Design and implementation of a 
hotspot network 
independent of Wi-Fi service providers 
E.E.J. Vonk 
<E.E.J.Vonk@EWI.TUDelft.NL>
Design and implementation of a hotspot network: inde-pendent 
of Wi-Fi service providers 
E.E.J. Vonk 
Copyright © 2005-2006 E.E.J. Vonk
Table of Contents 
1. Introduction ...................................................................................................... 1 
1.1. The assignment ....................................................................................... 1 
1.1.1. Problem Description ...................................................................... 1 
1.1.2. Project Description ........................................................................ 2 
1.2. The problem domain ................................................................................ 2 
1.2.1. What is Wireless-Fidelity? .............................................................. 2 
1.2.2. History of Wi-Fi ........................................................................... 4 
1.2.3. The problems that we are trying to solve ........................................... 6 
1.3. Project goal ............................................................................................ 8 
1.4. Project approach ..................................................................................... 9 
1.5. Social and scientific relevance ..................................................................10 
1.5.1. Social relevance ..........................................................................10 
1.5.2. Scientific relevance ......................................................................10 
1.6. Used terminology and conventions ............................................................10 
1.6.1. Terminology ...............................................................................10 
1.6.2. Conventions ...............................................................................11 
1.7. Document outline ...................................................................................11 
2. Analysis ..........................................................................................................13 
2.1. Requirements elicitation ..........................................................................13 
2.1.1. Purpose of the system ...................................................................13 
2.1.2. Scope of the system ......................................................................13 
2.1.3. Objectives and success criteria of the project .....................................13 
2.1.4. Current System ............................................................................13 
2.1.5. Proposed System .........................................................................14 
2.2. Further analysis .....................................................................................16 
2.2.1. Network topologies ......................................................................17 
2.2.2. Defining the actors .......................................................................27 
2.2.3. Defining the various uses of the system ............................................29 
2.2.4. Defining the data model ................................................................42 
3. Design ............................................................................................................45 
3.1. Defining the design goals .........................................................................45 
3.1.1. Design goals ...............................................................................45 
3.2. Design problems ....................................................................................46 
3.2.1. Where to put the functionality ........................................................46 
3.2.2. Network of multiple access points ...................................................47 
3.2.3. Security .....................................................................................47 
3.2.4. Hardware and firmware ................................................................47 
3.2.5. Configuration deployment .............................................................48 
3.2.6. Maintenance and monitoring ..........................................................48 
3.2.7. Interoperability ............................................................................48 
3.3. Proposed software architecture ..................................................................49 
3.3.1. Overview ...................................................................................49 
3.3.2. Subsystem decomposition .............................................................49 
3.3.3. Hardware/software mapping ..........................................................50 
v
3.3.4. Persistent data management ...........................................................51 
3.3.5. Global software control .................................................................52 
3.4. Designing the subsystems ........................................................................52 
3.4.1. UserManagement subsystem ..........................................................52 
3.4.2. Storage subsystem .......................................................................56 
4. Implementation ................................................................................................59 
4.1. Solutions for the design problems ..............................................................59 
4.1.1. Where to put the functionality ........................................................59 
4.1.2. Network of multiple access points ...................................................59 
4.1.3. Security .....................................................................................60 
4.1.4. Hardware and firmware ................................................................67 
4.1.5. Configuration deployment .............................................................74 
4.1.6. Maintenance and monitoring ..........................................................74 
4.1.7. Interoperability ............................................................................79 
4.2. Implementation ......................................................................................82 
4.2.1. Implementing the management system .............................................82 
4.2.2. Implementing the firmware ............................................................84 
5. Evaluation .......................................................................................................87 
5.1. Test setup .............................................................................................87 
5.2. Test procedure and approach ....................................................................87 
5.2.1. Development tests ........................................................................87 
5.2.2. Pilot tests ...................................................................................88 
5.3. Test results ............................................................................................88 
5.3.1. The firmware ..............................................................................88 
5.3.2. The management system ...............................................................89 
5.3.3. Results of system testing ...............................................................89 
6. Conclusions .....................................................................................................91 
6.1. Project specific conclusions ......................................................................91 
6.2. General conclusions ................................................................................92 
A. References ......................................................................................................95 
A.1. Books ..................................................................................................95 
A.2. Articles and other documents ...................................................................95 
A.3. Various references ............................................................................... 102 
B. Used acronyms .............................................................................................. 105 
C. Extra project information ................................................................................. 111 
C.1. Used tools .......................................................................................... 111 
C.2. Needed preliminary knowledge .............................................................. 112 
C.2.1. Networking concepts ................................................................. 112 
C.2.2. Cryptographic concepts .............................................................. 115 
D. Project supporting documentation ..................................................................... 121 
D.1. Globalplan for Mobidot thesis project ...................................................... 121 
D.2. Risk analysis for Mobidot thesis project ................................................... 122 
vi
List of Figures 
1.1. WLAN with one access point ............................................................................ 3 
1.2. Mobidot network with a centralized management system ........................................ 9 
2.1. Centralized architecture [Webopedia1] ...............................................................17 
2.2. Star architecture [Webopedia1] .........................................................................18 
2.3. Bus architecture [Webopedia1] .........................................................................18 
2.4. Decentralized architecture [Minar2002] ..............................................................18 
2.5. Mesh architecture [Webopedia1] .......................................................................19 
2.6. Hierarchical architecture [Minar2002] ................................................................19 
2.7. Ring architecture [Minar2002] ..........................................................................19 
2.8. Centralized+Ring architecture [Minar2002] .........................................................20 
2.9. Centralized+Centralized architecture [Minar2002] ................................................20 
2.10. Centralized+Decentralized architecture [Minar2002] ...........................................21 
2.11. Tree architecture [Webopedia1] .......................................................................21 
2.12. Mobidot Infrastructure Situation 1 ...................................................................25 
2.13. Mobidot Infrastructure Situation 2 ...................................................................26 
2.14. Mobidot Infrastructure Situation 3 ...................................................................27 
2.15. Involved systems, their dependencies and responsible actors .................................28 
2.16. Use case diagram group 1 ...............................................................................29 
2.17. Use case diagram group 2 ...............................................................................30 
2.18. Sequence diagram for use case: CreateNewAccount ............................................31 
2.19. Sequence diagram for use case: CreateNewAccount (part 2) .................................32 
2.20. Sequence diagram for use case: ManageFirmware (add) .......................................34 
2.21. Sequence diagram for use case: ManageFirmware (add, part 2) .............................35 
2.22. Sequence diagram for use case: ManageHotspotsAndAPs (view) ...........................36 
2.23. Sequence diagram for use case: ManageHotspotsAndAPs (view, part 2) ..................36 
2.24. Sequence diagram for use case: ManageConfigurations (edit) ................................37 
2.25. Sequence diagram for use case: ManageConfigurations (edit, part 2) ......................37 
2.26. Sequence diagram for use case: ManageAccounts (delete) ....................................38 
2.27. Sequence diagram for use case: ManageAccounts (delete, part 2) ...........................39 
2.28. The data model ............................................................................................43 
3.1. Subsystem class diagram .................................................................................49 
3.2. Deployment diagram .......................................................................................51 
3.3. UserManagementModels class diagram ..............................................................53 
3.4. UserManagementGUI class diagram ..................................................................55 
3.5. UserManagementControllers class diagram .........................................................56 
3.6. ConfigurationStoreSubsystem class diagram ........................................................56 
4.1. 802.1X authentication process [Open1X1] ..........................................................65 
4.2. Netgear WG602 access point [SeattleWireless1] ..................................................68 
4.3. Netgear WG602 access point (internal view) [SeattleWireless1] ..............................68 
4.4. Linksys WRT54G access point + router [SeattleWireless2] ....................................69 
4.5. Linksys WRT54G access point + router (internal view) [SeattleWireless2] ................70 
4.6. Soekris net4801 [Soekris3] ...............................................................................71 
4.7. Soekris net4801 (internal view) [Soekris3] ..........................................................71 
4.8. SSH tunneling ...............................................................................................79 
C.1. OSI reference model [Tanenbaum1996] ........................................................... 112 
vii
C.2. TCP/IP and OSI network stacks [Tanenbaum1996] ............................................ 114 
viii
List of Tables 
2.1. Evaluation properties for several network topologies .............................................24 
2.2. Use case CreateNewAccount ............................................................................31 
2.3. Use case Login ..............................................................................................32 
2.4. Use case UseSystem .......................................................................................33 
2.5. Use case ManageFirmware (add) .......................................................................34 
2.6. Use case ManageHotspotsAndAPs (view) ...........................................................35 
2.7. Use case ManageConfigurations (edit) ...............................................................37 
2.8. Use case ManageAccounts (delete) ....................................................................38 
2.9. Use case PutHotspotDownForMaintenance .........................................................39 
2.10. Use case SendNetworkAnnouncement ..............................................................40 
2.11. Use case SetupAP .........................................................................................41 
2.12. Use case RetrieveUsageStatistics .....................................................................42 
ix
x
Chapter 1. Introduction 
This project is called 'Design and implementation of a hotspot network' and forms the second part of 
the thesis project. It started with a research assignment named 'How to deploy a Wi-Fi service pro-vider 
independent hotspot network?'. This document will describe the second part of this thesis 
project. 
1.1. The assignment 
Since a couple of years a lot of new developments have taken place in the field of IT. Two of these 
(relevant to this thesis assignment) are: 
• The rise of Open Source Software (OSS). 
• The rise of wireless Internet access at so-called 'hotspots'. 
The first development, the rise of OSS, causes the increase of usage of OSS in commercial products. 
Due to the licensing conditions of OSS, the source code of the commercial software needs to be 
freely available. This offers interesting opportunities. 
The second development (the development on which this assignment is based), is the introduction of 
wireless Internet access. A so-called 'hotspot' is a location that offers wireless Internet access to any-one 
using a laptop, PDA, etc. The wireless Internet access is based on the 802.11 Wi-Fi standard. 
Devices conforming to this standard are used more and more in mobile devices such as laptops and 
PDAs. Public institutions are getting equipped with Wi-Fi (are being transformed to hotspots), such 
as hotels, restaurants, airports, train stations, trains, but the technology is also available within com-panies. 
At these locations quick and easy access to the Internet is assured by Wi-Fi technology. 
A few companies put up and maintain hotspots, such as T-Mobile, KPN and Swisscom. In general 
these hotspots are composed of a local network and a remote central server. The largest problem is 
the fact that such systems differ for each Wi-Fi provider and thus are hard to interconnect. Each pro-vider 
uses its own methods of logging in and has different rules when it comes to the usage of the 
hotspots. The one might require downloading software in order to use the wireless network, the oth-er 
might only use readily available hardware and software and is insecure because of that. 
Mobidot is a company which is run by Joost Hietbrink en Michele Nijhuis, the suppliers of this as-signment. 
The development of software which manages wireless networks is the core business of 
Mobidot. It is Mobidot's intention to put up a network of Wi-Fi hotspots, on which Wi-Fi providers 
can offer Internet access to their customers. 
1.1.1. Problem Description 
Providing a continuous, fast and low cost Internet connection is what competitors are trying to 
achieve with the deployment of hotspots. To achieve this goal, several problems have to be solved: a 
user should be able to make use of the hotspot in the same way at each hotspot of each provider. To 
deploy as much hotspots as possible, the costs for deployment and maintenance of hotspots should 
be reduced. 
1
1.1.2. Project Description 
Design an appropriate model for the network architecture of a hotspot. All problems described 
above should be solved with this model. In more detail this means using OSS and budget hardware 
to achieve compatibility and cost reduction. Develop a prototype of the network architecture and of 
a management system that will monitor and manage this architecture. 
1.2. The problem domain 
Around 1995, connectivity (with connectivity in this document is meant: having the possibility to 
connect to some public computing network such as the Internet) wasn't part of common life. People 
used to communicate with one another by means of letters, telegraphy and telephone. With the intro-duction 
of computers this gradually changed. First some computers were connected to create a net-work 
called ArpaNet, initiated by American military and educational institutions. Later on, in the 
nineties, the Internet was formed out of the former ArpaNet, connecting computers to each other 
worldwide, creating a huge network of computers. The Internet introduced connectivity to the home. 
Anyone with a desktop computer at home was able to connect to anyone else by the Internet, in a 
matter of minutes. Nowadays, there is again a shift in the field of connectivity. It's not just possible 
for anyone to connect to the worldwide network, it is possible for anyone to do this from anywhere, 
and at any time. With the introduction of technologies such as GPRS, UMTS, and Wi-Fi 
(Wireless-Fidelity), mobile access to the Internet has become possible. The last of these technolo-gies, 
Wi-Fi (also known as WLAN), will form the basis for this project. 
1.2.1. What is Wireless-Fidelity? 
"How many times have you needed network or Internet access at home and 
wished you could work in a different room, or even outside, without having to run 
a long Ethernet cable? How many times have you been in a public spot, such as an 
airport or hotel, and realized you needed to send a quick e-mail? How many hours 
have you wasted sitting in conference rooms between meetings while your e-mails 
pile up?" [Roshan2003] 
Wireless Fidelity is a relatively new technology which enables people to connect to IP networks 
(such as the Internet) without any network wires connected to their computer. Wireless digital com-munication 
is not new, other wireless technologies such as HAM-radio and Aloha have been around 
for a long period. There were several reasons why these technologies didn't become popular: they 
were expensive, they were not easy to use (mainly used by specialized individuals and enthusiasts) 
and they offered a much lower bandwidth compared to wired networks. This all changed with the 
introduction of Wireless Fidelity (or Wi-Fi). 
Wi-Fi can operate in two modes: infrastructure mode and ad hoc mode. Ad hoc mode (referred to as 
IBSS, or Independent Basic Service Set) refers to direct connections between exactly two com-puters, 
with the same possibilities as a serial cable. Infrastructure mode is the more interesting mode 
of Wi-Fi: it basically works the same as an ethernet, without using network wires. This mode is 
what the name WLAN (Wireless Local Area Network) refers to. 
2
Figure 1.1. WLAN with one access point 
In this mode, several computers can be interconnected, in order to exchange information and data, 
just like you would on a wired network. One computer in the network could even be designated to 
be a gateway machine, enabling any computer on the network to access an outside network such as 
the Internet. In the infrastructure mode, there is a central component, called the access point. Infra-structure 
mode is also referred to as BSS (Basic Service Set). When multiple access points are used 
to create one WLAN, this mode is called ESS (Extended Service Set). All computers that wish to 
have a wireless network connection (from now on called wireless clients), associate (make a con-nection 
and authenticate) with this access point. This can only be done when the device with Wi-Fi 
capable hardware is in the range of the access point, which is limited to 300 meters outdoors, and at 
most 100 meters indoors (depending on the amount of walls that are in between the wireless client 
and the access point). Once a connection with the access point is established, the wireless client can 
begin performing network operations, just like in a wired network. And just like on a wired network, 
clients of wireless networks will have to share the available bandwidth. Wi-Fi introduces advant-ages, 
some of which include the fact that wires are no longer needed to interconnect all computers of 
a network. Furthermore, anyone with a portable computer with Wi-Fi capable hardware can connect 
be part anywhere in the coverage area of the access point and access the local network and possibly 
also external networks. 
Wi-Fi is defined in one of IEEE's standards: 802.11. 
"802.11 refers to a family of specifications developed by the IEEE for wireless 
LAN technology. 802.11 specifies an over-the-air interface between a wireless cli-ent 
and a base station or between two wireless clients. The IEEE accepted the spe-cification 
in 1997." [Webopedia2] 
3
Wi-Fi is known by many different names. Each of the following names refer to the same base tech-nology, 
without referring to any particular implementation or specification: Wireless-Fidelity, Wi- 
Fi, 802.11, WLAN. Further, there are specifications under 802.11 whose names are usually used in 
order to denote any implementation of such a specification. At this moment there are the following 
specifications: 
• 802.11: The original specification of 1997. This specification defines a transmission speed of 1 
or 2 MBps and an operation frequency of 2.4 GHz. In most cases, when 802.11 is referred to 
nowadays, any of the specifications discussed below is meant instead of this original specifica-tion. 
• 802.11b: This specification was approved by the IEEE in 1999 and defines a transmission speed 
of 11 MBps and the same operation frequency as 802.11, 2.4 GHz. Originally the term Wireless- 
Fidelity (or Wi-Fi) denoted this specification, but with the introduction of even newer specifica-tions, 
this changed. Wi-Fi now refers to the implementation of any of the specifications of the 
802.11 standard. 
• 802.11a: This specification was added in order to achieve a much higher speed than 802.11b: 54 
MBps. But in order to achieve this speed, it was chosen to use another frequency band: 5 GHz. 
This decision meant that existing hardware would be incompatible, and couldn't be used to 
achieve this speed. 
• 802.11g: Finally, this specification was added as it was realized that 802.11a wasn't gaining pop-ularity, 
mainly due to the fact that new hardware was needed. Especially access points offering 
public access were equipped with hardware implementing the 802.11b standard, and as such 
weren't able to handle client hardware that implemented the 802.11a standard. To overcome this, 
the 802.11g standard was devised. This specification defined a speed of 54 MBps in the 2.4 GHz 
band, which made this standard backward compatible with 802.11b. With hardware implement-ing 
this specification people were able to both connect to newer access points implementing the 
802.11g standards (supporting the 54 MBps transmission speed) and to older access points 
which only supported 802.11b. 
1.2.2. History of Wi-Fi 
When Wi-Fi was first introduced, it wasn't foreseen it could gain such a popularity it has now. Prob-ably 
one of the main reasons why Wi-Fi was introduced was its ease of installation and use. It could 
act as a replacement for wired networks, making it a lot easier to install home networks and 
(probably even more important) corporate networks. Not having to lay down wires in order to con-nect 
all computers in a home or office together would mean the installation and maintenance of such 
a network is much easier, a new network could be installed in a matter of minutes. 
Sharing an existing Internet connection with several people was an advantage that initiated the pop-ularity 
of Wi-Fi. People would have the ability, for example, to share their Internet connection with 
their neighbors. Since the Wi-Fi radio signal has a range of 100 meters and sometimes even up to 
300 meters, this could easily be done. The only thing needed is an access point that covers all neigh-bors 
that want to participate, and having those neighbors acquire a wireless network card for their 
computer. This setup would give the involved parties one great advantage: since there is one Internet 
connection used by several parties, the costs for that connection would also be divided among the 
parties. 
4
This way of Internet connection sharing more or less lead to another new approach, which was im-plemented 
mostly by students in some student cities, including Leiden in the Netherlands (see 
[WirelessLeiden1]) and Seattle in the United States (see [SeattleWireless3]). In this case, access to a 
certain access point would be freely and publicly available. To denote an area which had coverage 
of a publicly accessible access point, the term hotspot was introduced (in most cases, a spot is con-sidered 
to be an infinitely small dot, or at least too small to be a circle or oval. In this case, a hotspot 
refers to the coverage area of an access point which has a radius of 100 up to 300 meters. Normally 
this would be called a circle, but in comparison to the size of the already existing Internet, this cov-erage 
area is indeed very small, and thus called a spot). But this wasn't all, all these hotspots would 
be interconnected using the same air-to-air interface or possibly some using wires. This would cre-ate 
a giant LAN (Local Area Network) which introduced the possibility of creating a socialist-type 
of network: sharing data (music, movies, games, etc) free of charge. This would be very interesting, 
as it wouldn't be needed to connect to the Internet to find any music or movies. And it would lead to 
some advantages, such as not incurring high bandwidth costs of normal Internet connections and 
having a smaller possibility of the file sharing connections being tapped by authorities, risking pen-alties 
for copyright infringement, etc. Anyone with a laptop would be able to make sure he would be 
in the coverage area of a hotspot, connect to the network and start sharing data. 
Like with all good ideas, it didn't take long before a commercial implementation was given birth. It 
was soon realized that there was a need for Internet access (for business people, students, etc) out-side 
home, business or university. Some time after a failed start up by Mobistar in the 90's (using the 
original 802.11 standard), some small parties, called WISPs (Wireless Internet Service Providers), 
started installing access points (using the 802.11b standard) at public meeting places, such as cafes, 
restaurants, hotels, libraries, etc. The term hotspot would from then on refer to a public place that 
implemented a publicly accessible wireless network. The access point would be connected to the In-ternet 
using either an existing Internet connection, or a new Internet connection would be acquired. 
Furthermore, the access to the wireless network wouldn't be free of charge, but would be charged 
for, by the hotel, restaurant, etc. in question. With the introduction of such commercially accessible 
hotspots, interesting opportunities became possible. It would be possible to place hotspots in restaur-ants 
along highways which are used a lot by business people. These business people would then be 
able to make a stop over between one appointment and another at such a restaurant, and be able to 
check their email, enter information into a corporate system about the last appointment, etc. Or it 
would be possible to equip hotels with publicly accessible access points, and enable business people 
staying over at that hotel for a conference to perform tasks that otherwise would have to wait until 
these people would return from the conference. 
This commercial approach started small. Most large companies are usually hesitant to take the first 
steps in a completely new market, in which successful involvement is uncertain. This meant that 
several small parties first started initiatives, slowly implementing more and more public places with 
hotspots. Once the business gains were recognized by large corporations (mostly telecommunication 
providers), these corporations would buy out the small WISPs, to take over their market share, and 
start expanding from that point on. A good example of this in the Netherlands was Hubhop, which 
was initiated in May 2002, and by May 2003 was bought by KPN, the largest telecommunication 
provider of the Netherlands. 
The buyout of small WISPs by large corporations meant the initiation of a widespread implementa-tion 
of public hotspots. At this moment, there are three major parties (and some minor parties) in the 
Netherlands offering Internet access over public hotspots: KPN Hubhop, T-Mobile and Swisscom 
Eurospot, and each of these parties is independently implementing public hotspots. 
5
1.2.3. The problems that we are trying to solve 
We observe that the Wi-Fi world is fragmented, possibly because Wi-Fi is still an immature techno-logy. 
We see home user systems being backed by large corporations such as Linksys (daughter com-pany 
of Cisco). For public hotspot systems we however see no systems from large corporations. No-madix, 
which is rather expensive (in terms of investments for managers of public institutions which 
house the public hotspots), is not backed by some large corporation. It has such a dangerous market 
position, perhaps even more because their systems are quite expensive. In short, there's little to 
choose from in the world of public hotspot systems. It would be nice to see a more diverse set of 
systems available, of which this project perhaps could be one. For example, when we look at sys-tems 
for cellular communication, why do Motorola, Siemens, Nokia and Ericsson all develop mo-bile 
phones? The technology they provide is not renewing (compared amongst each other), the com-ponents 
used for the transmissions are quite standard. Their approach to certain usability problems 
or features however differs greatly. This is where they've got something to gain. The same goes for 
the world of systems for public hotspots. While the core technology doesn't differ at all between sys-tems 
(we do want to maintain interoperability, at least the end user expects this), there are possibilit-ies 
for new systems by focusing on different features and problems. This however is only a market-ing 
problem/observation. 
We will now go into more depth as to which technical (and sometimes technical and economical) 
problems exist. Basically, the problem that we observe is that there's no system that's extensible to a 
large degree, that supports SNAT circumvention (i.e. adjustments needed in existing infrastructure 
in order to support management and monitoring of devices), supports zero configuration and which 
is low cost. 
SNAT circumvention 
This plays a role with networking hardware, in the IP layer of the TCP/IP stack, where hardware 
used in a network is placed behind a NAT-gateway. Before we can fully understand what the prob-lem 
is, we first need to look at what NAT actually is. 
"Network Address Translation (NAT) allows computers on a private network to 
access the Internet without requiring their own global (public) Internet address. 
NAT modifies outgoing network packets so that the return address is a valid Inter-net 
host. Return (incoming) packets have their destination address changed back, 
and are relayed to the client host, thereby protecting the private addresses from 
public view." [MLIP1] 
Network Address Translation is usually applied in order to perform Internet Connection Sharing: 
sharing one Internet connection with multiple clients on an internal network. Since normally each 
network client should be configured with its own unique IP address, we would run into a problem: 
the number of external IP addresses that are in possession of a certain person are usually less than 
the amount of network clients. In order to solve this, the network clients get a private IP address as-signed, 
an IP address that is not recognized on public networks such as the Internet, it has to be 
translated to the public IP address of the network gateway (the gateway between the local network 
and the Internet). When replies of traffic (initiated by a local network client) arrive at the gateway, 
the destination IP address of the reply is translated back to the private IP address of the respective 
local network client, and the packet is forwarded to that network client. Two forms of address trans-lation 
exist: 
6
• S(ource) NAT: the Network Address Translation process that was previously described, it cre-ates 
the possibility for internal hosts to access an outside network. Furthermore, it makes these 
hosts unreachable for network devices on any outside network, since the internal hosts are not 
known by a public IP address, this can either be an increase of security or a problem. 
• D(estination) NAT: is the process of translating the IP address of traffic that arrives at the gate-way 
to the IP address of some internal host, and forwarding the traffic to that host. This is inher-ently 
different from SNAT, since in this case the network traffic doesn't get initiated by the in-ternal 
host but the external host. DNAT can occur on the transport layer, in which case one or 
more TCP or UDP ports get forwarded to an internal host. DNAT can also occur at the network 
layer, in which case all traffic for a certain external IP gets forwarded to an internal host. DNAT 
can be useful in situations where one might want to place servers behind a NAT-enabled fire-wall, 
either to decrease the number of needed IP addresses (DNAT on network layer), or to be 
certain that traffic to such a server is only possible on specified ports (DNAT on transport layer). 
SNAT only has to be set up for outgoing traffic, replies to such traffic are automatically handled by 
a NAT daemon which maintains state tables in which logs are kept of all translated traffic. The 
problem usually plays a role on non-enterprise networks (i.e. home or small to middle sized business 
networks), where SNAT is applied in order to give several machines access to the Internet. SNAT in 
itself increases the security of the internal hosts and because the internal machines don't need to al-low 
incoming connections, they only setup outgoing connections. In most cases no DNAT has been 
setup in order to make the internal machines reachable, as it is normally desired to have these ma-chines 
to be unreachable from the Internet. This however is a problem for Mobidot, as Mobidot 
needs to monitor and access its access points, which it does by consulting certain daemons running 
on the access points. In other words, we want to circumvent SNAT and make these daemons reach-able 
from the Internet (but without modifying the configuration of an existing infrastructure). 
Zero configuration (Plug 'N Play) 
The problem of zero configuration is one particularly important problem to deal with. It is related to 
the problem of SNAT circumvention: we don't want to bother the managers of public institutions. It 
shouldn't be needed for them to do all kinds of configurations, ideally the system would be a zero 
configuration: the manager places the access point, connects it to the Internet, and the access point 
then configures itself. Further, due to the fact that we need to connect to the Internet, we might need 
user credentials if the access point is to be the main gateway. We need to get this information from 
the manager of the public institution and into the access point. 
Low cost solution 
The last problem, with current systems, that should be mentioned is the costs for creating and main-taining 
a hotspot. Each WISP uses its own hardware, but current systems for such purposes are ex-pensive 
in three aspects. First, the hardware needed is quite expensive, and leads to a large invest-ment, 
for the owner of a public location (such as a hotel). The second and third cost aspects are the 
installation and maintenance costs. Due to the fact that current systems aren't flexible in local net-work 
layout (the previously discussed problem) and the fact they need to be configured locally for 
some specific settings, introduces the need for a mechanic, which means extra investment costs. Be-cause 
hardware is not 'plug 'n play' means a mechanic will be needed for maintenance (read: support 
contract) also, in the case of problems or in the case of firmware updates of the access point hard-ware. 
This results into costs much too high for local businesses that want to add Wi-Fi as an extra 
service beside their core business. Current systems allow for example hotels with rankings of three 
stars or more to invest in a current Wi-Fi solution. For hotels in the low end of the market there is no 
such possibility, while the visitors of such hotels (for example backpackers), might just as well (or 
7
even more) be interested in wireless access. The situation even gets worse due to the fact of the ex-istence 
of multiple, non-interoperable, WISPs, as will be discussed below. All these costs might lead 
to a too uncertain return-on-investment, meaning businesses won't invest. 
Furthermore, there are two problems which in itself don't make the project renewing, but do need to 
be addressed in this project: 
Extensibility 
This isn't a problem that plays a role in competitive systems such as Nomadix, but it does need to be 
taken into account if a system is to be created which can last. Even though performance is sacri-ficed, 
extensibility is needed to keep up with the fast development in the world of Wi-Fi. It basically 
means the entire system should be extensible, i.e. all different parts of the system. Even extensibility 
in other directions have to be taken into account, for example: can the system that is created be run 
on different hardware? If the Nomadix system would only run on the current selected set of hard-ware, 
they would have a problem when that certain piece of hardware is not available anymore. 
Roaming 
Each WISP implements the authentication of its users (checking whether a certain user is allowed to 
use the services of the network) in its own way, which makes roaming difficult. "Roaming is a gen-eral 
term in wireless telecommunications that refers to the extending of connectivity service in a net-work 
that is different from the network with which a station is registered. The canonical example of 
'roaming' is for cellular phones, when you take your phone to an area where your service provider 
does not have coverage (e.g., another country). In order for a mobile device to roam to another net-work, 
a number of processes need to be performed. The first necessity for inter-network roaming is 
that your service provider must have a roaming agreement with the network to which you have 
moved. In 802.11 roaming can also mean subscriber mobility or handover within the same network" 
[Wikipedia9]. This means that users are unable to roam to the networks of other WISPs. When, for 
example, some hotels are equipped with T-Mobile hotspots and some others with KPN hotspots, 
then a client who has a KPN Wi-Fi subscription will be forced to find a hotel room in a hotel which 
equips a KPN hotspot, while his preference for a certain hotel might force him into a hotel which 
equips T-Mobile hotspots. This might be a problem for certain businesses, which already have a 
public hotspot, but not with multiple WISPs. Since roaming in many cases is not possible, it would 
be needed to pay for wireless access more than once, i.e. getting a Wi-Fi subscription with more 
than one WISP. This is a inconvenience for the user. Clients of for example hotels and restaurants 
will be more selective. Previously they would select a hotel by its ranking and perhaps its location. 
Now they will also take into account if they can have access to the network of their WISP. This 
might result into a drop of clients for certain hotels. The problem with roaming is mainly in combin-ation 
with the large investment costs. Roaming partnerships, such as Picopoint and Boingo do exist, 
but these equip expensive hardware and partnership costs as discussed above, and as such the roam-ing 
problem is not solved. 
1.3. Project goal 
The goal is to design and implement a prototype of the mentioned network architecture, in order to 
facilitate a solution to the mentioned problem. This will be done using OSS and budget hardware. 
Some important requirements of this network include user friendliness, scalability, flexibility, com-patibility, 
robustness and low production costs. 
8
Figure 1.2. Mobidot network with a centralized management system 
The network architecture needs to be augmented with a management system from which the various 
hotspots of the network can be monitored and managed. 
In other words, the goal is to create a prototype of the two parts of the system (firmware that runs on 
the access points and a management system that runs on the central server) and implement as much 
requirements as possible. A minimal running system should be delivered, while at the same time 
designing the system in such a way that enhancements can be implemented easily. 
The main personal goal in this project is to learn many new things (both in terms of technology and 
in terms of project approach) as well as to look at various different approaches in solving problems, 
and try several approaches if the problem occurs multiple time. This relates not so much to the actu-al 
project contents, but it does relate to the project approach as will be discussed further on. 
1.4. Project approach 
This document describes the thesis project from inception to completion in chronological order. The 
project is divided into a number of phases. The first phase, the analysis, will look at the system. In 
this phase the problem domain is identified. The actors which play a role in the system are identi- 
9
fied. An identification of the use of the system takes place. In the second phase, the design phase, 
the system is designed on an abstract level. The involved hardware is defined and described. The de-composition 
of the system into subsystems is described. The assignment of the various subsystems 
to certain hardware is given. Further, choices regarding persistent storage are also decided upon in 
the design phase. The design phase is followed by the implementation phase, in which the object 
design and the actual implementation of the system is performed. Finally the evaluation phase fol-lows, 
in which the system is tested to see if it meets expectations. 
Besides the creation of the system, the thesis project consists of the creation of a report documenting 
the project. The basis for this report (notes, pieces of text, images) is created in-line with the project. 
The actual creation and finalization of the report takes place at the end of the thesis project. 
1.5. Social and scientific relevance 
1.5.1. Social relevance 
Being connected using wireless technologies is becoming more popular every day. More and more 
people are using wireless technologies every day. Wireless technologies are becoming a part of 
people's lives, either personally or professionally or both. People are counting on wireless technolo-gies 
to be able to do their work more efficiently, resulting in a great dependence on these technolo-gies. 
The fact that the society is becoming wireless connected makes it socially relevant. 
1.5.2. Scientific relevance 
The scientific relevance of this research lies in the same realization as stated before: being connec-ted 
using wireless technologies is becoming more popular. This popularity can result in a downfall 
of such a technology if no good structure is thought of to fit it all in. A scientific approach (as op-posed 
to the economic approaches taken by the various telecom providers) is needed in order to cre-ate 
a well-structured architecture. The structured approach using academic techniques, the use of 
OSS and the new way of approaching the problem (top-down: from a general abstract overview to a 
detailed implementation; as opposed to the bottom-up approach applied by telecom providers: func-tionality 
is needed somewhere and later on at other places, eventually leading to an integrated, 
though not well designed, whole) is what makes this project scientifically relevant. 
1.6. Used terminology and conventions 
1.6.1. Terminology 
A lot of terms exist in the world of wireless networks, hereby is stated what is meant by each term. 
First of all a clear distinction needs to be made between access point and hotspot. Access point 
refers to the hardware device providing wireless access to other networks or to other wireless cli-ents. 
Hotspot refers to the coverage area of the access point, which usually has a radius of 100 or up 
to 300 meters. In this area or 'spot' one can get wireless access, but not outside it, i.e. the spot in 
which one can get access is 'hot'. Furthermore, companies providing Internet services using wireless 
technologies are called WISPs (Wireless Internet Service Provider), by analogy to ISP (Internet Ser-vice 
Provider). There is also something which is called 'hotzone'. This refers to another type of ser-vice 
(which will not be discussed in this document) provided by WISPs. In this case the coverage 
10
area of the hotspot has a radius of several kilometers. 
1.6.2. Conventions 
In this document, references made to other documentation and quotations from other documentation 
will be denoted by square brackets ('[' and ']') with an identification tag inside that is formed of the 
author's name, the year in which the document was published (if known) and possibly an integer to 
denote a sequence if multiple documents exist of the same author and publishing year. Further, not 
yet defined terms will be defined in-line in the respective document section (as opposed to the use of 
footnotes, which are unfortunately not supported fully, as described in appendix C.1). Lastly, 
whenever references in third person are made, the word 'he' is used, in each of these cases 'she' could 
be meant just as well, unless stated otherwise. 
1.7. Document outline 
This document discusses the thesis project 'Design and implementation of a hotspot network' from 
inception to completion. It starts with an introduction, in which the problem domain is discussed, 
followed by a discussion of the project's goal and approach. 
The document then discusses the various phases of the project, namely the analysis, design, imple-mentation 
and testing phases. Each chapter will tell about the approach taken to finish a phase. Fur-thermore 
it discusses the choices that were made as multiple options appeared. There are four 
chapters discussing the various phases, the analysis chapter (chapter 2), which discusses the require-ments 
elicitation and the determination of the actors and use cases, the design chapter (chapter 3) the 
implementation chapter (chapter 4) and finally the evaluation chapter (chapter 5). 
Finally, in the conclusions the results of the project and some interpretations of these results will be 
given. The conclusions will also include a general discussion of the study as it was provided by the 
TU Delft and how it was perceived by the writer of this document. 
11
12
Chapter 2. Analysis 
In this chapter the analysis of the Mobidot project is discussed. The requirements elicitation is dis-cussed, 
in particular, requirements of the project and product. Further, the translation of the problem 
domain and defined requirements to the definition of a data model and definition of use cases and 
actors is described. 
2.1. Requirements elicitation 
2.1.1. Purpose of the system 
The purpose of the system is to provide public Wi-Fi access to Internet under a user friendly envir-onment. 
Users have to share bandwidth, and this happens in a fair way. Sign-ups and payments for 
accounts is made easy. Furthermore, the system will require minimal adjustments to a client's sys-tem, 
using the system to access the Internet is practically plug and play. Finally, security is provided 
as much as possible without interfering with the mentioned features. The system will support easy 
roaming to and from other Wi-Fi networks. It is possible for users from other Wi-Fi networks to use 
our system, and vice versa. 
2.1.2. Scope of the system 
The scope of the system is quite complex, four parties are involved, each having one or more re-sponsibilities. 
The main party involved is Mobidot itself. It is responsible for three systems: the 
central management system, the support department and the development department. Furthermore, 
zero or more telecommunication providers are involved, either as technology partners or as roaming 
partners. They supply NAS or VPN servers in order to support roaming. Further, they supply the In-ternet 
connections needed for the various hotspots and the central management system. The third 
party that's involved is the group of managers of the public institutions (hotels, etc) housing the hot-spots. 
They are responsible for housing the Mobidot access points and for a reception desk that can 
function as a 1st line helpdesk. Finally, there are the clients who visit the public institutions and that 
use the system. They are responsible for the hardware used to access the system. Further, they are 
responsible for retrieving an account needed to access the system. 
2.1.3. Objectives and success criteria of the project 
2.1.3.1. Objectives 
The objective of the project is to create a working prototype of the system, which will completely 
implement a small set of important features. The system should be developed in such a way that it 
can be used in production environments but also can easily be extended with additional features. 
2.1.3.2. Success criteria 
The project is a success when the mentioned set of important features has been implemented within 
the time constraints described in the global plan (see appendix A) and when the system is designed, 
implemented in such a way that it can already be deployed successfully in production environments. 
2.1.4. Current System 
13
The system to be developed doesn't replace any existing system, as it introduces new technology to 
create new possibilities. 
2.1.5. Proposed System 
2.1.5.1. Overview 
The system's main function will be the deliverance of paid wireless Internet access to visitors of 
public places (such as hotels and restaurants). It will do this by means of the 802.11 wireless fidelity 
protocol. The system will consist of multiple hotspots, which are constituted themselves of one or 
more APs. These APs will be connected to a central server in a centralized topology (purely central-ized 
or centralized+ring, etc). 
The APs will offer the wireless Internet access to the visitors of the hotspots. The central Mobidot 
system will manage the network of APs by monitoring, by configuring and keeping it up-to-date. 
Wireless users will need to authenticate themselves before they can use the network, unless they 
want to visit some particular websites, which can be accessed for free. 
2.1.5.2. Functional Requirements 
• Free websites : The user can visit certain websites (a small amount of informational sites, such 
as yellow pages, etc) without being authenticated. 
• Mobidot Wi-Fi accounts : The client creates a Wi-Fi account at the Mobidot login website, and 
uses a simple pay system such as paid SMS or a 0900 service number to pay for the account and 
activate it. 
• Live roaming : Client moves around with his mobile equipment within the hotspot from the cov-erage 
area of one AP to the coverage area of another, while the Internet connection is kept alive. 
• Inter-network roaming : A client of another public Wi-Fi provider connects to the Internet using 
the Mobidot Wi-Fi network by selecting his provider on the central Mobidot system login web-site. 
• Manager to user communication (one way) : Manager notifies client of an upcoming event by 
means of a message, sent from the central management system. 
• Bandwidth adjustment per hotspot : Manager activates a different (as compared to the standard 
setup) bandwidth sharing setup on one or more APs of a certain hotspot. 
• Easy new configuration deployment : Manager sets up a new configuration for all or some of the 
Mobidot hotspots. The new configuration is then automatically applied by all hotspots in ques-tion. 
• Status overview : Manager visits the 'status overview' page of the central Mobidot system man-agement 
website where the central Mobidot system shows status and statistical information of 
all Mobidot hotspots. 
• Easy firmware updates : Manager uploads new firmware to the central Mobidot system from 
where it is distributed automatically to all hotspots. 
14
• Account management : Manager manages clients' accounts, such as editing of user information, 
resetting passwords and deleting accounts. 
• AP status/statistical information supply : At regular intervals, APs gather status and statistical 
information (about the network, users, hardware status, etc) and send this information to the 
central Mobidot system. 
• Usage statistics logging : The central Mobidot system keeps logs of the usage of the system by 
users, both in terms of usage duration and data traffic. 
• Monitoring : The central Mobidot system monitors the Mobidot network by retrieving certain 
SNMP (Simple Network Management Protocol) information from the APs from time to time. 
• Web redirection : Users are redirected to the login screen of the system if they try to visit a web-site 
with their web browser, while they are not authenticated yet. 
• Mail redirection : The mail agents of users are redirected to the mail server running on the cent-ral 
Mobidot system, but only if these users have authenticated successfully. 
• Manageability from central point : Manager manages the Mobidot network from the central Mo-bidot 
system, using the central Mobidot system management website. 
• Easy hotspot setup : APs of a certain hotspot configure themselves automatically such that new 
hotspots can be deployed or existing hotspots extended in a plug and play manner. 
2.1.5.3. Non-functional requirements 
2.1.5.3.1. User interface and human factors 
• User friendly access to the system : It should be possible for clients to use the system without 
(too many) adjustments to their computer system. The user can use the infrastructure without 
modifying his IP settings. 
2.1.5.3.2. Hardware consideration 
• AP hardware : Hardware is needed for the access points. The APs should support running Linux 
firmware. 
• Thin AP hardware : As much functionality as possible should be implemented in the central 
Mobidot system, instead of in the APs. 
2.1.5.3.3. Error handling and extreme conditions 
• Monitoring alerts : When the central Mobidot system notices that an AP is not announcing its 
presence anymore and is being non-responsive, the central Mobidot system sends an alert to the 
manager(s). 
15
2.1.5.3.4. Quality issues 
• Fair use : Bandwidth as made available by the APs on a certain hotspot is divided (roughly) 
evenly among all connected users, i.e. it shouldn't be possible for one user to block out another 
by means of heavy downloads or uploads. 
• Basic bandwidth availability : A bandwidth of 256 Kbps is made available for the manager of 
the location (i.e. a hotel) where the hotspot is hosted. 
2.1.5.3.5. System modifications 
• On the fly firmware updates : APs upgrade their firmware automatically by regularly checking 
in with the central Mobidot system to check for new versions of the firmware. If an upgrade is 
available, the firmware is automatically downloaded, installed and activated. 
• Traffic tapping : The system should provide hooks such that tapping network traffic can be setup 
easily. 
2.1.5.3.6. Security issues 
• Host-to-network layer isolation : Laptops should operate isolated on the wireless network, it 
shouldn't be possible for laptops to contact each other circumventing the AP and it shouldn't be 
possible for laptops to contact machines on a possibly existing wired network (to which the AP 
might be connected). 
• Optional extra security for users : Privacy of users is protected as much as possible, without 
having the user friendly access to the system suffer degradation. Either 802.11i should be sup-ported 
(if it can be supported without requiring users to use it; some hardware might not support 
it), or optional VPN connections of any type should be supported. 
• Authentication before system use : Unauthenticated users cannot use the wireless network, be-sides 
browsing some free websites. 
• Rogue APs : Rogue APs are detected and (if possible) locked out. 
2.1.5.4. Pseudo requirements 
The system will be written in at least two programming languages, one for the management system 
and one for the firmware additions. The management system will be programmed in PHP, the firm-ware 
additions in shell script. 
2.2. Further analysis 
In this section, the second part of the analysis is discussed. Since it's clear we are dealing with a cli-ent- 
server type of system, we need to choose an appropriate network topology. This will be dis-cussed 
first, starting with a theoretical discussion about various possible topologies. After this, the 
16
identification of the various actors and uses of the system (in terms of scenarios and use cases) from 
the requirements is discussed, followed by a discussion of the inception of the data model from the 
use cases. 
2.2.1. Network topologies 
The theory of network topologies is actually based on graph theory of mathematics. Many similarit-ies 
can be found, and also many algorithms from graph theory are used in network applications that 
apply a particular topology. 
When we are talking about network structures and topologies in relation to the objective of this 
project, there are actually two distinct network structures to talk about. The first one is the network 
that is formed by the various hotspots and a central Mobidot system, in this document this network 
will be referred to as Mobidot network. The other one is the network that is formed between mul-tiple 
access points at one location (a hotel, a train station, etc), this network type will be referred to 
as 'Mobidot WLAN'. Multiple access points are used when the coverage area of one access point is 
too small, or when the bandwidth offered by one access point is too small for the amount of custom-ers 
that want access to the network. 
Before having an in-depth look at each of the network topologies, first lets have a look a what kinds 
of network topologies there are in general. [Webopedia1] states: 
"Topology refers to the shape of a network, or the network's layout. How different 
nodes in a network are connected to each other and how they communicate is de-termined 
by the network's topology. Topologies are either physical or logical." 
According to [Minar2002] there are four basic topologies: centralized, decentralized, hierarchical 
and ring systems. These topologies can be used by themselves or they can be combined in one way 
or another to create hybrid networks. [Minar2002] considers topology in terms of the information 
flow. This means that the information flow that occurs between nodes more or less defines with 
what kind of network topology we are dealing. Because of this fact we will later on have a look at 
what kinds of information flows exist within the Mobidot network, in order to be able to choose a 
network structure. 
Centralized architecture 
In a centralized architecture, client machines 
have to contact a central server in order to get 
something done. 
Figure 2.1. Centralized architecture 
17
[Webopedia1] 
Figure 2.2. Star architecture 
[Webopedia1] 
Star architecture 
The star architecture is a member of the central-ized 
architectures group, and is realized as a net-work 
which contains a central hub and several 
nodes. All nodes (can only) communicate to 
each other through the central hub. 
Bus architecture 
In the bus architecture, nodes are connected to 
one another through a common bus. This archi-tecture 
is a special kind of centralized architec-ture, 
since it's not merely the fact that there can 
be nodes that play a centralized role in the net-work, 
but more the fact that the backbone 
through which the nodes communicate is the 
centralized part of the network. 
Figure 2.3. Bus architecture 
[Webopedia1] 
Figure 2.4. Decentralized architecture 
[Minar2002] 
Decentralized architecture 
Decentralized systems are essentially pure peer-to- 
peer systems, thus there is symmetrical com-munication 
(one node can request something 
from another and get a response, that other node 
can also request something from the former 
node, and get a response also), and all nodes 
have equal roles. There is no central part in the 
network, and as such, the availability of the net-work 
is not dependent on one single machine, 
while this is an advantage, pure decentralized 
systems also introduce the problem that there is 
no central authority. 
18
Mesh architecture 
The mesh architecture is a concept that comes 
from graph theory, and denotes a network in 
which all nodes are connected to all other nodes. 
Figure 2.5. Mesh architecture 
[Webopedia1] 
Figure 2.6. Hierarchical architecture 
[Minar2002] 
Hierarchical architecture 
One of the systems that made the Internet ac-cessible 
to humans is the Domain Name Service 
(accessible in the meaning that it is relatively 
easy to operate). The Domain Name Service (or 
DNS) is a hierarchical system "where authority 
flows from the root name-servers to the server 
for the registered name and often down to third-level 
servers" [Minar2002]. 
Ring architecture 
"A single centralized server 
cannot handle high client load, 
so a common solution is to use 
a cluster of machines arranged 
in a ring to act as a distributed 
server. Communication 
between the nodes coordinates 
state-sharing, producing a 
group of nodes that provide 
identical function but have 
19
fail-over and load-balancing 
capabilities." [Minar2002] 
Figure 2.7. Ring architecture 
[Minar2002] 
Figure 2.8. Centralized+Ring 
architecture [Minar2002] 
Hybrid: centralized+ring architecture 
"Serious web server applica-tions 
often have a ring of serv-ers 
for load balancing and fail-over. 
The server system itself 
is a ring, but the system as a 
whole (including the clients) is 
a hybrid: a centralized system 
where the server is itself a 
ring. The result is the simpli-city 
of a centralized system 
(from the client's point of 
view) with the robustness of a 
ring." [Minar2002] 
Hybrid: centralized+centralized architecture 
In situations where servers themselves are clients 
to other servers, we are talking about a central-ized+ 
centralized architecture. For instance 2-tier 
and multi-tier applications work this way. 
Figure 2.9. Centralized+Centralized 
architecture [Minar2002] 
Hybrid: centralized+decentralized architec-ture 
"A new wave of peer-to-peer 
systems is advancing an archi- 
20
Figure 2.10. Centralized+Decentralized 
architecture [Minar2002] 
tecture of centralized systems 
embedded in decentralized 
systems. This hybrid topology 
is realized with hundreds of 
thousands of peers in the 
FastTrack file-sharing system 
used in KaZaA and Morpheus. 
Most peers have a centralized 
relationship to a "super node," 
forwarding all file queries to 
this server (much like a Nap-ster 
client sends queries to the 
Napster server). But instead of 
super nodes being standalone 
servers, they band themselves 
together in a Gnutella-like de-centralized 
network, propagat-ing 
queries. Internet email also 
shows this kind of hybrid topo-logy. 
Mail clients have a cent-ralized 
relationship with a spe-cific 
mail server, but mail serv-ers 
themselves share email in a 
decentralized fashion." 
[Minar2002] 
Hybrid: tree architecture 
"A hybrid topology. Groups of 
star-configured networks are 
connected to a linear bus back-bone." 
[Webopedia1] 
Figure 2.11. Tree architecture 
[Webopedia1] 
2.2.1.1. Evaluation properties for choosing network topologies 
21
[Minar2002] presents seven properties which can influence decisions in choosing a certain network 
topology. Whenever a new application is designed, one of the design steps includes the choice of a 
suitable topology, based on the requirements of the application that is to be developed. These seven 
properties (as presented by [Minar2002]) are: 
• Manageability 
Manageability defines if it is easy to manage the system. Management activities could include 
updating, repairing and logging. 
• Information coherence 
Coherence is defined by Dictionary.com as: 
"The quality or state of cohering, especially a logical, orderly, and aesthetically 
consistent relationship of parts." 
So when we are talking about information coherence, we are talking about pieces of information 
throughout the system, which have to be or naturally are consistent with each other. In this docu-ment, 
when a system is said to be coherent, it means information coherence exists in the system, 
or can be enforced without problems. When talking about information coherence, three aspects 
play a role: non-repudiation, auditability and consistency. Non-repudiation means that it is not 
possible for people to send information through the system and later on deny that they sent it. 
Auditability means that transactions through the system are traceable to an origin. Consistency 
deals with the fact that certain pieces of information shouldn't contradict with certain other 
pieces of information in the system. When these aspects are either enforced or readily available 
by nature within the system, then we are dealing with a system in which information is coherent. 
Information in a system is said to be not coherent when it is impossible to enforce information 
coherence without changing the network topology used. 
• Extensibility 
Extensibility deals with the fact how well a certain system can be extended with resources (as in 
information or other data). For example, how easy is it to add a host sharing some files to an ex-isting 
file sharing network? 
• Fault tolerance 
Fault tolerance concerns the immunity of the system to erroneous situations or faults. The more 
fault tolerant a system is, the more a system can continue to operate without having the user no-tice 
a fault occurred. 
• Security 
Security deals with how easy it is to hack the system, or seen from the other viewpoint, how 
hard it is to secure the system. 
• Resistance to lawsuits and politics 
Is the system easy to shutdown by authorities, for example in media sharing applications? Being 
lawsuit proof mainly plays a role in popular peer-to-peer file sharing applications, which are un-der 
pressure of large music and movie production companies. 
22
• Scalability 
Scalability is about being able to enlarge a system to meet demands. It deals with how well the 
network scales when resources are actually being added to the network. For example can a cer-tain 
network handle 2000 clients or hosts, or can it only handle 10 clients? 
Of these seven properties, resistance to lawsuits, extensibility and information coherence will not be 
reviewed. Resistance to lawsuits doesn't play any role in the choice of network topologies for a cer-tain 
business application. And since the Mobidot network is not destined to be an information sys-tem, 
but rather a network access providing system, it won't be dealing with information and as such 
extensibility and information coherence don't play a role in this case. 
2.2.1.2. Evaluation of the various network topologies 
In order to ease the choice of a network topology, these properties are valued against each network 
topology set forth by [Minar2002] and [Webopedia1] with a 'good', 'average' or 'bad' designation. 
Each network topology will be discussed individually, all properties will get a grade depending on 
the results of the discussion and a summarizing table will be provided at the end of this section. 
2.2.1.2.1. Centralized architectures 
In centralized architectures, there is one central server to which many clients connect. The fact that 
there is only one server in the system, means that the system is easily manageable, all data is con-centrated 
at one host and as such only one host needs to be managed. Securing a centralized system 
is very easy, there is only one host that needs to be protected. Fault tolerance is not achieved in any 
way in a centralized system. If the central Mobidot system goes down, the network is down, causing 
the entire system to be unusable. When talking about scalability there are little growing possibilities 
of the system (hardware might be added, but only a limited amount) without changing the network 
topology used, thus the scalability of centralized systems is bad. 
2.2.1.2.2. Ring architectures 
Ring architectures are architectures which consist of multiple servers. Since these servers usually 
have a single owner, these networks act the same as centralized architectures when it comes to man-ageability 
and security. One of the added advantages of ring architectures over centralized architec-tures 
is the fact that there is fault tolerance, since multiple servers are doing exactly the same thing. 
This first of all achieves load balancing, but it also creates the possibility of letting other servers 
take over the work of a certain server if it goes down, resulting in fault tolerance. Lastly, contrary to 
centralized architectures, ring architectures scale quite well if well-designed, any number of hosts 
can be inserted into the ring. 
2.2.1.2.3. Hierarchical architectures 
Hierarchical systems have a clear chain of actions, but usually are owned by various people, making 
it hard to manage individual hosts of the network. Since nodes in the network usually are owned by 
multiple individuals, incorporating security into the system is hard. Contrary to centralized architec-tures, 
hierarchical architectures provide good scalability. On any level of the tree below the root, any 
number of servers can be added in order to handle the system load. Finally, hierarchical systems are 
more fault tolerant than centralized systems, but the root of the hierarchical architecture is still a 
single point of failure. 
23
2.2.1.2.4. Decentralized architectures 
Decentralized systems consist of multiple systems, which all form an active part of the network. 
