SlideShare a Scribd company logo
First of a Kind 2020
Application Process & Eligibility
Rhianne Montgomery
Kelvin Davies
Michael Fritchley
Steve Sopp
1SBRI Overview
2 Competition Eligibility Criteria
3 Application Criteria & Process
4Submitting your Application
Contents
5 Q&A
SBRI Overview
What is SBRI?
Small business research initiative
Pre-commercial procurement
Requires a lead customer
Outcome-driven solutions
Well-defined challenges of un-met needs
Open to applicants within the EU/ EEA
5
SBRI: the small business
research initiative
Helping government:
SBRI helps government organisations solve tough
challenges by connecting them with innovative businesses.
Helping businesses:
SBRI offers innovators the chance to win a government
contract to help demonstrate and develop their new
technologies.
Helping government, helping businesses
Jenny Griffiths, founder, Snap Fashion
Development Contracts
• 100% funded (procurement contract)
• At least 50% of the contract must be R&D
• Operate under procurement rules rather than state aid rules
• UK implementation of EU pre-commercial procurement
• Deliverable based and focused on milestones
Contract with Prime Supplier
• who may choose to sub-contract but remains accountable
IP rests with Supplier
• You will keep all rights to your IPR, but DfT may require a royalty-free licence. However, if you create
significant capability but do not choose to exploit it, DfT reserve the right to do so under licence.
SBRI Key Features
FOAK 2020 Eligibility
• Open to all organisations. There is no limit on the size or type of company.
• Open to companies from all sectors
• Research organisations are eligible, however they must demonstrate a route to market, i.e., have a plan
to commercialise the results before the contract is issued
• Must carry out demonstration work in the UK
• Must involve a railway asset owner (stations, rolling stock, infrastructure), an experienced rail
organisation and a rail organisation that has the potential to become a customer (these can all be the
same organisation)
• Must work in partnership with organisations that have rail-sector expertise
Application Process
Information Required
Section 1. Application Details
Section 2. Details of Lead Applicant Organisation
Section 3. Contact Details
Section 4. Title and Abstract for Publication
Section 5. Q1 : Description of Proposed Idea / Technology
Section 6. Q2: Technical Project Summary
Section 7. Q3: Current state of the art and intellectual property
Section 8. Q4 :Project plan and methodology
Section 9. Q5: Technical Team and Expertise
Section 10. Q6: Application Finances
Section 11. Q7: Commercial Potential
Section 12. Q8: Application to the Rail Industry – Practicality
Section 13. Q9: Application to the Rail Industry – Benefits
Section 14. Declaration
Application Form
Appendices permitted
Appendices permitted
1. Application
• Please enter information solely on the project
2. Details of Lead Applicant Organisation
3. Contact Details
4. Title and Abstract for Publication
• Please provide a brief, public facing description of the
project. Should your project be successful, this information
will be made public once the award is confirmed.
Non-technical Questions
5. Description of Proposed Idea/Technology
• Avoiding the use of unnecessary technical jargon, describe clearly how the proposed project will deliver the
outcomes as described in the competition documentation.
• You may submit 2 A4 pages of appendices for this question, such as an image or diagram
6. Technical Project Summary
• Please provide a structured summary of the technical basis of the project. This should outline the
background to the technology, including what the innovation is, and the key deliverables. This would
typically involve highlighting the research and development that will prove the scientific and commercial
merit of the project.
Project-specific Questions
Project-specific Questions
7. Current State of the Art and Intellectual Property (IP)
Please provide details of any competing technologies / market alternatives and the relative benefits of the proposed
technology. Include details of any existing IP and its significance to your freedom to operate.
8. Project Plan and Methodology
Describe the project plan and detail the key project milestones and deliverables.
Project Management
• Identify the project management processes that will ensure milestones are achieved and describe key risks (in the
categories of technical, commercial and environmental) and mitigation actions.
• Provide a Gantt chart to support this section, in PDF format, maximum 2 A4 pages
Project-specific Questions
9. Technical Team and Expertise
• Provide a detailed description of the skills and expertise and track record of the team, including the relevant
knowledge and skills of each member.
• Outline the proportion of time each member will spend on the project. Relevant commercial and
management expertise should also be included. Also include details of any sub-contractors and the
expertise they bring to the project.
10. Application Finances
Please provide a summary of costs for the project. All costs MUST include VAT (where applicable)
• “Fair market value”
• Profit not included
Eligible Costs
Direct costs:
• Labour costs for all those contributing to the project, broken
down by individual
• Material Costs (including consumables specific to the project)
• Capital Equipment Costs
• Sub-contract costs
• Travel and subsistence
• Other costs specifically attributed to the project
Indirect Costs:
• General office and basic laboratory consumables
• Library services/learning resources
• Typing/secretarial
• Finance, personnel, public relations and departmental services
• Central and distributed computing
• Cost of capital employed
• Overheads
Project-specific Questions
11. Commercial Potential
• Please provide details of the clear
commercial potential to lead to a marketable
product, process or service and a clear plan
to deliver that and route to market.
• You will need to describe the significance of
the competitive advantage which this
technology affords over existing/alternate
technologies that can meet the market
needs.
Project-specific Questions
12. Application to the Rail Industry – Practicality
Please explain the application to the rail industry, in particular how this demonstration:
• delivers a plausible innovation that has a good probability of being successfully exploited in the context of
one or more railway systems operating in the UK
• will deliver operational evidence, and an opportunity to assess public confidence and commercial
incentives to help accelerate the commercialisation of this innovation in the rail industry?
• will support rail staff in gaining an understanding of the need and impact of this innovation, and an
