                        Design phase results and

                      analysis phase expectations

                              Date: 14/01/2010
Roman Agaev, M.Sc, PMP
Supra Information Technology ltd.


                                     Table of Contents

1.The expectations from the analysis phase.....................................................3
2.The results of design phase............................................................................3
Roman Agaev, M.Sc, PMP
Supra Information Technology ltd.


   1. The expectations from the analysis phase

          ●   Complete understanding by the analyst of the business process

          ●   Determination of the main functional points that allow to close
              the process logically

          ●   The state diagram (UML) that describes the process, its states,
              transitions and conditions for those in form of functional points

          ●   Complete understanding of the process context from Siebel data
              model perspective

          ●   The ERD of the process context its physical and logical links
              and constraints (tables, indexes, keys, data types, mvls etc...)

          ●   Appropriate understanding/knowledge of ERD internal content
              meaning the properties of each entity its nature, source etc...

          ●   Appropriate understanding of Siebel environment abilities in
              context of previously denoted process definition

   1. The results of design phase

          ●   Evaluation of the process from perspective of its appliance
              within the Siebel environment – gap analysis

          ●   Fragmentation of main functional points denoted by state
              diagram into appropriate valid functional elements

          ●   Examination of those functional elements on appliance within
              the previously defined infrastructure mechanisms

          ●   Examination of the process ERD from physical and logical
              perspectives
Roman Agaev, M.Sc, PMP
Supra Information Technology ltd.

          ●   Mapping of needed entity properties as well as appliance of
              needed physical and logical changes in terms of fields, indexes,
              table columns, links, keys

          ●   Preparation of the TDD document for the implementation phase

          ●   Escort of implementation phase and guiding according
              neediness

Design Results

  • 1.
    Roman Agaev, M.Sc,PMP Supra Information Technology ltd. 1. Design phase results and analysis phase expectations Date: 14/01/2010
  • 2.
    Roman Agaev, M.Sc,PMP Supra Information Technology ltd. Table of Contents 1.The expectations from the analysis phase.....................................................3 2.The results of design phase............................................................................3
  • 3.
    Roman Agaev, M.Sc,PMP Supra Information Technology ltd. 1. The expectations from the analysis phase ● Complete understanding by the analyst of the business process ● Determination of the main functional points that allow to close the process logically ● The state diagram (UML) that describes the process, its states, transitions and conditions for those in form of functional points ● Complete understanding of the process context from Siebel data model perspective ● The ERD of the process context its physical and logical links and constraints (tables, indexes, keys, data types, mvls etc...) ● Appropriate understanding/knowledge of ERD internal content meaning the properties of each entity its nature, source etc... ● Appropriate understanding of Siebel environment abilities in context of previously denoted process definition 1. The results of design phase ● Evaluation of the process from perspective of its appliance within the Siebel environment – gap analysis ● Fragmentation of main functional points denoted by state diagram into appropriate valid functional elements ● Examination of those functional elements on appliance within the previously defined infrastructure mechanisms ● Examination of the process ERD from physical and logical perspectives
  • 4.
    Roman Agaev, M.Sc,PMP Supra Information Technology ltd. ● Mapping of needed entity properties as well as appliance of needed physical and logical changes in terms of fields, indexes, table columns, links, keys ● Preparation of the TDD document for the implementation phase ● Escort of implementation phase and guiding according neediness