Usually the various hosts in the network are owned by various individuals, making the system hard 
to manage. Further, for the same reason, a decentralized system is hard to secure. Any host could 
connect and start to inject bad information or data into the system, because of the fact that there is 
no central authority. But contrary to centralized systems, decentralized systems are very fault toler-ant, 
since in essence all nodes are equals, it won't be noticed if one node goes down, since others can 
take over. Lastly, a decentralized system scales quite well when information coherence is not con-sidered, 
any number of hosts can be connected without performance degradation (any node that con-nects 
to the network can from then on provide the same services to the network to again other nodes, 
and these nodes in turn can do the same) If it would be necessary to keep the information in the sys-tem 
coherent, algorithms would be needed to achieve this, causing a lot of overhead. "If that over-head 
grows with the size of the system, then the system may not scale well." [Minar2002]. Since in-formation 
doesn't play a role in the Mobidot network, information coherence doesn't have to be con-sidered, 
causing decentralized architectures to scale quite well in that particular situation. 
2.2.1.2.5. Hybrid architectures 
It is impossible to discuss the properties of all possible combinations of architectures, so only a gen-eral 
overview will be presented here. 
Combining different architectures, creating hybrid architectures, is usually done to add the advant-ages 
of one architecture to those of another, trying to get the best of both worlds. For example file 
sharing applications like Kazaa utilize a hybrid centralized + decentralized architecture. Having a 
couple of super nodes form a decentralized network, and having this network of super nodes acting 
as a centralized system to many clients. This gives advantages like manageability of the system, 
ability to keep the system secure (in essence the super nodes are central and in control of one party), 
but still the system has the very good fault tolerance of decentralized systems. 
2.2.1.2.6. Summary of the evaluation properties 
Below are presented the evaluation properties as defined and discussed for the various topologies 
above. 
Name Manageability Fault tolerance Security Scalability 
Centralized good bad good bad 
Decentralized bad good bad good 
Hierarchical average average bad good 
Ring good average good average 
Table 2.1. Evaluation properties for several network topologies 
2.2.1.3. The appropriate topology 
A problem with the system that is to be designed is the fact that the system has a distributed nature, 
which makes things more complex. On one hand there are the access points which have to be mon- 
24
itored and managed, on the other hand there is the system that manages and monitors the infrastruc-ture. 
There are three information flows active in the infrastructure: an authentication flow (user try-ing 
to get access), a user data flow (user making use of the Internet) and a management flow 
(between the access points and the central managing system). In all situations, the management flow 
is centralized, since the information is needed centrally in order to manage the system. The other 
two information flows can however be centralized or decentralized. Before we can make a well-weighed 
decision in choosing a network topology, we must first know which options there are and 
discuss the pros and cons of each option. 
Figure 2.12. Mobidot Infrastructure Situation 1 
In the first situation, both the authentication flows and user data flows are decentralized and directly 
sent to the roaming partner of which the current user is a client. This situation imposes a serious lim-itation: 
we have no control over the authentication flow. As such we don't know who is active on 
our networks and we cannot manage these users nor monitor them. For example, we cannot send 
network announcements to these users in order to inform them about upcoming downtime of the 
network, due to the maintenance. 
25
Figure 2.13. Mobidot Infrastructure Situation 2 
In the second situation, both the authentication flows and user data flows are proxied through the 
central Mobidot system, before they are sent to a roaming partner, if any. Having the user data flow 
centrally imposes a very large problem: the central server becomes a bottleneck and a single point of 
failure. Unless the central server is heavily invested in, it will lead to performance problems. Fur-thermore, 
the central server might need to be setup redundantly on geographically separated net- 
26
works, possibly leading to high costs. 
Figure 2.14. Mobidot Infrastructure Situation 3 
In the third situation, the authentication flow is setup centrally, i.e. it is proxied through the central 
Mobidot system before it is sent to the roaming partner in question. The user data flow is however 
decentralized. In this situation we have combined the pros of the first two options and filtered out 
the cons of these options. As such, this situation seems to be the best choice. 
2.2.2. Defining the actors 
Having a good look at the system and the environment in which it operates leads to the identifica-tion 
of four actors. First of all there's the end user, the visitor of for example a hotel who wishes to 
browse the Internet with his laptop wirelessly (HotspotVisitor). There's the manager of the institu-tion 
(hotel, restaurant, etc) housing the public hotspot (HotspotLocationManager). This actor is in-volved 
with the system in two ways. First as an unlimited user (that is, only on his hotspot). Further 
he manages everything that is needed to operate his hotspot, i.e. the investments for the necessary 
hardware and the necessary network connections (externally to the Internet, and internally). And in 
time, he might be responsible for maintaining the portal site (using specialized Mobidot tools) for 
his specific hotspot. The third actor which is identified is the manager of a WISP with which Mo-bidot 
has a roaming agreement (RoamingPartner). This actor needs information about the use of the 
Mobidot infrastructure by its users, in order to be able to bill its users. Finally, there's the technical 
staff of Mobidot, the Mobidot network managers, who manage and monitor the infrastructure 
(MobidotNetworkManager). 
Now let's have a look at the system and its environment. Each involved actor is responsible for a 
certain piece of the system. 
27
Figure 2.15. Involved systems, their dependencies and responsible actors 
Basically, the HotspotVisitor's hardware (i.e. laptop) depends on the presence of Mobidot access 
points. The APs together with the needed Internet connection to connect the AP to are the responsib-ility 
of the HotspotLocationManager. The HotspotLocationManager orders an AP from Mobidot 
and places it in a strategic location (considering the coverage area of the access point), making sure 
28
it can connect to the Internet. The APs in turn depend on the central Mobidot system, which the Mo-bidotNetworkManager 
is responsible for. This system is, like the other systems, composed of sever-al 
parts. One of these is the AAA server. This AAA server (which, amongst other things, performs 
authentication of users) is in turn dependent on the AAA server of RoamingPartners, whenever 
users from such roaming partners roam onto the Mobidot network. Both the central Mobidot system 
and the AAA servers of RoamingPartners depend on an Internet connection, just as the Mobidot 
APs. Finally, the diagram above also shows a little about the assignment, it shows two parts of the 
system which are to be developed for this assignment: The Mobidot AP system and the Mobidot 
management system. 
2.2.3. Defining the various uses of the system 
Taking a good look at the requirements, we can find that most use cases are similar, but not exactly 
the same. The fact that most use cases are similar means we can quickly design and implement the 
system, as the same design philosophy that is used for one use case can be used for the others. In 
this case, there are two groups of use cases. 
Figure 2.16. Use case diagram group 1 
29
Figure 2.17. Use case diagram group 2 
2.2.3.1. HotspotVisitor use cases 
The tables below describe the CreateNewAccount use case, the Login use case and the UseSystem 
use case in detail. The CreateNewAccount use case describes how one retrieves an activation code 
and uses this code to create a new account. The Login use case describes how one logs in into the 
system to be able to use the system. The UseSystem use case, finally, describes how one uses the 
system. For CreateNewAccount a translation into a sequence diagram is provided too. 
Use case name CreateNewAccount 
Participating actor(s) 
Initiated by HotspotVisitor 
Entry condition 
1. The HotspotVisitor starts his laptop and 
runs his favorite web browser, trying to vis-it 
a website. 
Flow of events 
2. The AP contacts the AAA server on the 
central Mobidot system to find out whether 
the user has logged in successfully. 
3. The AAA server returns a false value and 
the AP redirects the HotspotVisitor to the 
central Mobidot system login website. 
4. The HotspotVisitor activates the "Create a 
new HotspotVisitor account" function of 
the central Mobidot system login website. 
5. The HotspotVisitor is asked to use a phone/ 
cellular payment system in order to get an 
30
activation code. 
6. [The HotspotVisitor uses the external pay-ment 
system, which generates and stores an 
activation code and announces this code to 
the HotspotVisitor. The activation code 
(including some extra information, such as 
the amount that was paid for) is stored in 
the Mobidot database by the external pay-ment 
system.] 
7. The HotspotVisitor enters personal inform-ation 
(name, postal address and email ad-dress), 
a new user name and password, and 
the activation code into the input form on 
the "create new account" web page and hits 
the "Create Account" button. 
8. The central Mobidot system checks in the 
Mobidot database whether this user name is 
available. 
9. The central Mobidot system receives the re-quest, 
checks whether the activation code is 
correct by contacting the Mobidot database. 
When it is, the central Mobidot system re-trieves 
some additional information from 
the same table in the Mobidot database (i.e. 
the amount that was paid for). 
Exit condition 
10. The HotspotVisitor's account is created in 
the Mobidot database. The HotspotVisitor 
receives a message confirming the success-ful 
creation of the account. 
Table 2.2. Use case CreateNewAccount 
Figure 2.18. Sequence diagram for use case: CreateNewAccount 
31
Figure 2.19. Sequence diagram for use case: CreateNewAccount (part 2) 
Use case name Login 
Participating actor(s) 
Initiated by HotspotVisitor 
Entry condition 
1. The HotspotVisitor starts his laptop and 
runs his web browser, in order to visit the 
central Mobidot system login website. 
Flow of events 
2. The HotspotVisitor enters his login creden-tials 
in the input form that is presented, and 
hits the Login button. 
3. The AP intercepts the request, interprets the 
query and queries the AAA server on the 
central Mobidot system with the provided 
information. 
4. The central Mobidot system AAA server 
checks whether the login credentials are 
correct, and if so returns a success message 
to the AP, else it sends a failure message. It 
records several details about the login 
(login status, login time) in the Mobidot 
database. 
5. The AP forwards the response detailing 
success or failure to the HotspotVisitor. The 
AP adjusts its firewall tables such that net-work 
traffic from the HotspotVisitor is al-lowed. 
Exit condition 
6. The HotspotVisitor receives either a failure 
or success message. In case of a success 
message, the HotspotVisitor is then authen-ticated 
and can then initiate the UseSystem 
and Logout use cases. 
32
Table 2.3. Use case Login 
Use case name UseSystem 
Participating actor(s) 
Initiated by HotspotVisitor 
Entry condition 
1. The HotspotVisitor was successfully au-thenticated 
as described in the Login use 
case and starts his web browser to visit a 
website. 
Flow of events 
2. The HotspotVisitor's laptop sends the web-site 
request to the nearest AP. 
3. The AP checks whether this user is authen-ticated 
(by checking with the AAA server in 
the central Mobidot system), if so, it allows 
the query to pass. 
4. The central Mobidot system forwards the 
website request to the intended server and 
the central Mobidot system returns its re-sponse 
to the AP. 
5. The AP forwards the response to the Hot-spotVisitor's 
laptop. 
Exit condition 
6. The HotspotVisitor receives the website 
that was requested. The use case keeps re-peating 
from step 2, unless the HotspotVis-itor 
logs out from the system. 
Table 2.4. Use case UseSystem 
2.2.3.2. MobidotNetworkManager use cases 
In this section we will look at various management use cases. These use cases basically describe 
how one manages a certain type of information. Management of information (in this system) in-volves 
four basic actions: add, view, edit and delete. Each of these actions are described in the tables 
below, followed by a translation into sequence diagrams. We will discuss the add action of the Man-ageFirmware 
use case, the view action of the ManageHotspotsAndAPs use case, the edit action of 
the ManageConfigurations use case and the delete action of the ManageAccounts use case. Further- 
33
more, we will look at the use case descriptions of the use cases PutHotspotDownForMaintenance 
and SendNetworkAnnouncement. 
Use case name ManageFirmware (add) 
Participating actor(s) 
Initiated by MobidotNetworkManager 
Entry condition 
1. The MobidotNetworkManager activates the 
"Firmware Management" function of the 
central Mobidot system management web-site. 
Flow of events 
2. The central Mobidot system queries the file 
system and shows a list of all previously 
uploaded firmware images to the Mobidot- 
NetworkManager. 
3. The MobidotNetworkManager clicks the 
Add button and browses to and selects the 
firmware on his PC he wants to upload. He 
hits the Submit button. 
4. The central Mobidot system then stores the 
firmware image in a previously configured 
location in the file system of the central 
Mobidot system. 
Exit condition 
5. The firmware image is added to the file sys-tem 
of the central Mobidot system. APs will 
notice the new firmware within the next 
hour and update themselves. 
Table 2.5. Use case ManageFirmware (add) 
Figure 2.20. Sequence diagram for use case: ManageFirmware (add) 
34
Figure 2.21. Sequence diagram for use case: ManageFirmware (add, part 2) 
Use case name ManageHotspotsAndAPs (view) 
Participating actor(s) 
Initiated by MobidotNetworkManager 
Entry condition 
1. The MobidotNetworkManager activates the 
"Manage Hotspots" function of the central 
Mobidot system. 
Flow of events 
2. The central Mobidot system queries the 
Mobidot database and shows a list with all 
hotspots to the MobidotNetworkManager. 
3. The MobidotNetworkManager clicks on a 
hotspot he wants to view. 
4. The central Mobidot system then fetches all 
related hotspot information of the selected 
hotspot from the Mobidot database and 
shows it to the MobidotNetworkManager. 
Exit condition 
5. The MobidotNetworkManager gets an over-view 
of all information related to the selec-ted 
Hotspot, including the collection of APs 
which are located at that hotspot. 
Table 2.6. Use case ManageHotspotsAndAPs (view) 
35
Figure 2.22. Sequence diagram for use case: ManageHotspotsAndAPs (view) 
Figure 2.23. Sequence diagram for use case: ManageHotspotsAndAPs (view, 
part 2) 
Use case name ManageConfigurations (edit) 
Participating actor(s) 
Initiated by MobidotNetworkManager 
Entry condition 
1. The MobidotNetworkManager activates the 
"Manage Configurations" function of the 
central Mobidot system. 
Flow of events 
2. The central Mobidot system queries the 
Mobidot database and shows a list with all 
configurations to the MobidotNetworkMan-ager. 
3. The MobidotNetworkManager selects some 
configurations he wants to edit, he then hits 
the Edit button. 
36
4. The MobidotNetworkManager changes the 
preferred firewall and traffic shaping con-figurations 
of the selected hotspot configur-ation 
and hits the Save button. 
Exit condition 
5. The hotspot configuration is updated with 
the new information. 
Table 2.7. Use case ManageConfigurations (edit) 
Figure 2.24. Sequence diagram for use case: ManageConfigurations (edit) 
Figure 2.25. Sequence diagram for use case: ManageConfigurations (edit, part 
2) 
Use case name ManageAccounts (delete) 
Participating actor(s) 
Initiated by MobidotNetworkManager 
Entry condition 
1. The MobidotNetworkManager activates the 
37
"Account Management" function of the 
central Mobidot system management web-site. 
Flow of events 
2. The central Mobidot system queries the 
Mobidot database and shows a list with all 
users to the MobidotNetworkManager. 
3. The MobidotNetworkManager selects some 
users to delete and hits the Delete button. 
4. The central Mobidot system asks the Mo-bidotNetworkManager 
whether he is sure, 
the MobidotNetworkManager hits the Yes 
button. 
5. The central Mobidot system then instructs 
the Mobidot database to delete the selected 
accounts. 
Exit condition 
6. The selected accounts are deleted from the 
Mobidot database. 
Table 2.8. Use case ManageAccounts (delete) 
Figure 2.26. Sequence diagram for use case: ManageAccounts (delete) 
38
Figure 2.27. Sequence diagram for use case: ManageAccounts (delete, part 2) 
Use case name PutHotspotDownForMaintenance 
Participating actor(s) 
Initiated by MobidotNetworkManager 
Entry condition 
1. The MobidotNetworkManager uploads a 
new firmware according to the Manage- 
Firmware (add) use case. 
Flow of events 
2. The AP checks in with the central Mobidot 
system once every hour in order to check 
for updated packages and new firmware. It 
finds a new version of the firmware. 
3. The AP puts itself in offline mode in order 
to prepare for the firmware upgrade. 
Exit condition 
4. All APs are put offline for maintenance. 
Table 2.9. Use case PutHotspotDownForMaintenance 
Use case name SendNetworkAnnouncement 
Participating actor(s) 
Initiated by MobidotNetworkManager 
Communicates to/with HotspotVisitor 
Entry condition 
1. The MobidotNetworkManager uploads a 
new firmware according to the Manage- 
Firmware (add) use case. 
39
Flow of events 
2. The central Mobidot system stores a general 
message concerning downtime of the sys-tem 
in the Mobidot database, for each user 
separately. 
3. The browser on the laptop of the Hot-spotVisitor 
regularly polls the AP for new 
info. In this case it will find a NetworkAn-nouncement 
is available, at which point it 
will download and delete the message and 
show it to the HotspotVisitor. 
Exit condition 
4. The network announcement is broadcast to 
all HotspotVisitors. 
Table 2.10. Use case SendNetworkAnnouncement 
2.2.3.3. HotspotLocationManager use cases 
The table below describes the SetupAP use case in detail. It describes the actions the HotspotLoca-tionManager 
performs in order to get his Mobidot hotspot working. 
Use case name SetupAP 
Participating actor(s) 
Initiated by HotspotLocationManager 
Entry condition 
1. The HotspotLocationManager has invested 
in AP hardware from Mobidot. 
Flow of events 
2. The HotspotLocationManager receives the 
AP hardware and places it in a strategic loc-ation. 
3. The HotspotLocationManager intends to 
connect the AP to the Internet. He turns on 
the AP, which immediately starts installing 
itself. 
4. The AP checks whether it can get an IP ad-dress 
by DHCP (automatic configuration). 
5. The previous step failed and the AP brings 
an Internet connection configuration web- 
40
site online. 
6. The HotspotLocationManager connects his 
laptop to the Mobidot AP and starts his web 
browser to visit this configuration website. 
7. The HotspotLocationManager enters his 
user credentials, which he received from his 
ISP, which are needed to get an Internet 
connection. 
8. The HotspotLocationManager presses the 
Save button to store the user credentials. 
9. The AP then checks, using the new inform-ation, 
whether it can get an Internet connec-tion. 
10. The AP can successfully connect to the In-ternet. 
It connects to the central Mobidot 
system in order to download an installation/ 
configuration script. 
11. The AP runs this script, which then starts 
installing several needed packages. After 
the installation phase has finished, the AP 
starts configuring itself according to set-tings 
which are stored in the central Mo-bidot 
system. 
Exit condition 
12. The AP is setup and ready for servicing Wi- 
Fi users. 
Table 2.11. Use case SetupAP 
2.2.3.4. RoamingPartner use cases 
The table below describes the RetrieveUsageStatistics use case in detail. It describes how a roaming 
partner retrieves the usage statistics of its users, who have roamed onto the networks of other Wi-Fi 
providers. 
Use case name RetrieveUsageStatistics 
Participating actor(s) 
Initiated by RoamingPartner 
41
Entry condition 
1. The RoamingPartner activates the "Retrieve 
Usage Statistics" function of the central 
Mobidot system. 
Flow of events 
2. The central Mobidot system queries the 
Mobidot database for usage statistics for all 
users which belong to the RoamingPartner. 
Exit condition 
3. The central Mobidot system returns the us-age 
information to the RoamingPartner. 
Table 2.12. Use case RetrieveUsageStatistics 
2.2.4. Defining the data model 
The previous discussion dealt with various use cases which play a role in the system. These use 
cases are the basis for the creation of the data model. 
The use cases describe the system modifying or accessing certain information based on user input. A 
model is a collection of such information which represents data about a part of the system that is be-ing 
managed. The essence of the Mobidot infrastructure management system is to manage the vari-ous 
parts of the system, which means to add, view, edit and delete information. From the use cases 
we can find which models to manage: user accounts, roaming partners, hotspots, hotspot configura-tions, 
firewall configurations, traffic shaping configurations, access points and firmware. Each of 
these objects can be translated directly to a class in the class diagram. Another model also plays a 
role in the management of the system, which is however not fully managed, but only read and de-leted: 
the activation code. From the new account creation use case we can find that there is an ex-ternal 
system used by customers in order to pay for their accounts. This external system adds these 
payments in the form of activation codes in the Mobidot database, for the users to be able to activate 
their accounts. 
Besides the various classes, relations between these classes need to be expressed in the data model. 
For example each hotspot has one or more access points and exactly one hotspot configuration. Each 
hotspot configuration has exactly one firewall configuration and exactly one traffic shaping config-uration. 
From all this information, the data model (the class diagram of the models) can be defined and de-signed, 
of which the result is shown below. 
42
Figure 2.28. The data model 
43
44
Chapter 3. Design 
In this chapter the system design is discussed. Which design problems are we facing? Which design 
goals are we trying to achieve? What hardware and software are available, and which is chosen and 
why? Further, how is the system decomposed into subsystems and how are they mapped to the vari-ous 
hardware systems? How are certain problems solved, such as persistent storage of data? After 
that, a closer look is taken at some subsystems: how are they constructed and why are they construc-ted 
the way they are? Not everything of the design phase will be discussed, rather, the discussion 
will focus on choices and decisions, and how these decisions impact the development of the system. 
3.1. Defining the design goals 
For the design goals there were three important considerations to make. First, the thesis project only 
runs for a limited amount of time. In the case of possible pilot projects, the system preferably would 
have a minimal working base, as opposed to a complete set of features, but no really working sys-tem. 
Second, due to the fact the thesis time is limited, the system should be made extensible, in or-der 
to be able to easily expand the system after the finalization of the thesis project, i.e. to transform 
the prototype into a production ready system. Third, the requirements as defined during analysis 
have to be kept in mind. 
All in all, this results in an extensive set of design goals. In general when it comes to delivery time, 
functionality can be traded in if needed, in order to have an early delivery time. On the other hand, 
quality cannot be sacrificed, i.e. the minimal base should do its work well, if it is to be launched as a 
pilot. 
Another design goal is usability. One of the most important parts of an infrastructure such as the one 
being developed now, is that it should be easy to use for the end user, no difficult maneuvers should 
be needed in order to use it. This notion has some side effects for security. Because native Wi-Fi se-curity 
is not mature at the moment, in this project it is favorable to drop native security and provide 
add on security measures (such as VPN possibility) instead. 
Finally, it was noted that the system needs to be extensible. This means it should be possible to 
change a current implemented subsystem in order to support another external system (or back-end 
system) for example. It also means it should be possible to extend the system with new functional-ity. 
Think for example of the possibility for hotel owners (or hotspot owners in general) to modify 
the portal web page, which is shown to the hotspot visitor. The hotspot owner could provide inform-ation 
about his hotel or local information of the town of residence on this portal web page. 
3.1.1. Design goals 
• Usability: It is easy for users to use the Mobidot infrastructure's services. When a non-authenticated 
user tries to use the system, the system informs the user about the need to login 
first (unless a free website was requested). 
• Utility: Bandwidth is divided evenly among active users, and a minimum amount of bandwidth 
(256 Kbps) is dedicated to the manager of the institution which is housing the hotspot. 
45
• Delivery time vs. functionality: Due to pilot setups of the Mobidot infrastructure, it might be 
needed to sacrifice functionality in favor of early delivery time. In order to be able to do this, a 
minimal functional implementation will be focused at, such that a minimal running system is ac-quired 
(users can login and use the system). 
• Delivery time vs. quality: Since the pilot setups have to get a working implementation, quality 
will not be sacrificed in favor of early delivery time, testing is performed as usual. 
• Security: The system supports the authentication of users, and supports the protection of the pri-vacy 
of users without sacrificing usability. This means that 802.11i (in particular 802.1X) will 
not be enabled at this time, as it requires users to use this technology (an AP can only support 
one Wi-Fi security measure, such as 802.11i, WEP or Open System Authentication at a time). 
802.11i is however not supported well yet in some client hardware. Security can be obtained by 
using VPN technology between supplicant and authenticator. 
• Robustness: All operations performed by the system which require user input achieve robustness 
by checking the input of the user and by checking the progress of the operation (rolling back any 
partial results in case of an overall failed operation). 
• Availability: The central Mobidot system performs active and passive monitoring in order to be 
able to keep the availability of the Mobidot infrastructure at a high level. 
• Fault tolerance: The central management system can run on multiple servers in order to provide 
fault tolerance. 
• Extensibility: The system provides hooks so the system can support traffic tapping if needed. 
• Modifiability: The system is designed in such a way that specific subsystems can be replaced by 
others without affecting the rest of the system. 
3.2. Design problems 
Now we will take a look at the various design problems which we are facing. Solutions to these 
problems will be discussed throughout the rest of this document. The solutions to these problems 
will be discussed in the next chapter, where the implementation of the system is discussed. 
3.2.1. Where to put the functionality 
The first thing we have to look at is the various hardware subsystems of the system, deciding where 
to put the intelligence of the system. Aspects such as performance and ownership of sources play a 
role in these decisions. This problem deals with where to implement the various pieces of function-ality 
of the system. We can do this either in the access points, which are located on the hotspots 
(hotels, restaurants, etc), or we can choose to implement as much as possible in the central Mobidot 
system. If we choose to implement everything in the access points this might have some negative 
implications. First of all, if the access points are going to be Linux based, then any additions to the 
firmware of the access points falls under the GPL (General Public License), just as the firmware it-self. 
As such, this means the sources of the additions have to be shared with the general public if the 
access point with the firmware is to be sold to other parties (as opposed to using it only internally). 
Second of all, the firmware might become heavy in terms of resource usage and this might negat- 
46
ively affect performance. On the other hand, we cannot implement everything on the central Mo-bidot 
system, since we need to have some minimal running system on the access points. All in all, 
for all pieces of functionality individually, one must choose where to implement this. 
3.2.2. Network of multiple access points 
A different problem to look at is the structure of the wireless network at one hotspot location. In 
most cases, a hotspot will be small enough to be handled by one access point. It might however, be 
possible for a hotspot to need more than one access point in order to have coverage on the entire loc-ation, 
this might for example be the case with camp sites. The problem to solve here is how we des-ignate 
the various access points. Do we manage them all as stand alone units, or do we look at them 
from a master-slave point of view, i.e. do we designate one as a master and the rest as slave? In the 
latter case, we would manage the master access point from the central management system, and the 
rest from the master access point (preferably automatically while managing the master access point). 
In the former case, we would manage each access point as though it is the only access point for that 
hotspot. In this case, we need to implement less in the access point itself, which relates to a problem 
discussed earlier. Related to this problem is the choice of how to interconnect the various access 
points. It is possible to interconnect them using an UTP network, but this has a substantial disad-vantage: 
it needs a wired network. It would be much more elegant to interconnect the access points 
using a technology they have already on board: wireless IP technology a.k.a. 802.11. In this case the 
limiting factor is performance: can we use the wireless channels both for interconnection of access 
points, as well as transport of user data, and still provide a reasonable throughput for user data? 
3.2.3. Security 
Another problem, which had quite much coverage in the media, is security. It is quite well known 
by now that existing security measures for wireless 802.11 based networks are not sufficient or inef-fective 
all together. New approaches are undertaken to create new security measures for 802.11 
based networks, and these approaches are described in the 802.11i standard. The standards describ-ing 
these approaches are however still not finalized, meaning we are currently in a sub-optimal situ-ation: 
we know existing security measures are ineffective, and we know that new solutions are avail-able, 
but aren't finalized yet, meaning that it's not incorporated into hardware on a large scale 
(changes to the draft standard would make that hardware unusable), especially in client hardware. If 
it is incorporated however, it is done so based on a certain version of the draft standard, and this 
could potentially make an access point of one brand incompatible with one of another brand. All in 
all, we can choose to apply 802.11i security measures, which means we exclude a group of clients 
from having access to our systems. On the other hand, we could choose to give only minimal native 
security support, but provide security add-ons, such as the ability to create a VPN (Virtual Private 
Network) between the client hardware and the access points. 
3.2.4. Hardware and firmware 
A different problem is the choice of certain hardware to use as access points, and the choice of using 
a build root from a specific distributor. A build root is a directory structure which is filled with all 
sources needed to create the firmware, i.e. sources for the build tools and sources for the software 
which needs to run on the firmware. At first, a build root is only available from the vendor of the 
particular hardware solution, but later on alternatives may arise, due to the fact that some hardware 
solutions are Linux (GPL) based. One needs to choose between various hardware based on specific 
47
needs. Further, one needs to choose between possibly various build roots, usually based on which 
software tools are already available within the firmware. But the choice is also based on the flexibil-ity 
of the firmware. Is it easily extended? How easy is it to remove existing features in order to make 
room for new features? How easy is it to perform upgrades once the firmware is running in produc-tion? 
These questions need to be answered for available build roots, in order to make a well in-formed 
choice. 
3.2.5. Configuration deployment 
We also need to deal with another problem, namely the deployment of configurations on the various 
access points. Due to the fact that the access points run off-site, they need to be self-maintaining, 
and this means that configurations for various software tools need to be deployed automatically. 
Such configurations include firewall scripts, traffic shaping scripts, etc. Some of these configura-tions 
are globally the same, some are specific for each access point. We need a way to easily deploy 
these configurations at each access point, including the knowledge of which access point we are 
dealing with. Another question is whether all configurations can be deployed automatically. For 
some configurations it might be needed to get settings from the manager of the location hosting the 
hotspot, and this information might be privacy sensitive. One could choose to maintain such settings 
on a central server, and possibly encrypt it. But then it is still easily vulnerable to theft. One could 
also choose to have the manager of the hotspot location enter the information manually into the ac-cess 
point, while the access point is installing itself for the first time (on site). 
3.2.6. Maintenance and monitoring 
Reachability of the access point (the SNAT circumvention problem as discussed in the first chapter) 
is another problem to deal with. In most situations, the access point will be the device in the network 
which will connect to the Internet, making it directly reachable for outside devices. It is however 
possible for devices to be placed deeper inside an already existing network. In this case there are 
two possibilities: the first possibility is the device to have a non-private Internet IP address, in which 
case the access point is also directly accessible. The other possibility, which is much more common, 
is that the access point receives an IP address from a private range (which means these IP addresses 
are not usable for Internet traffic, but only for local IP traffic), and the device's address is translated 
(Network Address Translation) at the gateway. In this case our access point is not directly reachable. 
If we want to connect to the access point from our central management server, certain rules have to 
be setup on the gateway or some kind of permanent tunnel through the firewall should be setup in 
order to make the internal machine (in this case an access point) reachable from the Internet. This 
problem exists for various protocols, i.e. for remote command shells, such as SSH (Secure Shell), 
but also for the monitoring protocol SNMP (Simple Network Management Protocol). For the latter 
protocol, it is needed to run an agent on the device which is being monitored, this agent needs to be 
talked to by a central monitoring daemon, where the monitoring daemon initiates the conversation 
(as a client). These protocols could not be used if no special measures would be taken. 
3.2.7. Interoperability 
The last problem to address is the problem of interoperability with other WISPs. We want to allow 
customers of these WISPs access to our wireless networks, if we have a roaming agreement with 
such a WISP. The first problem is how to authenticate these users. In general for authentication pur-poses 
an AAA server (Authentication, Authorization and Accounting) is used. There are three types, 
48
with several existing implementations in some cases: RADIUS, TACACS+ and Diameter. So the 
problem to solve here is which AAA server to use, and whether or not to maintain interoperability 
with other AAA server types, if it is even possible for that matter. 
3.3. Proposed software architecture 
3.3.1. Overview 
The system's architecture is basically composed of two components: the central Mobidot system and 
the AP. There's one central Mobidot system and there are one or more hotspots containing one or 
more APs. 
3.3.2. Subsystem decomposition 
The subsystem decomposition is aimed at a split in three parts of the functionality of the manage-ment 
system. The first part, StorageSubsystem, takes care of storing information. The second and 
third parts, the UserManagementSubsystem and HotspotManagementSubsystem, take care of the 
core functionality of the system: dealing with user related tasks respectively dealing with hotspot re-lated 
tasks. The remaining subsystems aren't modeled in UML since they are either external from 
the system (but important enough to mentioned), or they cannot be modeled in UML (due to the 
nature of the subsystem; i.e. the chosen programming language). They will be discussed in the hard-ware/ 
software mapping section. 
Figure 3.1. Subsystem class diagram 
StorageSubsystem The StorageSubsystem is responsible for all stor-age 
related tasks. It stores all information that 
needs to be stored, to be retrieved, or both: activ-ation 
codes, configurations, firmwares, hotspot 
and access points, roaming partners and users. 
49
UserManagementSubsystem The UserManagementSubsystem is responsible 
for user-oriented tasks: logging users in and out, 
automatic re-authentication when a user roams, 
sending network announcements to users, usage 
administration for both Mobidot users and ex-ternal 
users, management of accounts by the ad-ministrator, 
creation of new accounts by the user, 
increments of the account balance by the user 
and finally checking whether the user is logged 
in, in the case of normal system use. 
HotspotManagementSubsystem The HotspotSubsystem is responsible for bring-ing 
the hotspots up and down on demand, 
providing status overviews to the MobidotNet-workManager 
and performing configuration up-dates 
and firmware upgrades. 
3.3.3. Hardware/software mapping 
All subsystems defined above will be part of the central management system, and as such will be 
mapped to the central Mobidot system. There are some remaining subsystems, which will be dis-cussed 
below: 
FirmwareSubsystem This subsystem is the base subsystem of the APs. 
It is the OS that runs on the APs. It takes care of 
all of the AP's activities (such as routing traffic, 
authenticating users, letting users roam, logging 
off users). To perform Mobidot specific tasks it 
depends on the SNATCircumventionSubsystem, 
the AutoConfigurationSubsystem, and the 
AutoInstallationSubsystem. 
SNATCircumventionSubsystem This subsystem takes care of the SNAT circum-vention 
problem, by setting up everything that is 
necessary for it. 
AutoConfigurationSubsystem This subsystem is responsible for the configura-tion 
of the AP. This includes firewall configura-tions, 
traffic shaping configurations and some 
general configuration settings. To achieve a zero 
configuration setup, these configurations are per-formed 
automatically in coordination with the 
central Mobidot system. 
AutoInstallationSubsystem This subsystem is responsible for installing the 
needed software packages on the AP in order to 
support the other subsystems on the AP. It also 
responsible for keeping these software packages 
up to date. 
CaptivePortalSubsystem This subsystem is responsible for providing fa- 
50
cilities for the user to identify himself to the sys-tem. 
ExternalCommSubsystem The ExternalCommSubsystem is responsible for 
communication with external systems, such as an 
external payment system which generates activa-tion 
codes. This subsystem will be used both by 
the subsystems of the central management sys-tem 
and of the AP. It will be part of the central 
Mobidot system, as that eases the implementa-tion 
of the system. 
Figure 3.2. Deployment diagram 
Note: subsystems denoted with square brackets ('[' and ']') will be implemented in this project, but 
cannot be modeled in UML. Subsystems denoted with angle brackets ('<' and '>') will be implemen-ted 
using existing software packages. 
3.3.4. Persistent data management 
For the persistent data management it was necessary to choose an appropriate storage back end for 
storing several types of information. For most types of information the MySQL database is found to 
be the best choice, mainly due to its speed, its ease of implementation (no custom storage structure 
has to be defined, only a set of attributes per information type has to be defined), its ability to easily 
execute complex queries and finally its ability to easily support concurrent accesses. 
UserStoreSubsystem The UserStoreSubsystem is responsible for stor-ing 
user related data (i.e. the list of UserAc-counts 
which are collected in the UserAccount- 
Collection). 
RoamingPartnerStoreSubsystem The RoamingPartnerStoreSubsystem is respons-ible 
for storing the list of ExternalWifiProviders 
(RoamingPartnersCollection) with which Mo-bidot 
has a roaming agreement. 
HotspotStoreSubsystem The HotspotStoreSubsystem is responsible for 
storing hotspot related data (the list of Hotspots 
and APs in HotspotCollection). 
51
ConfigurationStoreSubsystem The ConfigurationStoreSubsystem is responsible 
for storing configuration data which is used by 
hotspots. The configuration data is composed of 
general configuration data, firewall configuration 
data and traffic shaping configuration data (the 
list of HotspotConfigurations in HotspotConfig-urationCollection, 
the list of FirewallConfigura-tions 
in FirewallConfigurationCollection, and the 
list of TrafficShapingConfigurations in Traffic- 
ShapingConfigurationCollection). 
ActivationCodeStoreSubsystem The ActivationCodeStoreSubsystem is respons-ible 
for retrieving activation codes which were 
generated by some external payment system. It 
deals with ActivationCodeInfos which are part 
of the ActivationCodeCollection. 
FirmwareStoreSubsystem The FirmwareStoreSubsystem is responsible for 
storing new firmware, which will be retrieved by 
the access points by means of some file transfer 
protocol. Due to the fact we are dealing here 
with mostly files and no structural information, it 
was chosen to store the firmware in a plain file 
system, using the file names of the firmware for 
storing any extra information (such as version 
numbers, etc). The subsystem deals with AP-Firmwares 
which are part of the APFirmware- 
Collection. 
3.3.5. Global software control 
The server software for the Mobidot infrastructure will be implemented as a web service provider, 
meaning that each request for information instantiates a new instance of the server software. This 
means that two distinct requests are serviced by two separate processes which cannot (at least at this 
moment) share anything (such as memory, control flow, etc). 
3.4. Designing the subsystems 
In this section the design of the subsystems will be discussed. We will take a look at the partitioning 
of the base subsystems into packages and we have a look at the basic functionality of each package. 
Due to the fact that the HotspotManagementSubsystem is practically designed the same way as the 
UserManagementSubsystem, we will only take a look at the UserManagementSubsystem. Further, 
due to the fact the partitioning of the StorageSubsystem has already been discussed above 
(Persistent data management), we will only discuss the design for the StorageSubsystem. 
3.4.1. UserManagement subsystem 
We will now have a look at the design of the UserManagement subsystem. As said before, the User- 
52
ManagementSubsystem and HotspotManagementSubsystem have been designed with the same reas-oning. 
The first thing to discuss is the partitioning of the subsystem in packages. The subsystem has 
been partitioned in three packages: Controllers, GUI and Models. The Model-View-Controller ar-chitecture 
forms the basis for this partitioning. For this project this architecture has been slightly 
modified. One of the reasons for this is the fact that the application is not a normal GUI application. 
Instead it is a web application which is initiated upon an incoming request from a web browser. 
After this sole request is handled, the instance of the application is terminated and the application 
server will wait for new requests. This means that no event handling takes place and that a sequence 
of interactions with the user is handled by as many instances of the application. For the MVC archi-tecture 
this means that there's no subscribe/notify protocol. Further, since there's no active instance 
of the application, each request is initiated by a Dispatcher class, which in turn calls the GUI. This 
GUI in turn calls the Controller. From this point on the MVC is the same as usual. For the sake of 
simplicity, the View is implemented by the GUI also, which actually means that when the GUI calls 
the controller it waits for the output as delivered by the controller. When the GUI receives this out-put, 
it sends it to the user. 
3.4.1.1. UserManagementModels package 
Figure 3.3. UserManagementModels class diagram 
53
The models have been designed with especially one goal in mind: easy expandability. It is preferred 
that models are as autonomous as possible. One well known way of abstracting the internals of a 
model is by the use of get/set methods (in the diagram above denoted by the general names getAT-TRIBUTE() 
and setATTRIBUTE(), as there are quite a few attributes to get and set). In addition to 
this, check methods have been created. These methods perform various checks on the contents of a 
particular attribute, perhaps to check whether it has a valid value, whether the value is within a cer-tain 
range or whether it contains valid characters. Each model has a global check() method, which in 
turn calls all defined check methods of the model. When, for example, the data of the model has to 
be stored in a database, this method can be called first to check upon validity of the data. 
Furthermore, each model has an update() method and a toDataArray() method. The update method 
updates several attributes of the model at once. It accepts a well-formed associative array (array in-dexed 
by strings), of which the indexes are taken to be the attribute names, and the values are taken 
to be the new contents of the attributes. This method actually calls the set method for each named at-tribute. 
The toDataArray() method acts like the toString() method which is regularly used in Java. 
But instead of creating a string representation of the object, it creates the well-formed associative ar-ray 
that is needed by update(). All this has been done to ease the handling of the models and the 
storage of the data of the models. This is because the database functions of PHP in fact accept well-formed 
associative arrays when doing an insert or update query. Furthermore, doing a select query 
returns a well-formed associative array. In other words, when we want to store a model, we only 
have to call the toDataArray of a method, and pass the resulting array to the respective database 
function. When we retrieve data from the database, we can just create a new model and pass the re-turned 
array to the constructor (which in turn calls update). 
Besides the models themselves, collection classes are contained within the Models packages. Basic-ally 
the collections provide methods in order to keep the collections current: add, set (used to update 
an already existing instance of an item in the collection), get and delete. Besides the basic function-ality, 
a collection can expose more methods for extra functionality. For example methods which can 
get an item based on different criteria (getAccountByName), or methods which can set a particular 
attribute of the models contained in the collection which are not supposed to be manipulated directly 
(storeNetworkAnnouncement). 
3.4.1.2. UserManagementGUI package 
54
Figure 3.4. UserManagementGUI class diagram 
As discussed above, the GUI classes perform two functions: getting input from the user, passing it 
on to the controllers and showing the data of a model to the user. For these purposes the GUI classes 
expose basically two types of methods: process- and show-methods. For simple use cases a GUI 
only contains one show and one process method. For management use cases, a GUI contains process 
and show methods for each basic operation (add, view, edit, delete) if applicable. Furthermore, each 
GUI contains an init() method which is always called in order to do some preprocessing of the en-vironment 
as offered by the application server. Based on the situation either only the GUI is shown 
(when the respective GUI wasn't loaded yet) by init(), or init() first calls the respective process 
method, followed by a call to the respective show method. When init() finishes, it returns control 
and its output to the Dispatcher that called him. The Dispatcher then sends the output to the user. 
3.4.1.3. UserManagementControllers package 
55
Figure 3.5. UserManagementControllers class diagram 
The controllers are the classes which instantiate changes in the state of models. They keep instances 
of the collections which they maintain, and perform manipulations on the methods contained within 
these collections. 
3.4.2. Storage subsystem 
56
Figure 3.6. ConfigurationStoreSubsystem class diagram 
The final subsystem to discuss is the StorageSubsystem. Since all storage packages in the Storage 
subsystem have been designed with the same philosophy, only the ConfigurationStoreSubsystem 
will be discussed. The main focus here is the same as for the UserManagementSubsystem: expand-ability. 
In order to achieve this, it was chosen to implement the storage subsystems using the Bridge 
pattern. The bridge pattern allows for the storage back end to be reimplemented, for example in or-der 
to support a new database system, without having to change the front end. This is done by defin-ing 
an interface in the DatabaseConnector, which is implemented by, in this case, the MySQLCon-nector. 
Subsequently, the front end can be changed without the need for changing the back end, un-less 
of course the back end interface appears to lack certain functionality. 
The functionality exposed by the DatabaseConnector interface is quite basic: it supports the basic 
operations of a database: get, insert, update and delete. Further, it supports getting the identifiers of 
all items of the type of information stored by the respective subsystem, in this case configurations. 
The functionality exposed by the AbstractDatabaseConnectors is the same for most storage subsys-tems: 
getting, inserting, updating and deleting data in terms of models, instead of in terms of data-base 
table items. Furthermore, more complex functionality is provided in single functions, for ex-ample 
for the addition of one configuration, three inserts of DatabaseConnector are performed: one 
for the HotspotConfiguration, one for the FirewallConfiguration and one for the TrafficShapingCon-figuration. 
57
58
Chapter 4. Implementation 
In this chapter the implementation phase of the Mobidot thesis project are discussed. We will look at 
it in three steps. First we will look at the chosen solutions for the various design problems. Further 
we will look at the implementation of the management system. Finally, we will look at the imple-mentation 
of the firmware. The discussion focuses on the choices that were made during implement-ation, 
especially in the design domain, as changes in the design are needed due to inefficiencies 
found during implementation. 
4.1. Solutions for the design problems 
In this section solutions for the design problems are discussed. After a discussion about the possible 
solutions for a problem, one particular solution is chosen and supporting argumentation is provided. 
4.1.1. Where to put the functionality 
The solution to the problem of where to put the functionality or intelligence of the system has been 
given largely already in the hardware/software mapping paragraph of the design chapter. Due to li-censing 
issues (the firmware is Linux based, which is available only under a GPL license), it has 
been chosen to implement as much as possible in the central Mobidot system. A nice side effect of 
this (if done right) is however also a performance increase. For example proxying web server re-quests 
for the Wi-Fi login page to the central Mobidot system instead of running a web server on the 
access point itself eases the load on the CPU of the access points. The main tasks of the access 
points will include tasks such as providing wireless access and securing the WLAN that they create. 
Additional tasks such as providing a login page, logging in/out users and maintaining usage data 
will be performed by the central Mobidot system, having the access points relay such requests to the 
central Mobidot system (standard software solutions exist for this purpose, i.e. chillispot). 
4.1.2. Network of multiple access points 
When it comes to networks with multiple access points, it has been chosen to designate the access 
points as stand alone units, instead of using master/slave designations. First of all this eases the 
design. Second, we only need to create one firmware that fits all purposes. Finally, the result of this 
choice means networks of multiple access points are readily possible. No additional precautions 
have to be taken in order to let access points know of each other's presence and to let them cooperate 
in a master/slave fashion. The only restriction at this point in time is the fact that all access points 
have to be plugged into an existing wired network, having each serving its own coverage area. Pos-sible 
future extensions include the use of WDS. WDS stands for Wireless Distribution System. In-creasingly 
more wireless access point drivers include this technology. WDS creates the possibility 
of easily setting up an access point as a real wireless router. This means an access point can accept 
wireless traffic from client hardware (i.e. laptops), and again use the wireless network to transport 
this traffic to another access point. The last access point in line then hands over the traffic to a router 
which is connected to the Internet. WDS is also easily configured: only the MAC addresses of the 
access point peers of a certain access point have to be configured, due to the fact that the rest of the 
settings have already been configured on the access point while creating the wireless network. 
59
4.1.3. Security 
"It's depressing how often we see that those who don't remember history are 
doomed to repeat it. When cordless phones and the first analog cell phones hit the 
market, anybody with a scanner that operated at the right frequency could easily 
listen to calls not intended for them. The same cycle played out with 802.11 
equipment." [Gast2002] 
The above quotation already gives some clue about the problems with security in wireless networks. 
At first it turned out that wireless networks weren't secure at all, no thought had ever been given to 
security while the IEEE 802.11 standard was being devised. 
"While the current access points provide several security mechanisms, our work 
combined with the work of others show that ALL of these mechanisms are com-pletely 
in-effective." [Arbaugh2001] 
A lot of security mechanisms exist for 802.11 networks, but, as pointed out above, most fail in ac-complishing 
their goal. Some of the security mechanisms have no or little effect or have a huge 
management overhead, some of them make the network more insecure then before deployment of 
the security mechanism, and some of them might only be usable to a certain degree. 
There are several tasks that have to/can be performed on a wireless network in order to make it 
(more) secure: 
• Authentication: 
"Authentication is any process by which you verify that someone is who they 
claim they to be. This usually involves a user name and a password, but can in-clude 
any other method of demonstrating identity, such as a smart card, retina 
scan, voice recognition, or fingerprints. Authentication is equivalent to showing 
your drivers license at the ticket counter at the airport." [Apache1] 
• Authorization: 
"Authorization is finding out if the person, once identified, is permitted to have 
the resource. This is usually determined by finding out if that person is a part of a 
particular group, if that person has paid admission, or has a particular level of se-curity 
clearance. Authorization is equivalent to checking the guest list at an ex-clusive 
party, or checking for your ticket when you go to the opera." [Apache1] 
• Access control: 
"Access control is a much more general way of talking about controlling access to 
a web resource. Access can be granted or denied based on a wide variety of criter-ia, 
such as the network address of the client, the time of day, the phase of the 
moon, or the browser which the visitor is using. Access control is analogous to 
locking the gate at closing time, or only letting people onto the ride who are more 
than 48 inches tall - it's controlling entrance by some arbitrary condition which 
may or may not have anything to do with the attributes of the particular visitor." 
60
[Apache1] 
• Key management: Key management relates to the ease of the management of keys used in cryp-tographic 
algorithms. The easier it is to change any keys that are in use, the better the key man-agement 
is. 
• Data integrity and confidentiality: Data integrity and confidentiality relates to the protection of 
data that travels across the network. It has to be protected from tampering (integrity protection) 
and from eavesdropping (confidentiality). 
These concepts will play an important role in determining whether a certain security measure is ap-propriate 
or not. The distinction between authentication and access control is not always very clear, 
but for the sake of this project we will refer to authentication as the process whereby a user gets ac-cepted/ 
rejected by a certain system on the basis of personal non-shared information, such as a user 
name-password combination. When a shared secret is involved, we will refer to it as access control. 
The goal of this discussion is not to go into implementation details of the security mechanisms, but 
merely to give an overview of what is available to secure the Mobidot WLAN, present weaknesses 
of each and find the best candidate to do the job. 
4.1.3.1. Service Set Identifier (Closed Network Access Control) 
Initially, the Service Set Identifier was meant to identify a network. The access point would broad-cast 
its name to the surrounding area using beacon frames. A beacon frame is similar to the beacon 
signals used in aviation, by which a pilot can determine whether he is close to an airport, and which 
one that would be. The same goes for beacon frames in Wi-Fi: a beacon frame is transmitted by an 
access point and carries information about that access point such as the name of the network (SSID), 
a time stamp, supported transfer rates, etc. Such a beacon frame is periodically sent by the access 
point (by default the interval is set to 100ms), in order to make it possible for wireless clients to find 
the access point and associate with it. In other words: the beacon frame is the heartbeat of a wireless 
LAN. Similar as in aviation where a airport would seem to have disappeared if there would be a 
power outage, an access point would be offline (and thus invisible for radio receivers) if such a 
beacon frame would not be broadcast for one reason or another. (See [Geier2002] for more informa-tion 
on beacon frames.) The use of beacon frames makes it easy for people to select the right net-work 
by just scanning for them. Lucent came up with a security mechanism called Closed Network 
Access Control which changed the network name into a shared secret, by not having the access 
point broadcast its network name. This means that only people who know the SSID are able to con-nect. 
It is false to assume this approach makes the network safe. In order for a client to connect to an 
access point, he still has to connect to the access point of the network he intends to connect to, 
meaning he should send along the SSID of the network he wishes to connect to, and this means that 
the SSID is still sent in clear text. People with the right equipment will be able to sniff such packets 
from the air, and find out the SSID. This security measure should be treated as stated by 
[Dismukes2002]: 
"SSID settings on your network should be considered the first level security, and 
should be treated as such. In its standards-adherent state, SSID may not offer any 
protection to who gains access to your network, but configuring your SSID to 
something not easily guessable can make it harder for intruders to know what ex-actly 
they are looking at." 
61
For Mobidot it's not a good choice to implement Closed Network Access Control as it makes it 
harder for people to connect to the Mobidot WLAN, while one of the main goals of the system is the 
ease of making connections. 
4.1.3.2. Access control lists (MAC address filtering) 
Each network card (both wireless and wired) is configured with a MAC address. A MAC address is 
an address in the form of 6 bytes which identifies a specific network card on a network. All MAC 
addresses are unique, this is accomplished by dividing the MAC address space into several chunks, 
each chunk getting assigned to a specific vendor. MAC address filtering is based on the identifica-tion 
by their MAC address. A list of MAC addresses of allowed clients makes it possible to provide 
access only to those hosts that are mentioned on the list. This would seem like a good security 
mechanism, if it wouldn't be the case that MAC addresses can be overridden ('spoofed') by software. 
This means that one could sniff wireless traffic for accepted MAC addresses, and spoof traffic with 
any valid MAC address found. Another problem of MAC address filtering is the fact that it incurs a 
large management overhead, since the list of MAC addresses has to be managed by hand. For small 
networks this might be no problem, but for large networks (such as the Mobidot infrastructure aims 
to be) this is not feasible. 
4.1.3.3. Open system authentication 
Open system authentication actually is a situation in which there is no authentication, it is the de-fault 
authentication protocol for 802.11. Simply any client that connects to the access point is al-lowed 
access. This might seem a strange sort of security, but it enables the possibility of disabling 
faulty simple authentication systems, and then, for example, enabling more sophisticated authentica-tion 
schemes such as 802.1X. 
4.1.3.4. WEP/WEP+/128-bit WEP and shared key authentication 
WEP (Wired Equivalent Privacy) is a security mechanism that was devised in order to make wire-less 
networks more secure (in a wired-equivalent way). WEP has three security goals 
[Borisov2001]: 
• Confidentiality: The fundamental goal of WEP is to prevent casual eavesdropping. 
• Access control: A second goal of the protocol is to protect access to a wireless network infra-structure. 
The 802.11 standard includes an optional feature to discard all packets that are not 
properly encrypted using WEP, and manufacturers advertise the ability of WEP to provide ac-cess 
control. 
• Data integrity: A related goal is to prevent tampering with transmitted messages; the integrity 
checksum field is included for this purpose. 
[Borisov2001] has shown that WEP fails to achieve all three goals. WEP encryption is achieved by 
combining a shared secret key with an initialization vector. The first problem lies in the fact that the 
size of the initialization is limited in size to 24 bits, making brute force attacks (attacks in which all 
possible combinations are tried) feasible (the entire space of 24 bits can be used up in less than half 
a day with average traffic, resulting in a wrap around of the initialization vectors), this problem is 
referred to as key stream reuse. [Borisov2001] notes that this problem of key stream reuse is inevit-able. 
The 802.11 specification recommends against initialization vector reuse, but doesn't prohibit it. 
62
This means hardware implementations should accept reused initialization vectors, or risk non-interoperability 
with 802.11 standard compliant devices. 
Furthermore, there are certain vectors which are cryptographically weak, which means that the WEP 
key can be cracked more easily when such initialization vectors are used. Another problem with the 
initialization vectors is that some hardware always initializes to 0 when being reset, resulting a high-er 
frequency of certain initialization vectors than others. Lucent has designed in reaction to these ini-tialization 
vector problems WEP+, or 128-bit WEP as they call it, as an enhancement of standard 
WEP which uses only 40 bit keys. But this doesn't solve the problem, since the problem is not the 
key that was used, but the initialization vector. The use of larger keys only makes the amount of 
bandwidth that can be used smaller, since it takes more CPU cycles to encrypt the traffic, and thus 
less traffic can be sent or received per second. 
4.1.3.5. Broadcast key rotation 
This is an idea introduced by Cisco, and it is related to WEP. Normally, all traffic on the network 
would be encrypted using the same key. With broadcast key rotation, the access point utilizes a dif-ferent 
key for broadcast packets, such as DHCP. These broadcast keys are also short lived, typically 
10 minutes or so. The effect of this is that an attacker cannot collect enough packets to crack the 
WEP key, but the security mechanism is only applicable to broadcast traffic, and not to specific user 
data traffic. Since this is an idea that was introduced by Cisco, it is proprietary and not widely im-plemented 
and used, and as such it is not quite usable. 