opportunity to assess the whole system benefits and opportunities
• will help open-up markets for this rail innovation based on evidence, technical data and intelligence
gathered from the demonstrator experience?
Project-specific Questions
13. Application to the Rail Industry – Benefits
Please explain the application to the rail industry, in particular how this demonstration will:
• deliver an opportunity for rail passengers to experience an enhancement in the experience of using the railway or
for rail staff to experience an enhancement in the experience of operating the railway?
• support SMEs and Tier 1 suppliers in demonstrating this rail innovation, with the potential to open-up new rail
export opportunities for UK PLC?
• provide an opportunity for media coverage and the reporting of an innovation success to help drive an increase in
rail staff and rail customer experience and satisfaction levels?
• help to provide evidence in relation to relevant regulations to show where they may impact on the delivery of
railway innovations, and to help ensure that barriers and risks to commercialisation are evident and readily
managed?
The Final Question
14. Declarations
• The lead applicant is expected to have discussed the application within their
own company and any other body whose co-operation will be required to
deliver the project.
• The lead applicant will need to obtain consent from an authorised officer or
appropriate signatory who will sign the contract if successful; we will provide a
contract for review. The contract is a legally binding document and subject to
the outcome of this competition.
• Application Form (must not be converted to different format)
• Appendices - font size no smaller than 10 (Arial) in PDF format
o Q5 appendices - 2 A4 sides: pictures; diagrams; technical documents etc.
o Q8 - Gantt Chart – 2 A4 sides
• Applications must be complete
o All mandatory information supplied to ensure eligibility
Forms Required
Applicants must have a letter of support from a rail organisation, but please do not
submit these with your application. These will be requested as part of the
assessment process.
Assessment & Selection
All applications are assessed by independent assessors drawn from industry and academia
Each application will be reviewed by several assessors to provide an average score.
Application Assessment
What do the assessors look for?
• Clear and concise answers
• The right amount of information
• not too much detail
• no assumptions
• Quantification and justification
• That the applicant (team) has presented a viable opportunity for growth, a level of innovation that
necessitates public sector investment and an appropriate team and approach to take it forward
Application Scoring
Assessment Criteria
Weighting
(points available)
1. How well does the proposed idea, solution or technology meet the challenge as detailed in the brief? 10
2. How valid is the technical approach that will be adopted? 10
3. Have the applicants made a good case for application of this idea, solution or technology to the rail industry? (See
particularly questions 8 and 9 on the application form)
40
4. How innovative is this project? To what extent does the project develop or employ novel concepts, approaches,
methodologies, tools or technologies for this area?
10
5. To what extent does the proposal show a clear plan for establishing technical and commercial feasibility and the
development of a working prototype?
How does the proposal demonstrate that there is a clear management plan What are the risks (technical, commercial and
environmental) to project success? How effectively will these be managed? How appropriate are the milestones and
evaluation procedures?
10
6. To what extent does the applicant appear to have the right skills, capabilities and experience to deliver the intended
benefits?
10
7. How appropriate is the proposal financially? Is the overall budget realistic and justified in terms of the aims and methods
proposed? Are the costs appropriate and justified?
10
8. Is there a clear commercial potential to lead to a marketable product, process or service and a clear plan to deliver that
and route to market? How significant is the competitive advantage which this technology affords over existing or alternate
technologies that can meet the market needs?
20
Final Assessor Question
Recommendation
Recommended Would you recommend this project for
funding and if not why not?
Submitting Your
Application & Next Steps
The Application Submission Process
Take your time, use all space providedCOMPLETE documents
DOWNLOAD documents
Don’t leave it to the last minute. Do it early!UPLOAD documents
On date providedNOTIFICATION received
Within 4 weeks of receiving your notificationFEEDBACK received
REGISTER Via competition website
Invitation to tender
1. If you intend to make an application, you must first REGISTER for the competition.
(Remember: Registration ends 1 week prior to the competition close)
2. You will receive an email with your username and password along with a link to the
secure upload area. This email will also contain your application form with unique
application number.
3. For multiple projects: please contact the support team (support@innovateuk.gov.uk)
after your first registration for additional unique application forms.
REGISTER
Public area
Click Login to access the Secure
area
DOWNLOAD
documents
Check: your application number matches your login username number
Naming
a) Your documents should contain your unique application number (e.g. App12345.docx)
b) Appendices begin with APPENDIX and supplied in PDF format.
Format
a) Application Form submitted as a Word file (.doc /.docx)
Full stage only:
b) Appendices submitted as PDF file
COMPLETE documents
Secure area
Enter your login details
and accept the T and Cs.
Click the Login button at
the bottom.
Click Upload and follow the
on-screen instructions.
UPLOAD documents
Notification will be received by email on or before the date stated in the timeline.
For successful projects:
• Financial project cost review and viability checks undertaken
• Contracts will be issued approximately 4 weeks after notification
• The Project may not start until the organisation has received and returned signed acceptance
of Contract
NOTIFICATION
received
Issued for both successful and unsuccessful applicants within 4 weeks of receiving your notification
Word document
Uploaded to your
secure area
Not issued via email
FEEDBACK received
Important Points
• Applicants must fully complete the application form
• Any size or type of organisation is eligible, providing a route to market is
demonstrated
• All contract values quoted include VAT
• Fair Market Value
• The contract terms and conditions are not negotiable
33

