 2002, “Quality Assurance Procedures Manual,” prepared for Korve
Engineering.
2. Utah Department of Transportation, “UDOT Quality Control/Quality Assurance (QA/QC)
Procedures,” Version 03/11/2014.