4.1.3.6. 802.1X (EAP, or Extensible Authentication Protocol) 
In the new standard 802.11i (which will be discussed later on), 802.1X plays an important role, as it 
takes care of the authentication of users. The new standard 802.11i has not been finalized yet, but 
802.1X has already been implemented into 802.11 products in order to already take advantage of it. 
802.1X is: 
"Port-based network access control that makes use of the physical access charac-teristics 
of IEEE 802 LAN infrastructures in order to provide a means of authen-ticating 
and authorizing devices attached to a LAN port that has point-to-point 
connection characteristics, and of preventing access to that port in cases in which 
the authentication and authorization fails. A port in this context is a single point of 
attachment to the LAN infrastructure." [802.1X-2001] 
802.1X uses EAP (Extensible Authentication Protocol), which is a transport protocol, which is op-timized 
for authentication purposes. As the name already shows, it is an extensible protocol, in fact, 
no authentication methods are defined by EAP, such methods still have to be defined. Many of such 
EAP methods exist: 
• EAP-MD5: authentication mechanism which uses an MD5 (Message Digest version 5) hash of 
user name and password in order to authenticate the user. According to [Dismukes2002] EAP-MD5 
offers no key management, requiring the use of static WEP keys. This completely disables 
the enhanced security possibilities of EAP. 
• L(ightweight)EAP: LEAP or EAP-Cisco Wireless uses the same approach as EAP-MD5 except 
for the fact that it uses dynamic WEP keys, which are rotated quite often (making it near to im-possible 
to crack the WEP key). Furthermore it adds the possibility of mutual authentication, in 
63
which the client is able to know if a certain access point is authentic. This prevents people from 
placing rogue access points into the wireless network. Two problems exist with LEAP, one of 
them being the fact that LEAP is designed by Cisco, resulting in only Cisco hardware being able 
to use LEAP. The other problem is the fact that MS-CHAPv1 is used for authentication (both 
ways), which has known vulnerabilities. 
• EAP-TLS: EAP-TLS utilizes Transport Layer Security (IETF's standardization of SSL or Secure 
Socket Layers) for authentication. Instead of user name/password combinations, this system uses 
X.509 certificates to handle authentication. The difference between the two is that the former 
method sends personal secret information (a password), while the latter method is able to identi-fy 
an entity (a user or a system) without sending private information. This is achieved by having 
a trusted third party sign such a certificate. The entity checking the identity of his peer can then 
check if the signature of the trusted third party is real. If this is the case, then the trusted third 
party certifies that the public personal information really identifies the entity that owns the certi-ficate. 
Several problems exist with this approach. The first problem is the fact that Microsoft de-veloped 
this security mechanism, resulting in a situation where this mechanism only works on 
Microsoft products. Replacing any software in the tool chain by another equivalent software will 
result in a non-working system (For example if you use OpenLDAP as directory service instead 
of Active Directory). Another problem is the fact that a public key infrastructure is used, which 
is a concept that is quite unknown to most companies, resulting in either a steep learning curve, 
or giving up upon EAP-TLS. Yet another problem is the fact that Microsoft utilizes custom at-tributes 
in the certificates that are used by EAP-TLS, while those fields are not added to certific-ates 
which are issued by Verisign or Thawte. This means that only certificates issued by Mi-crosoft 
can be used. 
• EAP-T(unneled)TLS: EAP-TTLS was design by Funk Software in response to EAP-TLS. EAP-TTLS 
provides for mutual authentication, but only for AP to client authentication certificates are 
used. For client to AP authentication, user credentials (user name/password) are used. EAP-TTLS 
can pass the user credentials using any challenge-response mechanism specified by the 
administrator. (PAP (PPP Authentication Protocol), CHAP (Challenge Handshake Authentica-tion 
Protocol), MS-CHAPv1 (Microsoft CHAP version 1), MS-CHAPv2 (Microsoft CHAP ver-sion 
2), PAP/Token Card, EAP) 
• P(rotected)EAP: according to [Dismukes2002], PEAP has the same characteristics as EAP-TTLS, 
except for the fact that it is designed by Microsoft and Cisco instead of Funk Software. 
There are lots more implementations of methods for EAP, for a complete list, refer to [IANA1]. 
64
Figure 4.1. 802.1X authentication process [Open1X1] 
"IEEE 802.1x is a port based authentication protocol. It can be used in *any* 
scenario where one can abstract out the notion of a port. It requires entities to play 
three roles in the authentication process: that of a supplicant, an authenticator and 
an authentication server. A Port Access Entity (PAE) is an entity that has access 
or is capable of gaining or controlling access to some port which offers some ser-vices. 
When applied to IEEE 802.11, the access point acts as an authenticator, 
while a wireless station (laptop etc) is the supplicant which is authenticated by the 
authentication server (for example a certain RADIUS implementation)." 
[Open1X1] 
802.1X wasn't specifically designed for use on wireless networks, but for wired networks. It has 
been ported to wireless networks because of the fact it is extensible, easing the process of adding 
more authentication mechanisms (based on EAP) later on to wireless products. The use of EAP on 
wireless networks does however introduce a problem: since it was designed for wired networks, no 
real thought has been given to the possibility of people sniffing the EAP traffic. In the case of wired 
networks it is quite hard to sniff such traffic, it involves having access to the network devices of ma-chines 
involved (the server in question, or routers in between). In the case of wireless networks it is 
much easier to sniff network traffic, it can be achieved by just putting up a wireless receiver, and see 
all network traffic flow by. But, as [Gast2002] states, EAP is still a far better solution to the current 
802.11 security problems than WEP ever was. According to [Airespace1] 802.1X introduces the 
possibility of having a master key sent to the user in encrypted form (after the user has been authen-ticated, 
the key will be sent along with the message that tells the user the authentication process was 
a success), which from then on will be used for communication purposes. When 802.1X is used by 
itself, this means that the master key will be the key that will be used for the WEP protocol. 
4.1.3.7. 802.11i, WPA (TSN, TKIP) and WPA2 (RSN, CCMP, AES-CCM) 
802.11i is the new security standard for 802.11 networks devised by IEEE. As already stated before, 
802.1X will play an important role in 802.11i, as it takes care of the authentication. The 802.11i 
standard has not been finalized yet. 802.11i will provide for an authentication framework 
65
(802.1X/EAP) combined with any authentication algorithm (which doesn't get mandated by the 
802.11i standard). Further, 802.11i will provide for enhanced key management, dynamic keys, mu-tual 
authentication and for data privacy and integrity. Data privacy and data integrity will be 
provided for in two ways: 
• TKIP: this will use per-frame keying (changing keys after every frame sent) and MIC (message 
integrity check). TKIP will be compatible with old hardware, since it uses the same encryption 
protocol as WEP (RC4), but as stated before, it will use a new key for every packet. Further, it 
will encrypt the initialization vector, which in case of WEP is sent in the clear (which is a secur-ity 
hole in the WEP case). 
• AES-CCM: the approach for new hardware will be based on the AES algorithm. The Advanced 
Encryption Standard is the new American government's encryption standard of choice. AES is 
based on the Rijndael algorithm which was developed by the Belgian researchers Vincent Rij-men 
and Joan Daemen. Details of the Rijndael algorithm aren't needed here, except for the fact 
that AES replaces DES because of its greater strength and speed (that is, AES is faster than 
Triple DES. Triple DES is basically DES, but run three times. This was done to achieve a 
stronger encryption while no better alternative was available yet. See [AESLounge1] for more 
information). 
Because industry couldn't wait for the release of 802.11i, the Wi-Fi Alliance (which is a non-profit 
international association formed in 1999 to certify interoperability of wireless Local Area Network 
products based on IEEE 802.11 specification) felt obliged to release a "snapshot" of the 802.11i 
standard, based on draft 3 of the 802.11i standard [Strand2004]. As stated by [Strand2004], the Wi- 
Fi Alliance released the snapshot as WPA (Wi-Fi Protected Access) or TSN or "Transition Security 
Network". TSN is based on TKIP + 802.1X. The final version of the 802.11i standard will be called 
WPA2 by the Wi-Fi Alliance or RSN ("Robust Secure Network"). RSN will be based on CCMP + 
802.1X. According to [Airespace1], WPA2 will introduce some advanced features, including key 
management, by having a pairwise master key (PMK) which is exchanged using 802.1X or in a pre-shared 
way, which will be used to generate/retrieve a pairwise transient key (PTK), which in turn 
will be used to generate three other keys for respectively key exchange and transport of data: key 
confirmation key (KCK), key encryption key (KEK) and the temporal key (TK). Other advanced 
features include pre authentication, which authenticates a wireless client to other access points to 
which the user might move in the future, thus enabling roaming. 
4.1.3.8. VPN 
A VPN, or Virtual Private Network is: 
"A private network that utilizes parts of the public telecommunications network. 
VPNs send encrypted data through the public network to ensure the security of 
transactions" [hp1] 
VPNs make it possible to circumvent certain security problems of wireless networks, even though 
they weren't designed for that purpose. With VPNs, as stated above, one can create a virtual network 
on top of an existing network structure, such as the Internet, and usually this is done in a secure way 
using an encryption algorithm. While using VPNs for authentication, data integrity and confidential-ity 
protection is quite secure, it still doesn't address all security problems. A problem that remains to 
exist is the fact that two illegitimate persons can still abuse the wireless network, though not for ac- 
66
cess to the Internet, but they can contact each other and steal away bandwidth. This is because a 
VPN can only be setup on an IP-layer of a network, which means that before systems can be authen-ticated 
through a VPN, they first have to acquire an IP address, usually by means of a DHCP server. 
This means that anyone can at least connect to the network to get an IP, also people with wrong in-tentions. 
Another problem that gets introduced here is that such illegitimate users can also contact 
other wireless clients, possibly abusing their machines to access networks outside the wireless net-work. 
These security issues have to be addressed when a VPN is to be used in a wireless network. 
4.1.3.9. The chosen solution 
It has been chosen to apply the Open System Authentication security measure, or in other words us-ing 
no existing Wi-Fi specific security measure. It has been shown the existing security measures 
don't supply the needed security, sometimes incur large management overheads and further, they 
will be replaced by new security measures anyway. Instead it has been chosen to support VPN con-nections 
over the Mobidot WLAN and to warn the users about the security risk. Finally, the choice 
of the firmware to be used on the access points has also to do with upcoming security measures, as 
will be discussed later on. 
4.1.4. Hardware and firmware 
In this section we will have a look at various hardware solutions and various firmware that can be 
run on these hardware solutions. 
4.1.4.1. Hardware 
4.1.4.1.1. Customizable access points 
Customizable access points are hardware devices, which are already completely integrated and be-ing 
sold by large companies, which already deliver some basic access point services, to be used in 
standard situations. Such companies make use of an open source kernel such as the Linux kernel. 
Because of the license that is attached to the Linux kernel, these companies are forced to supply the 
source code of any of their additions to the standard kernel. Such source code can then be used to 
implement extra features for such an access point, which is exactly what is needed by Mobidot. 
Solutions of several companies have been researched: Linksys, Netgear, D-Link, SMC and Belkin. 
Of these companies, only Linksys and Netgear seem to support the open source community. In the 
discussion that follows, several hardware terms will be mentioned: 
• wireless access point: an access point which (usually) has one socket for a wired network cable, 
in order to be able to connect the access point to an already existing internal network. 
• wireless gateway: an access point which (usually) has one socket for a wired network cable and 
which has specific software (PPPoE) in order to be able to connect the access point to some ex-ternal 
network such as the Internet. 
• wireless router: an access point which is a combination of a wired network switch, and a wire-less 
access point or a wireless gateway. 
• wireless ethernet bridge: an access point which is used to interconnect remote LANs without a 
cable. 
67
4.1.4.1.1.1. Netgear 
Figure 4.2. Netgear WG602 access point [SeattleWireless1] 
Netgear is one of very few companies to supply the source code of the software used in their hard-ware 
products. Since the software used by Netgear is GPL licensed, they are forced to publish the 
source code of the modifications they made to the original GPL software. 
Specifications of the WG602 model include, according to [SeattleWireless1]: 16 megabytes of 
RAM, 4 megabytes of flash memory, an Intersil 54g miniPCI (PCI with small slots) card with Pris-mGT 
chipset, a RTL8139 chipset, and a processor operating at 100 up to 150 MHz. 
Figure 4.3. Netgear WG602 access point (internal view) [SeattleWireless1] 
68
The first version of the WG602 has a miniPCI slot, which makes it possible to apply hardware up-grades 
to the WG602 in order to support new Wi-Fi standards such as 802.11i. It is, however, un-known 
if new versions and other models also have a miniPCI slot (it seems to be a trend to integrate 
the Wi-Fi chipset into the used motherboard, in order to force the user into buying new hardware 
when he desires to use new technologies). The operating system kernel in use is Linux 2.2.14, which 
is quite old, but seems to do the job. Furthermore, several other operating system tools, utilities and 
daemons are used: busybox 0.50, uClibc 0.9.08, vsftpd 1.1.3. When considering finances, Netgear is 
quite interesting, with prices ranging from 60 to 200 euros. [Tweakers1] 
4.1.4.1.1.2. Linksys 
Figure 4.4. Linksys WRT54G access point + router [SeattleWireless2] 
Linksys is one of the other few companies that uses GPL'ed software in its products, and as such 
provides the used source code on its website. The specifications, according to [SeattleWireless2], of 
the Linksys WRT54G seem to be better than the WG602 model of Netgear in several aspects. 
69
Figure 4.5. Linksys WRT54G access point + router (internal view) 
[SeattleWireless2] 
While the amount of memory and flash memory are the same (16 MB respectively 4 MB), the pro-cessor 
operates at a speed of 200 MHz, and uses Broadcom chipsets for both wired and Wi-Fi net-working. 
Old versions of the WRT54G had a miniPCI slot, which made it possible to apply hard-ware 
upgrades to the WRT54G in order to support new Wi-Fi standards such as 802.11i. In the 
latest versions however, this miniPCI slot has been removed and replaced with a chipset which has 
been integrated into the motherboard, as such disabling the possibility of easy future upgrades. The 
Linksys WRT54G also uses a Linux kernel, but a slightly newer (but not quite up to date) one, ver-sion 
2.4.20. A lot more tools and libraries are used by the WRT54G than the WG602. They both use 
uClibc and busybox, but WRT54G also uses other tools and libraries such as: iproute2, openssl, 
pppd, pptp-client, rp-pppoe, rp-l2tp, udhcpd (which are all popular Linux tools) and even a small 
sized HTTP daemon. Linksys, like Netgear, has quite interesting solutions when looking at the 
prices, which range from 50 to 200 euros. [Tweakers1] 
4.1.4.1.2. Solution using separate hardware parts 
Another solution for the hardware implementation is to make use of several separate computer parts, 
such as a motherboard, CPU, memory and networking devices, in order to create an access point 
from the ground up. 
4.1.4.1.2.1. Soekris board with additional hardware 
70
Figure 4.6. Soekris net4801 [Soekris3] 
"Soekris Engineering, Inc. is a small company specializing in the design of em-bedded 
computer and communication devices." [Soekris1] 
As stated, Soekris Engineering specializes in the design of embedded systems. 
Figure 4.7. Soekris net4801 (internal view) [Soekris3] 
The embedded systems are composed of a motherboard with CPU (486-class or 586-class), ethernet 
ports for wired network connectivity, a miniPCI slot and up to two PCMCIA (small credit card-sized 
devices) adapters which might enable the embedded system to be expanded with a wireless 
network card or any other device, some other hardware chipsets and some specific amount of 
memory and flash memory (the amount depends on the model chosen). 
71
The reasons that make this solution very interesting are the following: 
• The motherboard has a hardware watchdog integrated. "A watchdog is a device used to protect a 
system from specific software or hardware failures that may cause the system to stop respond-ing. 
The application is first registered with the watchdog device. Once the watchdog is running 
on your system the application must periodically send information to the watchdog device. If the 
device doesn't receive this signal within the set period of time it would execute the proper key-strokes 
to reboot the machine or restart the application." [Webopedia7] 
• The motherboard has lots of expansion options, it supports up to three expansion slots (miniPCI 
and 2 PC-Card/Cardbus slots). As such the embedded system can be expanded with hardware 
that increases the high availability even further. Further, when new Wi-Fi standards get devised, 
the old Wi-Fi miniPCI card can simply be replaced with a new one. 
What might make this system less interesting is its price. The base embedded system costs between 
130 and 280 dollars (without discounts), depending on what is needed for processing power and 
amount of expansion slots, etc. [Soekris2] In order to make this into an access point, at least one 
miniPCI Wi-Fi card is needed, and the choice is quite limited due to the limited availability of 
drivers in Linux. An Atheros based card which is 802.11i ready is available for around 80 dollars. 
[Netgate1] 
4.1.4.1.3. The chosen hardware solution 
The Linksys customizable access point has been chosen as the hardware device of preference. The 
Linksys seems to offer a quite good price/capabilities ratio. Furthermore, there seem to be quite 
some firmware available for the Linksys, which seems to show that a lot of people are already modi-fying 
their access points. This could mean that a lot of documentation is already available, which 
could ease the implementation quite a lot. 
4.1.4.2. Firmware / Build root 
In this section we will look at the firmware that is available for the Linksys WRT54G access point. 
4.1.4.2.1. The original Linksys firmware 
It was quickly found that the original Linksys firmware build root is poorly designed. The most 
probable reason for this is probably that Linksys has nothing to gain from a well-designed build 
root, they only have man hours to lose. Firmware for future hardware will contain the same software 
programs, only the drivers will differ, as new ones will be added in order to support new hardware. 
There are several problems with the Linksys build root, one of them being the lack of in-depth docu-mentation. 
Only a simple README file could be found, which only describes how to make a binary 
firmware. Furthermore, this description isn't even accurate, since the procedure as it is explained 
gives errors and the commands entered should be adjusted. On of the largest problems with this 
firmware however, is the fact that it is not aimed at extensibility. The build root contains some soft-ware 
packages by default, but it doesn't provide easy means for extending the firmware with new 
software packages. And even if you would take the time to add (or hack in) these packages, you still 
have no mechanism of selecting which packages you want to install, since sometimes you perhaps 
want to include different packages than usual, or perhaps leave out some packages of the original 
firmware. Lastly, this firmware doesn't include support for a file system that supports persistent stor-age. 
The firmware contents are stored in a read only file system, and furthermore only the RAM can 
72
be used for writing (which obviously isn't persistent). 
4.1.4.2.2. HyperWRT / Sveasoft / DD-WRT 
About the HyperWRT, Sveasoft and DD-WRT firmware we can be short: they are based on the ori-ginal 
firmware with extra features hacked in. Further, as stated before, there's no selection mechan-ism, 
and this means sometimes everything possible is crammed in until there's no space left. While 
particularly Sveasoft and DD-WRT do include some nice features (such as a SSH daemon and the 
Chillispot captive portal), they are not a good choice. Would Mobidot ever need to add some pack-age, 
then it would first be needed to remove (hack out) software packages before new ones could be 
added. Furthermore, the exact size of the packages is unknown, as such it would needed to perform 
some trial and error in order to create as much free space as needed (the access points have limited 
storage on a flash chip). 
4.1.4.2.3. OpenWRT 
Unlike the other build roots, the OpenWRT appears to be a very appropriate candidate to do the job. 
OpenWRT has two aspects which make it a quite strong competitor: support for multiple hardware 
devices and extensibility. OpenWRT has one problem though, it is not in final version yet, new re-lease 
candidates are still coming out. 
It has been found that OpenWRT supports multiple hardware devices. By including modular device 
drivers, the appropriate drivers can be selected for the right hardware. That means that at this mo-ment 
already some five or six different brands of access points are supported. Would any of these 
brands drop support for customized firmware, then it would easily be possible to just use another 
one. Or perhaps that some brands offer other possibilities than others. For example access points 
from Asus have built in USB ports, which Linksys access points don't. Such a feature could be used 
for example for storage of certain data, for which the internal flash storage doesn't suffice. 
But probably the strongest feature of OpenWRT is the fact that it is extensible. In OpenWRT, 
everything is contained in *.ipkg package files. Of each package it is exactly known how much stor-age 
space the files contained inside use. Installing these packages in the firmware can be done at 
firmware creation time or at run time. When done at run time, one needs only to download the pack-age 
to the access point and run 'ipkg install'. Further, the build root has an excellent package selec-tion 
tool, in which the packages that are to be installed at firmware creation time can be selected. 
Here, it is possible to include or exclude the various packages that are included in the build root, but 
also various kernel features which have been defined as modules. This means that support for cer-tain 
features (such as support for various kinds of file systems, support for networking protocols, 
etc) can be traded in, in exchange for free space. When the firmware is created, a read-only file sys-tem 
is created on which all initial packages are extracted. The remaining free space however, in this 
case, is designated to a separate partition on which a writable file system is created. This way, even 
at run time packages can be installed or data can be written persistently. This last fact basically 
means the firmware can be upgraded through packages instead of through dangerous firmware up-grades, 
when the entire firmware is overwritten with a new firmware image. Such operations are al-ways 
dangerous, since loss of power results in a defective access point. When only a certain package 
can be upgraded, the rest of the firmware will remain working, even if the package upgrade fails. 
At this moment there's one problem though: OpenWRT is not final yet. Release candidates are still 
being released, which means the candidates are not mature enough yet. Later on we will see what 
impact this has on this project. Even though this problem exists, OpenWRT has been chosen as the 
73
firmware of preference. This is particularly because of the well design (which was developed with 
the future in mind, i.e. upcoming modifications, new hardware, etc), and because of the bad design 
of the other solutions. 
4.1.5. Configuration deployment 
It has been chosen to create a set of scripts which can configure the access point to the settings as re-corded 
in the management system. These scripts run on first installation of the access point and each 
hour to check and possibly perform updates. It has been chosen to have the manager of a public in-stitution 
enter the credentials of his Internet connection (user name/password) manually on-site. Due 
to the security sensitivity of this information, it is not very wise to store such information centrally 
(although taking that approach would reach a full plug-and-play solution). An additional script has 
been created that asks for and tests Internet settings using a simple website on a simple web server 
which temporarily runs on the access point. The manager of a public institution will use his browser 
to visit this website to enter his credentials. 
4.1.6. Maintenance and monitoring 
One particularly difficult problem to deal with is making the access points manageable from any-where. 
This means it should be possible to place the access point at any node in some network, but 
still be able to manage and monitor this access point from an external network, such as the Internet. 
The particular problem which we are dealing with was described in the design problems, section 
'Maintenance and monitoring', namely the fact that most networks use Network Address Translation 
(NAT). In such cases we can modify firewalling rules at an already existing firewall, this is however 
not what we want. We want to solve the problem in such a way that at most only a very minimal 
change to existing systems and configurations is needed. About the only way of achieving this is by 
the use of a VPN (Virtual Private Network) solution. VPNs are essentially tunnels through existing 
networks which connect nodes logically which are by far not directly physically connected. With 
some solutions this can be done with encryption. Before discussing the chosen solution for this 
problem, we'll first look at some well known VPN solutions. 
4.1.6.1. Network layer 
4.1.6.1.1. IP-in-IP tunnels 
In some cases, it might be needed to encapsulate IP packets inside other IP packets. In this situation 
we are tunneling a network layer network inside another network layer. The most obvious situation 
in which this would be applied is a situation where there are two private network layer (IP) net-works, 
which are both connected to some public network (the Internet) and which should be connec-ted 
together in such a way that it seems to be one private network. This can be achieved using IP-in- 
IP tunnels, but the interconnection of networks is also the only thing that is achieved, i.e. there's 
no encryption. 
4.1.6.1.2. GRE tunnels 
GRE stands for Generic Routing Encapsulation and is quite similar to IP-in-IP tunnels, though with 
some differences. The first difference is that GRE is a more general approach to network layer in 
network layer encapsulation, meaning the encapsulation is not limited to IP, both for the original 
packet, and for the packet that encapsulates the original packet. As stated by [RFC1701]: 
74
"In the most general case, a system has a packet that needs to be encapsulated and 
routed. We will call this the payload packet. The payload is first encapsulated in a 
GRE packet, which possibly also includes a route. The resulting GRE packet can 
then be encapsulated in some other protocol and then forwarded. We will call this 
outer protocol the delivery protocol." 
This more general approach to network layer in network layer encapsulation also creates another 
possibility, the transport of special IP packets such as multicast traffic, or even IPv6 packets, but 
like IP-in-IP, it also doesn't support encryption. 
4.1.6.1.3. Microsoft's PPTP 
"PPTP is implemented as a PPP session over Generic Routing Encapsulation 
(GRE). Authentication is usually by MSCHAP-v2 (Microsoft Challenge Hand-shake 
Authentication Protocol) , and supplies key material for the subsequent Mi-crosoft 
Point-to-Point Encryption (MPPE) applied to data packets." [Wikipedia2] 
As stated here, PPTP is the encapsulation of PPP in GRE. Recall that GRE is a network layer pro-tocol 
and PPP is a data link layer protocol. PPTP is implemented, as already stated earlier, by the 
use of the GRE protocol. But in addition to this, a TCP connection from client to server, usually on 
port 1723, is used to control the PPTP connection. According to [Hardin2000] and [Wikipedia2] 
PPTP suffers security vulnerabilities and as such should not be used. 
4.1.6.1.4. L2TP 
"L2TP can crudely be described as "PPP over IP", although it has many more fea-tures 
than this simple description would imply." [Wikipedia1] 
L2TP is based on the older PPTP protocol and the older proprietary L2F (Layer 2 Forwarding) pro-tocol 
by Cisco. 
"L2TP acts as a data link layer (layer 2 of the OSI model) protocol for tunneling 
network traffic between two peers over an existing network (i.e. the Internet). It is 
an extension of the Point-to-Point Protocol (PPP). It is still common to use PPP 
sessions within an L2TP tunnel. L2TP does not provide confidentiality or strong 
authentication itself." [Wikipedia1] 
According to [Wikipedia1], L2TP packets can be categorized as two types: control packets and data 
packets. Reliability is provided for control packets by the L2TP, but not for the data packets, which 
has to be taken care of by higher layer protocols. 
4.1.6.1.5. IPSec 
All the tunneling protocols discussed up until now don't provide data confidentiality. IPSec on the 
other hand is a protocol that does provide confidentiality, and even more. IPSec, as the name already 
says, secures IP traffic, and it works on the network layer. The IPSec protocol provides four func-tions: 
• Confidentiality. Confidentiality is achieved by means of encryption. IPSec is a framework of 
75
open standards, which means that it is not bound to any particular encryption algorithm. 
• Data integrity. In order to provide data integrity, a hashing algorithm is applied on the messages 
that have to be sent out. IPSec uses the Hashed Message Authentication Codes in order to 
achieve this, and the most commonly used flavors are HMAC-MD5 and HMAC-SHA1. It is im-portant 
to understand that a certain message (of any length) can be converted to a fixed-length 
hash, but the reverse, retrieving the message from the hash, isn't possible. 
• Origin authentication. Origin authentication is provided and used to make sure the communica-tion 
channel is secure. Before any communication can take place, mutual authentication has to 
take place. 
• Anti replay protection. Anti replay protection works in a similar way to the use of sequence 
numbers in TCP. A sequence number gets added to each IPSec packet, and the sequence number 
of each packet gets compared to a sliding window. Packages with illegal sequence numbers get 
discarded. This prevents illegal uses of IPSec networks, such as rerunning an authentication pro-cess 
using sniffed traffic, in order for the hacker to get illegitimate access to the IPSec network, 
for example. 
Two terms play an important role in IPSec: 
• Security Association: A Security Association (SA) is a set of security information that describes 
a particular kind of secure connection between one device and another. You can consider it a 
"contract", if you will, that specifies the particular security mechanisms that are used for secure 
communications between the two. A device's security associations are contained in its Security 
Association Database (SAD). [TCPIPGuide2] The to be used security association is identified 
by the Security Parameter Index (SPI). 
• Security Parameter Index (SPI): A 32-bit number that is chosen to uniquely identify a particular 
SA for any connected device. The SPI is placed in AH or ESP datagrams and thus links each se-cure 
datagram to the security association. It is used by the recipient of a transmission so it knows 
what SA governs the datagram. [TCPIPGuide3] 
4.1.6.2. Transport layer 
4.1.6.2.1. SSL based VPNs 
SSL (Secure Socket Layer; an algorithm with a public-key encryption-based key exchange, certific-ate- 
based authentication and symmetric cipher-based traffic encryption) is a technology that adds se-curity 
to protocols on the transport layer (mainly TCP). Nowadays it's most commonly used for ser-vices 
like HTTP and FTP, in order to make the data transfers secure. The only thing that SSL adds 
to an already existing protocol is confidentiality (encryption), it only secures one connection 
between two hosts. SSL cannot be used to secure connections between various networks, unless 
some custom application is written which implements tunneling of a layer 2 or layer 3 protocol us-ing 
SSL for confidentiality. A simple kind of VPN might be implemented by creating a website us-ing 
SSL and user logins. After being logged in, the user can access all kinds of data and perform ac-tions, 
the only problem with this setup is the fact that it's a remote access based VPN, i.e. it cannot 
be used to interconnect networks. 
76
4.1.6.2.2. CIPE 
CIPE, which stands for Crypto IP encapsulation, is a custom designed tunneling protocol using en-cryption. 
"CIPE encapsulates encrypted IP datagrams in UDP datagrams and sends them via 
the normal UDP mechanism. This is different from standard IP-in-IP encapsula-tion. 
UDP was chosen because this way many different endpoints can easily be 
distinguished by port numbers; because an IP protocol number would warrant a 
formal registration; and because handling of UDP datagrams is easier than using a 
separate IP protocol number, especially in firewalled setups. Specifically, UDP 
can be handled by user-level applications such as a SOCKS5 relayer. A CIPE link 
always connects exactly two endpoints." [Titz2004] 
As we can read in the above description, CIPE implements the tunnel using UDP, and such a tunnel 
can only exist between two end points. As already stated in the description above, the advantage is 
that it should be able to pass through the firewall (note: if the firewall doesn't restrict UDP traffic) 
without problems, unlike packets using a custom IP protocol, which might be discarded by the fire-wall 
with a greater possibility. This advantage only plays a role in networks where a tunnel should 
be set up without consent of a security officer. A problem of this approach is the added overhead 
and the inability to check for authentication of packets before they are decrypted, which results in a 
performance loss in case of denial-of-service attacks. Would it be possible to authenticate packets 
before they were decrypted, a denial-of-service attack wouldn't have such a great impact, since the 
decryption wouldn't have to take place, which is CPU intensive. Furthermore, a lot of overhead is 
added. An IP packet, which already consists of 40 bytes of headers (TCP and IP), gets wrapped in 
another UDP/IP packet, which again adds 40 bytes. (UDP, TCP and IP packets all have headers of at 
least 40 bytes; there are optional extensions which can make the headers larger) 
4.1.6.3. Application layer 
4.1.6.3.1. SSH based VPNs 
SSH stands for Secure Shell. A shell is a command line user interface which is generally used in 
Unix type systems. The secure shell is a secure (and cryptographically strong) implementation of the 
old remote shell protocol in UNIX, which enables remote access to UNIX systems. Besides provid-ing 
a remote command line interface and authenticate users against a UNIX user database, SSH is 
able to perform much more functions, such as forwarding traffic through its encrypted channel. This 
makes SSH a popular choice for adding authentication to protocols which natively don't provide au-thentication 
or for adding encryption to protocols which natively don't encrypt traffic. 
In the case of SSH based VPNs, one protocol or another is tunneled through an existing SSH con-nection. 
A popular approach to this is the tunneling of PPP traffic through a SSH connection. It is 
actually quite similar to the situation described for SSL VPNs, except for the fact that SSH by 
nature is capable of carrying any traffic, i.e. no custom protocol has to be written anymore. Some 
problems exist for this approach. First of all, this approach has the same problems when it comes to 
overhead and performance loss as the CIPE approach. Furthermore, SSH is a user space program, 
which results in two problems. First, the tunnel has to be set up manually (though it could be scrip-ted) 
and should always exist in order for the VPN to be usable. Once the tunnel goes down (which 
can happen once in a while with TCP connections), the VPN goes down. The second problem is the 
fact that SSH lives in user space, meaning a lot of context switches are needed between user and 
77
kernel space: the user wants to connect over the VPN, sets up a connection, this goes from user 
space to kernel space, gets routed, gets back to user space to be tunneled through SSH, and then gets 
back to kernel space in order to be routed as standard TCP traffic. The same actions (though in op-posite 
order) occurs at the other side of the tunnel. 
4.1.6.4. The chosen solution 
Before we can make a well weighed decision in choosing a tunneling solution, we should first 
identify our needs. One need that we can identify is the fact that multiple tunnels per network should 
be supported. In [Fratto2000] we can find that IPSec in combination with NAT natively doesn't sup-port 
multiple tunnels. The reason for this is actually the same as for any network layer tunneling 
solution: we can only identify traffic on the network layer by IP address. Normally in situations with 
NAT, traffic is identified by transport layer attributes, such as the source port number. In case of 
network layer tunneling, we can only differentiate traffic by the IP address, since the payload of the 
network layer packet is not a normal transport layer packet, but a packet of some other type, for ex-ample 
GRE. In other words, we can only look at the original source IP address and the translated IP 
address in order to know the real destination of incoming tunneled traffic. Due to this fact, all net-work 
layer solutions aren't appropriate. In the case of IPSec, it would be possible to differentiate 
between various tunnels by the SPI number, as stated by [Fratto2000]. In this case however, we 
need specialized hardware, and this is not what we wanted. 
This leaves us with transport layer or application layer solutions. In the case of SSL tunnels 
however, it was stated we would need to write a custom application in order to implement tunneling 
for any type of network traffic. Since this is not at all desired, this leaves us with either SSH tunnel-ing 
or CIPE. 
First was decided to use PPP over SSH tunnels. PPP is the Point-to-Point Protocol which offers a 
layer 2 connection between two end points, which in turn can be used for IP networks and thus also 
for TCP and UDP connections. However it turned out also not as a good choice, due to the nature of 
TCP connections. In [Titz2001] is extensively explained why this does not work well. It comes 
down to problems with the retransmission algorithm used in TCP in case of network congestion. In 
such situations, TCP lowers its transmission speed in order to lower the congestion, by increasing 
timeouts between the sending of two packets. 
78
Figure 4.8. SSH tunneling 
However, when one TCP connection is tunneled through another, this has a very nasty side effect: 
"The lower layer TCP queues up a retransmission and increases its timeouts. Since 
the connection is blocked for this amount of time, the upper layer (i.e. payload) 
TCP won't get a timely ACK, and will also queue a retransmission. Because the 
timeout is still less than the lower layer timeout, the upper layer will queue up 
more retransmissions faster than the lower layer can process them. This makes the 
upper layer connection stall very quickly and every retransmission just adds to the 
problem - an internal meltdown effect." [Titz2001] 
The upper layer TCP connection is the TCP connection which is tunneled through the lower layer 
TCP connection. Due to these problems, another tunneling strategy needed to be chosen. Because 
encryption of connections is very desirable, the choice fell on Cipe. Cipe is a relatively new techno-logy 
which tunnels IP traffic through UDP tunnels, offering encryption along the way. Unlike other 
tunneling protocols like PPTP and IPSec, Cipe, like SSH, can have multiple tunnels through one 
NAT-gateway. The tunneling protocol would run in the transport layer, thus it would be possible to 
assign it to any given port number (in a 16-bit range), meaning you could theoretically create about 
65000 tunnels through one NAT-gateway. This number is enough for Wi-Fi networks, as the 
amount of access points at a local site will never be higher than this. It will however quite regularly 
be higher than one. 
4.1.7. Interoperability 
In order to support roaming we will be running an AAA server. We will first investigate which types 
of AAA servers are available, followed by an investigation of existing implementations. After that, 
we will discuss what AAA server type and implementation was chosen to use. 
79
4.1.7.1. AAA server types 
4.1.7.1.1. AAA Servers (Authentication, Authorization and Accounting) 
AAA servers play an important role in corporate networks, both business networks and the networks 
of Internet Service Providers. AAA servers perform three basic functions: authentication, authoriza-tion 
and accounting. Authentication (as already explained earlier) performs verification checks to 
see whether the user who tries to log in is who he says he is. Authorization deals with controlling 
what someone is allowed to do, which actions that person should be allowed to perform. Finally, ac-counting 
takes care of tracking what someone has done, logging which actions a certain user has 
performed. According to [Laet2004] The AAA server model was designed in such a flexible way 
that (almost) any kind of access method can benefit from its security features: dial up connections, 
ISDN, ADSL and VPN. There are three popular implementations of AAA servers. There's RADI-US: 
"Remote Authentication Dial-In User Service (RADIUS) is a client/server pro-tocol 
and software that enables remote access servers to communicate with a cent-ral 
server to authenticate dial-in users and authorize their access to the requested 
system or service. RADIUS allows a company to maintain user profiles in a cent-ral 
database that all remote servers can share. It provides better security, allowing 
a company to set up a policy that can be applied at a single administered network 
point. Having a central service also means that it's easier to track usage for billing 
and for keeping network statistics. Created by Livingston (now owned by Lucent), 
RADIUS is a de facto industry standard used by a number of network product 
companies and is a proposed IETF standard." [SearchSecurity1] 
Further there's TACACS+, which is Cisco proprietary implementation of an AAA protocol: 
"There are three versions of TACACS and the third version is called TACACS+, 
which is not compatible with previous versions." [Javvin1] 
And finally there's Diameter: 
"The Diameter protocol is being designed by the IETF's AAA Working Group." 
[OpenDiameter1] 
Diameter is a new AAA protocol that's being designed by the IETF as an alternative for the older, 
less capable and proprietary RADIUS and TACACS+ protocols. 
4.1.7.2. AAA server implementations 
4.1.7.2.1. FreeRADIUS 
FreeRADIUS is one of a few open source implementations of a RADIUS server. FreeRADIUS 
seems to be a quite mature project. FreeRADIUS supports MySQL, PostgreSQL, Oracle and LDAP 
databases. It supports EAP and many of its forms: EAP-MD5, EAP-TLS, EAP-TTLS, EAP-PEAP 
and EAP-LEAP. It has two very interesting features for Mobidot: it supports executing external pro-grams 
(which could make the Mobidot solution support other AAA servers by externally connecting 
to such an AAA server, would the AAA server of a roaming partner be of a different type than RA-DIUS), 
and it supports proxying of requests (meaning forwarding of the request to another RADIUS 
80
server) with fail-over ("A backup operation that automatically switches to a standby database, server 
or network if the primary system fails or is temporarily shut down for servicing" [Webopedia5]) and 
load balancing ("Distributing processing and communications activity evenly across a computer net-work 
so that no single device is overwhelmed" [Webopedia6]). Finally, the server comes with a 
PHP-based web user administration tool. A PAM module (Pluggable Authentication Module) and 
Apache web server authentication modules are available. It is stated by the maintainers of FreeRA-DIUS 
that the software has reached stable release, and it would be ready for deployment in any size 
network. 
4.1.7.2.2. Cistron RADIUS, ICRADIUS, XtRADIUS, GNU RADIUS 
The Cistron RADIUS server was developed by Miquel van Smoorenburg (from the Cistron ISP in 
the Netherlands). The server was developed quite some time ago, and lacks support for new fea-tures. 
It does support proxying of requests and PAM authentication, but it doesn't support databases 
except for the Berkeley database format DBM and it doesn't support EAP at all, only PAP and 
CHAP. ICRADIUS, XtRADIUS and GNU RADIUS are derivatives of Cistron RADIUS, each 
adding some minor features. ICRADIUS adds MySQL database support. XtRADIUS adds a quite 
nice feature: the ability of running scripts which will handle the authentication and user accounting, 
thus enabling querying external resources (much like the external program execution function of 
FreeRADIUS). GNU RADIUS adds extensibility by using the Scheme programming language as a 
script interpreter, it adds support for PostgreSQL databases and it adds support for SNMP manage-ment 
and monitoring. 
FreeRADIUS is in fact also another derivative of Cistron RADIUS. But due to the fact that the de-velopment 
approach chosen for FreeRADIUS (development done by a large group of individuals), 
FreeRADIUS seems to offer much more features and seems to be more mature. 
4.1.7.2.3. OpenRADIUS 
OpenRADIUS is another implementation of a RADIUS server, which was developed from scratch. 
OpenRADIUS doesn't support EAP. On the other hand, OpenRADIUS supports proxying, and is ex-tensible 
because of the use of external program calls for the handling of any action, such as authen-tication 
of users, etc. For this reason, any type of database could be supported, but isn't at this mo-ment. 
OpenRADIUS does introduce an optimizing feature with calling external programs: called 
programs are only launched once, and from then on kept in memory, so it can be consulted many 
times without needing to reload it, resulting in a performance gain. This project seems to be a one-man 
project however, and as such is a less attractive solution than FreeRADIUS. 
4.1.7.2.4. tacppd, libtacplus, mod_auth_tacacs 
Tacppd is an open source implementation of the Cisco proprietary TACACS+ AAA protocol. The 
implementation at this point in time is quite basic, and is mainly limited to operation with Cisco 
products. The EAP protocol is not supported, and there's support for one database only: Postgr-eSQL. 
Furthermore, it seems like this project is also a one-man project. Tacppd doesn't seem to be a 
real alternative to the use of a RADIUS server, also because of the fact that TACACS+ is a propriet-ary 
protocol. Tacppd does come with some useful additions however: libtacplus and 
mod_auth_tacacs. The first of these is a code library with which TACACS+ authentication calls can 
be made or received easily. The last of these is an authentication module for use in the Apache web 
server. 
81
4.1.7.2.5. ACE RADIUS library and OpenDiameter 
Both ACE RADIUS and OpenDiameter aren't server products, but code libraries. Which means they 
are not usable for immediate deployment of an AAA server. They might, however, come in handy 
for the same reason as libtacplus: making external authentication calls to an AAA server of another 
type (in this case RADIUS or Diameter). ACE RADIUS seems to be not quite mature yet, it is still 
in beta stage. It also seems that ACE RADIUS does not support EAP, and as such is not quite an in-teresting 
option. OpenDiameter however seems to be more mature, having support for several EAP 
protocol types, and even more on the way. The next version will even support 802.1X and support 
for using the library for software that implements either the supplicant, the authenticator or the au-thentication 
server. Future releases will also include support for RADIUS. 
4.1.7.2.6. Open1X 
Open1X is an open source implementation of the IEEE 802.1X protocol. It only focuses on the sup-plicant 
and authenticator part (and the authenticator part isn't in active development at the moment). 
Many EAP protocols are supported, including: EAP-MD5, EAP-MSCHAPv2, LEAP, PEAP, EAP-TLS 
and EAP-TTLS. Recall that the supplicant is the network client who tries to authenticate to a 
network service. This means that Open1X is primarily meant for the users of a wireless network and 
in this case only those who use Linux as their operating system. Most probably Mobidot will not 
need this software, unless it is decided the users of the Mobidot need to install custom software in 
order to be able to get a connection. 
4.1.7.3. The chosen solution 
For several reasons FreeRADIUS has been chosen as the AAA server of preference. First of all, it is 
most probably the most widespread used type. Diameter is a relatively new open source alternative. 
TACACS+ is a Cisco proprietary implementation. There's no good open source server implementa-tion 
of TACACS+, as such it cannot be used anyway. Some good libraries for TACACS+ have been 
found however, so theoretically it's possible to extend FreeRADIUS with TACACS+ support, the 
hooks for such extensions are already available in FreeRADIUS. Further, FreeRADIUS is the only 
one supporting EAP. Since EAP is part of 802.1X/802.11i, the new upcoming security standard for 
wireless technology, it might be a wise decision to choose a solution which is already capable of 
dealing with EAP. Finally, FreeRADIUS supports fail-over which a requirement for setups in which 
the AAA server plays such a central role as it does in the Mobidot infrastructure. 
4.2. Implementation 
4.2.1. Implementing the management system 
The implementation of the management system was quite comprehensive and took just a bit less 
than a quarter of the entire project duration, totaling 7747 lines of PHP code and 799 lines of 
HTML. Although quite some design changes took place during this period, the requirements were 
implemented easily due to the clear structure of the system. 
One of the largest changes in the project was in the set of use cases. At first various use cases were 
defined very distinctively from one another, including: PutHotspotUp, PutHotspotDownForMain-tenance, 
DeployNewAPFirmware, DeployNewHotspotConfiguration, PutFirewallTunnelUp, Put- 
82
FirewallTunnelDown, SendNetworkAnnouncement and RetrieveUsageStatistics. Due to the fact that 
most of these use cases are quite different from the other use cases means the design can get 
(unnecessarily) complicated. 
The first choice was to drop the use case RetrieveUsageStatistics. This use case was introduced for 
roaming partners to retrieve usage information of their users who have roamed onto the Mobidot 
network. This information can however be sent automatically (without user initiation) to the roam-ing 
partner by means of an extension of the RADIUS protocol, and this functionality is implemented 
by the Chillispot captive portal. 
Another choice was to embed SendNetworkAnnouncement into the management of hotspots and ac-cess 
points. Essentially a network announcement needs to be sent only when the hotspot goes down 
temporarily for maintenance, it preferably will never be needed for any other cause, as we don't 
want to bother the user too much. As such it is unnecessary to model it as a separate use case. 
Yet another choice which led to the removal of use cases was the choice to use permanent firewall 
tunnels instead of temporary firewall tunnels. These tunnels are needed to enable the use of proto-cols 
such as SNMP in cases where the Mobidot AP is not directly addressable, for example in 
SNAT-enabled networks. The reason why this was needed will be discussed in the 'Problem domain' 
section of the first chapter. This choice led to the removal of the PutFirewallTunnelUp and PutFire-wallTunnelDown 
use cases. 
The final choice (related to the changes in use cases) was composed of the removal of several use 
cases, but all for the same reason. The remaining use cases in essence all adjust the state of the sys-tem 
in one way or another. Such actions can be caught in general management use cases. For ex-ample 
PutHotspotUp and PutHotspotDownForMaintenance just adjust the status of a hotspot, and 
basically are edit operations in the management of hotspots. Further, DeployNewAPFirmware basic-ally 
is an add operation in a firmware management use case. The DeployNewHotspotConfiguration 
use case can be dealt with in the same way. Due to these changes also a new composite use case is 
introduced: ManageFirmware. 
Some other changes were made in the modeling of parts of the system in terms of class diagrams. 
First of all, during the design phase the choice was made to create helper classes which would aid in 
the creation of the necessary HTML output. During the implementation however, a very handy tem-plate 
engine was found, which could generate HTML from text files with variable substitution. Due 
to the use of this engine, the helper classes could be dropped. Another, more important, design 
change was the choice to drop the differentiation between master and slave access points. Rather, 
access points would be looked at as stand alone units. Each access point offers wireless access to the 
neighborhood it is placed in, and as such it doesn't need to know about fellow access points. It only 
needs to deal with wireless IP traffic, and it needs to know where to hand it off to. 
Further, the distinction between Mobidot users and users from roaming partners was dropped, as 
this is (in terms of usage logging, authentication checks, etc) already taken care of by Chillispot. 
From then on, users would be modeled by an UserAccount object, making the design again easier. 
Lastly, having separate Status classes (HotspotStatus, APStatus) also made the design unnecessary 
difficult, particularly because there is little status information, so it can just as well be handled in-side 
the Hotspot and AP objects. 
Finally, a problem was encountered in the storage back ends. It was chosen to implemented it in a 
very general manner, such that it can be reused for storing any type of information. This was done 
using the bridge pattern, and using only a pre-defined set of functions in the implementer classes. As 
83
such there were basically four operations: get, insert, update and delete. This however limits the us-ability 
of the storage back end, as it can only perform as much as these pre-defined functions can 
perform. Without adding functions it was possible to add just enough functionality to the existing 
functions to support more extensive queries, i.e. for sorting data in a particular order, paginate re-cords 
and operate on multiple sets of data in one shot. This was done by using arguments which 
were unused by default, unless they would have a value. Further, in situations where it was needed, 
database transactions would be composed of multiple queries, i.e. creating, updating or deleting con-figurations, 
including their firewall and traffic shaping configurations. 
4.2.2. Implementing the firmware 
The implementation of the firmware took a bit more than an eighth of the entire project duration, 
totaling 626 lines of C code and 440 lines of shell script code (bash script code; the awk code which 
is embedded in the bash script code will amount to even more lines of code). It consisted of an in-vestigation 
as to how the firmware works and how it can be extended, and of the implementation of 
the Mobidot extensions that were needed. One important part was understanding how the build root 
of the firmware works. The build root is the collection of files that makes up the source of the firm-ware, 
and which can be used to make a new firmware from scratch. Adding extensions to the Open- 
WRT firmware was found to be considerably easier than with the other investigated firmware: some 
minor modifications in configuration and make files and the addition of a small makefile and con-figuration 
file were needed. This, as opposed to the other firmware, where extensibility is reached 
by hacking in the new features. 
OpenWRT eases the customization of firmware (as in choosing which software to install in the firm-ware) 
considerably. Unlike the other firmware, OpenWRT allows to select the packages that are 
wanted in a menu driven program. After having configured the base firmware configuration, the 
needed extensions of the firmware still need to be implemented. The extensions that are needed per-form 
a specific set of functions. After an access point has been acquired it's got a default installation 
of a stock Linksys firmware, which is totally inadequate, due to its generality. When the Mobidot 
specific firmware is installed a series of actions is performed. First it makes sure there's a functional 
Internet connection. If there is none, it tries getting an address using DHCP. If that fails, an HTTP 
daemon is launched which enables the user to visit a specific website. This website enables the user 
to enter specific Internet connection settings. Preferably this wouldn't be needed on-site, as we 
prefer to deliver the access point to clients, having them connect the access point and then having 
the access point installing itself completely unattended. In this case however, the settings are secur-ity 
sensitive. Storing them centrally is a potential security problem (even more because the Internet 
connection settings, including passwords, are client specific and not Mobidot's). When the Internet 
connection is successfully setup, we can continue installing the firmware. Due to storage constraints 
it was chosen to leave out as much functionality as possible, only installing on demand what is 
needed using packages. The access point at this point downloads a script from the central Mobidot 
system, trying indefinitely when failing. This script takes care of installing the needed packages and 
configuring them according to the settings as defined in the management panel. When this is fin-ished, 
the access point is ready for use. From then on it will run the same script on an hourly basis, 
only updating the system if necessary, both in terms of packages (installations and deletions) and in 
terms of configuration settings. 
Undoubtedly the most difficult thing of implementing the firmware extensions was the fact that the 
access point has no console, not even the possibility for a serial console. In combination with shell 
scripts this led to quite a few difficult situations. Shell scripting languages are interpreted languages, 
84
meaning they don't get compiled and thus there are no checks on syntax and semantic errors. The 
only way of knowing whether a script works is by running it. However one needs to be very cau-tious, 
because one bad command in the script can render the access point unusable. 
85
86
Chapter 5. Evaluation 
5.1. Test setup 
In the case of the management system, testing wasn't that difficult. Due to the fact the management 
system has been written as a web application, it could be tested on any workstation. It was however 
needed to have installed multiple web browsers, in order to ensure browser independence. In this 
case the system was tested using both a Windows XP and a Debian Linux OS. Windows XP was 
equipped with both Internet Explorer version 6 and with Firefox version 1. Debian was equipped 
with Firefox 1. Ensuring the website runs well inside Firefox means web browsers like Mozilla (the 
original, not Firefox) and Netscape 7+ are covered too, since they use the same HTML engine as 
Firefox. Besides a workstation, a server was needed too, on which the management system would be 
installed. A server which was already in the air for purposes like this fitted the job nicely. The server 
had Debian Linux pre installed, and already had an Apache web server and PHP4 engine installed. 
In the case of the firmware, things were a little bit more difficult. In this situation the same worksta-tion 
and server are needed. However, in this case the workstation needed to be configured with mul-tiple 
IP addresses in a different range, due to the fact the access point can only be flashed with new 
firmware on a fixed IP address. Of course, in order to test the firmware, the access point itself is 
needed, of which three were available all having a different revision (unfortunately no emulator 
could be found which could run the firmware before deploying it onto hardware). This could be 
used in order to test whether the firmware works across different revisions, as Linksys has changed 
some hardware components between various revisions. 
5.2. Test procedure and approach 
5.2.1. Development tests 
Testing actually can be two separate things. For one, testing can mean testing the low level function-ality 
of the program: do the methods of the program perform their functions as they should? This is 
known as unit testing. On the other hand, testing also means testing the program as a whole. Does 
the program expose errors when the individual subsystems are combined when executing the pro-gram? 
This is otherwise known as integration testing. Lastly, does it perform the actions which are 
defined in the requirements document? Can the functionality as provided by the program be used in 
an intuitive way? This is also known as system testing. 
All three testing methods have been applied, although the first one in a different way than usual. 
First of all, unit testing is not as well supported by tools under PHP as under languages such as Java. 
This means that a lot of programming has to be done in order to unit test the various classes. 
However, since the classes in themselves aren't that difficult (most of them anyway), it was chosen 
to do unit testing by logical reasoning. Just by reasoning what would happen if a certain class would 
be used resulted in quite a few bugs fixed, mainly logical bugs; syntactic and semantic errors are 
caught by PHP upon execution of the program. Further, the classes would be tested anyway whilst 
testing the functionality of the program as it is exposed to the user (during integration testing). 
So the testing approach consisted mainly of actively testing the user functionality of the program 
87
while it was implemented (ongoing integration testing). The system would be expanded feature by 
feature, implementing a new one when the old one tested successfully. So basically each time a new 
use case was implemented it would be tested right away by a new test case. Finally, the program 
would again be tested on its user functionality once everything was implemented, using the same 
test cases, but performing the tested actions in multiple ways. This was done to catch bugs which 
only come forth when executing functionality in a program in a certain order. 
Finally, the final testing phase consisted of some functional testing (testing the requirements of the 
RAD), and some performance testing (testing non functional requirements and design goals), in oth-er 
words this phase performed the system testing. Another part of system testing is the acceptance 
testing, which is discussed below in section 'Pilot tests'. 