More Related Content

What's hot

Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK
 
Ktn Network
Ktn NetworkKtn Network
Ktn Network
PDirken
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
Agència per a la Competitivitat de l'empresa - ACCIÓ
 
Main steps in an innovation procurement (including steps before the procurement)
Main steps in an innovation procurement (including steps before the procurement)Main steps in an innovation procurement (including steps before the procurement)
Main steps in an innovation procurement (including steps before the procurement)
Agència per a la Competitivitat de l'empresa - ACCIÓ
 
Innovation loans briefing events open september 2019 slides to share
Innovation loans briefing events open september 2019 slides to shareInnovation loans briefing events open september 2019 slides to share
Innovation loans briefing events open september 2019 slides to share
KTN
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
Agència per a la Competitivitat de l'empresa - ACCIÓ
 
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
KTN
 
TFI DEMO Competition Briefing & Capability for TFI Event
TFI DEMO Competition Briefing & Capability for TFI EventTFI DEMO Competition Briefing & Capability for TFI Event
TFI DEMO Competition Briefing & Capability for TFI Event
KTN
 
Applicant Briefing - Sharon McHugh, Innovate UK
Applicant Briefing - Sharon McHugh, Innovate UKApplicant Briefing - Sharon McHugh, Innovate UK
Applicant Briefing - Sharon McHugh, Innovate UK
KTN
 
The Wales Space Strategy John Whalley
The Wales Space Strategy John WhalleyThe Wales Space Strategy John Whalley
The Wales Space Strategy John Whalley
Innovate UK
 
Future Worlds Event - Kezia Williamson KTN
Future Worlds Event - Kezia Williamson KTNFuture Worlds Event - Kezia Williamson KTN
Future Worlds Event - Kezia Williamson KTN
Invest Northern Ireland
 
An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...
An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...
An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...
KTN
 
Competition Scope - George Papadakis, Innovate UK
Competition Scope - George Papadakis, Innovate UKCompetition Scope - George Papadakis, Innovate UK
Competition Scope - George Papadakis, Innovate UK
KTN
 
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
KTN
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
KTN
 
ISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to CancerISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to Cancer
KTN
 
Transforming Food Production: Series A Investor Partnership - SMEs Competitio...
Transforming Food Production: Series A Investor Partnership - SMEs Competitio...Transforming Food Production: Series A Investor Partnership - SMEs Competitio...
Transforming Food Production: Series A Investor Partnership - SMEs Competitio...
KTN
 
Making the Move from the Academic to the Commercial Lab: What You Should Kno...
Making the Move from the Academic to the Commercial  Lab: What You Should Kno...Making the Move from the Academic to the Commercial  Lab: What You Should Kno...
Making the Move from the Academic to the Commercial Lab: What You Should Kno...
Principal Investigator Leader
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
KTN
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
KTN
 

What's hot (20)

Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing pack
 
Ktn Network
Ktn NetworkKtn Network
Ktn Network
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
 
Main steps in an innovation procurement (including steps before the procurement)
Main steps in an innovation procurement (including steps before the procurement)Main steps in an innovation procurement (including steps before the procurement)
Main steps in an innovation procurement (including steps before the procurement)
 
Innovation loans briefing events open september 2019 slides to share
Innovation loans briefing events open september 2019 slides to shareInnovation loans briefing events open september 2019 slides to share
Innovation loans briefing events open september 2019 slides to share
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
 
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
Network Rail & Innovate UK Railways SBRI Competition Briefing: Innovation in ...
 
TFI DEMO Competition Briefing & Capability for TFI Event
TFI DEMO Competition Briefing & Capability for TFI EventTFI DEMO Competition Briefing & Capability for TFI Event
TFI DEMO Competition Briefing & Capability for TFI Event
 
Applicant Briefing - Sharon McHugh, Innovate UK
Applicant Briefing - Sharon McHugh, Innovate UKApplicant Briefing - Sharon McHugh, Innovate UK
Applicant Briefing - Sharon McHugh, Innovate UK
 
The Wales Space Strategy John Whalley
The Wales Space Strategy John WhalleyThe Wales Space Strategy John Whalley
The Wales Space Strategy John Whalley
 
Future Worlds Event - Kezia Williamson KTN
Future Worlds Event - Kezia Williamson KTNFuture Worlds Event - Kezia Williamson KTN
Future Worlds Event - Kezia Williamson KTN
 
An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...
An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...
An Introduction to Eurostars - an Opportunity for SMEs to Collaborate Interna...
 
Competition Scope - George Papadakis, Innovate UK
Competition Scope - George Papadakis, Innovate UKCompetition Scope - George Papadakis, Innovate UK
Competition Scope - George Papadakis, Innovate UK
 
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
Network Rail & Innovate UK: Background to the Network Rail Challenges - Janin...
 
Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
 
ISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to CancerISCF Application of whole Genome Sequencing approaches to Cancer
ISCF Application of whole Genome Sequencing approaches to Cancer
 
Transforming Food Production: Series A Investor Partnership - SMEs Competitio...
Transforming Food Production: Series A Investor Partnership - SMEs Competitio...Transforming Food Production: Series A Investor Partnership - SMEs Competitio...
Transforming Food Production: Series A Investor Partnership - SMEs Competitio...
 
Making the Move from the Academic to the Commercial Lab: What You Should Kno...
Making the Move from the Academic to the Commercial  Lab: What You Should Kno...Making the Move from the Academic to the Commercial  Lab: What You Should Kno...
Making the Move from the Academic to the Commercial Lab: What You Should Kno...
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
 

Similar to Department for Transport SBRI Rail Competition Briefing - Application Process & Eligibility

Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...
KTN
 
Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...
Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...
Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...
Invest Northern Ireland
 
Transforming Accountancy, Insurance & Legal Services with AI & Data
Transforming  Accountancy,  Insurance  &  Legal  Services  with  AI  &  DataTransforming  Accountancy,  Insurance  &  Legal  Services  with  AI  &  Data
Transforming Accountancy, Insurance & Legal Services with AI & Data
KTN
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
Innovate UK
 
Digital Security by Design Software Ecosystem Competition
Digital Security by Design Software Ecosystem CompetitionDigital Security by Design Software Ecosystem Competition
Digital Security by Design Software Ecosystem Competition
KTN
 
Competition Briefing - Open Digital Solutions for Net Zero Energy
Competition Briefing - Open Digital Solutions for Net Zero Energy Competition Briefing - Open Digital Solutions for Net Zero Energy
Competition Briefing - Open Digital Solutions for Net Zero Energy
KTN
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposal
Tony Toole
 
SBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear WasteSBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear Waste
KTN
 
Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...
Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...
Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...
Invest Northern Ireland
 
Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...
KTN
 
Maxine Smith 19 May V Final
Maxine Smith 19 May V FinalMaxine Smith 19 May V Final
Maxine Smith 19 May V Final
InnovateUK
 
SDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of Things
SDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of ThingsSDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of Things
SDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of Things
KTN
 
Roundtable discussion notes for Innovate UK 5G competition
Roundtable discussion notes for Innovate UK 5G competitionRoundtable discussion notes for Innovate UK 5G competition
Roundtable discussion notes for Innovate UK 5G competition
techUK
 
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De MartinoOpen Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
JIC
 
BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...
BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...
BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...
KTN
 
Rick Hathaway V SCTCday cloud 24 feb16 Barcelona
Rick Hathaway V SCTCday cloud 24 feb16 BarcelonaRick Hathaway V SCTCday cloud 24 feb16 Barcelona
Rick Hathaway V SCTCday cloud 24 feb16 Barcelona
Agustin Argelich Casals
 
Enabling technologies cv presentation
Enabling technologies cv presentationEnabling technologies cv presentation
Enabling technologies cv presentation
CSR Europe
 
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationMulti-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
The European GNSS Agency (GSA)
 
Technology Transfer between Europe and India
Technology Transfer between Europe and IndiaTechnology Transfer between Europe and India
Technology Transfer between Europe and India
Amjad Shaikh
 
Allan matthews bp icam
Allan matthews   bp icamAllan matthews   bp icam
Allan matthews bp icam
The Advanced Materials Show
 

Similar to Department for Transport SBRI Rail Competition Briefing - Application Process & Eligibility (20)

Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...Competition scope, competition eligibility conditions and application process...
Competition scope, competition eligibility conditions and application process...
 
Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...
Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...
Innovate UK Emerging & Enabling Technologies Roadshow | Applicant briefing | ...
 
Transforming Accountancy, Insurance & Legal Services with AI & Data
Transforming  Accountancy,  Insurance  &  Legal  Services  with  AI  &  DataTransforming  Accountancy,  Insurance  &  Legal  Services  with  AI  &  Data
Transforming Accountancy, Insurance & Legal Services with AI & Data
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
 
Digital Security by Design Software Ecosystem Competition
Digital Security by Design Software Ecosystem CompetitionDigital Security by Design Software Ecosystem Competition
Digital Security by Design Software Ecosystem Competition
 
Competition Briefing - Open Digital Solutions for Net Zero Energy
Competition Briefing - Open Digital Solutions for Net Zero Energy Competition Briefing - Open Digital Solutions for Net Zero Energy
Competition Briefing - Open Digital Solutions for Net Zero Energy
 
Jisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposalJisc fe and skills development and resource programme proposal
Jisc fe and skills development and resource programme proposal
 
SBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear WasteSBRI competition: Sort and Segregate Nuclear Waste
SBRI competition: Sort and Segregate Nuclear Waste
 
Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...
Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...
Emerging & Enabling Technologies event, 19 September 17 - presentation by Jon...
 
Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...Transforming Construction Innovation Hub Overview and Platform Design Competi...
Transforming Construction Innovation Hub Overview and Platform Design Competi...
 
Maxine Smith 19 May V Final
Maxine Smith 19 May V FinalMaxine Smith 19 May V Final
Maxine Smith 19 May V Final
 
SDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of Things
SDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of ThingsSDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of Things
SDTaP Demonstrators Phase 2: Cyber Security Challenges in the Internet of Things
 
Roundtable discussion notes for Innovate UK 5G competition
Roundtable discussion notes for Innovate UK 5G competitionRoundtable discussion notes for Innovate UK 5G competition
Roundtable discussion notes for Innovate UK 5G competition
 
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De MartinoOpen Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
 
BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...
BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...
BEIS Nuclear Innovation Programme - Grant Call for Advanced Manufacturing and...
 