5.2.2. Pilot tests 
Pilot testing was arranged by the suppliers of the assignment at some locations in Delft, namely two 
hotels and a campsite. This would only be performed however if the system proved to be sufficient 
to supply these hotels and campsite with a working setup. The judgment in this was done solely by 
the suppliers of the assignment. Due to the fact that the system proved not be 100% sufficient, it was 
chosen not to perform the pilot tests. The reasons why are documented below in the test results. 
5.3. Test results 
In this section the results of the testing phase are discussed. Not all problems and bugs will be dis-cussed. 
A short overview will be given, discussing the problems or bugs that might introduce 
needed design changes. Depending on the estimated time needed to implemented these changes and 
the necessity of these changes in relation to the efficiency gained by them, they might or might not 
have been implemented. In some cases the changes would result in a better thought out design, but it 
wouldn't give performance gains. As such these changes have not been implemented, but rather doc-umented 
in order to learn from them for future projects. The testing results will now be discussed 
separately for the firmware part and for the management part of the system. 
5.3.1. The firmware 
The largest problem with the firmware was the state of the build root of OpenWRT. It was in beta 
during the thesis project, as such not ready for production use. This became clear during a late phase 
of the project. One of the largest problems was the fact that the firmware can lock up the hardware it 
runs on, needing a hard reset in order to continue. This happened regularly (but not always) when 
installing the Mobidot firmware on the router. After successfully installing all needed packages, the 
router would initiate a reboot in order to begin serving user requests. During this reboot the router 
locked up various times. This was the main reason not to continue the pilot projects. Another prob-lem 
was the fact that the used OpenWRT version wasn't ready for Linux kernel 2.6, meaning sup-port 
for traffic shaping wasn't as extensive as needed. In order to provide wireless Internet access at 
hotspots with evenly divided bandwidth, extensive traffic shaping is needed. Because of these two 
problems the pilot projects were delayed. These problems however weren't important enough to 
choose another build root, such as Sveasoft for example. The better design of OpenWRT compared 
to other build roots outweighs the temporary functional problems of the OpenWRT build root. 
Another problem, but which was easily fixed, was a bug in one of the scripting engines used in the 
88
firmware (grep). The Mobidot installation scripts needed this tool for information about needed 
packages, where to get them and how to install them. The script however had a memory problem: it 
allocated too much memory due to the use of certain options. This resulted in the router running out 
of memory. The problem was solved by approaching the wanted functionality from a different 
angle, using a different tool (awk). 
5.3.2. The management system 
On the management side some problems have been found too. The first problem that was discovered 
deals with the configuration of access points. While it is possible to configure the firewall and traffic 
shaping through the management panel, there is no dedicated structure for managing other configur-ation 
settings which are set in the router in so called non-volatile RAM variables. While most of 
these are related to the firewall (or security in general), they can be set in the firewall script. It 
would have been more nice however to have a separate management function for controlling the 
various nvram variables. 
Another problem is with multiple access points at one site. While it was chosen not to focus on mas-ter- 
slave configurations due to time constraints, it would've been possible to implement features 
which in the future can be used to setup these configurations. A technology known as Wireless Dis-tribution 
System can support radio communication between access points using the same wireless 
technology. While it is still in beta in OpenWRT, it would've been better to prematurely support it 
by adding configuration possibilities. 
The last problem actually relates to both the management system and the firmware. At this moment 
it is possible to set network announcements, which should be shown to users in case of temporary 
unavailability of the system. The problem at this point however is that these messages cannot al-ways 
be shown. When someone logs in using a web browser, these messages will eventually be 
shown in the pop up screen which is shown after logging in. If someone logs in using WPA (which 
for the time being is not supported) however, all authentication is done outside a browser, meaning 
no messages can be communicated to the user. 
5.3.3. Results of system testing 
During system testing it was found that most requirements are implemented, and worked well. The 
functional and performance tests, which are part of the system tests, will be discussed now. 
5.3.3.1. Functional testing 
The functional requirement 'Bandwidth adjustment per hotspot' has only been partly implemented, 
since OpenWRT doesn't support traffic shaping well yet. 'Live roaming' is not yet supported, since 
this should be taken care of by the captive portal which doesn't support it yet. Due to the fact that the 
solution to the SNAT circumvention has only been designed, but not implemented, it is for the time 
being not possible to get 'Status overviews'. The addition of SNMP would be needed also, which 
means a steep learning curve (difficult protocol) and the application for Mobidot specific MIBs (sets 
of SNMP attributes) at the IANA (Internet Assigned Numbers Authority; the organization that's the 
authority which deals with the assignment of IP addresses and the birth of new top level domain 
names), which would take a fair amount of time. The 'monitoring', 'status/statistical information sup-ply', 
and 'presence announcements' are closely related to the 'Status overview', and are not imple-mented 
for the same reason. 
89
5.3.3.2. Performance testing 
The requirements 'Fair use' and 'Basic bandwidth availability' are related to the 'Bandwidth adjust-ment 
per hotspot' functional requirement, they have not been implemented for the same reasons. 'Op-tional 
extra security for users' is not completely implemented since it's not within the main focus of 
the project: the goal was to create a well thought out design, and implement as much as possible. 
Since the system isn't production ready yet, missing the optional extra security isn't a problem, and 
can easily be added later. All needed hooks for it are already available in the firmware. Finally, it 
was found to be impossible to detect Rogue APs in an easy way, and even more to warn users about 
them. As such that requirement has not been met, it can however easily be met by certain EAP pro-tocols 
(i.e. EAP-TTLS) which most probably will be used in the future. 
5.3.3.3. Acceptance and installation testing 
This testing approach has not been performed due to the unstable and incomplete state of the Open- 
WRT build root, as discussed earlier. 
90
Chapter 6. Conclusions 
This chapter contains conclusions as they were made for the Mobidot infrastructure project. An ab-stract 
overview of the project is given, further some sub-optimal approaches will be discussed from 
which can be learned for future projects. Finally a discussion about how the project was perceived, 
the overall feeling of the author is described. The chapter ends with a discussion containing general 
conclusions about how the entire study at the Technical University of Delft was perceived. 
6.1. Project specific conclusions 
In this project an infrastructure has been designed and built which is used to provide the user with a 
wireless connection to the Internet. While the hotspot visitor is the main user of the product, it is not 
the main actor we are aiming at. The problem that was perceived is the fact that current solutions are 
quite expensive, too expensive for low budget institutions such as small hotels and small restaurants. 
The intention of this project was to create a working solution for public wireless networks at a frac-tion 
of the cost of current solutions. The two largest cost factors with current solutions are the in-vestment 
in the equipment and the installation and maintenance by a mechanic. As such, we are 
aiming at the managers of public (low budget) institutions. The project is renewing in that it reaches 
near full automation. This is achieved by making the product plug 'n play, and by applying active 
monitoring of the devices. Since the solution is aimed to be low budget, broken installations can 
easily be replaced by new ones. Thus keeping down times to a minimum and at the same time keep-ing 
maintenance costs low. Another renewing aspect (to a lesser extent though) of the project is the 
fact that roaming will be possible, even though the solution is low budget. This means users of other 
Wi-Fi suppliers can roam to the Mobidot network, keeping their number of contracts for digital 
communication services to a minimum. 
This project has aimed at creating a well thought out design, instead of a fully working solution with 
a bad design. This means most of the time has been put in the design, and less in the implementa-tion. 
As such not all functionality is implemented, although most of it is. Things that have been de-signed 
but not implemented include monitoring, setups with multiple cooperating access points and 
VPN security on the WLAN. After this project is finished it is easily possible to add these features 
to complete the solution to a production ready system. 
Especially the first two phases of the project, the analysis and design, took a lot of time. In this case 
the problem domain is hard to grasp. This is because it is very unclear at the start of the project 
which systems and actors play a role in this infrastructure, as there are quite a few. Once all require-ments, 
needed functionality, involved actors and systems and dependencies between systems had 
been defined and modeled, implementation could be quickly done. 
The project suffered some failings mainly because of external factors. Due to the fact that the 
project plays in a new field, and is dependent on quite a few other products, the possibilities for a 
thesis project are limited to what these products can deliver. The largest problem in this was the 
firmware for the access points. All firmware except one were found to be badly designed and not 
useful for this project. The firmware that was found to be well designed and useful, OpenWRT, had 
some maturity problems though. Once this firmware matures, the solution can be finished to be a 
production ready system. 
The project was perceived as difficult but interesting. A lot of aspects of the project, including wire- 
91
less technology in itself were new to the author. It was interesting to see how one can develop from 
knowing near to nothing about a certain subject, to building an entire system in the respective sub-ject. 
During the study only small, confined exercises have been performed. Never before there's 
been a large solitary project such as the thesis project. It is interesting to see how one develops from 
having no idea on how to solve a certain problem, to having extensive knowledge of the various 
ways to solve such a problem, and design and develop a system to fit that solution. During the study, 
various courses have been given on a wide variation of subjects. During the thesis project this know-ledge 
is structured and organized, and this has happened in a satisfactory way. A system has been 
created in a project which was walked through completely from inception to completion, applying 
previously gained knowledge and researching needed new knowledge. Getting the responsibility to 
make the necessary choices and accepting that responsibility to the fullest, shows that the study as 
provided by the TUDelft has attained its goal: to deliver quality engineers. 
The guidance in the project was perceived as pleasant. The emphasis of the guidance was exactly in 
the right area, where it was needed: overall project management, and documentation. Especially de-termining 
the right audience, and aiming the documentation at that audience was needed and was 
guided in an excellent way. Finally, the guidance was excellent in the design of the system. While 
system design has been educated at the university, it has only been practiced minimally. Applying it 
to a large project was a large step to take, and the guidance in this was very satisfactory. The overall 
project was perceived as very useful and contributing a lot to personal growth, both in the field of 
work of ICT, and in the field of finding a barrier between work and free time and making sure that 
barrier wouldn't shift too much. 
6.2. General conclusions 
After almost eight years of studying at the TUDelft, the end of this life period is quite near, getting 
ready to transition to a completely autonomous existence. The time spent at the TUDelft overall has 
been perceived as pleasant. 
The study period not only has made me grow from novice to expert on a professional level. It has 
also made me grow on a personal level, in relation to being with other people, getting to be more 
open to other people and getting a broader perspective upon the world. Personally, one of the most 
interesting aspects of the study was the fact of getting in contact with people from varying religious 
and cultural backgrounds. Getting to know these people and their backgrounds was a privilege, and 
an eye-opening experience. An experience of personal growth that, I believe, many conservative 
people lack. I've met people both with quite strict religious beliefs and quite loose religious beliefs. 
During this study some people were more important to me than others, mainly because a lot of my 
personal growth can be contributed to them. Michele Buonaiuto, an Italian from Napoli, who has 
been my study partner for nearly the entire study (except for the first quarter) has played an import-ant 
role in my pleasure of studying at the TUDelft. Doing a lot of projects with him was a joy, I've 
been with him through better and through worse. Another important person during my study was 
Vahid Shafiei (Iranian). One of the reasons my study took eight years instead of five is the amount 
of maths. Vahid was the one with whom I found the needed discipline to finish most remaining 
maths courses in the fourth year: maths for 8 hours a day, 6 days a week for 9 months. Solving a dif-ficult 
exercise was a joy and would always go hand in hand with a necessary dose of humor. His 
view upon the world and his intellectual thinking (he has done a philosophy study in Iran) made it a 
joy to spend time with him. During later phases of my study, I started to work as a student assistant 
for the TUDelft. First for the Computer Organization course (2001, 2003), from September 2003 on 
92
as a helpdesk employee at the Practicumgroep Zuid-Plantsoen. It was here where I met Wim Haan 
of whom I found out to be quite the same person as I am. Sharing much of the same beliefs and 
working together fluently has resulted in starting our own business together. Finally Lucas 
Breedveld, Mohammad Sobat and Shuai She, whom I have enjoyed working with on various 
projects but also outside college hours. 
When it comes to the study itself, I'm for the most part pleased with how things went. With true 
Computer Science courses I didn't have much trouble passing them. First of all I'm quite interested 
in a diverse set of subjects, which made it even easier. With maths courses I had more problems 
however. While the material isn't that fundamentally difficult, my old studying method didn't work 
for these courses, a lot more discipline and dedication was needed to pass these courses. Finally, 
when it comes to societal courses, things were quite a lot worse. I find that the respective teachers 
have a hard time bringing the learning material in an enjoyable way, much like my history classes in 
high school. About the only examination method with these courses was to ask for lists of dates 
(milestones in history), characteristics of something (name all advantages and disadvantages of a 
particular approach), etc. Such educational methods don't make the material interesting, and thus fail 
to being effective in transferring knowledge. One other unfortunate thing is that I had to put quite 
some time into maths, which makes it look like maths is all I did in my study. One thing I structur-ally 
missed in the study is ongoing practice in software design and project management. There are 
only about two courses dealing with software design, and only halfway the third year, project man-agement 
is taught. More attention is given to programming, while this should be the other way 
around, since a university (I think) is supposed to aim at a more abstract level. 
When it comes to the TUDelft as an organization, I believe in essence it means well, but fails to be-come 
one of a kind. This is reflected in the latest reorganization plans, in which a way of working 
much like the University of Twente and TU of Eindhoven is trying to be achieved. Instead the 
TUDelft should find its own way of doing things best. One of the things in which TUDelft excelled, 
and for which many foreign students came to Delft, was Information Systems. Instead of dumping 
this at another faculty, it should have gotten more privilege. 
All in all, I had a great time at the TU Delft. Thanks to everyone who made it a wonderful experi-ence, 
including: Michele Buonaiuto, Wim Haan, Vahid Shafiei, Mohammad Sobat, Lucas 
Breedveld, Shuai She, Hattat el Hammouchi, George Stere, Naim Larbi, Abdulhakim Boztas, Firas 
AlHassany, Noureddine Ou-Aissa, Chakib Boucharraba, Nahil Celikoglu, Aqab Bin Talal, Sabit 
Asholi, Ravi Chablani, Joost Hietbrink, Michele Nijhuis, Wijnand Post, Hamid Safari, Leon 
Planken, Azad Imamoglu, Serap Boduc, Bas Schopman, Amros Karbor, Amad Zawity, Denis de 
Leeuw Duarte, Jun Chen Chen, Michel Meulpolder, Sander Koning, Mustapha Idrissi, Reza Sum-ampouw, 
Miriam ter Brake, Ronald Huizer, Lieuwe Jan Koning, Serkan Eskici, Osman Zemouri. 
93
94
Appendix A. References 
A.1. Books 
• Networking in general 
1. [Dyson1994] Peter Dyson - Dictionary of networking 
The Network Press, 1994, 2nd edition 
ISBN 0-7821-1818-6 
2. [Tanenbaum1996] Andrew S. Tanenbaum - Computer Networks 
Prentice Hall, Inc, 1996, 3rd edition 
ISBN 0-13-394248-1 
• Security 
1. [Laet2004] Gert de Laet and Gert Schauwers - Network Security Fundamentals 
Cisco Press, Sep. 2004 
ISBN 1-587051672 
2. [Lubbe1997] J.C.A. van der Lubbe - Basismethoden cryptografie 
Delftse Universitaire Pers, 1997, Tweede druk 
ISBN 90-407-1256-5 
• Wi-Fi 
1. [Roshan2003] Pejman Roshan and Jonathan Leary - 802.11 Wireless LAN Fundamentals 
Cisco Press, Dec. 2003 
ISBN 1-58705-077-3 
• Various 
1. [Franssen2002] Maarten Franssen - Methodologie en Ethiek van de Techniek 
TUDelft Fac. TBM, sectie Filosofie, Maart 2002 
A.2. Articles and other documents 
95
• Network structures 
1. [Epema2003] DHJ Epema - Distributed Systems 
Course IN4002 on http://blackboard.icto.tudelft.nl, file book2003.pdf 
2. [Minar2002] Nelson Minar - Distributed Systems Topologies 
http://www.openp2p.com/pub/a/p2p/2001/12/14/topologies_one.html 
http://www.openp2p.com/pub/a/p2p/2002/01/08/p2p_topologies_pt2.html 
• Wi-Fi 
1. [Register1] The Register - Will pressure to speed up 802.11n wreck standards process? 
http://www.theregister.co.uk/2004/01/16/will_pressure_to_speed_up/ 
2. [Wifinetnews1] Wi-Fi Networking News - 802.11n Archives 
http://wifinetnews.com/archives/cat_80211n.html 
3. [NWFusion1] NetworkWorldFusion - 802.11n 
http://www.nwfusion.com/details/6450.html?def 
• Wireless technologies other than Wi-Fi 
1. [Cohen2003] Cohen & Deutsch - 802.16: A Look Under The Hood 
http://www.Wi-Fiplanet.com/tutorials/article.php/10724_3068551_1 
2. [Lipset2003] Lipset - 802.16e vs 802.20 
http://www.Wi-Fiplanet.com/tutorials/article.php/3072471 
3. [Geier2003] Geier - 802.16: A Future Option for Wireless MANs 
http://www.Wi-Fiplanet.com/tutorials/article.php/2236611 
4. [Cohen2003-2] Cohen & Deutsch - 802.16: The Future in Last Mile Wireless Connectivity 
http://www.Wi-Fiplanet.com/tutorials/article.php/3065261 
5. [UMTSForum1] UMTS Forum - What is UMTS? 
ht-tp:// 
www.umts-forum.org/servlet/dycon/ztumts/umts/Live/en/umts/What+is+UMTS_index 
• Security 
1. [Arbaugh2001] Arbaugh, Shankar, Wan - Your 802.11 Wireless Network has No Clothes 
http://www.cs.umd.edu/~waa/wireless.pdf 
2. [Borisov2001] Borisov, Goldberg, Wagner - Intercepting Mobile Communications, The In- 
96
security of 802.11 
http://www.isaac.cs.berkeley.edu/isaac/mobicom.pdf 
3. [Gast2002] Matthew Gast - Wireless LAN security, a short history 
http://www.oreillynet.com/pub/a/wireless/2002/04/19/security.html 
4. [Dismukes2002] Trey Dismukes - Wireless Security Blackpaper 
http://arstechnica.com/articles/paedia/security.ars 
5. [Strand2004] Lars Strand - 802.1X Port-Based Authentication HOWTO 
http://tldp.org/HOWTO/8021X-HOWTO/intro.html#what80211i 
6. [Viney2004] Boden-Cummins, Viney - IPSEC over WLAN: residual vulnerabilities 
ht-tp:// 
www.qinetiq.com/home/core_skills/knowledge_information_and_systems/trusted_info 
rmation_management/white_paper_index.Par.0014.File.pdf 
7. [Airespace1] Airespace.com - Authentication and Encryption in an Enterprise Wireless 
LAN 
http://www.airespace.com/technology/technote_auth_enc_wlan.php 
8. [AESLounge1] AES Lounge website 
http://www.iaik.tu-graz.ac.at/research/krypto/AES/ 
• Corporate Networks 
1. [Davis2004] Jeff Davis - Centralized Wireless LAN, Thin vs Fat Technology 
http://www.cablingbusiness.com/pdfs/storynov04.pdf 
• Networking in general 
1. [Titz2001] Olaf Titz - Why TCP Over TCP Is A Bad Idea 
http://sites.inka.de/sites/bigred/devel/tcp-tcp.html 
2. [Fratto2000] Mike Fratto - Why Can't IPsec and NAT Just Get Along? 
http://www.networkcomputing.com/1123/1123ws2.html 
3. [Hubert2003] Bert Hubert - Linux Advanced Routing & Traffic Control 
http://www.lartc.org/ 
4. [Titz2004] Olaf Titz - CIPE Manual 
http://sites.inka.de/sites/bigred/devel/cipe-doc/cipe.html 
97
5. [Hardin2000] John D. Hardin - Linux VPN Masquerade HOWTO 
http://www.linux.org/docs/ldp/howto/VPN-Masquerade-HOWTO.html 
6. [Geier2002] Jim Geier - 802.11 Beacons Revealed 
http://www.Wi-Fiplanet.com/tutorials/print.php/1492071 
7. [Geier2002-2] Jim Geier - 802.11 Alphabet Soup 
http://www.Wi-Fiplanet.com/tutorials/article.php/10724_1439551_1 
8. [CABA1] CABA - WiMedia (802.15.3) Standards & Protocols 
http://www.caba.org/standard/wimedia.html 
9. [Hirt2003] Hirt & Porcino - Ultra-Wideband Radio Technology: Potential and Challenges 
Ahead 
Course SPM9612 on http://blackboard.icto.tudelft.nl, file hirt.pdf 
10. [Duarte2001] Duarte - UMTS: challenges and perspectives 
Course SPM9612 on http://blackboard.icto.tudelft.nl, file UMTS_04duargb.pdf 
11. [Javvin1] Protocol Dictionary - TACACS 
http://www.javvin.com/protocolTACACS.html 
12. [OpenDiameter1] Open Diameter Web Site 
http://www.opendiameter.org/ 
13. [SearchSecurity1] searchSecurity.com Definitions - RADIUS 
http://searchsecurity.techtarget.com/sDefinition/0,,sid14_gci214249,00.html 
14. [Open1X1] Open1x -- Open Source Implementation of IEEE 802.1x 
http://open1x.sourceforge.net/ 
• Definitions and examples 
1. [Hp1] HP - Glossary for mobile development - V 
ht-tp:// 
h21007.www2.hp.com/dspp/tech/tech_TechDocumentDetailPage_IDX/1,1701,1383,00 
.html 
2. [Apache1] Apache - Authentication, Authorization, and Access Control 
http://httpd.apache.org/docs/howto/auth.html 
3. [TCPIPGuide1] TCPIP Guide - IPSec Encapsulating Security Payload (ESP) 
98
http://www.tcpipguide.com/free/t_IPSecEncapsulatingSecurityPayloadESP-4.htm 
4. [TCPIPGuide2] TCPIP Guide - IPSec Security Associations page 1 
ht-tp:// 
www.tcpipguide.com/free/t_IPSecSecurityAssociationsandtheSecurityAssociation.htm 
5. [TCPIPGuide3] TCPIP Guide - IPSec Security Associations page 2 
ht-tp:// 
www.tcpipguide.com/free/t_IPSecSecurityAssociationsandtheSecurityAssociation-2.ht 
m 
6. [Webopedia1] Webopedia - Network Topologies 
http://www.webopedia.com/quick_ref/topologies.asp 
7. [Webopedia2] Webopedia - 802.11 
http://www.webopedia.com/TERM/8/802_11.html 
8. [Webopedia3] Webopedia - pluggable authentication module 
http://itmanagement.webopedia.com/TERM/P/pluggable_authentication_module.html 
9. [Webopedia4] Webopedia - SNMP 
http://www.webopedia.com/TERM/S/SNMP.html 
10. [Webopedia5] Webopedia - Failover 
http://www.webopedia.com/TERM/F/failover.html 
11. [Webopedia6] Webopedia - Load Balancing 
http://www.webopedia.com/TERM/l/load_balancing.html 
12. [Webopedia7] Webopedia - Watchdog 
http://winplanet.webopedia.com/TERM/W/watchdog.html 
13. [Webopedia8] Webopedia - PCMCIA 
http://www.webopedia.com/TERM/P/PCMCIA.html 
14. [Webopedia9] Webopedia - PC Card 
http://www.webopedia.com/TERM/P/PC_card.html 
15. [Webopedia10] Webopedia - CardBus 
http://ecrmguide.webopedia.com/TERM/C/CardBus.html 
16. [Webopedia11] Webopedia - PCI 
99
http://www.webopedia.com/TERM/P/PCI.html 
17. [Webopedia12] Webopedia - Tunneling 
http://winplanet.webopedia.com/TERM/T/tunneling.html 
18. [Rescomp1] Rescomp SNMP Howto - Overview 
ht-tp:// 
www.rescomp.berkeley.edu/about/training/senior/progs/SNMP-HOWTO/SNMP-HOW 
TO-1.html 
19. [Wikipedia1] Wikipedia - L2TP 
http://en.wikipedia.org/wiki/L2TP 
20. [Wikipedia2] Wikipedia - PPTP 
http://en.wikipedia.org/wiki/Point-to-Point_Tunneling_Protocol 
21. [Wikipedia3] Wikipedia - Firewall (networking) 
http://en.wikipedia.org/wiki/Firewall_%28networking%29 
22. [Wikipedia4] Wikipedia - Packet filter 
http://en.wikipedia.org/wiki/Packet_filter 
23. [Wikipedia5] Wikipedia - TKIP 
http://en.wikipedia.org/wiki/TKIP 
24. [Wikipedia6] Wikipedia - SSL 
http://en.wikipedia.org/wiki/Secure_Sockets_Layer 
25. [Wikipedia7] Wikipedia - Challenge-response test 
http://en.wikipedia.org/wiki/Challenge-response_test 
26. [Wikipedia8] Wikipedia - Challenge-response authentication 
http://en.wikipedia.org/wiki/Challenge-response_authentication 
27. [Wikipedia9] Wikipedia - Roaming 
http://en.wikipedia.org/wiki/Roaming 
28. [Wikipedia10] Wikipedia - Simple Network Management Protocol 
http://en.wikipedia.org/wiki/Simple_network_management_protocol 
29. [Wikipedia11] Wikipedia - Management information base 
http://en.wikipedia.org/wiki/Management_information_base 
100
30. [Wikipedia12] Wikipedia - Abstract syntax notation one 
http://en.wikipedia.org/wiki/ASN.1 
31. [Wikipedia13] Wikipedia - Protocol data unit 
http://en.wikipedia.org/wiki/Protocol_data_unit 
32. [Wikipedia14] Wikipedia - Kernel 
http://en.wikipedia.org/wiki/Kernel_(computers) 
33. [Wikipedia15] Wikipedia - User space 
http://en.wikipedia.org/wiki/User_space 
34. [Wikipedia16] Wikipedia - Webmin 
http://en.wikipedia.org/wiki/Webmin 
35. [MLIP1] ML IP - Network Address Translation (NAT) 
http://www.ml-ip.com/html/support/glossary.html 
36. [Vigyan1] Vigyanprasar website - what does HAM really mean? 
http://www.vigyanprasar.com/ham/MEANING.htm 
37. [Imms1] Insurance Marketing & Management Services - Cyber-Glossary 
http://www.imms.com/cyberglos/ 
38. [ITSecurity1] ITSecurity.com Dictionary - Spoofing 
http://www.itsecurity.com/dictionary/spoof.htm 
39. [ITSecurity2] ITSecurity.com Dictionary - Sniffer 
http://www.itsecurity.com/dictionary/sniffer.htm 
40. [FFIEC1] Federal Financial Institutions Examination Council - Glossary 
http://www.ffiec.gov/ffiecinfobase/booklets/information_security/08_glossary.html 
41. [Cryptomathic1] Cryptomathic Labs - Technical Dictionary 
http://www.cryptomathic.com/labs/techdict.html 
42. [Stallion1] Stallion Support Services - Glossary of Terms 
http://www.stallion.com/html/support/glossary.html 
43. [ZIDDokus1] ZID Dokus - Glossary of ATM Terms and Acronyms 
http://www.edvz.uni-linz.ac.at/dokus/atm.html 
101
44. [Devx1] DevX - Wireless Glossary: 1G 
http://www.devx.com/wireless/Door/11259 
45. [Devx2] DevX - Wireless Glossary: 2G 
http://www.devx.com/wireless/Door/11263 
46. [Devx3] DevX - Wireless Glossary: 2.5G 
http://www.devx.com/wireless/Door/11264 
47. [Devx4] DevX - Wireless Glossary: 3G 
http://www.devx.com/wireless/Door/11265 
• Standards, RFCs and lists 
1. [802.1X-2001] Port-Based Network Access Control (802.1X-2001) 
http://standards.ieee.org/getieee802/download/802.1X-2001.pdf 
2. [RFC3748] RFC3748: Extensible Authentication Protocol (EAP) 
http://www.ietf.org/rfc/rfc3748.txt 
3. [RFC1701] RFC1701: Generic Routing Encapsulation (GRE) 
http://www.ietf.org/rfc/rfc1701.txt 
4. [IANA1] Extensible Authentication Protocol (EAP) Registry 
http://www.iana.org/assignments/eap-numbers 
A.3. Various references 
1. [TMobile1] T-Mobile website - Rate Plan 
https://selfcare.hotspot.t-mobile.com/RatePlan.do 
2. [Picopoint1] Picopoint website - frontpage 
http://www.picopoint.com/ 
3. [Picopoint2] Picopoint website - services 
http://www.picopoint.com/services.php 
4. [GBIA1] GBIA website - frontpage 
http://www.gbia.com/ 
102
5. [Planetnl1] Planet.nl website - Wi-Fi-aanbieders lid van NLIP 
http://www.planet.nl/planet/show/id=118880/contentid=422720/sc=f8cf57 
6. [SeattleWireless1] Seattle Wireless - Netgear WG602 
http://www.seattlewireless.net/index.cgi/NetgearWG602 
7. [SeattleWireless2] Seattle Wireless - Linksys WRT54G 
http://www.seattlewireless.net/index.cgi/LinksysWrt54g 
8. [Netgear1] Netgear - GPL Open Source Code for Programmers 
http://kbserver.netgear.com/kb_web_files/n101238.asp 
9. [Linksys1] Linksys - GPL code center 
http://www.linksys.com/support/gpl.asp 
10. [Soekris1] Soekris Engineering - About 
http://www.soekris.com/about.htm 
11. [Tweakers1] Tweakers.net - Pricewatch WLAN access points 
http://www.tweakers.net/pricewatch/cat/314 
12. [Soekris2] Soekris - How to buy 
http://www.soekris.com/how_to_buy.htm 
13. [Soekris3] Soekris Engineering - Bundles 
http://www.soekris.com/bundles.htm 
14. [Netgate1] Netgate - Wireless Mini PCI Cards 
http://www.netgate.com/index.php?cPath=26_34 
15. [KernelOrg1] Kernel.ORG - What is Linux? 
http://www.kernel.org/ 
16. [FreebsdOrg1] FreeBSD.ORG - What is FreeBSD? 
http://www.freebsd.org/ 
17. [SeattleWireless3] Seattle Wireless 
http://www.seattlewireless.net/ 
18. [WirelessLeiden1] Stichting Wireless Leiden 
http://www.wirelessleiden.nl/ 
19. [Tweakers2] Tweakers.net - Nieuws [ XS4All begint rechtszaak tegen Staat om aftapkosten ] 
103
http://www.tweakers.net/nieuws/36491 
104
Appendix B. Used acronyms 
• AAA: Authentication, Authorization and Accounting 
• ACE: Adaptive Communication Environment 
• ACK: Acknowledgment 
• ADSL: Asynchronous Digital Subscriber Line 
• AES: Advanced Encryption Standard 
• AH: Authentication Header 
• AMPS: Advanced Mobile Phone System 
• ASN.1: Abstract Syntax Notation One 
• ASP: Application Service Provider 
• BER: Basic Encoding Rules 
• BSD: Berkeley Software Design 
• BSS: Basic Service Set 
• CBC-CTR: Cipher Block Chaining Counter Mode 
• CBC: Cipher Block Chaining 
• CCM(P): Cipher block chaining Counter Mode Protocol 
• CDMA: Code Division Multiple Access 
• CER: Canonical Encoding Rules 
• CERT: Computer Emergency Response Team 
• CHAP: Challenge Handshake Authentication Protocol 
• CIPE: Crypto IP Encapsulation 
• CPU: Central Processing Unit 
• CRC: Cyclic Redundancy Check 
• CSLIP: Compressed Serial Line Internet Protocol 
• CVS: Concurrent Versions System 
• DBM: Database Manager 
• DER: Distinguished Encoding Rules 
105
• DES: Data Encryption Standard 
• DHCP: Dynamic Host Configuration Protocol 
• DMZ: Demilitarized Zone 
• DNAT: Destination Network Address Translation 
• DNS: Domain Name System 
• EAP: Extensible Authentication Protocol 
• EDGE: Enhanced Data rates for GSM Evolution 
• ESP: Encapsulating Security Payload 
• ESS: Extended Service Set 
• ETACS: Extended TACS 
• FTP: File Transfer Protocol 
• GBIA: Global Broadband Internet Access 
• GIF: Graphics Interchange Format 
• GNU: GNU's Not Unix 
• GPL: GNU General Public License 
• GPRS: General Packet Radio Service 
• GRE: Generic Routing Encapsulation 
• GSM: originally Group Speciale Mobile, now Global System for Mobile communications 
• GUI: Graphical User Interface 
• HAM: The meaning of this acronym is not known, but it relates to amateur radio. See [Vigyan1] 
for more information. 
• HMAC: Hashed Message Authentication Code 
• HTML: Hypertext Modeling Language 
• HTTP: Hypertext Transfer Protocol 
• IBSS: Independent Basic Service Set 
• ICE: Inter City Express 
• ICMP: Internet Control Message Protocol 
• ICT: Information and Communication Technology 
• IEEE: Institute of Electrical and Electronics Engineers 
106
• IETF: Internet Engineering Task Force 
• IPSEC: IP Security 
• ISDN: Integrated Services Digital Network 
• ISO: International Organization for Standardization, the name ISO is actually the Greek word 
iso which means equal. 
• ISP: Internet Service Provider 
• ITU: International Telecommunications Union 
• KCK: Key Confirmation Key 
• KEK: Key Encryption Key 
• KPN: Koninklijke PTT Nederland 
• L2F: Layer 2 Forwarding 
• L2TP: Layer 2 Tunneling Protocol 
• LAN: Local Area Network 
• LDAP: Lightweight Directory Access Protocol 
• LEAP: Lightweight Extensible Authentication Protocol 
• MAC: Message Authentication Code (in the field of cryptography) or Medium Access Control 
(in the field of networking) 
• MAP: Master Access Point 
• MD5: Message Digest version 5 
• MIB: Management Information Base 
• MIC: Message Integrity Check 
• MIMO: Multiple-In Multiple-Out 
• MMS: Multimedia Messaging Service 
• MNO: Mobile Network Operator 
• MPPE: Microsoft Point-to-Point Encryption 
• MRTG: Multi Router Traffic Grapher 
• MSCHAP: Microsoft Challenge Handshake Authentication Protocol 
• MULTICS: Multiplexed Information and Computing Service 
• MVC: Model View Controller architecture 
107
• N-AMPS: Narrow band AMPS 
• NAS: Network Attached Storage 
• NAT: Network Address Translation 
• NLIP: Nederlandse Internet Providers 
• NMT: Nordic Mobile Telephone system 
• NOC: Network Operations Center 
• OSI: Open System Interconnect 
• OSS: Open Source Software 
• P2P: Peer-to-Peer 
• PAE: Port Access Entity 
• PAM: Pluggable Authentication Modules 
• PAP: PPP Authentication Protocol 
• PCI: Peripheral Component Interconnect 
• PCMCIA: Personal Computer Memory Card International Association 
• PDA: Personal Digital Assistant 
• PDF: Portable Document Format 
• PDU: Protocol Data Unit 
• PEAP: Protected Extensible Authentication Protocol 
• PER: Packed Encoding Rules 
• PHP4: PHP: Hypertext Preprocessor, version 4 
• PHP: PHP: Hypertext Preprocessor 
• PKI: Public Key Infrastructure 
• PMK: Pairwise Master Key 
• PNG: Portable Network Graphics 
• POSIX: Portable Operating System Interface 
• PPP: Point-to-Point Protocol 
• PPTP: Point-to-Point Tunneling Protocol 
• PTK: Pairwise Transient Key 
• RADIUS: Remote Authentication Dial-In User Service 
108
• RAD: Requirements Analysis Document 
• RAM: Random Access Memory 
• RC4: Rivest Cipher 4 
• RFC: Request-For-Comments 
• RRD: Round Robin Database (database that stores information without expanding over time, by 
overwriting old information; ie for use with MRTG) 
• RSA: Rivest, Shamir and Adleman 
• RSN: Robust Secure Network 
• SAD: Security Association Database 
• SAP: Slave Access Point 
• SHA1: Secure Hash Algorithm version 1 
• SMS: Short Message Service 
• SMTP: Simple Mail Transfer Protocol 
• SNAT: Source Network Address Translation 
• SNMP: Simple Network Management Protocol 
• SOCKS5: Proxy protocol SOCK-et-S version 5 
• SPI: Security Parameter Index 
• SQL: Structured Query Language 
• SSH: Secure Shell 
• SSID: Service Set Identifier 
• SSL: Secure Socket Layer 
• TACACS+: Enhanced incompatible version of TACACS 
• TACACS: Terminal Access Controller Access Control System 
• TACS: Total Access Communications System 
• TCP: Transmission Control Protocol 
• TDMA: Time Division Multiple Access 
• TGV: Train a Grande Vitesse, English: high speed train 
• TKIP: Temporary Key Integrity Protocol 
• TK: Temporal Key 
109
• TLS: Transport Layer Security 
• TSN: Transition Security Network 
• TTL: Time-To-Live 
• TTLS: Tunneled TLS 
• UDP: User Datagram Protocol 
• UML: Unified Modeling Language 
• UMTS: Universal Mobile Telecommunications System 
• UNIX: originally UNICS, meaning Uniplexed Information and Computing System, later 
changed to UNIX. It was a pun on an experimental operating system in the 60s called Multics. 
• USB: Universal Serial Bus 
• UTP: Unshielded Twisted Pair 
• UWB: Ultra Wide Band 
• VPN: Virtual Private Network 
• WAN: Wide Area Network 
• WAP: Wireless Application Protocol 
• WBA: Wireless Broadband Alliance 
• WBAN: Wireless Body Area Network 
• WDS: Wireless Distribution System 
• WEP: Wired Equivalent Privacy 
• WISP: Wireless Internet Service Provider 
• WLAN: Wireless Local Area Network 
• WPA2: version 2 of WPA 
• WPA: Wi-Fi Protected Access 
• WPAN: Wireless Personal Area Network 
• WWW: World Wide Web 
• XER: XML Encoding Rules 
• XML: eXtensible Modeling Language 
• XSL: XML Stylesheet Language 
110
Appendix C. Extra project information 
C.1. Used tools 
In here, the choice of development and documentation tools is discussed. One general choice (a bit 
as a proof of concept) was to only use Open Source tools in order to complete the project (with the 
exception of the Windows XP OS). One of the most important choices in software tools was the de-velopment 
environment to use. While most development environments (Netbeans, Dev C++, etc) 
aim at a specific use or need, it was a desire to use one which can be used for multiple purposes. 
Having earlier experience with the Eclipse platform made the decision quite easy. While eclipse was 
still in development, by the time the thesis project started it was already quite matured. Eclipse 
would fit to be used as a programmer's editor for various languages (a diversity of languages could 
be needed for this project). But it would also suffice as a general text editor and XML editor. Espe-cially 
this last fact (fitness for XML editing) introduced an interesting possibility, that is, the use of 
DocBook XML and XSL for writing project documentation. The use of DocBook introduced some 
very interesting advantages. Having had some negative experiences with Microsoft Word, such as 
corrupt documents at the end of a project, only strengthened this choice. The fact the report is writ-ten 
in XML means it is always readable, and much more recoverable in case of problems, as op-posed 
to some binary proprietary format. The choice for DocBook meant some external tools would 
be needed in order to be able to generate the documentation. Here it was decided to use java-based 
software (Xalan for parsing the XML, Saxon for transforming into XSL-Formatting Objects, and fi-nally 
Apache FOP for transforming the XSL-FO into PDF), such that platform independence is met 
(just like with Eclipse, which is also written in java) and use of the Windows OS is not dictated. 
Besides documentation tools, design tools needed to be chosen. Platform independence was again an 
important factor. ArgoUML was chosen due to earlier experiences with this tool. One problem was 
however introduced by this choice (as seemed later on): sequence diagrams weren't implemented 
yet. The solution was to use another java program called Sequence, which can translate textual de-scriptions 
of sequence diagrams into graphics in batch. Creating a XSL translator file and DTD 
(Document Type Definition) file made it possible to define the sequence diagrams in XML, which 
would then be translated to the textual syntax of Sequence, which in turn would translate these de-scriptions 
into graphics. This means that most of the thesis project documentation is now based in 
XML and can be translated to other formats in batch, which in the end can be translated to PDF. 
This introduces homogeneity in the documentation process. As such this eases the documentation 
process, both in normal operation as in recovery from possible data corruption. 
Development tools (outside Eclipse) needed to be chosen as well. One important choice was the use 
of a certain concurrent versioning system, such that the development of the project is versioned. 
Many solutions for versioning exist, while only some are well known. Previous experience with the 
CVS versioning directed the desire in this direction. However, CVS has some disadvantages which 
make it less interesting. One such disadvantage is the improper handling of binary files. This is is 
not a huge problem, since everything in the project is text based. One other considerable problem 
however, is the inability to restructure the directories inside a project in the repository. A versioning 
system fixing these problems, and which is actually based on CVS, is Subversion. It was chosen to 
use this versioning system. 
For the actual implementation, it was chosen to use the Debian Linux OS. Linux delivers by default 
111
a very large set of development software, in the form of compilers, assemblers, debuggers, etc. Fur-ther, 
Linux (or any UNIX alike OS for that matter), is very rich in its ability for mass processing of 
text files (i.e. bash, grep, awk, sed, perl, cut). 
C.2. Needed preliminary knowledge 
It is assumed the reader has some basic knowledge of some networking and cryptographic concepts. 
A short overview of each of these concepts will be presented here. 
C.2.1. Networking concepts 
C.2.1.1. TCP/IP and OSI network stacks 
Figure C.1. OSI reference model [Tanenbaum1996] 
Each layer of the network stack performs its own function: 
• 1. Physical: This is the layer that takes care of all physical data traffic. 
112
• 2. Data link: This is the layer that makes the physical layer accessible for software. The data link 
layer takes care of error detection and correction, takes care of identifying individual frames by 
finding their boundaries in one way or another. Networks of data link layers (for example ether-net) 
contain hosts which can all contact each other directly. Hosts on such networks are ad-dressed 
by MAC (Medium Access Control) addresses. 
• 3. Network: The network layer combines various layer 2 networks into one layer 3 network. 
Layer 3 networks are laid upon layer 2 networks, and multiple layer 3 networks are interconnec-ted 
using gateways and routers in order to create large layer 3 networks, such as the Internet. 
Hosts on such networks are identified by IP addresses (at least in the case of the TCP/IP stack). 
• 4. Transport: The transport layer spans one or more layer 3 networks, in order to create host-to- 
host (end-to-end) connections (see the figure above to see the distinction between the layers 1 
to 3 on the one side, and layers 4 to 7 on the other side). In other words, the transport layer only 
deals with the source and destination machine of particular data traffic. Transport layer connec-tions 
are identified by a port or some other identifier. 
• 5. Session: The session layer makes it possible for users on different machines to establish ses-sions. 
The session layer provides ordinary data transport in the same way the transport layer 
does, but adds extra services: dialogue control (half-duplex or full-duplex communication), 
token management (making sure the two sides don't attempt the same operation at the same 
time) and synchronization (inserting checkpoints in the data stream in order to be able to resume 
the data transfer after a crash). 
• 6. Presentation: As stated by [Tanenbaum 1996]: 
"The presentation layer is concerned with the syntax and semantics of the inform-ation 
transmitted." 
The presentation layer is used to perform functions which resolve certain problems which are 
faced by multiple users and which can be solved in a general way. 
• 7. Application: In the application layer is contained a variety of protocols which are commonly 
needed by applications, for example HTTP for web servers and browsers, FTP for file transfers 
and SMTP for email. 
Explained above is the OSI network stack. The TCP/IP stack was developed for the same goal, 
though by different means. The TCP/IP stack is the one used in the former ArpaNet and its suc-cessor, 
the Internet. The main distinctions between OSI and TCP/IP are the fact that TCP/IP doesn't 
define the session and presentation layers, the network layer is called the Internet layer and the data 
link layer and physical layer of the OSI stack are combined into one layer in the TCP/IP stack and is 
called host-to-network layer. 
113
Figure C.2. TCP/IP and OSI network stacks [Tanenbaum1996] 
For a more detailed explanation of these network stacks, refer to [Tanenbaum1996]. 
C.2.1.2. Some (popular) networking terms 
• Spoofing: 
"Impersonating a server or person without permission. Pretending to be someone 
else. The deliberate inducement of a user or a resource to take an incorrect action. 
Attempt to gain access to a system by pretending to be an authorized user. Imper-sonating, 
masquerading, and mimicking are forms of spoofing." [Imms1] 
"Faking the origin; for example, forging mail headers to make it appear that mes-sages 
originated elsewhere. One spoof incident reported by CERT involved mes-sages 
sent to users, supposedly from local system administrators, requesting them 
to change their password to the new value provided in the message. These mes-sages 
were not from the administrators, but from intruders trying to steal ac-counts." 
[ITSecurity1] 
"Web spoofing. Academics at Princeton university published a paper describing 
how easy it is for Web spoofers to produce a 'fake' site that can sit between the 
user and his or her intended destination. Thus spoofers could receive messages 
and then pass them on to the true destination, and could receive replies and pass 
them back to the user. In this way it would be possible to 'filter' valuable informa-tion, 
possibly without the parties concerned ever knowing that it had occurred." 
[ITSecurity1] 
114
A good example of web spoofing in the Netherlands occurred around the start of the 21st cen-tury, 
when the Rabobank online banking website was hacked and visitors of that site were redir-ected 
to an identically looking site, which let the users log in and forward (back and forth) data 
to the real banking website. This way, the hackers could retrieve many logins of the online bank-ing 
system in question, enabling them to withdraw money illegitimately. 
• Sniffing: 
"A program that monitors network traffic. Sniffers are used to capture data trans-mitted 
on a network. The act is called sniffing. Like so many security applications, 
sniffers can be used to either enhance or weaken network security. Intrusion De-tection 
Systems use sniffers to detect suspicious traffic; hackers use sniffers to ob-tain 
passwords." [ITSecurity2] 
"The passive interception of data transmissions." [FFIEC1] 
Sniffing originates on wired networks, where information belonging to a certain person and 
destined for some other system is passed through intermediate systems in order to reach the des-tination. 
This fact introduces the possibility for users of such systems (whether legitimate or ille-gitimate, 
by hacking into the system) to intercept such traffic and have a look at it. Network con-nections 
which are not point-to-point, such as ethernets, also provide for sniffing traffic, since on 
such networks traffic destined for a certain host (for example the gateway to the Internet) gets 
received by all hosts, but normally only the destined host reads and acts on the information that 
was received. This wouldn't be the case if the network device gets put in promiscuous mode by 
the user, which can only be done by the administrator of a system. In that case, the system in 
question reads all traffic on the ethernet, including traffic that wasn't destined for that system. 
Now the problem gets worse on wireless LANs. While it is normally quite difficult to become 
administrator on a system which is also connected to a certain wired network, it is much easier 
to put a privately owned system (i.e. a laptop) in the coverage area of an access point. 
• Tunneling: 
"A technology that enables one network to send its data via the connections of an-other 
network. Tunneling works by encapsulating a network protocol within pack-ets 
carried by the second network. For example, the PPTP technology from Mi-crosoft 
enables organizations to use the Internet to transmit data across a VPN. It 
does this by embedding its own network protocol within the TCP/IP packets car-ried 
by the Internet." [Webopedia12] 
• Encapsulation: 
"Where data is inserted into a different kind of packet so the original packet is hid-den." 
[Stallion1] 
C.2.2. Cryptographic concepts 
Several cryptographic concepts will be mentioned below, including a short description. For a more 
in-depth explanation of these concepts, refer to [Lubbe1997]. 
115
C.2.2.1. Cryptographic aspects and methods 
• Ciphertext: the text that results from encrypting a plaintext. 
• Pseudo-random progression: progression of numbers (zeros and ones) of which the structure is 
as random and unpredictable as possible. 
• Encryption: the process of transforming a plaintext into an encrypted form (called ciphertext), 
which can also be transformed back to its original form (the plaintext). 
• Decryption: the process of transforming a ciphertext back to its original form. 
• Block ciphering: encryption in blocks of a certain size, for example 64 bits in case of DES. This 
is usually used in case of already present data, for example local files which need to be encryp-ted. 
• Stream ciphering: encryption in units, for example per character or per bit encryption. This is 
usually used in situations with streaming data, such as communications. 
• Public key system (asymmetric system): an encryption system with two keys: a public key and a 
private key. Each user has both keys. The public one gets sent to other parties, who will use that 
key for encrypting traffic destined for the owner of the public key. The private key is kept 
private by the user, and is used for decryption. Public key systems are based on two important 
aspects: one-way functions and trapdoor functions. One-way functions are functions which are 
easily calculated, while their inverse isn't at all. Trapdoor functions are actually one-way func-tions 
(encryption), except in this case there is additional information that makes it possible to 
compute the inverse of the function (decryption), the secrecy of that information is what makes 
this system secure. Public key algorithms are usually very slow in their calculations. 
• Public key infrastructure: 
"A public key infrastructure provides an electronic framework - i.e. software and a 
set of rules and practices - for secure communication and transactions between or-ganizations 
and individuals. A PKI is based on asymmetric encryption and digital 
signature technologies. It enables two parties to exchange confidential electronic 
messages and to enter into legally binding agreements over the Internet." 
[Cryptomathic1] 
• Shared key system (symmetric system): an encryption system with one key, the shared secret 
key. This key is shared by everyone who wants to join in the communication. Shared key sys-tems 
usually have very fast algorithms, but are also more insecure, since the probability of leak-ing 
of the key is quite large. 
• Key stream: A key stream is a pseudo-random progression. It is generated by a function, with as 
input parameters a secret key and sometimes also some extra component such as an initialization 
vector. The function initializes itself on the basis of the secret key and the initialization vector, 
and from then on generates (as long as needed) a pseudo-random progression which is to be used 
for the encryption of data. Usually, for additional encryption sessions, the initialization vector 
will be changed linearly and then another key stream is generated. 
116
• Key stream reuse: Generation (and use) of an already earlier generated key stream. For example 
when certain hardware always uses the same secret key and after a reset of that hardware the ini-tialization 
vector is always reset to some default value, then some initialization vectors will oc-cur 
much more often than others, resulting in the same pseudo-random progressions being gen-erated 
over and over, and thus resulting in key stream reuse. This is a potential security threat, 
because if someone (a hacker) notices this, that person can collect all data that was encrypted us-ing 
the same key stream. From all that encrypted data he can try to find what the actual key 
stream was, and since encrypted data is only a combination (in one way or another) of plaintext 
data and a certain key stream, he can deduce what the original plaintext was. 
• Confidentiality: making sure that communications are confidential: only the intended audience 
can take part in the communication. Confidentiality is achieved through encryption. 
• Reliability (integrity): making sure that transferred data arrives at the other end unmodified, usu-ally 
this is achieved using some form of cryptographic authentication. 
• Continuity: making sure that systems can continue operating, communications can continue to 
take place, data can continue to be stored. Attacks that try to influence the continuity of a system 
are usually called Denial-of-Service (DoS) attacks. 
• Key management: a necessary means in order to keep cryptographic algorithms effective. No 
matter how secure an algorithm is, if the keys cannot be kept secure, the cryptographic algorithm 
isn't effective. Key management is an essential part of the entire security scheme. Both in sym-metric 
and asymmetric systems it is needed for several parties to have common keys in order to 
communicate. In the case of asymmetric systems, parties should have the public keys of all other 
parties they want to communicate with. In the case of symmetric systems, parties should have 
the secret key of the communication system they want to have access to. Making sure all in-volved 
parties have all the keys they need in order to be able to communicate is referred to as 
key management. Key management is composed of the following aspects: 
• Key generation: the generation of keys to be used for cryptographic algorithms. The key has 
to be as unpredictable as possible (refer to pseudo-random characteristics), and shouldn't be 
cryptographically weak or semi-weak. 
• Key storage, transport and meta keys: keys shouldn't be stored and transmitted in the clear. 
Both for storage and for transport separate keys should be used. Such keys that secure anoth-er 
key during storage or transport are called meta keys. 
• Key change: one important aspect of cryptographic algorithms is the frequent change of keys 
that are in use. When keys are changed often enough, attacks such as exhaustive key 
searches are (almost) impossible. 
• Key destruction: the destruction of keys when they are no longer in use. Two types of de-struction 
exist: passive and active. Passive destruction is basically letting the power drop 
from the memory chip, obviously this only works for volatile memory. Active destruction is 
performed by overwriting the memory with other contents. In case of volatile memory, one 
overwrite pass is necessary. In the case of non-volatile memory (i.e. magnetic devices such 
as hard disks), multiple overwrite passes are necessary. Depending on the importance of the 
encrypted information well known wipe algorithms, such as the DoD 5220-22.M method (7 
passes) or the Gutmann method (35 passes), can be applied to erase the information. 
117
• Key distribution using asymmetric systems: keys used in asymmetric algorithms are distrib-uted 
using a trusted third party in order to ensure the authenticity of the keys. 
• Key distribution using symmetric systems: keys used in symmetric algorithms are initially 
distributed physically, this means that keys are entered into a system by a person. Any sub-sequent 
keys are distributed using either the previous key, or using a key distribution center. 
In the latter solution, every user has a key which he only shares with the key distribution 
center, and which will be used to receive new keys from the key distribution center. 
• Challenge-response mechanism: 
"A challenge-response test is a test involving a set of questions (or "challenges"), 
that the person or other entity has to answer in order to pass the test. If the person 
or entity provides an adequate response to the challenges, then it is deemed that 
this person or entity has passed the test." [Wikipedia7] 
"In computer security, challenge-response authentication relies on the possession 
of a secret of some sort to perform authentication. A very simple example is ask-ing 
for a password, where the challenge is asking for the password, and the ad-equate 
response is the correct password. This was adequate in the days before the 
Internet, when the user could be sure that the system asking for the password was 
really the system they were trying to access, and that nobody was likely to be 
eavesdropping on the communication channel to observe the password being 
entered. These days, a more sophisticated approach is necessary involving two-way 
authentication, where both the user and the system must each convince the 
other that they know the shared secret (the password), without this secret ever be-ing 
transmitted in the clear over the communication channel, where eavesdroppers 
might be lurking. The way this is done involves using the password as the encryp-tion 
key to transmit some randomly-generated information as the challenge, 
whereupon the other end must return as its response a similarly-encrypted value 
which is some predetermined function of the originally-offered information, thus 
proving that it was able to decrypt the challenge. For instance, in Kerberos, the 
challenge is an encrypted integer N, while the response is the encrypted integer N 
+ 1, proving that the other end was able to decrypt the integer N." [Wikipedia8] 
• Cryptographic protocol: a set of prescriptions that should be followed by parties that want to ex-change 
information in a secure way. 