Rick Hathaway V SCTCday cloud 24 feb16 Barcelona
Rick Hathaway V SCTCday cloud 24 feb16 BarcelonaRick Hathaway V SCTCday cloud 24 feb16 Barcelona
Rick Hathaway V SCTCday cloud 24 feb16 Barcelona
 
Enabling technologies cv presentation
Enabling technologies cv presentationEnabling technologies cv presentation
Enabling technologies cv presentation
 
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentationMulti-frequency multipurpose antenna for Galileo - Webinar presentation
Multi-frequency multipurpose antenna for Galileo - Webinar presentation
 
Technology Transfer between Europe and India
Technology Transfer between Europe and IndiaTechnology Transfer between Europe and India
Technology Transfer between Europe and India
 
Allan matthews bp icam
Allan matthews   bp icamAllan matthews   bp icam
Allan matthews bp icam
 

More from KTN

Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
KTN
 
UK Catalysis: Innovation opportunities for an enabling technology
UK Catalysis: Innovation opportunities for an enabling technologyUK Catalysis: Innovation opportunities for an enabling technology
UK Catalysis: Innovation opportunities for an enabling technology
KTN
 
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
KTN
 
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
KTN
 
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
KTN
 
Smart Networks and Services Joint Undertaking (SNS JU) Call Topics
Smart Networks and Services Joint Undertaking (SNS JU) Call TopicsSmart Networks and Services Joint Undertaking (SNS JU) Call Topics
Smart Networks and Services Joint Undertaking (SNS JU) Call Topics
KTN
 
Building Talent for the Future 2 – Expression of Interest Briefing
Building Talent for the Future 2 – Expression of Interest BriefingBuilding Talent for the Future 2 – Expression of Interest Briefing
Building Talent for the Future 2 – Expression of Interest Briefing
KTN
 
Connected and Autonomous Vehicles Cohort Workshop
Connected and Autonomous Vehicles Cohort WorkshopConnected and Autonomous Vehicles Cohort Workshop
Connected and Autonomous Vehicles Cohort Workshop
KTN
 
Biodiversity and Food Production: The Future of the British Landscape
Biodiversity and Food Production: The Future of the British LandscapeBiodiversity and Food Production: The Future of the British Landscape
Biodiversity and Food Production: The Future of the British Landscape
KTN
 
Engage with...Performance Projects
Engage with...Performance ProjectsEngage with...Performance Projects
Engage with...Performance Projects
KTN
 
How to Create a Good Horizon Europe Proposal Webinar
How to Create a Good Horizon Europe Proposal WebinarHow to Create a Good Horizon Europe Proposal Webinar
How to Create a Good Horizon Europe Proposal Webinar
KTN
 
Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...
Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...
Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...
KTN
 
Engage with...Custom Interconnect
Engage with...Custom InterconnectEngage with...Custom Interconnect
Engage with...Custom Interconnect
KTN
 
Engage with...ZF
Engage with...ZFEngage with...ZF
Engage with...ZF
KTN
 
Engage with...FluxSys
Engage with...FluxSysEngage with...FluxSys
Engage with...FluxSys
KTN
 
Made Smarter Innovation: Sustainable Smart Factory Competition Briefing
Made Smarter Innovation: Sustainable Smart Factory Competition BriefingMade Smarter Innovation: Sustainable Smart Factory Competition Briefing
Made Smarter Innovation: Sustainable Smart Factory Competition Briefing
KTN
 
Driving the Electric Revolution – PEMD Skills Hub
Driving the Electric Revolution – PEMD Skills HubDriving the Electric Revolution – PEMD Skills Hub
Driving the Electric Revolution – PEMD Skills Hub
KTN
 
Medicines Manufacturing Challenge EDI Survey Briefing Webinar
Medicines Manufacturing Challenge EDI Survey Briefing WebinarMedicines Manufacturing Challenge EDI Survey Briefing Webinar
Medicines Manufacturing Challenge EDI Survey Briefing Webinar
KTN
 
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Pitches
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | PitchesHorizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Pitches
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Pitches
KTN
 
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Slides
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | SlidesHorizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Slides
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Slides
KTN
 

More from KTN (20)

Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
Prospering from the Energy Revolution: Six in Sixty - Technology and Infrastr...
 
UK Catalysis: Innovation opportunities for an enabling technology
UK Catalysis: Innovation opportunities for an enabling technologyUK Catalysis: Innovation opportunities for an enabling technology
UK Catalysis: Innovation opportunities for an enabling technology
 
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
Industrial Energy Transformational Fund Phase 2 Spring 2022 - Competition Bri...
 
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
 
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
Horizon Europe ‘Culture, Creativity and Inclusive Society’ Consortia Building...
 