• Hash functions: a one-way function of which it is impossible to compute the inverse. A set of in-put 
values of variable length is reflected onto a set of output values of fixed length. A desired 
characteristic of hash functions is that such a function should be collision free, meaning that it 
should be (near to) impossible to create two messages which transform into the same hash. 
• Authentication: 
• Message integrity: deals with the fact that messages shouldn't be changed during transit. 
This means that methods are needed to be able to detect if messages have changed during 
transit. 
118
• Entity authentication: deals with ensuring that the other party is who he says he is. (ensuring 
no man-in-the-middle attacks have taken place) 
• Message authentication: basically the combination of message integrity and entity authentic-ation. 
• MAC (Message Authentication Code): implementation of message authentication using a 
secret function instead of a public function like in the case of hash functions, for example the 
use of symmetric algorithms, i.e. DES, in the form of a one-way function. 
• Digital signature: digital proof that someone did perform a certain action, such as sending a 
certain message. This is achieved using public key systems, by having the sender of a mes-sage 
encrypting the message with his own private key (perhaps in addition to encrypting it 
with the public key of the other party). The receiver will then decrypt the ciphertext with the 
public key of the sender. Since the sender is the only one in possession of the private key 
used for the digital signature, he must be the one who sent the message. 
• X.509: 
"Public key certificate standard developed as part of the X.500 directory specifica-tion. 
The X.500 directory specification is a standard for the development of a mul-tipurpose 
directory service that can be part of a global directory available to any-one 
in the world with Internet access. Such a directory is sometimes called a glob-al 
White Pages directory. The X.500 standard was defined by the International 
Telecommunications Union (ITU), and the International Organization for Stand-ardization 
and International Electro-Chemical Commission (ISO/IEC). The X.509 
standard is used for secure management and distribution of digitally signed certi-ficates 
across secure Internet networks." [Cryptomathic1] 
C.2.2.2. Crypto analytic attacks and other attacks 
• Exhaustive key search: in this attack all possible combinations of ones and zeros as cryptograph-ic 
keys are tried, until the right one is found. Usually this is quite difficult for two reasons: the 
number of possible keys is large (usually too large if keys are changed often) and the text that is 
searched for might not be recognized (while perhaps the right key was generated using this at-tack). 
This is not a real crypto analytic attack, since no intelligent searching is applied, such as 
analysis of the structure of the message or statistics of characteristics of the message. 
• Ciphertext-only attack: attack using intelligent search tactics to find the message and/or the key 
where only the ciphertext is available. 
• Known plaintext attack: attack using intelligent search tactics to find the message and/or the key 
where a sniffed plaintext and ciphertext are available. 
• Chosen plaintext attack: attack using intelligent search tactics to find the message and/or the key 
where a chosen plaintext and corresponding ciphertext are available. 
• Birthday attack and birthday paradox: the birthday attack is an attack in which someone 
119
searches for messages M and M' for which holds that h(M') = h(M), where h is the hash function 
in use. The attack is based on the birthday paradox, the paradox that in a group of for example 
23 people, the chance of finding two people that have a birthday on the same is larger than 50%. 
• Man-in-the-middle attack: attack in which a third (invisible) person intercepts traffic between 
two parties, changes the information and retransmits it to the right party, without the two other 
parties knowing. 
120
Appendix D. Project supporting 
documentation 
D.1. Globalplan for Mobidot thesis project 
2005 
The thesis project consists of 32 weeks * 40 hours. This amounts to a total time of 1280 hours to be 
spent for the thesis project, Working times will be: 08:30 - 12:30, 13:00 - 17:00, 18:00 - 22:00 
(monday to friday). From 01-01-2005 till 31-05-2005 and 05-09-2005 till 31-12-2005, monday-, 
tuesday- and wednesday afternoon and monday and tuesday evening will be occupied by another 
job. 
Projects 
• Thesis [Start date: 04-04-2005, Deadline: 31-10-2005] 
• Reports: 
• Implementation of a WIFI service provider independent hotspot network [Deadline: 
31-10-2005] 
• Phases: 
• Project initialization [Deadline: 10-04-2005] 
• Analysis [Deadline: 08-05-2005] 
• Design [Deadline: 12-06-2005] 
• Implementation [Deadline: 28-08-2005] 
• Evaluation [Deadline: 25-09-2005] 
• Project finalization [Deadline: 16-10-2005] 
• Tasks: 
• Presentation [Date: 10-2005] 
• Periods: 
• 04-04-2005 - 01-05-2005 (4 weeks), 40 hrs/week 
• 02-05-2005 - 08-05-2005 (1 week), 60 hrs/week 
• 09-05-2005 - 05-06-2005 (4 weeks), 40 hrs/week 
• 06-06-2005 - 10-07-2005 (5 weeks), 60 hrs/week 
121
• 11-07-2005 - 24-07-2005 (2 weeks), 0 hrs/week 
• 25-07-2005 - 04-09-2005 (6 weeks), 60 hrs/week 
• 05-09-2005 - 16-10-2005 (6 weeks), 40 hrs/week 
D.2. Risk analysis for Mobidot thesis project 
Hazard Likelihood Impact Risk exposure Risk reduction 
approach 
R1 Unavailability 
of resources 
7 7 49 Likelihood re-duction 
R2 Unavailability 
of key client 
personnel 
(Joost, 
Michele) 
3 5 15 Hazard preven-tion 
R3 Technical 
problems 
2 10 20 Contingency 
planning 
R4 Losing project 
contents and 
files 
5 10 50 Contingency 
planning 
R5 Sickness af-fecting 
critical 
path activities 
5 7 35 Likelihood re-duction, 
Con-tingency 
plan-ning 
R6 Sickness af-fecting 
non-critical 
activit-ies 
5 3 15 Likelihood re-duction 
R7 Changes to re-quirements 
specification 
during later 
phases of the 
project 
1 8 8 Likelihood re-duction 
R8 Requirements 
specification 
takes longer 
than expected 
3 3 9 Risk avoidance 
R9 Implementa-tion 
takes 
2 7 14 Risk avoidance 
122
Hazard Likelihood Impact Risk exposure Risk reduction 
approach 
longer than ex-pected 
R10 Implementa-tion 
testing 
demonstrates 
errors or defi-ciencies 
in 
design 
1 10 10 Likelihood re-duction 
R11 Design takes 
longer than ex-pected 
3 5 15 Risk avoidance 
• R1: Make sure all resources are available beforehand. (get all books, etc before they are needed) 
• R2: Early scheduling of meetings 
• R3: Making available backup systems on which can be worked. The target hardware of the 
project itself is low cost and can be bought whenever needed (funds are available) 
• R4: Multiple backup strategies 
• R5: Living healthy, getting enough sleep, using the weekends as time off to do something else 
• R6: Living healthy, getting enough sleep, using the weekends as time off to do something else 
• R7: Incremental prototyping 
• R8: Plan enough or extra time for this phase or part 
• R9: Plan enough or extra time for this phase or part 
• R10: Take enough time for the design, and review it carefully 
• R11: Plan enough or extra time for this phase or part 
Critical path activities: 
• round up of requirements analysis before design 
• round up of thesis project before deadline 
Non critical activities: 
• Transition from design to implementation 
• Transition from implementation to testing 
123
124

Design hotspot With Opensource Tools

  • 1.
    Design and implementationof a hotspot network independent of Wi-Fi service providers E.E.J. Vonk <E.E.J.Vonk@EWI.TUDelft.NL>
  • 2.
    Design and implementationof a hotspot network: inde-pendent of Wi-Fi service providers E.E.J. Vonk Copyright © 2005-2006 E.E.J. Vonk
  • 5.
    Table of Contents 1. Introduction ...................................................................................................... 1 1.1. The assignment ....................................................................................... 1 1.1.1. Problem Description ...................................................................... 1 1.1.2. Project Description ........................................................................ 2 1.2. The problem domain ................................................................................ 2 1.2.1. What is Wireless-Fidelity? .............................................................. 2 1.2.2. History of Wi-Fi ........................................................................... 4 1.2.3. The problems that we are trying to solve ........................................... 6 1.3. Project goal ............................................................................................ 8 1.4. Project approach ..................................................................................... 9 1.5. Social and scientific relevance ..................................................................10 1.5.1. Social relevance ..........................................................................10 1.5.2. Scientific relevance ......................................................................10 1.6. Used terminology and conventions ............................................................10 1.6.1. Terminology ...............................................................................10 1.6.2. Conventions ...............................................................................11 1.7. Document outline ...................................................................................11 2. Analysis ..........................................................................................................13 2.1. Requirements elicitation ..........................................................................13 2.1.1. Purpose of the system ...................................................................13 2.1.2. Scope of the system ......................................................................13 2.1.3. Objectives and success criteria of the project .....................................13 2.1.4. Current System ............................................................................13 2.1.5. Proposed System .........................................................................14 2.2. Further analysis .....................................................................................16 2.2.1. Network topologies ......................................................................17 2.2.2. Defining the actors .......................................................................27 2.2.3. Defining the various uses of the system ............................................29 2.2.4. Defining the data model ................................................................42 3. Design ............................................................................................................45 3.1. Defining the design goals .........................................................................45 3.1.1. Design goals ...............................................................................45 3.2. Design problems ....................................................................................46 3.2.1. Where to put the functionality ........................................................46 3.2.2. Network of multiple access points ...................................................47 3.2.3. Security .....................................................................................47 3.2.4. Hardware and firmware ................................................................47 3.2.5. Configuration deployment .............................................................48 3.2.6. Maintenance and monitoring ..........................................................48 3.2.7. Interoperability ............................................................................48 3.3. Proposed software architecture ..................................................................49 3.3.1. Overview ...................................................................................49 3.3.2. Subsystem decomposition .............................................................49 3.3.3. Hardware/software mapping ..........................................................50 v
  • 6.
    3.3.4. Persistent datamanagement ...........................................................51 3.3.5. Global software control .................................................................52 3.4. Designing the subsystems ........................................................................52 3.4.1. UserManagement subsystem ..........................................................52 3.4.2. Storage subsystem .......................................................................56 4. Implementation ................................................................................................59 4.1. Solutions for the design problems ..............................................................59 4.1.1. Where to put the functionality ........................................................59 4.1.2. Network of multiple access points ...................................................59 4.1.3. Security .....................................................................................60 4.1.4. Hardware and firmware ................................................................67 4.1.5. Configuration deployment .............................................................74 4.1.6. Maintenance and monitoring ..........................................................74 4.1.7. Interoperability ............................................................................79 4.2. Implementation ......................................................................................82 4.2.1. Implementing the management system .............................................82 4.2.2. Implementing the firmware ............................................................84 5. Evaluation .......................................................................................................87 5.1. Test setup .............................................................................................87 5.2. Test procedure and approach ....................................................................87 5.2.1. Development tests ........................................................................87 5.2.2. Pilot tests ...................................................................................88 5.3. Test results ............................................................................................88 5.3.1. The firmware ..............................................................................88 5.3.2. The management system ...............................................................89 5.3.3. Results of system testing ...............................................................89 6. Conclusions .....................................................................................................91 6.1. Project specific conclusions ......................................................................91 6.2. General conclusions ................................................................................92 A. References ......................................................................................................95 A.1. Books ..................................................................................................95 A.2. Articles and other documents ...................................................................95 A.3. Various references ............................................................................... 102 B. Used acronyms .............................................................................................. 105 C. Extra project information ................................................................................. 111 C.1. Used tools .......................................................................................... 111 C.2. Needed preliminary knowledge .............................................................. 112 C.2.1. Networking concepts ................................................................. 112 C.2.2. Cryptographic concepts .............................................................. 115 D. Project supporting documentation ..................................................................... 121 D.1. Globalplan for Mobidot thesis project ...................................................... 121 D.2. Risk analysis for Mobidot thesis project ................................................... 122 vi
  • 7.
    List of Figures 1.1. WLAN with one access point ............................................................................ 3 1.2. Mobidot network with a centralized management system ........................................ 9 2.1. Centralized architecture [Webopedia1] ...............................................................17 2.2. Star architecture [Webopedia1] .........................................................................18 2.3. Bus architecture [Webopedia1] .........................................................................18 2.4. Decentralized architecture [Minar2002] ..............................................................18 2.5. Mesh architecture [Webopedia1] .......................................................................19 2.6. Hierarchical architecture [Minar2002] ................................................................19 2.7. Ring architecture [Minar2002] ..........................................................................19 2.8. Centralized+Ring architecture [Minar2002] .........................................................20 2.9. Centralized+Centralized architecture [Minar2002] ................................................20 2.10. Centralized+Decentralized architecture [Minar2002] ...........................................21 2.11. Tree architecture [Webopedia1] .......................................................................21 2.12. Mobidot Infrastructure Situation 1 ...................................................................25 2.13. Mobidot Infrastructure Situation 2 ...................................................................26 2.14. Mobidot Infrastructure Situation 3 ...................................................................27 2.15. Involved systems, their dependencies and responsible actors .................................28 2.16. Use case diagram group 1 ...............................................................................29 2.17. Use case diagram group 2 ...............................................................................30 2.18. Sequence diagram for use case: CreateNewAccount ............................................31 2.19. Sequence diagram for use case: CreateNewAccount (part 2) .................................32 2.20. Sequence diagram for use case: ManageFirmware (add) .......................................34 2.21. Sequence diagram for use case: ManageFirmware (add, part 2) .............................35 2.22. Sequence diagram for use case: ManageHotspotsAndAPs (view) ...........................36 2.23. Sequence diagram for use case: ManageHotspotsAndAPs (view, part 2) ..................36 2.24. Sequence diagram for use case: ManageConfigurations (edit) ................................37 2.25. Sequence diagram for use case: ManageConfigurations (edit, part 2) ......................37 2.26. Sequence diagram for use case: ManageAccounts (delete) ....................................38 2.27. Sequence diagram for use case: ManageAccounts (delete, part 2) ...........................39 2.28. The data model ............................................................................................43 3.1. Subsystem class diagram .................................................................................49 3.2. Deployment diagram .......................................................................................51 3.3. UserManagementModels class diagram ..............................................................53 3.4. UserManagementGUI class diagram ..................................................................55 3.5. UserManagementControllers class diagram .........................................................56 3.6. ConfigurationStoreSubsystem class diagram ........................................................56 4.1. 802.1X authentication process [Open1X1] ..........................................................65 4.2. Netgear WG602 access point [SeattleWireless1] ..................................................68 4.3. Netgear WG602 access point (internal view) [SeattleWireless1] ..............................68 4.4. Linksys WRT54G access point + router [SeattleWireless2] ....................................69 4.5. Linksys WRT54G access point + router (internal view) [SeattleWireless2] ................70 4.6. Soekris net4801 [Soekris3] ...............................................................................71 4.7. Soekris net4801 (internal view) [Soekris3] ..........................................................71 4.8. SSH tunneling ...............................................................................................79 C.1. OSI reference model [Tanenbaum1996] ........................................................... 112 vii
  • 8.
    C.2. TCP/IP andOSI network stacks [Tanenbaum1996] ............................................ 114 viii
  • 9.
    List of Tables 2.1. Evaluation properties for several network topologies .............................................24 2.2. Use case CreateNewAccount ............................................................................31 2.3. Use case Login ..............................................................................................32 2.4. Use case UseSystem .......................................................................................33 2.5. Use case ManageFirmware (add) .......................................................................34 2.6. Use case ManageHotspotsAndAPs (view) ...........................................................35 2.7. Use case ManageConfigurations (edit) ...............................................................37 2.8. Use case ManageAccounts (delete) ....................................................................38 2.9. Use case PutHotspotDownForMaintenance .........................................................39 2.10. Use case SendNetworkAnnouncement ..............................................................40 2.11. Use case SetupAP .........................................................................................41 2.12. Use case RetrieveUsageStatistics .....................................................................42 ix
  • 10.
  • 11.
    Chapter 1. Introduction This project is called 'Design and implementation of a hotspot network' and forms the second part of the thesis project. It started with a research assignment named 'How to deploy a Wi-Fi service pro-vider independent hotspot network?'. This document will describe the second part of this thesis project. 1.1. The assignment Since a couple of years a lot of new developments have taken place in the field of IT. Two of these (relevant to this thesis assignment) are: • The rise of Open Source Software (OSS). • The rise of wireless Internet access at so-called 'hotspots'. The first development, the rise of OSS, causes the increase of usage of OSS in commercial products. Due to the licensing conditions of OSS, the source code of the commercial software needs to be freely available. This offers interesting opportunities. The second development (the development on which this assignment is based), is the introduction of wireless Internet access. A so-called 'hotspot' is a location that offers wireless Internet access to any-one using a laptop, PDA, etc. The wireless Internet access is based on the 802.11 Wi-Fi standard. Devices conforming to this standard are used more and more in mobile devices such as laptops and PDAs. Public institutions are getting equipped with Wi-Fi (are being transformed to hotspots), such as hotels, restaurants, airports, train stations, trains, but the technology is also available within com-panies. At these locations quick and easy access to the Internet is assured by Wi-Fi technology. A few companies put up and maintain hotspots, such as T-Mobile, KPN and Swisscom. In general these hotspots are composed of a local network and a remote central server. The largest problem is the fact that such systems differ for each Wi-Fi provider and thus are hard to interconnect. Each pro-vider uses its own methods of logging in and has different rules when it comes to the usage of the hotspots. The one might require downloading software in order to use the wireless network, the oth-er might only use readily available hardware and software and is insecure because of that. Mobidot is a company which is run by Joost Hietbrink en Michele Nijhuis, the suppliers of this as-signment. The development of software which manages wireless networks is the core business of Mobidot. It is Mobidot's intention to put up a network of Wi-Fi hotspots, on which Wi-Fi providers can offer Internet access to their customers. 1.1.1. Problem Description Providing a continuous, fast and low cost Internet connection is what competitors are trying to achieve with the deployment of hotspots. To achieve this goal, several problems have to be solved: a user should be able to make use of the hotspot in the same way at each hotspot of each provider. To deploy as much hotspots as possible, the costs for deployment and maintenance of hotspots should be reduced. 1
  • 12.
    1.1.2. Project Description Design an appropriate model for the network architecture of a hotspot. All problems described above should be solved with this model. In more detail this means using OSS and budget hardware to achieve compatibility and cost reduction. Develop a prototype of the network architecture and of a management system that will monitor and manage this architecture. 1.2. The problem domain Around 1995, connectivity (with connectivity in this document is meant: having the possibility to connect to some public computing network such as the Internet) wasn't part of common life. People used to communicate with one another by means of letters, telegraphy and telephone. With the intro-duction of computers this gradually changed. First some computers were connected to create a net-work called ArpaNet, initiated by American military and educational institutions. Later on, in the nineties, the Internet was formed out of the former ArpaNet, connecting computers to each other worldwide, creating a huge network of computers. The Internet introduced connectivity to the home. Anyone with a desktop computer at home was able to connect to anyone else by the Internet, in a matter of minutes. Nowadays, there is again a shift in the field of connectivity. It's not just possible for anyone to connect to the worldwide network, it is possible for anyone to do this from anywhere, and at any time. With the introduction of technologies such as GPRS, UMTS, and Wi-Fi (Wireless-Fidelity), mobile access to the Internet has become possible. The last of these technolo-gies, Wi-Fi (also known as WLAN), will form the basis for this project. 1.2.1. What is Wireless-Fidelity? "How many times have you needed network or Internet access at home and wished you could work in a different room, or even outside, without having to run a long Ethernet cable? How many times have you been in a public spot, such as an airport or hotel, and realized you needed to send a quick e-mail? How many hours have you wasted sitting in conference rooms between meetings while your e-mails pile up?" [Roshan2003] Wireless Fidelity is a relatively new technology which enables people to connect to IP networks (such as the Internet) without any network wires connected to their computer. Wireless digital com-munication is not new, other wireless technologies such as HAM-radio and Aloha have been around for a long period. There were several reasons why these technologies didn't become popular: they were expensive, they were not easy to use (mainly used by specialized individuals and enthusiasts) and they offered a much lower bandwidth compared to wired networks. This all changed with the introduction of Wireless Fidelity (or Wi-Fi). Wi-Fi can operate in two modes: infrastructure mode and ad hoc mode. Ad hoc mode (referred to as IBSS, or Independent Basic Service Set) refers to direct connections between exactly two com-puters, with the same possibilities as a serial cable. Infrastructure mode is the more interesting mode of Wi-Fi: it basically works the same as an ethernet, without using network wires. This mode is what the name WLAN (Wireless Local Area Network) refers to. 2
  • 13.
    Figure 1.1. WLANwith one access point In this mode, several computers can be interconnected, in order to exchange information and data, just like you would on a wired network. One computer in the network could even be designated to be a gateway machine, enabling any computer on the network to access an outside network such as the Internet. In the infrastructure mode, there is a central component, called the access point. Infra-structure mode is also referred to as BSS (Basic Service Set). When multiple access points are used to create one WLAN, this mode is called ESS (Extended Service Set). All computers that wish to have a wireless network connection (from now on called wireless clients), associate (make a con-nection and authenticate) with this access point. This can only be done when the device with Wi-Fi capable hardware is in the range of the access point, which is limited to 300 meters outdoors, and at most 100 meters indoors (depending on the amount of walls that are in between the wireless client and the access point). Once a connection with the access point is established, the wireless client can begin performing network operations, just like in a wired network. And just like on a wired network, clients of wireless networks will have to share the available bandwidth. Wi-Fi introduces advant-ages, some of which include the fact that wires are no longer needed to interconnect all computers of a network. Furthermore, anyone with a portable computer with Wi-Fi capable hardware can connect be part anywhere in the coverage area of the access point and access the local network and possibly also external networks. Wi-Fi is defined in one of IEEE's standards: 802.11. "802.11 refers to a family of specifications developed by the IEEE for wireless LAN technology. 802.11 specifies an over-the-air interface between a wireless cli-ent and a base station or between two wireless clients. The IEEE accepted the spe-cification in 1997." [Webopedia2] 3
  • 14.
    Wi-Fi is knownby many different names. Each of the following names refer to the same base tech-nology, without referring to any particular implementation or specification: Wireless-Fidelity, Wi- Fi, 802.11, WLAN. Further, there are specifications under 802.11 whose names are usually used in order to denote any implementation of such a specification. At this moment there are the following specifications: • 802.11: The original specification of 1997. This specification defines a transmission speed of 1 or 2 MBps and an operation frequency of 2.4 GHz. In most cases, when 802.11 is referred to nowadays, any of the specifications discussed below is meant instead of this original specifica-tion. • 802.11b: This specification was approved by the IEEE in 1999 and defines a transmission speed of 11 MBps and the same operation frequency as 802.11, 2.4 GHz. Originally the term Wireless- Fidelity (or Wi-Fi) denoted this specification, but with the introduction of even newer specifica-tions, this changed. Wi-Fi now refers to the implementation of any of the specifications of the 802.11 standard. • 802.11a: This specification was added in order to achieve a much higher speed than 802.11b: 54 MBps. But in order to achieve this speed, it was chosen to use another frequency band: 5 GHz. This decision meant that existing hardware would be incompatible, and couldn't be used to achieve this speed. • 802.11g: Finally, this specification was added as it was realized that 802.11a wasn't gaining pop-ularity, mainly due to the fact that new hardware was needed. Especially access points offering public access were equipped with hardware implementing the 802.11b standard, and as such weren't able to handle client hardware that implemented the 802.11a standard. To overcome this, the 802.11g standard was devised. This specification defined a speed of 54 MBps in the 2.4 GHz band, which made this standard backward compatible with 802.11b. With hardware implement-ing this specification people were able to both connect to newer access points implementing the 802.11g standards (supporting the 54 MBps transmission speed) and to older access points which only supported 802.11b. 1.2.2. History of Wi-Fi When Wi-Fi was first introduced, it wasn't foreseen it could gain such a popularity it has now. Prob-ably one of the main reasons why Wi-Fi was introduced was its ease of installation and use. It could act as a replacement for wired networks, making it a lot easier to install home networks and (probably even more important) corporate networks. Not having to lay down wires in order to con-nect all computers in a home or office together would mean the installation and maintenance of such a network is much easier, a new network could be installed in a matter of minutes. Sharing an existing Internet connection with several people was an advantage that initiated the pop-ularity of Wi-Fi. People would have the ability, for example, to share their Internet connection with their neighbors. Since the Wi-Fi radio signal has a range of 100 meters and sometimes even up to 300 meters, this could easily be done. The only thing needed is an access point that covers all neigh-bors that want to participate, and having those neighbors acquire a wireless network card for their computer. This setup would give the involved parties one great advantage: since there is one Internet connection used by several parties, the costs for that connection would also be divided among the parties. 4
  • 15.
    This way ofInternet connection sharing more or less lead to another new approach, which was im-plemented mostly by students in some student cities, including Leiden in the Netherlands (see [WirelessLeiden1]) and Seattle in the United States (see [SeattleWireless3]). In this case, access to a certain access point would be freely and publicly available. To denote an area which had coverage of a publicly accessible access point, the term hotspot was introduced (in most cases, a spot is con-sidered to be an infinitely small dot, or at least too small to be a circle or oval. In this case, a hotspot refers to the coverage area of an access point which has a radius of 100 up to 300 meters. Normally this would be called a circle, but in comparison to the size of the already existing Internet, this cov-erage area is indeed very small, and thus called a spot). But this wasn't all, all these hotspots would be interconnected using the same air-to-air interface or possibly some using wires. This would cre-ate a giant LAN (Local Area Network) which introduced the possibility of creating a socialist-type of network: sharing data (music, movies, games, etc) free of charge. This would be very interesting, as it wouldn't be needed to connect to the Internet to find any music or movies. And it would lead to some advantages, such as not incurring high bandwidth costs of normal Internet connections and having a smaller possibility of the file sharing connections being tapped by authorities, risking pen-alties for copyright infringement, etc. Anyone with a laptop would be able to make sure he would be in the coverage area of a hotspot, connect to the network and start sharing data. Like with all good ideas, it didn't take long before a commercial implementation was given birth. It was soon realized that there was a need for Internet access (for business people, students, etc) out-side home, business or university. Some time after a failed start up by Mobistar in the 90's (using the original 802.11 standard), some small parties, called WISPs (Wireless Internet Service Providers), started installing access points (using the 802.11b standard) at public meeting places, such as cafes, restaurants, hotels, libraries, etc. The term hotspot would from then on refer to a public place that implemented a publicly accessible wireless network. The access point would be connected to the In-ternet using either an existing Internet connection, or a new Internet connection would be acquired. Furthermore, the access to the wireless network wouldn't be free of charge, but would be charged for, by the hotel, restaurant, etc. in question. With the introduction of such commercially accessible hotspots, interesting opportunities became possible. It would be possible to place hotspots in restaur-ants along highways which are used a lot by business people. These business people would then be able to make a stop over between one appointment and another at such a restaurant, and be able to check their email, enter information into a corporate system about the last appointment, etc. Or it would be possible to equip hotels with publicly accessible access points, and enable business people staying over at that hotel for a conference to perform tasks that otherwise would have to wait until these people would return from the conference. This commercial approach started small. Most large companies are usually hesitant to take the first steps in a completely new market, in which successful involvement is uncertain. This meant that several small parties first started initiatives, slowly implementing more and more public places with hotspots. Once the business gains were recognized by large corporations (mostly telecommunication providers), these corporations would buy out the small WISPs, to take over their market share, and start expanding from that point on. A good example of this in the Netherlands was Hubhop, which was initiated in May 2002, and by May 2003 was bought by KPN, the largest telecommunication provider of the Netherlands. The buyout of small WISPs by large corporations meant the initiation of a widespread implementa-tion of public hotspots. At this moment, there are three major parties (and some minor parties) in the Netherlands offering Internet access over public hotspots: KPN Hubhop, T-Mobile and Swisscom Eurospot, and each of these parties is independently implementing public hotspots. 5
  • 16.
    1.2.3. The problemsthat we are trying to solve We observe that the Wi-Fi world is fragmented, possibly because Wi-Fi is still an immature techno-logy. We see home user systems being backed by large corporations such as Linksys (daughter com-pany of Cisco). For public hotspot systems we however see no systems from large corporations. No-madix, which is rather expensive (in terms of investments for managers of public institutions which house the public hotspots), is not backed by some large corporation. It has such a dangerous market position, perhaps even more because their systems are quite expensive. In short, there's little to choose from in the world of public hotspot systems. It would be nice to see a more diverse set of systems available, of which this project perhaps could be one. For example, when we look at sys-tems for cellular communication, why do Motorola, Siemens, Nokia and Ericsson all develop mo-bile phones? The technology they provide is not renewing (compared amongst each other), the com-ponents used for the transmissions are quite standard. Their approach to certain usability problems or features however differs greatly. This is where they've got something to gain. The same goes for the world of systems for public hotspots. While the core technology doesn't differ at all between sys-tems (we do want to maintain interoperability, at least the end user expects this), there are possibilit-ies for new systems by focusing on different features and problems. This however is only a market-ing problem/observation. We will now go into more depth as to which technical (and sometimes technical and economical) problems exist. Basically, the problem that we observe is that there's no system that's extensible to a large degree, that supports SNAT circumvention (i.e. adjustments needed in existing infrastructure in order to support management and monitoring of devices), supports zero configuration and which is low cost. SNAT circumvention This plays a role with networking hardware, in the IP layer of the TCP/IP stack, where hardware used in a network is placed behind a NAT-gateway. Before we can fully understand what the prob-lem is, we first need to look at what NAT actually is. "Network Address Translation (NAT) allows computers on a private network to access the Internet without requiring their own global (public) Internet address. NAT modifies outgoing network packets so that the return address is a valid Inter-net host. Return (incoming) packets have their destination address changed back, and are relayed to the client host, thereby protecting the private addresses from public view." [MLIP1] Network Address Translation is usually applied in order to perform Internet Connection Sharing: sharing one Internet connection with multiple clients on an internal network. Since normally each network client should be configured with its own unique IP address, we would run into a problem: the number of external IP addresses that are in possession of a certain person are usually less than the amount of network clients. In order to solve this, the network clients get a private IP address as-signed, an IP address that is not recognized on public networks such as the Internet, it has to be translated to the public IP address of the network gateway (the gateway between the local network and the Internet). When replies of traffic (initiated by a local network client) arrive at the gateway, the destination IP address of the reply is translated back to the private IP address of the respective local network client, and the packet is forwarded to that network client. Two forms of address trans-lation exist: 6
  • 17.
    • S(ource) NAT:the Network Address Translation process that was previously described, it cre-ates the possibility for internal hosts to access an outside network. Furthermore, it makes these hosts unreachable for network devices on any outside network, since the internal hosts are not known by a public IP address, this can either be an increase of security or a problem. • D(estination) NAT: is the process of translating the IP address of traffic that arrives at the gate-way to the IP address of some internal host, and forwarding the traffic to that host. This is inher-ently different from SNAT, since in this case the network traffic doesn't get initiated by the in-ternal host but the external host. DNAT can occur on the transport layer, in which case one or more TCP or UDP ports get forwarded to an internal host. DNAT can also occur at the network layer, in which case all traffic for a certain external IP gets forwarded to an internal host. DNAT can be useful in situations where one might want to place servers behind a NAT-enabled fire-wall, either to decrease the number of needed IP addresses (DNAT on network layer), or to be certain that traffic to such a server is only possible on specified ports (DNAT on transport layer). SNAT only has to be set up for outgoing traffic, replies to such traffic are automatically handled by a NAT daemon which maintains state tables in which logs are kept of all translated traffic. The problem usually plays a role on non-enterprise networks (i.e. home or small to middle sized business networks), where SNAT is applied in order to give several machines access to the Internet. SNAT in itself increases the security of the internal hosts and because the internal machines don't need to al-low incoming connections, they only setup outgoing connections. In most cases no DNAT has been setup in order to make the internal machines reachable, as it is normally desired to have these ma-chines to be unreachable from the Internet. This however is a problem for Mobidot, as Mobidot needs to monitor and access its access points, which it does by consulting certain daemons running on the access points. In other words, we want to circumvent SNAT and make these daemons reach-able from the Internet (but without modifying the configuration of an existing infrastructure). Zero configuration (Plug 'N Play) The problem of zero configuration is one particularly important problem to deal with. It is related to the problem of SNAT circumvention: we don't want to bother the managers of public institutions. It shouldn't be needed for them to do all kinds of configurations, ideally the system would be a zero configuration: the manager places the access point, connects it to the Internet, and the access point then configures itself. Further, due to the fact that we need to connect to the Internet, we might need user credentials if the access point is to be the main gateway. We need to get this information from the manager of the public institution and into the access point. Low cost solution The last problem, with current systems, that should be mentioned is the costs for creating and main-taining a hotspot. Each WISP uses its own hardware, but current systems for such purposes are ex-pensive in three aspects. First, the hardware needed is quite expensive, and leads to a large invest-ment, for the owner of a public location (such as a hotel). The second and third cost aspects are the installation and maintenance costs. Due to the fact that current systems aren't flexible in local net-work layout (the previously discussed problem) and the fact they need to be configured locally for some specific settings, introduces the need for a mechanic, which means extra investment costs. Be-cause hardware is not 'plug 'n play' means a mechanic will be needed for maintenance (read: support contract) also, in the case of problems or in the case of firmware updates of the access point hard-ware. This results into costs much too high for local businesses that want to add Wi-Fi as an extra service beside their core business. Current systems allow for example hotels with rankings of three stars or more to invest in a current Wi-Fi solution. For hotels in the low end of the market there is no such possibility, while the visitors of such hotels (for example backpackers), might just as well (or 7
  • 18.
    even more) beinterested in wireless access. The situation even gets worse due to the fact of the ex-istence of multiple, non-interoperable, WISPs, as will be discussed below. All these costs might lead to a too uncertain return-on-investment, meaning businesses won't invest. Furthermore, there are two problems which in itself don't make the project renewing, but do need to be addressed in this project: Extensibility This isn't a problem that plays a role in competitive systems such as Nomadix, but it does need to be taken into account if a system is to be created which can last. Even though performance is sacri-ficed, extensibility is needed to keep up with the fast development in the world of Wi-Fi. It basically means the entire system should be extensible, i.e. all different parts of the system. Even extensibility in other directions have to be taken into account, for example: can the system that is created be run on different hardware? If the Nomadix system would only run on the current selected set of hard-ware, they would have a problem when that certain piece of hardware is not available anymore. Roaming Each WISP implements the authentication of its users (checking whether a certain user is allowed to use the services of the network) in its own way, which makes roaming difficult. "Roaming is a gen-eral term in wireless telecommunications that refers to the extending of connectivity service in a net-work that is different from the network with which a station is registered. The canonical example of 'roaming' is for cellular phones, when you take your phone to an area where your service provider does not have coverage (e.g., another country). In order for a mobile device to roam to another net-work, a number of processes need to be performed. The first necessity for inter-network roaming is that your service provider must have a roaming agreement with the network to which you have moved. In 802.11 roaming can also mean subscriber mobility or handover within the same network" [Wikipedia9]. This means that users are unable to roam to the networks of other WISPs. When, for example, some hotels are equipped with T-Mobile hotspots and some others with KPN hotspots, then a client who has a KPN Wi-Fi subscription will be forced to find a hotel room in a hotel which equips a KPN hotspot, while his preference for a certain hotel might force him into a hotel which equips T-Mobile hotspots. This might be a problem for certain businesses, which already have a public hotspot, but not with multiple WISPs. Since roaming in many cases is not possible, it would be needed to pay for wireless access more than once, i.e. getting a Wi-Fi subscription with more than one WISP. This is a inconvenience for the user. Clients of for example hotels and restaurants will be more selective. Previously they would select a hotel by its ranking and perhaps its location. Now they will also take into account if they can have access to the network of their WISP. This might result into a drop of clients for certain hotels. The problem with roaming is mainly in combin-ation with the large investment costs. Roaming partnerships, such as Picopoint and Boingo do exist, but these equip expensive hardware and partnership costs as discussed above, and as such the roam-ing problem is not solved. 1.3. Project goal The goal is to design and implement a prototype of the mentioned network architecture, in order to facilitate a solution to the mentioned problem. This will be done using OSS and budget hardware. Some important requirements of this network include user friendliness, scalability, flexibility, com-patibility, robustness and low production costs. 8
  • 19.
    Figure 1.2. Mobidotnetwork with a centralized management system The network architecture needs to be augmented with a management system from which the various hotspots of the network can be monitored and managed. In other words, the goal is to create a prototype of the two parts of the system (firmware that runs on the access points and a management system that runs on the central server) and implement as much requirements as possible. A minimal running system should be delivered, while at the same time designing the system in such a way that enhancements can be implemented easily. The main personal goal in this project is to learn many new things (both in terms of technology and in terms of project approach) as well as to look at various different approaches in solving problems, and try several approaches if the problem occurs multiple time. This relates not so much to the actu-al project contents, but it does relate to the project approach as will be discussed further on. 1.4. Project approach This document describes the thesis project from inception to completion in chronological order. The project is divided into a number of phases. The first phase, the analysis, will look at the system. In this phase the problem domain is identified. The actors which play a role in the system are identi- 9
  • 20.
    fied. An identificationof the use of the system takes place. In the second phase, the design phase, the system is designed on an abstract level. The involved hardware is defined and described. The de-composition of the system into subsystems is described. The assignment of the various subsystems to certain hardware is given. Further, choices regarding persistent storage are also decided upon in the design phase. The design phase is followed by the implementation phase, in which the object design and the actual implementation of the system is performed. Finally the evaluation phase fol-lows, in which the system is tested to see if it meets expectations. Besides the creation of the system, the thesis project consists of the creation of a report documenting the project. The basis for this report (notes, pieces of text, images) is created in-line with the project. The actual creation and finalization of the report takes place at the end of the thesis project. 1.5. Social and scientific relevance 1.5.1. Social relevance Being connected using wireless technologies is becoming more popular every day. More and more people are using wireless technologies every day. Wireless technologies are becoming a part of people's lives, either personally or professionally or both. People are counting on wireless technolo-gies to be able to do their work more efficiently, resulting in a great dependence on these technolo-gies. The fact that the society is becoming wireless connected makes it socially relevant. 1.5.2. Scientific relevance The scientific relevance of this research lies in the same realization as stated before: being connec-ted using wireless technologies is becoming more popular. This popularity can result in a downfall of such a technology if no good structure is thought of to fit it all in. A scientific approach (as op-posed to the economic approaches taken by the various telecom providers) is needed in order to cre-ate a well-structured architecture. The structured approach using academic techniques, the use of OSS and the new way of approaching the problem (top-down: from a general abstract overview to a detailed implementation; as opposed to the bottom-up approach applied by telecom providers: func-tionality is needed somewhere and later on at other places, eventually leading to an integrated, though not well designed, whole) is what makes this project scientifically relevant. 1.6. Used terminology and conventions 1.6.1. Terminology A lot of terms exist in the world of wireless networks, hereby is stated what is meant by each term. First of all a clear distinction needs to be made between access point and hotspot. Access point refers to the hardware device providing wireless access to other networks or to other wireless cli-ents. Hotspot refers to the coverage area of the access point, which usually has a radius of 100 or up to 300 meters. In this area or 'spot' one can get wireless access, but not outside it, i.e. the spot in which one can get access is 'hot'. Furthermore, companies providing Internet services using wireless technologies are called WISPs (Wireless Internet Service Provider), by analogy to ISP (Internet Ser-vice Provider). There is also something which is called 'hotzone'. This refers to another type of ser-vice (which will not be discussed in this document) provided by WISPs. In this case the coverage 10
  • 21.
    area of thehotspot has a radius of several kilometers. 1.6.2. Conventions In this document, references made to other documentation and quotations from other documentation will be denoted by square brackets ('[' and ']') with an identification tag inside that is formed of the author's name, the year in which the document was published (if known) and possibly an integer to denote a sequence if multiple documents exist of the same author and publishing year. Further, not yet defined terms will be defined in-line in the respective document section (as opposed to the use of footnotes, which are unfortunately not supported fully, as described in appendix C.1). Lastly, whenever references in third person are made, the word 'he' is used, in each of these cases 'she' could be meant just as well, unless stated otherwise. 1.7. Document outline This document discusses the thesis project 'Design and implementation of a hotspot network' from inception to completion. It starts with an introduction, in which the problem domain is discussed, followed by a discussion of the project's goal and approach. The document then discusses the various phases of the project, namely the analysis, design, imple-mentation and testing phases. Each chapter will tell about the approach taken to finish a phase. Fur-thermore it discusses the choices that were made as multiple options appeared. There are four chapters discussing the various phases, the analysis chapter (chapter 2), which discusses the require-ments elicitation and the determination of the actors and use cases, the design chapter (chapter 3) the implementation chapter (chapter 4) and finally the evaluation chapter (chapter 5). Finally, in the conclusions the results of the project and some interpretations of these results will be given. The conclusions will also include a general discussion of the study as it was provided by the TU Delft and how it was perceived by the writer of this document. 11
  • 22.
  • 23.
    Chapter 2. Analysis In this chapter the analysis of the Mobidot project is discussed. The requirements elicitation is dis-cussed, in particular, requirements of the project and product. Further, the translation of the problem domain and defined requirements to the definition of a data model and definition of use cases and actors is described. 2.1. Requirements elicitation 2.1.1. Purpose of the system The purpose of the system is to provide public Wi-Fi access to Internet under a user friendly envir-onment. Users have to share bandwidth, and this happens in a fair way. Sign-ups and payments for accounts is made easy. Furthermore, the system will require minimal adjustments to a client's sys-tem, using the system to access the Internet is practically plug and play. Finally, security is provided as much as possible without interfering with the mentioned features. The system will support easy roaming to and from other Wi-Fi networks. It is possible for users from other Wi-Fi networks to use our system, and vice versa. 2.1.2. Scope of the system The scope of the system is quite complex, four parties are involved, each having one or more re-sponsibilities. The main party involved is Mobidot itself. It is responsible for three systems: the central management system, the support department and the development department. Furthermore, zero or more telecommunication providers are involved, either as technology partners or as roaming partners. They supply NAS or VPN servers in order to support roaming. Further, they supply the In-ternet connections needed for the various hotspots and the central management system. The third party that's involved is the group of managers of the public institutions (hotels, etc) housing the hot-spots. They are responsible for housing the Mobidot access points and for a reception desk that can function as a 1st line helpdesk. Finally, there are the clients who visit the public institutions and that use the system. They are responsible for the hardware used to access the system. Further, they are responsible for retrieving an account needed to access the system. 2.1.3. Objectives and success criteria of the project 2.1.3.1. Objectives The objective of the project is to create a working prototype of the system, which will completely implement a small set of important features. The system should be developed in such a way that it can be used in production environments but also can easily be extended with additional features. 2.1.3.2. Success criteria The project is a success when the mentioned set of important features has been implemented within the time constraints described in the global plan (see appendix A) and when the system is designed, implemented in such a way that it can already be deployed successfully in production environments. 2.1.4. Current System 13
  • 24.
    The system tobe developed doesn't replace any existing system, as it introduces new technology to create new possibilities. 2.1.5. Proposed System 2.1.5.1. Overview The system's main function will be the deliverance of paid wireless Internet access to visitors of public places (such as hotels and restaurants). It will do this by means of the 802.11 wireless fidelity protocol. The system will consist of multiple hotspots, which are constituted themselves of one or more APs. These APs will be connected to a central server in a centralized topology (purely central-ized or centralized+ring, etc). The APs will offer the wireless Internet access to the visitors of the hotspots. The central Mobidot system will manage the network of APs by monitoring, by configuring and keeping it up-to-date. Wireless users will need to authenticate themselves before they can use the network, unless they want to visit some particular websites, which can be accessed for free. 2.1.5.2. Functional Requirements • Free websites : The user can visit certain websites (a small amount of informational sites, such as yellow pages, etc) without being authenticated. • Mobidot Wi-Fi accounts : The client creates a Wi-Fi account at the Mobidot login website, and uses a simple pay system such as paid SMS or a 0900 service number to pay for the account and activate it. • Live roaming : Client moves around with his mobile equipment within the hotspot from the cov-erage area of one AP to the coverage area of another, while the Internet connection is kept alive. • Inter-network roaming : A client of another public Wi-Fi provider connects to the Internet using the Mobidot Wi-Fi network by selecting his provider on the central Mobidot system login web-site. • Manager to user communication (one way) : Manager notifies client of an upcoming event by means of a message, sent from the central management system. • Bandwidth adjustment per hotspot : Manager activates a different (as compared to the standard setup) bandwidth sharing setup on one or more APs of a certain hotspot. • Easy new configuration deployment : Manager sets up a new configuration for all or some of the Mobidot hotspots. The new configuration is then automatically applied by all hotspots in ques-tion. • Status overview : Manager visits the 'status overview' page of the central Mobidot system man-agement website where the central Mobidot system shows status and statistical information of all Mobidot hotspots. • Easy firmware updates : Manager uploads new firmware to the central Mobidot system from where it is distributed automatically to all hotspots. 14
  • 25.
    • Account management: Manager manages clients' accounts, such as editing of user information, resetting passwords and deleting accounts. • AP status/statistical information supply : At regular intervals, APs gather status and statistical information (about the network, users, hardware status, etc) and send this information to the central Mobidot system. • Usage statistics logging : The central Mobidot system keeps logs of the usage of the system by users, both in terms of usage duration and data traffic. • Monitoring : The central Mobidot system monitors the Mobidot network by retrieving certain SNMP (Simple Network Management Protocol) information from the APs from time to time. • Web redirection : Users are redirected to the login screen of the system if they try to visit a web-site with their web browser, while they are not authenticated yet. • Mail redirection : The mail agents of users are redirected to the mail server running on the cent-ral Mobidot system, but only if these users have authenticated successfully. • Manageability from central point : Manager manages the Mobidot network from the central Mo-bidot system, using the central Mobidot system management website. • Easy hotspot setup : APs of a certain hotspot configure themselves automatically such that new hotspots can be deployed or existing hotspots extended in a plug and play manner. 2.1.5.3. Non-functional requirements 2.1.5.3.1. User interface and human factors • User friendly access to the system : It should be possible for clients to use the system without (too many) adjustments to their computer system. The user can use the infrastructure without modifying his IP settings. 2.1.5.3.2. Hardware consideration • AP hardware : Hardware is needed for the access points. The APs should support running Linux firmware. • Thin AP hardware : As much functionality as possible should be implemented in the central Mobidot system, instead of in the APs. 2.1.5.3.3. Error handling and extreme conditions • Monitoring alerts : When the central Mobidot system notices that an AP is not announcing its presence anymore and is being non-responsive, the central Mobidot system sends an alert to the manager(s). 15
  • 26.
    2.1.5.3.4. Quality issues • Fair use : Bandwidth as made available by the APs on a certain hotspot is divided (roughly) evenly among all connected users, i.e. it shouldn't be possible for one user to block out another by means of heavy downloads or uploads. • Basic bandwidth availability : A bandwidth of 256 Kbps is made available for the manager of the location (i.e. a hotel) where the hotspot is hosted. 2.1.5.3.5. System modifications • On the fly firmware updates : APs upgrade their firmware automatically by regularly checking in with the central Mobidot system to check for new versions of the firmware. If an upgrade is available, the firmware is automatically downloaded, installed and activated. • Traffic tapping : The system should provide hooks such that tapping network traffic can be setup easily. 2.1.5.3.6. Security issues • Host-to-network layer isolation : Laptops should operate isolated on the wireless network, it shouldn't be possible for laptops to contact each other circumventing the AP and it shouldn't be possible for laptops to contact machines on a possibly existing wired network (to which the AP might be connected). • Optional extra security for users : Privacy of users is protected as much as possible, without having the user friendly access to the system suffer degradation. Either 802.11i should be sup-ported (if it can be supported without requiring users to use it; some hardware might not support it), or optional VPN connections of any type should be supported. • Authentication before system use : Unauthenticated users cannot use the wireless network, be-sides browsing some free websites. • Rogue APs : Rogue APs are detected and (if possible) locked out. 2.1.5.4. Pseudo requirements The system will be written in at least two programming languages, one for the management system and one for the firmware additions. The management system will be programmed in PHP, the firm-ware additions in shell script. 2.2. Further analysis In this section, the second part of the analysis is discussed. Since it's clear we are dealing with a cli-ent- server type of system, we need to choose an appropriate network topology. This will be dis-cussed first, starting with a theoretical discussion about various possible topologies. After this, the 16
  • 27.
    identification of thevarious actors and uses of the system (in terms of scenarios and use cases) from the requirements is discussed, followed by a discussion of the inception of the data model from the use cases. 2.2.1. Network topologies The theory of network topologies is actually based on graph theory of mathematics. Many similarit-ies can be found, and also many algorithms from graph theory are used in network applications that apply a particular topology. When we are talking about network structures and topologies in relation to the objective of this project, there are actually two distinct network structures to talk about. The first one is the network that is formed by the various hotspots and a central Mobidot system, in this document this network will be referred to as Mobidot network. The other one is the network that is formed between mul-tiple access points at one location (a hotel, a train station, etc), this network type will be referred to as 'Mobidot WLAN'. Multiple access points are used when the coverage area of one access point is too small, or when the bandwidth offered by one access point is too small for the amount of custom-ers that want access to the network. Before having an in-depth look at each of the network topologies, first lets have a look a what kinds of network topologies there are in general. [Webopedia1] states: "Topology refers to the shape of a network, or the network's layout. How different nodes in a network are connected to each other and how they communicate is de-termined by the network's topology. Topologies are either physical or logical." According to [Minar2002] there are four basic topologies: centralized, decentralized, hierarchical and ring systems. These topologies can be used by themselves or they can be combined in one way or another to create hybrid networks. [Minar2002] considers topology in terms of the information flow. This means that the information flow that occurs between nodes more or less defines with what kind of network topology we are dealing. Because of this fact we will later on have a look at what kinds of information flows exist within the Mobidot network, in order to be able to choose a network structure. Centralized architecture In a centralized architecture, client machines have to contact a central server in order to get something done. Figure 2.1. Centralized architecture 17
  • 28.
    [Webopedia1] Figure 2.2.Star architecture [Webopedia1] Star architecture The star architecture is a member of the central-ized architectures group, and is realized as a net-work which contains a central hub and several nodes. All nodes (can only) communicate to each other through the central hub. Bus architecture In the bus architecture, nodes are connected to one another through a common bus. This archi-tecture is a special kind of centralized architec-ture, since it's not merely the fact that there can be nodes that play a centralized role in the net-work, but more the fact that the backbone through which the nodes communicate is the centralized part of the network. Figure 2.3. Bus architecture [Webopedia1] Figure 2.4. Decentralized architecture [Minar2002] Decentralized architecture Decentralized systems are essentially pure peer-to- peer systems, thus there is symmetrical com-munication (one node can request something from another and get a response, that other node can also request something from the former node, and get a response also), and all nodes have equal roles. There is no central part in the network, and as such, the availability of the net-work is not dependent on one single machine, while this is an advantage, pure decentralized systems also introduce the problem that there is no central authority. 18
  • 29.
    Mesh architecture Themesh architecture is a concept that comes from graph theory, and denotes a network in which all nodes are connected to all other nodes. Figure 2.5. Mesh architecture [Webopedia1] Figure 2.6. Hierarchical architecture [Minar2002] Hierarchical architecture One of the systems that made the Internet ac-cessible to humans is the Domain Name Service (accessible in the meaning that it is relatively easy to operate). The Domain Name Service (or DNS) is a hierarchical system "where authority flows from the root name-servers to the server for the registered name and often down to third-level servers" [Minar2002]. Ring architecture "A single centralized server cannot handle high client load, so a common solution is to use a cluster of machines arranged in a ring to act as a distributed server. Communication between the nodes coordinates state-sharing, producing a group of nodes that provide identical function but have 19
  • 30.
    fail-over and load-balancing capabilities." [Minar2002] Figure 2.7. Ring architecture [Minar2002] Figure 2.8. Centralized+Ring architecture [Minar2002] Hybrid: centralized+ring architecture "Serious web server applica-tions often have a ring of serv-ers for load balancing and fail-over. The server system itself is a ring, but the system as a whole (including the clients) is a hybrid: a centralized system where the server is itself a ring. The result is the simpli-city of a centralized system (from the client's point of view) with the robustness of a ring." [Minar2002] Hybrid: centralized+centralized architecture In situations where servers themselves are clients to other servers, we are talking about a central-ized+ centralized architecture. For instance 2-tier and multi-tier applications work this way. Figure 2.9. Centralized+Centralized architecture [Minar2002] Hybrid: centralized+decentralized architec-ture "A new wave of peer-to-peer systems is advancing an archi- 20
  • 31.
    Figure 2.10. Centralized+Decentralized architecture [Minar2002] tecture of centralized systems embedded in decentralized systems. This hybrid topology is realized with hundreds of thousands of peers in the FastTrack file-sharing system used in KaZaA and Morpheus. Most peers have a centralized relationship to a "super node," forwarding all file queries to this server (much like a Nap-ster client sends queries to the Napster server). But instead of super nodes being standalone servers, they band themselves together in a Gnutella-like de-centralized network, propagat-ing queries. Internet email also shows this kind of hybrid topo-logy. Mail clients have a cent-ralized relationship with a spe-cific mail server, but mail serv-ers themselves share email in a decentralized fashion." [Minar2002] Hybrid: tree architecture "A hybrid topology. Groups of star-configured networks are connected to a linear bus back-bone." [Webopedia1] Figure 2.11. Tree architecture [Webopedia1] 2.2.1.1. Evaluation properties for choosing network topologies 21
  • 32.
    [Minar2002] presents sevenproperties which can influence decisions in choosing a certain network topology. Whenever a new application is designed, one of the design steps includes the choice of a suitable topology, based on the requirements of the application that is to be developed. These seven properties (as presented by [Minar2002]) are: • Manageability Manageability defines if it is easy to manage the system. Management activities could include updating, repairing and logging. • Information coherence Coherence is defined by Dictionary.com as: "The quality or state of cohering, especially a logical, orderly, and aesthetically consistent relationship of parts." So when we are talking about information coherence, we are talking about pieces of information throughout the system, which have to be or naturally are consistent with each other. In this docu-ment, when a system is said to be coherent, it means information coherence exists in the system, or can be enforced without problems. When talking about information coherence, three aspects play a role: non-repudiation, auditability and consistency. Non-repudiation means that it is not possible for people to send information through the system and later on deny that they sent it. Auditability means that transactions through the system are traceable to an origin. Consistency deals with the fact that certain pieces of information shouldn't contradict with certain other pieces of information in the system. When these aspects are either enforced or readily available by nature within the system, then we are dealing with a system in which information is coherent. Information in a system is said to be not coherent when it is impossible to enforce information coherence without changing the network topology used. • Extensibility Extensibility deals with the fact how well a certain system can be extended with resources (as in information or other data). For example, how easy is it to add a host sharing some files to an ex-isting file sharing network? • Fault tolerance Fault tolerance concerns the immunity of the system to erroneous situations or faults. The more fault tolerant a system is, the more a system can continue to operate without having the user no-tice a fault occurred. • Security Security deals with how easy it is to hack the system, or seen from the other viewpoint, how hard it is to secure the system. • Resistance to lawsuits and politics Is the system easy to shutdown by authorities, for example in media sharing applications? Being lawsuit proof mainly plays a role in popular peer-to-peer file sharing applications, which are un-der pressure of large music and movie production companies. 22
  • 33.
    • Scalability Scalabilityis about being able to enlarge a system to meet demands. It deals with how well the network scales when resources are actually being added to the network. For example can a cer-tain network handle 2000 clients or hosts, or can it only handle 10 clients? Of these seven properties, resistance to lawsuits, extensibility and information coherence will not be reviewed. Resistance to lawsuits doesn't play any role in the choice of network topologies for a cer-tain business application. And since the Mobidot network is not destined to be an information sys-tem, but rather a network access providing system, it won't be dealing with information and as such extensibility and information coherence don't play a role in this case. 2.2.1.2. Evaluation of the various network topologies In order to ease the choice of a network topology, these properties are valued against each network topology set forth by [Minar2002] and [Webopedia1] with a 'good', 'average' or 'bad' designation. Each network topology will be discussed individually, all properties will get a grade depending on the results of the discussion and a summarizing table will be provided at the end of this section. 2.2.1.2.1. Centralized architectures In centralized architectures, there is one central server to which many clients connect. The fact that there is only one server in the system, means that the system is easily manageable, all data is con-centrated at one host and as such only one host needs to be managed. Securing a centralized system is very easy, there is only one host that needs to be protected. Fault tolerance is not achieved in any way in a centralized system. If the central Mobidot system goes down, the network is down, causing the entire system to be unusable. When talking about scalability there are little growing possibilities of the system (hardware might be added, but only a limited amount) without changing the network topology used, thus the scalability of centralized systems is bad. 2.2.1.2.2. Ring architectures Ring architectures are architectures which consist of multiple servers. Since these servers usually have a single owner, these networks act the same as centralized architectures when it comes to man-ageability and security. One of the added advantages of ring architectures over centralized architec-tures is the fact that there is fault tolerance, since multiple servers are doing exactly the same thing. This first of all achieves load balancing, but it also creates the possibility of letting other servers take over the work of a certain server if it goes down, resulting in fault tolerance. Lastly, contrary to centralized architectures, ring architectures scale quite well if well-designed, any number of hosts can be inserted into the ring. 2.2.1.2.3. Hierarchical architectures Hierarchical systems have a clear chain of actions, but usually are owned by various people, making it hard to manage individual hosts of the network. Since nodes in the network usually are owned by multiple individuals, incorporating security into the system is hard. Contrary to centralized architec-tures, hierarchical architectures provide good scalability. On any level of the tree below the root, any number of servers can be added in order to handle the system load. Finally, hierarchical systems are more fault tolerant than centralized systems, but the root of the hierarchical architecture is still a single point of failure. 23
  • 34.
    2.2.1.2.4. Decentralized architectures Decentralized systems consist of multiple systems, which all form an active part of the network. Usually the various hosts in the network are owned by various individuals, making the system hard to manage. Further, for the same reason, a decentralized system is hard to secure. Any host could connect and start to inject bad information or data into the system, because of the fact that there is no central authority. But contrary to centralized systems, decentralized systems are very fault toler-ant, since in essence all nodes are equals, it won't be noticed if one node goes down, since others can take over. Lastly, a decentralized system scales quite well when information coherence is not con-sidered, any number of hosts can be connected without performance degradation (any node that con-nects to the network can from then on provide the same services to the network to again other nodes, and these nodes in turn can do the same) If it would be necessary to keep the information in the sys-tem coherent, algorithms would be needed to achieve this, causing a lot of overhead. "If that over-head grows with the size of the system, then the system may not scale well." [Minar2002]. Since in-formation doesn't play a role in the Mobidot network, information coherence doesn't have to be con-sidered, causing decentralized architectures to scale quite well in that particular situation. 2.2.1.2.5. Hybrid architectures It is impossible to discuss the properties of all possible combinations of architectures, so only a gen-eral overview will be presented here. Combining different architectures, creating hybrid architectures, is usually done to add the advant-ages of one architecture to those of another, trying to get the best of both worlds. For example file sharing applications like Kazaa utilize a hybrid centralized + decentralized architecture. Having a couple of super nodes form a decentralized network, and having this network of super nodes acting as a centralized system to many clients. This gives advantages like manageability of the system, ability to keep the system secure (in essence the super nodes are central and in control of one party), but still the system has the very good fault tolerance of decentralized systems. 2.2.1.2.6. Summary of the evaluation properties Below are presented the evaluation properties as defined and discussed for the various topologies above. Name Manageability Fault tolerance Security Scalability Centralized good bad good bad Decentralized bad good bad good Hierarchical average average bad good Ring good average good average Table 2.1. Evaluation properties for several network topologies 2.2.1.3. The appropriate topology A problem with the system that is to be designed is the fact that the system has a distributed nature, which makes things more complex. On one hand there are the access points which have to be mon- 24
  • 35.
    itored and managed,on the other hand there is the system that manages and monitors the infrastruc-ture. There are three information flows active in the infrastructure: an authentication flow (user try-ing to get access), a user data flow (user making use of the Internet) and a management flow (between the access points and the central managing system). In all situations, the management flow is centralized, since the information is needed centrally in order to manage the system. The other two information flows can however be centralized or decentralized. Before we can make a well-weighed decision in choosing a network topology, we must first know which options there are and discuss the pros and cons of each option. Figure 2.12. Mobidot Infrastructure Situation 1 In the first situation, both the authentication flows and user data flows are decentralized and directly sent to the roaming partner of which the current user is a client. This situation imposes a serious lim-itation: we have no control over the authentication flow. As such we don't know who is active on our networks and we cannot manage these users nor monitor them. For example, we cannot send network announcements to these users in order to inform them about upcoming downtime of the network, due to the maintenance. 25
  • 36.
    Figure 2.13. MobidotInfrastructure Situation 2 In the second situation, both the authentication flows and user data flows are proxied through the central Mobidot system, before they are sent to a roaming partner, if any. Having the user data flow centrally imposes a very large problem: the central server becomes a bottleneck and a single point of failure. Unless the central server is heavily invested in, it will lead to performance problems. Fur-thermore, the central server might need to be setup redundantly on geographically separated net- 26
  • 37.
    works, possibly leadingto high costs. Figure 2.14. Mobidot Infrastructure Situation 3 In the third situation, the authentication flow is setup centrally, i.e. it is proxied through the central Mobidot system before it is sent to the roaming partner in question. The user data flow is however decentralized. In this situation we have combined the pros of the first two options and filtered out the cons of these options. As such, this situation seems to be the best choice. 2.2.2. Defining the actors Having a good look at the system and the environment in which it operates leads to the identifica-tion of four actors. First of all there's the end user, the visitor of for example a hotel who wishes to browse the Internet with his laptop wirelessly (HotspotVisitor). There's the manager of the institu-tion (hotel, restaurant, etc) housing the public hotspot (HotspotLocationManager). This actor is in-volved with the system in two ways. First as an unlimited user (that is, only on his hotspot). Further he manages everything that is needed to operate his hotspot, i.e. the investments for the necessary hardware and the necessary network connections (externally to the Internet, and internally). And in time, he might be responsible for maintaining the portal site (using specialized Mobidot tools) for his specific hotspot. The third actor which is identified is the manager of a WISP with which Mo-bidot has a roaming agreement (RoamingPartner). This actor needs information about the use of the Mobidot infrastructure by its users, in order to be able to bill its users. Finally, there's the technical staff of Mobidot, the Mobidot network managers, who manage and monitor the infrastructure (MobidotNetworkManager). Now let's have a look at the system and its environment. Each involved actor is responsible for a certain piece of the system. 27
  • 38.
    Figure 2.15. Involvedsystems, their dependencies and responsible actors Basically, the HotspotVisitor's hardware (i.e. laptop) depends on the presence of Mobidot access points. The APs together with the needed Internet connection to connect the AP to are the responsib-ility of the HotspotLocationManager. The HotspotLocationManager orders an AP from Mobidot and places it in a strategic location (considering the coverage area of the access point), making sure 28
  • 39.
    it can connectto the Internet. The APs in turn depend on the central Mobidot system, which the Mo-bidotNetworkManager is responsible for. This system is, like the other systems, composed of sever-al parts. One of these is the AAA server. This AAA server (which, amongst other things, performs authentication of users) is in turn dependent on the AAA server of RoamingPartners, whenever users from such roaming partners roam onto the Mobidot network. Both the central Mobidot system and the AAA servers of RoamingPartners depend on an Internet connection, just as the Mobidot APs. Finally, the diagram above also shows a little about the assignment, it shows two parts of the system which are to be developed for this assignment: The Mobidot AP system and the Mobidot management system. 2.2.3. Defining the various uses of the system Taking a good look at the requirements, we can find that most use cases are similar, but not exactly the same. The fact that most use cases are similar means we can quickly design and implement the system, as the same design philosophy that is used for one use case can be used for the others. In this case, there are two groups of use cases. Figure 2.16. Use case diagram group 1 29
  • 40.
    Figure 2.17. Usecase diagram group 2 2.2.3.1. HotspotVisitor use cases The tables below describe the CreateNewAccount use case, the Login use case and the UseSystem use case in detail. The CreateNewAccount use case describes how one retrieves an activation code and uses this code to create a new account. The Login use case describes how one logs in into the system to be able to use the system. The UseSystem use case, finally, describes how one uses the system. For CreateNewAccount a translation into a sequence diagram is provided too. Use case name CreateNewAccount Participating actor(s) Initiated by HotspotVisitor Entry condition 1. The HotspotVisitor starts his laptop and runs his favorite web browser, trying to vis-it a website. Flow of events 2. The AP contacts the AAA server on the central Mobidot system to find out whether the user has logged in successfully. 3. The AAA server returns a false value and the AP redirects the HotspotVisitor to the central Mobidot system login website. 4. The HotspotVisitor activates the "Create a new HotspotVisitor account" function of the central Mobidot system login website. 5. The HotspotVisitor is asked to use a phone/ cellular payment system in order to get an 30
  • 41.
    activation code. 6.[The HotspotVisitor uses the external pay-ment system, which generates and stores an activation code and announces this code to the HotspotVisitor. The activation code (including some extra information, such as the amount that was paid for) is stored in the Mobidot database by the external pay-ment system.] 7. The HotspotVisitor enters personal inform-ation (name, postal address and email ad-dress), a new user name and password, and the activation code into the input form on the "create new account" web page and hits the "Create Account" button. 8. The central Mobidot system checks in the Mobidot database whether this user name is available. 9. The central Mobidot system receives the re-quest, checks whether the activation code is correct by contacting the Mobidot database. When it is, the central Mobidot system re-trieves some additional information from the same table in the Mobidot database (i.e. the amount that was paid for). Exit condition 10. The HotspotVisitor's account is created in the Mobidot database. The HotspotVisitor receives a message confirming the success-ful creation of the account. Table 2.2. Use case CreateNewAccount Figure 2.18. Sequence diagram for use case: CreateNewAccount 31
  • 42.
    Figure 2.19. Sequencediagram for use case: CreateNewAccount (part 2) Use case name Login Participating actor(s) Initiated by HotspotVisitor Entry condition 1. The HotspotVisitor starts his laptop and runs his web browser, in order to visit the central Mobidot system login website. Flow of events 2. The HotspotVisitor enters his login creden-tials in the input form that is presented, and hits the Login button. 3. The AP intercepts the request, interprets the query and queries the AAA server on the central Mobidot system with the provided information. 4. The central Mobidot system AAA server checks whether the login credentials are correct, and if so returns a success message to the AP, else it sends a failure message. It records several details about the login (login status, login time) in the Mobidot database. 5. The AP forwards the response detailing success or failure to the HotspotVisitor. The AP adjusts its firewall tables such that net-work traffic from the HotspotVisitor is al-lowed. Exit condition 6. The HotspotVisitor receives either a failure or success message. In case of a success message, the HotspotVisitor is then authen-ticated and can then initiate the UseSystem and Logout use cases. 32
  • 43.
    Table 2.3. Usecase Login Use case name UseSystem Participating actor(s) Initiated by HotspotVisitor Entry condition 1. The HotspotVisitor was successfully au-thenticated as described in the Login use case and starts his web browser to visit a website. Flow of events 2. The HotspotVisitor's laptop sends the web-site request to the nearest AP. 3. The AP checks whether this user is authen-ticated (by checking with the AAA server in the central Mobidot system), if so, it allows the query to pass. 4. The central Mobidot system forwards the website request to the intended server and the central Mobidot system returns its re-sponse to the AP. 5. The AP forwards the response to the Hot-spotVisitor's laptop. Exit condition 6. The HotspotVisitor receives the website that was requested. The use case keeps re-peating from step 2, unless the HotspotVis-itor logs out from the system. Table 2.4. Use case UseSystem 2.2.3.2. MobidotNetworkManager use cases In this section we will look at various management use cases. These use cases basically describe how one manages a certain type of information. Management of information (in this system) in-volves four basic actions: add, view, edit and delete. Each of these actions are described in the tables below, followed by a translation into sequence diagrams. We will discuss the add action of the Man-ageFirmware use case, the view action of the ManageHotspotsAndAPs use case, the edit action of the ManageConfigurations use case and the delete action of the ManageAccounts use case. Further- 33
  • 44.
    more, we willlook at the use case descriptions of the use cases PutHotspotDownForMaintenance and SendNetworkAnnouncement. Use case name ManageFirmware (add) Participating actor(s) Initiated by MobidotNetworkManager Entry condition 1. The MobidotNetworkManager activates the "Firmware Management" function of the central Mobidot system management web-site. Flow of events 2. The central Mobidot system queries the file system and shows a list of all previously uploaded firmware images to the Mobidot- NetworkManager. 3. The MobidotNetworkManager clicks the Add button and browses to and selects the firmware on his PC he wants to upload. He hits the Submit button. 4. The central Mobidot system then stores the firmware image in a previously configured location in the file system of the central Mobidot system. Exit condition 5. The firmware image is added to the file sys-tem of the central Mobidot system. APs will notice the new firmware within the next hour and update themselves. Table 2.5. Use case ManageFirmware (add) Figure 2.20. Sequence diagram for use case: ManageFirmware (add) 34
  • 45.
    Figure 2.21. Sequencediagram for use case: ManageFirmware (add, part 2) Use case name ManageHotspotsAndAPs (view) Participating actor(s) Initiated by MobidotNetworkManager Entry condition 1. The MobidotNetworkManager activates the "Manage Hotspots" function of the central Mobidot system. Flow of events 2. The central Mobidot system queries the Mobidot database and shows a list with all hotspots to the MobidotNetworkManager. 3. The MobidotNetworkManager clicks on a hotspot he wants to view. 4. The central Mobidot system then fetches all related hotspot information of the selected hotspot from the Mobidot database and shows it to the MobidotNetworkManager. Exit condition 5. The MobidotNetworkManager gets an over-view of all information related to the selec-ted Hotspot, including the collection of APs which are located at that hotspot. Table 2.6. Use case ManageHotspotsAndAPs (view) 35
  • 46.
    Figure 2.22. Sequencediagram for use case: ManageHotspotsAndAPs (view) Figure 2.23. Sequence diagram for use case: ManageHotspotsAndAPs (view, part 2) Use case name ManageConfigurations (edit) Participating actor(s) Initiated by MobidotNetworkManager Entry condition 1. The MobidotNetworkManager activates the "Manage Configurations" function of the central Mobidot system. Flow of events 2. The central Mobidot system queries the Mobidot database and shows a list with all configurations to the MobidotNetworkMan-ager. 3. The MobidotNetworkManager selects some configurations he wants to edit, he then hits the Edit button. 36
  • 47.
    4. The MobidotNetworkManagerchanges the preferred firewall and traffic shaping con-figurations of the selected hotspot configur-ation and hits the Save button. Exit condition 5. The hotspot configuration is updated with the new information. Table 2.7. Use case ManageConfigurations (edit) Figure 2.24. Sequence diagram for use case: ManageConfigurations (edit) Figure 2.25. Sequence diagram for use case: ManageConfigurations (edit, part 2) Use case name ManageAccounts (delete) Participating actor(s) Initiated by MobidotNetworkManager Entry condition 1. The MobidotNetworkManager activates the 37
  • 48.
    "Account Management" functionof the central Mobidot system management web-site. Flow of events 2. The central Mobidot system queries the Mobidot database and shows a list with all users to the MobidotNetworkManager. 3. The MobidotNetworkManager selects some users to delete and hits the Delete button. 4. The central Mobidot system asks the Mo-bidotNetworkManager whether he is sure, the MobidotNetworkManager hits the Yes button. 5. The central Mobidot system then instructs the Mobidot database to delete the selected accounts. Exit condition 6. The selected accounts are deleted from the Mobidot database. Table 2.8. Use case ManageAccounts (delete) Figure 2.26. Sequence diagram for use case: ManageAccounts (delete) 38
  • 49.
    Figure 2.27. Sequencediagram for use case: ManageAccounts (delete, part 2) Use case name PutHotspotDownForMaintenance Participating actor(s) Initiated by MobidotNetworkManager Entry condition 1. The MobidotNetworkManager uploads a new firmware according to the Manage- Firmware (add) use case. Flow of events 2. The AP checks in with the central Mobidot system once every hour in order to check for updated packages and new firmware. It finds a new version of the firmware. 3. The AP puts itself in offline mode in order to prepare for the firmware upgrade. Exit condition 4. All APs are put offline for maintenance. Table 2.9. Use case PutHotspotDownForMaintenance Use case name SendNetworkAnnouncement Participating actor(s) Initiated by MobidotNetworkManager Communicates to/with HotspotVisitor Entry condition 1. The MobidotNetworkManager uploads a new firmware according to the Manage- Firmware (add) use case. 39
  • 50.
    Flow of events 2. The central Mobidot system stores a general message concerning downtime of the sys-tem in the Mobidot database, for each user separately. 3. The browser on the laptop of the Hot-spotVisitor regularly polls the AP for new info. In this case it will find a NetworkAn-nouncement is available, at which point it will download and delete the message and show it to the HotspotVisitor. Exit condition 4. The network announcement is broadcast to all HotspotVisitors. Table 2.10. Use case SendNetworkAnnouncement 2.2.3.3. HotspotLocationManager use cases The table below describes the SetupAP use case in detail. It describes the actions the HotspotLoca-tionManager performs in order to get his Mobidot hotspot working. Use case name SetupAP Participating actor(s) Initiated by HotspotLocationManager Entry condition 1. The HotspotLocationManager has invested in AP hardware from Mobidot. Flow of events 2. The HotspotLocationManager receives the AP hardware and places it in a strategic loc-ation. 3. The HotspotLocationManager intends to connect the AP to the Internet. He turns on the AP, which immediately starts installing itself. 4. The AP checks whether it can get an IP ad-dress by DHCP (automatic configuration). 5. The previous step failed and the AP brings an Internet connection configuration web- 40
  • 51.
    site online. 6.The HotspotLocationManager connects his laptop to the Mobidot AP and starts his web browser to visit this configuration website. 7. The HotspotLocationManager enters his user credentials, which he received from his ISP, which are needed to get an Internet connection. 8. The HotspotLocationManager presses the Save button to store the user credentials. 9. The AP then checks, using the new inform-ation, whether it can get an Internet connec-tion. 10. The AP can successfully connect to the In-ternet. It connects to the central Mobidot system in order to download an installation/ configuration script. 11. The AP runs this script, which then starts installing several needed packages. After the installation phase has finished, the AP starts configuring itself according to set-tings which are stored in the central Mo-bidot system. Exit condition 12. The AP is setup and ready for servicing Wi- Fi users. Table 2.11. Use case SetupAP 2.2.3.4. RoamingPartner use cases The table below describes the RetrieveUsageStatistics use case in detail. It describes how a roaming partner retrieves the usage statistics of its users, who have roamed onto the networks of other Wi-Fi providers. Use case name RetrieveUsageStatistics Participating actor(s) Initiated by RoamingPartner 41
  • 52.
    Entry condition 1.The RoamingPartner activates the "Retrieve Usage Statistics" function of the central Mobidot system. Flow of events 2. The central Mobidot system queries the Mobidot database for usage statistics for all users which belong to the RoamingPartner. Exit condition 3. The central Mobidot system returns the us-age information to the RoamingPartner. Table 2.12. Use case RetrieveUsageStatistics 2.2.4. Defining the data model The previous discussion dealt with various use cases which play a role in the system. These use cases are the basis for the creation of the data model. The use cases describe the system modifying or accessing certain information based on user input. A model is a collection of such information which represents data about a part of the system that is be-ing managed. The essence of the Mobidot infrastructure management system is to manage the vari-ous parts of the system, which means to add, view, edit and delete information. From the use cases we can find which models to manage: user accounts, roaming partners, hotspots, hotspot configura-tions, firewall configurations, traffic shaping configurations, access points and firmware. Each of these objects can be translated directly to a class in the class diagram. Another model also plays a role in the management of the system, which is however not fully managed, but only read and de-leted: the activation code. From the new account creation use case we can find that there is an ex-ternal system used by customers in order to pay for their accounts. This external system adds these payments in the form of activation codes in the Mobidot database, for the users to be able to activate their accounts. Besides the various classes, relations between these classes need to be expressed in the data model. For example each hotspot has one or more access points and exactly one hotspot configuration. Each hotspot configuration has exactly one firewall configuration and exactly one traffic shaping config-uration. From all this information, the data model (the class diagram of the models) can be defined and de-signed, of which the result is shown below. 42
  • 53.
    Figure 2.28. Thedata model 43
  • 54.
  • 55.
    Chapter 3. Design In this chapter the system design is discussed. Which design problems are we facing? Which design goals are we trying to achieve? What hardware and software are available, and which is chosen and why? Further, how is the system decomposed into subsystems and how are they mapped to the vari-ous hardware systems? How are certain problems solved, such as persistent storage of data? After that, a closer look is taken at some subsystems: how are they constructed and why are they construc-ted the way they are? Not everything of the design phase will be discussed, rather, the discussion will focus on choices and decisions, and how these decisions impact the development of the system. 3.1. Defining the design goals For the design goals there were three important considerations to make. First, the thesis project only runs for a limited amount of time. In the case of possible pilot projects, the system preferably would have a minimal working base, as opposed to a complete set of features, but no really working sys-tem. Second, due to the fact the thesis time is limited, the system should be made extensible, in or-der to be able to easily expand the system after the finalization of the thesis project, i.e. to transform the prototype into a production ready system. Third, the requirements as defined during analysis have to be kept in mind. All in all, this results in an extensive set of design goals. In general when it comes to delivery time, functionality can be traded in if needed, in order to have an early delivery time. On the other hand, quality cannot be sacrificed, i.e. the minimal base should do its work well, if it is to be launched as a pilot. Another design goal is usability. One of the most important parts of an infrastructure such as the one being developed now, is that it should be easy to use for the end user, no difficult maneuvers should be needed in order to use it. This notion has some side effects for security. Because native Wi-Fi se-curity is not mature at the moment, in this project it is favorable to drop native security and provide add on security measures (such as VPN possibility) instead. Finally, it was noted that the system needs to be extensible. This means it should be possible to change a current implemented subsystem in order to support another external system (or back-end system) for example. It also means it should be possible to extend the system with new functional-ity. Think for example of the possibility for hotel owners (or hotspot owners in general) to modify the portal web page, which is shown to the hotspot visitor. The hotspot owner could provide inform-ation about his hotel or local information of the town of residence on this portal web page. 3.1.1. Design goals • Usability: It is easy for users to use the Mobidot infrastructure's services. When a non-authenticated user tries to use the system, the system informs the user about the need to login first (unless a free website was requested). • Utility: Bandwidth is divided evenly among active users, and a minimum amount of bandwidth (256 Kbps) is dedicated to the manager of the institution which is housing the hotspot. 45
  • 56.
    • Delivery timevs. functionality: Due to pilot setups of the Mobidot infrastructure, it might be needed to sacrifice functionality in favor of early delivery time. In order to be able to do this, a minimal functional implementation will be focused at, such that a minimal running system is ac-quired (users can login and use the system). • Delivery time vs. quality: Since the pilot setups have to get a working implementation, quality will not be sacrificed in favor of early delivery time, testing is performed as usual. • Security: The system supports the authentication of users, and supports the protection of the pri-vacy of users without sacrificing usability. This means that 802.11i (in particular 802.1X) will not be enabled at this time, as it requires users to use this technology (an AP can only support one Wi-Fi security measure, such as 802.11i, WEP or Open System Authentication at a time). 802.11i is however not supported well yet in some client hardware. Security can be obtained by using VPN technology between supplicant and authenticator. • Robustness: All operations performed by the system which require user input achieve robustness by checking the input of the user and by checking the progress of the operation (rolling back any partial results in case of an overall failed operation). • Availability: The central Mobidot system performs active and passive monitoring in order to be able to keep the availability of the Mobidot infrastructure at a high level. • Fault tolerance: The central management system can run on multiple servers in order to provide fault tolerance. • Extensibility: The system provides hooks so the system can support traffic tapping if needed. • Modifiability: The system is designed in such a way that specific subsystems can be replaced by others without affecting the rest of the system. 3.2. Design problems Now we will take a look at the various design problems which we are facing. Solutions to these problems will be discussed throughout the rest of this document. The solutions to these problems will be discussed in the next chapter, where the implementation of the system is discussed. 3.2.1. Where to put the functionality The first thing we have to look at is the various hardware subsystems of the system, deciding where to put the intelligence of the system. Aspects such as performance and ownership of sources play a role in these decisions. This problem deals with where to implement the various pieces of function-ality of the system. We can do this either in the access points, which are located on the hotspots (hotels, restaurants, etc), or we can choose to implement as much as possible in the central Mobidot system. If we choose to implement everything in the access points this might have some negative implications. First of all, if the access points are going to be Linux based, then any additions to the firmware of the access points falls under the GPL (General Public License), just as the firmware it-self. As such, this means the sources of the additions have to be shared with the general public if the access point with the firmware is to be sold to other parties (as opposed to using it only internally). Second of all, the firmware might become heavy in terms of resource usage and this might negat- 46
  • 57.
    ively affect performance.On the other hand, we cannot implement everything on the central Mo-bidot system, since we need to have some minimal running system on the access points. All in all, for all pieces of functionality individually, one must choose where to implement this. 3.2.2. Network of multiple access points A different problem to look at is the structure of the wireless network at one hotspot location. In most cases, a hotspot will be small enough to be handled by one access point. It might however, be possible for a hotspot to need more than one access point in order to have coverage on the entire loc-ation, this might for example be the case with camp sites. The problem to solve here is how we des-ignate the various access points. Do we manage them all as stand alone units, or do we look at them from a master-slave point of view, i.e. do we designate one as a master and the rest as slave? In the latter case, we would manage the master access point from the central management system, and the rest from the master access point (preferably automatically while managing the master access point). In the former case, we would manage each access point as though it is the only access point for that hotspot. In this case, we need to implement less in the access point itself, which relates to a problem discussed earlier. Related to this problem is the choice of how to interconnect the various access points. It is possible to interconnect them using an UTP network, but this has a substantial disad-vantage: it needs a wired network. It would be much more elegant to interconnect the access points using a technology they have already on board: wireless IP technology a.k.a. 802.11. In this case the limiting factor is performance: can we use the wireless channels both for interconnection of access points, as well as transport of user data, and still provide a reasonable throughput for user data? 3.2.3. Security Another problem, which had quite much coverage in the media, is security. It is quite well known by now that existing security measures for wireless 802.11 based networks are not sufficient or inef-fective all together. New approaches are undertaken to create new security measures for 802.11 based networks, and these approaches are described in the 802.11i standard. The standards describ-ing these approaches are however still not finalized, meaning we are currently in a sub-optimal situ-ation: we know existing security measures are ineffective, and we know that new solutions are avail-able, but aren't finalized yet, meaning that it's not incorporated into hardware on a large scale (changes to the draft standard would make that hardware unusable), especially in client hardware. If it is incorporated however, it is done so based on a certain version of the draft standard, and this could potentially make an access point of one brand incompatible with one of another brand. All in all, we can choose to apply 802.11i security measures, which means we exclude a group of clients from having access to our systems. On the other hand, we could choose to give only minimal native security support, but provide security add-ons, such as the ability to create a VPN (Virtual Private Network) between the client hardware and the access points. 3.2.4. Hardware and firmware A different problem is the choice of certain hardware to use as access points, and the choice of using a build root from a specific distributor. A build root is a directory structure which is filled with all sources needed to create the firmware, i.e. sources for the build tools and sources for the software which needs to run on the firmware. At first, a build root is only available from the vendor of the particular hardware solution, but later on alternatives may arise, due to the fact that some hardware solutions are Linux (GPL) based. One needs to choose between various hardware based on specific 47
  • 58.
    needs. Further, oneneeds to choose between possibly various build roots, usually based on which software tools are already available within the firmware. But the choice is also based on the flexibil-ity of the firmware. Is it easily extended? How easy is it to remove existing features in order to make room for new features? How easy is it to perform upgrades once the firmware is running in produc-tion? These questions need to be answered for available build roots, in order to make a well in-formed choice. 3.2.5. Configuration deployment We also need to deal with another problem, namely the deployment of configurations on the various access points. Due to the fact that the access points run off-site, they need to be self-maintaining, and this means that configurations for various software tools need to be deployed automatically. Such configurations include firewall scripts, traffic shaping scripts, etc. Some of these configura-tions are globally the same, some are specific for each access point. We need a way to easily deploy these configurations at each access point, including the knowledge of which access point we are dealing with. Another question is whether all configurations can be deployed automatically. For some configurations it might be needed to get settings from the manager of the location hosting the hotspot, and this information might be privacy sensitive. One could choose to maintain such settings on a central server, and possibly encrypt it. But then it is still easily vulnerable to theft. One could also choose to have the manager of the hotspot location enter the information manually into the ac-cess point, while the access point is installing itself for the first time (on site). 3.2.6. Maintenance and monitoring Reachability of the access point (the SNAT circumvention problem as discussed in the first chapter) is another problem to deal with. In most situations, the access point will be the device in the network which will connect to the Internet, making it directly reachable for outside devices. It is however possible for devices to be placed deeper inside an already existing network. In this case there are two possibilities: the first possibility is the device to have a non-private Internet IP address, in which case the access point is also directly accessible. The other possibility, which is much more common, is that the access point receives an IP address from a private range (which means these IP addresses are not usable for Internet traffic, but only for local IP traffic), and the device's address is translated (Network Address Translation) at the gateway. In this case our access point is not directly reachable. If we want to connect to the access point from our central management server, certain rules have to be setup on the gateway or some kind of permanent tunnel through the firewall should be setup in order to make the internal machine (in this case an access point) reachable from the Internet. This problem exists for various protocols, i.e. for remote command shells, such as SSH (Secure Shell), but also for the monitoring protocol SNMP (Simple Network Management Protocol). For the latter protocol, it is needed to run an agent on the device which is being monitored, this agent needs to be talked to by a central monitoring daemon, where the monitoring daemon initiates the conversation (as a client). These protocols could not be used if no special measures would be taken. 3.2.7. Interoperability The last problem to address is the problem of interoperability with other WISPs. We want to allow customers of these WISPs access to our wireless networks, if we have a roaming agreement with such a WISP. The first problem is how to authenticate these users. In general for authentication pur-poses an AAA server (Authentication, Authorization and Accounting) is used. There are three types, 48
  • 59.
    with several existingimplementations in some cases: RADIUS, TACACS+ and Diameter. So the problem to solve here is which AAA server to use, and whether or not to maintain interoperability with other AAA server types, if it is even possible for that matter. 3.3. Proposed software architecture 3.3.1. Overview The system's architecture is basically composed of two components: the central Mobidot system and the AP. There's one central Mobidot system and there are one or more hotspots containing one or more APs. 3.3.2. Subsystem decomposition The subsystem decomposition is aimed at a split in three parts of the functionality of the manage-ment system. The first part, StorageSubsystem, takes care of storing information. The second and third parts, the UserManagementSubsystem and HotspotManagementSubsystem, take care of the core functionality of the system: dealing with user related tasks respectively dealing with hotspot re-lated tasks. The remaining subsystems aren't modeled in UML since they are either external from the system (but important enough to mentioned), or they cannot be modeled in UML (due to the nature of the subsystem; i.e. the chosen programming language). They will be discussed in the hard-ware/ software mapping section. Figure 3.1. Subsystem class diagram StorageSubsystem The StorageSubsystem is responsible for all stor-age related tasks. It stores all information that needs to be stored, to be retrieved, or both: activ-ation codes, configurations, firmwares, hotspot and access points, roaming partners and users. 49
  • 60.
    UserManagementSubsystem The UserManagementSubsystemis responsible for user-oriented tasks: logging users in and out, automatic re-authentication when a user roams, sending network announcements to users, usage administration for both Mobidot users and ex-ternal users, management of accounts by the ad-ministrator, creation of new accounts by the user, increments of the account balance by the user and finally checking whether the user is logged in, in the case of normal system use. HotspotManagementSubsystem The HotspotSubsystem is responsible for bring-ing the hotspots up and down on demand, providing status overviews to the MobidotNet-workManager and performing configuration up-dates and firmware upgrades. 3.3.3. Hardware/software mapping All subsystems defined above will be part of the central management system, and as such will be mapped to the central Mobidot system. There are some remaining subsystems, which will be dis-cussed below: FirmwareSubsystem This subsystem is the base subsystem of the APs. It is the OS that runs on the APs. It takes care of all of the AP's activities (such as routing traffic, authenticating users, letting users roam, logging off users). To perform Mobidot specific tasks it depends on the SNATCircumventionSubsystem, the AutoConfigurationSubsystem, and the AutoInstallationSubsystem. SNATCircumventionSubsystem This subsystem takes care of the SNAT circum-vention problem, by setting up everything that is necessary for it. AutoConfigurationSubsystem This subsystem is responsible for the configura-tion of the AP. This includes firewall configura-tions, traffic shaping configurations and some general configuration settings. To achieve a zero configuration setup, these configurations are per-formed automatically in coordination with the central Mobidot system. AutoInstallationSubsystem This subsystem is responsible for installing the needed software packages on the AP in order to support the other subsystems on the AP. It also responsible for keeping these software packages up to date. CaptivePortalSubsystem This subsystem is responsible for providing fa- 50
  • 61.
    cilities for theuser to identify himself to the sys-tem. ExternalCommSubsystem The ExternalCommSubsystem is responsible for communication with external systems, such as an external payment system which generates activa-tion codes. This subsystem will be used both by the subsystems of the central management sys-tem and of the AP. It will be part of the central Mobidot system, as that eases the implementa-tion of the system. Figure 3.2. Deployment diagram Note: subsystems denoted with square brackets ('[' and ']') will be implemented in this project, but cannot be modeled in UML. Subsystems denoted with angle brackets ('<' and '>') will be implemen-ted using existing software packages. 3.3.4. Persistent data management For the persistent data management it was necessary to choose an appropriate storage back end for storing several types of information. For most types of information the MySQL database is found to be the best choice, mainly due to its speed, its ease of implementation (no custom storage structure has to be defined, only a set of attributes per information type has to be defined), its ability to easily execute complex queries and finally its ability to easily support concurrent accesses. UserStoreSubsystem The UserStoreSubsystem is responsible for stor-ing user related data (i.e. the list of UserAc-counts which are collected in the UserAccount- Collection). RoamingPartnerStoreSubsystem The RoamingPartnerStoreSubsystem is respons-ible for storing the list of ExternalWifiProviders (RoamingPartnersCollection) with which Mo-bidot has a roaming agreement. HotspotStoreSubsystem The HotspotStoreSubsystem is responsible for storing hotspot related data (the list of Hotspots and APs in HotspotCollection). 51
  • 62.
    ConfigurationStoreSubsystem The ConfigurationStoreSubsystemis responsible for storing configuration data which is used by hotspots. The configuration data is composed of general configuration data, firewall configuration data and traffic shaping configuration data (the list of HotspotConfigurations in HotspotConfig-urationCollection, the list of FirewallConfigura-tions in FirewallConfigurationCollection, and the list of TrafficShapingConfigurations in Traffic- ShapingConfigurationCollection). ActivationCodeStoreSubsystem The ActivationCodeStoreSubsystem is respons-ible for retrieving activation codes which were generated by some external payment system. It deals with ActivationCodeInfos which are part of the ActivationCodeCollection. FirmwareStoreSubsystem The FirmwareStoreSubsystem is responsible for storing new firmware, which will be retrieved by the access points by means of some file transfer protocol. Due to the fact we are dealing here with mostly files and no structural information, it was chosen to store the firmware in a plain file system, using the file names of the firmware for storing any extra information (such as version numbers, etc). The subsystem deals with AP-Firmwares which are part of the APFirmware- Collection. 3.3.5. Global software control The server software for the Mobidot infrastructure will be implemented as a web service provider, meaning that each request for information instantiates a new instance of the server software. This means that two distinct requests are serviced by two separate processes which cannot (at least at this moment) share anything (such as memory, control flow, etc). 3.4. Designing the subsystems In this section the design of the subsystems will be discussed. We will take a look at the partitioning of the base subsystems into packages and we have a look at the basic functionality of each package. Due to the fact that the HotspotManagementSubsystem is practically designed the same way as the UserManagementSubsystem, we will only take a look at the UserManagementSubsystem. Further, due to the fact the partitioning of the StorageSubsystem has already been discussed above (Persistent data management), we will only discuss the design for the StorageSubsystem. 3.4.1. UserManagement subsystem We will now have a look at the design of the UserManagement subsystem. As said before, the User- 52
  • 63.
    ManagementSubsystem and HotspotManagementSubsystemhave been designed with the same reas-oning. The first thing to discuss is the partitioning of the subsystem in packages. The subsystem has been partitioned in three packages: Controllers, GUI and Models. The Model-View-Controller ar-chitecture forms the basis for this partitioning. For this project this architecture has been slightly modified. One of the reasons for this is the fact that the application is not a normal GUI application. Instead it is a web application which is initiated upon an incoming request from a web browser. After this sole request is handled, the instance of the application is terminated and the application server will wait for new requests. This means that no event handling takes place and that a sequence of interactions with the user is handled by as many instances of the application. For the MVC archi-tecture this means that there's no subscribe/notify protocol. Further, since there's no active instance of the application, each request is initiated by a Dispatcher class, which in turn calls the GUI. This GUI in turn calls the Controller. From this point on the MVC is the same as usual. For the sake of simplicity, the View is implemented by the GUI also, which actually means that when the GUI calls the controller it waits for the output as delivered by the controller. When the GUI receives this out-put, it sends it to the user. 3.4.1.1. UserManagementModels package Figure 3.3. UserManagementModels class diagram 53
  • 64.
    The models havebeen designed with especially one goal in mind: easy expandability. It is preferred that models are as autonomous as possible. One well known way of abstracting the internals of a model is by the use of get/set methods (in the diagram above denoted by the general names getAT-TRIBUTE() and setATTRIBUTE(), as there are quite a few attributes to get and set). In addition to this, check methods have been created. These methods perform various checks on the contents of a particular attribute, perhaps to check whether it has a valid value, whether the value is within a cer-tain range or whether it contains valid characters. Each model has a global check() method, which in turn calls all defined check methods of the model. When, for example, the data of the model has to be stored in a database, this method can be called first to check upon validity of the data. Furthermore, each model has an update() method and a toDataArray() method. The update method updates several attributes of the model at once. It accepts a well-formed associative array (array in-dexed by strings), of which the indexes are taken to be the attribute names, and the values are taken to be the new contents of the attributes. This method actually calls the set method for each named at-tribute. The toDataArray() method acts like the toString() method which is regularly used in Java. But instead of creating a string representation of the object, it creates the well-formed associative ar-ray that is needed by update(). All this has been done to ease the handling of the models and the storage of the data of the models. This is because the database functions of PHP in fact accept well-formed associative arrays when doing an insert or update query. Furthermore, doing a select query returns a well-formed associative array. In other words, when we want to store a model, we only have to call the toDataArray of a method, and pass the resulting array to the respective database function. When we retrieve data from the database, we can just create a new model and pass the re-turned array to the constructor (which in turn calls update). Besides the models themselves, collection classes are contained within the Models packages. Basic-ally the collections provide methods in order to keep the collections current: add, set (used to update an already existing instance of an item in the collection), get and delete. Besides the basic function-ality, a collection can expose more methods for extra functionality. For example methods which can get an item based on different criteria (getAccountByName), or methods which can set a particular attribute of the models contained in the collection which are not supposed to be manipulated directly (storeNetworkAnnouncement). 3.4.1.2. UserManagementGUI package 54
  • 65.
    Figure 3.4. UserManagementGUIclass diagram As discussed above, the GUI classes perform two functions: getting input from the user, passing it on to the controllers and showing the data of a model to the user. For these purposes the GUI classes expose basically two types of methods: process- and show-methods. For simple use cases a GUI only contains one show and one process method. For management use cases, a GUI contains process and show methods for each basic operation (add, view, edit, delete) if applicable. Furthermore, each GUI contains an init() method which is always called in order to do some preprocessing of the en-vironment as offered by the application server. Based on the situation either only the GUI is shown (when the respective GUI wasn't loaded yet) by init(), or init() first calls the respective process method, followed by a call to the respective show method. When init() finishes, it returns control and its output to the Dispatcher that called him. The Dispatcher then sends the output to the user. 3.4.1.3. UserManagementControllers package 55
  • 66.
    Figure 3.5. UserManagementControllersclass diagram The controllers are the classes which instantiate changes in the state of models. They keep instances of the collections which they maintain, and perform manipulations on the methods contained within these collections. 3.4.2. Storage subsystem 56
  • 67.
    Figure 3.6. ConfigurationStoreSubsystemclass diagram The final subsystem to discuss is the StorageSubsystem. Since all storage packages in the Storage subsystem have been designed with the same philosophy, only the ConfigurationStoreSubsystem will be discussed. The main focus here is the same as for the UserManagementSubsystem: expand-ability. In order to achieve this, it was chosen to implement the storage subsystems using the Bridge pattern. The bridge pattern allows for the storage back end to be reimplemented, for example in or-der to support a new database system, without having to change the front end. This is done by defin-ing an interface in the DatabaseConnector, which is implemented by, in this case, the MySQLCon-nector. Subsequently, the front end can be changed without the need for changing the back end, un-less of course the back end interface appears to lack certain functionality. The functionality exposed by the DatabaseConnector interface is quite basic: it supports the basic operations of a database: get, insert, update and delete. Further, it supports getting the identifiers of all items of the type of information stored by the respective subsystem, in this case configurations. The functionality exposed by the AbstractDatabaseConnectors is the same for most storage subsys-tems: getting, inserting, updating and deleting data in terms of models, instead of in terms of data-base table items. Furthermore, more complex functionality is provided in single functions, for ex-ample for the addition of one configuration, three inserts of DatabaseConnector are performed: one for the HotspotConfiguration, one for the FirewallConfiguration and one for the TrafficShapingCon-figuration. 57
  • 68.
  • 69.
    Chapter 4. Implementation In this chapter the implementation phase of the Mobidot thesis project are discussed. We will look at it in three steps. First we will look at the chosen solutions for the various design problems. Further we will look at the implementation of the management system. Finally, we will look at the imple-mentation of the firmware. The discussion focuses on the choices that were made during implement-ation, especially in the design domain, as changes in the design are needed due to inefficiencies found during implementation. 4.1. Solutions for the design problems In this section solutions for the design problems are discussed. After a discussion about the possible solutions for a problem, one particular solution is chosen and supporting argumentation is provided. 4.1.1. Where to put the functionality The solution to the problem of where to put the functionality or intelligence of the system has been given largely already in the hardware/software mapping paragraph of the design chapter. Due to li-censing issues (the firmware is Linux based, which is available only under a GPL license), it has been chosen to implement as much as possible in the central Mobidot system. A nice side effect of this (if done right) is however also a performance increase. For example proxying web server re-quests for the Wi-Fi login page to the central Mobidot system instead of running a web server on the access point itself eases the load on the CPU of the access points. The main tasks of the access points will include tasks such as providing wireless access and securing the WLAN that they create. Additional tasks such as providing a login page, logging in/out users and maintaining usage data will be performed by the central Mobidot system, having the access points relay such requests to the central Mobidot system (standard software solutions exist for this purpose, i.e. chillispot). 4.1.2. Network of multiple access points When it comes to networks with multiple access points, it has been chosen to designate the access points as stand alone units, instead of using master/slave designations. First of all this eases the design. Second, we only need to create one firmware that fits all purposes. Finally, the result of this choice means networks of multiple access points are readily possible. No additional precautions have to be taken in order to let access points know of each other's presence and to let them cooperate in a master/slave fashion. The only restriction at this point in time is the fact that all access points have to be plugged into an existing wired network, having each serving its own coverage area. Pos-sible future extensions include the use of WDS. WDS stands for Wireless Distribution System. In-creasingly more wireless access point drivers include this technology. WDS creates the possibility of easily setting up an access point as a real wireless router. This means an access point can accept wireless traffic from client hardware (i.e. laptops), and again use the wireless network to transport this traffic to another access point. The last access point in line then hands over the traffic to a router which is connected to the Internet. WDS is also easily configured: only the MAC addresses of the access point peers of a certain access point have to be configured, due to the fact that the rest of the settings have already been configured on the access point while creating the wireless network. 59
  • 70.
    4.1.3. Security "It'sdepressing how often we see that those who don't remember history are doomed to repeat it. When cordless phones and the first analog cell phones hit the market, anybody with a scanner that operated at the right frequency could easily listen to calls not intended for them. The same cycle played out with 802.11 equipment." [Gast2002] The above quotation already gives some clue about the problems with security in wireless networks. At first it turned out that wireless networks weren't secure at all, no thought had ever been given to security while the IEEE 802.11 standard was being devised. "While the current access points provide several security mechanisms, our work combined with the work of others show that ALL of these mechanisms are com-pletely in-effective." [Arbaugh2001] A lot of security mechanisms exist for 802.11 networks, but, as pointed out above, most fail in ac-complishing their goal. Some of the security mechanisms have no or little effect or have a huge management overhead, some of them make the network more insecure then before deployment of the security mechanism, and some of them might only be usable to a certain degree. There are several tasks that have to/can be performed on a wireless network in order to make it (more) secure: • Authentication: "Authentication is any process by which you verify that someone is who they claim they to be. This usually involves a user name and a password, but can in-clude any other method of demonstrating identity, such as a smart card, retina scan, voice recognition, or fingerprints. Authentication is equivalent to showing your drivers license at the ticket counter at the airport." [Apache1] • Authorization: "Authorization is finding out if the person, once identified, is permitted to have the resource. This is usually determined by finding out if that person is a part of a particular group, if that person has paid admission, or has a particular level of se-curity clearance. Authorization is equivalent to checking the guest list at an ex-clusive party, or checking for your ticket when you go to the opera." [Apache1] • Access control: "Access control is a much more general way of talking about controlling access to a web resource. Access can be granted or denied based on a wide variety of criter-ia, such as the network address of the client, the time of day, the phase of the moon, or the browser which the visitor is using. Access control is analogous to locking the gate at closing time, or only letting people onto the ride who are more than 48 inches tall - it's controlling entrance by some arbitrary condition which may or may not have anything to do with the attributes of the particular visitor." 60
  • 71.
    [Apache1] • Keymanagement: Key management relates to the ease of the management of keys used in cryp-tographic algorithms. The easier it is to change any keys that are in use, the better the key man-agement is. • Data integrity and confidentiality: Data integrity and confidentiality relates to the protection of data that travels across the network. It has to be protected from tampering (integrity protection) and from eavesdropping (confidentiality). These concepts will play an important role in determining whether a certain security measure is ap-propriate or not. The distinction between authentication and access control is not always very clear, but for the sake of this project we will refer to authentication as the process whereby a user gets ac-cepted/ rejected by a certain system on the basis of personal non-shared information, such as a user name-password combination. When a shared secret is involved, we will refer to it as access control. The goal of this discussion is not to go into implementation details of the security mechanisms, but merely to give an overview of what is available to secure the Mobidot WLAN, present weaknesses of each and find the best candidate to do the job. 4.1.3.1. Service Set Identifier (Closed Network Access Control) Initially, the Service Set Identifier was meant to identify a network. The access point would broad-cast its name to the surrounding area using beacon frames. A beacon frame is similar to the beacon signals used in aviation, by which a pilot can determine whether he is close to an airport, and which one that would be. The same goes for beacon frames in Wi-Fi: a beacon frame is transmitted by an access point and carries information about that access point such as the name of the network (SSID), a time stamp, supported transfer rates, etc. Such a beacon frame is periodically sent by the access point (by default the interval is set to 100ms), in order to make it possible for wireless clients to find the access point and associate with it. In other words: the beacon frame is the heartbeat of a wireless LAN. Similar as in aviation where a airport would seem to have disappeared if there would be a power outage, an access point would be offline (and thus invisible for radio receivers) if such a beacon frame would not be broadcast for one reason or another. (See [Geier2002] for more informa-tion on beacon frames.) The use of beacon frames makes it easy for people to select the right net-work by just scanning for them. Lucent came up with a security mechanism called Closed Network Access Control which changed the network name into a shared secret, by not having the access point broadcast its network name. This means that only people who know the SSID are able to con-nect. It is false to assume this approach makes the network safe. In order for a client to connect to an access point, he still has to connect to the access point of the network he intends to connect to, meaning he should send along the SSID of the network he wishes to connect to, and this means that the SSID is still sent in clear text. People with the right equipment will be able to sniff such packets from the air, and find out the SSID. This security measure should be treated as stated by [Dismukes2002]: "SSID settings on your network should be considered the first level security, and should be treated as such. In its standards-adherent state, SSID may not offer any protection to who gains access to your network, but configuring your SSID to something not easily guessable can make it harder for intruders to know what ex-actly they are looking at." 61
  • 72.
    For Mobidot it'snot a good choice to implement Closed Network Access Control as it makes it harder for people to connect to the Mobidot WLAN, while one of the main goals of the system is the ease of making connections. 4.1.3.2. Access control lists (MAC address filtering) Each network card (both wireless and wired) is configured with a MAC address. A MAC address is an address in the form of 6 bytes which identifies a specific network card on a network. All MAC addresses are unique, this is accomplished by dividing the MAC address space into several chunks, each chunk getting assigned to a specific vendor. MAC address filtering is based on the identifica-tion by their MAC address. A list of MAC addresses of allowed clients makes it possible to provide access only to those hosts that are mentioned on the list. This would seem like a good security mechanism, if it wouldn't be the case that MAC addresses can be overridden ('spoofed') by software. This means that one could sniff wireless traffic for accepted MAC addresses, and spoof traffic with any valid MAC address found. Another problem of MAC address filtering is the fact that it incurs a large management overhead, since the list of MAC addresses has to be managed by hand. For small networks this might be no problem, but for large networks (such as the Mobidot infrastructure aims to be) this is not feasible. 4.1.3.3. Open system authentication Open system authentication actually is a situation in which there is no authentication, it is the de-fault authentication protocol for 802.11. Simply any client that connects to the access point is al-lowed access. This might seem a strange sort of security, but it enables the possibility of disabling faulty simple authentication systems, and then, for example, enabling more sophisticated authentica-tion schemes such as 802.1X. 4.1.3.4. WEP/WEP+/128-bit WEP and shared key authentication WEP (Wired Equivalent Privacy) is a security mechanism that was devised in order to make wire-less networks more secure (in a wired-equivalent way). WEP has three security goals [Borisov2001]: • Confidentiality: The fundamental goal of WEP is to prevent casual eavesdropping. • Access control: A second goal of the protocol is to protect access to a wireless network infra-structure. The 802.11 standard includes an optional feature to discard all packets that are not properly encrypted using WEP, and manufacturers advertise the ability of WEP to provide ac-cess control. • Data integrity: A related goal is to prevent tampering with transmitted messages; the integrity checksum field is included for this purpose. [Borisov2001] has shown that WEP fails to achieve all three goals. WEP encryption is achieved by combining a shared secret key with an initialization vector. The first problem lies in the fact that the size of the initialization is limited in size to 24 bits, making brute force attacks (attacks in which all possible combinations are tried) feasible (the entire space of 24 bits can be used up in less than half a day with average traffic, resulting in a wrap around of the initialization vectors), this problem is referred to as key stream reuse. [Borisov2001] notes that this problem of key stream reuse is inevit-able. The 802.11 specification recommends against initialization vector reuse, but doesn't prohibit it. 62
  • 73.