Smart Networks and Services Joint Undertaking (SNS JU) Call Topics
Smart Networks and Services Joint Undertaking (SNS JU) Call TopicsSmart Networks and Services Joint Undertaking (SNS JU) Call Topics
Smart Networks and Services Joint Undertaking (SNS JU) Call Topics
 
Building Talent for the Future 2 – Expression of Interest Briefing
Building Talent for the Future 2 – Expression of Interest BriefingBuilding Talent for the Future 2 – Expression of Interest Briefing
Building Talent for the Future 2 – Expression of Interest Briefing
 
Connected and Autonomous Vehicles Cohort Workshop
Connected and Autonomous Vehicles Cohort WorkshopConnected and Autonomous Vehicles Cohort Workshop
Connected and Autonomous Vehicles Cohort Workshop
 
Biodiversity and Food Production: The Future of the British Landscape
Biodiversity and Food Production: The Future of the British LandscapeBiodiversity and Food Production: The Future of the British Landscape
Biodiversity and Food Production: The Future of the British Landscape
 
Engage with...Performance Projects
Engage with...Performance ProjectsEngage with...Performance Projects
Engage with...Performance Projects
 
How to Create a Good Horizon Europe Proposal Webinar
How to Create a Good Horizon Europe Proposal WebinarHow to Create a Good Horizon Europe Proposal Webinar
How to Create a Good Horizon Europe Proposal Webinar
 
Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...
Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...
Horizon Europe Tackling Diseases and Antimicrobial Resistance (AMR) Webinar a...
 
Engage with...Custom Interconnect
Engage with...Custom InterconnectEngage with...Custom Interconnect
Engage with...Custom Interconnect
 
Engage with...ZF
Engage with...ZFEngage with...ZF
Engage with...ZF
 
Engage with...FluxSys
Engage with...FluxSysEngage with...FluxSys
Engage with...FluxSys
 
Made Smarter Innovation: Sustainable Smart Factory Competition Briefing
Made Smarter Innovation: Sustainable Smart Factory Competition BriefingMade Smarter Innovation: Sustainable Smart Factory Competition Briefing
Made Smarter Innovation: Sustainable Smart Factory Competition Briefing
 
Driving the Electric Revolution – PEMD Skills Hub
Driving the Electric Revolution – PEMD Skills HubDriving the Electric Revolution – PEMD Skills Hub
Driving the Electric Revolution – PEMD Skills Hub
 
Medicines Manufacturing Challenge EDI Survey Briefing Webinar
Medicines Manufacturing Challenge EDI Survey Briefing WebinarMedicines Manufacturing Challenge EDI Survey Briefing Webinar
Medicines Manufacturing Challenge EDI Survey Briefing Webinar
 
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Pitches
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | PitchesHorizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Pitches
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Pitches
 
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Slides
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | SlidesHorizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Slides
Horizon Europe Clean Energy Webinar - Cluster 5 Destination 3 | Slides
 

Recently uploaded

"Scaling RAG Applications to serve millions of users", Kevin Goedecke
"Scaling RAG Applications to serve millions of users",  Kevin Goedecke"Scaling RAG Applications to serve millions of users",  Kevin Goedecke
"Scaling RAG Applications to serve millions of users", Kevin Goedecke
Fwdays
 
AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
Ajin Abraham
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
Jason Yip
 
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
Fwdays
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
DianaGray10
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving
 
High performance Serverless Java on AWS- GoTo Amsterdam 2024
High performance Serverless Java on AWS- GoTo Amsterdam 2024High performance Serverless Java on AWS- GoTo Amsterdam 2024
High performance Serverless Java on AWS- GoTo Amsterdam 2024
Vadym Kazulkin
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Neo4j
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
c5vrf27qcz
 
ScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking ReplicationScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking Replication
ScyllaDB
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
Hiroshi SHIBATA
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
ScyllaDB
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
Chart Kalyan
 
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin..."$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
Fwdays
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
BibashShahi
 
What is an RPA CoE? Session 2 – CoE Roles
What is an RPA CoE?  Session 2 – CoE RolesWhat is an RPA CoE?  Session 2 – CoE Roles
What is an RPA CoE? Session 2 – CoE Roles
DianaGray10
 
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
zjhamm304
 
From Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMsFrom Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMs
Sease
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
MichaelKnudsen27
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
Neo4j
 

Recently uploaded (20)

"Scaling RAG Applications to serve millions of users", Kevin Goedecke
"Scaling RAG Applications to serve millions of users",  Kevin Goedecke"Scaling RAG Applications to serve millions of users",  Kevin Goedecke
"Scaling RAG Applications to serve millions of users", Kevin Goedecke
 
AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
 
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
 
High performance Serverless Java on AWS- GoTo Amsterdam 2024
High performance Serverless Java on AWS- GoTo Amsterdam 2024High performance Serverless Java on AWS- GoTo Amsterdam 2024
High performance Serverless Java on AWS- GoTo Amsterdam 2024
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
 
ScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking ReplicationScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking Replication
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
 
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin..."$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
 
What is an RPA CoE? Session 2 – CoE Roles
What is an RPA CoE?  Session 2 – CoE RolesWhat is an RPA CoE?  Session 2 – CoE Roles
What is an RPA CoE? Session 2 – CoE Roles
 
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
 
From Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMsFrom Natural Language to Structured Solr Queries using LLMs
From Natural Language to Structured Solr Queries using LLMs
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
 
Leveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and StandardsLeveraging the Graph for Clinical Trials and Standards
Leveraging the Graph for Clinical Trials and Standards
 

Department for Transport SBRI Rail Competition Briefing - Application Process & Eligibility