    This means hardwareimplementations should accept reused initialization vectors, or risk non-interoperability with 802.11 standard compliant devices. Furthermore, there are certain vectors which are cryptographically weak, which means that the WEP key can be cracked more easily when such initialization vectors are used. Another problem with the initialization vectors is that some hardware always initializes to 0 when being reset, resulting a high-er frequency of certain initialization vectors than others. Lucent has designed in reaction to these ini-tialization vector problems WEP+, or 128-bit WEP as they call it, as an enhancement of standard WEP which uses only 40 bit keys. But this doesn't solve the problem, since the problem is not the key that was used, but the initialization vector. The use of larger keys only makes the amount of bandwidth that can be used smaller, since it takes more CPU cycles to encrypt the traffic, and thus less traffic can be sent or received per second. 4.1.3.5. Broadcast key rotation This is an idea introduced by Cisco, and it is related to WEP. Normally, all traffic on the network would be encrypted using the same key. With broadcast key rotation, the access point utilizes a dif-ferent key for broadcast packets, such as DHCP. These broadcast keys are also short lived, typically 10 minutes or so. The effect of this is that an attacker cannot collect enough packets to crack the WEP key, but the security mechanism is only applicable to broadcast traffic, and not to specific user data traffic. Since this is an idea that was introduced by Cisco, it is proprietary and not widely im-plemented and used, and as such it is not quite usable. 4.1.3.6. 802.1X (EAP, or Extensible Authentication Protocol) In the new standard 802.11i (which will be discussed later on), 802.1X plays an important role, as it takes care of the authentication of users. The new standard 802.11i has not been finalized yet, but 802.1X has already been implemented into 802.11 products in order to already take advantage of it. 802.1X is: "Port-based network access control that makes use of the physical access charac-teristics of IEEE 802 LAN infrastructures in order to provide a means of authen-ticating and authorizing devices attached to a LAN port that has point-to-point connection characteristics, and of preventing access to that port in cases in which the authentication and authorization fails. A port in this context is a single point of attachment to the LAN infrastructure." [802.1X-2001] 802.1X uses EAP (Extensible Authentication Protocol), which is a transport protocol, which is op-timized for authentication purposes. As the name already shows, it is an extensible protocol, in fact, no authentication methods are defined by EAP, such methods still have to be defined. Many of such EAP methods exist: • EAP-MD5: authentication mechanism which uses an MD5 (Message Digest version 5) hash of user name and password in order to authenticate the user. According to [Dismukes2002] EAP-MD5 offers no key management, requiring the use of static WEP keys. This completely disables the enhanced security possibilities of EAP. • L(ightweight)EAP: LEAP or EAP-Cisco Wireless uses the same approach as EAP-MD5 except for the fact that it uses dynamic WEP keys, which are rotated quite often (making it near to im-possible to crack the WEP key). Furthermore it adds the possibility of mutual authentication, in 63
  • 74.
    which the clientis able to know if a certain access point is authentic. This prevents people from placing rogue access points into the wireless network. Two problems exist with LEAP, one of them being the fact that LEAP is designed by Cisco, resulting in only Cisco hardware being able to use LEAP. The other problem is the fact that MS-CHAPv1 is used for authentication (both ways), which has known vulnerabilities. • EAP-TLS: EAP-TLS utilizes Transport Layer Security (IETF's standardization of SSL or Secure Socket Layers) for authentication. Instead of user name/password combinations, this system uses X.509 certificates to handle authentication. The difference between the two is that the former method sends personal secret information (a password), while the latter method is able to identi-fy an entity (a user or a system) without sending private information. This is achieved by having a trusted third party sign such a certificate. The entity checking the identity of his peer can then check if the signature of the trusted third party is real. If this is the case, then the trusted third party certifies that the public personal information really identifies the entity that owns the certi-ficate. Several problems exist with this approach. The first problem is the fact that Microsoft de-veloped this security mechanism, resulting in a situation where this mechanism only works on Microsoft products. Replacing any software in the tool chain by another equivalent software will result in a non-working system (For example if you use OpenLDAP as directory service instead of Active Directory). Another problem is the fact that a public key infrastructure is used, which is a concept that is quite unknown to most companies, resulting in either a steep learning curve, or giving up upon EAP-TLS. Yet another problem is the fact that Microsoft utilizes custom at-tributes in the certificates that are used by EAP-TLS, while those fields are not added to certific-ates which are issued by Verisign or Thawte. This means that only certificates issued by Mi-crosoft can be used. • EAP-T(unneled)TLS: EAP-TTLS was design by Funk Software in response to EAP-TLS. EAP-TTLS provides for mutual authentication, but only for AP to client authentication certificates are used. For client to AP authentication, user credentials (user name/password) are used. EAP-TTLS can pass the user credentials using any challenge-response mechanism specified by the administrator. (PAP (PPP Authentication Protocol), CHAP (Challenge Handshake Authentica-tion Protocol), MS-CHAPv1 (Microsoft CHAP version 1), MS-CHAPv2 (Microsoft CHAP ver-sion 2), PAP/Token Card, EAP) • P(rotected)EAP: according to [Dismukes2002], PEAP has the same characteristics as EAP-TTLS, except for the fact that it is designed by Microsoft and Cisco instead of Funk Software. There are lots more implementations of methods for EAP, for a complete list, refer to [IANA1]. 64
  • 75.
    Figure 4.1. 802.1Xauthentication process [Open1X1] "IEEE 802.1x is a port based authentication protocol. It can be used in *any* scenario where one can abstract out the notion of a port. It requires entities to play three roles in the authentication process: that of a supplicant, an authenticator and an authentication server. A Port Access Entity (PAE) is an entity that has access or is capable of gaining or controlling access to some port which offers some ser-vices. When applied to IEEE 802.11, the access point acts as an authenticator, while a wireless station (laptop etc) is the supplicant which is authenticated by the authentication server (for example a certain RADIUS implementation)." [Open1X1] 802.1X wasn't specifically designed for use on wireless networks, but for wired networks. It has been ported to wireless networks because of the fact it is extensible, easing the process of adding more authentication mechanisms (based on EAP) later on to wireless products. The use of EAP on wireless networks does however introduce a problem: since it was designed for wired networks, no real thought has been given to the possibility of people sniffing the EAP traffic. In the case of wired networks it is quite hard to sniff such traffic, it involves having access to the network devices of ma-chines involved (the server in question, or routers in between). In the case of wireless networks it is much easier to sniff network traffic, it can be achieved by just putting up a wireless receiver, and see all network traffic flow by. But, as [Gast2002] states, EAP is still a far better solution to the current 802.11 security problems than WEP ever was. According to [Airespace1] 802.1X introduces the possibility of having a master key sent to the user in encrypted form (after the user has been authen-ticated, the key will be sent along with the message that tells the user the authentication process was a success), which from then on will be used for communication purposes. When 802.1X is used by itself, this means that the master key will be the key that will be used for the WEP protocol. 4.1.3.7. 802.11i, WPA (TSN, TKIP) and WPA2 (RSN, CCMP, AES-CCM) 802.11i is the new security standard for 802.11 networks devised by IEEE. As already stated before, 802.1X will play an important role in 802.11i, as it takes care of the authentication. The 802.11i standard has not been finalized yet. 802.11i will provide for an authentication framework 65
  • 76.
    (802.1X/EAP) combined withany authentication algorithm (which doesn't get mandated by the 802.11i standard). Further, 802.11i will provide for enhanced key management, dynamic keys, mu-tual authentication and for data privacy and integrity. Data privacy and data integrity will be provided for in two ways: • TKIP: this will use per-frame keying (changing keys after every frame sent) and MIC (message integrity check). TKIP will be compatible with old hardware, since it uses the same encryption protocol as WEP (RC4), but as stated before, it will use a new key for every packet. Further, it will encrypt the initialization vector, which in case of WEP is sent in the clear (which is a secur-ity hole in the WEP case). • AES-CCM: the approach for new hardware will be based on the AES algorithm. The Advanced Encryption Standard is the new American government's encryption standard of choice. AES is based on the Rijndael algorithm which was developed by the Belgian researchers Vincent Rij-men and Joan Daemen. Details of the Rijndael algorithm aren't needed here, except for the fact that AES replaces DES because of its greater strength and speed (that is, AES is faster than Triple DES. Triple DES is basically DES, but run three times. This was done to achieve a stronger encryption while no better alternative was available yet. See [AESLounge1] for more information). Because industry couldn't wait for the release of 802.11i, the Wi-Fi Alliance (which is a non-profit international association formed in 1999 to certify interoperability of wireless Local Area Network products based on IEEE 802.11 specification) felt obliged to release a "snapshot" of the 802.11i standard, based on draft 3 of the 802.11i standard [Strand2004]. As stated by [Strand2004], the Wi- Fi Alliance released the snapshot as WPA (Wi-Fi Protected Access) or TSN or "Transition Security Network". TSN is based on TKIP + 802.1X. The final version of the 802.11i standard will be called WPA2 by the Wi-Fi Alliance or RSN ("Robust Secure Network"). RSN will be based on CCMP + 802.1X. According to [Airespace1], WPA2 will introduce some advanced features, including key management, by having a pairwise master key (PMK) which is exchanged using 802.1X or in a pre-shared way, which will be used to generate/retrieve a pairwise transient key (PTK), which in turn will be used to generate three other keys for respectively key exchange and transport of data: key confirmation key (KCK), key encryption key (KEK) and the temporal key (TK). Other advanced features include pre authentication, which authenticates a wireless client to other access points to which the user might move in the future, thus enabling roaming. 4.1.3.8. VPN A VPN, or Virtual Private Network is: "A private network that utilizes parts of the public telecommunications network. VPNs send encrypted data through the public network to ensure the security of transactions" [hp1] VPNs make it possible to circumvent certain security problems of wireless networks, even though they weren't designed for that purpose. With VPNs, as stated above, one can create a virtual network on top of an existing network structure, such as the Internet, and usually this is done in a secure way using an encryption algorithm. While using VPNs for authentication, data integrity and confidential-ity protection is quite secure, it still doesn't address all security problems. A problem that remains to exist is the fact that two illegitimate persons can still abuse the wireless network, though not for ac- 66
  • 77.
    cess to theInternet, but they can contact each other and steal away bandwidth. This is because a VPN can only be setup on an IP-layer of a network, which means that before systems can be authen-ticated through a VPN, they first have to acquire an IP address, usually by means of a DHCP server. This means that anyone can at least connect to the network to get an IP, also people with wrong in-tentions. Another problem that gets introduced here is that such illegitimate users can also contact other wireless clients, possibly abusing their machines to access networks outside the wireless net-work. These security issues have to be addressed when a VPN is to be used in a wireless network. 4.1.3.9. The chosen solution It has been chosen to apply the Open System Authentication security measure, or in other words us-ing no existing Wi-Fi specific security measure. It has been shown the existing security measures don't supply the needed security, sometimes incur large management overheads and further, they will be replaced by new security measures anyway. Instead it has been chosen to support VPN con-nections over the Mobidot WLAN and to warn the users about the security risk. Finally, the choice of the firmware to be used on the access points has also to do with upcoming security measures, as will be discussed later on. 4.1.4. Hardware and firmware In this section we will have a look at various hardware solutions and various firmware that can be run on these hardware solutions. 4.1.4.1. Hardware 4.1.4.1.1. Customizable access points Customizable access points are hardware devices, which are already completely integrated and be-ing sold by large companies, which already deliver some basic access point services, to be used in standard situations. Such companies make use of an open source kernel such as the Linux kernel. Because of the license that is attached to the Linux kernel, these companies are forced to supply the source code of any of their additions to the standard kernel. Such source code can then be used to implement extra features for such an access point, which is exactly what is needed by Mobidot. Solutions of several companies have been researched: Linksys, Netgear, D-Link, SMC and Belkin. Of these companies, only Linksys and Netgear seem to support the open source community. In the discussion that follows, several hardware terms will be mentioned: • wireless access point: an access point which (usually) has one socket for a wired network cable, in order to be able to connect the access point to an already existing internal network. • wireless gateway: an access point which (usually) has one socket for a wired network cable and which has specific software (PPPoE) in order to be able to connect the access point to some ex-ternal network such as the Internet. • wireless router: an access point which is a combination of a wired network switch, and a wire-less access point or a wireless gateway. • wireless ethernet bridge: an access point which is used to interconnect remote LANs without a cable. 67
  • 78.
    4.1.4.1.1.1. Netgear Figure4.2. Netgear WG602 access point [SeattleWireless1] Netgear is one of very few companies to supply the source code of the software used in their hard-ware products. Since the software used by Netgear is GPL licensed, they are forced to publish the source code of the modifications they made to the original GPL software. Specifications of the WG602 model include, according to [SeattleWireless1]: 16 megabytes of RAM, 4 megabytes of flash memory, an Intersil 54g miniPCI (PCI with small slots) card with Pris-mGT chipset, a RTL8139 chipset, and a processor operating at 100 up to 150 MHz. Figure 4.3. Netgear WG602 access point (internal view) [SeattleWireless1] 68
  • 79.
    The first versionof the WG602 has a miniPCI slot, which makes it possible to apply hardware up-grades to the WG602 in order to support new Wi-Fi standards such as 802.11i. It is, however, un-known if new versions and other models also have a miniPCI slot (it seems to be a trend to integrate the Wi-Fi chipset into the used motherboard, in order to force the user into buying new hardware when he desires to use new technologies). The operating system kernel in use is Linux 2.2.14, which is quite old, but seems to do the job. Furthermore, several other operating system tools, utilities and daemons are used: busybox 0.50, uClibc 0.9.08, vsftpd 1.1.3. When considering finances, Netgear is quite interesting, with prices ranging from 60 to 200 euros. [Tweakers1] 4.1.4.1.1.2. Linksys Figure 4.4. Linksys WRT54G access point + router [SeattleWireless2] Linksys is one of the other few companies that uses GPL'ed software in its products, and as such provides the used source code on its website. The specifications, according to [SeattleWireless2], of the Linksys WRT54G seem to be better than the WG602 model of Netgear in several aspects. 69
  • 80.
    Figure 4.5. LinksysWRT54G access point + router (internal view) [SeattleWireless2] While the amount of memory and flash memory are the same (16 MB respectively 4 MB), the pro-cessor operates at a speed of 200 MHz, and uses Broadcom chipsets for both wired and Wi-Fi net-working. Old versions of the WRT54G had a miniPCI slot, which made it possible to apply hard-ware upgrades to the WRT54G in order to support new Wi-Fi standards such as 802.11i. In the latest versions however, this miniPCI slot has been removed and replaced with a chipset which has been integrated into the motherboard, as such disabling the possibility of easy future upgrades. The Linksys WRT54G also uses a Linux kernel, but a slightly newer (but not quite up to date) one, ver-sion 2.4.20. A lot more tools and libraries are used by the WRT54G than the WG602. They both use uClibc and busybox, but WRT54G also uses other tools and libraries such as: iproute2, openssl, pppd, pptp-client, rp-pppoe, rp-l2tp, udhcpd (which are all popular Linux tools) and even a small sized HTTP daemon. Linksys, like Netgear, has quite interesting solutions when looking at the prices, which range from 50 to 200 euros. [Tweakers1] 4.1.4.1.2. Solution using separate hardware parts Another solution for the hardware implementation is to make use of several separate computer parts, such as a motherboard, CPU, memory and networking devices, in order to create an access point from the ground up. 4.1.4.1.2.1. Soekris board with additional hardware 70
  • 81.
    Figure 4.6. Soekrisnet4801 [Soekris3] "Soekris Engineering, Inc. is a small company specializing in the design of em-bedded computer and communication devices." [Soekris1] As stated, Soekris Engineering specializes in the design of embedded systems. Figure 4.7. Soekris net4801 (internal view) [Soekris3] The embedded systems are composed of a motherboard with CPU (486-class or 586-class), ethernet ports for wired network connectivity, a miniPCI slot and up to two PCMCIA (small credit card-sized devices) adapters which might enable the embedded system to be expanded with a wireless network card or any other device, some other hardware chipsets and some specific amount of memory and flash memory (the amount depends on the model chosen). 71
  • 82.
    The reasons thatmake this solution very interesting are the following: • The motherboard has a hardware watchdog integrated. "A watchdog is a device used to protect a system from specific software or hardware failures that may cause the system to stop respond-ing. The application is first registered with the watchdog device. Once the watchdog is running on your system the application must periodically send information to the watchdog device. If the device doesn't receive this signal within the set period of time it would execute the proper key-strokes to reboot the machine or restart the application." [Webopedia7] • The motherboard has lots of expansion options, it supports up to three expansion slots (miniPCI and 2 PC-Card/Cardbus slots). As such the embedded system can be expanded with hardware that increases the high availability even further. Further, when new Wi-Fi standards get devised, the old Wi-Fi miniPCI card can simply be replaced with a new one. What might make this system less interesting is its price. The base embedded system costs between 130 and 280 dollars (without discounts), depending on what is needed for processing power and amount of expansion slots, etc. [Soekris2] In order to make this into an access point, at least one miniPCI Wi-Fi card is needed, and the choice is quite limited due to the limited availability of drivers in Linux. An Atheros based card which is 802.11i ready is available for around 80 dollars. [Netgate1] 4.1.4.1.3. The chosen hardware solution The Linksys customizable access point has been chosen as the hardware device of preference. The Linksys seems to offer a quite good price/capabilities ratio. Furthermore, there seem to be quite some firmware available for the Linksys, which seems to show that a lot of people are already modi-fying their access points. This could mean that a lot of documentation is already available, which could ease the implementation quite a lot. 4.1.4.2. Firmware / Build root In this section we will look at the firmware that is available for the Linksys WRT54G access point. 4.1.4.2.1. The original Linksys firmware It was quickly found that the original Linksys firmware build root is poorly designed. The most probable reason for this is probably that Linksys has nothing to gain from a well-designed build root, they only have man hours to lose. Firmware for future hardware will contain the same software programs, only the drivers will differ, as new ones will be added in order to support new hardware. There are several problems with the Linksys build root, one of them being the lack of in-depth docu-mentation. Only a simple README file could be found, which only describes how to make a binary firmware. Furthermore, this description isn't even accurate, since the procedure as it is explained gives errors and the commands entered should be adjusted. On of the largest problems with this firmware however, is the fact that it is not aimed at extensibility. The build root contains some soft-ware packages by default, but it doesn't provide easy means for extending the firmware with new software packages. And even if you would take the time to add (or hack in) these packages, you still have no mechanism of selecting which packages you want to install, since sometimes you perhaps want to include different packages than usual, or perhaps leave out some packages of the original firmware. Lastly, this firmware doesn't include support for a file system that supports persistent stor-age. The firmware contents are stored in a read only file system, and furthermore only the RAM can 72
  • 83.
    be used forwriting (which obviously isn't persistent). 4.1.4.2.2. HyperWRT / Sveasoft / DD-WRT About the HyperWRT, Sveasoft and DD-WRT firmware we can be short: they are based on the ori-ginal firmware with extra features hacked in. Further, as stated before, there's no selection mechan-ism, and this means sometimes everything possible is crammed in until there's no space left. While particularly Sveasoft and DD-WRT do include some nice features (such as a SSH daemon and the Chillispot captive portal), they are not a good choice. Would Mobidot ever need to add some pack-age, then it would first be needed to remove (hack out) software packages before new ones could be added. Furthermore, the exact size of the packages is unknown, as such it would needed to perform some trial and error in order to create as much free space as needed (the access points have limited storage on a flash chip). 4.1.4.2.3. OpenWRT Unlike the other build roots, the OpenWRT appears to be a very appropriate candidate to do the job. OpenWRT has two aspects which make it a quite strong competitor: support for multiple hardware devices and extensibility. OpenWRT has one problem though, it is not in final version yet, new re-lease candidates are still coming out. It has been found that OpenWRT supports multiple hardware devices. By including modular device drivers, the appropriate drivers can be selected for the right hardware. That means that at this mo-ment already some five or six different brands of access points are supported. Would any of these brands drop support for customized firmware, then it would easily be possible to just use another one. Or perhaps that some brands offer other possibilities than others. For example access points from Asus have built in USB ports, which Linksys access points don't. Such a feature could be used for example for storage of certain data, for which the internal flash storage doesn't suffice. But probably the strongest feature of OpenWRT is the fact that it is extensible. In OpenWRT, everything is contained in *.ipkg package files. Of each package it is exactly known how much stor-age space the files contained inside use. Installing these packages in the firmware can be done at firmware creation time or at run time. When done at run time, one needs only to download the pack-age to the access point and run 'ipkg install'. Further, the build root has an excellent package selec-tion tool, in which the packages that are to be installed at firmware creation time can be selected. Here, it is possible to include or exclude the various packages that are included in the build root, but also various kernel features which have been defined as modules. This means that support for cer-tain features (such as support for various kinds of file systems, support for networking protocols, etc) can be traded in, in exchange for free space. When the firmware is created, a read-only file sys-tem is created on which all initial packages are extracted. The remaining free space however, in this case, is designated to a separate partition on which a writable file system is created. This way, even at run time packages can be installed or data can be written persistently. This last fact basically means the firmware can be upgraded through packages instead of through dangerous firmware up-grades, when the entire firmware is overwritten with a new firmware image. Such operations are al-ways dangerous, since loss of power results in a defective access point. When only a certain package can be upgraded, the rest of the firmware will remain working, even if the package upgrade fails. At this moment there's one problem though: OpenWRT is not final yet. Release candidates are still being released, which means the candidates are not mature enough yet. Later on we will see what impact this has on this project. Even though this problem exists, OpenWRT has been chosen as the 73
  • 84.
    firmware of preference.This is particularly because of the well design (which was developed with the future in mind, i.e. upcoming modifications, new hardware, etc), and because of the bad design of the other solutions. 4.1.5. Configuration deployment It has been chosen to create a set of scripts which can configure the access point to the settings as re-corded in the management system. These scripts run on first installation of the access point and each hour to check and possibly perform updates. It has been chosen to have the manager of a public in-stitution enter the credentials of his Internet connection (user name/password) manually on-site. Due to the security sensitivity of this information, it is not very wise to store such information centrally (although taking that approach would reach a full plug-and-play solution). An additional script has been created that asks for and tests Internet settings using a simple website on a simple web server which temporarily runs on the access point. The manager of a public institution will use his browser to visit this website to enter his credentials. 4.1.6. Maintenance and monitoring One particularly difficult problem to deal with is making the access points manageable from any-where. This means it should be possible to place the access point at any node in some network, but still be able to manage and monitor this access point from an external network, such as the Internet. The particular problem which we are dealing with was described in the design problems, section 'Maintenance and monitoring', namely the fact that most networks use Network Address Translation (NAT). In such cases we can modify firewalling rules at an already existing firewall, this is however not what we want. We want to solve the problem in such a way that at most only a very minimal change to existing systems and configurations is needed. About the only way of achieving this is by the use of a VPN (Virtual Private Network) solution. VPNs are essentially tunnels through existing networks which connect nodes logically which are by far not directly physically connected. With some solutions this can be done with encryption. Before discussing the chosen solution for this problem, we'll first look at some well known VPN solutions. 4.1.6.1. Network layer 4.1.6.1.1. IP-in-IP tunnels In some cases, it might be needed to encapsulate IP packets inside other IP packets. In this situation we are tunneling a network layer network inside another network layer. The most obvious situation in which this would be applied is a situation where there are two private network layer (IP) net-works, which are both connected to some public network (the Internet) and which should be connec-ted together in such a way that it seems to be one private network. This can be achieved using IP-in- IP tunnels, but the interconnection of networks is also the only thing that is achieved, i.e. there's no encryption. 4.1.6.1.2. GRE tunnels GRE stands for Generic Routing Encapsulation and is quite similar to IP-in-IP tunnels, though with some differences. The first difference is that GRE is a more general approach to network layer in network layer encapsulation, meaning the encapsulation is not limited to IP, both for the original packet, and for the packet that encapsulates the original packet. As stated by [RFC1701]: 74
  • 85.
    "In the mostgeneral case, a system has a packet that needs to be encapsulated and routed. We will call this the payload packet. The payload is first encapsulated in a GRE packet, which possibly also includes a route. The resulting GRE packet can then be encapsulated in some other protocol and then forwarded. We will call this outer protocol the delivery protocol." This more general approach to network layer in network layer encapsulation also creates another possibility, the transport of special IP packets such as multicast traffic, or even IPv6 packets, but like IP-in-IP, it also doesn't support encryption. 4.1.6.1.3. Microsoft's PPTP "PPTP is implemented as a PPP session over Generic Routing Encapsulation (GRE). Authentication is usually by MSCHAP-v2 (Microsoft Challenge Hand-shake Authentication Protocol) , and supplies key material for the subsequent Mi-crosoft Point-to-Point Encryption (MPPE) applied to data packets." [Wikipedia2] As stated here, PPTP is the encapsulation of PPP in GRE. Recall that GRE is a network layer pro-tocol and PPP is a data link layer protocol. PPTP is implemented, as already stated earlier, by the use of the GRE protocol. But in addition to this, a TCP connection from client to server, usually on port 1723, is used to control the PPTP connection. According to [Hardin2000] and [Wikipedia2] PPTP suffers security vulnerabilities and as such should not be used. 4.1.6.1.4. L2TP "L2TP can crudely be described as "PPP over IP", although it has many more fea-tures than this simple description would imply." [Wikipedia1] L2TP is based on the older PPTP protocol and the older proprietary L2F (Layer 2 Forwarding) pro-tocol by Cisco. "L2TP acts as a data link layer (layer 2 of the OSI model) protocol for tunneling network traffic between two peers over an existing network (i.e. the Internet). It is an extension of the Point-to-Point Protocol (PPP). It is still common to use PPP sessions within an L2TP tunnel. L2TP does not provide confidentiality or strong authentication itself." [Wikipedia1] According to [Wikipedia1], L2TP packets can be categorized as two types: control packets and data packets. Reliability is provided for control packets by the L2TP, but not for the data packets, which has to be taken care of by higher layer protocols. 4.1.6.1.5. IPSec All the tunneling protocols discussed up until now don't provide data confidentiality. IPSec on the other hand is a protocol that does provide confidentiality, and even more. IPSec, as the name already says, secures IP traffic, and it works on the network layer. The IPSec protocol provides four func-tions: • Confidentiality. Confidentiality is achieved by means of encryption. IPSec is a framework of 75
  • 86.
    open standards, whichmeans that it is not bound to any particular encryption algorithm. • Data integrity. In order to provide data integrity, a hashing algorithm is applied on the messages that have to be sent out. IPSec uses the Hashed Message Authentication Codes in order to achieve this, and the most commonly used flavors are HMAC-MD5 and HMAC-SHA1. It is im-portant to understand that a certain message (of any length) can be converted to a fixed-length hash, but the reverse, retrieving the message from the hash, isn't possible. • Origin authentication. Origin authentication is provided and used to make sure the communica-tion channel is secure. Before any communication can take place, mutual authentication has to take place. • Anti replay protection. Anti replay protection works in a similar way to the use of sequence numbers in TCP. A sequence number gets added to each IPSec packet, and the sequence number of each packet gets compared to a sliding window. Packages with illegal sequence numbers get discarded. This prevents illegal uses of IPSec networks, such as rerunning an authentication pro-cess using sniffed traffic, in order for the hacker to get illegitimate access to the IPSec network, for example. Two terms play an important role in IPSec: • Security Association: A Security Association (SA) is a set of security information that describes a particular kind of secure connection between one device and another. You can consider it a "contract", if you will, that specifies the particular security mechanisms that are used for secure communications between the two. A device's security associations are contained in its Security Association Database (SAD). [TCPIPGuide2] The to be used security association is identified by the Security Parameter Index (SPI). • Security Parameter Index (SPI): A 32-bit number that is chosen to uniquely identify a particular SA for any connected device. The SPI is placed in AH or ESP datagrams and thus links each se-cure datagram to the security association. It is used by the recipient of a transmission so it knows what SA governs the datagram. [TCPIPGuide3] 4.1.6.2. Transport layer 4.1.6.2.1. SSL based VPNs SSL (Secure Socket Layer; an algorithm with a public-key encryption-based key exchange, certific-ate- based authentication and symmetric cipher-based traffic encryption) is a technology that adds se-curity to protocols on the transport layer (mainly TCP). Nowadays it's most commonly used for ser-vices like HTTP and FTP, in order to make the data transfers secure. The only thing that SSL adds to an already existing protocol is confidentiality (encryption), it only secures one connection between two hosts. SSL cannot be used to secure connections between various networks, unless some custom application is written which implements tunneling of a layer 2 or layer 3 protocol us-ing SSL for confidentiality. A simple kind of VPN might be implemented by creating a website us-ing SSL and user logins. After being logged in, the user can access all kinds of data and perform ac-tions, the only problem with this setup is the fact that it's a remote access based VPN, i.e. it cannot be used to interconnect networks. 76
  • 87.
    4.1.6.2.2. CIPE CIPE,which stands for Crypto IP encapsulation, is a custom designed tunneling protocol using en-cryption. "CIPE encapsulates encrypted IP datagrams in UDP datagrams and sends them via the normal UDP mechanism. This is different from standard IP-in-IP encapsula-tion. UDP was chosen because this way many different endpoints can easily be distinguished by port numbers; because an IP protocol number would warrant a formal registration; and because handling of UDP datagrams is easier than using a separate IP protocol number, especially in firewalled setups. Specifically, UDP can be handled by user-level applications such as a SOCKS5 relayer. A CIPE link always connects exactly two endpoints." [Titz2004] As we can read in the above description, CIPE implements the tunnel using UDP, and such a tunnel can only exist between two end points. As already stated in the description above, the advantage is that it should be able to pass through the firewall (note: if the firewall doesn't restrict UDP traffic) without problems, unlike packets using a custom IP protocol, which might be discarded by the fire-wall with a greater possibility. This advantage only plays a role in networks where a tunnel should be set up without consent of a security officer. A problem of this approach is the added overhead and the inability to check for authentication of packets before they are decrypted, which results in a performance loss in case of denial-of-service attacks. Would it be possible to authenticate packets before they were decrypted, a denial-of-service attack wouldn't have such a great impact, since the decryption wouldn't have to take place, which is CPU intensive. Furthermore, a lot of overhead is added. An IP packet, which already consists of 40 bytes of headers (TCP and IP), gets wrapped in another UDP/IP packet, which again adds 40 bytes. (UDP, TCP and IP packets all have headers of at least 40 bytes; there are optional extensions which can make the headers larger) 4.1.6.3. Application layer 4.1.6.3.1. SSH based VPNs SSH stands for Secure Shell. A shell is a command line user interface which is generally used in Unix type systems. The secure shell is a secure (and cryptographically strong) implementation of the old remote shell protocol in UNIX, which enables remote access to UNIX systems. Besides provid-ing a remote command line interface and authenticate users against a UNIX user database, SSH is able to perform much more functions, such as forwarding traffic through its encrypted channel. This makes SSH a popular choice for adding authentication to protocols which natively don't provide au-thentication or for adding encryption to protocols which natively don't encrypt traffic. In the case of SSH based VPNs, one protocol or another is tunneled through an existing SSH con-nection. A popular approach to this is the tunneling of PPP traffic through a SSH connection. It is actually quite similar to the situation described for SSL VPNs, except for the fact that SSH by nature is capable of carrying any traffic, i.e. no custom protocol has to be written anymore. Some problems exist for this approach. First of all, this approach has the same problems when it comes to overhead and performance loss as the CIPE approach. Furthermore, SSH is a user space program, which results in two problems. First, the tunnel has to be set up manually (though it could be scrip-ted) and should always exist in order for the VPN to be usable. Once the tunnel goes down (which can happen once in a while with TCP connections), the VPN goes down. The second problem is the fact that SSH lives in user space, meaning a lot of context switches are needed between user and 77
  • 88.
    kernel space: theuser wants to connect over the VPN, sets up a connection, this goes from user space to kernel space, gets routed, gets back to user space to be tunneled through SSH, and then gets back to kernel space in order to be routed as standard TCP traffic. The same actions (though in op-posite order) occurs at the other side of the tunnel. 4.1.6.4. The chosen solution Before we can make a well weighed decision in choosing a tunneling solution, we should first identify our needs. One need that we can identify is the fact that multiple tunnels per network should be supported. In [Fratto2000] we can find that IPSec in combination with NAT natively doesn't sup-port multiple tunnels. The reason for this is actually the same as for any network layer tunneling solution: we can only identify traffic on the network layer by IP address. Normally in situations with NAT, traffic is identified by transport layer attributes, such as the source port number. In case of network layer tunneling, we can only differentiate traffic by the IP address, since the payload of the network layer packet is not a normal transport layer packet, but a packet of some other type, for ex-ample GRE. In other words, we can only look at the original source IP address and the translated IP address in order to know the real destination of incoming tunneled traffic. Due to this fact, all net-work layer solutions aren't appropriate. In the case of IPSec, it would be possible to differentiate between various tunnels by the SPI number, as stated by [Fratto2000]. In this case however, we need specialized hardware, and this is not what we wanted. This leaves us with transport layer or application layer solutions. In the case of SSL tunnels however, it was stated we would need to write a custom application in order to implement tunneling for any type of network traffic. Since this is not at all desired, this leaves us with either SSH tunnel-ing or CIPE. First was decided to use PPP over SSH tunnels. PPP is the Point-to-Point Protocol which offers a layer 2 connection between two end points, which in turn can be used for IP networks and thus also for TCP and UDP connections. However it turned out also not as a good choice, due to the nature of TCP connections. In [Titz2001] is extensively explained why this does not work well. It comes down to problems with the retransmission algorithm used in TCP in case of network congestion. In such situations, TCP lowers its transmission speed in order to lower the congestion, by increasing timeouts between the sending of two packets. 78
  • 89.
    Figure 4.8. SSHtunneling However, when one TCP connection is tunneled through another, this has a very nasty side effect: "The lower layer TCP queues up a retransmission and increases its timeouts. Since the connection is blocked for this amount of time, the upper layer (i.e. payload) TCP won't get a timely ACK, and will also queue a retransmission. Because the timeout is still less than the lower layer timeout, the upper layer will queue up more retransmissions faster than the lower layer can process them. This makes the upper layer connection stall very quickly and every retransmission just adds to the problem - an internal meltdown effect." [Titz2001] The upper layer TCP connection is the TCP connection which is tunneled through the lower layer TCP connection. Due to these problems, another tunneling strategy needed to be chosen. Because encryption of connections is very desirable, the choice fell on Cipe. Cipe is a relatively new techno-logy which tunnels IP traffic through UDP tunnels, offering encryption along the way. Unlike other tunneling protocols like PPTP and IPSec, Cipe, like SSH, can have multiple tunnels through one NAT-gateway. The tunneling protocol would run in the transport layer, thus it would be possible to assign it to any given port number (in a 16-bit range), meaning you could theoretically create about 65000 tunnels through one NAT-gateway. This number is enough for Wi-Fi networks, as the amount of access points at a local site will never be higher than this. It will however quite regularly be higher than one. 4.1.7. Interoperability In order to support roaming we will be running an AAA server. We will first investigate which types of AAA servers are available, followed by an investigation of existing implementations. After that, we will discuss what AAA server type and implementation was chosen to use. 79
  • 90.
    4.1.7.1. AAA servertypes 4.1.7.1.1. AAA Servers (Authentication, Authorization and Accounting) AAA servers play an important role in corporate networks, both business networks and the networks of Internet Service Providers. AAA servers perform three basic functions: authentication, authoriza-tion and accounting. Authentication (as already explained earlier) performs verification checks to see whether the user who tries to log in is who he says he is. Authorization deals with controlling what someone is allowed to do, which actions that person should be allowed to perform. Finally, ac-counting takes care of tracking what someone has done, logging which actions a certain user has performed. According to [Laet2004] The AAA server model was designed in such a flexible way that (almost) any kind of access method can benefit from its security features: dial up connections, ISDN, ADSL and VPN. There are three popular implementations of AAA servers. There's RADI-US: "Remote Authentication Dial-In User Service (RADIUS) is a client/server pro-tocol and software that enables remote access servers to communicate with a cent-ral server to authenticate dial-in users and authorize their access to the requested system or service. RADIUS allows a company to maintain user profiles in a cent-ral database that all remote servers can share. It provides better security, allowing a company to set up a policy that can be applied at a single administered network point. Having a central service also means that it's easier to track usage for billing and for keeping network statistics. Created by Livingston (now owned by Lucent), RADIUS is a de facto industry standard used by a number of network product companies and is a proposed IETF standard." [SearchSecurity1] Further there's TACACS+, which is Cisco proprietary implementation of an AAA protocol: "There are three versions of TACACS and the third version is called TACACS+, which is not compatible with previous versions." [Javvin1] And finally there's Diameter: "The Diameter protocol is being designed by the IETF's AAA Working Group." [OpenDiameter1] Diameter is a new AAA protocol that's being designed by the IETF as an alternative for the older, less capable and proprietary RADIUS and TACACS+ protocols. 4.1.7.2. AAA server implementations 4.1.7.2.1. FreeRADIUS FreeRADIUS is one of a few open source implementations of a RADIUS server. FreeRADIUS seems to be a quite mature project. FreeRADIUS supports MySQL, PostgreSQL, Oracle and LDAP databases. It supports EAP and many of its forms: EAP-MD5, EAP-TLS, EAP-TTLS, EAP-PEAP and EAP-LEAP. It has two very interesting features for Mobidot: it supports executing external pro-grams (which could make the Mobidot solution support other AAA servers by externally connecting to such an AAA server, would the AAA server of a roaming partner be of a different type than RA-DIUS), and it supports proxying of requests (meaning forwarding of the request to another RADIUS 80
  • 91.
    server) with fail-over("A backup operation that automatically switches to a standby database, server or network if the primary system fails or is temporarily shut down for servicing" [Webopedia5]) and load balancing ("Distributing processing and communications activity evenly across a computer net-work so that no single device is overwhelmed" [Webopedia6]). Finally, the server comes with a PHP-based web user administration tool. A PAM module (Pluggable Authentication Module) and Apache web server authentication modules are available. It is stated by the maintainers of FreeRA-DIUS that the software has reached stable release, and it would be ready for deployment in any size network. 4.1.7.2.2. Cistron RADIUS, ICRADIUS, XtRADIUS, GNU RADIUS The Cistron RADIUS server was developed by Miquel van Smoorenburg (from the Cistron ISP in the Netherlands). The server was developed quite some time ago, and lacks support for new fea-tures. It does support proxying of requests and PAM authentication, but it doesn't support databases except for the Berkeley database format DBM and it doesn't support EAP at all, only PAP and CHAP. ICRADIUS, XtRADIUS and GNU RADIUS are derivatives of Cistron RADIUS, each adding some minor features. ICRADIUS adds MySQL database support. XtRADIUS adds a quite nice feature: the ability of running scripts which will handle the authentication and user accounting, thus enabling querying external resources (much like the external program execution function of FreeRADIUS). GNU RADIUS adds extensibility by using the Scheme programming language as a script interpreter, it adds support for PostgreSQL databases and it adds support for SNMP manage-ment and monitoring. FreeRADIUS is in fact also another derivative of Cistron RADIUS. But due to the fact that the de-velopment approach chosen for FreeRADIUS (development done by a large group of individuals), FreeRADIUS seems to offer much more features and seems to be more mature. 4.1.7.2.3. OpenRADIUS OpenRADIUS is another implementation of a RADIUS server, which was developed from scratch. OpenRADIUS doesn't support EAP. On the other hand, OpenRADIUS supports proxying, and is ex-tensible because of the use of external program calls for the handling of any action, such as authen-tication of users, etc. For this reason, any type of database could be supported, but isn't at this mo-ment. OpenRADIUS does introduce an optimizing feature with calling external programs: called programs are only launched once, and from then on kept in memory, so it can be consulted many times without needing to reload it, resulting in a performance gain. This project seems to be a one-man project however, and as such is a less attractive solution than FreeRADIUS. 4.1.7.2.4. tacppd, libtacplus, mod_auth_tacacs Tacppd is an open source implementation of the Cisco proprietary TACACS+ AAA protocol. The implementation at this point in time is quite basic, and is mainly limited to operation with Cisco products. The EAP protocol is not supported, and there's support for one database only: Postgr-eSQL. Furthermore, it seems like this project is also a one-man project. Tacppd doesn't seem to be a real alternative to the use of a RADIUS server, also because of the fact that TACACS+ is a propriet-ary protocol. Tacppd does come with some useful additions however: libtacplus and mod_auth_tacacs. The first of these is a code library with which TACACS+ authentication calls can be made or received easily. The last of these is an authentication module for use in the Apache web server. 81
  • 92.
    4.1.7.2.5. ACE RADIUSlibrary and OpenDiameter Both ACE RADIUS and OpenDiameter aren't server products, but code libraries. Which means they are not usable for immediate deployment of an AAA server. They might, however, come in handy for the same reason as libtacplus: making external authentication calls to an AAA server of another type (in this case RADIUS or Diameter). ACE RADIUS seems to be not quite mature yet, it is still in beta stage. It also seems that ACE RADIUS does not support EAP, and as such is not quite an in-teresting option. OpenDiameter however seems to be more mature, having support for several EAP protocol types, and even more on the way. The next version will even support 802.1X and support for using the library for software that implements either the supplicant, the authenticator or the au-thentication server. Future releases will also include support for RADIUS. 4.1.7.2.6. Open1X Open1X is an open source implementation of the IEEE 802.1X protocol. It only focuses on the sup-plicant and authenticator part (and the authenticator part isn't in active development at the moment). Many EAP protocols are supported, including: EAP-MD5, EAP-MSCHAPv2, LEAP, PEAP, EAP-TLS and EAP-TTLS. Recall that the supplicant is the network client who tries to authenticate to a network service. This means that Open1X is primarily meant for the users of a wireless network and in this case only those who use Linux as their operating system. Most probably Mobidot will not need this software, unless it is decided the users of the Mobidot need to install custom software in order to be able to get a connection. 4.1.7.3. The chosen solution For several reasons FreeRADIUS has been chosen as the AAA server of preference. First of all, it is most probably the most widespread used type. Diameter is a relatively new open source alternative. TACACS+ is a Cisco proprietary implementation. There's no good open source server implementa-tion of TACACS+, as such it cannot be used anyway. Some good libraries for TACACS+ have been found however, so theoretically it's possible to extend FreeRADIUS with TACACS+ support, the hooks for such extensions are already available in FreeRADIUS. Further, FreeRADIUS is the only one supporting EAP. Since EAP is part of 802.1X/802.11i, the new upcoming security standard for wireless technology, it might be a wise decision to choose a solution which is already capable of dealing with EAP. Finally, FreeRADIUS supports fail-over which a requirement for setups in which the AAA server plays such a central role as it does in the Mobidot infrastructure. 4.2. Implementation 4.2.1. Implementing the management system The implementation of the management system was quite comprehensive and took just a bit less than a quarter of the entire project duration, totaling 7747 lines of PHP code and 799 lines of HTML. Although quite some design changes took place during this period, the requirements were implemented easily due to the clear structure of the system. One of the largest changes in the project was in the set of use cases. At first various use cases were defined very distinctively from one another, including: PutHotspotUp, PutHotspotDownForMain-tenance, DeployNewAPFirmware, DeployNewHotspotConfiguration, PutFirewallTunnelUp, Put- 82
  • 93.
    FirewallTunnelDown, SendNetworkAnnouncement andRetrieveUsageStatistics. Due to the fact that most of these use cases are quite different from the other use cases means the design can get (unnecessarily) complicated. The first choice was to drop the use case RetrieveUsageStatistics. This use case was introduced for roaming partners to retrieve usage information of their users who have roamed onto the Mobidot network. This information can however be sent automatically (without user initiation) to the roam-ing partner by means of an extension of the RADIUS protocol, and this functionality is implemented by the Chillispot captive portal. Another choice was to embed SendNetworkAnnouncement into the management of hotspots and ac-cess points. Essentially a network announcement needs to be sent only when the hotspot goes down temporarily for maintenance, it preferably will never be needed for any other cause, as we don't want to bother the user too much. As such it is unnecessary to model it as a separate use case. Yet another choice which led to the removal of use cases was the choice to use permanent firewall tunnels instead of temporary firewall tunnels. These tunnels are needed to enable the use of proto-cols such as SNMP in cases where the Mobidot AP is not directly addressable, for example in SNAT-enabled networks. The reason why this was needed will be discussed in the 'Problem domain' section of the first chapter. This choice led to the removal of the PutFirewallTunnelUp and PutFire-wallTunnelDown use cases. The final choice (related to the changes in use cases) was composed of the removal of several use cases, but all for the same reason. The remaining use cases in essence all adjust the state of the sys-tem in one way or another. Such actions can be caught in general management use cases. For ex-ample PutHotspotUp and PutHotspotDownForMaintenance just adjust the status of a hotspot, and basically are edit operations in the management of hotspots. Further, DeployNewAPFirmware basic-ally is an add operation in a firmware management use case. The DeployNewHotspotConfiguration use case can be dealt with in the same way. Due to these changes also a new composite use case is introduced: ManageFirmware. Some other changes were made in the modeling of parts of the system in terms of class diagrams. First of all, during the design phase the choice was made to create helper classes which would aid in the creation of the necessary HTML output. During the implementation however, a very handy tem-plate engine was found, which could generate HTML from text files with variable substitution. Due to the use of this engine, the helper classes could be dropped. Another, more important, design change was the choice to drop the differentiation between master and slave access points. Rather, access points would be looked at as stand alone units. Each access point offers wireless access to the neighborhood it is placed in, and as such it doesn't need to know about fellow access points. It only needs to deal with wireless IP traffic, and it needs to know where to hand it off to. Further, the distinction between Mobidot users and users from roaming partners was dropped, as this is (in terms of usage logging, authentication checks, etc) already taken care of by Chillispot. From then on, users would be modeled by an UserAccount object, making the design again easier. Lastly, having separate Status classes (HotspotStatus, APStatus) also made the design unnecessary difficult, particularly because there is little status information, so it can just as well be handled in-side the Hotspot and AP objects. Finally, a problem was encountered in the storage back ends. It was chosen to implemented it in a very general manner, such that it can be reused for storing any type of information. This was done using the bridge pattern, and using only a pre-defined set of functions in the implementer classes. As 83
  • 94.
    such there werebasically four operations: get, insert, update and delete. This however limits the us-ability of the storage back end, as it can only perform as much as these pre-defined functions can perform. Without adding functions it was possible to add just enough functionality to the existing functions to support more extensive queries, i.e. for sorting data in a particular order, paginate re-cords and operate on multiple sets of data in one shot. This was done by using arguments which were unused by default, unless they would have a value. Further, in situations where it was needed, database transactions would be composed of multiple queries, i.e. creating, updating or deleting con-figurations, including their firewall and traffic shaping configurations. 4.2.2. Implementing the firmware The implementation of the firmware took a bit more than an eighth of the entire project duration, totaling 626 lines of C code and 440 lines of shell script code (bash script code; the awk code which is embedded in the bash script code will amount to even more lines of code). It consisted of an in-vestigation as to how the firmware works and how it can be extended, and of the implementation of the Mobidot extensions that were needed. One important part was understanding how the build root of the firmware works. The build root is the collection of files that makes up the source of the firm-ware, and which can be used to make a new firmware from scratch. Adding extensions to the Open- WRT firmware was found to be considerably easier than with the other investigated firmware: some minor modifications in configuration and make files and the addition of a small makefile and con-figuration file were needed. This, as opposed to the other firmware, where extensibility is reached by hacking in the new features. OpenWRT eases the customization of firmware (as in choosing which software to install in the firm-ware) considerably. Unlike the other firmware, OpenWRT allows to select the packages that are wanted in a menu driven program. After having configured the base firmware configuration, the needed extensions of the firmware still need to be implemented. The extensions that are needed per-form a specific set of functions. After an access point has been acquired it's got a default installation of a stock Linksys firmware, which is totally inadequate, due to its generality. When the Mobidot specific firmware is installed a series of actions is performed. First it makes sure there's a functional Internet connection. If there is none, it tries getting an address using DHCP. If that fails, an HTTP daemon is launched which enables the user to visit a specific website. This website enables the user to enter specific Internet connection settings. Preferably this wouldn't be needed on-site, as we prefer to deliver the access point to clients, having them connect the access point and then having the access point installing itself completely unattended. In this case however, the settings are secur-ity sensitive. Storing them centrally is a potential security problem (even more because the Internet connection settings, including passwords, are client specific and not Mobidot's). When the Internet connection is successfully setup, we can continue installing the firmware. Due to storage constraints it was chosen to leave out as much functionality as possible, only installing on demand what is needed using packages. The access point at this point downloads a script from the central Mobidot system, trying indefinitely when failing. This script takes care of installing the needed packages and configuring them according to the settings as defined in the management panel. When this is fin-ished, the access point is ready for use. From then on it will run the same script on an hourly basis, only updating the system if necessary, both in terms of packages (installations and deletions) and in terms of configuration settings. Undoubtedly the most difficult thing of implementing the firmware extensions was the fact that the access point has no console, not even the possibility for a serial console. In combination with shell scripts this led to quite a few difficult situations. Shell scripting languages are interpreted languages, 84
  • 95.
    meaning they don'tget compiled and thus there are no checks on syntax and semantic errors. The only way of knowing whether a script works is by running it. However one needs to be very cau-tious, because one bad command in the script can render the access point unusable. 85
  • 96.
  • 97.
    Chapter 5. Evaluation 5.1. Test setup In the case of the management system, testing wasn't that difficult. Due to the fact the management system has been written as a web application, it could be tested on any workstation. It was however needed to have installed multiple web browsers, in order to ensure browser independence. In this case the system was tested using both a Windows XP and a Debian Linux OS. Windows XP was equipped with both Internet Explorer version 6 and with Firefox version 1. Debian was equipped with Firefox 1. Ensuring the website runs well inside Firefox means web browsers like Mozilla (the original, not Firefox) and Netscape 7+ are covered too, since they use the same HTML engine as Firefox. Besides a workstation, a server was needed too, on which the management system would be installed. A server which was already in the air for purposes like this fitted the job nicely. The server had Debian Linux pre installed, and already had an Apache web server and PHP4 engine installed. In the case of the firmware, things were a little bit more difficult. In this situation the same worksta-tion and server are needed. However, in this case the workstation needed to be configured with mul-tiple IP addresses in a different range, due to the fact the access point can only be flashed with new firmware on a fixed IP address. Of course, in order to test the firmware, the access point itself is needed, of which three were available all having a different revision (unfortunately no emulator could be found which could run the firmware before deploying it onto hardware). This could be used in order to test whether the firmware works across different revisions, as Linksys has changed some hardware components between various revisions. 5.2. Test procedure and approach 5.2.1. Development tests Testing actually can be two separate things. For one, testing can mean testing the low level function-ality of the program: do the methods of the program perform their functions as they should? This is known as unit testing. On the other hand, testing also means testing the program as a whole. Does the program expose errors when the individual subsystems are combined when executing the pro-gram? This is otherwise known as integration testing. Lastly, does it perform the actions which are defined in the requirements document? Can the functionality as provided by the program be used in an intuitive way? This is also known as system testing. All three testing methods have been applied, although the first one in a different way than usual. First of all, unit testing is not as well supported by tools under PHP as under languages such as Java. This means that a lot of programming has to be done in order to unit test the various classes. However, since the classes in themselves aren't that difficult (most of them anyway), it was chosen to do unit testing by logical reasoning. Just by reasoning what would happen if a certain class would be used resulted in quite a few bugs fixed, mainly logical bugs; syntactic and semantic errors are caught by PHP upon execution of the program. Further, the classes would be tested anyway whilst testing the functionality of the program as it is exposed to the user (during integration testing). So the testing approach consisted mainly of actively testing the user functionality of the program 87
  • 98.
    while it wasimplemented (ongoing integration testing). The system would be expanded feature by feature, implementing a new one when the old one tested successfully. So basically each time a new use case was implemented it would be tested right away by a new test case. Finally, the program would again be tested on its user functionality once everything was implemented, using the same test cases, but performing the tested actions in multiple ways. This was done to catch bugs which only come forth when executing functionality in a program in a certain order. Finally, the final testing phase consisted of some functional testing (testing the requirements of the RAD), and some performance testing (testing non functional requirements and design goals), in oth-er words this phase performed the system testing. Another part of system testing is the acceptance testing, which is discussed below in section 'Pilot tests'. 5.2.2. Pilot tests Pilot testing was arranged by the suppliers of the assignment at some locations in Delft, namely two hotels and a campsite. This would only be performed however if the system proved to be sufficient to supply these hotels and campsite with a working setup. The judgment in this was done solely by the suppliers of the assignment. Due to the fact that the system proved not be 100% sufficient, it was chosen not to perform the pilot tests. The reasons why are documented below in the test results. 5.3. Test results In this section the results of the testing phase are discussed. Not all problems and bugs will be dis-cussed. A short overview will be given, discussing the problems or bugs that might introduce needed design changes. Depending on the estimated time needed to implemented these changes and the necessity of these changes in relation to the efficiency gained by them, they might or might not have been implemented. In some cases the changes would result in a better thought out design, but it wouldn't give performance gains. As such these changes have not been implemented, but rather doc-umented in order to learn from them for future projects. The testing results will now be discussed separately for the firmware part and for the management part of the system. 5.3.1. The firmware The largest problem with the firmware was the state of the build root of OpenWRT. It was in beta during the thesis project, as such not ready for production use. This became clear during a late phase of the project. One of the largest problems was the fact that the firmware can lock up the hardware it runs on, needing a hard reset in order to continue. This happened regularly (but not always) when installing the Mobidot firmware on the router. After successfully installing all needed packages, the router would initiate a reboot in order to begin serving user requests. During this reboot the router locked up various times. This was the main reason not to continue the pilot projects. Another prob-lem was the fact that the used OpenWRT version wasn't ready for Linux kernel 2.6, meaning sup-port for traffic shaping wasn't as extensive as needed. In order to provide wireless Internet access at hotspots with evenly divided bandwidth, extensive traffic shaping is needed. Because of these two problems the pilot projects were delayed. These problems however weren't important enough to choose another build root, such as Sveasoft for example. The better design of OpenWRT compared to other build roots outweighs the temporary functional problems of the OpenWRT build root. Another problem, but which was easily fixed, was a bug in one of the scripting engines used in the 88
  • 99.
    firmware (grep). TheMobidot installation scripts needed this tool for information about needed packages, where to get them and how to install them. The script however had a memory problem: it allocated too much memory due to the use of certain options. This resulted in the router running out of memory. The problem was solved by approaching the wanted functionality from a different angle, using a different tool (awk). 5.3.2. The management system On the management side some problems have been found too. The first problem that was discovered deals with the configuration of access points. While it is possible to configure the firewall and traffic shaping through the management panel, there is no dedicated structure for managing other configur-ation settings which are set in the router in so called non-volatile RAM variables. While most of these are related to the firewall (or security in general), they can be set in the firewall script. It would have been more nice however to have a separate management function for controlling the various nvram variables. Another problem is with multiple access points at one site. While it was chosen not to focus on mas-ter- slave configurations due to time constraints, it would've been possible to implement features which in the future can be used to setup these configurations. A technology known as Wireless Dis-tribution System can support radio communication between access points using the same wireless technology. While it is still in beta in OpenWRT, it would've been better to prematurely support it by adding configuration possibilities. The last problem actually relates to both the management system and the firmware. At this moment it is possible to set network announcements, which should be shown to users in case of temporary unavailability of the system. The problem at this point however is that these messages cannot al-ways be shown. When someone logs in using a web browser, these messages will eventually be shown in the pop up screen which is shown after logging in. If someone logs in using WPA (which for the time being is not supported) however, all authentication is done outside a browser, meaning no messages can be communicated to the user. 5.3.3. Results of system testing During system testing it was found that most requirements are implemented, and worked well. The functional and performance tests, which are part of the system tests, will be discussed now. 5.3.3.1. Functional testing The functional requirement 'Bandwidth adjustment per hotspot' has only been partly implemented, since OpenWRT doesn't support traffic shaping well yet. 'Live roaming' is not yet supported, since this should be taken care of by the captive portal which doesn't support it yet. Due to the fact that the solution to the SNAT circumvention has only been designed, but not implemented, it is for the time being not possible to get 'Status overviews'. The addition of SNMP would be needed also, which means a steep learning curve (difficult protocol) and the application for Mobidot specific MIBs (sets of SNMP attributes) at the IANA (Internet Assigned Numbers Authority; the organization that's the authority which deals with the assignment of IP addresses and the birth of new top level domain names), which would take a fair amount of time. The 'monitoring', 'status/statistical information sup-ply', and 'presence announcements' are closely related to the 'Status overview', and are not imple-mented for the same reason. 89
  • 100.