  • 1. First of a Kind 2020 Application Process & Eligibility Rhianne Montgomery Kelvin Davies Michael Fritchley Steve Sopp
  • 2. 1SBRI Overview 2 Competition Eligibility Criteria 3 Application Criteria & Process 4Submitting your Application Contents 5 Q&A
  • 4. What is SBRI? Small business research initiative Pre-commercial procurement Requires a lead customer Outcome-driven solutions Well-defined challenges of un-met needs Open to applicants within the EU/ EEA
  • 5. 5 SBRI: the small business research initiative Helping government: SBRI helps government organisations solve tough challenges by connecting them with innovative businesses. Helping businesses: SBRI offers innovators the chance to win a government contract to help demonstrate and develop their new technologies. Helping government, helping businesses Jenny Griffiths, founder, Snap Fashion
  • 6. Development Contracts • 100% funded (procurement contract) • At least 50% of the contract must be R&D • Operate under procurement rules rather than state aid rules • UK implementation of EU pre-commercial procurement • Deliverable based and focused on milestones Contract with Prime Supplier • who may choose to sub-contract but remains accountable IP rests with Supplier • You will keep all rights to your IPR, but DfT may require a royalty-free licence. However, if you create significant capability but do not choose to exploit it, DfT reserve the right to do so under licence. SBRI Key Features
  • 7. FOAK 2020 Eligibility • Open to all organisations. There is no limit on the size or type of company. • Open to companies from all sectors • Research organisations are eligible, however they must demonstrate a route to market, i.e., have a plan to commercialise the results before the contract is issued • Must carry out demonstration work in the UK • Must involve a railway asset owner (stations, rolling stock, infrastructure), an experienced rail organisation and a rail organisation that has the potential to become a customer (these can all be the same organisation) • Must work in partnership with organisations that have rail-sector expertise
  • 9. Information Required Section 1. Application Details Section 2. Details of Lead Applicant Organisation Section 3. Contact Details Section 4. Title and Abstract for Publication Section 5. Q1 : Description of Proposed Idea / Technology Section 6. Q2: Technical Project Summary Section 7. Q3: Current state of the art and intellectual property Section 8. Q4 :Project plan and methodology Section 9. Q5: Technical Team and Expertise Section 10. Q6: Application Finances Section 11. Q7: Commercial Potential Section 12. Q8: Application to the Rail Industry – Practicality Section 13. Q9: Application to the Rail Industry – Benefits Section 14. Declaration Application Form Appendices permitted Appendices permitted
  • 10. 1. Application • Please enter information solely on the project 2. Details of Lead Applicant Organisation 3. Contact Details 4. Title and Abstract for Publication • Please provide a brief, public facing description of the project. Should your project be successful, this information will be made public once the award is confirmed. Non-technical Questions
  • 11. 5. Description of Proposed Idea/Technology • Avoiding the use of unnecessary technical jargon, describe clearly how the proposed project will deliver the outcomes as described in the competition documentation. • You may submit 2 A4 pages of appendices for this question, such as an image or diagram 6. Technical Project Summary • Please provide a structured summary of the technical basis of the project. This should outline the background to the technology, including what the innovation is, and the key deliverables. This would typically involve highlighting the research and development that will prove the scientific and commercial merit of the project. Project-specific Questions
  • 12. Project-specific Questions 7. Current State of the Art and Intellectual Property (IP) Please provide details of any competing technologies / market alternatives and the relative benefits of the proposed technology. Include details of any existing IP and its significance to your freedom to operate. 8. Project Plan and Methodology Describe the project plan and detail the key project milestones and deliverables. Project Management • Identify the project management processes that will ensure milestones are achieved and describe key risks (in the categories of technical, commercial and environmental) and mitigation actions. • Provide a Gantt chart to support this section, in PDF format, maximum 2 A4 pages
  • 13. Project-specific Questions 9. Technical Team and Expertise • Provide a detailed description of the skills and expertise and track record of the team, including the relevant knowledge and skills of each member. • Outline the proportion of time each member will spend on the project. Relevant commercial and management expertise should also be included. Also include details of any sub-contractors and the expertise they bring to the project. 10. Application Finances Please provide a summary of costs for the project. All costs MUST include VAT (where applicable) • “Fair market value” • Profit not included
  • 14. Eligible Costs Direct costs: • Labour costs for all those contributing to the project, broken down by individual • Material Costs (including consumables specific to the project) • Capital Equipment Costs • Sub-contract costs • Travel and subsistence • Other costs specifically attributed to the project Indirect Costs: • General office and basic laboratory consumables • Library services/learning resources • Typing/secretarial • Finance, personnel, public relations and departmental services • Central and distributed computing • Cost of capital employed • Overheads
  • 15. Project-specific Questions 11. Commercial Potential • Please provide details of the clear commercial potential to lead to a marketable product, process or service and a clear plan to deliver that and route to market. • You will need to describe the significance of the competitive advantage which this technology affords over existing/alternate technologies that can meet the market needs.
  • 16. Project-specific Questions 12. Application to the Rail Industry – Practicality Please explain the application to the rail industry, in particular how this demonstration: • delivers a plausible innovation that has a good probability of being successfully exploited in the context of one or more railway systems operating in the UK • will deliver operational evidence, and an opportunity to assess public confidence and commercial incentives to help accelerate the commercialisation of this innovation in the rail industry? • will support rail staff in gaining an understanding of the need and impact of this innovation, and an opportunity to assess the whole system benefits and opportunities • will help open-up markets for this rail innovation based on evidence, technical data and intelligence gathered from the demonstrator experience?