    5.3.3.2. Performance testing The requirements 'Fair use' and 'Basic bandwidth availability' are related to the 'Bandwidth adjust-ment per hotspot' functional requirement, they have not been implemented for the same reasons. 'Op-tional extra security for users' is not completely implemented since it's not within the main focus of the project: the goal was to create a well thought out design, and implement as much as possible. Since the system isn't production ready yet, missing the optional extra security isn't a problem, and can easily be added later. All needed hooks for it are already available in the firmware. Finally, it was found to be impossible to detect Rogue APs in an easy way, and even more to warn users about them. As such that requirement has not been met, it can however easily be met by certain EAP pro-tocols (i.e. EAP-TTLS) which most probably will be used in the future. 5.3.3.3. Acceptance and installation testing This testing approach has not been performed due to the unstable and incomplete state of the Open- WRT build root, as discussed earlier. 90
  • 101.
    Chapter 6. Conclusions This chapter contains conclusions as they were made for the Mobidot infrastructure project. An ab-stract overview of the project is given, further some sub-optimal approaches will be discussed from which can be learned for future projects. Finally a discussion about how the project was perceived, the overall feeling of the author is described. The chapter ends with a discussion containing general conclusions about how the entire study at the Technical University of Delft was perceived. 6.1. Project specific conclusions In this project an infrastructure has been designed and built which is used to provide the user with a wireless connection to the Internet. While the hotspot visitor is the main user of the product, it is not the main actor we are aiming at. The problem that was perceived is the fact that current solutions are quite expensive, too expensive for low budget institutions such as small hotels and small restaurants. The intention of this project was to create a working solution for public wireless networks at a frac-tion of the cost of current solutions. The two largest cost factors with current solutions are the in-vestment in the equipment and the installation and maintenance by a mechanic. As such, we are aiming at the managers of public (low budget) institutions. The project is renewing in that it reaches near full automation. This is achieved by making the product plug 'n play, and by applying active monitoring of the devices. Since the solution is aimed to be low budget, broken installations can easily be replaced by new ones. Thus keeping down times to a minimum and at the same time keep-ing maintenance costs low. Another renewing aspect (to a lesser extent though) of the project is the fact that roaming will be possible, even though the solution is low budget. This means users of other Wi-Fi suppliers can roam to the Mobidot network, keeping their number of contracts for digital communication services to a minimum. This project has aimed at creating a well thought out design, instead of a fully working solution with a bad design. This means most of the time has been put in the design, and less in the implementa-tion. As such not all functionality is implemented, although most of it is. Things that have been de-signed but not implemented include monitoring, setups with multiple cooperating access points and VPN security on the WLAN. After this project is finished it is easily possible to add these features to complete the solution to a production ready system. Especially the first two phases of the project, the analysis and design, took a lot of time. In this case the problem domain is hard to grasp. This is because it is very unclear at the start of the project which systems and actors play a role in this infrastructure, as there are quite a few. Once all require-ments, needed functionality, involved actors and systems and dependencies between systems had been defined and modeled, implementation could be quickly done. The project suffered some failings mainly because of external factors. Due to the fact that the project plays in a new field, and is dependent on quite a few other products, the possibilities for a thesis project are limited to what these products can deliver. The largest problem in this was the firmware for the access points. All firmware except one were found to be badly designed and not useful for this project. The firmware that was found to be well designed and useful, OpenWRT, had some maturity problems though. Once this firmware matures, the solution can be finished to be a production ready system. The project was perceived as difficult but interesting. A lot of aspects of the project, including wire- 91
  • 102.
    less technology initself were new to the author. It was interesting to see how one can develop from knowing near to nothing about a certain subject, to building an entire system in the respective sub-ject. During the study only small, confined exercises have been performed. Never before there's been a large solitary project such as the thesis project. It is interesting to see how one develops from having no idea on how to solve a certain problem, to having extensive knowledge of the various ways to solve such a problem, and design and develop a system to fit that solution. During the study, various courses have been given on a wide variation of subjects. During the thesis project this know-ledge is structured and organized, and this has happened in a satisfactory way. A system has been created in a project which was walked through completely from inception to completion, applying previously gained knowledge and researching needed new knowledge. Getting the responsibility to make the necessary choices and accepting that responsibility to the fullest, shows that the study as provided by the TUDelft has attained its goal: to deliver quality engineers. The guidance in the project was perceived as pleasant. The emphasis of the guidance was exactly in the right area, where it was needed: overall project management, and documentation. Especially de-termining the right audience, and aiming the documentation at that audience was needed and was guided in an excellent way. Finally, the guidance was excellent in the design of the system. While system design has been educated at the university, it has only been practiced minimally. Applying it to a large project was a large step to take, and the guidance in this was very satisfactory. The overall project was perceived as very useful and contributing a lot to personal growth, both in the field of work of ICT, and in the field of finding a barrier between work and free time and making sure that barrier wouldn't shift too much. 6.2. General conclusions After almost eight years of studying at the TUDelft, the end of this life period is quite near, getting ready to transition to a completely autonomous existence. The time spent at the TUDelft overall has been perceived as pleasant. The study period not only has made me grow from novice to expert on a professional level. It has also made me grow on a personal level, in relation to being with other people, getting to be more open to other people and getting a broader perspective upon the world. Personally, one of the most interesting aspects of the study was the fact of getting in contact with people from varying religious and cultural backgrounds. Getting to know these people and their backgrounds was a privilege, and an eye-opening experience. An experience of personal growth that, I believe, many conservative people lack. I've met people both with quite strict religious beliefs and quite loose religious beliefs. During this study some people were more important to me than others, mainly because a lot of my personal growth can be contributed to them. Michele Buonaiuto, an Italian from Napoli, who has been my study partner for nearly the entire study (except for the first quarter) has played an import-ant role in my pleasure of studying at the TUDelft. Doing a lot of projects with him was a joy, I've been with him through better and through worse. Another important person during my study was Vahid Shafiei (Iranian). One of the reasons my study took eight years instead of five is the amount of maths. Vahid was the one with whom I found the needed discipline to finish most remaining maths courses in the fourth year: maths for 8 hours a day, 6 days a week for 9 months. Solving a dif-ficult exercise was a joy and would always go hand in hand with a necessary dose of humor. His view upon the world and his intellectual thinking (he has done a philosophy study in Iran) made it a joy to spend time with him. During later phases of my study, I started to work as a student assistant for the TUDelft. First for the Computer Organization course (2001, 2003), from September 2003 on 92
  • 103.
    as a helpdeskemployee at the Practicumgroep Zuid-Plantsoen. It was here where I met Wim Haan of whom I found out to be quite the same person as I am. Sharing much of the same beliefs and working together fluently has resulted in starting our own business together. Finally Lucas Breedveld, Mohammad Sobat and Shuai She, whom I have enjoyed working with on various projects but also outside college hours. When it comes to the study itself, I'm for the most part pleased with how things went. With true Computer Science courses I didn't have much trouble passing them. First of all I'm quite interested in a diverse set of subjects, which made it even easier. With maths courses I had more problems however. While the material isn't that fundamentally difficult, my old studying method didn't work for these courses, a lot more discipline and dedication was needed to pass these courses. Finally, when it comes to societal courses, things were quite a lot worse. I find that the respective teachers have a hard time bringing the learning material in an enjoyable way, much like my history classes in high school. About the only examination method with these courses was to ask for lists of dates (milestones in history), characteristics of something (name all advantages and disadvantages of a particular approach), etc. Such educational methods don't make the material interesting, and thus fail to being effective in transferring knowledge. One other unfortunate thing is that I had to put quite some time into maths, which makes it look like maths is all I did in my study. One thing I structur-ally missed in the study is ongoing practice in software design and project management. There are only about two courses dealing with software design, and only halfway the third year, project man-agement is taught. More attention is given to programming, while this should be the other way around, since a university (I think) is supposed to aim at a more abstract level. When it comes to the TUDelft as an organization, I believe in essence it means well, but fails to be-come one of a kind. This is reflected in the latest reorganization plans, in which a way of working much like the University of Twente and TU of Eindhoven is trying to be achieved. Instead the TUDelft should find its own way of doing things best. One of the things in which TUDelft excelled, and for which many foreign students came to Delft, was Information Systems. Instead of dumping this at another faculty, it should have gotten more privilege. All in all, I had a great time at the TU Delft. Thanks to everyone who made it a wonderful experi-ence, including: Michele Buonaiuto, Wim Haan, Vahid Shafiei, Mohammad Sobat, Lucas Breedveld, Shuai She, Hattat el Hammouchi, George Stere, Naim Larbi, Abdulhakim Boztas, Firas AlHassany, Noureddine Ou-Aissa, Chakib Boucharraba, Nahil Celikoglu, Aqab Bin Talal, Sabit Asholi, Ravi Chablani, Joost Hietbrink, Michele Nijhuis, Wijnand Post, Hamid Safari, Leon Planken, Azad Imamoglu, Serap Boduc, Bas Schopman, Amros Karbor, Amad Zawity, Denis de Leeuw Duarte, Jun Chen Chen, Michel Meulpolder, Sander Koning, Mustapha Idrissi, Reza Sum-ampouw, Miriam ter Brake, Ronald Huizer, Lieuwe Jan Koning, Serkan Eskici, Osman Zemouri. 93
  • 104.
  • 105.
    Appendix A. References A.1. Books • Networking in general 1. [Dyson1994] Peter Dyson - Dictionary of networking The Network Press, 1994, 2nd edition ISBN 0-7821-1818-6 2. [Tanenbaum1996] Andrew S. Tanenbaum - Computer Networks Prentice Hall, Inc, 1996, 3rd edition ISBN 0-13-394248-1 • Security 1. [Laet2004] Gert de Laet and Gert Schauwers - Network Security Fundamentals Cisco Press, Sep. 2004 ISBN 1-587051672 2. [Lubbe1997] J.C.A. van der Lubbe - Basismethoden cryptografie Delftse Universitaire Pers, 1997, Tweede druk ISBN 90-407-1256-5 • Wi-Fi 1. [Roshan2003] Pejman Roshan and Jonathan Leary - 802.11 Wireless LAN Fundamentals Cisco Press, Dec. 2003 ISBN 1-58705-077-3 • Various 1. [Franssen2002] Maarten Franssen - Methodologie en Ethiek van de Techniek TUDelft Fac. TBM, sectie Filosofie, Maart 2002 A.2. Articles and other documents 95
  • 106.
    • Network structures 1. [Epema2003] DHJ Epema - Distributed Systems Course IN4002 on http://blackboard.icto.tudelft.nl, file book2003.pdf 2. [Minar2002] Nelson Minar - Distributed Systems Topologies http://www.openp2p.com/pub/a/p2p/2001/12/14/topologies_one.html http://www.openp2p.com/pub/a/p2p/2002/01/08/p2p_topologies_pt2.html • Wi-Fi 1. [Register1] The Register - Will pressure to speed up 802.11n wreck standards process? http://www.theregister.co.uk/2004/01/16/will_pressure_to_speed_up/ 2. [Wifinetnews1] Wi-Fi Networking News - 802.11n Archives http://wifinetnews.com/archives/cat_80211n.html 3. [NWFusion1] NetworkWorldFusion - 802.11n http://www.nwfusion.com/details/6450.html?def • Wireless technologies other than Wi-Fi 1. [Cohen2003] Cohen & Deutsch - 802.16: A Look Under The Hood http://www.Wi-Fiplanet.com/tutorials/article.php/10724_3068551_1 2. [Lipset2003] Lipset - 802.16e vs 802.20 http://www.Wi-Fiplanet.com/tutorials/article.php/3072471 3. [Geier2003] Geier - 802.16: A Future Option for Wireless MANs http://www.Wi-Fiplanet.com/tutorials/article.php/2236611 4. [Cohen2003-2] Cohen & Deutsch - 802.16: The Future in Last Mile Wireless Connectivity http://www.Wi-Fiplanet.com/tutorials/article.php/3065261 5. [UMTSForum1] UMTS Forum - What is UMTS? ht-tp:// www.umts-forum.org/servlet/dycon/ztumts/umts/Live/en/umts/What+is+UMTS_index • Security 1. [Arbaugh2001] Arbaugh, Shankar, Wan - Your 802.11 Wireless Network has No Clothes http://www.cs.umd.edu/~waa/wireless.pdf 2. [Borisov2001] Borisov, Goldberg, Wagner - Intercepting Mobile Communications, The In- 96
  • 107.
    security of 802.11 http://www.isaac.cs.berkeley.edu/isaac/mobicom.pdf 3. [Gast2002] Matthew Gast - Wireless LAN security, a short history http://www.oreillynet.com/pub/a/wireless/2002/04/19/security.html 4. [Dismukes2002] Trey Dismukes - Wireless Security Blackpaper http://arstechnica.com/articles/paedia/security.ars 5. [Strand2004] Lars Strand - 802.1X Port-Based Authentication HOWTO http://tldp.org/HOWTO/8021X-HOWTO/intro.html#what80211i 6. [Viney2004] Boden-Cummins, Viney - IPSEC over WLAN: residual vulnerabilities ht-tp:// www.qinetiq.com/home/core_skills/knowledge_information_and_systems/trusted_info rmation_management/white_paper_index.Par.0014.File.pdf 7. [Airespace1] Airespace.com - Authentication and Encryption in an Enterprise Wireless LAN http://www.airespace.com/technology/technote_auth_enc_wlan.php 8. [AESLounge1] AES Lounge website http://www.iaik.tu-graz.ac.at/research/krypto/AES/ • Corporate Networks 1. [Davis2004] Jeff Davis - Centralized Wireless LAN, Thin vs Fat Technology http://www.cablingbusiness.com/pdfs/storynov04.pdf • Networking in general 1. [Titz2001] Olaf Titz - Why TCP Over TCP Is A Bad Idea http://sites.inka.de/sites/bigred/devel/tcp-tcp.html 2. [Fratto2000] Mike Fratto - Why Can't IPsec and NAT Just Get Along? http://www.networkcomputing.com/1123/1123ws2.html 3. [Hubert2003] Bert Hubert - Linux Advanced Routing & Traffic Control http://www.lartc.org/ 4. [Titz2004] Olaf Titz - CIPE Manual http://sites.inka.de/sites/bigred/devel/cipe-doc/cipe.html 97
  • 108.
    5. [Hardin2000] JohnD. Hardin - Linux VPN Masquerade HOWTO http://www.linux.org/docs/ldp/howto/VPN-Masquerade-HOWTO.html 6. [Geier2002] Jim Geier - 802.11 Beacons Revealed http://www.Wi-Fiplanet.com/tutorials/print.php/1492071 7. [Geier2002-2] Jim Geier - 802.11 Alphabet Soup http://www.Wi-Fiplanet.com/tutorials/article.php/10724_1439551_1 8. [CABA1] CABA - WiMedia (802.15.3) Standards & Protocols http://www.caba.org/standard/wimedia.html 9. [Hirt2003] Hirt & Porcino - Ultra-Wideband Radio Technology: Potential and Challenges Ahead Course SPM9612 on http://blackboard.icto.tudelft.nl, file hirt.pdf 10. [Duarte2001] Duarte - UMTS: challenges and perspectives Course SPM9612 on http://blackboard.icto.tudelft.nl, file UMTS_04duargb.pdf 11. [Javvin1] Protocol Dictionary - TACACS http://www.javvin.com/protocolTACACS.html 12. [OpenDiameter1] Open Diameter Web Site http://www.opendiameter.org/ 13. [SearchSecurity1] searchSecurity.com Definitions - RADIUS http://searchsecurity.techtarget.com/sDefinition/0,,sid14_gci214249,00.html 14. [Open1X1] Open1x -- Open Source Implementation of IEEE 802.1x http://open1x.sourceforge.net/ • Definitions and examples 1. [Hp1] HP - Glossary for mobile development - V ht-tp:// h21007.www2.hp.com/dspp/tech/tech_TechDocumentDetailPage_IDX/1,1701,1383,00 .html 2. [Apache1] Apache - Authentication, Authorization, and Access Control http://httpd.apache.org/docs/howto/auth.html 3. [TCPIPGuide1] TCPIP Guide - IPSec Encapsulating Security Payload (ESP) 98
  • 109.
    http://www.tcpipguide.com/free/t_IPSecEncapsulatingSecurityPayloadESP-4.htm 4. [TCPIPGuide2]TCPIP Guide - IPSec Security Associations page 1 ht-tp:// www.tcpipguide.com/free/t_IPSecSecurityAssociationsandtheSecurityAssociation.htm 5. [TCPIPGuide3] TCPIP Guide - IPSec Security Associations page 2 ht-tp:// www.tcpipguide.com/free/t_IPSecSecurityAssociationsandtheSecurityAssociation-2.ht m 6. [Webopedia1] Webopedia - Network Topologies http://www.webopedia.com/quick_ref/topologies.asp 7. [Webopedia2] Webopedia - 802.11 http://www.webopedia.com/TERM/8/802_11.html 8. [Webopedia3] Webopedia - pluggable authentication module http://itmanagement.webopedia.com/TERM/P/pluggable_authentication_module.html 9. [Webopedia4] Webopedia - SNMP http://www.webopedia.com/TERM/S/SNMP.html 10. [Webopedia5] Webopedia - Failover http://www.webopedia.com/TERM/F/failover.html 11. [Webopedia6] Webopedia - Load Balancing http://www.webopedia.com/TERM/l/load_balancing.html 12. [Webopedia7] Webopedia - Watchdog http://winplanet.webopedia.com/TERM/W/watchdog.html 13. [Webopedia8] Webopedia - PCMCIA http://www.webopedia.com/TERM/P/PCMCIA.html 14. [Webopedia9] Webopedia - PC Card http://www.webopedia.com/TERM/P/PC_card.html 15. [Webopedia10] Webopedia - CardBus http://ecrmguide.webopedia.com/TERM/C/CardBus.html 16. [Webopedia11] Webopedia - PCI 99
  • 110.
    http://www.webopedia.com/TERM/P/PCI.html 17. [Webopedia12]Webopedia - Tunneling http://winplanet.webopedia.com/TERM/T/tunneling.html 18. [Rescomp1] Rescomp SNMP Howto - Overview ht-tp:// www.rescomp.berkeley.edu/about/training/senior/progs/SNMP-HOWTO/SNMP-HOW TO-1.html 19. [Wikipedia1] Wikipedia - L2TP http://en.wikipedia.org/wiki/L2TP 20. [Wikipedia2] Wikipedia - PPTP http://en.wikipedia.org/wiki/Point-to-Point_Tunneling_Protocol 21. [Wikipedia3] Wikipedia - Firewall (networking) http://en.wikipedia.org/wiki/Firewall_%28networking%29 22. [Wikipedia4] Wikipedia - Packet filter http://en.wikipedia.org/wiki/Packet_filter 23. [Wikipedia5] Wikipedia - TKIP http://en.wikipedia.org/wiki/TKIP 24. [Wikipedia6] Wikipedia - SSL http://en.wikipedia.org/wiki/Secure_Sockets_Layer 25. [Wikipedia7] Wikipedia - Challenge-response test http://en.wikipedia.org/wiki/Challenge-response_test 26. [Wikipedia8] Wikipedia - Challenge-response authentication http://en.wikipedia.org/wiki/Challenge-response_authentication 27. [Wikipedia9] Wikipedia - Roaming http://en.wikipedia.org/wiki/Roaming 28. [Wikipedia10] Wikipedia - Simple Network Management Protocol http://en.wikipedia.org/wiki/Simple_network_management_protocol 29. [Wikipedia11] Wikipedia - Management information base http://en.wikipedia.org/wiki/Management_information_base 100
  • 111.
    30. [Wikipedia12] Wikipedia- Abstract syntax notation one http://en.wikipedia.org/wiki/ASN.1 31. [Wikipedia13] Wikipedia - Protocol data unit http://en.wikipedia.org/wiki/Protocol_data_unit 32. [Wikipedia14] Wikipedia - Kernel http://en.wikipedia.org/wiki/Kernel_(computers) 33. [Wikipedia15] Wikipedia - User space http://en.wikipedia.org/wiki/User_space 34. [Wikipedia16] Wikipedia - Webmin http://en.wikipedia.org/wiki/Webmin 35. [MLIP1] ML IP - Network Address Translation (NAT) http://www.ml-ip.com/html/support/glossary.html 36. [Vigyan1] Vigyanprasar website - what does HAM really mean? http://www.vigyanprasar.com/ham/MEANING.htm 37. [Imms1] Insurance Marketing & Management Services - Cyber-Glossary http://www.imms.com/cyberglos/ 38. [ITSecurity1] ITSecurity.com Dictionary - Spoofing http://www.itsecurity.com/dictionary/spoof.htm 39. [ITSecurity2] ITSecurity.com Dictionary - Sniffer http://www.itsecurity.com/dictionary/sniffer.htm 40. [FFIEC1] Federal Financial Institutions Examination Council - Glossary http://www.ffiec.gov/ffiecinfobase/booklets/information_security/08_glossary.html 41. [Cryptomathic1] Cryptomathic Labs - Technical Dictionary http://www.cryptomathic.com/labs/techdict.html 42. [Stallion1] Stallion Support Services - Glossary of Terms http://www.stallion.com/html/support/glossary.html 43. [ZIDDokus1] ZID Dokus - Glossary of ATM Terms and Acronyms http://www.edvz.uni-linz.ac.at/dokus/atm.html 101
  • 112.
    44. [Devx1] DevX- Wireless Glossary: 1G http://www.devx.com/wireless/Door/11259 45. [Devx2] DevX - Wireless Glossary: 2G http://www.devx.com/wireless/Door/11263 46. [Devx3] DevX - Wireless Glossary: 2.5G http://www.devx.com/wireless/Door/11264 47. [Devx4] DevX - Wireless Glossary: 3G http://www.devx.com/wireless/Door/11265 • Standards, RFCs and lists 1. [802.1X-2001] Port-Based Network Access Control (802.1X-2001) http://standards.ieee.org/getieee802/download/802.1X-2001.pdf 2. [RFC3748] RFC3748: Extensible Authentication Protocol (EAP) http://www.ietf.org/rfc/rfc3748.txt 3. [RFC1701] RFC1701: Generic Routing Encapsulation (GRE) http://www.ietf.org/rfc/rfc1701.txt 4. [IANA1] Extensible Authentication Protocol (EAP) Registry http://www.iana.org/assignments/eap-numbers A.3. Various references 1. [TMobile1] T-Mobile website - Rate Plan https://selfcare.hotspot.t-mobile.com/RatePlan.do 2. [Picopoint1] Picopoint website - frontpage http://www.picopoint.com/ 3. [Picopoint2] Picopoint website - services http://www.picopoint.com/services.php 4. [GBIA1] GBIA website - frontpage http://www.gbia.com/ 102
  • 113.
    5. [Planetnl1] Planet.nlwebsite - Wi-Fi-aanbieders lid van NLIP http://www.planet.nl/planet/show/id=118880/contentid=422720/sc=f8cf57 6. [SeattleWireless1] Seattle Wireless - Netgear WG602 http://www.seattlewireless.net/index.cgi/NetgearWG602 7. [SeattleWireless2] Seattle Wireless - Linksys WRT54G http://www.seattlewireless.net/index.cgi/LinksysWrt54g 8. [Netgear1] Netgear - GPL Open Source Code for Programmers http://kbserver.netgear.com/kb_web_files/n101238.asp 9. [Linksys1] Linksys - GPL code center http://www.linksys.com/support/gpl.asp 10. [Soekris1] Soekris Engineering - About http://www.soekris.com/about.htm 11. [Tweakers1] Tweakers.net - Pricewatch WLAN access points http://www.tweakers.net/pricewatch/cat/314 12. [Soekris2] Soekris - How to buy http://www.soekris.com/how_to_buy.htm 13. [Soekris3] Soekris Engineering - Bundles http://www.soekris.com/bundles.htm 14. [Netgate1] Netgate - Wireless Mini PCI Cards http://www.netgate.com/index.php?cPath=26_34 15. [KernelOrg1] Kernel.ORG - What is Linux? http://www.kernel.org/ 16. [FreebsdOrg1] FreeBSD.ORG - What is FreeBSD? http://www.freebsd.org/ 17. [SeattleWireless3] Seattle Wireless http://www.seattlewireless.net/ 18. [WirelessLeiden1] Stichting Wireless Leiden http://www.wirelessleiden.nl/ 19. [Tweakers2] Tweakers.net - Nieuws [ XS4All begint rechtszaak tegen Staat om aftapkosten ] 103
  • 114.
  • 115.
    Appendix B. Usedacronyms • AAA: Authentication, Authorization and Accounting • ACE: Adaptive Communication Environment • ACK: Acknowledgment • ADSL: Asynchronous Digital Subscriber Line • AES: Advanced Encryption Standard • AH: Authentication Header • AMPS: Advanced Mobile Phone System • ASN.1: Abstract Syntax Notation One • ASP: Application Service Provider • BER: Basic Encoding Rules • BSD: Berkeley Software Design • BSS: Basic Service Set • CBC-CTR: Cipher Block Chaining Counter Mode • CBC: Cipher Block Chaining • CCM(P): Cipher block chaining Counter Mode Protocol • CDMA: Code Division Multiple Access • CER: Canonical Encoding Rules • CERT: Computer Emergency Response Team • CHAP: Challenge Handshake Authentication Protocol • CIPE: Crypto IP Encapsulation • CPU: Central Processing Unit • CRC: Cyclic Redundancy Check • CSLIP: Compressed Serial Line Internet Protocol • CVS: Concurrent Versions System • DBM: Database Manager • DER: Distinguished Encoding Rules 105
  • 116.
    • DES: DataEncryption Standard • DHCP: Dynamic Host Configuration Protocol • DMZ: Demilitarized Zone • DNAT: Destination Network Address Translation • DNS: Domain Name System • EAP: Extensible Authentication Protocol • EDGE: Enhanced Data rates for GSM Evolution • ESP: Encapsulating Security Payload • ESS: Extended Service Set • ETACS: Extended TACS • FTP: File Transfer Protocol • GBIA: Global Broadband Internet Access • GIF: Graphics Interchange Format • GNU: GNU's Not Unix • GPL: GNU General Public License • GPRS: General Packet Radio Service • GRE: Generic Routing Encapsulation • GSM: originally Group Speciale Mobile, now Global System for Mobile communications • GUI: Graphical User Interface • HAM: The meaning of this acronym is not known, but it relates to amateur radio. See [Vigyan1] for more information. • HMAC: Hashed Message Authentication Code • HTML: Hypertext Modeling Language • HTTP: Hypertext Transfer Protocol • IBSS: Independent Basic Service Set • ICE: Inter City Express • ICMP: Internet Control Message Protocol • ICT: Information and Communication Technology • IEEE: Institute of Electrical and Electronics Engineers 106
  • 117.
    • IETF: InternetEngineering Task Force • IPSEC: IP Security • ISDN: Integrated Services Digital Network • ISO: International Organization for Standardization, the name ISO is actually the Greek word iso which means equal. • ISP: Internet Service Provider • ITU: International Telecommunications Union • KCK: Key Confirmation Key • KEK: Key Encryption Key • KPN: Koninklijke PTT Nederland • L2F: Layer 2 Forwarding • L2TP: Layer 2 Tunneling Protocol • LAN: Local Area Network • LDAP: Lightweight Directory Access Protocol • LEAP: Lightweight Extensible Authentication Protocol • MAC: Message Authentication Code (in the field of cryptography) or Medium Access Control (in the field of networking) • MAP: Master Access Point • MD5: Message Digest version 5 • MIB: Management Information Base • MIC: Message Integrity Check • MIMO: Multiple-In Multiple-Out • MMS: Multimedia Messaging Service • MNO: Mobile Network Operator • MPPE: Microsoft Point-to-Point Encryption • MRTG: Multi Router Traffic Grapher • MSCHAP: Microsoft Challenge Handshake Authentication Protocol • MULTICS: Multiplexed Information and Computing Service • MVC: Model View Controller architecture 107
  • 118.
    • N-AMPS: Narrowband AMPS • NAS: Network Attached Storage • NAT: Network Address Translation • NLIP: Nederlandse Internet Providers • NMT: Nordic Mobile Telephone system • NOC: Network Operations Center • OSI: Open System Interconnect • OSS: Open Source Software • P2P: Peer-to-Peer • PAE: Port Access Entity • PAM: Pluggable Authentication Modules • PAP: PPP Authentication Protocol • PCI: Peripheral Component Interconnect • PCMCIA: Personal Computer Memory Card International Association • PDA: Personal Digital Assistant • PDF: Portable Document Format • PDU: Protocol Data Unit • PEAP: Protected Extensible Authentication Protocol • PER: Packed Encoding Rules • PHP4: PHP: Hypertext Preprocessor, version 4 • PHP: PHP: Hypertext Preprocessor • PKI: Public Key Infrastructure • PMK: Pairwise Master Key • PNG: Portable Network Graphics • POSIX: Portable Operating System Interface • PPP: Point-to-Point Protocol • PPTP: Point-to-Point Tunneling Protocol • PTK: Pairwise Transient Key • RADIUS: Remote Authentication Dial-In User Service 108
  • 119.
    • RAD: RequirementsAnalysis Document • RAM: Random Access Memory • RC4: Rivest Cipher 4 • RFC: Request-For-Comments • RRD: Round Robin Database (database that stores information without expanding over time, by overwriting old information; ie for use with MRTG) • RSA: Rivest, Shamir and Adleman • RSN: Robust Secure Network • SAD: Security Association Database • SAP: Slave Access Point • SHA1: Secure Hash Algorithm version 1 • SMS: Short Message Service • SMTP: Simple Mail Transfer Protocol • SNAT: Source Network Address Translation • SNMP: Simple Network Management Protocol • SOCKS5: Proxy protocol SOCK-et-S version 5 • SPI: Security Parameter Index • SQL: Structured Query Language • SSH: Secure Shell • SSID: Service Set Identifier • SSL: Secure Socket Layer • TACACS+: Enhanced incompatible version of TACACS • TACACS: Terminal Access Controller Access Control System • TACS: Total Access Communications System • TCP: Transmission Control Protocol • TDMA: Time Division Multiple Access • TGV: Train a Grande Vitesse, English: high speed train • TKIP: Temporary Key Integrity Protocol • TK: Temporal Key 109
  • 120.
    • TLS: TransportLayer Security • TSN: Transition Security Network • TTL: Time-To-Live • TTLS: Tunneled TLS • UDP: User Datagram Protocol • UML: Unified Modeling Language • UMTS: Universal Mobile Telecommunications System • UNIX: originally UNICS, meaning Uniplexed Information and Computing System, later changed to UNIX. It was a pun on an experimental operating system in the 60s called Multics. • USB: Universal Serial Bus • UTP: Unshielded Twisted Pair • UWB: Ultra Wide Band • VPN: Virtual Private Network • WAN: Wide Area Network • WAP: Wireless Application Protocol • WBA: Wireless Broadband Alliance • WBAN: Wireless Body Area Network • WDS: Wireless Distribution System • WEP: Wired Equivalent Privacy • WISP: Wireless Internet Service Provider • WLAN: Wireless Local Area Network • WPA2: version 2 of WPA • WPA: Wi-Fi Protected Access • WPAN: Wireless Personal Area Network • WWW: World Wide Web • XER: XML Encoding Rules • XML: eXtensible Modeling Language • XSL: XML Stylesheet Language 110
  • 121.
    Appendix C. Extraproject information C.1. Used tools In here, the choice of development and documentation tools is discussed. One general choice (a bit as a proof of concept) was to only use Open Source tools in order to complete the project (with the exception of the Windows XP OS). One of the most important choices in software tools was the de-velopment environment to use. While most development environments (Netbeans, Dev C++, etc) aim at a specific use or need, it was a desire to use one which can be used for multiple purposes. Having earlier experience with the Eclipse platform made the decision quite easy. While eclipse was still in development, by the time the thesis project started it was already quite matured. Eclipse would fit to be used as a programmer's editor for various languages (a diversity of languages could be needed for this project). But it would also suffice as a general text editor and XML editor. Espe-cially this last fact (fitness for XML editing) introduced an interesting possibility, that is, the use of DocBook XML and XSL for writing project documentation. The use of DocBook introduced some very interesting advantages. Having had some negative experiences with Microsoft Word, such as corrupt documents at the end of a project, only strengthened this choice. The fact the report is writ-ten in XML means it is always readable, and much more recoverable in case of problems, as op-posed to some binary proprietary format. The choice for DocBook meant some external tools would be needed in order to be able to generate the documentation. Here it was decided to use java-based software (Xalan for parsing the XML, Saxon for transforming into XSL-Formatting Objects, and fi-nally Apache FOP for transforming the XSL-FO into PDF), such that platform independence is met (just like with Eclipse, which is also written in java) and use of the Windows OS is not dictated. Besides documentation tools, design tools needed to be chosen. Platform independence was again an important factor. ArgoUML was chosen due to earlier experiences with this tool. One problem was however introduced by this choice (as seemed later on): sequence diagrams weren't implemented yet. The solution was to use another java program called Sequence, which can translate textual de-scriptions of sequence diagrams into graphics in batch. Creating a XSL translator file and DTD (Document Type Definition) file made it possible to define the sequence diagrams in XML, which would then be translated to the textual syntax of Sequence, which in turn would translate these de-scriptions into graphics. This means that most of the thesis project documentation is now based in XML and can be translated to other formats in batch, which in the end can be translated to PDF. This introduces homogeneity in the documentation process. As such this eases the documentation process, both in normal operation as in recovery from possible data corruption. Development tools (outside Eclipse) needed to be chosen as well. One important choice was the use of a certain concurrent versioning system, such that the development of the project is versioned. Many solutions for versioning exist, while only some are well known. Previous experience with the CVS versioning directed the desire in this direction. However, CVS has some disadvantages which make it less interesting. One such disadvantage is the improper handling of binary files. This is is not a huge problem, since everything in the project is text based. One other considerable problem however, is the inability to restructure the directories inside a project in the repository. A versioning system fixing these problems, and which is actually based on CVS, is Subversion. It was chosen to use this versioning system. For the actual implementation, it was chosen to use the Debian Linux OS. Linux delivers by default 111
  • 122.
    a very largeset of development software, in the form of compilers, assemblers, debuggers, etc. Fur-ther, Linux (or any UNIX alike OS for that matter), is very rich in its ability for mass processing of text files (i.e. bash, grep, awk, sed, perl, cut). C.2. Needed preliminary knowledge It is assumed the reader has some basic knowledge of some networking and cryptographic concepts. A short overview of each of these concepts will be presented here. C.2.1. Networking concepts C.2.1.1. TCP/IP and OSI network stacks Figure C.1. OSI reference model [Tanenbaum1996] Each layer of the network stack performs its own function: • 1. Physical: This is the layer that takes care of all physical data traffic. 112
  • 123.
    • 2. Datalink: This is the layer that makes the physical layer accessible for software. The data link layer takes care of error detection and correction, takes care of identifying individual frames by finding their boundaries in one way or another. Networks of data link layers (for example ether-net) contain hosts which can all contact each other directly. Hosts on such networks are ad-dressed by MAC (Medium Access Control) addresses. • 3. Network: The network layer combines various layer 2 networks into one layer 3 network. Layer 3 networks are laid upon layer 2 networks, and multiple layer 3 networks are interconnec-ted using gateways and routers in order to create large layer 3 networks, such as the Internet. Hosts on such networks are identified by IP addresses (at least in the case of the TCP/IP stack). • 4. Transport: The transport layer spans one or more layer 3 networks, in order to create host-to- host (end-to-end) connections (see the figure above to see the distinction between the layers 1 to 3 on the one side, and layers 4 to 7 on the other side). In other words, the transport layer only deals with the source and destination machine of particular data traffic. Transport layer connec-tions are identified by a port or some other identifier. • 5. Session: The session layer makes it possible for users on different machines to establish ses-sions. The session layer provides ordinary data transport in the same way the transport layer does, but adds extra services: dialogue control (half-duplex or full-duplex communication), token management (making sure the two sides don't attempt the same operation at the same time) and synchronization (inserting checkpoints in the data stream in order to be able to resume the data transfer after a crash). • 6. Presentation: As stated by [Tanenbaum 1996]: "The presentation layer is concerned with the syntax and semantics of the inform-ation transmitted." The presentation layer is used to perform functions which resolve certain problems which are faced by multiple users and which can be solved in a general way. • 7. Application: In the application layer is contained a variety of protocols which are commonly needed by applications, for example HTTP for web servers and browsers, FTP for file transfers and SMTP for email. Explained above is the OSI network stack. The TCP/IP stack was developed for the same goal, though by different means. The TCP/IP stack is the one used in the former ArpaNet and its suc-cessor, the Internet. The main distinctions between OSI and TCP/IP are the fact that TCP/IP doesn't define the session and presentation layers, the network layer is called the Internet layer and the data link layer and physical layer of the OSI stack are combined into one layer in the TCP/IP stack and is called host-to-network layer. 113
  • 124.
    Figure C.2. TCP/IPand OSI network stacks [Tanenbaum1996] For a more detailed explanation of these network stacks, refer to [Tanenbaum1996]. C.2.1.2. Some (popular) networking terms • Spoofing: "Impersonating a server or person without permission. Pretending to be someone else. The deliberate inducement of a user or a resource to take an incorrect action. Attempt to gain access to a system by pretending to be an authorized user. Imper-sonating, masquerading, and mimicking are forms of spoofing." [Imms1] "Faking the origin; for example, forging mail headers to make it appear that mes-sages originated elsewhere. One spoof incident reported by CERT involved mes-sages sent to users, supposedly from local system administrators, requesting them to change their password to the new value provided in the message. These mes-sages were not from the administrators, but from intruders trying to steal ac-counts." [ITSecurity1] "Web spoofing. Academics at Princeton university published a paper describing how easy it is for Web spoofers to produce a 'fake' site that can sit between the user and his or her intended destination. Thus spoofers could receive messages and then pass them on to the true destination, and could receive replies and pass them back to the user. In this way it would be possible to 'filter' valuable informa-tion, possibly without the parties concerned ever knowing that it had occurred." [ITSecurity1] 114
  • 125.
    A good exampleof web spoofing in the Netherlands occurred around the start of the 21st cen-tury, when the Rabobank online banking website was hacked and visitors of that site were redir-ected to an identically looking site, which let the users log in and forward (back and forth) data to the real banking website. This way, the hackers could retrieve many logins of the online bank-ing system in question, enabling them to withdraw money illegitimately. • Sniffing: "A program that monitors network traffic. Sniffers are used to capture data trans-mitted on a network. The act is called sniffing. Like so many security applications, sniffers can be used to either enhance or weaken network security. Intrusion De-tection Systems use sniffers to detect suspicious traffic; hackers use sniffers to ob-tain passwords." [ITSecurity2] "The passive interception of data transmissions." [FFIEC1] Sniffing originates on wired networks, where information belonging to a certain person and destined for some other system is passed through intermediate systems in order to reach the des-tination. This fact introduces the possibility for users of such systems (whether legitimate or ille-gitimate, by hacking into the system) to intercept such traffic and have a look at it. Network con-nections which are not point-to-point, such as ethernets, also provide for sniffing traffic, since on such networks traffic destined for a certain host (for example the gateway to the Internet) gets received by all hosts, but normally only the destined host reads and acts on the information that was received. This wouldn't be the case if the network device gets put in promiscuous mode by the user, which can only be done by the administrator of a system. In that case, the system in question reads all traffic on the ethernet, including traffic that wasn't destined for that system. Now the problem gets worse on wireless LANs. While it is normally quite difficult to become administrator on a system which is also connected to a certain wired network, it is much easier to put a privately owned system (i.e. a laptop) in the coverage area of an access point. • Tunneling: "A technology that enables one network to send its data via the connections of an-other network. Tunneling works by encapsulating a network protocol within pack-ets carried by the second network. For example, the PPTP technology from Mi-crosoft enables organizations to use the Internet to transmit data across a VPN. It does this by embedding its own network protocol within the TCP/IP packets car-ried by the Internet." [Webopedia12] • Encapsulation: "Where data is inserted into a different kind of packet so the original packet is hid-den." [Stallion1] C.2.2. Cryptographic concepts Several cryptographic concepts will be mentioned below, including a short description. For a more in-depth explanation of these concepts, refer to [Lubbe1997]. 115
  • 126.
    C.2.2.1. Cryptographic aspectsand methods • Ciphertext: the text that results from encrypting a plaintext. • Pseudo-random progression: progression of numbers (zeros and ones) of which the structure is as random and unpredictable as possible. • Encryption: the process of transforming a plaintext into an encrypted form (called ciphertext), which can also be transformed back to its original form (the plaintext). • Decryption: the process of transforming a ciphertext back to its original form. • Block ciphering: encryption in blocks of a certain size, for example 64 bits in case of DES. This is usually used in case of already present data, for example local files which need to be encryp-ted. • Stream ciphering: encryption in units, for example per character or per bit encryption. This is usually used in situations with streaming data, such as communications. • Public key system (asymmetric system): an encryption system with two keys: a public key and a private key. Each user has both keys. The public one gets sent to other parties, who will use that key for encrypting traffic destined for the owner of the public key. The private key is kept private by the user, and is used for decryption. Public key systems are based on two important aspects: one-way functions and trapdoor functions. One-way functions are functions which are easily calculated, while their inverse isn't at all. Trapdoor functions are actually one-way func-tions (encryption), except in this case there is additional information that makes it possible to compute the inverse of the function (decryption), the secrecy of that information is what makes this system secure. Public key algorithms are usually very slow in their calculations. • Public key infrastructure: "A public key infrastructure provides an electronic framework - i.e. software and a set of rules and practices - for secure communication and transactions between or-ganizations and individuals. A PKI is based on asymmetric encryption and digital signature technologies. It enables two parties to exchange confidential electronic messages and to enter into legally binding agreements over the Internet." [Cryptomathic1] • Shared key system (symmetric system): an encryption system with one key, the shared secret key. This key is shared by everyone who wants to join in the communication. Shared key sys-tems usually have very fast algorithms, but are also more insecure, since the probability of leak-ing of the key is quite large. • Key stream: A key stream is a pseudo-random progression. It is generated by a function, with as input parameters a secret key and sometimes also some extra component such as an initialization vector. The function initializes itself on the basis of the secret key and the initialization vector, and from then on generates (as long as needed) a pseudo-random progression which is to be used for the encryption of data. Usually, for additional encryption sessions, the initialization vector will be changed linearly and then another key stream is generated. 116
  • 127.
    • Key streamreuse: Generation (and use) of an already earlier generated key stream. For example when certain hardware always uses the same secret key and after a reset of that hardware the ini-tialization vector is always reset to some default value, then some initialization vectors will oc-cur much more often than others, resulting in the same pseudo-random progressions being gen-erated over and over, and thus resulting in key stream reuse. This is a potential security threat, because if someone (a hacker) notices this, that person can collect all data that was encrypted us-ing the same key stream. From all that encrypted data he can try to find what the actual key stream was, and since encrypted data is only a combination (in one way or another) of plaintext data and a certain key stream, he can deduce what the original plaintext was. • Confidentiality: making sure that communications are confidential: only the intended audience can take part in the communication. Confidentiality is achieved through encryption. • Reliability (integrity): making sure that transferred data arrives at the other end unmodified, usu-ally this is achieved using some form of cryptographic authentication. • Continuity: making sure that systems can continue operating, communications can continue to take place, data can continue to be stored. Attacks that try to influence the continuity of a system are usually called Denial-of-Service (DoS) attacks. • Key management: a necessary means in order to keep cryptographic algorithms effective. No matter how secure an algorithm is, if the keys cannot be kept secure, the cryptographic algorithm isn't effective. Key management is an essential part of the entire security scheme. Both in sym-metric and asymmetric systems it is needed for several parties to have common keys in order to communicate. In the case of asymmetric systems, parties should have the public keys of all other parties they want to communicate with. In the case of symmetric systems, parties should have the secret key of the communication system they want to have access to. Making sure all in-volved parties have all the keys they need in order to be able to communicate is referred to as key management. Key management is composed of the following aspects: • Key generation: the generation of keys to be used for cryptographic algorithms. The key has to be as unpredictable as possible (refer to pseudo-random characteristics), and shouldn't be cryptographically weak or semi-weak. • Key storage, transport and meta keys: keys shouldn't be stored and transmitted in the clear. Both for storage and for transport separate keys should be used. Such keys that secure anoth-er key during storage or transport are called meta keys. • Key change: one important aspect of cryptographic algorithms is the frequent change of keys that are in use. When keys are changed often enough, attacks such as exhaustive key searches are (almost) impossible. • Key destruction: the destruction of keys when they are no longer in use. Two types of de-struction exist: passive and active. Passive destruction is basically letting the power drop from the memory chip, obviously this only works for volatile memory. Active destruction is performed by overwriting the memory with other contents. In case of volatile memory, one overwrite pass is necessary. In the case of non-volatile memory (i.e. magnetic devices such as hard disks), multiple overwrite passes are necessary. Depending on the importance of the encrypted information well known wipe algorithms, such as the DoD 5220-22.M method (7 passes) or the Gutmann method (35 passes), can be applied to erase the information. 117
  • 128.
    • Key distributionusing asymmetric systems: keys used in asymmetric algorithms are distrib-uted using a trusted third party in order to ensure the authenticity of the keys. • Key distribution using symmetric systems: keys used in symmetric algorithms are initially distributed physically, this means that keys are entered into a system by a person. Any sub-sequent keys are distributed using either the previous key, or using a key distribution center. In the latter solution, every user has a key which he only shares with the key distribution center, and which will be used to receive new keys from the key distribution center. • Challenge-response mechanism: "A challenge-response test is a test involving a set of questions (or "challenges"), that the person or other entity has to answer in order to pass the test. If the person or entity provides an adequate response to the challenges, then it is deemed that this person or entity has passed the test." [Wikipedia7] "In computer security, challenge-response authentication relies on the possession of a secret of some sort to perform authentication. A very simple example is ask-ing for a password, where the challenge is asking for the password, and the ad-equate response is the correct password. This was adequate in the days before the Internet, when the user could be sure that the system asking for the password was really the system they were trying to access, and that nobody was likely to be eavesdropping on the communication channel to observe the password being entered. These days, a more sophisticated approach is necessary involving two-way authentication, where both the user and the system must each convince the other that they know the shared secret (the password), without this secret ever be-ing transmitted in the clear over the communication channel, where eavesdroppers might be lurking. The way this is done involves using the password as the encryp-tion key to transmit some randomly-generated information as the challenge, whereupon the other end must return as its response a similarly-encrypted value which is some predetermined function of the originally-offered information, thus proving that it was able to decrypt the challenge. For instance, in Kerberos, the challenge is an encrypted integer N, while the response is the encrypted integer N + 1, proving that the other end was able to decrypt the integer N." [Wikipedia8] • Cryptographic protocol: a set of prescriptions that should be followed by parties that want to ex-change information in a secure way. • Hash functions: a one-way function of which it is impossible to compute the inverse. A set of in-put values of variable length is reflected onto a set of output values of fixed length. A desired characteristic of hash functions is that such a function should be collision free, meaning that it should be (near to) impossible to create two messages which transform into the same hash. • Authentication: • Message integrity: deals with the fact that messages shouldn't be changed during transit. This means that methods are needed to be able to detect if messages have changed during transit. 118
  • 129.
    • Entity authentication:deals with ensuring that the other party is who he says he is. (ensuring no man-in-the-middle attacks have taken place) • Message authentication: basically the combination of message integrity and entity authentic-ation. • MAC (Message Authentication Code): implementation of message authentication using a secret function instead of a public function like in the case of hash functions, for example the use of symmetric algorithms, i.e. DES, in the form of a one-way function. • Digital signature: digital proof that someone did perform a certain action, such as sending a certain message. This is achieved using public key systems, by having the sender of a mes-sage encrypting the message with his own private key (perhaps in addition to encrypting it with the public key of the other party). The receiver will then decrypt the ciphertext with the public key of the sender. Since the sender is the only one in possession of the private key used for the digital signature, he must be the one who sent the message. • X.509: "Public key certificate standard developed as part of the X.500 directory specifica-tion. The X.500 directory specification is a standard for the development of a mul-tipurpose directory service that can be part of a global directory available to any-one in the world with Internet access. Such a directory is sometimes called a glob-al White Pages directory. The X.500 standard was defined by the International Telecommunications Union (ITU), and the International Organization for Stand-ardization and International Electro-Chemical Commission (ISO/IEC). The X.509 standard is used for secure management and distribution of digitally signed certi-ficates across secure Internet networks." [Cryptomathic1] C.2.2.2. Crypto analytic attacks and other attacks • Exhaustive key search: in this attack all possible combinations of ones and zeros as cryptograph-ic keys are tried, until the right one is found. Usually this is quite difficult for two reasons: the number of possible keys is large (usually too large if keys are changed often) and the text that is searched for might not be recognized (while perhaps the right key was generated using this at-tack). This is not a real crypto analytic attack, since no intelligent searching is applied, such as analysis of the structure of the message or statistics of characteristics of the message. • Ciphertext-only attack: attack using intelligent search tactics to find the message and/or the key where only the ciphertext is available. • Known plaintext attack: attack using intelligent search tactics to find the message and/or the key where a sniffed plaintext and ciphertext are available. • Chosen plaintext attack: attack using intelligent search tactics to find the message and/or the key where a chosen plaintext and corresponding ciphertext are available. • Birthday attack and birthday paradox: the birthday attack is an attack in which someone 119
  • 130.
    searches for messagesM and M' for which holds that h(M') = h(M), where h is the hash function in use. The attack is based on the birthday paradox, the paradox that in a group of for example 23 people, the chance of finding two people that have a birthday on the same is larger than 50%. • Man-in-the-middle attack: attack in which a third (invisible) person intercepts traffic between two parties, changes the information and retransmits it to the right party, without the two other parties knowing. 120
  • 131.
    Appendix D. Projectsupporting documentation D.1. Globalplan for Mobidot thesis project 2005 The thesis project consists of 32 weeks * 40 hours. This amounts to a total time of 1280 hours to be spent for the thesis project, Working times will be: 08:30 - 12:30, 13:00 - 17:00, 18:00 - 22:00 (monday to friday). From 01-01-2005 till 31-05-2005 and 05-09-2005 till 31-12-2005, monday-, tuesday- and wednesday afternoon and monday and tuesday evening will be occupied by another job. Projects • Thesis [Start date: 04-04-2005, Deadline: 31-10-2005] • Reports: • Implementation of a WIFI service provider independent hotspot network [Deadline: 31-10-2005] • Phases: • Project initialization [Deadline: 10-04-2005] • Analysis [Deadline: 08-05-2005] • Design [Deadline: 12-06-2005] • Implementation [Deadline: 28-08-2005] • Evaluation [Deadline: 25-09-2005] • Project finalization [Deadline: 16-10-2005] • Tasks: • Presentation [Date: 10-2005] • Periods: • 04-04-2005 - 01-05-2005 (4 weeks), 40 hrs/week • 02-05-2005 - 08-05-2005 (1 week), 60 hrs/week • 09-05-2005 - 05-06-2005 (4 weeks), 40 hrs/week • 06-06-2005 - 10-07-2005 (5 weeks), 60 hrs/week 121
  • 132.
    • 11-07-2005 -24-07-2005 (2 weeks), 0 hrs/week • 25-07-2005 - 04-09-2005 (6 weeks), 60 hrs/week • 05-09-2005 - 16-10-2005 (6 weeks), 40 hrs/week D.2. Risk analysis for Mobidot thesis project Hazard Likelihood Impact Risk exposure Risk reduction approach R1 Unavailability of resources 7 7 49 Likelihood re-duction R2 Unavailability of key client personnel (Joost, Michele) 3 5 15 Hazard preven-tion R3 Technical problems 2 10 20 Contingency planning R4 Losing project contents and files 5 10 50 Contingency planning R5 Sickness af-fecting critical path activities 5 7 35 Likelihood re-duction, Con-tingency plan-ning R6 Sickness af-fecting non-critical activit-ies 5 3 15 Likelihood re-duction R7 Changes to re-quirements specification during later phases of the project 1 8 8 Likelihood re-duction R8 Requirements specification takes longer than expected 3 3 9 Risk avoidance R9 Implementa-tion takes 2 7 14 Risk avoidance 122
  • 133.
    Hazard Likelihood ImpactRisk exposure Risk reduction approach longer than ex-pected R10 Implementa-tion testing demonstrates errors or defi-ciencies in design 1 10 10 Likelihood re-duction R11 Design takes longer than ex-pected 3 5 15 Risk avoidance • R1: Make sure all resources are available beforehand. (get all books, etc before they are needed) • R2: Early scheduling of meetings • R3: Making available backup systems on which can be worked. The target hardware of the project itself is low cost and can be bought whenever needed (funds are available) • R4: Multiple backup strategies • R5: Living healthy, getting enough sleep, using the weekends as time off to do something else • R6: Living healthy, getting enough sleep, using the weekends as time off to do something else • R7: Incremental prototyping • R8: Plan enough or extra time for this phase or part • R9: Plan enough or extra time for this phase or part • R10: Take enough time for the design, and review it carefully • R11: Plan enough or extra time for this phase or part Critical path activities: • round up of requirements analysis before design • round up of thesis project before deadline Non critical activities: • Transition from design to implementation • Transition from implementation to testing 123