  • 17. Project-specific Questions 13. Application to the Rail Industry – Benefits Please explain the application to the rail industry, in particular how this demonstration will: • deliver an opportunity for rail passengers to experience an enhancement in the experience of using the railway or for rail staff to experience an enhancement in the experience of operating the railway? • support SMEs and Tier 1 suppliers in demonstrating this rail innovation, with the potential to open-up new rail export opportunities for UK PLC? • provide an opportunity for media coverage and the reporting of an innovation success to help drive an increase in rail staff and rail customer experience and satisfaction levels? • help to provide evidence in relation to relevant regulations to show where they may impact on the delivery of railway innovations, and to help ensure that barriers and risks to commercialisation are evident and readily managed?
  • 18. The Final Question 14. Declarations • The lead applicant is expected to have discussed the application within their own company and any other body whose co-operation will be required to deliver the project. • The lead applicant will need to obtain consent from an authorised officer or appropriate signatory who will sign the contract if successful; we will provide a contract for review. The contract is a legally binding document and subject to the outcome of this competition.
  • 19. • Application Form (must not be converted to different format) • Appendices - font size no smaller than 10 (Arial) in PDF format o Q5 appendices - 2 A4 sides: pictures; diagrams; technical documents etc. o Q8 - Gantt Chart – 2 A4 sides • Applications must be complete o All mandatory information supplied to ensure eligibility Forms Required Applicants must have a letter of support from a rail organisation, but please do not submit these with your application. These will be requested as part of the assessment process.
  • 21. All applications are assessed by independent assessors drawn from industry and academia Each application will be reviewed by several assessors to provide an average score. Application Assessment What do the assessors look for? • Clear and concise answers • The right amount of information • not too much detail • no assumptions • Quantification and justification • That the applicant (team) has presented a viable opportunity for growth, a level of innovation that necessitates public sector investment and an appropriate team and approach to take it forward
  • 22. Application Scoring Assessment Criteria Weighting (points available) 1. How well does the proposed idea, solution or technology meet the challenge as detailed in the brief? 10 2. How valid is the technical approach that will be adopted? 10 3. Have the applicants made a good case for application of this idea, solution or technology to the rail industry? (See particularly questions 8 and 9 on the application form) 40 4. How innovative is this project? To what extent does the project develop or employ novel concepts, approaches, methodologies, tools or technologies for this area? 10 5. To what extent does the proposal show a clear plan for establishing technical and commercial feasibility and the development of a working prototype? How does the proposal demonstrate that there is a clear management plan What are the risks (technical, commercial and environmental) to project success? How effectively will these be managed? How appropriate are the milestones and evaluation procedures? 10 6. To what extent does the applicant appear to have the right skills, capabilities and experience to deliver the intended benefits? 10 7. How appropriate is the proposal financially? Is the overall budget realistic and justified in terms of the aims and methods proposed? Are the costs appropriate and justified? 10 8. Is there a clear commercial potential to lead to a marketable product, process or service and a clear plan to deliver that and route to market? How significant is the competitive advantage which this technology affords over existing or alternate technologies that can meet the market needs? 20
  • 23. Final Assessor Question Recommendation Recommended Would you recommend this project for funding and if not why not?
  • 25. The Application Submission Process Take your time, use all space providedCOMPLETE documents DOWNLOAD documents Don’t leave it to the last minute. Do it early!UPLOAD documents On date providedNOTIFICATION received Within 4 weeks of receiving your notificationFEEDBACK received REGISTER Via competition website Invitation to tender
  • 26. 1. If you intend to make an application, you must first REGISTER for the competition. (Remember: Registration ends 1 week prior to the competition close) 2. You will receive an email with your username and password along with a link to the secure upload area. This email will also contain your application form with unique application number. 3. For multiple projects: please contact the support team (support@innovateuk.gov.uk) after your first registration for additional unique application forms. REGISTER
  • 27. Public area Click Login to access the Secure area DOWNLOAD documents
  • 28. Check: your application number matches your login username number Naming a) Your documents should contain your unique application number (e.g. App12345.docx) b) Appendices begin with APPENDIX and supplied in PDF format. Format a) Application Form submitted as a Word file (.doc /.docx) Full stage only: b) Appendices submitted as PDF file COMPLETE documents
  • 29. Secure area Enter your login details and accept the T and Cs. Click the Login button at the bottom. Click Upload and follow the on-screen instructions. UPLOAD documents
  • 30. Notification will be received by email on or before the date stated in the timeline. For successful projects: • Financial project cost review and viability checks undertaken • Contracts will be issued approximately 4 weeks after notification • The Project may not start until the organisation has received and returned signed acceptance of Contract NOTIFICATION received
  • 31. Issued for both successful and unsuccessful applicants within 4 weeks of receiving your notification Word document Uploaded to your secure area Not issued via email FEEDBACK received
  • 32. Important Points • Applicants must fully complete the application form • Any size or type of organisation is eligible, providing a route to market is demonstrated • All contract values quoted include VAT • Fair Market Value • The contract terms and conditions are not negotiable
  • 33. 33